CAO Task Force Review/Recommendations FY 16 VRE Preliminary Budget as of 12-4-2014 Executive Summary December 10, 2014 CAO Task Force Recommendations Supports maintaining the total jurisdictional subsidy at $16.4 million (Option 1). Total fuel tax revenues which support VRE subsidies in the PRTC jurisdictions are projected to decline considerably in FY 15 and FY 16. Supports a 4% fare increase beginning July 1, 2015 (FY 16). Offsetting revenue is needed due to reductions in budgeted state operating assistance of $2.2 million from FY 15. Supports the addition of 6 positions (of which 3 in equipment operations are cost neutral replacing contract positions). VRE has not added a position which was not cost neutral since FY 2008. VRE’s total budget has increased from $64.4 million in FY 08 to $128.8 million in FY 16. The CIP during the same time period has increased from $5.6 million to $46.3 million accounting for about 2/3rds of this total increase. During this time there have been increases in the scope and complexity of federal reporting (both FRA and procurement) requirements and in the volume of purchasing (Sr. Contract Specialist/Financial Analyst/Security Specialist positions). The current system plan 2040 is unconstrained. VRE needs to develop a constrained system plan that balances what the jurisdictions can commit to fund with the fare increases the riders are willing to bear. The constrained system plan should show basic needs and then system expansion projects. The appropriate amount of a local capital contribution by the jurisdictions is unknown. VRE needs to better define the operating and capital costs of the system plan before asking the jurisdictions to commit funding over the six year plan. Facility and programmatic costs of capital projects need to be included in six year plan projections. Absence of these costs understates six year plan estimates of expenses and subsidy Date: 12/17/2014 1 VRE FY 16 Proposed Budget Total Enterprise Budget (Operating/Non-Operating/Capital) $128,431,611 an increase of $442,010 or 0.3% over the FY 15 adopted amount of $127,989,601 FY 16 Operating Expenses (excludes non-operating costs such as debt service, operating reserve and capital items) totals $75,401,741 an increase of $1,091,542 or 1.5% over the FY 15 adopted amount of $74,310,199 FY 16 Non-Operating Expenses totals $6,714,870 a decrease of $554,532 or (7.6%) over the FY 15 adopted amount of $7,269,402 FY 16 Capital budget totals $46,315,000 an decrease of $95,000 or 0.2% over the FY 15 adopted amount of $46,410,000 Includes $8.8 million in CMAQ/REF funding Date: 12/17/2014 2 FY 16 Budget - Expenditures Increase of 6 FTE’s – Three FTE’s in Equipment Operations are cost neutral three FTE’s in accounting, contract administration and safety & security Additional Fredericksburg line train Funded for 9 months in FY 15 Additional net cost for the remaining three months in FY 16 $305K. $473K Other major expenditure increases over the FY 15 adopted operating budget include: Repairs & Maintenance - Locomotives (includes shipping) Repairs & Maintenance – Railcars Repairs and Maintenance Custodial and snow removal Stations – Non-Routine Maintenance Yards – Non-Routine Maintenance 24/7 Coverage for yard security at both yards Additional office rental space Salaries & Benefits: 2% placeholder COLA in FY 16 Date: 12/17/2014 $415K $360K $150K $120K $ 80K $105K $120K $101K 3 FY 16 Budget – Reductions Reductions in Expenditures from FY 15 Adopted Mobilization Costs (one-time) Rail & Equipment Operations Lease of Railcars Diesel Fuel Budgeted Operating Reserve Transfer Insurance Date: 12/17/2014 $2M $821K $622K $554K $250K 4 Fare Citations – Sept 13 – Aug 14 Date: 12/17/2014 5 Fare Citations Date: 12/17/2014 6 State Operating Assistance FY 15 actual state operating assistance received was slightly more than $9 million FY 16 state operating assistance estimated at $8,100,000 Estimated reduction from FY 15 actual is approximately 10% due to declining Mass Transit Fund revenues projections from DRPT Date: 12/17/2014 7 Federal & State Capital Assistance VRE CIP excluding CMAQ/Capital Reserve Contribution/Project development FY 15 Adopted Federal Formula Funding (5307/5337)** State Capital Local Match Capital Reserve/ Prior Year Surplus* Total Capital Program $23,996,000 $13,068,200 $1,123,800 $832,000 $39,020,000 % FY 15 Total 61% 33% 3% 2% 100% FY 16 Proposed $15,355,800 $17,813,160 $437,040 $945,000 $34,551,000 % FY 16 Total 44% 52% 1% 3% 100% Change FY15/16 ($8,640,200) $4,744,960 ($686,760) $113,000 ($4,469,000) Percent Change -36.0% 36.3% -61.1% 13.6% -11.5% * FY 15 inlcudes $832,000 from capital reserve; FY 16 includes $945K from FY 14 surplus **FY 15 includes $1,520,000 from prior year federal funds In FY 15 – a total of $1.96 million in local monies leveraged $39 million in capital projects In FY 16 – a total of $1.4 million in local monies leverages $34.6 million in capital projects Date: 12/17/2014 8 FY 16 CIP FY 16 CIP funds the following $46.3 million in projects: 9 Railcars - $23.6M Facilities Infrastructure – $5.4M Equipment Storage – $3.4M Life Cycle Maintenance - $1.9M Security Enhancements - $100K Transit Enhancements - $100K Capital Reserve Contribution - $3M Lorton Platform (CMAQ) - $1.5M Rippon Platform (CMAQ) - $2.3M Brooke/Leeland (REF) 2ed Platform - $5M Date: 12/17/2014 9 FY 16 CIP- Capital Reserve Capital Reserve Contribution - $3 million per year Source of Funds – 100% Local Subsidy Completion of projects that require further funding Source of additional local match if necessary to show local commitment Advance projects related to Phase II of System Plan Limited federal & state funding for project development Examples (order of magnitude) include: Unforeseen issues with Environmental Impact Statement for the Long Bridge may require additional investments (up to $1M) Development of FTA Core Capacity application (up to $1M) CSX Fredericksburg 3rd track project ($4M -$15M) Potomac to CP VA corridor in the District ($3M - $15M) Projects not eligible for or suited to grant funding Date: 12/17/2014 10 FY 16 CIP – Capital Reserve Capital Reserve – Uncommitted Balance End of FY 13 - $3.4 million End of FY 14 - $8.6 million End of FY 15 - $13.1 million (approx.) End of FY 16 - $16.1 million (approx.) with $3 million in local capital contribution FY 16 estimate does not include any additional contribution from FY 15 surplus (if available) FY 16 does not include approximately $1 million in capital reserve funding budgeted in FY 15 that will not be need for start up costs for a new rail operator Most of the capital reserve contributions from FY 08 through FY 14 have come from surplus funds How much capital reserve is enough? VRE has indicated that it will prepare a financial plan in 2015 that better defines operating and capital needs Date: 12/17/2014 11 Jurisdictional Subsidy History Jurisdictional Subsidy $20,000,000 25,000 $18,000,000 A 20,000 v e r a 15,000 g e $16,000,000 R i d e r s 10,000 h D a i i p 5,000 l y $14,000,000 $12,000,000 $10,000,000 $8,000,000 $6,000,000 $4,000,000 $2,000,000 $0 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 30 32 32 32 32 30 30 30 30 30 32 32 32 34 34 Trains Trains Trains Trains Trains Trains Trains Trains Trains Trains Trains Trains Trains Trains Trains Local Subsidy Date: 12/17/2014 ADR 12 Juris Subsidy- Option 1 No Increase Proposed FY 2016 Budget Based on 10/1/14 Survey Actual FY2015 Subsidy Net Change $ Alexandria Arlington Fairfax County Fredericksburg Manassas Manassas Park Prince William County Stafford County Spotsylvania $133,894 $195,897 $4,847,285 $439,366 $766,491 $576,699 $5,309,674 $2,855,607 $1,303,888 $133,894 $195,897 $4,852,953 $581,244 $686,944 $401,762 $5,485,334 $2,689,391 $1,401,382 $0 $0 ($5,668) ($141,878) $79,547 $174,937 ($175,660) $166,216 ($97,494) 0.00% 0.00% -0.12% -24.41% 11.58% 43.54% -3.20% 6.18% -6.96% 0.81% 1.19% 29.50% 2.67% 4.67% 3.51% 32.32% 17.38% 7.94% 0.81% 1.19% 29.54% 3.54% 4.18% 2.45% 33.39% 16.37% 8.53% Total $16,428,801 $16,428,801 $0 0.00% 100.00% 100.00% Date: 12/17/2014 Net Change Percent of % FY 16 Subsidy Percent of FY 15 Subsidy 13 Juris Subsidy Option 2 - 2.3% Increase Proposed FY 2016 Budget Based on 10/1/14 Survey Actual FY2015 Subsidy Net Change $ Net Change % Alexandria Arlington Fairfax County Fredericksburg Manassas Manassas Park Prince William County Stafford County Spotsylvania $136,907 $200,305 $4,920,392 $456,122 $785,497 $589,830 $5,424,430 $2,932,764 $1,352,553 $133,894 $195,897 $4,852,953 $581,244 $686,944 $401,762 $5,485,333 $2,689,391 $1,401,382 $3,013 $4,408 $67,439 ($125,122) $98,553 $188,068 ($60,903) $243,373 ($48,829) 2.25% 2.25% 1.39% -21.53% 14.35% 46.81% -1.11% 9.05% -3.48% Total $16,798,800 $16,428,800 $370,000 2.25% Date: 12/17/2014 14 Jurisdictional Subsidy – 5 Yr History Subsidy FY 12 FY 13 FY 14 FY 15 FY 16 Alexandria Arlington Fairfax County Fredericksburg Manassas Manassas Park Prince William County Stafford County Spotsylvania $129,944 $190,117 $4,876,961 $420,566 $817,993 $566,504 $5,859,007 $2,505,805 $577,020 $133,894 $195,897 $4,511,265 $339,064 $642,662 $441,702 $4,761,324 $1,892,640 $3,510,352 $133,894 $195,897 $4,747,684 $427,728 $757,804 $574,709 $5,748,203 $2,529,281 $1,313,600 $133,894 $195,897 $4,852,953 $581,244 $686,944 $401,762 $5,485,334 $2,689,391 $1,401,382 $133,894 $195,897 $4,847,285 $439,366 $766,491 $576,699 $5,309,674 $2,855,607 $1,303,888 Total $15,943,917 $16,428,800 $16,428,800 $16,428,801 $16,428,801 Date: 12/17/2014 15 Proposed Fare Increase Option 1 - 4% fare increase or Option 2 – 2.3% fare increase Average Daily Ridership is 19,300 under either option Fiscal Year % Fare Increase Adopted ADR Actual ADR % Over/ Under System OT P -- Notes 90% OT P Fredericksburg line; 91% Manassas line 86% OT P Fredrericksburg line; 94% Manassas line 2002 4.00% 10,000 11,547 15.5% 2003 0.00% 13,100 13,231 1.0% -- 2004 4.00% 14,100 14,534 3.1% 86.8% 2005 6.00% 15,000 15,086 0.6% 86.1% 2006 2.75% 15,600 14,667 -6.0% 78.6% 2007 6.00% 17,400 13,647 -21.6% 84.8% 2008 0.00% 15,200 14,662 -3.5% 85.2% 2009 10.00% 14,700 15,754 7.2% 88.6% 2010 6.00% 15,600 16,673 6.9% 87.6% 2011 0.00% 16,200 18,377 13.4% 87.2% Added train 300; lengthened consists, step up fare reduced to $5 per trip 2012 0.00% 17,350 19,088 10.0% 95.3% Federal T ransit Benefit decreased to $125 month in Jan 12 Step up fare reduced to $3, added 1 car to Fredericksburg and 2 cars to Manassas lines; T ransit Benefit increased to $240 mo Jan 13 2013 3.00% 19,000 18,878 -0.6% 95.8% 2014 4.00% 20,100 18,119 -9.9% 93.8% 2015 0.00% 19,200 2016 4.00% 19,300 Date: 12/17/2014 P oor OT P due to CSX trackwork Federal T ransit Benefit Increased to $230 month in March 09 T ransit Benefit reduced Jan 2014 to $130 mo Additional 8 car train to Fredericksburg begins in FY 15 Spotsylvania Station opens in July 2015; Amtrak step up fare increases from $3 to $5 16 PRTC Fuel Tax Estimates Total PRTC jurisdictional fuel tax revenue estimates (FY 15-FY 20) have decreased considerably compared with the projections used in the FY 15 adopted budget Total fuel tax revenue decreased by $24 million or 14.3% from $168.7 million to $144.7 million Nationwide gasoline consumption is down approximately 5% since 2006 even though the economy has grown 25% Change is due to increased use of electric/hybrid cars, changing driving patterns resulting in fewer miles and more fuel efficient cars Energy Information Administration predicts that nationally the average price of gasoline will be below $3.00 per gallon in 2015 Gas prices down $0.60 since last Spring Date: 12/17/2014 17 PRTC Fuel Tax Estimates Fuel Tax Revenues Budget to Actual Twelve Months Ended June 2014 Prince William County Stafford Manassas Manassas Park Fredericksburg Spotsylvania* Total FY14 YTD Budget 15,247,882 5,186,886 1,430,666 941,227 1,792,676 4,361,503 28,960,840 FY14 YTD Actual 15,989,841 4,946,890 1,505,494 908,209 2,138,616 9,410,212 34,899,262 Variance % 5% -5% 5% -4% 19% 116% 21% Variance $ 741,959 (239,996) 74,828 (33,018) 345,940 5,048,709 5,938,422 * includes $3.5M adjustment for revenue received in prior years in FY 14 Date: 12/17/2014 18 PRTC Fuel Tax Estimates Consumption (forecast by Taxation) price, and changes in jurisdictional shares impact revenue projections Statewide consumption is forecast to decrease slightly from FY 14 to FY 15 and then increase Four of the six PRTC jurisdictions adjusted share of the total PRTC fuel tax revenue decreased from FY 13 to FY 14 Prince William Stafford Manassas Manassas Park Fredericksburg Spotsylvania 52.65% 17.91% 4.94% 3.25% 6.19% 15.06% 50.47% 15.65% 4.88% 2.94% 6.66% 19.40% The combination of lower prices and smaller share of the total resulted in all jurisdictions estimated revenue decreasing from FY 15 with the exception of Spotsylvania Date: 12/17/2014 19 PRTC Fuel Tax Estimates Updated Projections (with NYMEX pricing as of 12/04/14) for Use in FY 16 Budget FY15 $2.77 12,321,886 3,820,834 1,191,417 717,780 1,625,991 4,736,370 24,414,278 Price per Gallon Prince William Stafford Manassas Manassas Park Fredericksburg Spotsylvania Total FY16 $2.53 11,464,352 3,554,926 1,108,501 667,826 1,512,831 4,406,745 22,715,181 FY17 $2.56 11,726,766 3,636,297 1,133,874 683,113 1,547,459 4,507,614 23,235,123 FY18 $2.59 11,996,530 3,719,947 1,159,958 698,827 1,583,057 4,611,307 23,769,626 FY19 $2.67 12,631,332 3,916,789 1,221,338 735,806 1,666,825 4,855,317 25,027,407 FY20 $2.70 12,889,582 3,996,869 1,246,308 750,849 1,700,904 4,954,585 25,539,097 FY18 $2.98 14,644,423 4,981,607 1,374,044 903,977 1,721,728 4,188,889 27,814,668 FY19 $2.95 14,696,604 4,999,357 1,378,940 907,198 1,727,863 4,203,815 27,913,777 FY20 $2.95 14,784,783 5,029,354 1,387,214 912,641 1,738,230 4,229,038 28,081,260 88,846,151 30,222,879 8,336,181 5,484,331 10,445,540 25,413,544 168,748,626 (1,895,201) (1,032,485) (140,906) (161,792) (37,326) 725,547 % % -12.8% (15,815,703) -17.8% -20.5% (7,577,217) -25.1% -10.2% (1,274,785) -15.3% -17.7% (1,230,130) -22.4% -2.1% (808,473) -7.7% 17.2% 2,658,394 10.5% Total 73,030,448 22,645,662 7,061,396 4,254,201 9,637,067 28,071,938 144,700,712 Projections Used in FY15 Budget (with NYMEX pricing as of 11/26/13) FY15 $3.24 15,236,014 5,182,849 1,429,552 940,495 1,791,281 4,358,108 28,938,299 Price per Gallon Prince William Stafford Manassas Manassas Park Fredericksburg Spotsylvania Total Difference Prince William Stafford Manassas Manassas Park Fredericksburg Spotsylvania (2,914,128) (1,362,015) (238,135) (222,715) (165,290) 378,262 Amount Difference FY16 $3.11 14,804,644 5,036,110 1,389,078 913,867 1,740,565 4,234,719 28,118,983 % -19.1% -26.3% -16.7% -23.7% -9.2% 8.7% (4,524,021) -15.6% (3,340,292) (1,481,184) (280,577) (246,041) (227,734) 172,026 FY17 $3.03 14,679,683 4,993,602 1,377,353 906,153 1,725,873 4,198,975 27,881,639 % -22.6% -29.4% -20.2% -26.9% -13.1% 4.1% (5,403,802) -19.2% Date: 12/17/2014 (2,952,917) (1,357,305) (243,479) (223,040) (178,414) 308,639 % -20.1% -27.2% -17.7% -24.6% -10.3% 7.4% (4,646,516) -16.7% (2,647,893) (1,261,660) (214,086) (205,150) (138,671) 422,418 % -18.1% -25.3% -15.6% -22.7% -8.1% 10.1% (4,045,042) -14.5% (2,065,272) (1,082,568) (157,602) (171,392) (61,038) 651,502 % -14.1% -21.7% -11.4% -18.9% -3.5% 15.5% (2,886,370) -10.3% Total (2,542,163) -9.1% (24,047,914) -14.3% 20