SUBJECT: Unit Costs, Area Cost Factors, Size Adjustment Factors, and Inflation Rate
Guidance for Department of Defense Facility Construction for FY 00 and FY 01
Department of Defense Guidance for Unit Costs, Area Cost Factors, Size Adjustment
Factors and Inflation Rates are provided by attachment for immediate use in developing the
Fiscal Year 2000 and Fiscal Year 2001 military construction programs
Recipients are requested to further distribute this guidance to all appropriate personnel.
This information is also available on the Construction Criteria Base (CCB) and, therefore, paper
copies are not available. For further information contact Thomas R. Rutherford, P.E. at (703)
697-6193, or by e-mail at “ruthertr@acq.osd.mil.”
Principal Assistant Deputy Under Secretary of Defense
(Industrial Affairs and Installations)
Attachments
SUBJECT: Unit Cost, Area Cost Factors, Size Adjustment Factors, and Inflation Rate
Guidance for Department of Defense Facility Construction for FY 00 and FY 01
DISTRIBUTION:
Assistant Secretary Of The Army (Installations, Logistics And
Environment)
Assistant Secretary Of The Navy (Installation And Environment)
Assistant Secretary Of The Air Force (Manpower, Reserve Affairs,
Installations and Environment)
Department Of Defense Deputy Comptroller (Program/Budget)
Assistant Secretary Of Defense (Health Affairs)
Assistant Secretary Of Defense (Reserve Affairs)
Director, Advanced Research Projects Agency
Director, Defense Commissary Agency
Director, Defense Finance and Accounting Service
Director, Defense Information Systems Agency
Director, Defense Intelligence Agency
Director, Defense Logistics Agency
Director, Defense National Imagery and Mapping Agency
Director, Defense Special Weapons Agency
Director, National Security Agency Central Security Office
Director, Ballistic Missile Defense Organization
Director, Department Of Defense Dependents Schools
Director, Washington Headquarters Services
Director For Logistics (J-4)
General Comments
on Use of
Unit Costs, Area Cost Factors,
Size Adjustment Factor, and Inflation Rate
19 August 1998
The following tables for Unit Costs for DoD Facilities, Area Cost Factors (ACFs), Size
Adjustment Factors, and OSD Inflation Rates also are maintained and available on the
National Institute of Building Science (NIBS) Construction Criteria Database (CCB).
Please address any questions regarding the following tables or cost engineering procedures
to your participating Service member of the Tri-Service Committee on Cost Engineering.
Air Force: Mr. James Enloe
HQ USAF/ILECM
1260 Air Force Pentagon
Washington, DC 20330-1260
(703) 601-0187 or DSN 329-0187
Internet: jim.enloe@af.pentagon.mil
Army:
Mr. Ronald Hatwell
HQ USACE/CEMP-EC
20 Massachusetts Avenue, NW
Washington, DC 20314-1000
(202) 761-1240 or DSN 763-1240
Internet: ronald.j.hatwell@hq02.usace.army.mil
Navy:
Mr. Mohsen Athari
NAVFACENGCOM-FA
Washington Navy Yard
1322 Patterson Avenue SE, Suite 1000
Washington, DC 20374-5065
202-685-9216 or DSN 325-9216
Internet: mathari@hq.navfac.navy.mil
Tables A1 and A2: Unit Costs for DoD Facilities:
1. Table A1 provides metric unit cost data for DoD facilities in dollars per square meter
($/m2). Table A2 provides equivalent English unit cost data in dollars per square foot
($/SF).
2. Most of the unit costs and referenced facility sizes are based on historic construction
award data for Air Force, Army and Navy projects with construction contracts awarded
after January 1990. Unit costs for a few category codes that have a limited number of
awarded projects are based on contracts awarded since 1984. The unit cost database
includes only new construction projects and does not include data from renovation or
add/alter projects. The facility types or category codes listed represent those facilities more
frequently constructed by the Services.
3. The unit costs are escalated to October 2000 and October 2001. Use the official OSD
inflation rates shown in Table D to escalate the FY01 unit costs beyond FY01.
4. The unit costs are for primary facilities only and do not include supporting facility costs;
equipment acquired with other fund sources; contingency factors; supervision, inspection,
and overhead (SIOH); or construction cost growth resulting from user changes, unforeseen
site conditions, or contract document errors and omissions.
Table B: Area Cost Factors:
1. Use these area cost factors (ACFs) only with the unit costs from Table A.
2. Area cost factors are based on a bi-annual survey of local costs for a market basket of
10 labor crafts, 20 construction materials, and 4 equipment items. These labor, materials,
and equipment (LME) items are representative of the types of products and services used to
construct most military facilities. The survey covers a list of 254 cities that includes 96
Base Cities (two per state in the continental US), 103 additional cities in the continental
U.S., and 55 cities outside the continental United States.
3. Each of the LME costs is normalized and weighted to represent its contribution to the
total cost of a typical facility. The normalized LME then is modified by seven matrix
factors that cover local conditions affecting construction costs. These matrix factors
include weather, seismic, climatic (frost zone, wind loads, and HVAC), labor availability,
contractor overhead and profit, life support and mobilization, and labor productivity versus
the U.S. standard. The resultant ACF for each location is normalized again by dividing by
the Base City average to provide a final ACF that reflects the relative relationship of
construction costs between that location and the Base City average of 1.00.
4. There is no easy correlation between these ACFs and previous ACFs for specific
locations. No common benchmarks exist because both the Base City average and the
relationships between cities change for each two-year cycle. It is possible, however, to
compare differences between several locations in this database with differences between the
same locations in previous databases.
5. Do not use these ACFs to modify parametric cost estimates, detailed quantity-take-offs,
unit price book (UPB) line items, or commercial cost data. These other cost estimating
systems and databases have their own processes and factors for adjusting costs to different
locations.
Table C: Size Adjustment Factors:
1. The Size Adjustment Factor table is based on data analysis that shows a correlation
exists between project size and construction cost. Unit construction costs generally are
lower for larger projects due to greater opportunities for material quantity discounts and for
spreading mobilization, demobilization and general overhead costs over a greater number of
units.
2
2. All unit costs are based on the referenced facility sizes. Use Table C, Size Adjustment
Factor, to adjust unit costs for facilities whenever your project size differs from the
referenced facility size shown in Table A1 or A2. Divide the gross area of your proposed
facility by the referenced size for that facility type to determine the size relationship ratio.
Use this ratio to find the appropriate size adjustment factor in Table C. Multiply the unit
cost from Table A1 or A2 by the size adjustment factor to calculate the adjusted unit cost
for your facility.
3. Base your proposed project size on the total project scope to be awarded as a single
construction contract, regardless of the number of buildings to be constructed within that
scope. If a construction award project is to be broken into a number of discreet phases
where the contractor has limited control over the phasing, use the average scope for all
phases as the basis for your size adjustment calculations.
4. EXAMPLE: You propose to build a 6,440 m2 Enlisted Dormitory in FY00. The
referenced facility size taken from the unit cost summary is 9,250 m2. The size relationship
quotient is 0.70 (6,440 m2 divided by 9,250 m2). Enter Table C to find the Size Adjustment
Factor of 1.04. Multiply the unit cost of $1,389/m2 by 1.04 to determine that your adjusted
unit cost is $1,445/m2.
Tables D: Inflation Indices:
1. The inflation indices in Table D are based on Engineering News Record Building
Construction Indexes through Oct 1997. Inflation multipliers after Oct 1997 are projected
based on the Office of Management and Budget figures as published in the Under Secretary
of Defense (Comptroller) memo of 26 Jun 1998. Table D has a baseline index of 1.000 for
Oct 2000. Use the OSD indices for all future cost projections from Oct 1998 forward,
including submission of the President’s Budgets for FY 00 and FY 01 and supporting
congressional justification materials.
2. The previous Table D inflation guidance issued on 28 May 1997 had a baseline index of
1.000 for Oct 1999. The current Table D inflation indices are based on the ENR historic
data through Oct 1997 and projected after that date based on the Comptroller inflation
rates.
3
TABLE A1
UNIT COST DATA FOR DOD FACILITIES - METRIC UNITS
25 August 1998
(No change from 3 April 1998)
REFERENCE
(NOTES 1 AND 2)
UNIT COST ($ PER m2)
SIZE
2
GROSS m
FY 2000
FY 2001
FACILITY TYPE
1. SATELLITE COMMUNICATIONS CENTER
550
3,767
3,835
2. AIRCRAFT OPERATION BUILDING
(WITHOUT TOWER)
950
1,550
1,578
3. AIRFIELD FIRE AND RESCUE STATION
(DOES NOT INCLUDE CENTRAL ALARM SYSTEM)
750
1,755
1,787
4. OPERATIONS BUILDINGS
GENERAL PURPOSE
HEADQUARTERS
SQUADRON
1,200
1,000
1,100
1,238
1,464
1,528
1,260
1,490
1,556
5. APPLIED INSTRUCTION BUILDINGS
GENERAL INSTRUCTION
HIGH TECH (AUTO-AID) TRAINING
2,300
2,300
1,302
1,572
1,325
1,600
6. RESERVE FACILITIES
CENTER
VEHICLE MAINTENANCE
1,850
550
1,238
1,281
1,260
1,304
7. HANGERS
MAINTENANCE/ GENERAL PURPOSE
HIGH BAY MAINTENANCE
2,150
3,250
1,302
1,701
1,325
1,732
8. SHOPS
VEHICLE MAINTENANCE, WHEEL
VEHICLE MAINTENANCE, TRACK
AIRCRAFT AVIONICS
INSTALLATION MAINTENANCE
PARACHUTE AND DINGHY
A/C MACHINE SHOP
2,800
2,300
2,150
2,900
750
1,850
1,292
1,367
1,432
1,119
1,593
1,227
1,315
1,392
1,458
1,139
1,622
1,249
9. STORAGE FACILITIES
COLD STORAGE WAREHOUSE/PROCESSING
COLD STORAGE WAREHOUSE
GENERAL PURPOSE WAREHOUSE - LOW BAY
GENERAL PURPOSE WAREHOUSE - HIGH BAY
GENERAL PURPOSE MAGAZINE W/O CRANE
HIGH EXPLOSIVE MAGAZINE
1,000
550
3,700
9,290
950
450
1,141
1,528
678
624
1,733
1,873
1,162
1,556
690
635
1,764
1,907
Page 1
TABLE A1
UNIT COST DATA FOR DOD FACILITIES - METRIC UNITS
25 August 1998
(No change from 3 April 1998)
REFERENCE
(NOTES 1 AND 2)
UNIT COST ($ PER m2)
SIZE
GROSS m2
FY 2000
FY 2001
FACILITY TYPE
10. DOD MEDICAL FACILITIES (NOTE 3)
STATION HOSPITAL
REGIONAL MEDICAL CENTER
MEDICAL CLINIC
MEDICAL/DENTAL CLINIC
DENTAL CLINIC
NA
NA
2,800
4,650
1,400
1,841
2,196
1,561
1,636
1,927
1,874
2,236
1,589
1,665
1,962
2,300
1,950
1,227
1,572
1,249
1,600
3,700
1,496
1,523
12. BARRACKS, DORMITORIES (NOTE 5)
(NOT INCLUDE KITCHENETTE EQUIPMENT)
9,250
1,389
1,414
13. UNACCOMPANIED OFFICERS QUARTERS (NOTE 5)
4,100
1,302
1,325
14. MESS HALL ENLISTED
(INCLUDES KITCHEN EQUIPMENT AND INSTALLATION)
1,500
2,196
2,236
700
1,432
1,458
16. CHAPEL CENTER
1,400
1,625
1,654
17. COMMISSARY
(SALES STORE W/ OPERATIONAL EQUIPMENT)
7,900
1,292
1,315
1,400
930
1,400
450
1,475
1,302
1,367
1,270
1,502
1,325
1,392
1,293
840
861
855
876
11. ADMINISTRATIVE FACILITIES (NOTE 4)
MULTI-PURPOSE
DATA PROCESSING AREA FACILITY
(INCLUDES ADMIN AND STORAGE)
COMMAND HEADQUARTERS BUILDING
15. FIRE STATION COMMUNITY
18. FAMILY SUPPORT
CHILD DEVELOPMENT CENTER (NOTE 6)
EDUCATION CENTER
YOUTH CENTER
FAMILY SERVICE CENTER
19. FAMILY HOUSING (NOTE 7)
CONUS
OCONUS
NA
NA
20. PHYSICAL FITNESS TRAINING CENTER
1,850
1,507
1,534
21. EXCHANGE STORES
(W/ CAFETERIA AND SNACK BAR)
1,100
1,001
1,019
Page 2
TABLE A1
UNIT COST DATA FOR DOD FACILITIES - METRIC UNITS
25 August 1998
(No change from 3 April 1998)
REFERENCE
(NOTES 1 AND 2)
UNIT COST ($ PER m2)
SIZE
GROSS m2
FY 2000
FY 2001
FACILITY TYPE
22. ENLISTED SERVICE CLUBS
1,500
1,970
2,005
23. LIBRARIES
1,100
1,130
1,150
24. RECREATION CENTERS
1,850
1,259
1,282
700
1,539
1,567
1,033
1,066
1,109
1,052
1,085
1,129
1,259
1,282
25. BOWLING CENTERS
(8 LANES W/ PIN SPOTTING EQUIPMENT
AND AUTOMATIC SCORING DEVICE)
26. DEPENDENT SCHOOLS
ELEMENTARY
JUNIOR HIGH/MIDDLE
HIGH SCHOOL
NA
NA
NA
27. TEMPORARY LODGING FACILITIES
1,400
GENERAL NOTES
1. THESE UNIT COSTS ARE FORECAST TO A MIDPOINT OF CONSTRUCTION OF 1 OCTOBER FOR
THE RESPECTIVE FISCAL YEAR WITH AN AREA COST FACTOR (ACF) OF 1.00. UNIT COSTS
DO NOT INCLUDE ALLOWANCES FOR CONSTRUCTION CONTINGENCIES AND SIOH.
2. THESE UNIT COSTS INCLUDE INSTALLED (BUILT-IN) BUILDING EQUIPMENT AND FURNISHINGS
NORMALLY FUNDED WITH MILCON FUNDS.
3. UNIT COSTS FOR DOD MEDICAL FACILITIES INCLUDE CATEGORY A AND B EQUIPMENT, BUT
DO NOT INCLUDE CATEGORY E AND F EQUIPMENT COSTS.
4. UNIT COSTS FOR ADMINISTRATIVE FACILITIES DO NOT INCLUDE PREWIRED WORKSTATIONS
OR FURNITURE SYSTEMS.
5. UNIT COSTS FOR BARRACKS AND UNACCOMPANIED OFFICERS QUARTERS DO NOT INCLUDE
FREE STANDING KITCHEN EQUIPMENT.
6. UNIT COSTS FOR CHILD DEVELOPMENT CENTERS DO NOT INCLUDE FREE-STANDING FOOD
SERVICE EQUIPMENT OR PLAYGROUND AREA AND EQUIPMENT.
7. UNIT COSTS FOR FAMILY HOUSING ARE BASED ON NET AREA AND INCLUDE COSTS FOR
SPRINKLER SYSTEMS OR FIRE RATED CONSTRUCTION.
Page 3
TABLE A2
UNIT COST DATA FOR DOD FACILITIES - ENGLISH UNITS
25 August 1998
(No change from 3 April 1998)
REFERENCE
(NOTES 1 AND 2)
SIZE
UNIT COST ($ PER SF)
GROSS SF
FY 2000
FY 2001
FACILITY TYPE
1. SATELLITE COMMUNICATIONS CENTER
6,000
350
356
10,000
144
147
8,000
163
166
4. OPERATIONS BUILDINGS
GENERAL PURPOSE
HEADQUARTERS
SQUADRON
13,000
11,000
12,000
122
136
142
124
138
145
5. APPLIED INSTRUCTION BUILDINGS
GENERAL INSTRUCTION
HIGH TECH (AUTO-AID) TRAINING
25,000
25,000
121
146
123
149
6. RESERVE FACILITIES
CENTER
VEHICLE MAINTENANCE
20,000
6,000
115
119
117
121
7. HANGERS
MAINTENANCE/GENERAL PURPOSE
HIGH BAY MAINTENANCE
23,000
35,000
121
158
123
161
8. SHOPS
VEHICLE MAINTENANCE, WHEEL
VEHICLE MAINTENANCE, TRACK
AIRCRAFT AVIONICS
INSTALLATION MAINTENANCE
PARACHUTE AND DINGHY
A/C MACHINE SHOP
30,000
25,000
23,000
31,000
8,000
20,000
120
127
133
104
148
114
122
129
135
106
151
116
11,000
6,000
40,000
100,000
10,000
5,000
106
142
63
58
161
174
108
145
64
59
164
177
2. AIRCRAFT OPERATION BUILDING
(WITHOUT TOWER)
3. AIRFIELD FIRE AND RESCUE STATION
(DOES NOT INCLUDE CENTRAL ALARM SYSTEM)
9. STORAGE FACILITIES
COLD STORAGE WAREHOUSE/PROCESSING
COLD STORAGE WAREHOUSE
GENERAL PURPOSE WAREHOUSE - LOW BAY
GENERAL PURPOSE WAREHOUSE - HIGH BAY
GENERAL PURPOSE MAGAZINE W/O CRANE
HIGH EXPLOSIVE MAGAZINE
Page 1
TABLE A2
UNIT COST DATA FOR DOD FACILITIES - ENGLISH UNITS
25 August 1998
(No change from 3 April 1998)
REFERENCE
(NOTES 1 AND 2)
SIZE
UNIT COST ($ PER SF)
GROSS SF
FY 2000
FY 2001
FACILITY TYPE
10. DOD MEDICAL FACILITIES (NOTE 3)
STATION HOSPITAL
REGIONAL MEDICAL CENTER
MEDICAL CLINIC
MEDICAL/DENTAL CLINIC
DENTAL CLINIC
NA
NA
30,000
50,000
15,000
171
204
145
152
179
174
208
148
155
182
25,000
21,000
114
146
116
149
40,000
139
142
12. BARRACKS, DORMITORIES (NOTE 5)
(NOT INCLUDE KITCHENETTE EQUIPMENT)
99,500
129
131
13. UNACCOMPANIED OFFICERS QUARTERS (NOTE 5)
44,000
121
123
14. MESS HALL ENLISTED
(INCLUDES KITCHEN EQUIPMENT AND INSTALLATION)
16,000
204
208
7,500
133
135
16. CHAPEL CENTER
15,000
151
154
17. COMMISSARY
(SALES STORE W/ OPERATIONAL EQUIPMENT)
85,000
120
122
15,000
10,000
15,000
5,000
137
121
127
118
139
123
129
120
78
80
79
81
11. ADMINISTRATIVE FACILITIES (NOTE 4)
MULTI-PURPOSE
DATA PROCESSING AREA FACILITY
(INCLUDES ADMIN AND STORAGE)
COMMAND HEADQUARTERS BUILDING
15. FIRE STATION COMMUNITY
18. FAMILY SUPPORT
CHILD DEVELOPMENT CENTER (NOTE 6)
EDUCATION CENTER
YOUTH CENTER
FAMILY SERVICE CENTER
19. FAMILY HOUSING (NOTE 7)
CONUS
OCONUS
NA
NA
20. PHYSICAL FITNESS TRAINING CENTER
20,000
140
143
21. EXCHANGE STORES
(W/ CAFETERIA AND SNACK BAR)
12,000
93
95
Page 2
TABLE A2
UNIT COST DATA FOR DOD FACILITIES - ENGLISH UNITS
25 August 1998
(No change from 3 April 1998)
REFERENCE
(NOTES 1 AND 2)
SIZE
UNIT COST ($ PER SF)
GROSS SF
FY 2000
FY 2001
FACILITY TYPE
22. ENLISTED SERVICE CLUBS
16,000
183
186
23. LIBRARIES
12,000
105
107
24. RECREATION CENTERS
20,000
117
119
7,800
143
146
96
99
103
98
101
105
117
119
25. BOWLING CENTERS
(8 LANES W/ PIN SPOTTING EQUIPMENT
AND AUTOMATIC SCORING DEVICE)
25. DEPENDENT SCHOOLS
ELEMENTARY
JUNIOR HIGH/MIDDLE
HIGH SCHOOL
NA
NA
NA
27. TEMPORARY LODGING FACILITIES
15,000
GENERAL NOTES
1. THESE UNIT COSTS ARE FORECAST TO A MIDPOINT OF CONSTRUCTION OF 1 OCTOBER FOR
THE RESPECTIVE FISCAL YEAR WITH AN AREA COST FACTOR (ACF) OF 1.00. UNIT COSTS
DO NOT INCLUDE ALLOWANCES FOR CONSTRUCTION CONTINGENCIES AND SIOH.
2. THESE UNIT COSTS INCLUDE INSTALLED (BUILT-IN) BUILDING EQUIPMENT AND FURNISHINGS
NORMALLY FUNDED WITH MILCON FUNDS.
3. UNIT COSTS FOR DOD MEDICAL FACILITIES INCLUDE CATEGORY A AND B EQUIPMENT, BUT
DO NOT INCLUDE CATEGORY E AND F EQUIPMENT COSTS.
4. UNIT COSTS FOR ADMINISTRATIVE FACILITIES DO NOT INCLUDE PREWIRED WORKSTATIONS
OR FURNITURE SYSTEMS.
5. UNIT COSTS FOR BARRACKS AND UNACCOMPANIED OFFICERS QUARTERS DO NOT INCLUDE
FREE-STANDING KITCHEN EQUIPMENT.
6. UNIT COSTS FOR CHILD DEVELOPMENT CENTERS DO NOT INCLUDE FREE-STANDING FOOD
SERVICE EQUIPMENT OR PLAYGROUND AREA AND EQUIPMENT.
7. UNIT COSTS FOR FAMILY HOUSING ARE BASED ON NET AREA AND INCLUDE COSTS FOR
SPRINKLER SYSTEMS OR FIRE RATED CONSTRUCTION.
Page 3
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART I - U.S. LOCATIONS
STATE
ACF
INDEX
LOCATION
ALABAMA
MOBILE
MONTGOMERY
(A) ANNISTON ARMY DEPOT
(A) FORT MCCLELLAN
(A) FORT RUCKER
(AF) MAXWELL AIR FORCE BASE
(N) MOBILE AREA
(A) REDSTONE ARSENAL
ALASKA
0.83
0.82
0.84
0.81
0.82
0.80
0.84
0.82
0.85
ANCHORAGE
FAIRBANKS
ADAK NAVAL STATION
EIELSON AIR FORCE BASE
ELMENDORF AIR FORCE BASE
FORT GREELY
FORT RICHARDSON
FORT WAINWRIGHT
SHEMYA AIR FORCE BASE
CLEAR AIR FORCE BASE
1.60
1.50
1.71
2.38
1.74
1.53
1.87
1.50
1.71
2.45
1.88
FLAGSTAFF
TUSCON
(AF) DAVIS MONTHAN AIR FORCE BASE
(A) FORT HUACHUCA
(AF) LUKE AIR FORCE BASE
(A) NAVAJO ARMY DEPOT
(N) YUMA MCAS
(A) YUMA PROVING GROUND
0.95
0.97
0.93
0.93
0.97
0.96
0.95
1.09
1.09
FORT SMITH
PINE BLUFF
(A) FORT CHAFFEE
(AF) LITTLE ROCK AIR FORCE BASE
(A) PINE BLUFF ARSENAL
0.83
0.82
0.84
0.81
0.80
0.84
(N)
(AF)
(AF)
(A)
(A)
(A)
(AF)
(AF)
ARIZONA
ARKANSAS
1
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART I - U.S. LOCATIONS
LOCATION
ACF
INDEX
(AF)
(N)
(N)
(N)
(AF)
(N)
(N)
(A)
(A)
(A)
(N)
(AF)
(AF)
(N)
(A)
(N)
(A)
(A)
(A)
(A)
(N)
(AF)
(AF)
(N)
SAN DIEGO
SAN FRANCISCO
BEALE AIR FORCE BASE
CAMP PENDLETON MARINE CORPS
CENTERVILLE BEACH
CHINA LAKE NAVAL WEAPONS CENTER
EDWARDS AIR FORCE BASE
EL CENTRO NAVAL AIR FIELD
EL TORO
FORT HUNTER LIGGETT
FORT IRWIN
FORT ORD
LOS ANGELES AREA
MARCH AIR FORCE BASE
MCCLELLAN AIR FORCE BASE
MONTEREY AREA
OAKLAND ARMY BASE
PORT HUENEME AREA
RIVERBANK ARMY AMMO PLANT
SACRAMENTO ARMY DEPOT
SHARPE ARMY DEPOT
SIERRA ARMY DEPOT
STOCKTON AREA
TRAVIS AIR FORCE BASE
VANDENBERG AIR FORCE BASE
29 PALMS MARINE CORPS BASE
1.17
1.15
1.18
1.23
1.14
1.11
1.29
1.21
1.20
1.11
1.28
1.23
1.13
1.11
1.14
1.08
1.16
1.19
1.13
1.09
1.05
1.12
1.44
1.09
1.23
1.25
1.32
(AF)
(AF)
(AF)
(A)
(A)
(AF)
(A)
(A)
COLORADO SPRINGS
DENVER
AIR FORCE ACADEMY
CHEYENNE MOUNTAIN
FALCON AIR FORCE STATION
FITZSIMONS ARMY MED CENTER
FORT CARSON
PETERSON AIR FORCE BASE
PUEBLO ARMY DEPOT
ROCKY MOUNTAIN ARSENAL
1.04
1.04
1.04
1.04
1.09
1.09
1.05
1.06
1.04
0.98
1.03
(N)
(A)
BRIDGEPORT
NEW LONDON
NEW LONDON AREA
STRATFORD ENG PLANT
1.10
1.12
1.08
1.09
1.12
STATE
CALIFORNIA
COLORADO
CONNECTICUT
2
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART I - U.S. LOCATIONS
STATE
ACF
INDEX
LOCATION
DELAWARE
1.04
1.02
1.05
1.02
DOVER
WILMINGTON
(AF) DOVER AIR FORCE BASE
FLORIDA
(AF)
(AF)
(AF)
(N)
(N)
(AF)
(N)
(N)
(N)
(AF
MIAMI
PANAMA CITY
CAPE CANAVERAL
EGLIN AIR FORCE BASE
HOMESTEAD AIR FORCE BASE
JACKSONVILLE AREA
KEY WEST NAVAL AIR STATION
MACDILL AIR FORCE BASE
ORLANDO AREA
PANAMA CITY AREA
PENSACOLA AREA
TYNDALL AIR FORCE BASE
GEORGIA
0.90
0.94
0.85
0.96
0.86
0.94
0.90
1.08
0.84
0.89
0.85
0.88
0.85
ALBANY
ATLANTA
(N) ALBANY AREA
(A) FORT BENNING
(A) FORT GILLEM
(A) FORT GORDON
(A) FORT MCPHERSON
(A) FORT STEWART
(N) KINGS BAY
(AF) MOODY AFB
(AF) ROBINS AFB
0.87
0.80
0.93
0.82
0.81
0.93
0.85
0.93
0.83
0.92
0.87
0.82
HONOLULU
KANEOHE BAY
(N) BARBERS POINT NAVAL AIR STA
(N) BARKING SANDS
(N) FORD ISLAND
(A) FORT DERUSSY
(A) FORT SHAFTER
(AF) HICKMAN AIR FORCE BASE
(N) KANEOHE MARINE CORPS AIR ST
(N) PEARL HARBOR
(N) POHAKULOA
(A) SCHOFIELD BARRACKS
(A) TRIPLER ARMY MEDICAL CENTER
(A) WHEELER ARMY AIR FIELD
1.50
1.46
1.54
1.53
1.62
1.60
1.46
1.48
1.46
1.54
1.48
1.85
1.57
1.59
1.57
HAWAII
3
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART I - U.S. LOCATIONS
STATE
ACF
INDEX
LOCATION
IDAHO
BOISE
MOUNTAIN HOME
(AF) MOUNTAIN HOME AIR FORCE BASE
1.15
1.06
1.23
1.23
BELLEVILLE
CHICAGO
(N) FOREST PARK (CHICAGO)
(N) GLENVIEW (CHICAGO)
(N) GREAT LAKES (NTC)
(A) ROCK ISLAND ARSENAL
(A) SAVANNAH ARMY DEPOT
(AF) SCOTT AIR FORCE BASE
1.20
1.14
1.26
1.26
1.26
1.26
1.05
1.08
1.22
INDIANAPOLIS
LOGANSPORT
(N) CRANE NWSC
(A) FORT BENJAMIN HARRISON
(AF) GRISSOM AIR FORCE BASE
(A) JEFFERSON PROVING GROUND
1.01
1.04
0.98
1.05
1.06
1.06
0.96
ILLINOIS
INDIANA
IOWA
(A)
BURLINGTON
DES MOINES
IOWA ARMY AMMO PLANT
KANSAS
MANHATTAN
WICHITA
(A) FORT LEAVENWORTH
(A) FORT RILEY
(A) KANSAS ARMY AMMO PLANT
(AF) MCCONNELL AIR FORCE BASE
KENTUCKY
(A)
(A)
(A)
(N)
LEXINGTON
LOUISVILLE
FORT CAMPBELL
FORT KNOX
LEXINGTON/BLUE GRASS AD
LOUISVILLE NAVAL AIR STATION
4
1.06
1.13
1.00
1.21
0.94
0.94
0.94
1.08
1.11
0.92
1.01
0.92
0.91
0.93
1.02
1.01
0.98
0.93
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART I - U.S. LOCATIONS
STATE
ACF
INDEX
LOCATION
LOUISIANA
NEW ORLEANS
SHREVEPORT
(AF) BARKSDALE AIR FORCE BASE
(A) FORT POLK
(A) LOUISIANA ARMY AMMO PLANT
(A) NEW ORLEANS ARMY BASE
0.90
0.93
0.86
0.86
0.94
0.85
0.93
BANGOR
PORTLAND
BRUNSWICK AREA
CUTLER WINTER HARBOR
1.02
1.07
0.97
0.95
0.95
BALTIMORE
LEXINGTON PARK
(A) ABERDEEN PROVING GROUND
(AF) ANDREWS AIR FORCE BASE
(N) ANNAPOLIS
(N) BETHESDA
(N) CHELTONHAM (DC)
(N) CHESAPEAKE BEACH
(A) FORT DETRICK
(A) FORT GEORGE G MEADE
(A) FORT RITCHIE
(A) HARRY DIAMOND LAB
(N) INDIAN HEAD
(N) PATUXENT RIVER AREA
(N) THURMONT
0.87
0.87
0.87
0.88
0.96
0.88
0.96
0.96
0.90
0.88
0.88
0.88
0.96
0.90
0.88
0.88
1.19
BOSTON
FITCHBURG
(A) ARMY MAT & MECH LAB
(A) FORT DEVENS
(AF) HANSCOM AIR FORCE BASE
1.24
1.14
1.12
1.27
1.20
MAINE
(N)
(N)
MARYLAND
MASSACHUSETTS
MICHIGAN
(A)
(AF
DETROIT
MARQUETTE
DETROIT ARSENAL
K I SAWYER AIR FORCE BASE
1.16
1.16
1.16
1.15
1.16
DULUTH
MINNEAPOLIS
1.17
1.16
1.19
MINNESOTA
5
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART I - U.S. LOCATIONS
STATE
ACF
INDEX
LOCATION
MISSISSIPPI
BILOXI
COLUMBUS
(AF) COLUMBUS AIR FORCE BASE
(N) GULFPORT AREA
(AF) KEESLER AIR FORCE BASE
(N) MERIDIAN NAVAL AIR STATION
0.85
0.88
0.83
0.83
0.88
0.88
0.88
KANSAS CITY
SEDALIA
(A) FORT LEONARD WOOD
(A) LAKE CITY ARMY AMMO PLANT
(A) ST LOUIS ARMY AMMO PLANT
(AF) WHITEMAN AIR FORCE BASE
0.99
1.04
0.93
1.11
1.06
1.10
1.04
BILLINGS
GREAT FALLS
(AF) MALMSTROM AIR FORCE BASE
1.16
1.17
1.16
1.16
GRAND ISLAND
OMAHA
(A) CORNHUSKER ARMY AMMO PLANT
(AF) OFFUTT AIR FORCE BASE
0.93
0.88
0.97
0.86
0.97
HAWTHORNE
LAS VEGAS
(N) FALLON
(A) HAWTHORNE ARMY AMMO PLANT
(AF) NELLIS AIR FORCE BASE
1.10
1.14
1.05
1.25
1.13
1.07
MISSOURI
MONTANA
NEBRASKA
NEVADA
NEW HAMPSHIRE
1.06
CONCORD
PORTSMOUTH
PORTSMOUTH AREA
1.07
1.05
1.05
NEWARK
TRENTON
(N) BAYONNE MOT
(N) EARLE
(A) FORT DIX
(A) FORT MONMOUTH
(AF) MCGUIRE AIR FORCE BASE
(A) PICATINNY ARSENAL
1.15
1.16
1.14
1.15
1.15
1.15
1.10
1.15
1.20
(N)
NEW JERSEY
6
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART I - U.S. LOCATIONS
STATE
ACF
INDEX
LOCATION
NEW MEXICO
ALAMOGORDO
ALBUQUERQUE
(AF) CANNON AIR FORCE BASE
(AF) HOLLOMAN AIR FORCE BASE
(AF) KIRTLAND AIR FORCE BASE
(A) WHITE SANDS MR
1.02
1.02
1.01
1.03
0.98
0.96
1.03
ALBANY
NEW YORK CITY
(A) FORT DRUM
(AF) GRIFFISS AIR FORCE BASE
(N) NIAGARA
(AF) PLATTSBURGH AIR FORCE BASE
(A) SENECA ARMY DEPOT
(N) STATEN ISLAND
(A) U S MILITARY ACADEMY
(A) WATERVLIET ARSENAL
1.18
1.05
1.30
1.12
1.04
1.20
1.07
1.08
1.24
1.23
1.00
0.84
FAYETTEVILLE
GREENSBORO
(N) CAMP LEJEUNE AREA
(N) CHERRY POINT
(A) FORT BRAGG
(N) NEW RIVER
(AF) POPE AIR FORCE BASE
(AF) SEYMOUR JOHNSON AFB
(A) SUNNY POINT
0.83
0.84
0.93
0.92
0.86
0.93
0.86
0.82
0.93
1.03
GRAND FORKS
MINOT
(AF) MINOT AIR FORCE BASE
0.98
1.08
1.08
DAYTON
YOUNGSTOWN
(A) RAVENNA ARMY AMMO PLANT
(AF) WRIGHT-PATTERSON AFB
0.97
0.96
0.97
0.96
0.96
NEW YORK
NORTH CAROLINA
NORTH DAKOTA
OHIO
7
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART I - U.S. LOCATIONS
STATE
ACF
INDEX
LOCATION
OKLAHOMA
LAWTON
OKLAHOMA CITY
(AF) ALTUS AIR FORCE BASE
(A) FORT SILL
(A) MCALESTER ARMY AMMO PLANT
(AF) TINKER AIR FORCE BASE
(AF) VANCE AIR FORCE BASE
OREGON
(A)
PENDLETON
PORTLAND
UMATILLA ARMY DEPOT
1.11
1.16
1.05
1.19
(A)
(A)
(A)
(N)
(A)
(N)
(A)
(N)
1.04
PHILADELPHIA
PITTSBURGH
CARLISLE BARRACKS
INDIANTOWN GAP MR
LETTERKENNY ARMY DEPOT
MECHANICSBURG AREA
NEW CUMBERLAND ARMY DEPOT
PHILADELPHIA AREA
TOBYHANNA ARMY DEPOT
WARMINSTER
1.09
0.99
0.97
1.04
1.02
0.97
0.97
1.09
1.06
1.05
1.07
NEWPORT
PROVIDENCE
1.09
1.04
PENNSYLVANIA
RHODE ISLAND
SOUTH CAROLINA
SOUTH DAKOTA
0.89
0.90
0.88
1.00
0.93
0.84
0.88
0.92
0.87
CHARLESTON
COLUMBIA
(N) BEAUFORT AREA
(AF) CHARLESTON AIR FORCE BASE
(A) FORT JACKSON
(AF) SHAW AIR FORCE BASE
0.88
0.86
1.03
0.88
0.86
0.86
0.99
RAPID CITY
SIOUX FALLS
(AF) ELLSWORTH AIR FORCE BASE
1.00
0.97
1.02
CHATTANOOGA
MEMPHIS
(AF) ARNOLD AIR FORCE BASE
(A) VOLUNTEER ORDINANCE WORKS
(N) MEMPHIS NAVAL AIR STATION
0.85
0.83
0.87
0.94
0.81
0.98
TENNESSEE
8
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART I - U.S. LOCATIONS
STATE
LOCATION
ACF
INDEX
SAN ANGELO
SAN ANTONIO
BROOKS AIR FORCE BASE
CAMP BULLIS
CORPUS CHRISTI AREA
DALLAS
DYESS AIR FORCE BASE
FORT BLISS
FORT HOOD
FORT SAM HOUSTON
GOODFELLOW AIR FORCE BASE
KELLY AIR FORCE BASE
KINGSVILLE AREA
LACKLAND AIR FORCE BASE
LAUGHLIN AIR FORCE BASE
LONE STAR ARMY AMMO PLANT
LONGHORN ARMY AMMO PLANT
RANDOLPH AIR FORCE BASE
RED REVER ARMY DEPOT
REESE AIR FORCE BASE
SHEPPARD AIR FORCE BASE
INGLESIDE NAVAL STATION
0.82
0.81
0.82
0.82
0.82
0.92
0.94
0.86
0.95
0.85
0.82
0.81
0.82
0.93
0.82
1.01
0.85
0.85
0.82
0.85
0.87
0.94
0.95
TEXAS
(AF)
(A)
(N)
(N)
(AF)
(A)
(A)
(A)
(AF)
(AF)
(N)
(AF)
(AF)
(A)
(A)
(AF)
(A)
(AF)
(AF)
(N)
UTAH
OGDEN
SALT LAKE CITY
(A) DUGWAY PROVING GROUND
(A) FORT DOUGLAS
(AF) HILL AIR FORCE BASE
(A) TOOELE ARMY DEPOT
VERMONT
0.97
0.98
0.96
1.04
0.96
0.98
1.06
0.88
0.86
0.89
BURLINGTON
MONTPELIER
VIRGINIA
NORFOLK
RICHMOND
(N) DAHLGREN
(A) FORT A P HILL
(A) FORT BELVOIR
(A) FORT EUSTIS
(A) FORT LEE
(A) FORT MONROE
(A) FORT MYER
(A) FORT PICKETT
(A) FORT STORY
(AF) LANGLEY AIR FORCE BASE
9
0.90
0.91
0.88
0.92
0.88
0.96
0.91
0.91
0.91
0.96
0.94
0.91
0.91
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART I - U.S. LOCATIONS
STATE
VIRGINIA (Cont)
(N)
(A)
(A)
LOCATION
ACF
INDEX
0.90
QUANTICO
RADFORD ARMY AMMO PLANT
VINT HILL FARMS
0.96
0.95
0.92
WASHINGTON
SPOKANE
TACOMA
(N) BREMERTON
(N) EVERETT
(AF) FAIRCHILD AIR FORCE BASE
(A) FORT LEWIS
(N) INDIAN HEAD
(AF) MCCHORD AIR FORCE BASE
(N) SILVERDALE
(N) WHIDBEY ISLAND
(A) YAKIMA FIRING RANGE
WEST VIRGINIA
1.10
1.09
1.10
1.16
1.09
1.05
1.10
1.16
1.10
1.11
1.13
1.04
(N)
0.96
BLUEFIELD
CHARLESTON
SUGAR GROVE
0.96
0.96
1.39
(A)
(A)
MADISON
MILWAUKEE
BADGER ARMY AMMO PLANT
FORT MCCOY
1.10
1.09
1.11
1.16
1.15
CASPER
CHEYENNE
(AF) F E WARREN AIR FORCE BASE
0.98
0.97
0.98
0.98
(AF) BOLLING AIR FORCE BASE
(A) FORT MCNAIR
(A) WALTER REED ARMY MED CENTER
0.96
0.96
0.96
0.96
WISCONSIN
WYOMING
WASHINGTON DC
10
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART II - OCONUS LOCATIONS
NATION
LOCATION
ACF
INDEX
1.78
1.78
2.70
ANTIGUA $/US $
ANTIGUA
1.29
1.52
1.16
1.14
1.36
1.51
AUSTRALIAN $/US $
DARWIN
PERTH
SYDNEY
WOOMERA AS
1.23
1.23
182.58
LAJES
1.56
1.56
1.00
BAHAMIAN $/US $
ANDROS ISLAND
1.58
1.58
0.377
BAHRAIN DINAR/US $
BAHRAIN
1.33
1.33
35.86
BRUSSELS
1.55
1.55
1.00
BERMUDA $/US
BERMUDA
1.26
ARGENTIA/NEWFOUNDLAND 1.26
1.44
CANADIAN $/US $
1.52
1.52
1.00
US $
GUANTANAMO
2.45
2.45
1.00
US $
DIEGO GARCIA
1.28
1.28
3.40
EGYPTIAN POUND/US $
CAIRO
1.42
1.50
1.47
1.28
1.28
1.79
DEUTSCHE MARK/US $
FRANKFURT
KAISERSLAUTERN
TRIER
SPANGDALHEM
0.74
0.74
280.40
ATHENS
3.18
3.18
6.80
GODHAAB (WUUK)
ANTIGUA
AUSTRALIA
AZORES
BAHAMAS
BAHRAIN
BELGIUM
BERMUDA
CANADA
CUBA
DIEGO GARCIA
EGYPT
GERMANY
GREECE
GREENLAND
11
CURRENCY
EXCHANGE REMARKS
PORTUGUESE ESCUDO/US $
BELGIUM FRANC/US $
DRACHMA/US $
DANISH KRONE/US $
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART II - OCONUS LOCATIONS
NATION
LOCATION
ACF
INDEX
2.00
2.00
1.00
GUAM
3.15
3.15
72.48
REYKJAVIK
1.19
1.19
1.21
1.20
1.22
1.13
1,752.00
LIRA/US $
ISOLA DI CAPO RIZZUTO
LA MADDALENA
NAPLES
SIGNOLLA
VENICE
1.56
1.64
1.58
1.49
1.64
1.47
130.45
YEN/US $
ATSUGI
MISAWA
OKINAWA
TOKYO
IWAKUNI
2.11
2.11
1.00
JOHNSTON ATOLL
1.04
1.06
1.10
1.05
1.05
0.96
1,342.40
CHINHAE
DMZ ZONE AREA
KUNSAN
OSAN
SEOUL
2.19
2.19
1.00
US $
KWAJALEIN
1.98
1.98
1.00
US $
MIDWAY ISLAND
1.20
1.20
9.73
DIRHAM/US $
CASABLANCA
1.10
1.10
2.01
GUILDER/US $
OSS
2.03
2.03
1.72
NEW ZEALAND $/US $
WELLINGTON
1.39
1.39
0.385
RILOMANI/US $
RUWI
GUAM
ICELAND
ITALY
JAPAN
JOHNSTON ATOLL
KOREA
KWAJALEIN
MIDWAY ISLAND
MOROCCO
NETHERLANDS
NEW ZEALAND
OMAN
12
CURRENCY
EXCHANGE REMARKS
US $
KRONA/US $
US $
WON/US $
TABLE B
AREA COST FACTOR INDEXES
19 August 1998
(No change from 3 April 1998)
PART II - OCONUS LOCATIONS
NATION
LOCATION
ACF
INDEX
1.06
1.06
1.00
PANAMA CITY
0.67
0.67
0.68
42.79
MANILA
SUBIC BAY
1.16
1.16
1.00
US $
SAN JUAN
2.23
2.23
1.00
US $
SEYCHELLES ISLAND
1.04
1.04
151.00
ROTA
0.80
0.80
0.80
196,475.00
ANKARA
INCIRLIK
1.41
1.43
1.35
1.42
1.44
0.62
LONDON
MANCHESTER
ST MAWGAN
EDZELL, SCOTLAND
PANAMA
PHILIPPINES
PUERTO RICO
SEYCHELLES ISLAND
SPAIN
TURKEY
UNITED KINGDOM
13
CURRENCY
EXCHANGE REMARKS
US $
PHILIPPINE PESO/US $
PESETA/US $
TURKEY LIRA/US $
BRITISH POUND/US $
TABLE C
SIZE ADJUSTMENT FACTORS
19 August 1998
(No change from 3 April 1998)
PART I - FACILITIES OTHER THAN MILITARY FAMILY HOUSING
Size
Size
Relationship Adjustment
Ratio
Factor
< 0.05
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.275
1.275
1.255
1.225
1.190
1.170
1.150
1.130
1.110
1.100
1.080
1.070
1.060
1.050
1.040
1.030
1.025
1.020
1.015
1.010
Size
Relationship
Ratio
Size
Adjustment
Factor
1.00
1.05
1.10
1.15
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
1.85
1.90
1.95
1.000
0.995
0.990
0.985
0.980
0.978
0.976
0.974
0.972
0.970
0.968
0.966
0.964
0.962
0.960
0.958
0.957
0.955
0.953
0.952
Size
Size
Relationship Adjustment
Ratio
Factor
2.00
2.05
2.10
2.15
2.20
2.25
2.30
2.35
2.40
2.45
2.50
2.55
2.60
2.65
2.70
2.75
2.80
2.85
2.90
2.95
0.950
0.949
0.948
0.947
0.946
0.945
0.944
0.943
0.942
0.941
0.940
0.939
0.938
0.937
0.936
0.935
0.934
0.933
0.932
0.931
Size
Size
Relationship Adjustment
Ratio
Factor
3.00
3.05
3.10
3.15
3.20
3.25
3.30
3.35
3.40
3.45
3.50
> 3.50
0.930
0.929
0.928
0.927
0.926
0.925
0.924
0.923
0.922
0.921
0.920
0.920
PART II - MILTARY FAMILY HOUSING
PART IIA: PROJECT SIZE
PART IIB: UNIT SIZE
(METRIC)
PART IIB: UNIT SIZE
(ENGLISH)
Number
of Units
Size
Adjustment
Factor A
Unit
Size
(Net m2)
Size
Adjustment
Factor B
Unit
Size
(Net SF)
Size
Adjustment
Factor B
1-9
10 - 19
20 - 49
50 - 99
100 - 199
200 - 299
300 - 499
Over 499
1.15
1.10
1.05
1.02
1.00
0.98
0.96
0.95
55 - 69
70 - 78
79 - 88
89 - 97
98 - 106
107 - 116
117 - 125
Over 125
1.05
1.03
1.01
1.00
0.99
0.98
0.97
0.96
600 - 749
750 - 849
850 - 949
950 - 1049
1050 - 1149
1150 - 1249
1250 - 1349
Over 1349
1.05
1.03
1.01
1.00
0.99
0.98
0.97
0.96
Note 1:
Multiple the appropriate Project Size Factor A by the appropriate Unit Size Factor B
to determine the Size Adjustment Factor for Miltary Family Housing projects.
Table D
OSD INFLATION INDICES
(OMB Rates for Projecting Future Escalation)
(Baselined to October 2000 as 1.000)
25 August 1998
(Note 1)
Fiscal
Year
Start
Fiscal
Year
(Month Yr)
ENR
Indices
(Raw)
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
Oct 79
Oct 80
Oct 81
Oct 82
Oct 83
Oct 84
Oct 85
Oct 86
Oct 87
Oct 88
Oct 89
Oct 90
Oct 91
Oct 92
Oct 93
Oct 94
Oct 95
Oct 96
Oct 97
Oct 98
Oct 99
Oct 00
Oct 01
Oct 02
Oct 03
Oct 04
Oct 05
Oct 06
Oct 07
Oct 08
Oct 09
1900
1976
2151
2262
2416
2424
2441
2511
2569
2612
2672
2728
2786
2867
3016
3116
3117
3277
3372
3423
3477
3536
3600
3665
3742
3824
3908
3994
4082
4172
4264
Note 1:
Note 2:
Note 3:
(Note 2)
OSD
Budget
Authority
%
(Note 3)
OSD
Inflation
Indices
1.500
1.600
1.700
1.800
1.800
2.100
2.200
2.200
2.200
2.200
2.200
2.200
2.200
0.546
0.568
0.619
0.650
0.695
0.697
0.702
0.722
0.739
0.751
0.768
0.785
0.801
0.824
0.867
0.896
0.896
0.942
0.970
0.984
1.000
1.017
1.035
1.054
1.076
1.100
1.124
1.149
1.174
1.200
1.226
Inflation multipliers through October 1997 are based on
Engineering News Record Building Construction Indices.
Inflation multipliers after October 1997 are projections
based on the Price Escalation Indices (Annual Rates in
Percentages) for the OSD Budget Authority for Rates for
Military Construction/Military Family Housing Construction
per guidance issued by the Principal Deputy Under
Secretary of Defense (Comptroller) on 26 June 1997.
Use these inflation indices to adjust unit costs for projects
beyond FY 2001