18 November 2014 To: From: Cc: All CM@R Attendees Julie Moran; Alan Sellers- WCU Michael Watson - WTS All Attendees, Lance Williams- Stewart Engineering, Jamey Baysinger – Stewart Engineering, Kat West & Micheal Smith – Energy Ace, Ron Almond – Optima, Reggie Daniel – Camacho. Meeting Minutes RE: Brown Building Renovation and Addition (A/P) CM@R PRESUBMITTAL MEETING Western Carolina University WTS# 1429 SCO # 13-10964-01 Date of Meeting CM@ R PRE-SUBMITTAL Meeting _Advanced Planning Time Location November 18, 2014 2:00 PM Harrill Hall Attendees Name Organization/Co. Julie Moran Alan Sellers Curtis Monteith Michael Watson WCU WCU WCU WTS Other Attendees See Attached Sign-In Sheet I. Julie Moran started the meeting off with a welcome to interested firms in attendance and discussed the importance of this project to the campus. “Total Project Budget” noted in the solicitation of $18.9M should read: “Construction Budget Including FF&E and Kitchen Equipment”. 2. Michael Watson reviewed the building program overall and presented slides of the Advance Planning documents: See also attached. Survey, existing floor plans and photos of existing conditions – exterior and interior. Concept Site Plan, Proposed building plans and massing drawings. Reviewed overall Project Schedule and noted CM@R would be instrumental to help mee t target completion date of August 2016, and ready for use in Fall Semester. It was noted that Sustainability goal is LEED Silver, minimum, and possibly LEED Gold. 1316 Washington Street, Columbia, 29201 803.799.5181 1307 Morehead St, Suite 101, Charlotte, 28208 704.749.5181 Meeting Minutes WCU, Brown Building Page 2 of 2 18 November 2014 3. Questions from Attendees. Q: Are there Haz Mat materials to be abated and will they be done by Owner or GC? A: Yes, by GC, Haz Mat Report will be posted on WCU website. This work could be an early package. Q: Has GeoTech investigation been done? A: No, will be done in SD’s. Q: Confirm Submittal Date? A: See Solicitation, Tuesday, Dec 2, 2014 at 2:00 PM. It was noted that FedX will not guarantee morning delivery to WCU Q: Does 20 page submittal limit exclude the cover letter, tabs and financial information? A: WCU confirmed that all required information should be inclusive within the 20 page limit requirement. Q: How many copies? A: three (3) hard copies and one (1) electronic copy. Q: Will there be new parking in the project? A: No, just what can be provided in the service areas. Q: Are there utilities to be relocated? A: Yes, several lines will be relocated. The existing steam lines are planned to remain in place. Q: What are HUB participation requirements? A: WCU endeavors to meet the 10% goal. Q: What are General Conditions items to be included in the CMR fee? A: These are detailed in the General Provisions, Section II E (page 3) posted on the WCU project website for the project. This information can also be found on the North Carolina State Construction Office website. 4. Other items noted or discussed: WCU and the A/E Team are looking at options for boiler plant expansion, either within the Brown building or and the existing CEP to be part of this project. WCU advised attendees that another construction project nearby Brown will be in progress during this project. A privatized mixed use facility will be constructed where the current retail strip is currently on Centennial Drive. Parking and laydown areas for construction has yet to be determined. WCU will work with the CMR to develop a plan. WCU will contract with a Commissioning Agent on this project. The short list of proposers is expected by mid-December. Interviews will be held after the New Year. Selection of the CM@R will be around mid-January. The WCU Board of Trustees will make the final selection. On the site visit following the meeting, it was noted that vehicle access to Buchannan Residence Hall service area must be maintained during the course of this project. End of Minutes 1307 Morehead St, Suite 101, Charlotte, 28208 704.749.5181 3 2 $ &/ 32 $ 6: 7 (7 ($ 6 : &/ *8 3 36 ((&6 7 (3 36 $V SK DOW 332 2$ 3 &0 (& /3 6: *8 3 36 6 : 32$ 32 $ 36 36 3 36 *8 6: 3 6 ($ 36 36 36 $ 32 36 36 $ 32 36 $ 32 36 $ 32 36 6: 6: 60 0 (( /( 6 : ($ (& & 36 36 6: 36 6: *8 60 0 & 2 6: 36 $ 36 32 &/ 0 6 : ($ 36 ($ /3 366 32 $ 332 2$ 5: : 5: (( (($ $ &. 6: ((&& % 5 $V SK DOW 6 : 36 36 6: 36 Q , RS 'U 5LP ,Q % 5, 6: 6: 6: 36 ( 32 $ $ 6 : ($ ($ 36 $V SK DOW %2 ' 6: 32 36 // $5 6: ($ ( & 3 0 & Y ,Q (& DON HZ 6LG ( $ & *8 %& / *8%%%& 36 ($ 3 6 6 : 6: 6: *1 6: ( $ ($ 3 6 6: 6: 36 36 ((& 3 %/ 6 *1 *1 %/ 36 &&/ *1 V DV *U $ *1 36 *1 $ 32 3 6 36 36 &/ *1 : $ 36 ($ 36 9 // $ ($ (& 36 3 6 *1 ($ ($ ($ // : $ $V SK DOW 36 32 & ( $ ($ ( & 32 6: 6: $ 36 : $ : // % $ // . % . 6: 6: ( $ (& : $ :: // %% $$ //// . % . 6: 36 1 $V SK DOW ($ KD OW $8 /7 9 ( )) )) (& 6: *1 6: *1 67 (3 % // : $ G RR JZ 'R / 22 *1 2* : ' *1 %/ *1 DN 2 332 2 *1 KC VGT HG 6LGHZDON &/ 6: 6 : 77 (/ 60 0 32 $ 6: *8 ($ 6: 6: LGHZDON 3 / 6: 6: 2 %C %/ ' %/ ((&& ))% % ' *1 *1 (( && : : : ((& $&&/// $/ $ ///// :)) )$ $/ %%/// 6: 6: *1 6: 6: &/ *1 6: V DV *U P &0 3 36 *8 6: 36 *1 *1 &/ 3 36 *1 *1 (& ( )) &/ 32 & 6: 6: 60 0 55 ,0 ( & 6: 6: ( & 32 & 3 36 *1 *1 *1 1 / *1 *1 4 3 36 *1 *1 32 *1 6: 6: *8 QY $T 3 N HZDO 6LG : 6: 6 6: 6: 1( 75 6: 6: : DO ( )) N ORF HP + ( )) & 0 3 $V 3 2 $ . *1 *1 H 6LGHZ KD OW 7 6: *1 6: 7 $V SK DOW DGLQJ 'RFN ZDON WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal $V S 6 8 D.1.a ARCHITECTURAL NARRATIVE - EXISTING CONDITIONS - SITE PLAN 3 &0 OH KR DQ 0 U ZH 6H 5LP Y ,Q 9 10 6 &0 13 November 2014 6LG HZ DON EXISTING SITE PLAN 6LG 5 6 1. Driveway & retaining walls at East side of building 2. Pedestrian walkways near Dining Hall main entrance 3. Loading Dock truck access 4. Site looking back at Dining Hall main entrance 5. Stair & retaining walls at Southeast side of breezeway 6. Retaining wall at Northeast side of breezeway 7. Breezeway 8. Retaining / parking wall at Southwest side of building 9. Retaining / parking wall at Southwest side of building 10. Retaining wall / stair at Southwest side of building looking away from building D.1.a ARCHITECTURAL NARRATIVE - EXISTING CONDITIONS - SITE PHOTOGRAPHS WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 EXISTING LEVEL 1 PLAN < = 3 < = 6LGHZDON 6 DN L N D *U DN 2 VV + OR HP R JZ RG 6 OH DS 0 OH KR 6 OH KR DQ 0 U ZH 6H P 5L Y ,Q $V SK D OW 6LGH ZDON DON 6LG HZ 83 3 OW D *U VV 6 6LGHZDON D *U VV R ' 6 OH KR 6LGH 83 RG W OH ,Q R JZ OW D *U $V SK D VV ZDON 2 DN FK &R QF UH WH V 67 2 6LGHZD &R QF UH WH OW 'R RG 7 R JZ ER ATT O EN W OH ,Q RS ' U P 5L Y ,Q & G W OH ,Q RS 'U P 5L Y ,Q ( 1 N W OH ,Q RS ' U P 5L Y ,Q $V SK D $V SK D 6LGHZDON R $V SK D W OH ,Q RS 'U P 5L Y ,Q GREASE INTERCEPTOR 17' X6' X6' OW )) * ( R M E TR A AN SF O R D *U VV < = )) ( = 5 HED U (O HY 6 NV RF PO +H ( $V SK D $V SK D ZDON 2 OW WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal VV D.1.a ARCHITECTURAL NARRATIVE - EXISTING CONDITIONS - BUILDING SKIN - LEVEL 1 PLAN D *U 6L GH Z 13 November 2014 G HD OH KR DQ 0 U ZH 6H P 5L Y ,Q DN 6LGHZDON OH KR Q D ' LV 6 6LGHZDON &0 3 0 3 / 3 / D *U 83 'U 5L RS ,Q P Y H 6LG LU % 3 OW OW 1. Mary Mitchel Room exterior entrance 3. Dining Hall / C-Store main entrance D.1.a ARCHITECTURAL NARRATIVE - EXISTING CONDITIONS - BUILDING SKIN - LEVEL 1 PHOTOGRAPHS WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 2. Student Activity Space exterior entrance EXISTING GROUND LEVEL PLAN 6LGHZDON DN < = 2 OH KR DQ 0 QY DN 2 OH KR DQ 0 U ZH 6H P 5 L Y ,Q DN V DV *U 2 / G RR JZ 'R O DS 0 DN 2 W OH ,Q Y ,Q &29(5('7(55$&( G RR JZ 'R G RR JZ 'R W OH ,Q RS 'U P 5 L Y ,Q 6LGH ZDON D *U V DV *U ON HZD 6LG % 83 'U 5L RS , ,Q P QOH Y W K LUF &R QF UH WH 0 67 3 / 3 / V DV *U &R QF UH WH 81(;&$9$7(' O KR DQ H 2 DN W OH ,Q S UR P 5 L Y ,Q 6LG 67 ( 'RJZRRG $V SK DOW 6LGHZDON W OH ,Q S UR ' P L 5 Y Q , ( )) VV UD 4 67 &R QF UH WH G RR JZ 'R 81(;&$9$7(' $V SK DOW W OH ,Q RS 'U P 5 L Y ,Q & 81(;&$9$7(' /2$',1* '2&. W OH ,Q RS 'U P 5 L Y ,Q ' OH KR DQ 0 U ZH 6H P 5 L Y ,Q DN 2 6LGHZDON &R QF UH WH $V SK DOW V DV *U = < NV RF PO +H ( )) R PO +H V FN $V SK DOW 6LGHZDON 6L *U 13 November 2014 V DV *U D.1.a ARCHITECTURAL NARRATIVE - EXISTING CONDITIONS - BUILDING SKIN - GROUND LEVEL PLAN WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal $V SK DOW < = P +H 81(;&$9$7(' 81(;&$9$7(' FN OR ( )) 81(;&$9$7(' 6H W I RU & RQ W LV DG 'H 6 6LGHZDON 3 O DS 0 6 6 7 6LGHZDON $V SK DOW 5 ZDON $V SK DOW 6LGH DON 6LGHZ OH KR DQ 0 U ZH 6H P 5 L Y ,Q 6 G RR JZ 'R 9 3 9& QY 4. Loading Dock 5. Southwest facade 6. West facade 7. Breezeway near Stair 2 D.1.a ARCHITECTURAL NARRATIVE - EXISTING CONDITIONS - BUILDING SKIN - GROUND LEVEL PHOTOGRAPHS WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 EXISTING LEVEL 1 PLAN < = 3 < = 6LGHZDON 6 DN L N D *U DN 2 VV + OR HP R JZ RG 6 OH KR 6 OH KR DQ 0 U ZH 6H P 5L Y ,Q $V SK D OW 6LGH ZDON DON 6LG HZ 83 STAIR AIR R2 OH DS 0 3 OW D *U VV 6 6LGHZDON D *U VV W M R JZ STORAGE RG W OH ,Q BAKERY ROOM D Y DIARY R ' 6 REF/ STOR OH KR 6LGH 83 OW D *U $V SK D ( R ' RG W OH OW R ,Q RS 'U P 5L Y ,Q 1 CIRC ( STOR S R STOR )) = NV RF PO +H MARY MITCHEL ROOM VV CIRC STUDENT ACTIVITY SPACE D *U < = STOR CIRC ( STOR )) * R M E ( $V SK D ZDON OW WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal VV D.1.a ARCHITECTURAL NARRATIVE - EXISTING CONDITIONS - BUILDING INTERIOR - LEVEL 1 PLAN D *U 6L GH ZD 13 November 2014 $V SK D 6LGHZDON GREASE INTERCEPTOR 17' X6' X6' $V SK D 7 R JZ W OH ,Q RS ' U P 5L Y ,Q & STOR OFF $V SK D 5 HED U (O HY 6 6 W OH ,Q RS ' U P 5L Y ,Q W OH ,Q RS ' U P 5L Y ,Q R TR A AN SF O G HD OH KR DQ 0 U ZH 6H P 5L Y ,Q 6LGHZDON DN DN 5 &R QF UH WH C-STORE REST RE EST ER ATT O 2 6LGHZDON 4 N EN 2 JAN 6 G 0 3 / 67 7 STAIR AIR AI R1 2 OH KR DQ ' LV 6LGHZD OFF OW VV 8 KIT $V SK D DINING ROOM 3 / V REF/ STOR ZDON FK D *U &0 3 SERV. LINE KITCHEN &R QF UH WH LOBBY H 6LG LU % 83 'U 5L RS ,Q P Y 3 REF/ E STOR TO O OW OW 2. Lobby - looking at Dining Space entry 4. Dining Space 5. Serving Line Area 1. Student Activity Space 3. Lobby - looking at C-Store 7. Kitchen .LWFKHQORRNLQJDW2I¿FHZDOO D.1.a ARCHITECTURAL NARRATIVE - EXISTING CONDITIONS - BUILDING INTERIOR - LEVEL 1 PHOTOGRAPHS WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 6. Stair 1 9. Circulation - looking at restroom entry 10. Circulation - looking at Dish Washing / Storage entry 11. Dish Washing / Storage D.1.a ARCHITECTURAL NARRATIVE - EXISTING CONDITIONS - BUILDING INTERIOR - GROUND LEVEL PHOTOGRAPHS WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 12. Bulk Storage LEVEL 1 - DEMOLITION DIAGRAM REPAIR ENVELOPE, REPLACE/RE-WORK WINDOWS AND DOORS ACCESS. REPAIR ENVELOPE, DEMO PARTS OF WALLS FOR MORE SIGNIFICANT GLAZING OPPORUNITITES REPAIR WALL FOR ANY STRUCTURAL DAMAGE, CUT NEW OPENINGS (LARGE) IN WALL FOR COMMUNICATION BETWEEN NEW AND EXISTING REMOVE INTERIOR ELEMENTS (ALL) MINOR DEMO (FINISHES, HANDRAIL REPAIR, ELEVATOR UPDATE, NEW MECHANCAL OPENINGS) REMOVE EX. SLAB, EXCAVATE FOR NEW BOILER ROOM (4'-0") AND REMOVE STAIR AND OPENING. REF/STOR. R RESTROOM 19 SF RESTROOM 19 SF STORAGE S STO TO ORA ORA RA AG GE 0' 4' 8' STORAGE STO TO ORAG ORAG AG GE GE 470 4 70 70 SF SF LEVEL 1 PLAN CIRC CIRCULATION C IRC RCU ULA LATION LATIO 66 6 SF F 1/8" = 1'-0" 16' 32' D.1.a ARCHITECTURAL NARRATIVE - DEMOLITION DIAGRAMS - LEVEL 1 WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 N 1 A-2.0 GROUND LEVEL - DEMOLITION DIAGRAM STORAGE CAN WASH 422 SF UNEXCAVATED ELEV EL ELEVATOR EVA REPAIR ENVELOPE, REPLACE/RE-WORK WINDOWS AND DOORS ACCESS. REPAIR ENVELOPE, DEMO PARTS OF WALLS FOR MORE SIGNIFICANT GLAZING OPPORUNITITES LOADING DOCK UNEXCAVATED UNEXCAVATED REPAIR WALL FOR ANY STRUCTURAL DAMAGE, CUT NEW OPENINGS (LARGE) IN WALL FOR COMMUNICATION BETWEEN NEW AND EXISTING MECHANICAL ANIC AN ANIC CA C CAL AL REMOVE INTERIOR ELEMENTS (ALL) UNEXCAVATED UNEXCAVATED MINOR DEMO (FINISHES, HANDRAIL REPAIR, UNEXCAVATED ELEVATOR UPDATE, NEW MECHANCAL OPENINGS) REMOVE EX. SLAB, EXCAVATE FOR NEW BOILER ROOM (4'-0") AND REMOVE STAIR AND OPENING. 1 A-1.0 GROUND LEVEL PLAN 1/8" = 1'-0" D.1.a ARCHITECTURAL NARRATIVE - DEMOLITION DIAGRAMS - GROUND LEVEL WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 D.1.c.ii DESIGN NARRATIVES - MEP - BOILER PLANT - PRELIMINARY UTILITY PLAN WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 D.4 PRE-DESIGN PRECEDENTS WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 SITE SURVEY D.4 PRE-DESIGN DRAWINGS - SITE SURVEY WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 . = Si de wa lk 24 ak "O Sidewalk E P. L. N le ho an M .16 r 8 6 we 22 .8 Se m 2 216 Ri v. 2 In ol tr on r C 3' fo .93 5' 4 e t 80 l S 941 07.0 12 ai N = 5 43 40. 75 22 .= ev El S 2225 ak ak "O s as Gr 8" ak "O 26 ST ak "O IP "C 10 Si de wa lk "H 24 lk ewa Sid 6" Si de wa lk ck lo em s as Gr ry er Ch "M 18 od le ap le ap "M 26 ak "O 3' - 7 3/8" 35' - 1 11/16" Sidewalk 32 As ph alt 22 15 RA EXISTING LOADING DOCK TO REMAIN ak "O NEW GENERATOR NE 40 E "D 18 G ck lo em "H 18 od R ST o gw Do UPP. T. M E ak "O 8" C TR AN SF O R NEW TRANSFORMER NEW PRECAST CONC. STEPS ST E NEW SITE WALL As ph alt on m m si er "P 14 30 P. L. Si de wa lk ck lo em "H 19 C NEW SITE WALL As ph alt Sidewalk 3 .6 11 .83 22 05 2 m Ri v. 2 In WATER FIRE WATER FEATURE FEATUREFEATURE As ph alt P. L. S ak "O EXISTING SWITCH 20 22 P. L. ST 39 P is P. L. NEW PRECAST CONC. STEPS EXISTING SWITCH e ol h an M ck lo em "H 18 37' - 2 3/4" ad De 25 22 GRAVEL/GROUND COVER ak "O ak "O PAVERS P. L. s as Gr CM 28 40 DN PLANTER 22 30 90 21 UP T 24" CMP 24 " LINE OF ROOF ABOVE PRECAST CONC. ENTRY STEPS ck lo em PRECAST CONC. ak "O 2197.33 156STEPS .71° Dr Ri op I In m 2 nle 1 v. t 21 76.6 72 1 .18 22 35 ENTRY LINE OF ROOF ABOVE s as Gr As 1 ph NEW GREASE alt INCEPTOR e bl ou TO R 2 H GREASE INTERCEPTOR 17'X6'X6' 3 ck lo em 4 5 7 8 Si de wa lk 9 s as Gr s as Gr 6 s as Gr CATERING PARKING 10 11 12 14 15 16 C 17 21 85 18 19 20 22 23 24 ks 27 28 30 31 32 24' - 0" 30' - 0 7/8" 31' - 4 7/8" e ck in lo "P em 22 "H 13 e in "P 26 s as Gr P. L. 20 22 e Pin l. Db 7" od le ap "M 20 e Pin 20 " 15 00 22 e uc pr "S P. L. e in "P 26 As ph alt 2220 05 22 Old Ste ps s as Gr " 18 As ph alt 10 22 o gw Do P As ph alt NEW SITE WALL lk ewa S id " 18 Si de wa lk s as Gr e uc pr "S 21 UP V W 22 15 8" 6" od r la op H d oo gw Do d. ua "H 10 ly ol s as Gr e in "P 30 ly ol le ap "M 20 "M 19 P. T. le ap "M 25 221 0 lk wa de Si V W le ap Si de wa lk .P bl "D 22 6" Q s as Gr UP.P. L o gw Do s as Gr 7" o gw Do le ap s as Gr le ap M S e in "P 28 s as Gr e pl ri od As ph alt e in "P 34 "T 18 "M 12 35 22 s ep St P CM 24 "C M s as Gr ld e in "P 27 O s as Gr " 15 Ca Ri tch In m 2 Bas 1 v. i 21 86.7 n 4 30 22 e in "P 28 s as Gr s as Gr 80 21 Dr Ri op I In m 2 nle 1 v. t 21 86.9 83 0 .4 6 . .P e in "P 26 SITE WALL AND GREEN SCREEN L 25 22 18 e in "P P 52 M 5. " C 20 10 v . 2 In 21 85 lk wa de Si ck lo em 24 "C M P Si de wa lk ILL ER s as Gr e in "P 20 k oc ml He t 7 le In 9.2 5 op 20 6.9 Dr m 2 20 Ri v. 2 In 8" CH As ph alt "H 28 E " 11 ck lo em H " 14 As ph alt le ap "M 20 2190 e in "P 26 k oc ml He ak "O C 14 k loc em H " 36 195 ck lo em H " 11 PAVERS CO TR M AS PA H CT D OR U M PS TE R e in "P 36 ck lo em H " 16 s as Gr 34' - 5 3/8" ak "O 52' TRAILER P. L. T s as Gr k oc ml He " 13 2 52' TRAILER 30 22 00 RAMP 1:12 P. L. SITE WALL 22 0 AND GREEN 5 SCREEN s as Gr 23' - 0" s as Gr D Dr Ri op I In m 2 nle 1 v. t 21 83.3 80 9 .3 8 P. L. 75 21 6" od wo og ks loc em H " s as Gr 10 3- As ph alt Si de wa lk 9 P .7 VC 92 8" v. 21 n I CATERING PARKING LOADING DOCK ks loc em H " 33 10 3- 21 80 NEW SITE WALL UNDERGROU ND FUEL TANK 29 As ph alt l 26 8 2- loc em "H 25 9 N k loc em H " 21 V W V W 5/ 8" R = 59 eba = El 75 39 r S ev 2 3 . = 92 8.9 et f 21 8.5 67 or Co 79 8 ' nt .4 0 ' 6 ro E 13 V W 21 90 15' - 4 15/16" 30 "C M P 36 S PRECAST CONC. BENCH Si de wa lk 22 40 P. L. PLANTER "H 32 V W ak "O BENCH 22 45 ak "O 34 od ENTRY 36 lk ewa Sid o gw Do ENTRY PRECAST CONC. 8" 2210.00 Side walk s as Gr PRECAST CONC. BENCH 54' - 10" 2180.33 225 0 s as Gr GRASS 8" SLO PE 1:2 0 P. L. ck lo em "H e 18 in "P 16 e in "P 26 5 219 20 30 = As ph alt P. L. 48 l op "P As ph alt a 220 V W 1 lk wa de Si 2220 e Dr Ri op I In m 2 nle 1 v. t 21 98.8 93 7 .7 7 s as Gr lin er at "W 10 l 18 "C M P e uc pr "S E Dr Ri op I In m 2 nle 1 v. t 21 98.8 93 0 .7 0 15 2 2 s as Gr N ro nt Co r fo t Se 70' r ba 2.0 9' Re 7 09 ' 36 78. .35 8" 9 5/ = 5 542 192 2 7 .= ev El lk ewa Sid P V W s as Gr s as Gr 85 21 24 "C M Si de wa lk e uc pr "S As ph alt 2210 21 90 2205 As ph alt UP 6" W at er lin e 12" Wa ter line S ENTRY PRECAST CONC. BENCH PRECAST CONC. BENCH ck lo em 6" o gw Do le ho an 1 7 3 1 alk Sidew P. L. 7" M "H 22 s as Gr od UE AQ PL P. L. o gw Do r PAVERS 205 e in "P 28 e in "P 30 e in "P 38 s as Gr s as Gr le ho an 5 M r 8.1 0 .6 we 21 Se m 2 208 Ri v. 2 In ak "O S 6" ak 26 s as Gr "O 14 2215 V W 36 e in "P 24 ak "O ck lo em "H 14 e in "P 38 36 2220 "O 14 36 ck lo em "H 14 Si de wa lk e in "P 30 s as Gr 2230 35 ak "O V W ak "O s as Gr ly ol 2195 alk Sidew 2"2 8 24 34 H ALTERNATE LOCATION FOR THE C-STORE 2245 = 6" 2200 PLANTER As ph alt 2240 E s as Gr ry ko ic "H 12 l ro nt Co 5' r fo .70 7' et 205 .99 ' 6 lS 9 ai 594 03 2.6 N 4 1 = 75 22 .= ev El N P. L. P. L. 5 219 2205 0 le ho an M .89 r 7 4 we 23 7.2 Se m 2 22 Ri v. 2 In S s as Gr ish Sat. D p um St e in "P 36 ak s as Gr 2210 P. L. ak "O le ap 40 "M 18 P. L. "O 18 Sidewalk P. L. 22 00 P. L. P. L. alk Sidew SITE PLAN WCU BROWN BUILDING RENOVATION NOVEMBER 7, 2014 0' 10' 20' 40' 80' STORAGE 97 SF WOMENS MENS 64 SF 64 SF CSTORE 900 SF 2180.33 UP 2180.33 2180.33 EXISTING BUILDING FOOTPRINT WITHIN DASHED LINE LOWER LOBBY 812 SF ELEV. MACHINE ROOM ELEV. 1 93 SF 72 SF 1 A-1.2 LOWER GROUND LEVEL 1/8" = 1'-0" LOWER GROUND LEVEL 2,547 GSF LEVEL 1 PLAN - PROPOSED WCU BROWN BUILDING RENOVATION NOVEMBER 7, 2014 0' 4' 8' 16' 32' DIR FACILITIES SERV DIR RES LIVING 209 SF DIR RES LIFE DIR. OF OPS 209 SF 209 SF MED CONF ROOM ASST. DIR RES LIFE ASST. DIR RES LIFE FIN TRANS MGR 120 SF 120 SF 120 SF 209 SF 225 SF BREAK 300 SF CIRCULATION BOILERS 2795 SF 1345 SF DIR. OF CAMPUS SERV DIR. FOOD SERV 253 SF 146 SF HR 120 SF MENS 111 SF ASST VC FOR CAMPUS SERV CATERING SUITE DIR. CONF SERV STORAGE 258 SF 338 SF ASST. DIR FACILITIES SERV 120 SF 197 SF WOMENS 47 SF ASST. DIR ACADEMIC INITIATIVES OPS ASSIST ASST. DIR OPS 120 SF 120 SF 120 SF ROOM ASSIGN ROOM ASSIGN GROWTH 120 SF 120 SF 120 SF 111 SF RA FILE 128 SF DN UP 2180.33 OPEN LOBBY NEW SLAB 4' BELOW EXISTING GROUND FLOOR ELEVATION 161 SF EXISTING BUILDING FOOTPRINT WITHIN DASHED LINE 2197.33 1049 SF WAIT 205 SF COPY/SUPPLY 231 SF 2193.33 DATA CLOSET 83 SF MED CONF ELEV. 1 93 SF 2197.33 2190.53 159 SF MECH 839 SF RECEPTION WAIT 565 SF 138 SF CIRC 1139 SF LARGE CONF ELEC 113 SF 630 SF UNEXCAVATED ASSOC DIR DRUG/ALCOHOL COMMUNITY EDUC ETHICS 126 SF PLANTER DIR COMMUNITY ETHICS 262 SF 134 SF WORK/SUPPORT STAFF AREA 70 SF MECH/ELEC./STOR. 1129 SF MED CONF UNEXCAVATED 154 SF ASST. DIR COMMUNITY ETHICS STORAGE 88 SF 155 SF STORAGE 71 SF SERVICE CORRIDOR 2077 SF ELEV. 2 51 SF UNEXCAVATED ELEC. 746 SF UNEXCAVATED UNEXCAVATED UNEXCAVATED GROUND LEVEL 22,322 GSF LEVEL 2 PLAN - PROPOSED WCU BROWN BUILDING RENOVATION NOVEMBER 7, 2014 0' 4' 8' 16' 32' ALTERNATE LOCATION FOR THE C-STORE MENS 151 SF VENUE 3175 SF WOMENS 141 SF DINING ROOM 1751 SF ROOF TERRACE 3164 SF STARBUCKS 1011 SF FIRE PLACE OPEN OPEN DN CIRCULATION 2342 SF EXISTING BUILDING FOOTPRINT WITHIN DASHED LINE VESTIBULE 357 SF 2210.00 ELEV. 1 93 SF MENS 279 SF DINING 2342 SF WOMENS 262 SF DINING 3891 SF STORAGE 273 SF POT/WARE WASH 383 SF CHILIS 2234 SF TRAY RETURN 450 SF WATER FEATURE DISHWASHING 665 SF FIRE FEATURE WATER FEATURE SERVERY 2210 SF ELEV. 2 51 SF LOWER LEVEL MENS 105 SF 2,547 GSF GROUND LEVEL 22,322 GSF LEVEL 1 33,866 GSF TOTAL 58,735 GSF OFFICE 211 SF WOMENS 105 SF PREP 944 SF RECEIVING 506 SF CATERING 1007 SF RECEIVING 447 SF KITCHEN 2004 SF REF 196 SF RECEIVING 314 SF RECYCLE 113 SF CAN 107 SF DRY STORAGE 348 SF REFRIGERATION 490 SF LOADING DOCK LEVEL 3 PLAN - PROPOSED WCU BROWN BUILDING RENOVATION NOVEMBER 7, 2014 0' 4' 8' 16' 32' %52:15(129$7,21:&8 ,' 7DVN1DPH 'XUDWLRQ 6WDUW )LQLVK 3UHGHFHVVRUV ĚǀĂŶĐĞĚ WůĂŶŶŝŶŐ ϱϳ ĚĂLJƐ &ƌŝϵͬϭϵͬϭϰ &ƌŝϭϮͬϱͬϭϰ <ŝĐŬͲŽĨĨ DĞĞƚŝŶŐ ϭĚĂLJ &ƌŝϵͬϭϵͬϭϰ &ƌŝϵͬϭϵͬϭϰ ŽŶĐĞƉƚƐͬ WƌĞĐĞĚŶĞƚ DĞĞƚŝŶŐ ϭĚĂLJ dƵĞϵͬϯϬͬϭϰ dƵĞϵͬϯϬͬϭϰ DWͬ^ƚƌƵĐƚƵƌĂů ϱĚĂLJƐ DŽŶ ^LJƐƚĞŵƐZĞǀŝĞǁ ϭϬͬϲͬϭϰ &ƌŝϭϬͬϭϳͬϭϰ ϯ&^ͲϮĚĂLJƐ DĂƐƐŝŶŐΘWůĂŶ ϭϯĚĂLJƐ tĞĚ ƐƚƵĚŝĞƐ ϭϬͬϭͬϭϰ &ƌŝϭϬͬϭϳͬϭϰ ϯ >Θ ^ƵƐƚĂŝŶĂďŝůŝƚLJ tŽƌŬƐŚŽƉ &ŝŶĂůŽŶĐĞƉƚƐ ϭϬĚĂLJƐ DŽŶϭϬͬϮϬͬϭ&ƌŝϭϬͬϯϭͬϭϰ ϱ &ŝŶĂů WƌĞƐĞŶƚĂƚŝŽŶ ϭĚĂLJ ^ŝƚĞ^ƵƌǀĞLJ ϮϯĚĂLJƐ DŽŶϵͬϮϮͬϭϰtĞĚϭϬͬϮϮͬϭ ŽƐƚƐƚŝŵĂƚĞ ϵĚĂLJƐ tĞĚ ϭϬͬϮϵͬϭϰ &ƌŝϭϭͬϳͬϭϰ ϳ&^ͲϱĚĂLJƐ ^KͬKǁŶĞƌ ZĞǀŝĞǁ ϭϬĚĂLJƐ DŽŶ ϭϭͬϭϬͬϭϰ &ƌŝϭϭͬϮϭͬϭϰ ϴ ͬŽŶƚƌĂĐƚ ϮϬĚĂLJƐ DŽŶϭϭͬϭϬͬϭ&ƌŝϭϮͬϱͬϭϰ ϭϬ S 2FW 1RY 'HF -DQ )HE 0DU $SU 0D\ -XQ -XO $XJ 6HS 6WHZDUW2SWLPD dŚƵ ϭϬͬϭϲͬϭϰ &ƌŝϭϭͬϳͬϭϰ &ƌŝϭϭͬϳͬϭϰ ϳ&^нϱĚĂLJƐ DΛZŝƐŬ ^ĞůĞĐƚŝŽŶ ϱϲ ^ƵŶϭϭͬϮͬϭϰ &ƌŝϭͬϭϲͬϭϱ ĚĂLJƐ͍ ^ΖƐ ϰϯĚĂLJƐ DŽŶϭϭͬϮϰͬϭtĞĚϭͬϮϭͬϭϱ ΖƐ ϲϭĚĂLJƐ dŚƵϭͬϭϱͬϭϱ dŚƵϰͬϵͬϭϱ ΖƐ ϴϯĚĂLJƐ &ƌŝϰͬϭϬͬϭϱ dƵĞϴͬϰͬϭϱ ĂƌůLJ^ŝƚĞWĂĐŬĂŐĞ ϳϯĚĂLJƐ DŽŶϱͬϭϭͬϭϱtĞĚϴͬϭϵͬϭϱ ŝĚĚŝŶŐƵŝůĚŝŶŐ ϯϱ tĞĚϴͬϱͬϭϱ dƵĞϵͬϮϮͬϭϱ ϯϵ ĚĂLJƐ͍ ŽŶƐƚƌƵĐƚŝŽŶ 2ZQHU 55XWKHUIRUG ϯϰϭĚĂLJtĞĚϵͬϮϯͬϭϱtĞĚϭͬϭϭͬϭϳ 3URMHFW)LUVW/DXQFK 'DWH)UL 7DVN 3URMHFW6XPPDU\ 0DQXDO7DVN 6WDUWRQO\ 'HDGOLQH 6SOLW ,QDFWLYH7DVN 'XUDWLRQRQO\ )LQLVKRQO\ 3URJUHVV 0LOHVWRQH ,QDFWLYH0LOHVWRQH 0DQXDO6XPPDU\5ROOXS ([WHUQDO7DVNV 0DQXDO3URJUHVV 6XPPDU\ ,QDFWLYH6XPPDU\ 0DQXDO6XPPDU\ ([WHUQDO0LOHVWRQH :76 E PRELIMINARY PROJECT SCHEDULE WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 3DJH %52:15(129$7,21:&8 ,' 7DVN1DPH 'XUDWLRQ 6WDUW )LQLVK ĚǀĂŶĐĞĚ WůĂŶŶŝŶŐ ϱϳ ĚĂLJƐ DΛZŝƐŬ ^ĞůĞĐƚŝŽŶ ϱϲ ^ƵŶϭϭͬϮͬϭϰ &ƌŝϭͬϭϲͬϭϱ ĚĂLJƐ͍ 3UHGHFHVVRUV S 2FW 1RY 'HF -DQ )HE 0DU $SU 0D\ -XQ -XO $XJ 6HS 2FW &ƌŝϵͬϭϵͬϭϰ &ƌŝϭϮͬϱͬϭϰ ĚǀĞƌƚŝƐĞ WƌĞͲ^ƵďŵŝƚƚĂů ϭĚĂLJ͍ dƵĞ DĞĞƚŝŶŐ ϭϭͬϭϴͬϭϰ ^ƵďŵŝƚƚĂůƐƵĞ ϬĚĂLJƐ dƵĞϭϮͬϮͬϭϰ dƵĞϭϮͬϮͬϭϰ ϭϱ ^ŚŽƌƚ>ŝƐƚ ϬĚĂLJƐ dƵĞϭϮͬϵͬϭϰ dƵĞϭϮͬϵͬϭϰ ϭϲ /ŶƚĞƌǀŝĞǁƐ ϮĚĂLJƐ tĞĚϭϮͬϭϳͬϭdŚƵϭϮͬϭϴͬϭϰϭϳ ^ĞůĞĐƚŝŽŶ ϱĚĂLJƐ DŽŶϭͬϱͬϭϱ &ƌŝϭͬϵͬϭϱ ŽŶƚƌĂĐƚǁĂƌĚ ϱĚĂLJƐ DŽŶ WƌĞͲŽŶ ϭͬϭϮͬϭϱ ^ĞƌǀŝĐĞƐ 2ZQHU ϭϱĚĂLJƐ ^ƵŶϭϭͬϮͬϭϰ dŚƵϭϭͬϮϬͬϭϰ dƵĞ ϭϭͬϭϴͬϭϰ ϭϰ&^ͲϭϱĚĂLJƐ ϭϴ &ƌŝϭͬϭϲͬϭϱ ϭϵ ^ΖƐ ϰϯĚĂLJƐ DŽŶϭϭͬϮϰͬϭtĞĚϭͬϮϭͬϭϱ ΖƐ ϲϭĚĂLJƐ dŚƵϭͬϭϱͬϭϱ dŚƵϰͬϵͬϭϱ ΖƐ ϴϯĚĂLJƐ &ƌŝϰͬϭϬͬϭϱ dƵĞϴͬϰͬϭϱ ĂƌůLJ^ŝƚĞWĂĐŬĂŐĞ ϳϯĚĂLJƐ DŽŶϱͬϭϭͬϭϱtĞĚϴͬϭϵͬϭϱ ŝĚĚŝŶŐƵŝůĚŝŶŐ ϯϱ tĞĚϴͬϱͬϭϱ dƵĞϵͬϮϮͬϭϱ ϯϵ ĚĂLJƐ͍ ŽŶƐƚƌƵĐƚŝŽŶ ϯϰϭĚĂLJtĞĚϵͬϮϯͬϭϱtĞĚϭͬϭϭͬϭϳ 3URMHFW)LUVW/DXQFK 'DWH)UL 7DVN 3URMHFW6XPPDU\ 0DQXDO7DVN 6WDUWRQO\ 'HDGOLQH 6SOLW ,QDFWLYH7DVN 'XUDWLRQRQO\ )LQLVKRQO\ 3URJUHVV 0LOHVWRQH ,QDFWLYH0LOHVWRQH 0DQXDO6XPPDU\5ROOXS ([WHUQDO7DVNV 0DQXDO3URJUHVV 6XPPDU\ ,QDFWLYH6XPPDU\ 0DQXDO6XPPDU\ ([WHUQDO0LOHVWRQH :76 E PRELIMINARY PROJECT SCHEDULE WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 3DJH %52:15(129$7,21:&8 ,' 7DVN1DPH 'XUDWLRQ 6WDUW )LQLVK 3UHGHFHVVRUV ĚǀĂŶĐĞĚ WůĂŶŶŝŶŐ ϱϳ ĚĂLJƐ DΛZŝƐŬ ^ĞůĞĐƚŝŽŶ ϱϲ ^ƵŶϭϭͬϮͬϭϰ &ƌŝϭͬϭϲͬϭϱ ĚĂLJƐ͍ ^ΖƐ ϰϯĚĂLJƐ DŽŶϭϭͬϮϰͬϭtĞĚϭͬϮϭͬϭϱ S 2FW 1RY 'HF -DQ )HE 0DU $SU 0D\ -XQ -XO $XJ 6HS 2FW &ƌŝϵͬϭϵͬϭϰ &ƌŝϭϮͬϱͬϭϰ ĞƐŝŐŶ ZĞĨŝŶĞŵĞŶƚ ϮϬĚĂLJƐ DŽŶ ϭϭͬϮϰͬϭϰ ^Ƶď^ƵƌĨĂĐĞ ϭϳĚĂLJƐ dŚƵϭϭͬϮϳͬϭϰ&ƌŝϭϮͬϭϵͬϭϰ ϮϮ^^нϯĚĂLJƐ фEĞǁdĂƐŬх ^ŽƐƚ ƐƚŝŵĂƚĞ KǁŶĞƌZĞǀŝĞǁ ϭϬĚĂLJƐ dŚƵϭͬϴͬϭϱ tĞĚ Θ^ŝŐŶͲŽĨĨ ϭͬϮϭͬϭϱ ϭϬĚĂLJƐ dŚƵ ϭϮͬϭϭͬϭϰ &ƌŝϭϮͬϭϵͬϭϰ ϭϭ tĞĚ ϭϮͬϮϰͬϭϰ 2ZQHU 55XWKHUIRUG ϮϮ&^ͲϳĚĂLJƐ Ϯϱ&^нϭϬĚĂLJƐ ΖƐ ϲϭĚĂLJƐ dŚƵϭͬϭϱͬϭϱ dŚƵϰͬϵͬϭϱ ΖƐ ϴϯĚĂLJƐ &ƌŝϰͬϭϬͬϭϱ dƵĞϴͬϰͬϭϱ ĂƌůLJ^ŝƚĞWĂĐŬĂŐĞ ϳϯĚĂLJƐ DŽŶϱͬϭϭͬϭϱtĞĚϴͬϭϵͬϭϱ ŝĚĚŝŶŐƵŝůĚŝŶŐ ϯϱ tĞĚϴͬϱͬϭϱ dƵĞϵͬϮϮͬϭϱ ϯϵ ĚĂLJƐ͍ ŽŶƐƚƌƵĐƚŝŽŶ ϯϰϭĚĂLJtĞĚϵͬϮϯͬϭϱtĞĚϭͬϭϭͬϭϳ 3URMHFW)LUVW/DXQFK 'DWH)UL 7DVN 3URMHFW6XPPDU\ 0DQXDO7DVN 6WDUWRQO\ 'HDGOLQH 6SOLW ,QDFWLYH7DVN 'XUDWLRQRQO\ )LQLVKRQO\ 3URJUHVV 0LOHVWRQH ,QDFWLYH0LOHVWRQH 0DQXDO6XPPDU\5ROOXS ([WHUQDO7DVNV 0DQXDO3URJUHVV 6XPPDU\ ,QDFWLYH6XPPDU\ 0DQXDO6XPPDU\ ([WHUQDO0LOHVWRQH :76 E PRELIMINARY PROJECT SCHEDULE WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 3DJH %52:15(129$7,21:&8 ,' 7DVN1DPH 'XUDWLRQ 6WDUW )LQLVK 3UHGHFHVVRUV ĚǀĂŶĐĞĚ WůĂŶŶŝŶŐ ϱϳ ĚĂLJƐ DΛZŝƐŬ ^ĞůĞĐƚŝŽŶ ϱϲ ^ƵŶϭϭͬϮͬϭϰ &ƌŝϭͬϭϲͬϭϱ ĚĂLJƐ͍ ^ΖƐ ϰϯĚĂLJƐ DŽŶϭϭͬϮϰͬϭtĞĚϭͬϮϭͬϭϱ ΖƐ ϲϭĚĂLJƐ dŚƵϭͬϭϱͬϭϱ dŚƵϰͬϵͬϭϱ S 2FW 1RY 'HF -DQ )HE 0DU $SU 0D\ -XQ -XO $XJ 6HS 2FW &ƌŝϵͬϭϵͬϭϰ &ƌŝϭϮͬϱͬϭϰ WƌĞƉĂƌĞŽĐƐ ϯϬĚĂLJƐ dŚƵϭͬϭϱͬϭϱ tĞĚϮͬϮϱͬϭϱϮϲ&^ͲϱĚĂLJƐ ϵϬйŽƐƚ ϭϮĚĂLJƐ dŚƵϮͬϭϮͬϭϱ &ƌŝϮͬϮϳͬϭϱ Ϯϴ&^ͲϭϬĚĂLJƐ ^ƵďŵŝƚƚĂůƚŽ ^K ϮϬĚĂLJƐ dŚƵϮͬϮϲͬϭϱ tĞĚ ϯͬϮϱͬϭϱ ^KZĞǀŝĞǁ ŽŵŵĞŶƚƐ ϭĚĂLJ͍ dŚƵϯͬϮϲͬϭϱ dŚƵϯͬϮϲͬϭϱ ϯϬ &ŝŶĂůƉƉƌŽǀĂů ϭϬĚĂLJƐ &ƌŝϯͬϮϳͬϭϱ dŚƵϰͬϵͬϭϱ ϯϬ͕ϯϭ 55XWKHUIRUG&0#5 6&2 Ϯϴ ΖƐ ĂƌůLJ^ŝƚĞWĂĐŬĂŐĞ ϳϯĚĂLJƐ DŽŶϱͬϭϭͬϭϱtĞĚϴͬϭϵͬϭϱ ŝĚĚŝŶŐƵŝůĚŝŶŐ ϯϱ tĞĚϴͬϱͬϭϱ dƵĞϵͬϮϮͬϭϱ ϯϵ ĚĂLJƐ͍ ŽŶƐƚƌƵĐƚŝŽŶ ϴϯĚĂLJƐ &ƌŝϰͬϭϬͬϭϱ dƵĞϴͬϰͬϭϱ ϯϰϭĚĂLJtĞĚϵͬϮϯͬϭϱtĞĚϭͬϭϭͬϭϳ 3URMHFW)LUVW/DXQFK 'DWH)UL 7DVN 3URMHFW6XPPDU\ 0DQXDO7DVN 6WDUWRQO\ 'HDGOLQH 6SOLW ,QDFWLYH7DVN 'XUDWLRQRQO\ )LQLVKRQO\ 3URJUHVV 0LOHVWRQH ,QDFWLYH0LOHVWRQH 0DQXDO6XPPDU\5ROOXS ([WHUQDO7DVNV 0DQXDO3URJUHVV 6XPPDU\ ,QDFWLYH6XPPDU\ 0DQXDO6XPPDU\ ([WHUQDO0LOHVWRQH :76 E PRELIMINARY PROJECT SCHEDULE WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 3DJH %52:15(129$7,21:&8 ,' 7DVN1DPH 'XUDWLRQ 6WDUW )LQLVK 3UHGHFHVVRUV ĚǀĂŶĐĞĚ WůĂŶŶŝŶŐ ϱϳ ĚĂLJƐ DΛZŝƐŬ ^ĞůĞĐƚŝŽŶ ϱϲ ^ƵŶϭϭͬϮͬϭϰ &ƌŝϭͬϭϲͬϭϱ ĚĂLJƐ͍ ^ΖƐ ϰϯĚĂLJƐ DŽŶϭϭͬϮϰͬϭtĞĚϭͬϮϭͬϭϱ ΖƐ ϲϭĚĂLJƐ dŚƵϭͬϭϱͬϭϱ dŚƵϰͬϵͬϭϱ ΖƐ ϴϯĚĂLJƐ &ƌŝϰͬϭϬͬϭϱ dƵĞϴͬϰͬϭϱ S 2FW 1RY 'HF -DQ )HE 0DU $SU 0D\ -XQ -XO $XJ 6HS 2FW &ƌŝϵͬϭϵͬϭϰ &ƌŝϭϮͬϱͬϭϰ WƌĞƉĂƌĞŽĐƐ ϯϱĚĂLJƐ &ƌŝϰͬϭϬͬϭϱ dŚƵϱͬϮϴͬϭϱ ϯϮ /ƐƐƵĞ^ŝƚĞ WĂĐŬĂŐĞ ϭĚĂLJ ^ŝƚĞŽƐƚ ϳĚĂLJƐ DŽŶϰͬϮϳͬϭϱdƵĞϱͬϱͬϭϱ ϯϱ&^ͲϭϬĚĂLJƐ ^ƵďŵŝƚƚĂůƚŽ ^K ϰϬĚĂLJƐ &ƌŝϱͬϮϵͬϭϱ dŚƵϳͬϮϯͬϭϱ ϯϰ ^KZĞǀŝĞǁ ŽŵŵĞŶƚƐ ϮĚĂLJƐ͍ DŽŶ ϳͬϮϳͬϭϱ &ŝŶĂůƉƉƌŽǀĂů ϱĚĂLJƐ tĞĚϳͬϮϵͬϭϱdƵĞϴͬϰͬϭϱ ϯϳ͕ϯϴ &ƌŝϱͬϴͬϭϱ &ƌŝϱͬϴͬϭϱ ϯϰ&^ͲϭϱĚĂLJƐ 55XWKHUIRUG&0#5 6&2 dƵĞϳͬϮϴͬϭϱ ϯϳ&^нϭĚĂLJ ĂƌůLJ^ŝƚĞWĂĐŬĂŐĞ ϳϯĚĂLJƐ DŽŶϱͬϭϭͬϭϱtĞĚϴͬϭϵͬϭϱ ŝĚĚŝŶŐƵŝůĚŝŶŐ ϯϱ tĞĚϴͬϱͬϭϱ dƵĞϵͬϮϮͬϭϱ ϯϵ ĚĂLJƐ͍ ŽŶƐƚƌƵĐƚŝŽŶ ϯϰϭĚĂLJtĞĚϵͬϮϯͬϭϱtĞĚϭͬϭϭͬϭϳ 3URMHFW)LUVW/DXQFK 'DWH)UL 7DVN 3URMHFW6XPPDU\ 0DQXDO7DVN 6WDUWRQO\ 'HDGOLQH 6SOLW ,QDFWLYH7DVN 'XUDWLRQRQO\ )LQLVKRQO\ 3URJUHVV 0LOHVWRQH ,QDFWLYH0LOHVWRQH 0DQXDO6XPPDU\5ROOXS ([WHUQDO7DVNV 0DQXDO3URJUHVV 6XPPDU\ ,QDFWLYH6XPPDU\ 0DQXDO6XPPDU\ ([WHUQDO0LOHVWRQH :76 E PRELIMINARY PROJECT SCHEDULE WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 3DJH %52:15(129$7,21:&8 ,' 7DVN1DPH 'XUDWLRQ 6WDUW )LQLVK 3UHGHFHVVRUV ĚǀĂŶĐĞĚ WůĂŶŶŝŶŐ ϱϳ ĚĂLJƐ DΛZŝƐŬ ^ĞůĞĐƚŝŽŶ ϱϲ ^ƵŶϭϭͬϮͬϭϰ &ƌŝϭͬϭϲͬϭϱ ĚĂLJƐ͍ ^ΖƐ ϰϯĚĂLJƐ DŽŶϭϭͬϮϰͬϭtĞĚϭͬϮϭͬϭϱ ΖƐ ϲϭĚĂLJƐ dŚƵϭͬϭϱͬϭϱ dŚƵϰͬϵͬϭϱ ΖƐ ϴϯĚĂLJƐ &ƌŝϰͬϭϬͬϭϱ dƵĞϴͬϰͬϭϱ ĂƌůLJ^ŝƚĞWĂĐŬĂŐĞ ϳϯĚĂLJƐ DŽŶϱͬϭϭͬϭϱtĞĚϴͬϭϵͬϭϱ -DQ )HE 0DU $SU 0D\ -XQ -XO $XJ 6HS 2FW 1RY 'HF &ƌŝϵͬϭϵͬϭϰ &ƌŝϭϮͬϱͬϭϰ ŝĚĚŝŶŐWĞƌŝŽĚ ϭϱĚĂLJƐ DŽŶϱͬϭϭͬϭϱ&ƌŝϱͬϮϵͬϭϱ ϯϱ WƌĞͲŝĚ DĞĞƚŝŶŐ ϭĚĂLJ͍ DŽŶ ϱͬϭϭͬϭϱ s͘ΘŽƐƚ ůŝŐŶŵĞŶƚ ϳĚĂLJƐ DŽŶϲͬϭͬϭϱ dƵĞϲͬϵͬϭϱ ϰϭ ŽŶƚƌĂĐƚǁĂƌĚ ϭĚĂLJ͍ tĞĚ ϲͬϭϬͬϭϱ 'ƌŽƵŶĚƌĞĂŬŝŶŐϭĚĂLJ͍ &ƌŝϲͬϭϮͬϭϱ &ƌŝϲͬϭϮͬϭϱ ϰϰ&^нϭĚĂLJ ^ŝƚĞ ŽŶƐƚƌƵĐƚŝŽŶ DŽŶ ϱͬϭϭͬϭϱ tĞĚ ϲͬϭϬͬϭϱ ϱϬĚĂLJƐ dŚƵϲͬϭϭͬϭϱ tĞĚ ϴͬϭϵͬϭϱ ϰϭ&^ͲϭϱĚĂLJƐ ϰϯ ϰϰ ŝĚĚŝŶŐƵŝůĚŝŶŐ ϯϱ tĞĚϴͬϱͬϭϱ dƵĞϵͬϮϮͬϭϱ ϯϵ ĚĂLJƐ͍ ŽŶƐƚƌƵĐƚŝŽŶ ϯϰϭĚĂLJtĞĚϵͬϮϯͬϭϱtĞĚϭͬϭϭͬϭϳ 3URMHFW)LUVW/DXQFK 'DWH)UL 7DVN 3URMHFW6XPPDU\ 0DQXDO7DVN 6WDUWRQO\ 'HDGOLQH 6SOLW ,QDFWLYH7DVN 'XUDWLRQRQO\ )LQLVKRQO\ 3URJUHVV 0LOHVWRQH ,QDFWLYH0LOHVWRQH 0DQXDO6XPPDU\5ROOXS ([WHUQDO7DVNV 0DQXDO3URJUHVV 6XPPDU\ ,QDFWLYH6XPPDU\ 0DQXDO6XPPDU\ ([WHUQDO0LOHVWRQH :76 E PRELIMINARY PROJECT SCHEDULE WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 3DJH %52:15(129$7,21:&8 ,' 7DVN1DPH 'XUDWLRQ 6WDUW )LQLVK 3UHGHFHVVRUV ĚǀĂŶĐĞĚ WůĂŶŶŝŶŐ ϱϳ ĚĂLJƐ DΛZŝƐŬ ^ĞůĞĐƚŝŽŶ ϱϲ ^ƵŶϭϭͬϮͬϭϰ &ƌŝϭͬϭϲͬϭϱ ĚĂLJƐ͍ ^ΖƐ ϰϯĚĂLJƐ DŽŶϭϭͬϮϰͬϭtĞĚϭͬϮϭͬϭϱ ΖƐ ϲϭĚĂLJƐ dŚƵϭͬϭϱͬϭϱ dŚƵϰͬϵͬϭϱ ΖƐ ϴϯĚĂLJƐ &ƌŝϰͬϭϬͬϭϱ dƵĞϴͬϰͬϭϱ ĂƌůLJ^ŝƚĞWĂĐŬĂŐĞ ϳϯĚĂLJƐ DŽŶϱͬϭϭͬϭϱtĞĚϴͬϭϵͬϭϱ ŝĚĚŝŶŐƵŝůĚŝŶŐ ϯϱ tĞĚϴͬϱͬϭϱ dƵĞϵͬϮϮͬϭϱ ϯϵ ĚĂLJƐ͍ ŝĚĚŝŶŐWĞƌŝŽĚ ϮϬĚĂLJƐ tĞĚϴͬϱͬϭϱ dƵĞϵͬϭͬϭϱ ϯϵ WƌĞͲŝĚ DĞĞƚŝŶŐ ϭĚĂLJ͍ tĞĚ ϴͬϭϵͬϭϱ s͘͘ΘŽƐƚ ůŝŐŶŵĞŶƚ ϭϬĚĂLJƐ tĞĚϵͬϮͬϭϱ dƵĞϵͬϭϱͬϭϱ ϰϴ ŽŶƚƌĂĐƚǁĂƌĚ ϱĚĂLJƐ tĞĚ ϵͬϭϲͬϭϱ ŽŶƐƚƌƵĐƚŝŽŶ -XO $XJ 6HS 2FW 1RY 'HF &ƌŝϵͬϭϵͬϭϰ &ƌŝϭϮͬϱͬϭϰ tĞĚ ϴͬϭϵͬϭϱ ϰϴ&^ͲϭϬĚĂLJƐ dƵĞϵͬϮϮͬϭϱ ϱϬ ϯϰϭĚĂLJtĞĚϵͬϮϯͬϭϱtĞĚϭͬϭϭͬϭϳ 3URMHFW)LUVW/DXQFK 'DWH)UL 7DVN 3URMHFW6XPPDU\ 0DQXDO7DVN 6WDUWRQO\ 'HDGOLQH 6SOLW ,QDFWLYH7DVN 'XUDWLRQRQO\ )LQLVKRQO\ 3URJUHVV 0LOHVWRQH ,QDFWLYH0LOHVWRQH 0DQXDO6XPPDU\5ROOXS ([WHUQDO7DVNV 0DQXDO3URJUHVV 6XPPDU\ ,QDFWLYH6XPPDU\ 0DQXDO6XPPDU\ ([WHUQDO0LOHVWRQH :76 E PRELIMINARY PROJECT SCHEDULE WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 -XQ 3DJH -DQ )HE 0DU %52:15(129$7,21:&8 ,' 7DVN1DPH 'XUDWLRQ 6WDUW )LQLVK 3UHGHFHVVRUV ĚǀĂŶĐĞĚ WůĂŶŶŝŶŐ ϱϳ ĚĂLJƐ DΛZŝƐŬ ^ĞůĞĐƚŝŽŶ ϱϲ ^ƵŶϭϭͬϮͬϭϰ &ƌŝϭͬϭϲͬϭϱ ĚĂLJƐ͍ ^ΖƐ ϰϯĚĂLJƐ DŽŶϭϭͬϮϰͬϭtĞĚϭͬϮϭͬϭϱ ΖƐ ϲϭĚĂLJƐ dŚƵϭͬϭϱͬϭϱ dŚƵϰͬϵͬϭϱ ΖƐ ϴϯĚĂLJƐ &ƌŝϰͬϭϬͬϭϱ dƵĞϴͬϰͬϭϱ ĂƌůLJ^ŝƚĞWĂĐŬĂŐĞ ϳϯĚĂLJƐ DŽŶϱͬϭϭͬϭϱtĞĚϴͬϭϵͬϭϱ ŝĚĚŝŶŐƵŝůĚŝŶŐ ϯϱ tĞĚϴͬϱͬϭϱ dƵĞϵͬϮϮͬϭϱ ϯϵ ĚĂLJƐ͍ ŽŶƐƚƌƵĐƚŝŽŶ 2FW 1RY 'HF -DQ )HE &ƌŝϵͬϭϵͬϭϰ &ƌŝϭϮͬϱͬϭϰ ϯϰϭĚĂLJtĞĚϵͬϮϯͬϭϱtĞĚϭͬϭϭͬϭϳ WƌĞͲŽŶDĞĞƚŝŶŐϭĚĂLJ͍ tĞĚϵͬϯϬͬϭϱtĞĚϵͬϯϬͬϭϱϱϭ&^нϱĚĂLJƐ ŽŶƐƚƌƵĐƚŝŽŶ ;ͺͺŵŽŶƚŚƐͿ ϯϭϱ ĚĂLJƐ ĞŶĞĨŝĐĂů KĐĐƵƉĂŶĐLJ ϭĚĂLJ͍ tĞĚ ϭϭͬϮϯͬϭϲ WƵŶĐŚůŝƐƚ ϭϬĚĂLJƐ tĞĚϭϭͬϭϲͬϭdƵĞϭϭͬϮϵͬϭϲϱϰ&^ͲϭϱĚĂLJƐ &ŝŶĂů/ŶƐƉĞĐƚŝŽŶ ϱĚĂLJƐ tĞĚϭϭͬϯϬͬϭdƵĞϭϮͬϲͬϭϲ ϱϲ ĞƌƚŝĨŝĐĂƚĞŽĨ ŽŵƉůŝĂŶĐĞ ϭĚĂLJ͍ tĞĚ ϭϮͬϭϰͬϭϲ tĞĚ ϭϮͬϭϰͬϭϲ ϱϳ&^нϱĚĂLJƐ ZĞĐŽƌĚ ŽĐƵŵĞŶƚƐ ϮϬĚĂLJƐ dŚƵ ϭϮͬϭϱͬϭϲ tĞĚ ϭͬϭϭͬϭϳ ϱϴ 3URMHFW)LUVW/DXQFK 'DWH)UL tĞĚ ϵͬϮϯͬϭϱ dƵĞϭϮͬϲͬϭϲ ϱϭ tĞĚ ϭϭͬϮϯͬϭϲ ϱϰ&^ͲϭϬĚĂLJƐ 7DVN 3URMHFW6XPPDU\ 0DQXDO7DVN 6WDUWRQO\ 'HDGOLQH 6SOLW ,QDFWLYH7DVN 'XUDWLRQRQO\ )LQLVKRQO\ 3URJUHVV 0LOHVWRQH ,QDFWLYH0LOHVWRQH 0DQXDO6XPPDU\5ROOXS ([WHUQDO7DVNV 0DQXDO3URJUHVV 6XPPDU\ ,QDFWLYH6XPPDU\ 0DQXDO6XPPDU\ ([WHUQDO0LOHVWRQH :76 E PRELIMINARY PROJECT SCHEDULE WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 3DJH 0DU $SU 0D\ %52:15(129$7,21:&8 ,' 7DVN1DPH 'XUDWLRQ 6WDUW )LQLVK ĚǀĂŶĐĞĚ WůĂŶŶŝŶŐ ϱϳ ĚĂLJƐ DΛZŝƐŬ ^ĞůĞĐƚŝŽŶ ϱϲ ^ƵŶϭϭͬϮͬϭϰ &ƌŝϭͬϭϲͬϭϱ ĚĂLJƐ͍ ^ΖƐ ϰϯĚĂLJƐ DŽŶϭϭͬϮϰͬϭtĞĚϭͬϮϭͬϭϱ ΖƐ ϲϭĚĂLJƐ dŚƵϭͬϭϱͬϭϱ dŚƵϰͬϵͬϭϱ ΖƐ ϴϯĚĂLJƐ &ƌŝϰͬϭϬͬϭϱ dƵĞϴͬϰͬϭϱ ĂƌůLJ^ŝƚĞWĂĐŬĂŐĞ ϳϯĚĂLJƐ DŽŶϱͬϭϭͬϭϱtĞĚϴͬϭϵͬϭϱ ŝĚĚŝŶŐƵŝůĚŝŶŐ ϯϱ tĞĚϴͬϱͬϭϱ dƵĞϵͬϮϮͬϭϱ ĚĂLJƐ͍ ŽŶƐƚƌƵĐƚŝŽŶ 0D\ -XQ -XO $XJ 6HS 2FW 1RY 'HF &ƌŝϵͬϭϵͬϭϰ &ƌŝϭϮͬϱͬϭϰ ϯϰϭĚĂLJtĞĚϵͬϮϯͬϭϱtĞĚϭͬϭϭͬϭϳ WƌĞͲŽŶDĞĞƚŝŶŐϭĚĂLJ͍ tĞĚϵͬϯϬͬϭϱtĞĚϵͬϯϬͬϭϱ ŽŶƐƚƌƵĐƚŝŽŶ ;ͺͺŵŽŶƚŚƐͿ ϯϭϱ ĚĂLJƐ ĞŶĞĨŝĐĂů KĐĐƵƉĂŶĐLJ ϭĚĂLJ͍ tĞĚ ϭϭͬϮϯͬϭϲ WƵŶĐŚůŝƐƚ ϭϬĚĂLJƐ tĞĚϭϭͬϭϲͬϭdƵĞϭϭͬϮϵͬϭϲ &ŝŶĂů/ŶƐƉĞĐƚŝŽŶ ϱĚĂLJƐ tĞĚϭϭͬϯϬͬϭdƵĞϭϮͬϲͬϭϲ ĞƌƚŝĨŝĐĂƚĞŽĨ ŽŵƉůŝĂŶĐĞ ϭĚĂLJ͍ tĞĚ ϭϮͬϭϰͬϭϲ tĞĚ ϭϮͬϭϰͬϭϲ ZĞĐŽƌĚ ŽĐƵŵĞŶƚƐ ϮϬĚĂLJƐ dŚƵ ϭϮͬϭϱͬϭϲ tĞĚ ϭͬϭϭͬϭϳ 3URMHFW)LUVW/DXQFK 'DWH)UL tĞĚ ϵͬϮϯͬϭϱ dƵĞϭϮͬϲͬϭϲ tĞĚ ϭϭͬϮϯͬϭϲ 7DVN 3URMHFW6XPPDU\ 0DQXDO7DVN 6WDUWRQO\ 'HDGOLQH 6SOLW ,QDFWLYH7DVN 'XUDWLRQRQO\ )LQLVKRQO\ 3URJUHVV 0LOHVWRQH ,QDFWLYH0LOHVWRQH 0DQXDO6XPPDU\5ROOXS ([WHUQDO7DVNV 0DQXDO3URJUHVV 6XPPDU\ ,QDFWLYH6XPPDU\ 0DQXDO6XPPDU\ ([WHUQDO0LOHVWRQH :76 E PRELIMINARY PROJECT SCHEDULE WCU Brown Building Renovation & Addition - SCO No.: 13-10964-01-WCU Programming & Advanced Planning Submittal 13 November 2014 3DJH -DQ