CANCELLED UNIFIED FACILITIES CRITERIA (UFC) DoD FACILITIES PRICING GUIDE

advertisement
UFC 3-701-01
March 2011
ED
UNIFIED FACILITIES CRITERIA (UFC)
C
AN
C
EL
L
DoD FACILITIES PRICING GUIDE
FOR FY 2011
APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED
UFC 3-701-01
March 2011
UNIFIED FACILITIES CRITERIA (UFC)
DoD FACILITIES PRICING GUIDE FOR FY 2011
ED
Any copyrighted material included in this UFC is identified at its point of use.
Use of the copyrighted material apart from this UFC must have the permission of the
copyright holder.
U.S. ARMY CORPS OF ENGINEERS
NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity)
AIR FORCE CIVIL ENGINEER SUPPORT AGENCY
EL
L
OFFICE OF THE DEPUTY UNDER SECRETARY OF DEFENSE FOR
INSTALLATIONS AND ENVIRONMENT
Record of Changes (changes are indicated by \1\ ... /1/)
Date
Location
C
AN
C
Change No.
This UFC supersedes UFC 3-701-01, dated June 2010.
2
UFC 3-701-01
March 2011
FOREWORD
ED
The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides
planning, design, construction, sustainment, restoration, and modernization criteria, and applies
to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance
with USD(AT&L) Memorandum dated 29 May 2002. UFC will be used for all DoD projects and
work for other customers where appropriate. All construction outside of the United States is
also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction
Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.)
Therefore, the acquisition team must ensure compliance with the more stringent of the UFC, the
SOFA, the HNFA, and the BIA, as applicable.
EL
L
UFC are living documents and will be periodically reviewed, updated, and made available to
users as part of the Services’ responsibility for providing technical criteria for military
construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities
Engineering Command (NAVFAC), and Air Force Center for Engineering
and the Environment (AFCEE) are responsible for administration of the UFC system. Defense
agencies should contact the preparing service for document interpretation and improvements.
Technical content of UFC is the responsibility of the cognizant DoD working group.
Recommended changes with supporting rationale should be sent to the respective service
proponent office by the following electronic form: Criteria Change Request (CCR). The form is
also accessible from the Internet sites listed below.
UFC are effective upon issuance and are distributed only in electronic media from the following
source:
•
Whole Building Design Guide web site http://dod.wbdg.org/.
AN
C
Hard copies of UFC printed from electronic media should be checked against the current
electronic version prior to use to ensure that they are current.
JAMES C. DALTON, P.E.
C
Chief, Engineering and Construction
U.S. Army Corps of Engineers
TERRY G. EDWARDS, P.E.
Director, Air Force Center for
Engineering and the Environment
Department of the Air Force
JOSEPH E. GOTT, P.E.
Chief Engineer
Naval Facilities Engineering Command
MICHAEL McANDREW
Director, Facility Investment and
Management
Office of the Deputy Under Secretary of
Defense (Installations and Environment)
3
UFC 3-701-01
March 2011
UNIFIED FACILITIES CRITERIA (UFC)
REVISION SUMMARY SHEET
Subject:
Cancels:
UFC 3-701-01
UFC 3-701-01, dated June 2010
Description of revision: This revision:
ED
Updates all UFC tables (listed below) for FY 2011 using pricing data available in
January 2011.
C
AN
C
EL
L
Table 2: Facility Unit Costs for Military Construction ...................................................... 3
Table 3: Unit Costs for DoD Facility Cost Models ........................................................ 12
Table 4-1: Area Cost Factors ....................................................................................... 32
Table 4-2: Military Construction Escalation Rates ........................................................ 46
Table 4-3: PRV Escalation Rates ................................................................................. 47
Table 4-4: Operation and Maintenance Escalation Rates ............................................ 48
i
UFC 3-701-01
March 2011
TABLE OF CONTENTS
CHAPTER 1 INTRODUCTION........................................................................................ 1
1-1 SCOPE .................................................................................................................. 1
1-1.1 Chapter 2: Unit Costs for Military Construction Projects ............................ 1
1-1.2 Chapter 3: Unit Costs for DoD Facilities Cost Models ................................. 1
1-1.3 Chapter 4: Cost Adjustment Factors ............................................................. 1
1-2 DATA TABLES ..................................................................................................... 1
1-3 PROPONENT........................................................................................................ 1
2-1
2-2
ED
CHAPTER 2 UNIT COSTS FOR MILITARY CONSTRUCTION PROJECTS.................. 2
OVERVIEW ........................................................................................................... 2
FACILITY UNIT COST TABLE ............................................................................. 2
CHAPTER 3 UNIT COSTS FOR DOD FACILITIES COST MODELS ............................. 7
C
EL
L
OVERVIEW ........................................................................................................... 7
REPLACEMENT UNIT COSTS ............................................................................ 7
Definition........................................................................................................... 7
Use of Replacement Unit Costs ...................................................................... 7
SUSTAINMENT UNIT COSTS .............................................................................. 8
Definition........................................................................................................... 8
Use of Sustainment Unit Costs ....................................................................... 9
MODERNIZATION FACTORS .............................................................................. 9
Definitions......................................................................................................... 9
Use of Modernization Factors ......................................................................... 9
OPERATION UNIT COSTS .................................................................................. 9
Definition........................................................................................................... 9
Use of Operation Unit Costs ......................................................................... 10
UNIT COST HEIRARCHY ................................................................................... 10
REVISING UNIT COSTS..................................................................................... 10
AN
3-1
3-2
3-2.1
3-2.2
3-3
3-3.1
3-3.2
3-4
3-4.1
3-4.2
3-5
3-5.1
3-5.2
3-6
3-7
CHAPTER 4 COST ADJUSTMENT FACTORS ............................................................ 30
C
4-1 LOCATION ADJUSTMENTS .............................................................................. 30
4-1.1 Area Cost Factors .......................................................................................... 32
4-2 ESCALATION ..................................................................................................... 45
4-2.1 Military Construction ..................................................................................... 45
4-2.2 Plant Replacement Value Escalation Rates ................................................. 46
4-2.3 Facilities Sustainment and Operation .......................................................... 47
TABLES
Table 2: Facility Unit Costs for Military Construction ...................................................... 3
Table 3: Unit Costs for DoD Facility Cost Models ........................................................ 12
Table 4-1: Area Cost Factors ....................................................................................... 32
Table 4-2: Military Construction Escalation Rates ........................................................ 46
Table 4-3: PRV Escalation Rates ................................................................................. 47
Table 4-4: Operation and Maintenance Escalation Rates ............................................ 48
ii
UFC 3-701-01
March 2011
CHAPTER 1 INTRODUCTION
1-1
SCOPE
The DoD Facilities Pricing Guide supports a spectrum of facility planning, investment,
and analysis needs. This version of the Guide reflects updated cost and pricing data for
FY 2011 intended to support preparation of the DoD budget for FY 2013. It includes
reference information organized into three chapters:
1-1.1
Chapter 2: Unit Costs for Military Construction Projects
Chapter 3: Unit Costs for DoD Facilities Cost Models
EL
L
1-1.2
ED
Chapter 2 provides facility unit cost data for selected DoD facility types in support of
preparing Military Construction (MILCON) project documentation (DD Forms 1391) and
other project-level estimates in accordance with UFC 3-700-01A, “Programming Cost
Estimates for Military Construction” (as may be superseded).
Chapter 3 provides unit costs in support of DoD facilities cost models. These unit costs
are based upon the reported average DoD facility size or an established benchmark
size, as annotated for each Facility Analysis Category (FAC) in the DoD Real Property
Classification System (published separately). These unit costs are intended for macrolevel analysis and planning rather than individual facilities or projects.
1-1.3
Chapter 4: Cost Adjustment Factors
DATA TABLES
AN
1-2
C
Chapter 4 provides cost adjustment factors for location and future price escalation that
are applicable to the base unit costs in both chapters 2 and 3.
For the convenience of UFC users, all data tables in this UFC are available as part of
the supporting documentation download file accompanying this UFC on the Whole
Building Design Guide web site:
http://www.wbdg.org/ccb/DOD/UFC/ARCHIVES/ufc_3_701_01_FY11supplement.zip.
PROPONENT
C
1-3
The Office of the Deputy Under Secretary of Defense for Installations and Environment
is the proponent for the Facilities Pricing Guide. Recommendations from users toward
improving the usefulness of this reference are welcome.
1
UFC 3-701-01
March 2011
CHAPTER 2 UNIT COSTS FOR MILITARY CONSTRUCTION PROJECTS
2-1
OVERVIEW
2-2
FACILITY UNIT COST TABLE
ED
The facility unit costs in this chapter apply to preparation of programming-level cost
estimates for constructing military facilities in accordance with the methodology
described in UFC 3-700-01A. As explained in UFC 3-700-01A, these unit costs are not
to limit more detailed cost estimates. For the convenience of UFC users, all data tables
in this UFC are available as part of the supporting documentation download file
accompanying this UFC on the Whole Building Design Guide web site:
http://www.wbdg.org/ccb/DOD/UFC/ARCHIVES/ufc_3_701_01_FY11supplement.zip.
EL
L
Table 2 provides facility unit costs for various DoD facility types in dollars per square
meter ($/m2) and equivalent English unit cost data in dollars per square foot ($/SF) as of
October 2010. The listed facility types represent those facilities most frequently
constructed by the Military Services.
The unit costs in Table 2 are average unit costs from actual project awards since
September 2007 for Army, Navy, Air Force, and (for medical projects) TRICARE
Management Activity from the HII unit cost database. The database includes new
construction projects in the U.S.; it does not include renovation or add/alter projects, or
projects outside of the U.S. (other than Family Housing).
minimum antiterrorism design features (reference UFC 4-010-01, “DoD
Minimum Antiterrorism Standards for Buildings”) meeting Table B-1 standoff
distance requirements
AN
•
C
The unit costs include the following:
•
an average sales tax
•
Sustainable Design features for criteria in effect from September, 2007 thru
September, 2009.
C
The unit costs do not include the following:
•
gross receipt taxes or gross excise taxes. (Arizona, Mississippi, Washington,
New Mexico, Delaware, Hawaii, Illinois, Ohio, Pennsylvania, Texas, Michigan,
Kentucky, and the District of Columbia have varying amounts of gross receipt
taxes in lieu of a sales tax.)“Acts of God” or unusual market conditions
Applicable adjustments for gross receipt or excise taxes, Acts of God, and unusual
market conditions shall be documented and added to the cost estimate.
Various qualifications and restrictions apply to the unit costs in Table 2. These are
specified in the leading notes.
2
UFC 3-701-01
March 2011
Table 2: Facility Unit Costs for Military Construction
General: Facility unit costs include installed (built-in) building equipment and
furnishings normally funded with MILCON funds. Unit costs are for primary facilities
only and do not include the following:
supporting facility costs
•
equipment acquired with other fund sources, including pre-wired workstations
or furnishing systems, intrusion detection systems
•
sustainable design and construction features mandated since September,
2009; these will be estimated separately in accordance with component
guidelines and documented on DD form 1391 per DoD Instruction 4170.11,
Installation Energy Management, and applicable component guidance
•
state imposed gross receipts taxes and general excise taxes
•
special foundations, evidence-based design, intrusion detection system
installation, base exterior architectural preservation guidelines
•
enhanced Anti-Terrorism (AT) standards (exceeding the minimum in UFC 401-01, or when minimum standoff distances [Table B-1] are not achieved)
•
Progressive Collapse premiums, except for the following specific facility
types: Inpatient Hospital/MED Center, Primary Care Clinic (Attached), Major
Command Headquarters Building, Barracks/Dormitory, and Recruit Open Bay
(Barracks).
•
construction contingency allowances
•
supervision, inspection, and overhead (SIOH)
•
design costs (design-build contracts)
•
construction cost growth resulting from user changes, unforeseen site
conditions, or contract document errors and omissions, unusual market
conditions (for example material shortages, labor shortages, or Acts of God)
AN
C
EL
L
ED
•
C
Medical facilities: Unit costs include category A and category B equipment, but do
not include category E and category F equipment costs.
Barracks and Unaccompanied Officers Quarters: Unit costs do not include freestanding kitchen equipment. In addition to using the size adjustment factors, use the
project size adjustment factors in UFC 3-700-01A.
Child Development Centers: Unit costs do not include free-standing food service
equipment or playground area and equipment.
Family housing: Unit costs are based upon gross area and include sprinkler
systems or fire-rated construction. Unit costs include post-award design costs.
3
UFC 3-701-01
March 2011
Reserve facilities other than reserve centers: Use the unit cost of the appropriate
facility type.
Costs are independent of the acquisition strategy and are not specific to any single
construction type.
FACILITY TYPE
Oct 2010
unit cost
(GUC)
(gross m2)
($/m2)
Reference
size
(gross
SF)
Oct
2010
unit
cost
($/SF)
AN
C
Std.
Dev /
GUC
(Pct)
N
(Number
of
Projects)
6,220
2,881
23,000
46,000
578
268
113
91
20%
34%
3
7
VM*
2,690
***
121,830
3,004
VF**
29,000
***
37,134
279
12,588
83
34%
30%
1
7
5
2,320
3,340
1,970
2,314
35,000
36,000
183
215
49
52
27%
24%
120
34
2,970
6,500
2,276
2,065
32,000
70,000
211
192
18
26
9%
14%
60
21
4,460
1,907
48,000
177
49
28%
91
7,430
5,580
3,250
2,360
2,543
3,007
80,000
60,000
35,000
219
236
279
68
75
45
31%
32%
16%
17
5
3
2,790
2,140
1,860
740
1,860
2,092
1,851
1,755
2,156
2,466
30,000
23,000
20,000
8,000
24,000
194
172
163
200
229
43
49
37
50
35
22%
29%
23%
25%
15%
98
15
5
5
5
2,790
***
***
1,121
30,000
***
***
104
31
30%
26
13,940
917
150,000
85
36
42%
7
370
3,005
4,000
279
84
30%
4
740
650
2,616
2,016
8,000
7,000
243
187
53
72
22%
38%
6
18
NA
4,499
NA
418
73
17%
4
C
OPERATIONS BUILDINGS:
GENERAL PURPOSE
SQUADRON / BATTALION
APPLIED INSTRUCTION BUILDINGS:
GENERAL INSTRUCTION
HIGH TECH/SIMULATION TRAINING
(High Bay)
RESERVE CENTER (see note above)
HANGARS:
MAINTENANCE / GENERAL PURPOSE
HIGH BAY MAINTENANCE
CORROSION CONTROL
SHOPS:
VEHICLE MAINTENANCE
AIRCRAFT AVIONICS
INSTALLATION MAINTENANCE
PARACHUTE AND DINGHY
AIRCRAFT MACHINE SHOP
STORAGE FACILITIES:
COLD STORAGE PROCESSING
COLD STORAGE WAREHOUSE
GENERAL PURPOSE WAREHOUSE –
LOW BAY
GENERAL PURPOSE WAREHOUSE –
HIGH BAY
GENERAL PURPOSE MAGAZINE W/O
CRANE
HIGH EXPLOSIVE MAGAZINE
ARMORY
MEDICAL FACILITIES (see note above):
INPATIENT HOSPITAL / MED CENTER
Standard
Deviation
$/SF
2,140
4,270
EL
L
COMMUNICATIONS BUILDINGS:
SATELLITE COMMUNICATIONS CENTER
INTELLIGENCE COMMUNICATION
CENTER
AIRCRAFT OPERATIONS BUILDINGS:
WITHOUT TOWER
CONTROL TOWER (STAND-ALONE)
AIRFIELD FIRE AND RESCUE STATION
(does not include central alarm system)
Reference
size
ED
Unit Costs for Military
Construction
4
UFC 3-701-01
March 2011
Unit Costs for Military
Construction
FACILITY TYPE
Oct 2010
unit cost
(GUC)
(gross m2)
($/m2)
Std.
Dev /
GUC
(Pct)
N
(Number
of
Projects)
55
19%
11
4,047
3,455
15,000
160,000
376
321
78
50
21%
16%
7
7
13,010
2,648
140,000
246
25
10%
3
4,920
1,950
2,095
3,658
53,000
23,000
195
340
42
91
22%
27%
45
6
3,720
2,504
26,000
233
49
21%
6
31,590
2,552
340,000
237
71
30%
10
DENTAL CLINIC
MEDICAL CLINIC (attached to HOSPITAL /
MED CENTER)
1,390
13,940
MEDICAL CLINIC (LARGE, FREE
STANDING>60,000 GSF)
EL
L
MAJOR COMMAND HEADQUARTERS
BUILDING
UNACCOMPANIED HOUSING:
BARRACKS / DORMITORY (does not include
kitchenette equipment)
Standard
Deviation
$/SF
286
3,079
INSTALLATION/REGIONAL COMMAND
HEADQUARTERS BUILDING
(gross
SF)
Oct
2010
unit
cost
($/SF)
30,000
2,790
ADMINISTRATIVE FACILITIES:
MULTI-PURPOSE ADMIN
DATA PROCESSING AREA FACILITY
(includes admin and storage)
Reference
size
ED
MEDICAL CLINIC (SMALL, FREE
STANDING<60,000 GSF)
Reference
size
9,570
2,166
103,000
201
59
29%
94
RECRUIT OPEN BAY
OFFICERS QUARTERS (does not include
kitchenette equipment)
7,990
7,060
1,785
2,349
86,000
76,000
166
218
35
8
21%
4%
8
3
DINING FACILITY (includes kitchen
equipment and installation)
2,000
3,167
30,000
294
83
28%
38
5,480
1,948
59,000
181
29
16%
4
NA
NA
1,138
1,685
NA
NA
106
157
34
27
32%
17%
28
6
2,320
2,575
25,000
239
62
26%
43
1,860
3,070
1,950
2,532
2,333
2,402
***
21,000
33,000
21,000
235
217
223
***
71
63
41
30%
29%
18%
23
4
3
1,300
2,600
2,580
2,741
***
14,000
28,000
240
255
***
33
36
14%
14%
12
6
5,200
8,920
2,151
1,512
***
***
***
1,360
56,000
96,000
200
140
***
***
***
126
44
30
22%
21%
14
3
56
44%
3
C
AN
C
TEMPORARY LODGING FACILITY
FAMILY HOUSING (see note above):
CONUS FAMILY HOUSING
OCONUS FAMILY HOUSING
FAMILY SUPPORT FACILITIES:
CHILD DEVELOPMENT CTR (under 6 years
old)
CHILD DEVELOPMENT CTR (school age)
EDUCATION CENTER
YOUTH CENTER
FAMILY SERVICE CENTER
COMMUNITY SUPPORT FACILITIES:
FIRE STATION, COMMUNITY
CHAPEL CENTER
COMMISSARY (sales store w/ operational
equipment)
PHYSICAL FITNESS TRAINING CENTER
MAIN EXCHANGE (w/ mall service shops)
SERVICE CLUB
LIBRARY
RECREATION CENTER
MWR VEHICLE MAINTENANCE FACILITY
(Auto Hobby Shop)
930
5
10,000
UFC 3-701-01
March 2011
FACILITY TYPE
Reference
size
Oct 2010
unit cost
(GUC)
(gross m2)
($/m2)
BOWLING CENTER (8 lanes w/ pin-spotting
and automatic scoring equipment)
DEPENDENT SCHOOLS:
ELEMENTARY SCHOOL
JUNIOR HIGH / MIDDLE SCHOOL
HIGH SCHOOL
PARKING GARAGE / BUILDING (450
SF/vehicle includes turning space and
ramps)
BRIG/STOCKADE (Level 2 Confinement)
INDOOR FIRING RANGE
***
NA
25,640
1,895
***
***
548
7,430
2,140
2,547
2,071
* Unit cost per vertical meter
(gross
SF)
Oct
2010
unit
cost
($/SF)
NA
276,000
80,000
23,000
EL
L
** Unit cost per vertical foot
Reference
size
Standard
Deviation
$/SF
C
AN
C
N
(Number
of
Projects)
***
176
***
***
51
19
11
3
14
27%
11
237
192
97
35
41%
18%
5
9
*** Insufficient pricing data in the Historical Analysis Generator (HII) at www.hnd.usace.army.mil/HII
6
Std.
Dev /
GUC
(Pct)
ED
Unit Costs for Military
Construction
UFC 3-701-01
March 2011
CHAPTER 3 UNIT COSTS FOR DOD FACILITIES COST MODELS
3-1
OVERVIEW
This chapter describes the unit costs and related factors used in support of DoD
facilities cost models. These are intended for macro-level analysis and planning and
should not be used for individual facilities or project estimates.
ED
Unit costs and related factors are associated with Facility Analysis Categories (FACs)
represented by a 4-digit code in the DoD Real Property Classification System (RPCS), a
hierarchical scheme of real property types and functions that serves as the framework
for identifying, categorizing, and modeling the department’s inventory of land and
facilities. FACs are common across the department and suitable for department-wide
applications. For each FAC, Table 3 identifies the associated unit cost or factor to be
used in DoD facilities cost models and metrics.
EL
L
Whenever possible, unit costs and factors have been based upon commercial
benchmarks. Detailed supporting data for unit costs is available as part of the
supporting documentation download file accompanying this UFC on the Whole Building
Design Guide web site:
http://www.wbdg.org/ccb/DOD/UFC/ARCHIVES/ufc_3_701_01_FY11supplement.zip.
3-2
REPLACEMENT UNIT COSTS
3-2.1
Definition
C
AN
C
Replacement provides a complete and useable facility capable of serving the purpose of
the original facility. Replacement costs include construction of standard foundations, all
interior and exterior walls and doors, the roof, utilities out to the 5-foot line, all built-in
plumbing and lighting fixtures, security and fire protection systems, electrical
distribution, wall and floor coverings, heating and air conditioning systems, and
elevators. Not included are project costs such as design, supporting facility costs,
special foundations, equipment acquired with other funding sources (e.g. missionfunded range targets), contingency costs, and supervision, inspection, and overhead
(SIOH). Also not included are items generally considered personal property such as
computer systems, telephone instruments, and furniture.
3-2.2
Use of Replacement Unit Costs
Replacement unit costs form the basis of calculating plant replacement value in a
consistent manner across DoD. Plant replacement value represents the cost to design
and construct a notional facility to current standards to replace an existing facility at the
same location. The standard DoD formula for calculating plant replacement value is:
7
UFC 3-701-01
March 2011
Plant Replacement Value =
1
Facility Quantity x Replacement Unit Cost x Area Cost Factor x
2
3
Historical Records Adjustment x Planning and Design Factor x
4
Supervision Inspection and Overhead Factor x Contingency
5
factor
Replacement unit costs can also support large-scale program-level estimates for restationing plans with the addition of allowance for site preparation, earthwork,
landscaping, and related factors. Replacement unit costs should not be used for
individual project estimates.
SUSTAINMENT UNIT COSTS
3-3.1
Definition
ED
3-3
Sustainment provides for maintenance and repair activities necessary to keep a typical
inventory of facilities in good working order over their expected service life. It includes:
regularly scheduled adjustments and inspections, including maintenance
inspections (fire sprinkler heads, HVAC systems) and regulatory inspections
(elevators, bridges)
•
preventive maintenance tasks
•
emergency response and service calls for minor repairs
•
major repair or replacement of facility components (usually accomplished by
contract) that are expected to occur periodically throughout the facility service life
C
EL
L
•
C
AN
Sustainment includes regular roof replacement, refinishing wall surfaces, repairing and
replacing electrical, heating, and cooling systems, replacing tile and carpeting, and
similar types of work. 6 It does not include repairing or replacing non-attached
equipment or furniture, or bldg components that typically last more than 50 years (such
as foundations and structural members). Sustainment does not include restoration,
modernization, environmental compliance, specialized historical preservation, 7 general
facility condition inspections and assessments, planning and design (other than shop
drawings), or costs related to acts of God, which are funded elsewhere. Other tasks
associated with facilities operations (such as custodial services, grass cutting,
landscaping, waste disposal, and the provision of central utilities) are also not included. 8
1
A geographic location adjustment for costs of labor, material, and equipment, published in Chapter 4 for vertical construction.
An adjustment to account for increased costs for replacement of historical facilities or for construction in a historic district; the
current value of the factor is 1.05.
3
A factor to account for the planning and design of a facility; the current value of this factor is 1.09 for all but medical facilities and
1.13 for medical facilities.
4
A factor to account for the supervision, inspection, and overhead activities associated with the management of a construction
project; the current value of the factor is 1.057 for facilities in the continental US (CONUS), and 1.065 (USACE) or 1.062 (NAVFAC)
for facilities outside of the continental US (OCONUS).
5
A factor to account for construction contingencies; the current value of the factor is 1.05.
6
Facilities Sustainment also generally allows for overhead costs, which include architectural and engineering services.
7
Specialized historical preservation costs are those for customized components or materials that are no longer readily available.
8
Facilities Sustainment Program Element (PE) definition.
2
8
UFC 3-701-01
March 2011
3-3.2
Use of Sustainment Unit Costs
Sustainment unit costs represent the annual average sustainment cost for each FAC,
and serve as the basis for calculating annual facilities sustainment requirements for
DoD using the following formula:
9
Sustainment requirement = Facility Quantity x Sustainment Unit Cost x Area Cost Factor x Inflation Factor
MODERNIZATION FACTORS
3-4.1
Definitions
ED
3-4
3-4.2
EL
L
Modernization, along with restoration, improves facilities. Modernization consists of
alteration of facilities solely to implement new or higher standards (including regulatory
changes), to accommodate new functions, or to renew building components that
typically last more than 50 years (such as foundations and structural members).
Restoration includes repair and replacement work to restore facilities damaged by
inadequate sustainment, excessive age, disaster, accident, or other causes.
Restoration and modernization do not include recurring sustainment tasks or certain
environmental measures which are funded elsewhere. Other tasks associated with
facilities operations (such as custodial services, grounds services, waste disposal, and
the provision of central utilities) are also not included.
Use of Modernization Factors
AN
C
Modernization factors represent the average annual decrease in facility value over the
useful service life due to obsolescence. Conversely, this value represents the average
annual investment required to preserve the original facility value, adjusted for inflation,
through modernization. As such, modernization factors are fractional values with no
units (such as dollars) that are used in conjunction with plant replacement value to
generate estimates of modernization funding requirements.
Modernization factors are calculated using the following formula:
Annual modernization factor = total depreciation (%) / useful service life
C
Where the total depreciation is a percent of total facility value, and
the useful service life is expressed in years for each FAC.
In turn, the modernization factor is used to generate the average annual
modernization requirement using the following formula:
Modernization requirement = PRV x modernization factor
3-5
OPERATION UNIT COSTS
3-5.1
Definition
9
A geographic location adjustment for costs of labor, material, and equipment.
9
UFC 3-701-01
March 2011
Facilities Operation describes the functions associated with the use of facilities or
infrastructure: fire and emergency services, provision of energy utilities, provision of
water/wastewater utilities, pavement clearance, refuse collection and disposal, real
property leases, grounds maintenance and landscaping, pest control, custodial
services, real property management and engineering services, energy management,
and readiness engineering.
3-5.2
Use of Operation Unit Costs
Operation requirement
3-6
10
ED
Operation unit costs represent the annual average “bare” operational cost for each FAC,
and serve as the basis for calculating annual facilities operations requirements for DoD
using the following formula:
= Facility Quantity x Operation Unit Cost x Locality Index
UNIT COST HEIRARCHY
11
x Inflation Factor
EL
L
Unit costs for DoD cost models are classified by the following hierarchy of data sources:
Source 1: Standard, easily-accessible published data. Source 1 is the most desirable
due to ease of access, wide applicability, and lack of bias. Examples include the DoD
Tri-Service Committee on Cost Engineering, Service-specific cost guidance (USACE,
USAF), commercial cost-estimating guidelines or models (e.g., M&S or Whitestone), or
other Government-published cost guidance from federal, state, or local government
agencies (e.g. Fairfax County (Virginia) Park Authority).
AN
C
Source 2: Source 1 cost factors that are applied to facilities with similar but not identical
characteristics (e.g., sewage waste treatment facilities and industrial waste treatment
facilities). Source 2 also includes unpublished government or trade association cost
data (e.g. CEAC), and Service-validated cost factors for non-standard facilities that
have no commercial counterparts (e.g. missile launch facilities or military ranges).
C
Source 3: Includes unpublished project-specific data derived from Service project
documents (e.g. DD Forms 1391) or by calculating costs from reported plant
replacement value and inventory, or derived from using a ratio of sustainment to
construction from a similar Source-1 Facilities Analysis Category (e.g. FAC 2115,
Aircraft Maintenance Hangar, Depot derived from FAC 2111, Aircraft Maintenance
Hangar).
3-7
REVISING UNIT COSTS
Users of this UFC are encouraged to suggest revisions to the published cost factors,
particularly for facilities unique to their mission. Submit proposed changes to the
proponent office in accordance with the following guidelines:
10
For each operation function
A geographic location adjustment for costs of labor, material, and equipment for each operational function, equivalent to the Area
Cost Factor for construction or sustainment.
11
10
UFC 3-701-01
March 2011
Revised costs should come from an equivalent or superior source
•
Revised costs should be easily audited
•
Revised costs should be consistent with the functional definitions
•
Revised costs should be consistent with the scope of the Facility Analysis
Category
•
Revised costs should be suitable for application throughout DoD
C
AN
C
EL
L
ED
•
11
UFC 3-701-01
March 2011
Table 3: Unit Costs for DoD Facility Cost Models
(not to be used for military construction
projects)
$1.42
1112
Rotary-Wing Landing Area,
Surfaced
Runway Overrun Area,
Surfaced
Runway, Unsurfaced
Unmanned Aerial Vehicle
Runway &
Launch/Recovery Site
Taxiway, Surfaced
Rotary-Wing Taxiway,
Surfaced
Aircraft Apron, Surfaced
Compass Calibration Pad,
Surfaced
Missile Launching Pad,
Surfaced
Aircraft Washing Pad,
Surfaced
Miscellaneous Airfield
Pavement, Surfaced
Aircraft Pavement
Shoulder
Miscellaneous Airfield
Pavement, Unsurfaced
Aircraft Rinse Facility
Aircraft Fueling Facility
Aircraft Defueling Facility
Marine Fueling Facility
Vehicle Fueling Facility
Aircraft Operating Fuel
Storage
Marine Operating Fuel
Storage
Vehicle Operating Fuel
Storage
Other Operating Fuel
SY
$98.07
$1.07
$0.00
$0.2329
$0.0000
$0.0000
$0.0708
$0.1402
$0.0155
45
0.013300
SY
$69.58
$1.09
$0.00
$0.2329
$0.0000
$0.0000
$0.1212
$0.1402
$0.0265
45
0.013300
SY
SY
$69.58
$9.88
$0.90
$0.24
$0.00
$0.00
$0.2329
$0.0166
$0.0000
$0.0000
$0.0000
$0.0000
$0.2828
$0.2828
$0.1402
$0.0006
$0.0618
$0.0618
45
45
0.013300
0.013300
SY
SY
$69.58
$69.58
$1.07
$1.07
$0.00
$0.00
$0.2329
$0.2329
$0.0000
$0.0000
$0.0000
$0.0000
$0.0708
$0.0708
$0.1402
$0.1402
$0.0155
$0.0155
60
60
0.009900
0.009900
SY
SY
$97.79
$97.79
$1.07
$1.07
$0.00
$0.00
$0.2329
$0.2329
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0708
$0.1402
$0.0497
$0.0000
$0.0155
60
60
0.009900
0.009900
SY
$97.79
$1.07
$0.00
$0.2329
$0.0000
$0.0000
$0.0708
$0.0497
$0.0155
60
0.009900
SY
$97.79
$1.07
$0.00
$0.2329
$0.0000
$0.0000
$0.0708
$0.0497
$0.0155
60
0.009900
SY
$97.79
$1.07
$0.00
$0.2329
$0.0000
$0.0000
$0.0708
$0.1402
$0.0155
60
0.009900
SY
$69.58
$1.07
$0.00
$0.2329
$0.0000
$0.0000
$0.0708
$0.0497
$0.0155
60
0.009900
$9.88
$0.24
$0.00
$0.0166
$0.0000
$0.0000
$0.0708
$0.0006
$0.0155
45
0.013300
$160.45
$1,976.58
$1,976.58
$361.84
$113,698.49
$4.31
$1.07
$8.15
$8.15
$0.42
$483.22
$2.15
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.2329
$0.7219
$0.7219
$0.0562
$29.38
$0.0099
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0708
$0.0000
$0.0000
$0.0000
$0.0000
$0.0019
$0.0497
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0155
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
30
30
30
37
25
31
0.021000
0.021000
0.021000
0.017000
0.025200
0.019900
GA
$13.43
$2.15
$0.00
$0.0099
$0.0000
$0.0000
$0.0019
$0.0000
$0.0000
31
0.019900
GA
$3.16
$2.15
$0.00
$0.0099
$0.0000
$0.0000
$0.0019
$0.0000
$0.0000
31
0.019900
GA
$2.29
$2.15
$0.00
$0.0099
$0.0000
$0.0000
$0.0019
$0.0000
$0.0000
31
0.019900
1165
1166
1167
1211
1212
1221
1231
1241
1242
1243
1244
SY
SY
GM
GM
GM
OL
GA
Refuse
Collection
$0.0000
Grounds
Maint
$0.2828
Pvmt
Clearance
$0.1402
Pest
Control
$0.0618
EL
LE
C
1164
AN
1163
Custodial
Svcs
$0.0000
D
$168.95
1162
Real Prop
Mgmt
$0.2329
0.013300
SY
1131
1161
Sustainment
45
Fixed-Wing Runway,
Surfaced
1121
1122
Replacement
Modernization
Factor
(no units)
1111
1114
1115
UM
Useful
Svc
Life
(years)
Water/
Wastewater
$0.00
1113
FAC Title
C
FAC
Unit costs ($FY 2011)
12
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
1403
1404
1411
1412
1413
1421
1422
1431
1441
1442
1443
1444
1445
1446
Water/
Wastewater
LF
OL
$398.74
$103,812.23
$7.20
$777.37
$0.00
$0.00
$0.2558
$10.89
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
31
25
0.019900
0.025200
SF
SF
SF
$1,826.65
$288.06
$509.41
$24.74
$3.21
$10.80
$0.00
$0.19
$0.10
$1.38
$0.4815
$1.20
$0.0000
$1.25
$1.25
$0.0000
$0.0883
$0.0883
$0.0078
$0.0078
$0.0078
$0.0000
$0.0000
$0.0000
$0.0000
$0.0331
$0.0331
50
50
50
0.011900
0.012000
0.012300
EA
SF
EA
MI
LF
EA
SF
EA
SF
$47,943.40
$281.67
$9,861.38
$88,922.10
$67.35
$3,388.96
$288.06
$14,450.20
$288.06
$482.72
$7.62
$115.06
$152.26
$7.39
$48.99
$3.71
$283.79
$3.20
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.25
$0.00
$0.11
$101.81
$0.6919
$21.00
$188.83
$1.05
$5.94
$0.4843
$30.95
$0.4858
$0.0000
$1.25
$0.0000
$0.0000
$0.0000
$0.0000
$1.26
$0.0000
$1.26
$0.0000
$0.0883
$0.0000
$0.0000
$0.0000
$0.0000
$0.0888
$0.0000
$0.0888
$0.0000
$0.0078
$0.0000
$22.08
$0.0000
$0.0000
$0.0079
$0.0000
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0110
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0000
$0.0333
50
50
50
28
20
20
50
50
50
0.012300
0.012000
0.012300
0.022100
0.030100
0.030100
0.012000
0.012300
0.012000
SF
SF
$288.06
$245.52
$5.39
$4.68
$0.11
$0.11
$0.9901
$0.4455
$1.26
$1.26
$0.0888
$0.0888
$0.0079
$0.1350
$0.0000
$0.0000
$0.0333
$0.0333
50
45
0.012000
0.013400
SF
$231.99
$3.54
$0.58
$0.5599
$0.0000
$0.0888
$0.1350
$0.0000
$0.0333
45
0.013300
SF
$253.74
$3.18
$0.57
$0.5355
$1.26
$0.0888
$0.1350
$0.0000
$0.0333
50
0.012000
SF
SF
Refuse
Collection
Grounds
Maint
D
Sustainment
EL
LE
1321
1331
1341
1351
1361
1362
1371
1381
1402
Custodial
Svcs
Pvmt
Clearance
Pest
Control
Modernization
Factor
(no units)
Replacement
C
1262
1311
1312
Storage
POL Pipeline
Liquid Fuel
Loading/Unloading Facility
POL Pump Station
Communications Building
Satellite Communications
Building
Communications Facility
Aircraft Navigation Building
Aircraft Navigation Facility
Communications Lines
Airfield Pavement Lighting
Airfield Lighting
Ship Navigation Building
Ship Navigation Facility
Air Defense Operations
Building
Missile Operations Building
Emergency Operations
Center / SCIF
Airfield Fire And Rescue
Station
Aviation Operations
Building
Air Control Tower
Helium Production/Storage
Building
Helium Storage Facility
Ship Operations Building
Photo/TV Production
Building
Operations Support Lab
Operations Supply Building
Miscellaneous Operations
Support Building
Working Animal Support
Building
Security Force Building
Real Prop
Mgmt
Useful
Svc
Life
(years)
UM
AN
1251
1261
FAC Title
$841.23
$180.76
$2.91
$0.86
$0.19
$0.08
$1.54
$0.2118
$1.26
$0.9993
$0.0888
$0.1888
$0.0079
$0.0079
$0.0000
$0.0000
$0.0333
$0.0111
35
45
0.017600
0.013900
$91,337.24
$192.25
$169.66
$1,270.48
$3.24
$4.20
$0.00
$0.18
$0.07
$184.48
$0.3457
$0.3792
$0.0000
$0.2554
$1.26
$24.66
$0.0888
$0.0888
$0.0000
$0.0079
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0333
45
50
50
0.013900
0.012500
0.012300
$238.76
$180.76
$180.76
$3.52
$2.53
$4.25
$0.16
$0.04
$0.12
$0.4698
$0.1874
$0.4493
$1.26
$1.26
$1.26
$0.0888
$0.0111
$0.0888
$0.0079
$0.0079
$0.0079
$0.0000
$0.0000
$0.0000
$0.0333
$0.0333
$0.0111
55
45
55
0.010900
0.013900
0.011400
SF
$117.71
$3.31
$0.83
$0.2093
$1.61
$0.0888
$0.1350
$0.0000
$0.0333
40
0.015000
SF
$207.83
$4.08
$0.14
$0.3189
$0.2554
$0.0888
$0.1350
$0.0000
$0.0111
55
0.010900
EA
SF
SF
SF
SF
SF
C
FAC
Unit costs ($FY 2011)
13
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
Replacement
Sustainment
1451
Strategic Missile Launch
Facility
Missile Guidance Facility
Missile Access Shaft
Missile Access Tunnel
Missile Shelter
Missile Defense Facility
Ballistic Missile Control
Facility
Mechanical Security
Barricade
Overhead Cover
Aircraft Arresting System
Aircraft Catapult
Aircraft Firing-In Butt
Aircraft Blast Deflector
Aircraft Shelter, Hardened
Aircraft Shelter
Aircraft Support Facility
Nuclear Propulsion
Support Facility
Nuclear Weapons Support
Facility
Explosives
Holding/Transfer Area
Explosives Railway
Holding Yard
Explosives
Holding/Transfer Facility
Revetment
Central Vehicle Wash
Facility
Explosive Ordnance
Disposal Area
Security Support Facility
Miscellaneous Operations
Support Facility
Pier
Wharf
Pier/Wharf Access Trestle
EA
$4,902,723.78
SF
EA
LF
SF
EA
SF
1459
1461
1462
1463
1464
1465
1466
1467
1481
1491
1492
1493
1494
1495
1496
1497
1498
1499
1511
1512
1513
Custodial
Svcs
$11,774.08
$395.93
$89,046.75
$739.97
$44.37
$648,499.38
$395.93
$5.58
$1,255.25
$10.43
$0.66
$7,566.30
$17.49
$0.16
$0.00
$0.00
$0.04
$0.00
$0.11
$0.8570
$190.70
$1.56
$0.0779
$1,384.15
$0.8570
$0.9993
$0.0000
$0.0000
$0.1110
$356.99
$0.2554
$0.0888
$0.0000
$0.0000
$0.0111
$15.52
$0.0888
EA
$36,961.46
$3,327.18
$0.00
$0.0000
$0.0000
SF
EA
EA
EA
EA
SF
SF
EA
EA
$28.65
$778,717.45
$147,230.68
$456,123.52
$42,404.19
$335.26
$136.48
$1,581,991.16
$134,425.31
$0.83
$8,344.35
$129,791.62
$32,378.77
$532.12
$1.39
$1.01
$10,234.62
$1,568.39
$0.00
$0.00
$0.00
$0.00
$0.00
$0.04
$0.04
$0.00
$0.00
$0.1339
$1,668.19
$315.31
$980.12
$90.81
$0.7497
$0.3042
$3,531.39
$287.88
EA
$138,471.25
$1,615.60
$0.00
SY
$50.26
$1.76
$0.00
EA
EA
EA
EA
EA
AN
1458
Real Prop
Mgmt
$10,809.98
Refuse
Collection
$102.64
Grounds
Maint
$0.0000
Modernization
Factor
(no units)
45
0.013400
Pvmt
Clearance
$0.0000
Pest
Control
$307.93
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0000
$0.0000
$0.0111
$0.0000
$0.0111
45
60
60
33
33
33
0.013400
0.010000
0.010000
0.018300
0.018300
0.018300
$0.0000
$0.0000
$0.0000
$0.0000
15
0.040600
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.1110
$0.1110
$937.17
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0111
$0.0111
$89.89
$0.0000
$0.1349
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0111
$0.0111
$0.0000
$0.0000
15
10
10
15
29
40
45
45
30
0.040300
0.061000
0.061000
0.040300
0.020600
0.014900
0.013300
0.013300
0.020100
$295.85
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
30
0.020100
$0.1096
$0.0000
$0.0000
$0.2845
$0.0006
$0.0111
60
0.010000
$428,995.38
$8,371.94
$0.00
$830.25
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
60
0.010000
$7,543.13
$162.51
$0.00
$16.10
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
40
0.015000
$20,208.70
$7,858,232.87
$116.49
$31,350.01
$0.00
$0.00
$43.28
$16,410.26
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
36
30
0.016700
0.020000
$0.00
$0.00
$0.00
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
0.000000
C
1452
1453
1454
1455
1456
1457
$44,361.05
Water/
Wastewater
$1,508.87
D
UM
EL
LE
FAC Title
C
FAC
Useful
Svc
Life
(years)
SF
EA
$207.18
$14,425.46
$3.24
$192.50
$0.13
$0.00
$0.4722
$34.70
$0.2554
$26.65
$0.0888
$2.57
$0.1350
$0.0000
$0.0000
$0.0000
$0.0111
$7.70
36
50
0.016700
0.012000
SY
SY
SY
$2,566.35
$2,566.35
$837.38
$30.08
$30.08
$30.08
$0.00
$0.00
$0.00
$2.17
$2.17
$2.17
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0500
$0.0500
$0.0500
$0.0111
$0.0111
$0.0111
50
50
37
0.011900
0.011900
0.016100
14
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
Replacement
Sustainment
1531
1541
Marine Cargo Staging Area
Shore Erosion Prevention
Facility
Small Craft Berthing
Small Craft Building
Miscellaneous Waterfront
Facility
Harbor Control Facility
Offshore Mooring Facility
Harbor Marine
Improvements
General Purpose
Instruction Building
Applied Instruction Building
Band Training Facility
Reserve Training Facility
Physical Education
Building
Organizational Classroom
Indoor Firing Range and
Supporting Facility
Flight Simulator Facility
Physiological Training
Facility
Gas Training Facility
General Purpose Simulator
Facility
Training Pool and Tank
Range Support Building
Training Aids Support
Building
Training Support Structure
Observation Tower/Bunker
Offshore Range Support
Platform
Maneuver/Training Land,
Light Forces
Maneuver/Training Land,
Heavy Forces
Weapons Impact Area
SY
LF
$50.26
$336.02
FB
SF
EA
1711
1712
1713
1714
1715
1717
1718
1721
1722
1723
1724
1725
1731
1732
1733
1734
1735
1741
1742
1743
0.016100
0.016100
Custodial
Svcs
$0.0000
$0.0000
Refuse
Collection
$0.0000
$0.0000
Grounds
Maint
$0.0000
$0.0000
Pvmt
Clearance
$0.0006
$0.0000
Pest
Control
$0.0111
$0.0000
$1,776.25
$29.67
$47,468.44
$14.35
$1.53
$1,033.12
$0.00
$0.07
$0.00
$4.66
$0.0625
$101.66
$0.0000
$0.1110
$0.0000
$0.0000
$0.0111
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0111
$0.0000
37
37
37
0.016100
0.017000
0.016100
EA
EA
LF
$472,207.14
$10,052.64
$336.02
$923.74
$870.80
$9.75
$0.00
$0.00
$0.00
$1,011.27
$21.53
$1.10
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
37
36
36
0.016100
0.016600
0.016600
SF
$227.16
$4.61
$0.10
$0.3845
$0.2554
$0.0888
$0.1350
$0.0000
$0.0333
50
0.012000
SF
SF
SF
SF
$234.25
$150.79
$173.99
$200.09
$2.96
$4.40
$5.67
$3.38
$0.10
$0.10
$0.13
$0.07
$0.3845
$0.3140
$0.3408
$0.4065
$0.2554
$0.2554
$1.26
$1.26
$0.0888
$0.0888
$0.0888
$0.0888
$0.1350
$0.1350
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0333
$0.0333
$0.0333
50
50
55
45
0.012000
0.012000
0.010900
0.013300
SF
SF
$150.79
$198.16
$4.76
$4.02
$0.10
$0.01
$0.3140
$0.2775
$0.2554
$0.2554
$0.0888
$0.0888
$0.1350
$0.1350
$0.0000
$0.0000
$0.0333
$0.0111
50
45
0.012000
0.013300
SF
SF
$174.60
$105.10
SF
SF
$150.79
$174.60
$4.93
$2.61
$0.15
$0.10
$0.4892
$0.2528
$0.2554
$0.2554
$0.0888
$0.0888
$0.1350
$0.1350
$0.0000
$0.0000
$0.0333
$0.0333
50
50
0.012000
0.012000
$2.10
$3.40
$0.10
$0.09
$0.2702
$0.3457
$0.9993
$0.2554
$0.0888
$0.0888
$0.0079
$0.1350
$0.0000
$0.0000
$0.0000
$0.0333
45
50
0.013300
0.012000
$389,681.75
$189.46
$150.79
$11,281.35
$2.61
$2.03
$567.95
$0.13
$0.04
$834.54
$0.2698
$0.2945
$510.78
$0.2554
$0.1110
$0.0000
$0.0888
$0.0888
$0.0000
$0.0079
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0111
25
40
40
0.024000
0.015000
0.015000
$133.39
$144,788.39
$0.00
$0.29
$706.63
$0.00
$0.04
$0.00
$0.00
$0.1070
$352.45
$0.0000
$0.1110
$0.0000
$0.0000
$0.0888
$8.88
$0.0000
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0111
$79.02
$0.0000
35
36
N/A
0.017100
0.016700
0.000000
AC
$0.00
$0.64
$0.00
$0.0000
$0.0000
$0.0000
$4.59
$0.0000
$0.6251
N/A
0.000000
AC
$0.00
$0.64
$0.00
$0.0000
$0.0000
$0.0000
$4.59
$0.0000
$0.6251
N/A
0.000000
AC
$0.00
$0.64
$0.00
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
0.000000
EA
SF
SF
SF
EA
EA
AN
1611
1631
1641
37
37
$1.76
$9.75
Real Prop
Mgmt
$0.1096
$1.10
C
1551
1552
1591
Modernization
Factor
(no units)
Water/
Wastewater
$0.00
$0.00
D
UM
EL
LE
FAC Title
C
FAC
Useful
Svc
Life
(years)
15
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
Replacement
Sustainment
1744
1745
1750
Parachute Drop Zone
Parade and Drill Field
General Purpose Small
Arms Range
Zero Range
Field Fire Range
Record Fire Range
Night Fire Range
Known Distance Range
Sniper Range
Pistol Range
Machinegun Range
General Purpose Direct
Fire Range
Grenade Launcher Range
Grenade Machinegun
Range
Light Antiarmor Weapon
Range
Heavy Antiarmor Weapon
Range
Artillery Direct Fire Range
Tank Stationary Gunnery
Range
Indirect Fire Range
Scaled Indirect Fire Range
Scaled Gunnery Range
Armor Vehicle Crew
Training Range
Armor Vehicle Unit
Training Range
Fire and Movement Range
Squad Defense Range
Infantry Battle Course
Urban Combat Training
Range
Convoy Live Fire Range
Live Hand Grenade Range
Engineer Qualification
AC
AC
FP
$0.00
$0.00
$55,254.45
FP
FP
FP
FP
FP
FP
FP
FP
FP
1763
1764
1765
1766
1767
1768
1769
1771
1772
1773
1774
1775
1776
1777
1781
1782
0.000000
0.000000
0.024200
Custodial
Svcs
$0.0000
$0.0000
$0.0000
Refuse
Collection
$0.0000
$0.0000
$0.0000
Grounds
Maint
$245.88
$1,785.12
$991.57
Pvmt
Clearance
$0.0000
$0.0000
$0.0000
Pest
Control
$0.0000
$0.0000
$0.0000
$5,614.05
$55,254.45
$95,861.28
$3,413.37
$9,141.70
$263,818.69
$55,727.99
$51,731.80
$0.00
$69.04
$216.66
$411.18
$120.60
$192.48
$701.09
$164.82
$558.75
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1.19
$45.17
$75.49
$8.32
$22.29
$293.74
$7.36
$126.14
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$10.94
$388.86
$388.86
$51.63
$170.24
$1,263.62
$26.65
$619.60
$1,239.19
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
25
25
25
25
25
25
25
N/A
0.024200
0.024200
0.024200
0.024200
0.024200
0.024200
0.024200
0.024200
0.000000
FP
LN
$28,059.23
$256.97
$136.67
$1,262.05
$0.00
$0.00
$68.42
$0.6266
$0.0000
$0.0000
$0.0000
$0.0000
$674.00
$25,873.97
$0.0000
$0.0000
$0.0000
$0.0000
25
25
0.024200
0.024200
FP
$505,160.03
$624.63
$0.00
$1,231.73
$0.0000
$0.0000
$315.91
$0.0000
$0.0000
25
0.024200
LN
$2,624,919.35
$18,479.61
$0.00
$6,400.34
$0.0000
$0.0000
$21,169.60
$0.0000
$0.0000
25
0.024200
EA
EA
$1,113,939.43
$6,377,689.07
$2,781.16
$38,965.83
$0.00
$0.00
$2,716.12
$15,550.72
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
25
0.024200
0.024200
EA
EA
EA
LN
$0.00
$9,928.53
$42,087.69
$3,725,126.59
$0.00
$171.50
$171.50
$36,372.22
$0.00
$0.00
$0.00
$0.00
$0.0000
$24.21
$102.62
$7,958.82
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$14,169.07
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
25
25
25
0.000000
0.024200
0.024200
0.024200
$23,409,000.0
0
$129,358.22
$211,036.69
$2,407,229.09
$834,842.42
$72,069.58
$0.00
$11,710.92
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
0.024200
$1,019.15
$2,343.66
$10,481.87
$5,678.08
$0.00
$0.00
$0.00
$0.00
$279.81
$456.49
$2,400.53
$973.73
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$3,748.78
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
25
25
25
0.024200
0.024200
0.024200
0.024200
$560,950.60
$22,659.32
$318,010.56
$10,875.55
$147.62
$765.04
$0.00
$0.00
$0.00
$973.73
$49.01
$678.59
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$121.03
$46,176.47
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
25
25
0.024200
0.024200
0.024200
EA
LN
EA
EA
EA
AN
1761
1762
N/A
N/A
25
$0.64
$124.96
$281.86
Real Prop
Mgmt
$0.0000
$0.0000
$44.44
C
1751
1752
1753
1754
1755
1756
1757
1758
1760
Modernization
Factor
(no units)
Water/
Wastewater
$0.00
$0.00
$0.00
FP
FP
FP
D
UM
EL
LE
FAC Title
C
FAC
Useful
Svc
Life
(years)
16
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
1792
1793
1794
1795
1796
1797
1798
1799
2111
2112
2113
2114
2115
2116
2118
2121
2123
2124
2125
Water/
Wastewater
FP
$2,137,135.07
$8,379.57
$0.00
$4,622.83
$0.0000
$0.0000
$19,138.60
$0.0000
$0.0000
25
0.024200
EA
$87,930.50
$796.34
$0.00
$187.25
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
0.024200
EA
$35,865.02
$122.74
$0.00
$76.53
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
0.024200
EA
$1,315,959.22
$25,413.16
$0.00
$2,818.24
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
0.024200
EA
FP
EA
$0.00
$155,461.83
$1,977,983.45
$0.00
$842.92
$232.11
$0.00
$0.00
$0.00
$0.0000
$336.28
$4,868.13
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
25
25
0.000000
0.024200
0.024200
SF
$176.80
$0.66
$0.00
$5,107.79
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
0.024200
FP
$4,111.24
$88.46
$0.00
$8.89
$0.0000
$0.0000
$75.95
$0.0000
$0.0000
25
0.024200
EA
$92,170.19
$381.31
$0.00
$196.23
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
0.024200
EA
$44,945.05
$997.28
$0.00
$95.71
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
0.024200
SF
$234.89
$2.50
$0.04
$0.4868
$0.1110
$0.1888
$0.0079
$0.0000
$0.0111
40
0.015700
SF
SF
$217.01
$295.79
SF
$180.39
SF
SF
EA
SF
Refuse
Collection
Grounds
Maint
D
Sustainment
EL
LE
1791
Custodial
Svcs
Pvmt
Clearance
Pest
Control
Modernization
Factor
(no units)
Replacement
C
1790
Range
Light Demolition and
Flame Training Range
Miscellaneous Training
Facility
Aircraft Weapons
Calibration Range
Attack Helicopter Weapons
Range
Aircraft Weapons Range
Air Defense Range
Fire And Rescue Training
Facility
Urban Combat Training
Area, Non-Fire
Hand Grenade Range,
Non-Firing
Infiltration Course, Live
Fire
Confidence/Obstacle
Course
Aircraft Maintenance
Hangar
Aircraft Maintenance Shop
Aircraft Corrosion Control
Hangar
Aircraft Engine Test
Building
Aircraft Maintenance
Hangar, Depot
Aircraft Maintenance Shop,
Depot
Aircraft Engine Test
Facility
Missile
Maintenance/Assembly
Building
Missile/Launcher
Maintenance Support
Facility
Missile Test Tower
Missile
Maintenance/Assembly
Real Prop
Mgmt
Useful
Svc
Life
(years)
UM
$3.22
$2.07
$0.09
$0.04
$0.3845
$0.6580
$0.1110
$0.9993
$0.0888
$0.0111
$0.0079
$0.0079
$0.0000
$0.0000
$0.0111
$0.0111
40
40
0.015700
0.015700
$3.07
$0.12
$0.3553
$0.1110
$0.1888
$0.0079
$0.0000
$0.0111
50
0.012500
$261.42
$1.54
$0.09
$0.4868
$0.1110
$0.0111
$0.0079
$0.0000
$0.0111
40
0.015700
$236.34
$2.27
$0.09
$0.3845
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
40
0.015700
$2,902,784.81
$20,389.67
$0.00
$4,619.85
$12,991.50
$144.35
$0.0000
$0.0000
$433.05
50
0.011900
$200.64
$2.71
$0.12
$0.6175
$0.9993
$0.1888
$0.0079
$0.0000
$0.0111
31
0.020300
AN
1783
FAC Title
C
FAC
Unit costs ($FY 2011)
SF
$200.64
$2.67
$0.12
$0.4140
$0.9993
$0.0888
$0.0079
$0.0000
$0.0111
31
0.020300
EA
SF
$235,469.55
$200.64
$5,073.90
$2.38
$0.00
$0.09
$618.03
$0.6175
$0.0000
$0.9993
$0.0000
$0.1888
$0.0000
$0.0079
$0.0000
$0.0000
$0.0000
$0.0111
30
31
0.020100
0.020300
17
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
2135
2136
2137
2141
2142
2143
2144
2145
2146
2151
2152
2153
2154
2161
2162
2163
2171
2172
Water/
Wastewater
Refuse
Collection
Grounds
Maint
SF
$429.66
$17.88
$0.12
$0.9757
$0.9993
$0.0888
$0.0079
$0.0000
$0.0111
31
0.020300
SF
$646.05
$24.00
$0.12
$1.38
$0.0000
$0.1888
$0.0079
$0.0000
$0.0111
50
0.012500
EA
SF
SF
$11,203.90
$157.56
$180.76
$594.80
$1.78
$2.21
$0.00
$0.09
$0.12
$23.91
$0.2921
$0.2529
$0.0000
$0.9993
$0.9993
$0.0000
$0.0888
$0.0888
$0.0000
$0.0079
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0111
$0.0111
37
50
50
0.016700
0.012500
0.012500
EA
$7,858,232.87
$7,721.89
$0.00
$16,410.26
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
37
0.017000
SF
EA
SF
SF
$200.64
$4,640,216.06
$197.19
$197.19
$2.69
$98,559.15
$3.40
$1.94
$0.09
$0.00
$0.09
$0.09
$0.3967
$9,937.43
$0.3700
$0.3700
$0.9993
$0.0000
$0.9993
$0.9993
$0.0888
$0.0000
$0.0888
$0.0888
$0.0079
$0.0000
$0.0079
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0111
$0.0000
$0.0111
$0.0111
50
6
50
50
0.012500
0.103700
0.012500
0.012500
SF
$197.19
$3.73
$0.09
$0.3578
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
SF
$197.19
$3.80
$0.09
$0.3578
$0.9993
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
EA
$69,126.01
$1,670.12
$0.00
$149.77
$180.55
$18.06
$0.0000
$0.0000
$54.17
50
0.011900
EA
SF
$15,766,632.6
0
$157.56
SF
$140.45
D
Sustainment
EL
LE
2132
2133
2134
Custodial
Svcs
Pvmt
Clearance
Pest
Control
Modernization
Factor
(no units)
Replacement
C
2131
Building, Depot
Intercontinental Ballistic
Missile Processing Facility
Ship Maintenance Drydock
Marine Railway
Marine Maintenance Shop
Marine Maintenance
Support Facility
Landing Craft Wash
Facility
Nuclear Repair Shop
Fixed Crane Structure
Vehicle Maintenance Shop
Vehicle Maintenance
Shop, Depot
Vehicle Maintenance
Shop, National Guard
Vehicle Maintenance
Shop, Reserve
Vehicle Maintenance
Facility
Launch Vehicle Test
Facility
Weapon Maintenance
Shop
Weapon Maintenance
Shop, Depot
Special Weapon
Maintenance Shop
Weapon Maintenance
Facility, Depot
Ammunition Maint Shop
Ammunition Maint Shop,
Depot
Ammunition Maint Facility,
Depot
Electronic and
Communication Maint
Shop
Electronic and
Communication Maint
Real Prop
Mgmt
Useful
Svc
Life
(years)
UM
$5,225.00
$0.00
$35,803.14
$0.0000
$960.35
$0.0000
$0.0000
$2,881.05
50
0.011900
$2.64
$0.09
$0.2921
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
$2.32
$0.09
$0.3210
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
$200.64
$2.71
$0.09
$0.4926
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
$163.99
$3.46
$0.09
$0.3210
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
$163.99
$163.99
$2.98
$3.14
$0.09
$0.09
$0.3261
$0.3261
$0.1110
$0.1110
$0.0888
$0.0888
$0.0079
$0.0079
$0.0000
$0.0000
$0.0111
$0.0111
50
50
0.012500
0.012500
$163.99
$4.28
$0.09
$0.3261
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
SF
$158.53
$2.53
$0.09
$0.3651
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
SF
$158.53
$1.98
$0.09
$0.3651
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
SF
SF
SF
SF
SF
AN
2126
FAC Title
C
FAC
Unit costs ($FY 2011)
18
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
2183
2184
2191
2192
2211
2221
2231
2233
2241
2242
2251
2252
2261
2262
2264
2265
2271
2281
2291
3101
Water/
Wastewater
EA
$871,898.73
$11,940.43
$488.57
$2,008.10
$0.0000
$61.07
$0.0000
$0.0000
$0.0000
50
0.012500
SF
$157.56
$3.02
$0.09
$0.3578
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
SF
$157.56
$2.63
SF
SF
$157.56
$208.79
$3.19
$5.02
SF
$157.56
$3.57
EA
$354,022.88
$16,461.00
SF
SF
SF
SF
SF
$150.83
$158.46
$155.74
$648.24
$153.70
$1.78
$2.40
$2.29
$24.00
$1.95
SF
$94.97
$2.05
SF
SF
$156.57
$94.97
SF
$223.83
SF
SF
EA
SF
Refuse
Collection
Grounds
Maint
D
Sustainment
EL
LE
2182
Custodial
Svcs
Pvmt
Clearance
Pest
Control
Modernization
Factor
(no units)
Replacement
$0.09
$0.2921
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
$0.09
$0.09
$0.3752
$0.3967
$0.1110
$0.1110
$0.0888
$0.0888
$0.0079
$0.0079
$0.0000
$0.0000
$0.0111
$0.0111
50
50
0.012500
0.012500
$0.09
$0.2775
$0.1110
$0.0888
$0.0079
$0.0000
$0.0111
50
0.012500
$0.00
$2,867.33
$0.0000
$344.22
$0.0000
$0.0000
$1,032.66
50
0.011900
$0.08
$0.08
$0.08
$0.08
$0.08
$0.3851
$0.4728
$0.2534
$1.38
$0.2426
$0.9993
$0.9993
$0.9993
$0.0000
$0.9993
$0.1888
$0.1888
$0.1888
$0.1888
$0.1888
$0.0079
$0.0079
$0.0079
$0.0000
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0111
$0.0111
$0.0111
$0.0111
$0.0111
55
55
55
50
55
0.011400
0.011400
0.011400
0.012500
0.011400
$0.08
$0.2426
$0.9993
$0.1888
$0.0079
$0.0000
$0.0111
55
0.011400
$1.87
$1.93
$0.08
$0.08
$0.2426
$0.2426
$0.9993
$0.9993
$0.1888
$0.1888
$0.0079
$0.0079
$0.0000
$0.0000
$0.0111
$0.0111
55
55
0.011400
0.011400
$3.60
$0.08
$0.3739
$0.9993
$0.1888
$0.0079
$0.0000
$0.0111
55
0.011400
$94.97
$2.57
$0.08
$0.3739
$0.9993
$0.1888
$0.0079
$0.0000
$0.0111
55
0.010900
$1,026.37
$10.45
$0.08
$2.16
$0.9993
$0.1888
$0.0079
$0.0000
$0.0111
55
0.011400
$3,270,823.25
$56,549.46
$0.00
$6,712.39
$0.0000
$34.44
$0.0000
$0.0000
$103.33
55
0.010900
$158.53
$1.97
$0.08
$0.3973
$0.9993
$0.1888
$0.0079
$0.0000
$0.0111
55
0.011400
C
2181
Shop, Depot
Electronic and
Communication Maint
Facility
Installation Support Vehicle
Maint Shop
Installation Support
Equipment Maint Shop
Railroad Equipment Shop
Parachute And Dingy
Maintenance Shop
Facility Engineer
Maintenance Shop
Facility Engineer
Maintenance Facility
Aircraft Production Plant
Missile Production Plant
Ship Production Plant
Ship Building Dry-dock
Tank/Automotive
Production Plant
Tank/Automotive
Production Facility
Weapon Production Plant
Weapon Production
Facility
Ammunition Production
Plant
Ammunition Production
Facility
Ammunition
Demilitarization Plant
Ammunition
Demilitarization Facility
Electronic and
Communication Production
Plant
Miscellaneous Support
Production Plant
Construction Material
Production Plant
RDT&E Laboratory
Real Prop
Mgmt
Useful
Svc
Life
(years)
UM
AN
2173
FAC Title
C
FAC
Unit costs ($FY 2011)
SF
$157.24
$3.38
$0.08
$0.3967
$0.9993
$0.1888
$0.0079
$0.0000
$0.0111
55
0.011400
EA
$1,522,503.00
$27,265.00
$488.51
$3,632.35
$0.0000
$1,186.39
$0.0000
$0.0000
$209.36
55
0.011400
SF
$244.78
$2.56
$0.16
$0.4698
$0.9993
$0.0888
$0.0079
$0.0000
$0.0111
30
0.010900
19
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
Replacement
Sustainment
3102
SF
$275.85
SF
3902
3903
Medical Research
Laboratory
Biosafety Level 3
Laboratory
Biosafety Level 4
Laboratory
Aircraft RDT&E Facility
Missile and Space RDT&E
Facility
Ship and Marine RDT&E
Facility
Tank and Automotive
RDT&E Facility
Weapons RDT&E Facility
Ammunition, Explosive,
and Toxic RDT&E Facility
Electronic and
Communication RDT&E
Facility
Propulsion RDT&E Facility
Miscellaneous Item and
Equipment RDT&E Facility
Underwater Equipment
RDT&E Facility
RDT&E Technical Service
Facility
RDT&E Range Building
RDT&E Range Facility
RDT&E Range Complex
Miscellaneous RDT&E
Facility
RDT&E Area
Aerodynamic wind tunnel
AC
EA
3904
Propulsion engine test cell
EA
4111
4121
Bulk Liquid Fuel Storage
Bulk Liquid Storage, Other
Than Fuel
Liquid Oxygen Storage
Ammunition Storage,
Depot and Arsenal
3111
3121
3131
3141
3151
3161
3171
3181
3191
3201
3211
3711
3712
3713
3901
4122
4211
Custodial
Svcs
$0.9993
Refuse
Collection
$0.0888
$275.85
$10.63
$0.16
$0.6366
$0.9984
$0.0887
SF
$275.85
$15.81
$0.16
$0.6366
$0.9984
SF
SF
$228.61
$223.05
$2.42
$3.04
$0.16
$0.16
$0.4698
$0.6548
SF
$244.78
$2.29
$0.16
SF
$244.78
$2.46
SF
SF
$244.78
$244.78
$3.10
$3.53
SF
$244.78
$2.43
SF
SF
$244.78
$244.78
$2.87
$3.18
SF
$244.78
$2.87
SF
$244.78
SF
EA
EA
EA
$159.16
$221,534.15
$646,055.55
$221,534.15
30
0.020000
Pest
Control
$0.0111
$0.0079
$0.0000
$0.0111
20
0.030100
$0.0887
$0.0079
$0.0000
$0.0111
20
0.030100
$0.9993
$0.9993
$0.0888
$0.0888
$0.0079
$0.0079
$0.0000
$0.0000
$0.0111
$0.0111
55
55
0.010900
0.010900
$0.3371
$0.9993
$0.0888
$0.0079
$0.0000
$0.0111
55
0.010900
$0.16
$0.3664
$0.9993
$0.0888
$0.0079
$0.0000
$0.0111
55
0.010900
$0.16
$0.16
$0.6548
$0.4698
$0.9993
$0.9993
$0.0888
$0.0888
$0.0079
$0.0079
$0.0000
$0.0000
$0.0111
$0.0111
55
55
0.010900
0.010900
$0.16
$0.4698
$0.9993
$0.0888
$0.0079
$0.0000
$0.0111
55
0.010900
$0.16
$0.16
$0.4698
$0.3664
$0.9993
$0.9993
$0.0888
$0.0888
$0.0079
$0.0079
$0.0000
$0.0000
$0.0111
$0.0111
55
55
0.010900
0.010900
$0.16
$0.4526
$0.9993
$0.0888
$0.0079
$0.0000
$0.0111
55
0.010900
$2.40
$0.16
$0.3140
$0.9993
$0.0888
$0.0079
$0.0000
$0.0111
55
0.010900
$2.33
$1,714.88
$7,537.55
$4,510.88
$0.16
$0.00
$0.00
$0.00
$0.2702
$540.36
$1,383.59
$540.36
$0.1110
$0.0000
$0.0000
$0.0000
$0.0888
$20.74
$53.10
$20.74
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0111
$62.23
$159.30
$62.23
40
40
36
40
0.015000
0.015000
0.016600
0.015000
$0.00
$7,155,430.58
$0.00
$16,334.57
$2.22
$0.0000
$0.0000
$0.0000
$0.6251
$3,209.50
N/A
55
0.000000
0.010900
$0.00
$0.0000
$122,718.4
8
$0.0000
$0.0000
$1,069.83
$41,763.96
$0.0000
$1,308,982.5
2
$100,354.73
$0.0000
$0.0000
$0.0000
$0.0000
55
0.010900
BL
GA
$0.00
$613,284,571.
09
$47,018,204.2
0
$59.38
$2.10
$4.93
$0.09
$0.00
$0.00
$0.1290
$0.0042
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
30
28
0.020600
0.022100
SF
SF
$47.35
$241.66
$0.92
$2.18
$0.00
$0.00
$0.1118
$0.5160
$0.1110
$0.1110
$0.0111
$0.0111
$0.0079
$0.0807
$0.0000
$0.0000
$0.0111
$0.0111
24
55
0.025800
0.010900
20
Grounds
Maint
$0.0079
Modernization
Factor
(no units)
Pvmt
Clearance
$0.0000
AN
3104
Real Prop
Mgmt
$0.6371
C
3103
$5.75
Water/
Wastewater
$0.16
D
UM
EL
LE
FAC Title
C
FAC
Useful
Svc
Life
(years)
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
Replacement
Sustainment
4212
Intercontinental Ballistic
Missile Storage Facility
Ammunition Storage,
Installation
Liquid Propellant Storage,
Ammunition Related
Battery Storage, Weapon
Related
Open Ammunition Storage
Cold Storage, Depot
Cold Storage, Installation
Covered Storage Building,
Depot
Covered Storage Shed,
Depot
Hazardous Materials
Storage, Depot
Controlled Humidity
Storage, Depot
Covered Storage Building,
Installation
Covered Storage Shed,
Installation
Hazardous Materials
Storage, Installation
Controlled Humidity
Storage, Installation
Vehicle Storage, Covered
Storage Silo, Loose
Material
Small Arms Storage,
Installation
Open Storage, Depot
Open Storage, Installation
Hospital
Medical Laboratory
Morgue
Veterinary Facility
Medical Warehouse
Ambulance Shelter
Dental Facility
SF
$295.81
SF
4241
4251
4311
4321
4411
4412
4413
4414
4421
4422
4423
4424
4425
4426
4427
4511
4521
5100
5302
5303
5304
5306
5307
5400
Custodial
Svcs
$0.1110
$250.36
$2.63
$0.00
$0.5160
$0.1110
$0.0111
GA
$1.27
$0.09
$0.00
$0.0030
$0.0000
SF
$169.78
$4.57
$0.00
$0.3967
SY
SF
SF
SF
$38.18
$169.78
$87.06
$116.96
$1.76
$2.38
$2.85
$1.42
$0.00
$0.04
$0.04
$0.00
SF
$71.38
$0.88
SF
$146.93
$3.00
SF
$116.00
$1.55
SF
$89.90
$2.24
SF
$44.46
$0.90
SF
$146.93
SF
$116.00
SF
SF
$63.42
$26.60
SF
SY
SY
SF
SF
SF
SF
SF
SF
SF
Refuse
Collection
$0.0111
Grounds
Maint
$0.0807
Modernization
Factor
(no units)
55
0.010900
Pvmt
Clearance
$0.0000
Pest
Control
$0.0111
$0.0807
$0.0000
$0.0111
55
0.010900
$0.0000
$0.0000
$0.0000
$0.0000
46
0.013400
$0.1110
$0.0111
$0.0807
$0.0000
$0.0111
45
0.013400
$0.1114
$0.3967
$0.3967
$0.2118
$0.0000
$0.1110
$0.1110
$0.1110
$0.0000
$0.0111
$0.0111
$0.0111
$0.7264
$0.0079
$0.0079
$0.0079
$0.0006
$0.0000
$0.0000
$0.0000
$0.0111
$0.0111
$0.0111
$0.0111
60
45
45
45
0.010000
0.013200
0.013200
0.013200
$0.00
$0.0792
$0.1110
$0.0111
$0.0079
$0.0000
$0.0111
36
0.016500
$0.00
$0.3045
$0.1110
$0.0111
$0.0079
$0.0000
$0.0111
45
0.013200
$0.00
$0.1972
$0.1110
$0.0111
$0.0079
$0.0000
$0.0111
45
0.013200
$0.00
$0.1874
$0.1110
$0.0111
$0.0079
$0.0000
$0.0111
45
0.013200
$0.00
$0.0792
$0.1110
$0.0111
$0.0079
$0.0000
$0.0111
36
0.016500
$5.37
$0.04
$0.3045
$0.1110
$0.0111
$0.0079
$0.0000
$0.0111
45
0.013200
$1.51
$0.04
$0.1972
$0.1110
$0.0111
$0.0079
$0.0000
$0.0111
45
0.013200
$0.66
$0.90
$0.00
$0.00
$0.1535
$0.0440
$0.1110
$0.1110
$0.0111
$0.0111
$0.0079
$0.0079
$0.0000
$0.0000
$0.0111
$0.0111
40
36
0.014800
0.016500
$242.12
$2.79
$0.00
$0.5160
$0.1110
$0.0111
$0.0079
$0.0000
$0.0111
55
0.010800
$38.18
$38.18
$444.65
$238.76
$163.47
$165.27
$116.72
$82.96
$405.98
$0.18
$0.18
$6.17
$7.99
$4.04
$3.30
$1.30
$0.67
$10.02
$0.00
$0.00
$0.18
$0.18
$0.18
$0.18
$0.04
$0.07
$0.18
$0.1096
$0.1096
$0.5307
$0.4698
$0.4771
$0.4771
$0.1972
$0.1659
$0.5282
$0.0000
$0.0000
$1.61
$1.61
$1.61
$1.61
$0.9993
$0.1110
$1.61
$0.0000
$0.0000
$0.1221
$0.1221
$0.1221
$0.1221
$0.0111
$0.0111
$0.1221
$0.0509
$0.0509
$0.1350
$0.1350
$0.1350
$0.1350
$0.1350
$0.1350
$0.1350
$0.0006
$0.0006
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0111
$0.0111
$0.0333
$0.0333
$0.0333
$0.0333
$0.0333
$0.0333
$0.0333
75
75
30
20
50
45
50
35
30
0.008000
0.008000
0.020000
0.020000
0.012000
0.013300
0.013200
0.017000
0.020000
AN
4231
Real Prop
Mgmt
$0.8156
C
4221
$7.62
Water/
Wastewater
$0.00
D
UM
EL
LE
FAC Title
C
FAC
Useful
Svc
Life
(years)
21
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
UM
Replacement
Sustainment
5500
5501
6100
Dispensary And Clinic
Ambulatory Care Clinic
General Administrative
Building
Small Unit Headquarters
Building
Large Unit Headquarters
Building
Printing And Reproduction
Plant
Automated Data
Processing Center
Pentagon
Remote Delivery Facility
Administrative Structure,
Underground
Alternate Joint
Communications Center
Administrative Structure,
Other Than Buildings
Family Housing Dwelling
Family Housing
Trailer/Relocatable
Family Housing Trailer Site
Family Housing
Garage/Carport
Family Housing Storage
Facility
Miscellaneous Family
Housing Support Facility
Trailer Court Support
Facility
Family Housing Attendant
Facility
Enlisted Unaccomp
Personnel Housing
Enlisted Unaccomp
Personnel Housing,
Transient
Student Barracks
Annual
Training/Mobilization
SF
SF
SF
$304.49
$427.33
$216.52
SF
6104
6105
6106
6200
6201
6900
7110
7120
7130
7141
7142
7143
7145
7146
7210
7212
7213
7214
Refuse
Collection
$0.1221
$0.1221
$0.0888
Grounds
Maint
$0.1350
$0.1350
$0.1350
Pvmt
Clearance
$0.0000
$0.0000
$0.0000
Pest
Control
$0.0333
$0.0333
$0.0333
$172.06
$3.56
$0.13
$0.3724
$1.26
$0.0888
$0.1350
$0.0000
$0.0333
55
0.010800
SF
$280.32
$4.20
SF
$71.14
$3.23
SF
$234.25
$2.92
SF
SF
SF
$540.50
$150.27
$226.69
$7.03
$9.65
$2.26
SF
$237.79
$2.92
EA
$6,691.16
$196.78
SF
FA
$118.36
$34,654.55
$2.18
$892.95
FA
SF
$6,547.43
$52.85
SF
$20.20
SF
SF
SF
SF
$0.13
$0.3894
$1.26
$0.0888
$0.1350
$0.0000
$0.0333
55
0.010800
$0.08
$0.1954
$0.9993
$0.1888
$0.1350
$0.0000
$0.0333
45
0.013200
$0.43
$0.4527
$1.26
$0.0888
$0.1350
$0.0000
$0.0333
45
0.013200
$0.13
$0.09
$0.13
$0.3453
$0.2772
$0.4382
$1.25
$0.1109
$1.26
$0.0887
$0.0887
$0.0888
$0.1349
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0111
$0.0333
55
55
45
0.010800
0.010800
0.013200
$0.43
$0.4523
$1.25
$0.0887
$0.1349
$0.0000
$0.0333
55
0.010800
$0.00
$16.02
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
26
0.023100
$0.14
$0.00
$0.1752
$100.73
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
60
20
0.010000
0.030300
$412.43
$1.03
$0.00
$0.00
$15.78
$0.0782
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
20
35
0.030300
0.017200
$0.94
$0.00
$0.0876
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
30
0.020100
$52.85
$2.40
$0.07
$0.3457
$0.1110
$0.0888
$0.1350
$0.0000
$0.0333
55
0.010900
$107.17
$1.46
$0.07
$0.2251
$0.1110
$0.0888
$0.1350
$0.0000
$0.0333
55
0.010900
$78.06
$3.69
$0.18
$0.1832
$0.1110
$0.0888
$0.1350
$0.0000
$0.0333
40
0.015000
$182.69
$3.70
$0.18
$0.3724
$0.0000
$0.0000
$0.1350
$0.0000
$0.0000
55
0.010900
C
6103
0.020000
0.020000
0.010800
Custodial
Svcs
$1.61
$1.61
$1.26
AN
6102
30
30
55
$7.29
$5.38
$3.01
Real Prop
Mgmt
$0.4771
$0.4503
$0.3457
C
6101
Modernization
Factor
(no units)
Water/
Wastewater
$0.18
$0.18
$0.13
D
FAC Title
EL
LE
FAC
Useful
Svc
Life
(years)
SF
$163.84
$5.13
$0.18
$0.3724
$0.0000
$0.0888
$0.1350
$0.0000
$0.0000
55
0.010900
SF
SF
$151.76
$163.84
$4.53
$3.30
$0.18
$0.06
$0.3724
$0.3310
$0.0000
$0.0000
$0.1221
$0.0888
$0.1350
$0.1350
$0.0000
$0.0000
$0.0333
$0.0333
55
41
0.010900
0.014700
22
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
7233
7234
7235
7240
7241
7242
7250
7251
7311
7312
7313
7314
7321
7322
7323
7331
7332
7333
7340
7341
7342
7343
Water/
Wastewater
SF
$220.39
$3.84
$0.18
$0.4498
$1.61
$0.1220
$0.1349
$0.0000
$0.0333
55
0.010900
SF
SF
SF
$175.93
$314.40
$43.78
$4.89
$4.96
$2.51
$0.18
$3.16
$7.20
$0.3310
$0.6036
$0.1246
$0.0000
$1.61
$0.1110
$0.0888
$1.69
$0.0888
$0.1350
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0333
$0.0600
$0.0333
55
40
45
0.010900
0.015000
0.013400
SF
$52.85
$1.01
$0.00
$0.0685
$0.0000
$0.0000
$0.1350
$0.0000
$0.0000
35
0.017200
SF
SF
EA
$169.78
$150.79
$4,903.85
$5.40
$4.86
$95.72
$0.04
$5.49
$0.00
$0.4283
$0.4259
$8.91
$0.1110
$1.61
$0.0000
$0.0111
$0.0888
$0.0000
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0333
$0.0000
40
40
35
0.015000
0.015000
0.017200
SF
$201.06
$5.32
$0.18
$0.3651
$0.0000
$0.0888
$0.1350
$0.0000
$0.0000
55
0.010900
SF
SF
$173.99
$222.83
$5.37
$5.32
$0.18
$0.18
$0.3651
$0.3651
$0.0000
$0.0000
$0.0888
$0.0888
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
55
N/A
0.010900
0.010900
SF
$180.76
$1.28
$0.18
$0.0774
$0.0000
$0.0000
$0.1350
$0.0000
$0.0000
41
0.014700
SF
SF
SF
$4.97
$231.99
$230.16
$0.20
$3.70
$5.06
$0.00
$0.07
$0.18
$0.0120
$0.4186
$0.5180
$0.0000
$0.0000
$1.61
$0.0000
$0.0888
$0.0888
$0.1350
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0333
41
45
45
0.014700
0.013300
0.013300
SF
SF
$248.42
$269.13
$5.60
$3.72
$0.13
$0.10
$0.3578
$0.3578
$1.26
$1.26
$0.0888
$0.0888
$0.1350
$0.1350
$0.0000
$0.0000
$0.0333
$0.0333
50
55
0.012000
0.010900
$79.92
$169.78
$43.37
$204.50
$204.50
$3.67
$5.68
$1.25
$5.77
$3.66
$1.98
$0.08
$0.18
$3.16
$3.16
$0.4987
$0.2969
$0.0980
$0.4041
$0.6036
$1.61
$0.9993
$0.1110
$1.61
$1.61
$1.69
$0.1888
$0.0888
$1.69
$1.69
$0.1350
$0.1350
$0.1350
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0600
$0.0333
$0.0333
$0.0600
$0.0600
45
45
35
35
35
0.013400
0.013400
0.017200
0.017200
0.017200
$321.22
$5.60
$0.52
$0.5623
$1.61
$1.69
$0.1350
$0.0000
$0.0600
45
0.013400
SF
SF
SF
SF
SF
SF
Refuse
Collection
Grounds
Maint
D
Sustainment
EL
LE
7232
Custodial
Svcs
Pvmt
Clearance
Pest
Control
Modernization
Factor
(no units)
Replacement
C
7218
7220
7231
Barracks
Unaccompanied Housing
for Wounded Warriors
Recruit/Trainee Barracks
Dining Facility
Miscellaneous UPH
Support Building
Unaccomp Personnel
Housing Garage/Carport
Dining Support Facility
Latrine/Shower Facility
Miscellaneous UPH
Support Facility
Officer Unaccompanied
Personnel Housing
Officer UPH, Transient
Service Academy
Unaccomp Pers Housing
Emergency Unaccomp
Personnel Housing
EUPH Tent Pad
Fire Station Facility
Prison/Confinement
Facility
Police Station
Drug and Alcohol Abuse
Center
Bread/Pastry Kitchen
Ice/Dairy Products Plant
Greenhouse
Exchange Eating Facility
Non-Exchange Eating
Facility
Open Mess and Club
Facility
Thrift Shop
Bus Station
Laundry/Dry Cleaning
Facility
Clothing Sales Store
Real Prop
Mgmt
Useful
Svc
Life
(years)
UM
AN
7215
FAC Title
C
FAC
Unit costs ($FY 2011)
SF
SF
SF
$142.77
$81.94
$160.13
$3.50
$2.90
$3.94
$0.07
$0.07
$7.20
$0.2702
$0.2537
$0.3992
$0.1110
$0.1110
$0.9993
$0.0888
$0.0888
$0.1888
$0.1350
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0333
$0.0111
$0.0333
38
50
45
0.015800
0.012000
0.013900
SF
$160.13
$2.82
$0.07
$0.2702
$0.9993
$0.0888
$0.1350
$0.0000
$0.0333
50
0.012000
23
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
Replacement
Sustainment
7344
7345
Postal Facility
Exchange Automobile
Facility
Exchange Sales Facility
Bank and Credit Union
Car Wash Facility
Commissary
Education Center
Dependent School
Dependent School Support
Facility
Chapel Facility
Religious Education
Facility
Nursery and Child Care
Facility
Family Service Center
Homeless Support Facility
Forestry Guard Station
Locker Room
Air Raid/Fallout Shelter
Miscellaneous Personnel
Shelter
Public Restroom/Shower
Ceremonial Hall
Exchange Support Facility
Exchange Warehouse
Private Vehicle Inspection
Facility
Hobby And Craft Center
Automobile Craft Center
Golf Club House and Sales
Club and Organization
Building
Bowling Center
Library, General Use
Recreation Center
Indoor Skating Rink
SF
SF
$85.95
$119.58
SF
SF
SF
SF
SF
SF
SF
7371
7372
7380
7381
7382
7383
7384
7385
7386
7387
7388
7389
7411
7412
7413
7414
7415
7416
7417
7418
0.012000
0.015000
Custodial
Svcs
$0.9993
$0.9993
Refuse
Collection
$0.0888
$0.0888
Grounds
Maint
$0.1350
$0.1350
Pvmt
Clearance
$0.0000
$0.0000
Pest
Control
$0.0333
$0.0111
$160.13
$162.06
$63.96
$213.62
$211.69
$212.01
$162.39
$3.15
$3.64
$2.29
$2.00
$3.53
$3.74
$5.19
$0.07
$0.13
$1.34
$0.07
$0.10
$0.10
$0.04
$0.2702
$0.3213
$0.5319
$0.3359
$0.4138
$0.3538
$0.3585
$0.9993
$1.26
$0.0000
$0.2554
$1.26
$1.26
$0.1110
$0.0888
$0.0888
$0.0888
$0.0888
$0.0888
$0.0888
$0.0888
$0.1350
$0.1350
$0.1350
$0.1350
$0.1350
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0333
$0.0000
$0.0333
$0.0333
$0.0333
$0.0333
50
55
30
40
50
45
45
0.012000
0.010900
0.020100
0.015000
0.012000
0.013300
0.013300
SF
SF
$285.64
$269.69
$3.23
$3.77
$0.10
$0.10
$0.4235
$0.3457
$0.2554
$1.26
$0.0888
$0.0888
$0.1350
$0.1350
$0.0000
$0.0000
$0.0333
$0.0333
50
50
0.012000
0.012000
SF
$238.27
$2.50
$0.10
$0.4114
$1.61
$0.0888
$0.1350
$0.0000
$0.0333
45
0.013300
SF
SF
SF
SF
SF
SF
$287.09
$0.00
$207.18
$126.90
$226.69
$28.65
$3.82
$0.00
$0.99
$3.35
$3.34
$0.83
$0.10
$0.18
$0.00
$0.18
$0.00
$0.00
$0.3894
$0.0000
$0.4722
$0.2155
$0.4382
$0.1340
$1.26
$1.61
$0.0000
$1.61
$0.0000
$0.0000
$0.0888
$0.0888
$0.0888
$0.0888
$0.0000
$0.0000
$0.1350
$0.1350
$0.1350
$0.1350
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0333
$0.0000
$0.0333
$0.0000
$0.0000
50
N/A
36
36
45
36
0.012000
0.000000
0.016700
0.016700
0.013400
0.016700
SF
SF
SF
SF
SF
$139.20
$92.38
$160.13
$128.30
$180.76
$3.55
$2.28
$3.29
$1.62
$1.32
$0.18
$0.07
$0.09
$0.04
$0.07
$0.4065
$0.2118
$0.2702
$0.1996
$0.1874
$1.61
$0.1110
$0.1110
$0.1110
$0.9993
$0.0888
$0.0888
$0.0888
$0.0111
$0.0888
$0.1350
$0.1350
$0.1350
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0333
$0.0333
$0.0333
$0.0333
36
50
50
45
40
0.016700
0.011900
0.011800
0.013200
0.015000
$142.77
$136.01
$163.99
$321.22
$3.87
$2.47
$4.68
$4.23
$0.07
$0.07
$0.07
$0.07
$0.3578
$0.2873
$0.3310
$0.5623
$0.9993
$0.9993
$1.26
$1.26
$0.0888
$0.0888
$0.0888
$0.0888
$0.1350
$0.1350
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0333
$0.0333
$0.0333
50
40
50
45
0.011900
0.014900
0.011900
0.013300
$235.37
$232.96
$229.09
$123.42
$3.07
$3.36
$4.24
$2.17
$0.10
$0.07
$0.07
$0.04
$0.3992
$0.4016
$0.3773
$0.3075
$0.9993
$0.2554
$0.2554
$0.1110
$0.0888
$0.0888
$0.0888
$0.0888
$0.1350
$0.1350
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0333
$0.0333
$0.0333
40
55
50
45
0.014900
0.010900
0.011900
0.013300
SF
SF
SF
SF
AN
7361
7362
50
40
$3.62
$3.55
Real Prop
Mgmt
$0.2529
$0.2534
C
7346
7347
7348
7349
7351
7352
7353
Modernization
Factor
(no units)
Water/
Wastewater
$0.12
$0.07
SF
SF
SF
SF
D
UM
EL
LE
FAC Title
C
FAC
Useful
Svc
Life
(years)
24
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
Replacement
Sustainment
7421
Indoor Physical Fitness
Facility
Indoor Swimming Pool
Auditorium and Theater
Facility
Transient Lodging
Recreational Lodging
Transient and Recreational
Lodging Support Facility
Stable
Boathouse
Miscellaneous MWR
Facility
Miscellaneous MWR
Support
Playground
Outdoor Swimming Pool
Golf Course
Golf Driving Range
Golf Pitch and Putt Course
Outdoor Recreation Area
Recreational Pier
Marina
Outdoor Playing Court
Athletic Field
Running Track
Stadium
Pavilion
Outdoor Theater
Recreational Camp and
Trailer Park
Miscellaneous Outdoor
Recreation Facility
Wildlife Management Area
Museum
Monument and Memorial
Cemetery
Columbarium
SF
$200.09
SF
SF
7444
7445
7446
7447
7511
7512
7513
7514
7515
7516
7517
7518
7521
7522
7523
7524
7531
7532
7541
7542
7543
7601
7602
7603
7604
Custodial
Svcs
$0.1110
$201.06
$165.92
$3.32
$2.13
$0.07
$0.07
$0.3943
$0.3286
$0.1110
$0.1110
$0.0888
$0.0888
SF
SF
SF
$203.54
$78.16
$24.61
$5.11
$3.35
$1.22
$0.18
$0.18
$0.04
$0.3651
$0.1752
$0.2786
$1.61
$1.61
$0.1110
SF
SF
SF
$23.04
$30.22
$229.91
$0.63
$0.71
$2.35
$0.09
$0.09
$0.07
$0.1104
$0.0620
$0.2750
SF
$86.82
$3.48
$0.07
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
SF
EA
EA
$171,487.59
$1,610,375.00
$2,366,632.69
$163,164.30
$118,116.77
$15,370.01
$7,628.89
$626,190.75
$64,569.88
$189,593.29
$142,018.93
$2,038,189.50
$57.18
$166,329.36
$321,443.41
$3,582.03
$11,281.35
$65,288.98
$2,801.43
$30,368.08
$990.84
$437.07
$14,131.97
$1,664.05
$3,876.94
$3,345.16
$59,762.13
$0.36
$7,059.03
$15,496.62
$72,754.18
EA
AC
SF
EA
EA
CF
$0.00
$124.24
$6,801.45
$0.00
$135.00
Refuse
Collection
$0.0888
45
0.013300
Pest
Control
$0.0333
$0.1350
$0.1350
$0.0000
$0.0000
$0.0333
$0.0333
40
45
0.014900
0.013300
$0.0888
$0.0888
$0.0888
$0.1350
$0.1350
$0.1350
$0.0000
$0.0000
$0.0000
$0.0333
$0.0333
$0.0333
41
45
55
0.014700
0.013400
0.010900
$0.1110
$0.1110
$0.1110
$0.1888
$0.0111
$0.0888
$0.0079
$0.0079
$0.0079
$0.0000
$0.0000
$0.0000
$0.0600
$0.0333
$0.0333
36
31
45
0.016600
0.019200
0.013300
$0.1784
$0.1110
$0.0888
$0.0079
$0.0000
$0.0333
45
0.013300
$0.00
$567.95
$208,651.02
$11,691.69
$104,325.51
$0.00
$0.00
$13,466.19
$0.00
$11,591.72
$0.00
$11,591.72
$0.00
$0.00
$28,975.46
$452.74
$3,385.78
$8,327.23
$1,468.28
$3,028.84
$32.40
$9.77
$2,459.60
$98.20
$459.75
$304.15
$6,967.49
$0.1452
$984.46
$589.70
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0888
$33.31
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$4,104.72
$0.0000
$4,104.72
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$99.94
$0.0000
25
25
25
25
25
25
31
37
25
25
25
25
35
25
25
0.024000
0.024000
0.024000
0.024000
0.024000
0.024000
0.019300
0.016100
0.024000
0.024000
0.024000
0.024000
0.017100
0.024000
0.024000
$2,030.86
$0.00
$171.80
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
25
0.024000
$0.00
$3.38
$222.50
$0.00
$0.00
$0.00
$0.12
$0.00
$0.00
$0.00
$0.0000
$0.4016
$16.06
$0.0000
$0.0000
$0.0000
$1.26
$0.0000
$0.0000
$0.0000
$0.0000
$0.0888
$0.0000
$0.0000
$0.0000
$0.0000
$0.1350
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$0.0000
$0.0000
$0.0000
N/A
55
60
N/A
60
0.000000
0.010900
0.010000
0.000000
0.010000
25
Grounds
Maint
$0.1350
Modernization
Factor
(no units)
Pvmt
Clearance
$0.0000
AN
7441
7442
7443
Real Prop
Mgmt
$0.4065
C
7422
7431
$3.35
Water/
Wastewater
$0.07
D
UM
EL
LE
FAC Title
C
FAC
Useful
Svc
Life
(years)
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
Replacement
Sustainment
8111
8112
Electrical Power Source
Stand-By/Emergency
Power
Electrical Power Source,
Hydroelectric
Electrical Power Source,
Wind Generated
Electrical Power
Distribution Line, Overhead
Exterior Lighting, Pole
Electrical Power
Distribution Line,
Underground
Electrical Power
Substation
Electrical Power Switching
Station
Electrical Power
Transformers
Heat Source
Heat Distribution Line
Heat Gas Production Plant
Heat Gas Storage
Heat Gas Distribution Line
Refrigeration and Air
Conditioning Source
Chilled Water and
Refrigerant Distribution
Line
Sewage Treatment
Industrial Waste Treatment
Water Separation Facility
Septic Tank and Drain
Field
Septic Lagoon and
Settlement Ponds
Sewage Lift Stations
Sewer and Industrial
Waste Line
Refuse Collection and
Recycling Facility
KW
KW
$352.89
$268.29
MW
8121
8122
8123
8131
8132
8133
8211
8221
8231
8232
8241
8261
8271
8311
8312
8313
8314
8315
8316
8321
8331
0.014000
0.014000
Custodial
Svcs
$0.0000
$0.0000
Refuse
Collection
$0.0000
$0.0000
Grounds
Maint
$0.0000
$0.0000
Pvmt
Clearance
$0.0000
$0.0000
Pest
Control
$0.0000
$0.0000
$2,382,667.00
$15,704.49
$0.00
$2.52
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
45
0.014000
KW
$2,171.00
$15.71
$0.00
$2.52
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
45
0.014000
LF
$24.52
$0.29
$0.00
$0.0585
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
45
0.014000
EA
LF
$3,388.96
$29.97
$48.99
$0.61
$0.00
$0.00
$15.84
$0.1497
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
45
45
0.014000
0.014000
KV
$200.18
$17.19
$0.00
$0.4727
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
45
0.014000
KV
$10.71
$0.25
$0.00
$0.0253
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
45
0.014000
KV
$34.41
$5.20
$0.00
$0.0923
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
45
0.014000
MB
LF
MB
EA
LF
TR
$47,683.87
$191.76
$3,770.70
$95,882.70
$18.07
$3,926.44
$877.12
$2.48
$17.07
$57.95
$0.12
$74.32
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$28.34
$0.4941
$9.04
$80.90
$0.1983
$7.89
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
34
34
34
24
36
14
0.018200
0.018200
0.018200
0.025800
0.017100
0.044700
LF
$108.99
$3.57
$0.00
$0.1095
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
28
0.022100
$5,975.42
$6,521.12
$91.32
$3.97
$117.53
$117.53
$0.54
$0.01
$0.00
$0.00
$0.00
$0.00
$11.53
$11.53
$0.2080
$0.0131
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
50
50
50
24
0.011900
0.011900
0.011900
0.025000
$0.48
$0.0030
$0.00
$0.0052
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
24
0.025000
EA
LF
$202,959.28
$53.20
$1,179.23
$1.72
$319.79
$0.00
$527.78
$0.1300
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$137.05
$0.0000
24
60
0.025000
0.009900
EA
$242,137.32
$4,447.58
$320.08
$528.26
$0.0000
$0.0000
$0.0000
$0.0000
$137.18
45
0.013300
KG
KG
KG
GA
GA
AN
8114
45
45
$15.71
$19.58
Real Prop
Mgmt
$2.53
$1.07
C
8113
Modernization
Factor
(no units)
Water/
Wastewater
$0.00
$0.00
D
UM
EL
LE
FAC Title
C
FAC
Useful
Svc
Life
(years)
26
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
Replacement
Sustainment
8332
8333
8334
8411
8412
8413
8414
8415
8421
Incinerator
Sanitary Landfill
Hazardous Waste Landfill
Water Source, Potable
Water Treatment Facility
Water Storage, Potable
Water Well, Potable
Desalinization Plant
Water Distribution Line,
Potable
Water Pump Facility,
Potable
Water Source, Fire
Protection
Water Distribution Line,
Fire Protection
Water Impoundment, Fire
Protection
Water Pump Facility, Fire
Protection
Water Tank, Fire
Protection
Water Source, NonPotable
Water Storage, NonPotable
Reservoir, Water
Water Distribution Line,
Non-Potable
Water Pump Facility, NonPotable
Road, Surfaced
Road, Unsurfaced
Vehicle Bridge
Vehicular Tunnel
Vehicle Parking, Surfaced
Vehicle Parking and
Staging Area, Unsurfaced
Vehicle Staging Area,
Surfaced
TH
AC
AC
KG
KG
GA
KG
KG
LF
$301,052.74
$622,973.96
$1,245,947.92
$0.00
$2,210.09
$2.90
$36.16
$7,509.28
$25.40
$1,492.00
$5,331.45
$4,048.28
$0.00
$21.10
$0.03
$4.24
$150.48
$1.04
KG
$72.24
$0.02
GM
$98.24
$0.12
LF
$25.40
$1.04
MG
$0.00
$0.00
KG
$72.24
$0.02
GA
$2.90
$0.0003
KG
$54.24
GA
$0.90
8432
8433
8434
8435
8441
8442
8443
8451
8452
8511
8512
8513
8514
8521
8522
8523
MG
LF
KG
SY
SY
SY
LF
SY
SY
SY
45
36
36
N/A
50
50
50
50
60
0.013300
0.016600
0.016600
0.000000
0.011900
0.011900
0.011900
0.011900
0.009900
Real Prop
Mgmt
$14.08
$1,334.15
$2,668.31
$0.0000
$8.18
$0.0052
$0.0188
$16.03
$0.0949
Custodial
Svcs
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
Refuse
Collection
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
Grounds
Maint
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
Pvmt
Clearance
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
Pest
Control
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.00
$0.2108
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
50
0.011900
$0.00
$0.0987
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
50
0.011900
$0.00
$0.0949
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
50
0.011900
$0.00
$604.21
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
0.000000
$0.00
$0.2108
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
50
0.011900
$0.00
$0.0052
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
50
0.011900
$0.09
$0.00
$0.0188
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
50
0.011900
$0.0003
$0.00
$0.0052
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
50
0.011900
AN
8431
$0.00
$25.40
$0.00
$1.04
$0.00
$0.00
$0.0000
$0.0949
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
50
0.000000
0.011900
$72.24
$0.02
$0.00
$0.2108
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
50
0.011900
$26.13
$11.02
$1,066.28
$19,840.11
$30.61
$11.49
$0.65
$0.57
$13.54
$13.30
$1.76
$0.18
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.0552
$0.0164
$2.23
$0.0552
$0.1042
$0.0164
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.1016
$0.1016
$0.0000
$0.1016
$0.0254
$0.0254
$0.0500
$0.0006
$0.0500
$0.0500
$0.0500
$0.0006
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
28
28
46
N/A
32
32
0.021400
0.021400
0.013000
0.000000
0.018700
0.018700
$26.14
$1.76
$0.00
$0.0797
$0.0000
$0.0000
$0.0254
$0.0006
$0.0000
32
0.018700
C
8422
Modernization
Factor
(no units)
Water/
Wastewater
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
D
UM
EL
LE
FAC Title
C
FAC
Useful
Svc
Life
(years)
27
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
UM
Replacement
Sustainment
8524
8525
8526
8531
8541
8601
8611
8612
SY
SY
SY
SF
EA
MI
LF
EA
$35.62
$1,450.64
$26.14
$53.16
$160,632.82
$523,717.92
$9,494.23
$114,736.64
$0.00
$22.94
$1.76
$0.59
$2,202.58
$19,535.77
$132.04
$2,579.00
LF
LF
EA
LF
$2.63
$215.88
$1,713,772.63
$1,371.36
$0.0037
$0.54
$2,440.54
$6.34
8715
8721
8722
8811
Sidewalk and Walkway
Pedestrian Bridge
Miscellaneous Paved Area
Parking Garage/Building
Traffic Control Signals
Railroad Track
Railroad Bridge
Miscellaneous Railroad
Facility
Storm Drainage
Retaining Structure
Grounds Drainage Dams
Levees and Dikes for
Grounds Drainage
Storm Water Ponds
Boundary Fence and Wall
Security Fence
Dam
MG
LF
LF
EA
$0.00
$1.66
$2.81
$1,124,689.08
8812
Lock
EA
8813
8814
Navigation Revetments
Training Dikes/Wing
Dams/Pile Dikes
Flood Control Structures
Flood Control
Levee/Floodwall
Fish Facilities
Utility Building
Installation Gas Production
Plant
Installation Gas Storage
Vehicle Scales
Miscellaneous Pump
Station
Energy Management and
Control System
Hazardous Waste Storage
Or Disposal Facility
LF
LF
$0.00
$33.25
$69.73
$36,687,241.0
0
$36,687,241.0
0
$215.88
$1,371.36
EA
LF
$617,113.79
$1,371.36
8831
8910
8921
8922
8923
8924
8925
8926
0.021400
0.013000
0.018700
0.013300
0.040300
0.015400
0.013400
0.020600
Custodial
Svcs
$0.0000
$0.0000
$0.0000
$0.1110
$0.0000
$0.0000
$0.0000
$0.0000
Refuse
Collection
$0.0000
$0.0000
$0.0000
$0.0111
$0.0000
$0.0000
$0.0000
$0.0000
Grounds
Maint
$0.0000
$0.0000
$0.0000
$0.1372
$0.0000
$0.0000
$0.0000
$0.0000
Pvmt
Clearance
$0.0000
$0.0000
$0.0006
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
Pest
Control
$0.0000
$0.0000
$0.0000
$0.0333
$0.0000
$0.0000
$0.0000
$0.0000
$0.00
$0.00
$0.00
$0.00
$0.0093
$1.11
$144.19
$1.11
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
34
36
39
39
0.018200
0.016600
0.015800
0.015800
$0.00
$0.00
$0.00
$8,200.44
$0.0000
$0.0827
$0.0826
$91,237.24
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$12,447.10
$0.0000
$0.0000
$0.0000
$519.85
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$732.18
N/A
26
26
39
0.000000
0.023100
0.023100
0.015800
$8,207.97
$91,320.94
$0.0000
$12,458.52
$520.33
$0.0000
$732.85
39
0.015800
$0.54
$6.34
$0.00
$0.00
$1.10
$1.10
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
39
39
0.015800
0.015800
$2,964.81
$6.34
$0.00
$0.00
$101.57
$1.10
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
39
39
0.015800
0.015800
$310,613.94
$161.43
$282,800.25
$1,491.92
$3.56
$7,497.81
$0.00
$0.00
$0.00
$0.0000
$0.3992
$684.57
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$16.66
$0.0000
$0.0079
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0333
$49.97
39
55
55
0.015800
0.011400
0.010800
$75,252.40
$48,907.03
$12,525.35
$1,025.00
$1,110.58
$133.98
$0.00
$0.00
$0.00
$79.21
$50.65
$493.58
$0.0000
$0.0000
$0.0000
$14.40
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$43.21
$0.0000
$0.0000
30
30
50
0.020600
0.020600
0.012300
EA
$195,092.77
$14,425.83
$0.00
$699.10
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
14
0.044700
EA
$242,137.32
$4,460.01
$0.00
$528.26
$0.0000
$55.52
$0.0000
$0.0000
$166.56
45
0.013700
EA
SF
EA
EA
EA
EA
C
$1,124,689.08
AN
8821
8822
28
46
32
45
15
40
46
30
Real Prop
Mgmt
$0.0942
$2.38
$0.1096
$0.0841
$245.43
$2,087.41
$18.44
$239.62
C
8711
8712
8713
8714
Modernization
Factor
(no units)
Water/
Wastewater
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
D
FAC Title
EL
LE
FAC
Useful
Svc
Life
(years)
28
UFC 3-701-01
March 2011
(not to be used for military construction
projects)
Unit costs ($FY 2011)
UM
Replacement
Sustainment
8927
8928
8929
Utility Vaults
Loading Platform/Ramp
Miscellaneous Utility
Facility
Installation Gas
Distribution Line
Utility Tunnel
Miscellaneous Storage
Tank and Basin
Miscellaneous Component
of Other Facility
Government Owned land
State Owned Land
Withdrawn Public land
Licensed and Permitted
Land
Public Land
Land Easement
In-leased Land
Foreign Land
Building Improvements and
Acquisitions
Clearing, Grading, and
Landscaping
Demolition
Cut and Fill
Dredging
Other Real Property
Improvements
Contaminated Facility or
Area
Not Real Property
EA
EA
EA
$22,932.40
$16,833.97
$2,048.25
LF
9110
9111
9120
9130
9140
9210
9220
9230
9311
9321
9331
9341
9351
9391
9411
9999
Refuse
Collection
$0.0000
$0.0000
$0.0000
Grounds
Maint
$0.0000
$0.0000
$0.0000
Pvmt
Clearance
$0.0000
$0.0000
$0.0000
Pest
Control
$0.0000
$0.0000
$0.0000
$18.07
$0.52
$0.00
$0.1983
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
36
0.017100
LF
GA
$56.97
$0.80
$0.32
$0.0030
NA
$0.00
$0.00
AC
AC
AC
AC
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
AC
AC
AC
AC
NA
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
NA
$0.00
NA
NA
NA
NA
$0.00
$0.00
$0.00
$0.00
NA
NA
$0.00
$0.00
$0.0975
$0.0023
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
60
45
0.010300
0.013700
$0.00
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
0.000000
$0.00
$0.00
$0.00
$0.00
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
N/A
N/A
N/A
0.000000
0.000000
0.000000
0.000000
$0.00
$0.00
$0.00
$0.00
$0.00
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
N/A
N/A
N/A
N/A
0.000000
0.000000
0.000000
0.000000
0.000000
$0.00
$0.00
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
0.000000
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
N/A
N/A
N/A
0.000000
0.000000
0.000000
0.000000
$0.00
$0.00
$0.00
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
0.000000
$0.00
$0.00
$0.00
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
$0.0000
N/A
0.000000
C
8999
0.013300
0.020000
0.013700
Custodial
Svcs
$0.0000
$0.0000
$0.0000
AN
8931
8951
45
30
45
$126.06
$94.89
$300.03
Real Prop
Mgmt
$48.44
$26.09
$8.36
C
8930
Modernization
Factor
(no units)
Water/
Wastewater
$0.00
$0.00
$0.00
D
FAC Title
EL
LE
FAC
Useful
Svc
Life
(years)
29
UFC 3-701-01
March 2011
CHAPTER 4 COST ADJUSTMENT FACTORS
4-1
LOCATION ADJUSTMENTS
Table 4-1 provides area cost factors (ACFs) to be used for adjusting “bare” unit costs to
location-specific costs for the most common locations. A complete table of all DoD sites
that includes locality indices (LI) for adjusting operation costs is available as part of the
supporting documentation download file accompanying this UFC on the Whole Building
Design Guide web site:
http://www.wbdg.org/ccb/DOD/UFC/ARCHIVES/ufc_3_701_01_FY11supplement.zip.
EL
L
ED
For military construction projects, use the MILCON ACFs with the primary facility unit
costs from Chapter 2 or approved Air Force, Army, or Navy MILCON Pricing Guide. For
calculating Plant Replacement Value, use the MILCON ACFs with the appropriate
replacement unit costs from Chapter 3. For calculating sustainment costs, use the
sustainment ACFs with the appropriate sustainment unit costs from Chapter 3. For
calculating operation costs, use the appropriate operation function LI with the
corresponding operation cost from Chapter 3.
Do not use the MILCON ACFs to modify parametric cost estimates, detailed quantitytake-offs, unit price book (UPB) line items, commercial cost data, or user-generated unit
costs. These cost estimating methods and databases have their own processes and
factors for adjusting costs to different locations.
C
MILCON and sustainment ACFs were developed using the Tri-Service Cost
Engineering ACF software program. Operation LIs were developed by Whitestone
Research Corporation specifically for application in the DoD Facilities Operation Model.
C
AN
In general, the Tri-Service Cost Engineering ACF software program evaluates the local
costs for a United States market basket of 8 labor crafts, 17 construction materials, and
4 equipment items. These labor, materials, and equipment (LME) items are
representative of the types of products, services, and methods used to construct most
military facilities in the United States. Each of the LME costs is normalized and
weighted to represent its contribution to the total cost of a typical facility. The
normalized LME is then modified by seven matrix factors that cover local conditions
affecting construction costs. These matrix factors include weather, seismic, climatic
(frost zone, wind loads, and HVAC systems), labor availability, contractor overhead and
profit, life support and mobilization, and labor productivity versus the U.S. standard.
The resultant ACF for each location is normalized again by dividing by the 96-Base-City
average to provide a final ACF that reflects the relative relationship of construction costs
between that location and the 96-Base-City average as 1.00.
MILCON ACFs were calculated using a LME ratio of 35/63/2. Sustainment ACFs were
calculated using a LME ratio of 53/46/1.
30
UFC 3-701-01
March 2011
Both CONUS and OCONUS construction market surveys were conducted in 2010. The
CONUS survey covered 376 locations that included 96 Base Cities (two per state in the
continental US), and an additional 280 locations. The OCONUS survey included 99
locations, and was based on a market basket of goods for typical US labor, material,
equipment, and construction methods. CONUS and OCONUS surveys are now being
performed annually. When local materials and construction methods differ from those
represented by the published ACF, specific adjustments may need to be added to your
project estimate to account for any differences.
ED
There is no easy correlation between the current MILCON ACFs and previous MILCON
ACFs for specific locations. No common benchmarks exist because both the Base City
average and the relationships between cities change each cycle. It is possible, however,
to compare differences between several locations in this database with differences
between the same locations in previous databases.
EL
L
The ACF is not intended to or capable of responding to rapid changes in the market
place. Examples include Acts of God, accelerated construction schedules, changes in
the demand and supply for construction materials, labor, and equipment. An increased
demand for labor beyond what the local market can supply may require the enticement
of premium pay, overtime hours, temporary living expenses, and travel expenses.
C
AN
C
Users may request revisions to published ACFs when market conditions unexpectedly
change. Each request must be initiated by the USACE District senior cost engineer
through HQUSACE or by the NAVFAC regional cost engineer to their corresponding
NAVFAC Atlantic or Pacific Tri-Service Cost Engineering committee member. The local
cost engineer shall provide updated market basket ACF software input factors to
HQUSACE or NAVFAC for them to update the Tri-Service Cost Engineering ACF
software.
31
4-1.1
UFC 3-701-01
March 2011
Area Cost Factors
Table 4-1: Area Cost Factors
Inside US
MILCON
0.86
0.86
0.86
0.75
0.85
0.86
0.86
0.85
0.86
1.78
4.41
1.67
2.53
2.70
3.43
2.90
2.00
4.33
1.98
1.67
1.89
2.06
1.67
1.89
0.99
1.01
1.00
1.11
0.98
1.00
0.97
1.26
1.26
0.89
0.91
0.91
0.93
0.88
0.88
1.21
1.24
1.28
1.25
1.12
0.93
1.19
Sustainment
0.83
0.83
0.83
0.70
0.82
0.85
0.85
0.82
0.85
1.79
4.13
1.69
2.44
2.59
3.22
2.75
2.01
4.04
1.99
1.69
1.89
2.06
1.69
1.89
0.98
1.00
0.99
1.10
0.98
0.99
0.96
1.28
1.28
0.88
0.89
0.89
0.91
0.86
0.86
1.27
1.28
1.32
1.31
1.15
0.90
1.25
C
AN
C
EL
L
ED
ALABAMA AVERAGE
ANNISTON ARMY DEPOT
FORT MCCLELLAN
FORT RUCKER
MAXWELL AIR FORCE BASE
MOBILE
MOBILE AREA
MONTGOMERY
REDSTONE ARSENAL
ALASKA AVERAGE
ADAK NAVAL STATION
ANCHORAGE
CG- JUNEAU
CG- KETCHIKAN
CG- KODIAK
CG- PRINCE WILLIAM SOUND
CLEAR AIR FORCE BASE
EARECKSON AIR FORCE BASE
EIELSON AIR FORCE BASE
ELMENDORF AIR FORCE BASE
FAIRBANKS
FORT GREELY
FORT RICHARDSON
FORT WAINWRIGHT
ARIZONA AVERAGE
DAVIS MONTHAN AIR FORCE BASE
FLAGSTAFF
FORT HUACHUCA
LUKE AIR FORCE BASE
NAVAJO ARMY DEPOT
TUCSON
YUMA MCAS
YUMA PROVING GROUND
ARKANSAS AVERAGE
FORT CHAFFEE
FORT SMITH
LITTLE ROCK AIR FORCE BASE
PINE BLUFF
PINE BLUFF ARSENAL
CALIFORNIA AVERAGE
29 PALMS MARINE CORPS BASE
BARSTOW
BEALE AIR FORCE BASE
CAMP PENDLETON MARINE CORPS BASE
CENTERVILLE BEACH
CG- ALAMEDA
32
UFC 3-701-01
March 2011
Inside US
Sustainment
1.33
1.31
1.37
1.34
1.26
1.25
1.32
1.29
1.22
1.19
1.16
1.29
1.17
1.17
1.21
1.78
1.16
1.37
1.92
1.19
1.26
1.34
1.26
1.35
1.28
0.99
1.02
0.96
1.09
1.02
0.96
1.02
1.02
0.94
0.96
1.02
1.17
1.14
1.20
1.20
1.14
1.08
1.13
1.13
1.04
0.84
0.92
0.80
0.93
0.84
1.16
C
AN
C
EL
L
ED
CG- PETALUMA
CHINA LAKES NAVAL WEAPONS CENTER
CONCORD
EDWARDS AIR FORCE BASE
EL CENTRO NAVAL AIR FIELD
FORT HUNTER LIGGETT
FORT IRWIN
FORT ORD
LEMOORE
LOS ANGELES AREA
MARCH AIR RESERVE STATION
MONTEREY AREA
POINT MUGU
PORT HUENEME AREA
SACRAMENTO AREA
SAN CLEMENTE ISLAND
SAN DIEGO
SAN FRANCISCO
SAN NICOLAS ISLAND
SEAL BEACH
SHARPE ARMY DEPOT
SIERRA ARMY DEPOT
STOCKTON AREA
TRAVIS AIR FORCE BASE
VANDENBERG AIR FORCE BASE
COLORADO AVERAGE
AIR FORCE ACADEMY
BUCKLEY AIR FORCE BASE
CHEYENNE MOUNTAIN
COLORADO SPRINGS
DENVER
FORT CARSON
PETERSON AIR FORCE BASE
PUEBLO ARMY DEPOT
ROCKY MOUNTAIN ARSENAL
SCHRIEVER AIR FORCE BASE
CONNECTICUT AVERAGE
BRIDGEPORT
NEW LONDON
NEW LONDON AREA
STRATFORD ENG PLANT
DELAWARE AVERAGE
DOVER
DOVER AIR FORCE BASE
WILMINGTON
FLORIDA AVERAGE
CAPE CANAVERAL
EGLIN AIR FORCE BASE
HOMESTEAD AIR RESERVE STATION
JACKSONVILLE AREA
KEY WEST NAVAL AIR STATION
MILCON
1.27
1.26
1.29
1.30
1.22
1.21
1.28
1.25
1.17
1.13
1.10
1.25
1.13
1.13
1.15
1.75
1.13
1.29
1.88
1.13
1.21
1.28
1.21
1.29
1.24
0.99
1.02
0.96
1.09
1.02
0.96
1.02
1.02
0.95
0.96
1.02
1.14
1.11
1.16
1.16
1.11
1.06
1.11
1.11
1.02
0.85
0.92
0.82
0.92
0.86
1.17
33
UFC 3-701-01
March 2011
Inside US
Sustainment
0.96
0.85
0.89
0.82
0.79
0.82
0.78
0.82
0.78
0.84
0.80
0.85
0.88
0.84
0.93
0.88
0.91
0.88
0.94
0.81
0.85
2.14
2.33
2.10
2.03
2.10
2.10
2.10
2.17
2.10
2.47
2.10
2.10
2.10
0.92
0.90
0.93
0.93
1.26
1.15
1.37
1.31
1.37
1.39
1.00
1.00
1.16
0.94
1.06
0.99
1.02
C
AN
C
EL
L
ED
MACDILL AIR FORCE BASE
MAYPORT
MIAMI
ORLANDO AREA
PANAMA CITY
PANAMA CITY AREA
PENSACOLA AREA
TYNDALL AIR FORCE BASE
WHITING FIELD
GEORGIA AVERAGE
ALBANY
ATHENS
ATLANTA
FORT STEWART
FORT BENNING
FORT GILLEM
FORT GORDON
FORT MCPHERSON
KINGS BAY
MOODY AIR FORCE BASE
ROBINS AIR FORCE BASE
HAWAII AVERAGE
BARKING SANDS
FORD ISLAND
FORT DERUSSY
FORT SHAFTER
HICKAM AIR FORCE BASE
HONOLULU
KANEOHE BAY
PEARL HARBOR
POHAKULOA
SCHOFIELD BARRACKS
TRIPLER ARMY MEDICAL CENTER
WHEELER ARMY AIR FIELD
IDAHO AVERAGE
BOISE
MOUNTAIN HOME
MOUNTAIN HOME AIR FOCE BASE
ILLINOIS AVERAGE
BELLEVILLE
CHICAGO
FOREST PARK (CHICAGO)
GLENVIEW (CHICAGO)
GREAT LAKES (NTC)
ROCK ISLAND ARSENAL
SAVANNAH ARMY DEPOT
SCOTT AIR FORCE BASE
INDIANA AVERAGE
CRANE NWSC
FORT BENJAMIN HARRISON
GRISSOM AIR RESERVE BASE
MILCON
0.95
0.86
0.89
0.83
0.81
0.84
0.80
0.84
0.80
0.85
0.83
0.87
0.88
0.87
0.94
0.88
0.92
0.88
0.96
0.83
0.86
2.14
2.33
2.10
2.03
2.10
2.10
2.10
2.17
2.10
2.47
2.10
2.10
2.10
0.94
0.91
0.97
0.97
1.20
1.10
1.29
1.31
1.29
1.31
0.97
0.96
1.11
0.94
1.05
0.99
1.02
34
UFC 3-701-01
March 2011
Inside US
Sustainment
0.96
0.93
1.00
1.04
0.95
1.12
0.91
1.15
1.04
1.03
0.93
0.93
0.89
0.90
1.02
1.02
0.84
0.91
0.95
0.00
0.87
0.83
0.78
0.83
0.92
0.92
0.92
0.83
1.02
1.03
1.01
1.20
1.01
1.14
1.01
0.97
0.96
1.00
1.00
0.96
1.00
1.00
0.95
1.00
1.00
1.00
0.98
0.98
1.10
1.23
1.19
C
AN
C
EL
L
ED
INDIANAPOLIS
LOGANSPORT
IOWA AVERAGE
BURLINGTON
DES MOINES
IOWA ARMY AMMO PLANT
KANSAS AVERAGE
FORT LEAVENWORTH
FORT RILEY
KANSAS ARMY AMMO PLANT
MANHATTAN
MCCONNELL AIR FORCE BASE
WICHITA
KENTUCKY AVERAGE
FORT CAMPBELL
FORT KNOX
LEXINGTON
LEXINGTON/BLUE GRASS AD
LOUISVILLE
LOUISVILLE NAVAL AIR STATION
LOUISIANA AVERAGE
BARKSDALE AIR FORCE BASE
FORT POLK
LOUISIANA ARMY AMMO PLANT
NAS, JRB, NEW ORLEANS
NEW ORLEANS
NEW ORLEANS ARMY BASE
SHREVEPORT
MAINE AVERAGE
BANGOR
BRUNSWICK AREA
CG- SOUTHWEST HARBOR
CUTLER WINTER HARBOR
KITTERY/PORTSMOUTH
PORTLAND
MARYLAND AVERAGE
ABERDEEN PROVING GROUND
ANDREWS AIR FORCE BASE
ANNAPOLIS
BALTIMORE
BETHESDA
CHELTONHAM (DC)
CHESAPEAKE BEACH
FORT DETRICK
FORT GEORGE G MEADE
INDIAN HEAD
LEXINGTON PARK
PATUXENT RIVER AREA
THURMONT
MASSACHUSETTS AVERAGE
ARMY MAT & MECH LAB
MILCON
0.94
0.93
0.99
1.04
0.95
1.12
0.94
1.13
1.07
1.05
0.96
0.96
0.92
0.89
1.02
1.02
0.84
0.91
0.95
0.00
0.89
0.86
0.82
0.86
0.93
0.93
0.93
0.86
1.04
1.04
1.03
1.21
1.03
1.14
1.03
0.98
0.96
0.99
0.99
0.96
0.99
0.99
0.94
0.99
0.99
0.99
1.01
1.01
1.10
1.18
1.14
35
UFC 3-701-01
March 2011
Inside US
Sustainment
1.27
1.21
1.44
1.19
1.26
1.27
1.17
1.24
1.24
1.10
1.10
1.12
1.11
1.13
0.85
0.86
0.84
0.84
0.86
0.86
0.97
1.01
1.06
1.01
1.06
1.00
1.11
1.10
1.08
1.06
1.10
1.10
0.97
0.95
0.95
0.99
0.99
1.27
1.33
1.21
1.29
1.29
1.26
1.30
1.08
1.03
1.12
1.25
1.24
1.24
1.32
C
AN
C
EL
L
ED
BOSTON
CG- CAPE CODE
CG- MARTHA'S VINEYARD
FITCHBURG
FORT DEVENS
HANSCOMB AIR FORCE BASE
MICHIGAN AVERAGE
DETRIOT
DETROIT ARSENAL
KI SAWYER AIR FORCE BASE
MARQUETTE
MINNESOTA AVERAGE
DULUTH
MINNEAPOLIS
MISSISSIPPI AVERAGE
BILOXI
COLUMBUS
COLUMBUS AIR FORCE BASE
GULFPORT AREA
KEESLER AIR FORCE BASE
MERIDIAN NAVAL AIR STATION
MISSOURI AVERAGE
FORT LEONARD WOOD
KANSAS CITY
LAKE CITY ARMY AMMO PLANT
SEDALIA
ST LOUIS ARMY AMMO PLANT
WHITEMAN AIR FORCE BASE
MONTANA AVERAGE
BILLINGS
GREAT FALLS
MALMSTROM AIR FORCE BASE
NEBRASKA AVERAGE
CORNHUSKER ARMY AMMO PLANT
GRAND ISLAND
OFFUTT AIR FORCE BASE
OMAHA
NEVADA AVERAGE
CREECH AIR FORCE BASE
FALLON
HAWTHORNE
HAWTHORNE ARMY AMMO PLANT
LAS VEGAS
NELLIS AIR FORCE BASE
NEW HAMPSHIRE AVERAGE
CONCORD
PORTSMOUTH
NEW JERSEY AVERAGE
BAYONNE MOT
CG- CAPE MAY
EARLE NAVAL WEAPONS STATION
MILCON
1.21
1.18
1.42
1.15
1.22
1.21
1.15
1.21
1.21
1.08
1.08
1.07
1.07
1.07
0.87
0.88
0.86
0.86
0.88
0.88
0.98
0.98
1.07
0.98
1.03
0.99
1.08
1.09
1.09
1.07
1.11
1.11
0.96
0.95
0.95
0.98
0.98
1.26
1.29
1.22
1.29
1.29
1.22
1.25
1.08
1.04
1.12
1.18
1.17
1.22
1.25
36
UFC 3-701-01
March 2011
Inside US
Sustainment
1.25
1.32
1.25
1.25
1.24
1.28
1.25
0.95
0.96
0.95
1.00
0.98
0.95
1.01
1.08
1.04
1.12
1.40
1.15
1.36
1.59
1.12
1.04
1.04
1.05
1.59
1.52
1.04
0.81
0.94
0.93
0.83
0.88
0.79
0.94
0.88
0.78
0.82
1.04
0.95
0.95
1.14
1.14
0.91
0.89
0.95
0.89
0.94
0.89
0.96
0.90
C
AN
C
EL
L
ED
FORT DIX
FORT MONMOUTH
LAKEHURST
MCGUIRE AIR FORCE BASE
NEWARK
PICATINNY ARSENAL
TRENTON
NEW MEXICO AVERAGE
ALAMOGORDO
ALBUQUERQUE
CANNON AIR FORCE BASE
HOLLOMAN AIR FORCE BASE
KIRTLAND AIR FORCE BASE
WHITE SANDS MISSILE RANGE
NEW YORK AVERAGE
ALBANY NEW YORK
BUFFALO
CG- MONTAUK
FORT DRUM
LONG ISLAND
NEW YORK CITY
NIAGARA
ROME LABORATORY
SCOTIA
SENECA ARMY DEPOT
STATION ISLAND
US MILITARY ACADEMY
WATERVLIET ARSENAL
NORTH CAROLINA AVERAGE
CAMP LEJEUNE AREA
CHERRY POINT
FAYETTEVILLE
FORT BRAGG
GREENSBORO
NEW RIVER
POPE AIR FORCE BASE
SEYMOUR JOHNSON AFB
SUNNY POINT
NORTH DAKOTA AVERAGE
GRAND FORKS
GRAND FORKS AIR FORCE BASE
MINOT
MINOT AIR FORCE BASE
OHIO AVERAGE
DAYTON
RAVENA ARMY AMMO PLANT
WRIGHT-PATTERSON AFB
YOUNGSTOWN
OKLAHOMA AVERAGE
ALTUS AIR FORCE BASE
FORT SILL
MILCON
1.20
1.25
1.20
1.20
1.17
1.21
1.20
0.96
0.97
0.95
1.01
0.99
0.95
1.02
1.06
1.03
1.10
1.33
1.15
1.29
1.50
1.10
1.05
1.03
1.05
1.05
1.48
1.03
0.86
0.99
0.98
0.88
0.92
0.84
0.99
0.92
0.82
0.87
1.08
0.99
0.99
1.17
1.17
0.90
0.88
0.94
0.88
0.92
0.93
1.00
0.94
37
UFC 3-701-01
March 2011
Inside US
Sustainment
0.90
0.77
0.89
0.89
0.92
1.05
1.05
1.05
1.14
1.08
0.99
1.05
0.96
0.99
0.99
1.21
0.95
1.13
1.17
1.17
1.12
1.16
1.08
0.84
0.94
0.89
0.89
0.79
0.79
0.89
0.85
0.96
0.97
0.97
0.95
0.84
0.88
0.83
0.86
0.86
0.83
0.77
0.89
0.89
0.91
0.80
0.86
0.89
0.97
0.83
0.89
C
AN
C
EL
L
ED
LAWTON
MCALESTER ARMY AMMO PLANT
OKLAHOMA CITY
TINKER AIR FORCE BASE
VANCE AIR FORCE BASE
OREGON AVERAGE
PENDLETON
PORTLAND
UMATILLA ARMY DEPOT
PENNSYLVANIA AVERAGE
CARLISLE BARRACKS
INDIANTOWN GAP MR
LETTERKENNY ARMY DEPOT
MECHANICSBURG AREA
NEW CUMBERLAND ARMY DEPOT
PHILADELPHIA
PITTSBURGH
TOBYHANNA ARMY DEPOT
WARMINSTER
WILLOW GROVE
RHODE ISLAND AVERAGE
NEWPORT
PROVIDENCE
SOUTH CAROLINA AVERAGE
BEAUFORT AREA
CHARLESTON
CHARLESTON AIR FORCE BASE
COLUMBIA
FORT JACKSON
GOOSE CREEK
SHAW AIR FORCE BASE
SOUTH DAKOTA AVERAGE
ELLSWORTH AIR FORCE BASE
RAPID CITY
SIOUX FALLS
TENNESSEE AVERAGE
ARNOLD AIR FORCE BASE
CHATTANOOGA
MEMPHIS
MILLINGTON NAVAL SUPPORT ACTIVITY
VOLUNTEER ORDINANCE WORKS
TEXAS AVERAGE
BROOKS AIR FORCE BASE
CAMP BULLIS
CG- HOUSTON
CORPUS CHRISTI AREA
DALLAS
DYESS AIR FORCE BASE
FORT BILSS
FORT HOOD
FORT SAM HOUSTON
MILCON
0.94
0.81
0.93
0.93
0.96
1.03
1.02
1.03
1.11
1.04
0.99
1.05
0.96
0.99
0.99
1.15
0.93
1.11
1.11
1.11
1.09
1.13
1.05
0.88
0.99
0.92
0.92
0.83
0.83
0.92
0.88
1.00
1.01
1.01
0.98
0.86
0.90
0.85
0.87
0.87
0.85
0.79
0.91
0.91
0.92
0.85
0.88
0.93
1.01
0.86
0.91
38
UFC 3-701-01
March 2011
Inside US
Sustainment
0.89
0.85
0.85
0.89
0.83
0.89
0.89
0.80
0.67
0.89
0.80
0.86
0.74
0.79
0.88
1.02
1.07
1.01
1.06
1.02
1.01
1.07
0.92
0.91
0.94
0.89
0.92
0.92
0.95
0.95
1.00
0.92
0.91
0.92
1.00
0.91
0.92
0.92
0.92
1.00
0.93
0.87
0.95
0.98
0.92
1.09
1.24
1.24
1.20
1.17
1.09
C
AN
C
EL
L
ED
FORT WORTH
GOODFELLOW AIR FORCE BASE
INGLESIDE NAVAL STATION
KELLY FIELD
KINGSVILLE AREA
LACKLAND AIR FORCE BASE
LAUGHLIN AIR FORCE BASE
LONE STAR ARMY AMMO PLANT
LONGHORN ARMY AMMO PLANT
RANDOLPH AIR FORCE BASE
RED RIVER ARMY DEPOT
REESE AIR FORCE BASE
SAN ANGELO
SAN ANTONIO
SHEPPARD AIR FORCE BASE
UTAH AVERAGE
DUGWAY PROVING GROUND
FORT DOUGLAS
HILL AIR FORCE BASE
OGDEN
SALT LAKE CITY
TOOELE ARMY DEPOT
VERMONT AVERAGE
BURLINGTON
MONTPELIER
VIRGINIA AVERAGE
CAMP PEARY
CHESAPEAKE
DAHLGREN
FORT A. P. HILL
FORT BELVOIR
FORT EUSTIS
FORT LEE
FORT MONROE
FORT MYER
FORT PICKETT
FORT STORY
LANGLEY AIR FORCE BASE
NORFOLK
QUANTICO
RADFORD ARMY AMMO PLANT
RICHMOND
VINT HILL FARMS
WALLOPS ISLAND
YORKTOWN
WASHINGTON AVERAGE
BANGOR
BREMERTON
CG- PORT ANGELES
CG- SEATTLE
EVERETT
MILCON
0.91
0.89
0.91
0.89
0.91
0.87
0.91
0.93
0.85
0.74
0.91
0.85
0.78
0.80
0.89
1.04
1.09
1.04
1.08
1.04
1.04
1.09
0.96
0.94
0.98
0.91
0.94
0.94
0.96
0.96
1.00
0.94
0.94
0.94
1.00
0.94
0.94
0.94
0.94
1.00
0.95
0.89
0.96
1.02
0.94
1.08
1.21
1.21
1.18
1.15
1.08
39
UFC 3-701-01
March 2011
Inside US
Sustainment
1.02
1.16
1.24
1.25
1.16
1.24
1.02
1.16
1.28
1.10
0.94
0.91
0.97
1.32
1.10
1.13
1.15
1.15
1.06
1.15
0.98
0.96
1.01
1.01
1.01
1.01
1.01
1.01
Outside US
MILCON
Sustainment
1.63
1.63
1.47
1.47
1.18
1.18
1.08
1.08
1.26
1.26
1.14
1.14
2.34
2.34
2.23
2.23
1.92
1.92
1.77
1.77
1.46
1.46
1.33
1.33
1.14
1.14
1.04
1.04
AN
C
EL
L
ED
FAIRCHILD AIR FORCE BASE
FORT LEWIS
INDIAN ISLAND
KEYPORT
MCCHORD AIR FORCE BASE
SILVERDALE
SPOKANE
TACOMA
WHIDBEY ISLAND
YAKIMA FIRING RANGE
WEST VIRGINIA AVERAGE
BLUEFIELD
CHARLESTON
SUGAR GROVE
WISCONSIN AVERAGE
BADGER ARMY AMMO PLANT
CG - STURGEON BAY
FORT MCCOY
MADISON
MILWAUKEE
WYOMING AVERAGE
CASPER
CHEYENNE
F E WARREN AIR FORCE BASE
WASHINGTON DC AVERAGE
BOLLING AIR FORCE BASE
FORT MCNAIR
WALTER REED ARMY MEDICAL CENTER
MILCON
1.02
1.14
1.21
1.22
1.14
1.19
1.02
1.14
1.26
1.09
0.94
0.92
0.96
1.31
1.08
1.12
1.10
1.13
1.05
1.12
1.02
1.01
1.04
1.04
1.00
1.00
1.00
1.00
47.9200
97.8700
C
AFGHANISTAN
KUBUL
AFGHANI
ALBANIA
TIRANA
ALBANIAN LEKE
ALGERIA
ALGIERS
ALGERI
AMERICAN SAMOA
AMERICAN SAMOA
US DOLLAR
ANTIGUA
ANTIGUA
ANTIGUA DOLLAR
AUSTRALIA
PERTH
AUSTRALIA
AZERBAIJAN
BAKU
Currency
Exchange
Rate
72.2122
1.0000
2.6150
1.1053
40
UFC 3-701-01
March 2011
Outside US
MANAT
AZORES
LAJES
EURO
BAHAMAS
ANDROS ISLAND
BAHAMA DOLLAR
BAHRAIN
ASKAR
BAHRAINI DINAR
BELGIUM
BRUSSELS
MONS/CHIEVERES
EURO
BOSNIA
SARAJEVO
MARKA
BULGARIA
SOFIA
LEV
CAMBODIA
PHNOM PENH
RIEL
CANADA
ARGENTIA/NEWFOUNDLAND
CANADIAN DOLLAR
CHINA
HONG KONG
YUAN
CRETE
SOUDA BAY
EURO
CROATIA
ZAGREB
LEV
CUBA
GUANTANAMO
US DOLLAR
CZECH REPUBLIC
PRAGUE
CZECH KORUNY
DIEGO GARCIA
DIEGO GARCIA
US DOLLAR
EGYPT
CAIRO
EGYPTIAN POUND
ESTONIA
TALLINN
EURO
MILCON
Sustainment
1.14
1.14
1.80
1.80
1.57
1.57
1.41
1.41
1.66
1.66
1.48
1.48
Currency
Exchange
Rate
0.8028
0.7491
1.0000
ED
0.3770
1.41
1.47
1.36
1.34
1.40
1.28
1.27
1.27
1.21
1.21
AN
C
EL
L
0.7491
1.02
1.02
0.91
0.91
1.10
1.10
1.32
1.32
1.34
1.34
1.25
1.25
1.22
1.22
1.18
1.18
1.30
1.30
1.20
1.20
1.10
1.10
1.01
1.01
1.66
1.66
1.51
1.51
1.15
1.15
1.09
1.09
2.53
2.53
2.35
2.35
1.53
1.53
1.41
1.41
0.92
0.92
0.84
0.84
1.3824
1.3824
4155.0000
1.0581
6.8279
0.7491
C
1.3824
1.0000
18.3817
1.0000
5.445
0.7491
41
UFC 3-701-01
March 2011
Outside US
FRANCE
MARCEILLE
EURO
GEORGIA REPUBLIC
TBILISI
GEORGIA LARI
GERMANY
FRANKFURT
KAISERSLAUTERN
GRAFENWOEHR/HOHENFELS
EURO
GREECE
ATHENS
EURO
GREENLAND
THULE
DANISH KRONE
GUAM
GUAM
US DOLLAR
HORN OF AFRICA
DJIBOUTI
DJIBOUTIAN FRANC
HUNGARY
BUDAPEST
HUNGARIAN FLORINT
ICELAND
REYKJAVIK
KRONA
INDIA
NEW DELHI
INDIAN RUPEE
INDONESIA
JAKARTA
MILCON
Sustainment
1.47
1.47
1.38
1.38
0.93
0.93
0.82
0.82
1.26
1.32
1.20
1.20
1.23
1.28
1.24
1.16
1.34
1.34
1.28
1.28
2.67
2.67
2.56
2.56
Currency
Exchange
Rate
0.7491
ED
1.7202
0.7491
AN
C
EL
L
0.7491
2.21
2.21
2.11
2.11
2.05
2.05
1.80
1.80
1.02
1.02
0.93
0.93
1.98
1.98
1.89
1.89
1.43
1.43
1.33
1.33
1.04
1.04
0.97
0.97
1.98
1.98
1.79
1.79
1.13
1.13
1.09
1.09
1.30
1.30
1.23
1.23
1.49
1.48
1.41
1.54
1.43
1.39
1.39
1.33
1.45
1.34
5.5819
1.0000
157.0000
192.628
105.2688
46.0582
C
INDONESIAN RUPIAH
IRAQ
BAGHDAD
IRAQUI DINAR
IRELAND
DUBLIN
EURO
ISRAEL
TEL AVIV
SHEKELS
ITALY
NAPLES
SIGONELLA
AVIANO
GAETA
12859.790
0
1153.5000
0.7491
3.7213
42
UFC 3-701-01
March 2011
Outside US
Sustainment
1.57
1.44
1.44
1.47
1.40
1.51
1.35
1.43
1.45
1.35
1.38
1.33
1.40
1.26
1.35
1.36
Currency
Exchange
Rate
0.7491
ED
91.2524
1.31
1.31
1.19
1.19
1.06
1.17
1.06
1.04
1.02
1.05
1.04
1.04
1.04
0.96
1.08
0.95
0.94
0.93
0.95
0.95
0.95
0.95
0.99
0.99
0.90
0.90
1.59
1.59
1.44
1.44
2.64
2.64
2.58
2.58
0.94
0.94
0.86
0.86
1.32
1.32
1.20
1.20
0.86
0.86
0.79
0.79
2.20
2.20
2.07
2.07
1.02
1.02
0.92
0.92
1.33
1.33
1.27
1.27
EL
L
AN
C
VICENZA
EURO
JAPAN
ATSUGI
MISAWA
OKINAWA
TOKYO
IWAKUNI
YOKOSUKA
YEN
JORDAN
AMMAN
JORDANIAN DINAR
SOUTH KOREA
DMZ ZONE AREA
KUNSAN
OSAN
SEOUL
TONG DU CHON
TAEGU
PYONGTAEK
PUSAN
SOUTH KOREAN WON
KOSOVO
PRISTINA
EURO
KUWAIT
KUWAIT CITY
KUWAITI DINAR
KWAJALEIN
KWAJALEIN
US DOLLAR
LATVIA
RIGA
LATVIAN LAT
LEBANON
BEIRUT
LEBANON POUND
LITHUANIA
VILNIUS
LITHUANIAN LITAS
MIDWAY ISLAND
MIDWAY ISLAND
US DOLLAR
MOROCCO
CASABLANCA
DIRHAM
NETHERLANDS
OSS
EURO
MILCON
1099.5183
0.7491
0.2872
1.0000
C
0.5007
1504.5000
2.4406
1.0000
7.9797
0.7491
43
UFC 3-701-01
March 2011
Outside US
Sustainment
1.23
1.23
1.09
1.09
2.28
2.28
2.17
2.17
1.63
1.63
1.52
1.52
1.49
1.49
1.36
1.36
1.20
1.20
1.09
1.09
1.23
1.23
1.10
1.10
0.99
0.99
0.91
0.91
1.26
1.26
1.17
1.17
1.18
1.18
1.09
1.09
1.38
1.38
1.25
1.25
0.99
0.99
0.90
0.90
1.39
1.39
1.23
1.23
2.04
2.04
1.89
1.89
1.43
1.43
1.33
1.33
1.37
1.39
1.36
1.28
1.29
1.28
1.13
1.08
1.17
1.15
1.04
0.98
1.07
1.06
Currency
Exchange
Rate
1.4000
1.0000
ED
6.0905
0.3851
EL
L
1.0000
AN
C
NEW ZEALAND
WELLINGTON
NEW ZEALAND DOLLAR
NORTHERN MARIANA
SAIPAN
US DOLLAR
NORWAY
OSLO
NORWEGIAN KRONE
OMAN
RUWI
RIAL
PANAMA
PANAMA CITY
US DOLLAR
PHILIPPINES
SUBIC BAY
PHILPPINE PESO
POLAND
WARSAW
ZLOTYCH
PORTUGAL
LISBON
EURO
PUERTO RICO
SAN JUAN
US DOLLAR
QATAR
DOHA
RIYAL
ROMANIA
BUCHAREST
ROMANIAN LEU
SAUDI ARABIA
RIYADH
SAUDI RIYAL
SEYCHELLES ISLAND
SEYCHELLES ISLAND
US DOLLAR
SINGAPORE
SINGAPORE CITY
SINGAPORE DOLLAR
SPAIN
ROTA
MORON
EURO
THAILAND
BANGKOK
CHANG RAI
KORAT
MILCON
46.2300
2.8741
0.7491
1.0000
3.6412
2.9636
C
3.7502
1.0000
1.4246
0.7491
44
UFC 3-701-01
March 2011
Outside US
4-2
Sustainment
1.18
1.20
1.15
1.08
1.10
1.06
1.05
1.05
0.94
0.94
1.25
1.25
1.11
1.11
1.36
1.35
1.37
1.31
1.36
1.35
1.35
1.25
1.23
1.28
1.21
1.27
1.25
1.29
1.37
1.37
1.37
1.37
2.45
2.45
2.32
2.32
Currency
Exchange
Rate
33.1230
1.4139
ED
8.0055
EL
L
3.6728
0.5917
1.0000
1.0000
C
BAHT
TURKEY
ANKARA
INCIRLICK
TURKISH LIRA
UKRAINE
KIEV
HRYVNIA
UNITED ARAB EMIRATES
DUBAI
DIRHAM
UNITED KINGDOM
FAIRFORD/CROUGHTON
LAKENHEATH
MENWITH HILL
MILDENHALL
ST. MAWGAN
WEST RUISLIP
BRITISH POUND
VIRGIN ISLANDS
ST. THOMAS
US DOLLAR
WAKE ISLAND
WAKE ISLAND
US DOLLAR
MILCON
ESCALATION
AN
Tables 4-2, 4-3, and 4-4 provide escalation (inflation) factors used to adjust unit costs in
Tables 2 and 3 (expressed in base-year dollars) to the desired year, as follows:
4-2.1
Military Construction
C
Military construction project estimates that use unit costs from Table 2 should use the
military construction escalation factor from table 4-2 for the expected midpoint of
construction as described in UFC 3-700-01A.
45
UFC 3-701-01
March 2011
Table 4-2: Military Construction Escalation Rates
Historical
MonthENR
DoD
Year
Indices
SPI
(raw)
(Note 4)
100.00
104.89
98.32
96.83
2011
2012
2013
2014
2015
2016
1.50%
1.60%
1.70%
1.70%
1.80%
1.80%
Oct-10
Oct-11
Oct-12
Oct-13
Oct-14
Oct-15
Oct-16
2017
1.80%
Oct-17
EL
L
3745
4129
4265
4431
4535
(Note 3)
(Note 5)
1.0000
1.0150
1.0312
1.0487
1.0665
1.0857
1.1052
1.1251
C
Oct-03
Oct-04
Oct-05
Oct-06
Oct-07
Oct-08
Oct-09
Oct-10
(Note 2)
ED
(Note 1)
Budget Guidance
Projected
FY
Annual
Midpoint Escalation
factor
escalation
of
rate
constr
AN
Note 1: The historical index through October 2007 is the Engineering News Record Building Construction Index
(ENR BCI).
Note 2: The historical index from October 2007 is the DoD Selling Price Index (SPI), representing the average of
the RLB Construction Cost Index, Turner Construction Cost Index, and Saylor Subcontracting Index. DoD
established the SPI to more accurately represent actual (historical) market escalation as experienced by DoD as
the project owner for the type of construction in the portfolio. Previously, DoD used the Engineering News Record
Building Cost Index (BCI). The BCI tracks the cost of three basic materials and one skilled labor type, but does not
account for other pricing influences (such as risk and competition) that impact total delivered price to the project
owner. Saylor ceased publishing their index in October 2009, and the BLS PPI for NAICS 236223 is now the third index used in
the computation.
C
Note 3: Annual rates for military construction budget authority published by USD (Comptroller) in December 2010.
Note 4: Midpoint of construction is the assumed month and year half way through a typical 15 month project
awarded in April of the fiscal year. Interpolate between published escalation factors as necessary.
Note 5: The escalation factor is the cumulative (compounded) annual inflation rate from the base year. Use these
factors to escalate project estimates using unit costs in Table 2 to the expected midpoint of
construction, in accordance with UFC 3-700-01A.
4-2.2
Plant Replacement Value Escalation Rates
Plant Replacement Value (PRV) calculations that use replacement unit costs from
Table 3 should use the escalation factor from table 4-3 for the desired program year.
46
UFC 3-701-01
March 2011
Table 4-3: PRV Escalation Rates
Budget Guidance
Projected
FY
Annual
Program Escalation
factor
escalation
Year
rate
2011
2012
2013
2014
2015
2016
(Note 2)
1.50%
1.60%
1.70%
1.70%
1.80%
1.80%
2011
2012
2013
2014
2015
2016
1.0000
1.0150
1.0312
1.0488
1.0666
1.0858
ED
(Note 1)
4-2.3
EL
L
Note 1: Annual rates for military construction budget authority published by USD (Comptroller) in December
2010.
Note 2: Use these factors to adjust plant replacement value to future years.
Facilities Sustainment and Operation
C
AN
C
Modeled facilities sustainment and operation cost estimates that use unit costs from
Table 3 should use the O&M escalation factor from table 4D for the desired program
year.
47
UFC 3-701-01
March 2011
Table 4-4: Operation and Maintenance Escalation Rates
Budget Guidance
FY
Annual
escalation
rate
Projected
Program Escalation
factor
Year
(Note 1)
1.40%
1.50%
1.70%
1.70%
1.70%
1.70%
2011
2012
2013
2014
2015
2016
1.0000
1.0140
1.0292
1.0467
1.0645
1.0826
ED
2011
2012
2013
2014
2015
2016
(Note 2)
C
AN
C
EL
L
Note 1: Annual rates for O&M budget authority published by USD (Comptroller) in
December 2010.
Note 2: Use these factors to adjust sustainment and operation costs to future
years.
48
Download