LOS ANGELES COMMUNITY COLLEGE DISTRICT MEASURE J BOND CONSTRUCTION PROGRAM

advertisement
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
Final Editorial Review Not Completed
PLEASE COMPLETE
Date/Time Due
Services Requested:
Format
Editorial Review
Name:
Kristen Olko
Tel./Ext.:
213.533.3347
Special Instructions:
_v4
LOS ANGELES COMMUNITY COLLEGE DISTRICT
MEASURE J BOND CONSTRUCTION PROGRAM
Statement of Expenditures of Bond Proceeds
and Unaudited Supplementary Schedule
Year ended June 30, 2012
(With Independent Auditors’ Reports Thereon)
Revisions
Print
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
LOS ANGELES COMMUNITY COLLEGE DISTRICT
MEASURE J BOND CONSTRUCTION PROGRAM
Table of Contents
Page
Independent Auditors’ Report
1
Statement of Expenditures of Bond Proceeds
3
Notes to Statement of Expenditures of Bond Proceeds
4
Unaudited Supplementary Schedule of Expenditures of Bond Proceeds
6
Notes to Unaudited Supplementary Schedule of Expenditures of Bond Proceeds
7
Independent Auditors’ Report on Internal Control over Financial Reporting and on Compliance
and Other Matters Based on an Audit of the Measure J Bond Construction Program
Statement of Expenditures of Bond Proceeds Performed in Accordance with Government
Auditing Standards
9
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
Independent Auditors’ Report
The Honorable Board of Trustees
Los Angeles Community College District
Los Angeles, California:
We have audited the accompanying statement of expenditures of bond proceeds of the Measure J Bond
Construction Program of the Los Angeles Community College District (the District) for the year ended
June 30, 2012, as listed in the accompanying table of contents. The statement of expenditures of bond
proceeds is the responsibility of the District’s management. Our responsibility is to express an opinion on
the accompanying statement of expenditures of bond proceeds based on our audit.
We conducted our audit in accordance with auditing standards generally accepted in the United States of
America and the standards applicable to financial audits contained in Government Auditing Standards,
issued by the Comptroller General of the United States. Those standards require that we plan and perform
the audit to obtain reasonable assurance about whether the statement of expenditures of bond proceeds is
free of material misstatement. An audit includes consideration of internal control over financial reporting
as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose
of expressing an opinion on the effectiveness of the District’s internal control over financial reporting.
Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence
supporting the amounts and disclosures in the statement of expenditures of bond proceeds, assessing the
accounting principles used and significant estimates made by management, as well as evaluating the
overall statement presentation. We believe that our audit provides a reasonable basis for our opinion.
As described in note 2 to the statement of expenditures of bond proceeds, the accompanying statement of
expenditures of bond proceeds was prepared to comply with the requirements of California’s
Proposition 39, Smaller Classes, Safer Schools and Financial Accountable Act.
In our opinion, the statement of expenditures of bond proceeds referred to above presents fairly, in all
material respects, the expenditures of bond proceeds of the Measure J Bond Construction Program for the
year ended June 30, 2012 in conformity with U.S. generally accepted accounting principles.
In accordance with Government Auditing Standards, we have also issued our report dated December 19,
2012 on our consideration of the District’s internal control over financial reporting and on our tests of its
compliance with certain provisions of laws, regulations, contracts, and grant agreements and other matters.
The purpose of that report is to describe the scope of our testing of internal control over financial reporting
and compliance and the results of that testing, and not to provide an opinion on the internal control over
financial reporting or on compliance. That report is an integral part of an audit performed in accordance
with Government Auditing Standards and should be considered in assessing the results of our audit.
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
Our audit was conducted for the purpose of forming an opinion on the statement of expenditures of bond
proceeds for the year ended June 30, 2012. The accompanying supplementary schedule of expenditures of
bond proceeds of the Measure J Bond Construction Program of the District for the period from
November 4, 2008 (inception) through June 30, 2012 is presented for purposes of additional analysis and is
not a required part of the statement of expenditures of bond proceeds. The supplementary schedule of
expenditures of bond proceeds has not been subjected to the auditing procedures applied in the audit of the
statement of expenditures of bond proceeds for the year ended June 30, 2012, and accordingly, we express
no opinion on it.
December 19, 2012
2
DRAFT 12/12/2012 3:40 PM 116545_12_LACCD Measure J_FS.xlsx
LOS ANGELES COMMUNITY COLLEGE DISTRICT
MEASURE J BOND CONSTRUCTION PROGRAM
Statement of Expenditures of Bond Proceeds
Year ended June 30, 2012
College direct costs:
Structural and equipment costs:
Construction (new)
Construction (renovation)
Hardscape/landscape
Temporary facilities
Furniture, fixtures, and equipment
$
Total structural and equipment costs
169,191,530
41,638,471
193,527
1,288,205
16,745,266
229,056,999
Other costs:
Land acquisition
442,705
Total other costs
442,705
Development and support costs:
Master planning/EIR
Pre-design/programming
Design
Specialty consulting
Project management
Inspection and testing
Reimbursables
544,479
454,875
25,005,934
33,315,700
29,481,863
6,799,768
1,150,515
Total development and support costs
96,753,134
Total college direct costs
326,252,838
Program-wide costs:
Program management
Legal consulting fees
Compliance and audit fees
Rents and leases
19,571,885
4,836,684
1,669,354
3,726,508
Total program-wide costs
29,804,431
Total college direct costs and programwide costs
See accompanying notes to statement of expenditures of bond proceeds
3
$
356,057,269
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
LOS ANGELES COMMUNITY COLLEGE DISTRICT
MEASURE J BOND CONSTRUCTION PROGRAM
Notes to Statement of Expenditures of Bond Proceeds
Year ended June 30, 2012
(1)
Program Background
In April 2001, the Los Angeles Community College District (the District) became the first community
college district in the State of California to pass a property tax financed bond (Proposition A) under the
requirements of the Proposition 39, Smaller Classes, Safer Schools and Financial Accountability Act, of
the State of California (the Act). Effective April 12, 2007, the District’s board of trustees approved an
award of the contract for program management (Program Manager) services to URS Corporation. The
Program Manager is responsible for managing all program-related activities, including the maintenance of
the master schedule and the master program budget. The Program Manager provides its own staff and
services for budgeting, accounting, contracting, and supervising the program development.
The program is intended to increase educational opportunities, raise student achievement, and improve
health and safety conditions on the campuses of the nine colleges within the District through the
replacement and/or repair and rehabilitation of deteriorating buildings; the construction, furnishing, and
equipping of classrooms, laboratories, libraries, and related facilities; the repair and upgrading of electrical
wiring for computer technology, heating, air conditioning, and plumbing; complete earthquake retrofitting;
improvement of campus safety, fire security, parking, and lighting; and the improvement of current or to be
acquired real property to relieve overcrowding of the facilities on these campuses.
The District’s board of trustees approved an award of the contract for program management
(Program Manager) services to Daniel, Mann, Johnson & Mendenhall/Jenkins/Gales & Martinez, Inc.
(DMJM/JGM). Effective April 12, 2007, DMJM/JGM was replaced by a new Program Manager, URS
Corporation. The current contract between the District and Program Manager expired on April 12, 2012
and has subsequently been extended through January 2013.
The Program Manager is responsible for managing all program-related activities, including the
maintenance of the master schedule and the master program budget. The Program Manager provides its
own staff and services for budgeting, accounting, contracting, and supervising the program development.
(2)
Basis of Presentation
The accompanying statement of expenditures of bond proceeds for the year ended June 30, 2012 has been
prepared on the accrual basis of accounting. The Act requires an annual, independent financial audit of the
proceeds from the sale of the school facilities bonds until all of the proceeds have been expended.
Accordingly, the accompanying statement of expenditures of bond proceeds includes all amounts expended
using bond proceeds regardless of expenditure type.
(3)
Bond Issuances
On November 4, 2008, the voters of the Los Angeles County (the County) passed Measure J, a $3.5 billion
G.O. Bond measure. The bond measure was designed to finance construction, building acquisition,
equipment, and improvement of college and support facilities at the various campuses of the District.
On March 19, 2009, the District issued the 2009 Series A G.O. Bonds (Measure J) in the amount of
$350,000,000 and the 2009 Taxable Series B G.O. Bonds (Measure J) in the amount of $75,000,000 with
various interest rates ranging from 4.50% to 7.53%, maturing in 2034.
4
(Continued)
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
LOS ANGELES COMMUNITY COLLEGE DISTRICT
MEASURE J BOND CONSTRUCTION PROGRAM
Notes to Statement of Expenditures of Bond Proceeds
Year ended June 30, 2012
On July 22, 2010, the District issued $900,000,000 aggregate principal amount in G.O. Bonds, 2008
Election (Measure J) 2010 Series E Build America Bonds with 6.60% and 6.75% interest rates maturing in
2049. The proceeds are to be used to finance the construction, equipping, and improving of college and
support facilities at nine colleges.
On August 10, 2010, the District issued $175,000,000 aggregate principal amount in G.O. Bonds, 2008
Election (Measure J) 2010 Series C with 5.25% interest rate maturing in 2039. On August 10, 2010, the
District issued $125,000,000 aggregate principal amount in G.O. Bonds, 2008 Election (Measure J) 2010
Taxable Series D with 6.68% interest rate maturing in 2036. The proceeds from these two issues were used
to pay off the bond anticipation notes (BAN) payable of $300,000,000 received in June 2010.
5
DRAFT 12/12/2012 3:40 PM 116545_12_LACCD Measure J_FS.xlsx
LOS ANGELES COMMUNITY COLLEGE DISTRICT
MEASURE J BOND CONSTRUCTION PROGRAM
Supplementary Statement of Expenditures of Bond Proceeds
For the period from November 4, 2008 (inception) through June 30, 2012
(Unaudited)
2012 Budget
College direct costs:
Structural and equipment costs:
Construction (new)
Construction (renovation)
Hardscape/landscape
Temporary facilities
Furniture, fixtures, and equipment
Total structural and equipment costs
Other costs:
Land acquisition
Development and support costs:
Master planning/EIR
Pre-design/programming
Design
Specialty consulting
Project management
Inspection and testing
Reimbursables
Total development and support costs
Total college direct costs
Program-wide costs:
Program management
Legal consulting fees
Compliance and audit fees
Bond measure election costs
Rents and leases
Total program-wide costs
Total college direct costs and programwide costs
Unallocated interest (note 1)
Total college direct costs, program-wide costs, and unallocated interest earned
Period from
November 4,
2008
(inception)
through
June 30, 2012
Reclassifications
Subtotal
$ 1,577,916,743
752,796,333
— 8,119,720
208,066,953
371,172,707
245,835,721
193,527
4,385,988
74,153,882
15,894,025
13,642,648
— — 451,090
387,066,732
259,478,369
193,527
4,385,988
74,604,972
2,546,899,749
695,741,825
29,987,763
725,729,588
Cumulative
reimbursements
from the state
as of
June 30, 2012
(6,991,104)
(5,492,289)
— — (1,986,454)
(14,469,847)
Cumulative
expenditures
of bond
proceeds
for the period
from November 4,
2008 (inception)
through
June 30, 2012
380,075,628
253,986,080
193,527
4,385,988
72,618,518
711,259,741
???
59,679,219
64,579,600
6,970,758
5,890,744
271,039,370
231,879,465
173,965,606
75,149,531
6,665,312
4,648,969
4,020,918
146,889,541
120,961,667
76,694,508
17,919,493
3,529,503
12,685,000
20,445
— 3,130,052
288,942
14,565
153,854
24,026
77,264,600
— 77,264,600
4,669,414
4,020,918
150,019,593
121,250,609
76,709,073
18,073,347
3,553,529
— — (635,899)
— — (146,535)
— 4,669,414
4,020,918
149,383,694
121,250,609
76,709,073
17,926,812
3,553,529
771,560,786
374,664,599
3,631,884
378,296,483
(782,434)
377,514,049
3,378,139,754
1,134,986,024
46,304,647
1,181,290,671
(15,252,281)
1,166,038,390
98,482,594
21,101,110
— — 28,820,069
61,863,028
11,740,021
2,689,198
966,188
7,467,513
— (1,788)
75,560
— — 61,863,028
11,738,233
2,764,758
966,188
7,467,513
148,403,773
84,725,948
73,772
84,799,720
3,526,543,527
1,219,711,972
46,378,419
1,266,090,391
16,738,003
$ 3,543,281,530
See accompanying notes to unaudited supplementary schedule of expenditures of bond proceeds
6
— — — — — — (15,252,281)
61,863,028
11,738,233
2,764,758
966,188
7,467,513
84,799,720
1,250,838,110
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
UNAUDITED SUPPLEMENTARY SCHEDULE OF EXPENDITURES
OF BOND PROCEEDS
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
LOS ANGELES COMMUNITY COLLEGE DISTRICT
MEASURE J BOND CONSTRUCTION PROGRAM
Notes to Unaudited Supplementary Schedule of Expenditures of Bond Proceeds
For the period from
November 4, 2008 (inception) through June 30, 2012
(Unaudited)
(1)
Background
The unaudited supplementary schedule of expenditures of bond proceeds presents expenditures for the
period from November 4, 2008 (inception) through June 30, 2012.
(2)
Basis of Presentation
The accompanying statement of unaudited expenditures of bond proceeds has been prepared on the accrual
basis of accounting. The Proposition 39, Smaller Classes, Safer Schools and Financial Accountability Act,
of the State of California (the Act) requires an annual, independent financial audit of the proceeds from the
sale of the school facilities bonds until all of the proceeds have been expended. Accordingly, the
accompanying unaudited statement of expenditures of bond proceeds includes all amounts expended using
bond proceeds regardless of expenditure type, since inception.
The unaudited supplementary schedule of expenditures of bond proceeds includes the following:
(a)
Budget
The amounts included within the budget column in the accompanying unaudited supplementary
schedule of expenditures of bond proceeds represent estimates of the costs that will be expended to
complete the various projects at each of the Los Angeles Community College District’s (the District)
colleges.
(b)
Cumulative Expenditures
The amounts included within the cumulative expenditures of bond proceeds in the accompanying
unaudited supplementary schedule of expenditures of bond proceeds may include reclassifications
and reimbursements from other funding sources for the period from November 4, 2008 (inception)
through June 30, 2012.
(c)
Interest Earned
Interest earned on bond issuances that has not been expended is added to project budgets upon
approval by the District. Interest earned that has not yet been approved for specific projects is
included in unallocated interest earned.
(d)
Cumulative Reimbursements from State
During the period from November 4, 2008 (inception) through June 30, 2012, the District received
amounts from the State of California as reimbursement for various multi-funded projects. These
projects were to be funded by both state funds and bond proceeds. Prior to filing claims and receipt
of funds from the state, eligible Measure J bond proceeds were used to fund the projects. The
reimbursements received by the District, totaling $15,252,287 for period from November 4, 2008
(inception) through June 30, 2012, have been reflected in the accompanying unaudited
supplementary schedule of expenditures of bond proceeds as a reduction of expenditures made with
bond proceeds by cost classification on a cumulative basis.
7
(Continued)
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
LOS ANGELES COMMUNITY COLLEGE DISTRICT
MEASURE J BOND CONSTRUCTION PROGRAM
Notes to Unaudited Supplementary Schedule of Expenditures of Bond Proceeds
For the period from
November 4, 2008 (inception) through June 30, 2012
(Unaudited)
(e)
Reclassifications
Certain adjustments and reclassifications were made between the District’s various Proposition 39
bond programs during the year ended June 30, 2012, which were related to prior years. Such
amounts totaling $1,061,150 were reclassified to Measure J funds from Proposition AA and
Proposition A.
In addition, during the ordinary course of operations, management decisions were made to reallocate
expenditures to one or more of the bond programs for budgetary purposes. Expenditure transfers
from one bond program to another bond program were made resulting in a net increase in Measure J
expenditures of $47,439,569.
(3)
Reconciliation of Bond Proceeds
The following is a summary of total authorized and issued bond funds available at June 30, 2012:
Bonds authorized and issued
Bonds authorized but not yet issued
$
Total bonds authorized
1,625,000,000
1,875,000,000
3,500,000,000
Interest earned for the period from November 4, 2008 (inception) through
June 30, 2012
Additional proceeds from other income
28,385,436
14,896,090
Total bonds authorized and interest earned
3,543,281,526
Less expenditures of bond proceeds for the period from November 4, 2008
(inception) through June 30, 2012
Less unissued bonds at June 30, 2012
Total authorized and issued bond funds available at June 30, 2012
8
(1,250,838,110)
(1,875,000,000)
$
417,443,416
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
Independent Auditors’ Report on Internal Control over Financial Reporting
and on Compliance and Other Matters Based on an Audit of the Measure J
Bond Construction Program Statement of Expenditures of Bond Proceeds
Performed in Accordance with Government Auditing Standards
The Honorable Board of Trustees
Los Angeles Community College District
Los Angeles, California:
We have audited the Measure J Bond Construction Program Statement of Expenditures of Bond Proceeds
of the Los Angeles Community College District (the District) for the year ended June 30, 2012, and have
issued our report thereon dated December 19, 2012. We conducted our audit in accordance with auditing
standards generally accepted in the United States of America and the standards applicable to financial
audits contained in Government Auditing Standards issued by the Comptroller General of the United
States.
Internal Control over Financial Reporting
Management of the District is responsible for establishing and maintaining effective internal control over
financial reporting. In planning and performing our audit, we considered the District’s internal control over
financial reporting as a basis for designing our auditing procedures for the purpose of expressing our
opinion on the financial statements, but not for the purpose of expressing an opinion on the effectiveness of
the District’s internal control over financial reporting. Accordingly, we do not express an opinion on the
effectiveness of the District’s internal control over financial reporting.
Our consideration of internal control over financial reporting was for the limited purpose described in the
preceding paragraph and was not designed to identify all deficiencies in internal control over financial
reporting that might be significant deficiencies or material weaknesses and therefore, there can be no
assurance that all deficiencies, significant deficiencies, or material weaknesses have been identified
However, as discussed below, we identified certain deficiencies in internal control over financial reporting
that we consider to be material weaknesses.
A deficiency in internal control over financial reporting exists when the design or operation of a control
does not allow management or employees, in the normal course of performing their assigned functions, to
prevent, or detect and correct misstatements on a timely basis. A material weakness is a deficiency, or
combination of deficiencies, in internal control over financial reporting, such that there is a reasonable
possibility that a material misstatement of the entity’s financial statements will not be prevented, or
detected and corrected on a timely basis. We consider the following deficiencies in the District’s internal
control over financial reporting to be a material weakness.
Bond Program Expenditures
The District’s bond program (measures A, AA and J), is currently the largest nonoperating financial
activity being undertaken by the District, with total expenditures expected to exceed $6 billion, and
currently representing over $550 million in annual expenditures. We performed testwork over the
9
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
expenditures made with the use of bond proceeds for the year ended June 30, 2012, using a sample of 942
items and representing $271.7 million in expenditures for the combined measures. The District engages a
service provider to manage, process and account for the bond proceeds. The District separately records in
its financial statements the expenditures processed by its service provider, and other entries as required by
U.S. Generally Accepted Accounting Policies (GAAP). The following findings address the controls and
process activities at both the service provider and the District.
Criteria
Given the size and magnitude of the bond program, management of the District should have adequate
controls in place over bond expenditures such that they are recorded regularly and accurately, and no less
than monthly, in the financial statements of the District and the individual bond expenditure reports, and be
subject to an independent review.
Observations and Recommendations
The service provider accounts for expenditures on a cash basis. As a result, expenditures are frequently
reported in the wrong period. We noted approximately $2.75 million and $14 million, for 2012 and 2011,
respectively, of bond expenditures that were not recorded in the financial statements of the District or the
individual bond reports in the proper period. While there may be system limitations, the service provider,
along with the District, should develop and enforce control processes that would ensure all expenditures
are reported timely and accurately in the financial statements of the District and the separate bond
expenditure reports.
Amounts expended and provided to the District by the service provider are reported in the financial records
of the District as expended. During the 2011 audit, we identified control weaknesses in the bond
expenditure reconciliations and recommended that the District implement a documented reconciliation
process. The District has developed a written monthly reconciliation process that was implemented in
2012. However, we believe the process needs to be enhanced as reconciliations between amounts recorded
by the service provider and amounts recorded by the District are not prepared properly, and do not identify
adjustments that need to be made to the financial statements of the District or the separate bond
expenditure reports. Additionally, we did not identify a process whereby an individual, separate from the
preparer of such information, performs a formal monthly and documented review of the reconciliation or
an evaluation that the amounts are reported completely, accurately or timely. As a result, other accounting
entries required under GAAP, including the allocation of program management fees, are not properly
recorded throughout the year, causing undue inefficiencies and inaccuracies in the preparation of the
financial records of the District.
We recommend that there be a District employee dedicated to accounting for the expenditures of bond
funds and that these types of control activities occur monthly and are properly reconciled to amounts
provided by the service provider. Additionally, we recommend that the controls and processes in place to
reconcile bond expenditures in the financial statements of the District to those provided by the service
provider be available, such that other District employees would have sufficient information to perform this
function during periods of employee transition.
Cause
The procedures in place for the recording and review of bond expenditures in the financial statements of
the District or the separate bond expenditure reports require enhancement to include a proper reconciliation
and review process. The service provider recording expenditures on a cash basis without a strong trail of
contemporaneously prepared documentation for nonroutine transactions, coupled with a lack of timely
10
DRAFT 12/12/2012 3:44 PM 116545_12_LACCD Measure J_FS.docx
coordination and reconciliation of amounts expended between the District and the service provider
contribute to the issues noted.
Views of Responsible Officials
All financial statements are currently reported on accrual basis and comply with U.S. Generally Accepted
Accounting Policies (GAAP). The amount of $2.75 million for 2012 of bond expenditures has been
recorded in the current financial statements of the District and the individual bond expenditure reports.
Management agrees that certain amounts were not recorded in the proper period due to the nature of
estimating the accrued amounts by campus project management staff and other vendors on the program.
Further improvements will be implemented to include additional training to campus project management
staff and other vendors on the program and an increase in oversight by BuildLACCD.
The District will continue to work on the implementation of its newly developed monthly reconciliation
process and provide additional training to enhance the process to ensure reconciliations are prepared timely
and properly and that any adjustments that need to be made to the financial statements are made. We will
also add a procedure to the process that will more clearly identify that an individual separate from the
preparer of such reconciliations performs a formal monthly and documented review of the reconciliation as
required in the written procedures.
Compliance and Other Matters
As part of obtaining reasonable assurance about whether the Measure J Bond Construction Program
Statement of Expenditures of Bond Proceeds is free of material misstatement, we performed tests of its
compliance with certain provisions of laws, regulations, and contracts, noncompliance with which could
have a direct and material effect on the determination of financial statement amounts. However, providing
an opinion on compliance with those provisions was not an objective of our audit, and accordingly, we do
not express such an opinion. The results of our tests disclosed no instances of noncompliance or other
matters that are required to be reported under Government Auditing Standards.
The District’s response to the findings identified in our audit is described above. However, we did not audit
the District’s response, and accordingly, we express no opinion on the response.
This report is intended solely for the information and use of the Board of Trustees, management, and
federal awarding agencies and pass-through entities, and is not intended to be and should not be used by
anyone other than these specified parties.
December 19, 2012
11
Download