West Los Angeles College 2013 Draft Facilities Master Plan Update November 20, 2013 Facilities Master Planning and Oversight Committee PURPOSE OF THE MASTER PLAN UPDATE • Align College Facilities Planning with Needs Identified in the Educational Master Planning Process • • • • • • • • • Match Facility Performance to the Requirements of Identified Needs Plan for Optimal Utilization Rates Design for Flexible Teaching Space and Facilitate Diverse Pedagogies Minimize Cost of Ownership by Limiting Footprint and Updating Existing Facilities Establish Infrastructure/Technology for the Future Optimize Student Engagement and Provide Communal, Public Space Advance Program Adjacencies and Reinforce Campus Academic Core Integrate Accessibility into Design Respond to Critiques of Construction Agenda Page 2 PURPOSE OF THE MASTER PLAN UPDATE cont’d • Build for 2026, Plan through 2036 • Maintain CEQA Compliance • Support Growth Across College without Over-Building • Support Projected Growth Rates Across Campus to 2026 • No Programs Underserved • Projected 2036 Capacity Demands Not Provided “Too Early” • Allows for Future State Funding • Provide Foundation for Next Master-Planning Agenda • Remain Consistent with a 45-Year History of Long Outlook, Pragmatic Development Page 3 MASTER PLAN UPDATE CRITERIA Page 4 Reference Documents Educational Master Plan • • • • • Required by California Community College Chancellor’s Office Developed and Managed by the College Current Plan for Period 2009-2014 “Growth Trends” are Phase 1 of the Educational Master Plan, 2014-19 Phase 2 of the Educational Master Plan in progress (2013-14): programs and processes to implement Phase 1 and achieve educational attainment. Page 5 Reference Documents Short-Range Facilities Master Plan (Operations) • • • • • Required by California Community College Chancellor’s Office Developed and Managed by the College Required to Support the Educational Master Plan Requires Facilities Master Plan & Oversight Committee Approval Date Completed: October 2, 2013 Page 6 Reference Documents Current/Approved 2009 Long-Range Facilities Master Plan (Construction) • Reasons to Update Long-Range Facilities Master Plan • BOT rule 2605.1 / Admin Reg B-24 / Ed Code 70902 • Incorporates changes generated by Education Master Plan • Updated to reflect Short-Range Facilities Master Plan • Revised to include building name changes • Date Approved by Board of Trustees – August 2010 • Planning up to 2022 Page 7 Current/Approved 2009 Long-Range Facilities Master Plan On August 11, 2010, the LACCD Board of Trustees 1. Approved the 2009 WLAC Facilities Master Plan Update (as Revised June 2010) 2. Certified the Final Supplemental Environmental Impact Report Page 8 MASTER PLAN UPDATE CRITERIA Page 9 GROWTH PROJECTION FACTORS • • • • • • • • Available Funding (vs. Demand) Service Area Population Growth Historic Enrollment Trends Participation Rate (Enrollment ÷ Service Area Population) Full-Time Students as % of Total Student Population (WSCH per Student) Influence of Economic Conditions on Enrollment Influence of UC and CSU System Changes Success Rates of Area High Schools Page 10 Page 11 Page 12 Page 13 Page 14 VS. Page 15 Page 16 Page 17 Page 18 ADDITIONAL FACTORS CONSIDERED • An increasing number of residents are returning to community colleges to train for new careers as a result of job losses stemming from the Great Recession. (Source: California Postsecondary Education Commission) • UC and CSU are increasing fees, furloughing faculty, and limiting future enrollments. (Source: California Postsecondary Education Commission) • The top ten WLAC feeder schools have an average Academic Performance Index (API) ranking of 701; the State goal for each school is 800. (Source: WLAC Office of Research & Planning; CA Department of Education) • The College has met/exceeded funded enrollment capacity every year since 2000. • The inclusion of Beverly Hills and Marina del Rey in the College’s Service Area affects demographic data—population change, educational attainment, etc.—though the College serves 70% African American and Latino students who do not come from these area. • The high school graduation rate from 2008-2011 in the College’s Service Area has increased 1.17%, compared to -0.11% District-wide. This suggests that the number of likely students is increasing at a faster rate than total population growth. Page 19 SUMMARY OF COLLEGE-WIDE GROWTH PROJECTION On-Campus CREDIT CENSUS ENROLLMENT (i.e. Headcount) • Fall 2012: 8,233 • 2036: 15,300 • 186% Total Growth @ 2.6% per Year On-Campus STUDENT CONTACT HOURS (per Semester) • Fall 2012: 1,293,933 • 2036: 2,731,636 • 211% Total Growth @ 3.2% per Year Note: Projections determined through Phase I of the Educational Master Plan process and approved by the WLAC Academic Senate and College Council. Page 20 EDUCATIONAL MASTER PLAN, 2014-19, PHASE 1 Approved by the WLAC Academic Senate and College Council Page 21 MASTER PLAN UPDATE CRITERIA Page 22 CURRENT & PROJECTED INSTRUCTIONAL FACILITY UTILIZATION Page 23 Page 24 MASTER PLAN UPDATE CRITERIA Page 25 GEOGRAPHIC AREAS SERVED BY CAMPUS Geographic Areas Served • Hills • Westside • Central City • South Los Angeles Peer Institutions • City College • Southwest College • Santa Monica College • Trade Tech College • El Camino College Core Service Area Extended Service Area Page 26 MASTER PLAN UPDATE CRITERIA Page 27 PRIORITIES Toward 2026 Instructional Space Needs Page 28 PRIORITIES (Unfunded) Toward 2036 Instructional / Support Space Needs Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45 Page 46 Page 47 MASTER PLAN UPDATE CRITERIA Page 48 Current Campus Map (2013) Page 49 Proposed 2013 Construction Master Plan Update (Bond Funded) Page 50 Projected Required Future Facilities (Beyond Current Bond Program) Page 51 West Los Angeles College 2013 Draft Facilities Master Plan Update Supplemental Materials November 20, 2013 Facilities Master Planning and Oversight Committee SUPPLEMENTAL MATERIALS CONTENTS 1. Additional Reference Documents………………………….......…pg. 3 2. Space Inventory & Facilities Assessment………………………....pg. 8 3. Proposed Facilities Master Plan: Strategies & Budget……....….pg. 12 Additional Reference Documents Page 3 Page 4 ENVIRONMENTAL IMPACT REPORT • The approved 2009 Supplemental Environmental Impact Report (SEIR) studied and defined the mitigation measures required for a CEQAcompliant, maximum 15,300 On-Campus Student Headcount. • The SEIR specifies a minimum parking count of 2,487. Page 5 2003 Campus Map Page 6 2005 Master Plan Page 7 2009 Master Plan (Approved Drawing) Page 8 Space Inventory & Facility Assessment Page 9 SUMMARY OF FACILITIES ASSESSMENT • A large number of instructional spaces are currently under-utilized because the size, configuration, and technology capabilities do not match the facilities requirements established through Program Review and the Educational Master Plan: • 28 General Lecture Rooms • 5 General Laboratory Rooms • 3 Specialized Laboratory Rooms • The majority of existing under-utilized spaces may be readily remodeled into “needed” spaces but may not be suitable for conversion to highly specialized labs. • Original campus buildings are substandard in a number of areas, including: • IT/AV Capabilities • Wear and Tear Page 10 Page 11 Page 12 Proposed Facilities Master Plan Strategies & Budget Page 13 SUMMARY OF MASTER PLAN STRATEGIES • Remodel Under-Utilized or Inactive Spaces • Limit New Construction to Unique, Specialized Spaces • Locate Programs to Improve Departmental Cohesion and Inter-Departmental Synergies • Provide a Student-centric Campus Environment • Eliminate Temporary Modular Buildings and 1969 Bungalow Buildings • Eliminate the Need for Swing Space • Design within Budget and Prioritize Projects to Guard Against Contingencies Page 14 Page 15 Proposed Master Plan – STUDENT Proposed Master PlanACTIVITY – STUDENT ACTIVITY Page 16 Proposed 2013 Construction Master Plan Update View of Campus Core (East to West) Page 17