Exhibit A: Space Requirements

advertisement
Exhibit A: Space Requirements
In this example of space requirements, the list is divided into two parts
representing space with significantly different construction costs.
Happy Valley Children's Museum
ID
No. Space/Activity
1.0
1.1
1.2
1.3
1.4
1.5
Entry, Lobby, Admission, Store
Entry Vestibule
Lobby/ Orientation
Admissions/Tickets
Museum Store
Back Storage for Museum Store
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
Activity/Program Areas
Exhibit Floor
Art Space
(not used)
Toddler Area
Birthday Room
Multi-Purpose Room
Kitchen
No. of
Where is Space People Space
Square
Existing existing Criteria or
Sub- No. of Feet
Space
space? SF/item Items
Total Spaces Required
0
240 Main Floor
0
320 Main Floor
0
150
500
50
420
80
1
1
1
1
1
Sub-Total Net Assignable Square Feet
384 Admin Off.
440 Admin Off.
0
218 Admin Off.
25
0
28
0
4000
700
1
1
4000
700
700
700
0
120
1
1
1
1
700
700
0
120
Sub-Total Net Assignable Square Feet
6,220
0
240
35
80
64
64
64
80
64
0
210
0
0
Admin Off.
Admin Off.
Admin Off.
Admin Off.
Admin Off.
Admin Off.
Admin Off.
Admin Off.
Admin Off.
80
200
50
100
80
75
75
80
75
75
180
100
80
1
1
1
1
1
1
1
1
1
1
1
1
1
80
200
50
120
80
75
80
100
75
75
180
100
80
1
1
1
1
1
1
1
1
1
2
1
1
1
Sub-Total Net Assignable Square Feet
4.0 Administration: Programs
4.1 Operations Associate
4.2 Youth Programs Coordinator
4.3 Museum Educator
4.4 Earthworks Coordinator
4.5 Earthworks Educator/Facilitator
4.6 Earthworks Garden Manager
4.7 Floor Managers
4.8 Museum Artist
4.9 Volunteer Coordinator
4.10 Future Staff
4.11 Volunteer Break Area/Planning/Meeting
4.12 Volunteers' Personal Storage
Sub-Total Net Assignable Square Feet
Total Net Assignable Square Feet
of Type A space; 70% of Gross
Tare at 30%
Gross Square Footage of Type A Space
includes sculpture
1,200
2770 Main Floor
396 Main Floor
3.0 Administration: Finance and PR
3.1 Reception/Waiting
3.2 Executive Director
3.3 Executive Toilet
3.4 Associate Director of Administratio
3.5 Office Manager
3.6 Bookeeper
3.7 Store Manager
3.8 Director of External Affairs
3.9 PR Coordinator
3.1 Future Staff
3.11 Copy/Work Room/ Mail
3.12 Small Meeting/Planning Area
3.13 Filing and Storage
150
500
50
420
80
Notes
80
200
50
120
80
75
80
100
75
150
180
100
80
1,370
80 Admin Off.
Upstairs
Upstairs
Admin Off.
Upstairs
Upstairs
Upstairs
Upstairs
Upstairs
0
Upstairs
Upstairs
100
70
70
70
80
70
40
70
70
70
25
4
1
1
1
1
1
1
1
1
1
1
14
12
100
70
70
70
80
70
40
70
70
70
350
48
1
1
1
1
1
1
4
1
1
2
1
1
100
70
70
70
80
70
160
70
70
140
350
48
1,298
10,088
4,323
14,411
Approx. 1.5 times
Exhibit A: Space Requirements (continued)
Happy Valley Children's Museum (continued)
ID
No. Space/Activity
No. of
Square
Where is Space People Space
Existing existing Criteria or
Sub- No. of Feet
Total Spaces Required
Space
space? SF/item Items
Type B Space (Unfinished Space)
5.0
5.1
5.2
5.3
5.4
5.5
5.6
Exhibit Shop & Warehouse
Exhibit Shop
Design Area
Flammable Storage
Warehouse
Facilities Manager
Near Exhibit Floor Supply Storage
0
0
1500 rented
0
0
0
0
60
1700
80
80
1
1
1
1
1
1
0
0
60
1700
80
80
1
1
1
1
1
2
Sub-Total Net Assignable Square Feet
6.0
6.1
6.2
6.3
6.4
6.5
Earthworks Buildings
Greenhouse/Classroom
Aviary
Seedlings
Kids' Shop
Storage for Kid's Shop
0
0
60
1700
80
160
2,000
Outside
900
inc. above
inc. above
0
0
Sub-Total Net Assignable Square Feet
Total Net Assignable Square Feet
of Type B space; 80% of Gross
Tare Area at 20%
Gross Square Feet
Total Gross Squaqre Feet
400
300
200
400
200
1
1
1
1
1
400
300
200
400
200
1
1
1
1
1
400
300
200
400
200
1,500
3,500
875
4,375
18,786
Notes
Download