FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 FACILITIES CRITERIA (FC) DRAFT INDICATE MILITARY SERVICE/S TITLE IN UPPER CASE NOTE: Add appropriate Service suffix A, F or N on the FC number. APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED PRE-DECISIONAL; NOT FOR PUBLIC RELEASE FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 FACILITIES CRITERIA (FC) DRAFT INDICATE MILITARY SERVICE/S HERE TITLE IN UPPERCASE Any copyrighted material included in this FC is identified at its point of use. Use of the copyrighted material apart from this FC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indicated by \1\ ... /1/) Change No. 1 2 Date 20 Jun 2013 22 Sep 2013 Location Replaced Air Force Representative on Signature Page Updated Forward. This FC supersedes FC X-XXX-XX, dated m yyyy. FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 FOREWORD Facilities Criteria (FC) provide functional requirements (i.e., defined by users and operational needs of a particular facility type) for specific DoD Component(s), and are intended for use with unified technical requirements published in DoD Unified Facilities Criteria (UFC). FC are applicable only to the DoD Component(s) indicated in the title, and do not represent unified DoD requirements. Differences in functional requirements between DoD Components may exist due to differences in policies and operational needs. \2\ All construction outside of the United States is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.) Therefore, the acquisition team must ensure compliance with the most stringent of the UFC (replace w/ FC), the SOFA, the HNFA, and the BIA, as applicable. /2/ Because FC are coordinated with unified DoD technical requirements, they form an element of the DoD UFC system applicable to specific facility types. The UFC system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applicable to the Military Departments, Defense Agencies, and the DoD Field Activities. The UFC System also includes technical requirements and functional requirements for specific facility types, both published as UFC documents and FC documents. FC are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and the Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system. Defense agencies should contact the preparing service for document interpretation and improvements. Technical content is the responsibility of the cognizant DoD working group. Recommended changes with supporting rationale should be sent to the respective service proponent office by the following electronic form: Criteria Change Request. The form is also accessible from the Internet site listed below. FC are effective upon issuance and are distributed only in electronic media from the following source: Whole Building Design Guide web site http://dod.wbdg.org/. \2\ Refer to UFC 1-200-01, General Building Requirements, for implementation of new issuances on projects. /2/ AUTHORIZED BY: NOTE: Include the appropriate signature(s) below and delete those not used. FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 JAMES C. DALTON, P.E. Chief, Engineering and Construction U.S. Army Corps of Engineers JOSEPH E. GOTT, P.E. Chief Engineer Naval Facilities Engineering Command JOE SCIABICA, SES Director Air Force Civil Engineer Center MICHAEL McANDREW Director, Facilities Investment and Management Office of the Deputy Under Secretary of Defense (Installations and Environment) FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 This is a Microsoft word template intended to be used in conjunction with UFC 1-30001, Criteria Format Standard. It includes customized Microsoft Word Styles for Chapter Headings, subparagraphs, Figure titles, Table Titles, and general text. This is intended to create uniformly formatted documents with automated generation of Table of contents using embedded styles. FACILITIES CRITERIA (FC) [NEW][REVISION] SUMMARY SHEET Document: FC X-XXX-XX, Title Superseding: List applicable documents or None Description: Provide a brief description of purpose, scope, and applicability. Reasons for Document: Provide a description of the reasons the criteria is being updated or needed. Reasons could include unification, emerging policy, requirements, methodologies, technologies, or omissions. Impact: Describe the impact. This should describe impact on design cost, initial cost, energy savings, or life cycle costs. Unification Issues List all unification issues and justification why they were not unified. FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 Table of Contents, Table of Figures, and Table of Tables shall be automatically generated utilizing the Table of Contents features in Microsoft Word. Table of Contents should include chapter titles, major paragraph titles and first level subparagraph titles. This may be expanded to include second level subparagraphs only when it is required based on document content. TABLE OF CONTENTS CHAPTER 1 INTRODUCTION ....................................................................................... 1 1-1 BACKGROUND. ....................................................................................... 1 1-2 PURPOSE AND SCOPE. .......................................................................... 1 1-3 APPLICABILITY. ....................................................................................... 1 1-4 GENERAL BUILDING REQUIREMENTS. ................................................ 1 1-5 REFERENCES. ......................................................................................... 1 1-6 GLOSSARY. .............................................................................................. 1 CHAPTER 2 TECHNICAL REQUIREMENTS ................................................................ 3 2-1 MAJOR PARAGRAPH TITLE. .................................................................. 3 2-1.1 First level subparagraph title. ................................................................. 3 2-1.2 First level subparagraph title. ................................................................. 3 2-1.3 First level subparagraph title. ................................................................. 3 2-2 FIGURES ................................................................................................... 3 2-3 TABLES. ................................................................................................... 4 CHAPTER 3 DESIGN ..................................................................................................... 7 3-1 3-1.1 3-2 3-2.1 MAJOR PARAGRAPH TITLE. .................................................................. 7 First level subparagraph title. ................................................................. 7 MAJOR PARAGRAPH TITLE. .................................................................. 7 First level subparagraph title. ................................................................. 7 3-3 MAJOR PARAGRAPH TITLE. .................................................................. 7 3-4 MAJOR PARAGRAPH TITLE. .................................................................. 7 3-4.1 First level subparagraph title. ................................................................. 7 3-4.2 First level subparagraph title. ................................................................. 7 CHAPTER 4 TITLE ......................................................................................................... 9 4-1 MAJOR PARAGRAPH TITLE. .................................................................. 9 APPENDIX A REFERENCES ....................................................................................... 11 APPENDIX B BEST PRACTICES ................................................................................ 13 i B-1 B-1.1 B-2 B-2.1 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 MAJOR PARAGRAPH TITLE. ................................................................ 13 First level subparagraph title. ............................................................... 13 MAJOR PARAGRAPH TITLE. ................................................................ 13 First level subparagraph title. ............................................................... 13 B-3 MAJOR PARAGRAPH TITLE. ................................................................ 14 B-4 MAJOR PARAGRAPH TITLE. ................................................................ 14 B-5 MAJOR PARAGRAPH TITLE. ................................................................ 14 APPENDIX C GLOSSARY ........................................................................................... 15 FIGURES Figure 2-1 Example ......................................................................................................... 4 Figure 2-2 Example Using a 2x1 Table to Align Graphics ............................................... 4 TABLES Table 2-1 Example Table ................................................................................................ 5 ii FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 This is a Microsoft word template intended to be used in conjunction with UFC 1300-01, Criteria Format Standard. It includes customized Microsoft Word Styles for Chapter Headings, subparagraphs, Figure titles, Table Titles, general text. CHAPTER 1 INTRODUCTION 1-1 BACKGROUND. Provide subparagraph and text if applicable. 1-2 PURPOSE AND SCOPE. Description of purpose and scope. 1-3 APPLICABILITY. Description of applicability. 1-4 GENERAL BUILDING REQUIREMENTS. Comply with UFC 1-200-01, General Building Requirements. UFC 1-200-01 provides applicability of model building codes and government unique criteria for typical design disciplines and building systems, as well as for accessibility, antiterrorism, security, high performance and sustainability requirements, and safety. Use this FC in addition to UFC 1-200-01 and the UFCs and government criteria referenced therein. 1-5 REFERENCES. Appendix A contains a list of references used in this document. The publication date of the code or standard is not included in this document. In general, the latest available issuance of the reference is used. 1-6 GLOSSARY. Appendix C contains acronyms, abbreviations, and terms. 1 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 This Page Intentionally Left Blank Use blank pages to ensure new chapters start on side one of a 2 sided printout. 2 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 CHAPTER 2 TECHNICAL REQUIREMENTS Style for Chapter Titles shall be UFCchapter 2-1 MAJOR PARAGRAPH TITLE. Style for Major Paragraph Titles shall be UFCpara1. Style for paragraph text shall be UFCtext. 2-1.1 First level subparagraph title. Style for First level subparagraph titles shall be UFCpara2. Style for paragraph text shall be UFCtext. 2-1.2 First level subparagraph title. Style for First level subparagraph titles shall be UFCpara2. Style for paragraph text shall be UFCtext. 2-1.3 First level subparagraph title. Style for First level subparagraph titles shall be UFCpara2. Style for paragraph text shall be UFCtext. 2-1.3.1 Second level subparagraph title. Style for second level subparagraph titles; if used, shall be UFCpara3. Style for paragraph text shall be UFCtext. 2-1.3.2 Second level subparagraph title. Style for second level subparagraph titles; if used, shall be UFCpara3. Style for paragraph text shall be UFCtext. 2-1.3.2.1 Third level subparagraph title. Style for Third level subparagraph titles; if used, shall be UFCpara4. Style for paragraph text shall be UFCtext. 2-1.3.2.2 Third level subparagraph title. Style for Third level subparagraph titles; if used, shall be UFCpara4. Style for paragraph text shall be UFCtext. 2-2 FIGURES Style for figure titles shall be UFCfigure. Style for figure shall be UFCtext + Centered. If using multiple graphics for one figure uses a table to align graphics. Example is shown in Figure 2-2 3 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 Figure 2-1 Example Figure 2-2 Example Using a 2x1 Table to Align Graphics 2-3 TABLES. Style for table titles shall be UFCtable. Style for tables shall be UFCtext . Per UFC 1300-01, Font size may be reduced to a minimum 10-point to enhance the presentation of data within a table. 4 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 Table 2-1 Example Table Type Description Plan View Type I Narrow, symmetric illuminance pattern. Type II Slightly wider illuminance pattern than Type I. Type III Wide illuminance pattern. Type IV Widest illuminance pattern. Type V Symmetrical circular illuminance pattern. Type VS Symmetrical, nearly square illuminance pattern. 5 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 This Page Intentionally Left Blank 6 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 CHAPTER 3 DESIGN 3-1 MAJOR PARAGRAPH TITLE. Style for Major Paragraph Titles shall be UFCpara1. Style for paragraph text shall be UFCtext. 3-1.1 First level subparagraph title. Style for First level subparagraph titles shall be UFCpara2. Style for paragraph text shall be UFCtext. 3-1.1.1 Second level subparagraph title. Style for second level subparagraph titles; if used, shall be UFCpara3. Style for paragraph text shall be UFCtext. 3-1.1.1.1 Third level subparagraph title. Style for Third level subparagraph titles; if used, shall be UFCpara4. Style for paragraph text shall be UFCtext. 3-2 MAJOR PARAGRAPH TITLE. 3-2.1 First level subparagraph title. 3-2.1.1 Second level subparagraph title. 3-2.1.1.1 Third level subparagraph title. 3-3 MAJOR PARAGRAPH TITLE. 3-4 MAJOR PARAGRAPH TITLE. 3-4.1 First level subparagraph title. 3-4.2 First level subparagraph title. 7 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 This Page Intentionally Left Blank 8 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 CHAPTER 4 TITLE 4-1 MAJOR PARAGRAPH TITLE. Style for Major Paragraph Titles shall be UFCpara1. Style for paragraph text shall be UFCtext. Any additional chapters should be created utilizing the same Styles and paragraph numbering as previous chapters. 9 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 This Page Intentionally Left Blank 10 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 APPENDIX A REFERENCES Appendix Title shall be UFCAppendix. Style for references shall be UFCreference. Reference organization shall be bold all caps. Reference titles shall be in italics. The following are provided as an example. UNDERWRITER’S LABORATORY UL 681, Installation and Classification of Burglar and Holdup Alarm Systems for alarm system installation UL 2050, National Industrial Security Systems UL 2050 materials are restricted and only distributed to those demonstrating relevant national industrial security involvement. UNIFIED FACILITIES CRITERIA http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 1-200-01, General Building Requirements UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings UFC 4-020-01, DoD Security Engineering Facilities Planning Manual UFC 4-020-02, DoD Security Engineering Facilities Design Manual, currently in Draft and unavailable UFC 4-021-02NF, Security Engineering Electronic Security Systems UFC 4-020-04A, Electronic Security Systems: Security Engineering 11 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 This Page Intentionally Left Blank 12 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 APPENDIX B BEST PRACTICES Appendix Title shall be UFCAppendix. Use Appendix B to contain the Best Practice information. This information is considered to be guidance and not requirements. The main purpose is to communicate proven system/facility solutions and lessons learned and may not be the only solution to meet UFC requirements. It is not intended to be a textbook or to repeat information from industry standards and non-government references. Appendix B is not intended to parallel the chapter organization and numbering of the technical requirements section of the main text. B-1 MAJOR PARAGRAPH TITLE. Style for Major Paragraph Titles shall be UFCAppendixpara1. Style for paragraph text shall be UFCtext. B-1.1 First level subparagraph title. Style for First level subparagraph titles shall be UFCAppendixpara2. Style for paragraph text shall be UFCtext. B-1.1.1 Second level subparagraph title. Style for second level subparagraph titles; if used, shall be UFCAppendixpara3. Style for paragraph text shall be UFCtext. B-1.1.1.1 Third level subparagraph title Style for Third level subparagraph titles; if used, shall be UFCAppendixpara4. Style for paragraph text shall be UFCtext. B-2 MAJOR PARAGRAPH TITLE. Style for Major Paragraph Titles shall be UFCAppendixpara1. Style for paragraph text shall be UFCtext. B-2.1 First level subparagraph title. Style for First level subparagraph titles shall be UFCAppendixpara2. Style for paragraph text shall be UFCtext. B-2.1.1 Second level subparagraph title. Style for second level subparagraph titles; if used, shall be UFCAppendixpara3. Style for paragraph text shall be UFCtext. B-2.1.1.1 Third level subparagraph title 13 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 Style for Third level subparagraph titles; if used, shall be UFCAppendixpara4. Style for paragraph text shall be UFCtext. B-3 MAJOR PARAGRAPH TITLE. Style for Major Paragraph Titles shall be UFCAppendixpara1. Style for paragraph text shall be UFCtext. B-4 MAJOR PARAGRAPH TITLE. Style for Major Paragraph Titles shall be UFCAppendixpara1. Style for paragraph text shall be UFCtext. B-5 MAJOR PARAGRAPH TITLE. Style for Major Paragraph Titles shall be UFCAppendixpara1. Style for paragraph text shall be UFCtext. 14 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 APPENDIX C GLOSSARY C-1 ACRONYMS AFCEE Air Force Center for Engineering and the Environment BIA Bilateral Infrastructure Agreement DoD Department of Defense HQUSACE Headquarters, U.S. Army Corps of Engineers HNFA Host Nation Funded Construction Agreements NAVFAC Naval Facilities Engineering Command SOFA Status of Forces Agreements UFC Unified Facilities Criteria U.S. United States 15 FC X-XXX-XX 1 May 2013 Change 2, 22 September 2013 C-2 DEFINITION OF TERMS UFCAppendix: Custom Microsoft Word Style used for Appendix titles. UFCAppendixpara1: Custom Microsoft Word Style used for Major Paragraph Titles in appendixes UFCAppendixpara2: Custom Microsoft Word Style used for First level subparagraph titles in appendixes UFCAppendixpara3: Custom Microsoft Word Style used for Second level subparagraph titles in appendixes UFCAppendixpara4: Custom Microsoft Word Style used for Third level subparagraph titles in appendixes UFCchapter: Custom Microsoft Word Style used for Chapter titles UFCfigure: Custom Microsoft Word Style used for the titles of Figures UFCpara1: Custom Microsoft Word Style used for Major Paragraph Titles UFCpara2: Custom Microsoft Word Style used for First level subparagraph titles UFCpara3: Custom Microsoft Word Style used for Second level subparagraph titles UFCpara4: Custom Microsoft Word Style used for Third level subparagraph titles UFCreference: Custom Microsoft Word Style used for Reference Text UFCreferenceOrg: Custom Microsoft Word Style used for Reference Organization UFCtable: Custom Microsoft Word Style used for the titles of Tables UFCtext: Custom Microsoft Word Style for paragraph text 16