PROJECT MANAGEMENT PROJECT REPORT January 12, 2016 Phase Column Descriptions: • Scoping/Estimating - Project manager has been assigned and development of a cost estimate for the project is underway. • Awaiting Funding - Cost estimate has been provided to the customer. Funding has not been received. • Procurement - Funding is in place. Contracting process is underway. • Design - Contract for design services has been awarded. Design is in progress. • Construction - Contract for construction services has been awarded. Construction is underway. • On Hold • Complete - Work has been completed and accepted by the customer. • Closeout - Financial closeout is underway. SP/CI PROJ FUND NO 5085 882000 5117 882000 SOURCE FUND TITLE ESTM'D CPLTN PROJ BDGT 173100- Alderman Hall - Renovate or 945850 Reconfigure Suite 207 1/8/16 $49.2K 171300- Alderman Hall - Replace Ceiling Tiles, 945850 Lights, and HVAC Diffusers in Suite 208 1/15/16 Alderman Hall - Replace Flooring and Trim in Suites 104, 108, 202, 204 STATUS PROJ MGR PM NO ACTION OFFICE PHASE SPR received 8/3/15. Met with sponsor 8/5/15. Developing options. Sponsor picked option. Funding requested 9/30/15. Funding received 11/3/15. Bids opened 12/3/15. Work will begin 12/14/15. 99% complete. McCarley 5085 Proj Mgmt Construction $25.0K SPR received 9/21/15. Funding received 12/16/15. Work is complete as of 12/30/15. Awaiting invoices. Williams 5117 Proj Mgmt Complete T.B.D. T.B.D. SPR received 11/2/15. Pickard 5158 Proj Mgmt Scoping Estimating Allied Health - Planning & Programming T.B.D. T.B.D. SPR received 12/2/14. Morgan 4951 ACSvcs Scoping Estimating Almkuist-Nixon - Construct Permanent Wall for Room 112 Aquaculture Research Lab - Survey Existing Utilities in Parking Area T.B.D. $9.0K Blume 5153 Sponsor T.B.D. $2.4K SPR received 10/26/15. Funding requested 11/17/15. SPR received 3/24/15. Meeting with sponsor 4/13/15. Funding requested 4/29/15 McCarley 5017 Sponsor Awaiting Funding Awaiting Funding Bear Hall - Renovate Room 110 T.B.D. T.B.D. SPR received 12/8/15. Bids requested. Williams 5186 Proj Mgmt Boseman Field - Estimate for Locker Room Building T.B.D. $288.0K SPR received 8/5/15. Funding requested 10/08/15. McCarley 5087 Sponsor Page 1 of 21 Scoping Estimating Awaiting Funding PROJECT MANAGEMENT PROJECT REPORT 4959 882000 319098- Brooks Field - Indoor Practice Facility 945966 3/15/2016 (Design) $150K (Design) SPR received 12/15/14. Designer interviews conducted 1/15/15. Designer has been selected. Design is underway. Awaiting designer proposal. Funding requested 12/8/15. Funding received 12/16/15. Brooks Field - Install Fencing Under Bleachers T.B.D. T.B.D. SPR received 6/11/15. Brooks Field - Repair Press Box Damage T.B.D. $15.0K SPR received 12/8/15. Funding requested 1/8/16. January 12, 2016 Ross 4959 ACSvcs Design McCarley 5058 Proj Mgmt Scoping Estimating Blume 5185 Sponsor Awaiting Funding 5050 882000 319080- Brooks Field - Replace Irrigation 945966 System 7/21/15 $60.0K SPR received 5/22/15. Design received. Preparing to bid. Funding requested 6/29/15. Funding received 7/6/15. Work is complete. Preparing closeout. McCarley 5050 Proj Mgmt Complete 5119 882000 319080- Brooks Field - Replace Wooden 945966 Bleachers 3/15/16 $100.0K SPR received 9/24/15. Initial proposals are due 12/8/15. Funding requested 12/9/15. Funding received 12/16/15. The contract is awarded and material has been ordered. Williams 5119 Proj Mgmt Procurement T.B.D. T.B.D. SPR received 12/17/15. McCarley 5190 Proj Mgmt Scoping Estimating Burney Center - Remove Wallpaper and Paint Women's Restroom R&R 416290 416290 Burney CEP - Controls Upgrade T.B.D. $97.8K SPR generated 4/10/14. R&R Funding established 4/9/14. McCarley 4820 Proj Mgmt Scoping Estimating 5179 882000 180730- Burney CEP - Install Isolation Valves at 945866 Boilers 1/15/16 $4.1K SPR received 11/24/15. Funding requested 12/3/15. Funding received 12/15/15. Williams 5179 Proj Mgmt Procurement 5046 180540 180540 Burney CEP - Refurbish VFD Drive 6/19/15 $13.0K SPR generated 5/21/15. Funding established 5/21/15. Morgan 5046 ACSvcs Procurement R&R 416250 416250 CAB - Replace Chiller Compressor 6/30/15 $55.0K SPR generated 4/10/13. R&R funding established 4/9/14. Repair of compressor motor is complete. Additional work being considered. McCarley 4816 Proj Mgmt Construction Page 2 of 21 PROJECT MANAGEMENT PROJECT REPORT CAB - Replace Floor Covering T.B.D. $26.0K SPR received 5/27/14. Funding requested 7/17/14. CAB - Rotate Projector Rm 2005 T.B.D. $2.6K SPR received 11/17/14. Funding requested 12/18/14. CAB - Seal Mechanical Room Floors T.B.D. $44.0K January 12, 2016 Seifert 4860 Sponsor Awaiting Funding McCarley 4933 Sponsor Awaiting Funding SPR received 5/29/14. Funding requested 8/21/14. Blume 4869 Sponsor Awaiting Funding SP 14-014 883106 218019- Cahill Drive - Install Curb & Gutter 945940 Along Cahill Drive 9/30/15 $350.0K Project has been approved by the buildings and grounds committee and the design review committee. Funding request forwarded to project sponsor on 4/24/13. Funding received 7/30/13. Permit reconciliation is complete. Cahill Drive work is complete. Scope of project expanded to include lighting improvements along Walton Drive. Bid opening conducted on 2/26/15. PO for the additional work has been awarded. Lighting work is 60% complete. McCarley 4617 Proj Mgmt Construction 5068 882000 125260- Cameron Hall - Equipment Upgrade in 945865 Room 241 Cameron Hall - Renovations to Lounge 213A 180730- Cameron Hall- Repair Storm Water 945966 Lines 3/15/16 $60.4K McCarley 5068 Proj Mgmt Procurement T.B.D. T.B.D. SPR received 7/16/15. Funding requested 7/28/15. Funding received 1/7/16. SPR received 10/8/15. Blume 5125 Proj Mgmt 1/30/16 $11.0K McCarley 5160 Proj Mgmt Campus Commons - Replace Worn Wood on Commons Bridges T.B.D. $19.6K SPR received 11/2/15. Funding requested 11/3/15. Funding received 12/9/15. Work in progress. SPR received 8/10/15. Funding requested 8/20/15. Scoping Estimating Construction Williams 5089 Sponsor Awaiting Funding Campus Wide - Repair or Replace Utility Meters T.B.D. $50.0K SPR received 2/18/14. Funding requested 2/18/14. Revisiting campus approach to automating meters on 10/8/15. Reinmann 4776 Sponsor Awaiting Funding 6/30/16 $100.0K SPR generated 12/1/14. Funds provided 12/1/14. Sharpe 4948 Facilities Design 5160 4948 882000 180180 180180- Campus Wide Performance Contract # 945860 2 - Oversight Page 3 of 21 PROJECT MANAGEMENT PROJECT REPORT Campus Wide Performance Contract #2 - Investigative Survey T.B.D. T.B.D. Project has been approved by SCO. Selection of contractor has been made - Ameresco. Definitization of scope of work and schedule is underway. Review of ECMs was conducted on 4/21/14. 90% submittal has been received. Development of contract is underway. January 12, 2016 Sharpe 4244 Facilities Scoping/ Estimating R&R 413320 413320 Central Energy Plant - Upgrade Controls 6/30/15 $164.6K SPR generated 12/20/13. R&R funding established 12/20/13. McCarley 4741 Proj Mgmt Procurement R&R 416260 416260 Central Energy Plant to Dobo Hall Infrastructure 6/30/15 $100.0K SPR generated 4/10/14. R&R Funding established 4/9/14. McCarley 4817 Proj Mgmt Scoping Estimating CI 08-015 443811 40728320 Chancellors Walk - Drainage 6/30/15 $975.0K Construction in progress for storm water harvesting and irrigation. Work is complete. In closeout. Morgan 3497 ACSvcs Closeout Chancellors Walk - Level Bridge Pavers T.B.D. T.B.D. SPR received 5/20/15. McCarley 5044 Proj Mgmt Scoping Estimating 172800- CIE - Additional Counter Work Spaces 945850 7/31/15 $8.7K SPR received 5/15/15. Funding requested 5/22/15. Funding received 6/2/15. Work is complete. McCarley 5042 Proj Mgmt Complete CIE - Evaluate Installation of New Fire Alarm T.B.D. T.B.D. SPR received 11/9/15. Pickard 5169 Proj Mgmt Scoping Estimating CIE - Evaluation and Upgrades to HVAC System T.B.D. $18.2K SPR received 11/9/15. Funding requested 12/23/15. Pickard 5170 Sponsor Awaiting Funding 172800- CIE - Install Bike Rack & Outdoor 945966 Furniture 9/30/15 $7.9K SPR received 10/28/14.Funding requested 12/4/14. Funding received 7/8/15. Work awarded. Bike racks installed. Work is complete. McCarley 4922 Proj Mgmt Complete CIE - Investigate and/or Replace Lighting T.B.D. T.B.D. SPR received 7/27/15. Guinn 5080 Proj Mgmt Scoping Estimating CIE - Install Patio T.B.D. $31.1K SPR received 6/10/15. Concept and drawings accepted by sponsor. Working on approvals. Funding requested 12/17/15. Pickard 5057 Sponsor Awaiting Funding 5042 4922 882000 882000 Page 4 of 21 PROJECT MANAGEMENT PROJECT REPORT CIE - Phase 2 - Multimedia Improvements 8/25/15 $60.0K SPR received 1/21/15. Funding requested 2/3/15. Funding received 4/23/15. Delay due to increase in scope. Pickard 4971 Proj Mgmt On Hold CIS - Renovate Room 2007 into Research Lab T.B.D. T.B.D. SPR received 11/24/15. Blume 5176 Proj Mgmt Scoping Estimating CIS - Renovations to Rm 1020 T.B.D. $77.6K SPR received 7/24/14. Funding requested 9/12/14. McCarley 4887 Sponsor Awaiting Funding CIS - Renovations to Room 2004 T.B.D. $81.4K SPR received 10/29/14. Funding requested 12/4/14. design is complete. Awaiting construction funding. McCarley 4923 Sponsor Awaiting Funding CIS - Repair Portico Door Leaks T.B.D. T.B.D. SPR received 10/28/15. Blume 5155 Proj Mgmt Scoping Estimating SPR received 9/11/15. Pre-con on 10/6 with construction following. Completion by 1/31/16. Pickard 5106 Phy Plant Construction McCarley 4693 Fac Admin Closeout Sharpe 5026 ACSvcs Procurement Sharpe 5165 ACSvcs Seifert 3915 ACSvcs Awaiting Funding Complete Reinmann 4503 Proj Mgmt Procurement Reinmann 5091 Sponsor Awaiting Funding Pickard 5178 Sponsor McCarley 5191 Sponsor Awaiting Funding Awaiting Funding 5106 ATCFunded ATC- CMSMG - Erect Cell Tower Funded 1/31/16 $0.0K SP 14-028 883120 573750- CMSMG - Expand Floating Docks 214802945966 2/28/15 $332.8K SPR received 9/30/13. Funding requested 9/30/13. Funding received 10/17/13. Bid opening conducted on 4/29/14. Work is underway. Funding upgrade received 8/22/14. Work is complete. Closeout is underway. 5026 18015A 18015A CMSMG - Lab Hood Repairs 7/1/15 $150.0K T.B.D. T.B.D. SPR received 4/9/15. Funding received from 18015A per M. Morgan 4/9/15. SPR receieved 11/5/15. 10/31/13 $29.0M 1/30/16 $6.0K CMSMG - Refurbish Environmental Chambers T.B.D. $94.6K SPR received 8/13/15. Funding requested 9/24/15. Rebid 9/24/15 with low bidder selected. Awaiting funding and alternate selections. CMSMG - Renovate Porch into Enclosed Wet Lab CMSMG - Replace Existing NERR Storage Shed T.B.D. $21.7K T.B.D. $6.3K SPR received 11/24/15. Funding requested 1/7/16. SPR received 12/17/15. Funding requested 12/22/15. CI 10-005 443751 4503 882000 January 12, 2016 CMSMG - Laboratory Exhaust Damper Replacement CMSMG - Marbionic Building 40728302 148610- CMSMG - Modify Seawater Discharge 945966 Piping Notice to Proceed issued 10/5/11. Work is complete. SPR received from inactive files on 11/20/15. Funding requested 11/25/15. Funding received 12/9/15. Funding is for engineering only. Page 5 of 21 PROJECT MANAGEMENT PROJECT REPORT 5025 180540 180540 CMSMG - Marbionic Catch All 7/1/15 $45.0K CMSMG Marbionc - Add 2 Fume Hoods in Lab 2018 CMSMG Marbionc - Ventilation and Lab ACH Optimization T.B.D. $142.1K T.B.D. T.B.D. SPR received 4/6/15. Funding received from 180540 per M. Morgan 4/6/15. SPR received 9/28/15. Funding requested 11/3/15. SPR received 7/23/15. CMSMG Shellfish Hatchery - HOA Upgrade for Seawater System T.B.D. T.B.D. SPR received 11/3/15. CMSR - Renovations to Hatchery WB3 T.B.D. $11.8K Cornerstone Hall - Replace Bathroom Partitions T.B.D. Cornerstone Hall - Replace Common Space Flooring DeLoach Hall - Renovate Rooms 210 and 211 January 12, 2016 Morgan 5025 ACSvcs Procurement Williams 5121 Sponsor Williams 5078 Proj Mgmt Awaiting Funding Scoping Estimating Guinn 5163 Proj Mgmt Scoping Estimating SPR received 8/27/14. Funding requested 10/20/14. McCarley 4894 Sponsor Awaiting Funding $1.5K SPR received 10/8/15. Funding requested 10/22/15. Guinn 5135 Sponsor Awaiting Funding T.B.D. Varies SPR received 10/8/15. Funding requested 10/22/15. Guinn 5136 Sponsor Awaiting Funding T.B.D. T.B.D. SPR received 12/8/15. Pickard 5187 Proj Mgmt Scoping Estimating 4945 180186 180186- DeLoach Hall - Replace Chilled Water 945862 Control Valve 6/30/15 $10.0K SPR generated 11/21/14. Funding established 11/21/14. McCarley 4945 Proj Mgmt Procurement 5168 882000 216370- DePaolo Hall - Add New Office in Suite 945850 1033 1/30/16 $13.2K SPR received 11/9/15. Funding requested 11/30/15. Funding received 12/15/15. Work is complete as of 1/8/16. Williams 5168 Proj Mgmt Complete 5118 882000 319251- Dobo Hall - IDF Refresh 945866 1/8/16 $48.4K SPR received 9/22/15. Funding requested 9/24/15. Funding received 10/19/15. Guinn 5118 Proj Mgmt Procurement Dobo Hall - Install 4" Duct T.B.D. $3.5K SPR received 10/17/14. Funding requested 10/22/14. Seifert 4913 Sponsor Awaiting Funding Dobo Hall - Install Snorkel Hoods T.B.D. $17.0K SPR received 4/30/14. Funding requested 7/29/14. Sponsore inquied September 2015. Project may be funded in the near future. McCarley 4842 Sponsor Awaiting Funding Page 6 of 21 PROJECT MANAGEMENT PROJECT REPORT January 12, 2016 R&R 413230 413230 Dobo Hall - Refrigerant Monitoring 6/30/15 $210.0K SPR generated 12/20/13. R&R funding established 12/20/13. McCarley 4739 Proj Mgmt Construction R&R 416230 416230 Dobo Hall - Refrigerant Monitoring 6/30/15 $60.0K SPR generated 4/10/14. R&R Funding established 4/9/14. McCarley 4814 Proj Mgmt Scoping Estimating 5156 882000 121981- Dobo Hall - Renovate Classrooms 202 945850 and 205 1/15/16 $41.3K SPR received 11/2/15. Funding requested 12/8/15. Funding received 12/9/15. Furniture work started 1/5/16. To be completed by 1/9/16. Williams 5156 Proj Mgmt Construction T.B.D. T.B.D. SPR received 11/2/15. Guinn 5161 Proj Mgmt Scoping Estimating Dobo Hall- Renovate Rooms 117 and 119 into Research Labs R&R 416270 416270 Dobo Hall - Replace Boiler T.B.D. $250.0K SPR generated 4/10/14. R&R Funding established 4/9/14. Design fee proposal has been requested. McCarley 4818 Proj Mgmt Procurement 5071 882000 152420- Education Building - Divide Room 346 945850 into Two Offices 9/25/15 $11.5K SPR received 7/16/15. Funding requested 8/6/15. Funding received 8/24/15. Work is complete. Guinn 5071 Proj Mgmt Complete Education Building - Install New Door in Dean's Office T.B.D. $8.5K SPR received 3/12/15. Funding requested 3/23/15. Seifert 5009 Sponsor Awaiting Funding Reinmann 5039 Proj Mgmt On Hold Pickard 5166 Proj Mgmt Construction Williams 5113 Sponsor Awaiting Funding 5039 180186 180186 Education Building - Purchase Meters 6/15/15 $6.0K SPR received 5/14/15. Funding established 5/14/15. Procurement underway. Meters have arrived. Awaiting funding for installation. 5166 882000 152420- Education Building - Remove and 945850 Replace Sound Boards in Room 330 1/30/16 $11.0K T.B.D. $5.5K SPR received 11/6/15. Funding requested 11/25/15. Funding received 12/7/15. Work is underway. SPR received 9/15/15. Awaiting heating season to create estimate and make repairs. Awaiting price for repairs. Funding requested 12/16/15. Fisher Fieldhouse - Repair and Install Ductwork 5104 882000 644550- Fisher Student Center/Univeristy Union 945966 - Install Bike Racks 2/15/16 $4.3K SPR received 8/31/15. Funding requested 12/17/15. Funding received 1/7/2016. Guinn 5104 Proj Mgmt Procurement 5147 882000 644550- Fisher Student Center and Campus Life 945865 Buildings - Install Card Swipe Access 3/15/16 $22.1K SPR received 10/13/15. Funding requested 11/20/15. Funding received 1/7/16. Williams 5147 Proj Mgmt Procurement 5070 882000 644550- Fisher Student Center - Install Hand 945850 Dryers in Women's Restroom 1022 1/30/16 $4.8K SPR received 7/16/15. Funding requested 11/3/15. Funding received 12/18/15. Work is complete. Closeout is underway. Guinn 5070 Fac Admin Closeout Page 7 of 21 PROJECT MANAGEMENT PROJECT REPORT 5090 4897 882000 882000 January 12, 2016 Fisher Student Center - Modify ADA Doors 1007 T.B.D. $6.0K SPR received 1/28/15. Funding requested 3/24/15. Blume 4973 Sponsor Awaiting Funding Fisher Student Center - Modify ADA Doors Room 1006 T.B.D. $6.8K SPR received 1/28/15. Funding requested 3/27/15. Blume 4974 Sponsor Awaiting Funding 644550- Fisher Student Center - Paint Railings 945866 on Verandas 10/22/15 $6.0K SPR received 8/10/15. Funding requested 8/14/15. Funding received 9/21/15. Work is complete. Blume 5090 Proj Mgmt Complete Fisher Student Center Recommissioning Upgrades T.B.D. T.B.D. SPR received 10/13/15. Williams 5146 Proj Mgmt Scoping Estimating 644550- Fisher Student Center - Renovations to 945850 Room 1002 (Sharky's) 3/1/16 $8.0K Design Only SPR received 9/16/14. Funding requested 1/20/15. Sponsor has indicated they will be funding project soon. Design fee verified. Funding received 11/24/15. Conrtact for design awarded on 12/1/15. McCarley 4897 Proj Mgmt Design Fisher Student Center - Repair Lumina Step Lights T.B.D. T.B.D. SPR received 7/16/15. Guinn 5069 Proj Mgmt Scoping Estimating Fisher Student Center - Replace First Floor Flooring T.B.D. T.B.D. SPR received 8/18/15. Meeting with sponsor and contractor 9/2/15. Design meeting 11/17/15. Next meeting scheduled for 12/9/15. McCarley 5092 Proj Mgmt Scoping Estimating Fisher University Union - Energy Conservation Measures Implementation T.B.D. $120.0K SPR received 11/17/15. Funding requested 11/18/15. McCarley 5175 Sponsor Awaiting Funding Friday Annex - Install Golf Cart Charging Station T.B.D. $10.3K SPR received 5/19/15. Tommy Guinn met with sponsor. Funding requested 6/8/15. Cart not accepted by the state. Project on hold. Guinn 5043 Sponsor On Hold Friday Annex - Replace All HVAC Package Units T.B.D. T.B.D. SPR received 9/15/15. Replaced two failed units under emergency PO through Physical Plant. Other two units may be replace through project at later date. Williams 5109 Proj Mgmt Scoping Estimating Galloway Hall - Pressure Washing and Treating Exterior T.B.D. $60.0K SPR received 7/31/15. Funding requested 10/15/15. Guinn 5082 Sponsor Awaiting Funding Galloway Hall - Replace Interior Hallway Flooring T.B.D. Varies SPR received 10/8/15. Funding requested 10/22/15. Delayed until next spring. Williams 5138 Sponsor On Hold Page 8 of 21 PROJECT MANAGEMENT PROJECT REPORT 4999 180540 Graham Hall - Install Six Ribbon Style Bike Racks T.B.D. T.B.D. SPR received 1/11/15. Graham Hewlett Halls - Replace Fire Detector Devices Graham-Hewlett Connector - Re-Cover Front Desk and Install New Top T.B.D. T.B.D. T.B.D. $5.6K Greene Track - Estimate for Portal/Gateway Building T.B.D. Grounds - Construct New Surface Parking Lot 180540- Grounds - Design for Master 945850 Stormwater Plan Grounds - Install Bollard in Colonnade between FSC and Burney 4998 180540/1 945962 Grounds - Outdoor Enhancement 8015A Gravity Sewer (Design/Construction) CI 13-007 443783 5188 882000 Grounds - Outdoor Enhancement Project 644550- Grounds - Powerwash and Paint 945866 Columns and Colonnade Between FSC and Burney January 12, 2016 Guinn 5195 Proj Mgmt Scoping Estimating SPR received 10/23/15. Met with fire alarm technician on 12/22/15. SPR received 10/8/15. Funding requested 10/22/15. Possibly delayed until next spring. McCarley 5151 Proj Mgmt Williams 5140 Sponsor Scoping Estimating Awaiting Funding $1.1M SPR received 8/5/15. Funding requested 10/08/15. McCarley 5086 Sponsor Awaiting Funding T.B.D. T.B.D. SPR received 10/8/15. McCarley 5141 Proj Mgmt Scoping Estimating 6/30/15 $14.0K SPR generated 3/2/15. Funding established 3/2/15. Design is underway. Morgan 4999 ACSvcs Design T.B.D. T.B.D. SPR received 12/16/15. McCarley 5189 Proj Mgmt Scoping Estimating 6/30/16 $214.5K SPR generated 3/2/15. Funding established 3/3/15. Design is complete. Pre-bid held 3/31/15. Bids due 4/14/15. Contract awarded 4/16/15. Construction started 5/18/15. Sewer complete 7/1/15. Added work building 4D site pad and utilities complete 7/17/15. Added work building 7C site started 7/30/15. Thomson Corder contracted. Seifert 4998 ACSvcs Construction 6/30/16 $7.5M Design contract has been awarded. Work is complete on baseball practice field. Bid failed for fields. Reconfiguring design packages for re-bid. Building 4D awarded to Barboza 8/4/15. 4D work started 8/24/15. Lighting project construction in progress. 7C contract awarded 12/21/15. Seifert 4743 ACSvcs Design and Construction 1/15/16 $5.1K SPR received 12/16/15. Funding requested 12/18/15. Funding received 12/21/15. Powerwashing was completed on 12/28/15. Painting begins on 1/8/16. McCarley 5188 Proj Mgmt Construction Page 9 of 21 PROJECT MANAGEMENT PROJECT REPORT January 12, 2016 4919 882000 212139- Grounds - Sundial Installation 045966 4/30/15 $11.0K SPR received 10/24/14. Funding requested 12/9/14. Funding received 12/18/14. Work is complete. Closeout is underway. Blume 4919 Fac Admin Closeout 5123 882000 212139- Grounds - Sundial - Install Concerete 945966 Benches 3/15/16 $2.5K SPR received 9/23/15. Funding requested 9/23/15. Funding received 10/8/15. Blume 5123 Proj Mgmt Procurement SP 15-006 883243 12/31/14 $26.5K SPR generated 6/24/14. Funding requested 6/25/14. Funding received 7/14/14. Work is complete. Ross 4876 ACSvcs Complete Hanover Hall - Add Drywall and Replace Lights in Room 110 T.B.D. $3.4K SPR received 12/3/15. Funding requested 12/23/15. Guinn 5184 Sponsor Awaiting Funding Hoggard Hall - Renovate Rm 231 T.B.D. T.B.D. SPR received 11/17/14. On hold per sponsor. McCarley 4931 Proj Mgmt On Hold 1/30/16 $30.0K SPR received 10/8/15. Funding requested 10/22/15. Funding received 11/10/15. Contracts awarded 12/1/15. Funding upgrade requested 12/18/15. Funding upgrade received 1/7/16. Blume 5131 Proj Mgmt Construction Honors House - Replace Bathroom Partitions T.B.D. $1.5K SPR received 10/8/15. Funding requested 10/22/15. Blume 5132 Sponsor Awaiting Funding Honors House - Replace Common Space Flooring T.B.D. Varies SPR received 10/8/15. Funding requested 10/22/15. Blume 5133 Sponsor Awaiting Funding 5131 882000 Grounds - Tennis Facility Feasibility Study 318500- Honors House - Lobby Renovations 945850 5084 882000 318500, Housing - Multiple Buildings 505, 510, Condensate Cleaning 515923510 1/15/16 $28.7K SPR received 7/31/15. Funding requested 8/4/15. Funding received 9/23/15. Work completed on 12/18/15. Williams 5084 Proj Mgmt Complete 5115 882000 318500- Housing - Multiple Buildings -Housing 945850 R&R Phase I, FY16 8/1/16 $7.5M SPR received 9/18/15. Scope meetings are continuing, first cost estimate is $7.5M. CM@R pre-bid scheduled for 11/10/15. Design funding identified 12/8/15. CM@R recommendation will be presented to BOT in mid-January. Reinmann 5115 Phy Plant Design Page 10 of 21 PROJECT MANAGEMENT PROJECT REPORT Housing - Multiple Buildings - Install Bike Racks January 12, 2016 T.B.D. $38.0K SPR received 2/27/15. Funding requested 5/6/15. Seifert 4980 Sponsor Awaiting Funding 5093 882000 318300- HUB Building - Infrastructure - Phase I 945866 8/15/16 $100.0K SPR received 8/19/15. Funding requested 8/19/15. Funding received 8/26/15. Morgan 5093 ACSvcs Procurement 5128 882000 318500- Innovation House - Lobby Renovations 945850 1/30/16 $31.0K SPR received 10/8/15. Funding requested 10/22/15. Funding received 11/10/15. Contracts awarded 12/1/15. Funding upgrade requested 12/18/15. Funding upgrade received 1/7/16. Blume 5128 Proj Mgmt Construction Innovation House - Replace Bathroom Partitions T.B.D. $1.5K SPR received 10/8/15. Funding requested 10/22/15. Blume 5129 Sponsor Awaiting Funding Innovation House - Replace Common Space Flooring T.B.D. Varies SPR received 10/8/15. Funding requested 10/22/15. Blume 5130 Sponsor Awaiting Funding James Hall - Install Lenel Door Readers T.B.D. $4.6K SPR received 10/23/15. Funding requested 1/7/16. McCarley 5150 Sponsor Awaiting Funding Kenan Auditorium - Replace HVAC Diffusers T.B.D. $16.1K SPR received 10/8/15. Funding requested 10/29/15. Williams 5127 Sponsor Awaiting Funding 2/10/16 $14.0K SPR received 3/9/15. Funding requested 10/6/15. Funding received 12/15/15. Blume 5004 Proj Mgmt Procurement T.B.D. T.B.D. SPR received 12/23/15. Pickard 5194 Proj Mgmt Scoping Estimating 5004 882000 121750- Kenan Auditorium - Washer and Dryer 945866 Hook Up Kenan House - Courtyard Refurbishment Page 11 of 21 PROJECT MANAGEMENT PROJECT REPORT January 12, 2016 5062 882000 218010- Kenan House - FY2016 Interior/Exterior 945850 Repairs and Refurbishments 7/30/15 $110.0K SPR generated 6/24/15. Funding requested 6/24/15. Funding received 6/25/15. Work is complete. Preparing closeout. McCarley 5062 Proj Mgmt Complete 5054 180540 180540 Kenan House - Refurbish Finishes and General Repairs 6/15/15 $50.0K SPR generated 5/27/15. Funding appropriated 5/27/15. Work is complete. McCarley 5054 Proj Mgmt Complete 4914 882000 680100- Kenan House - Repairs & 945850 Improvements 6/30/15 $15.0K SPR generated 10/17/14. Funding received 10/21/14.Work is underway. Work is complete. McCarley 4914 Proj Mgmt Complete Kenan House - Replace Heating Hot Water Boiler T.B.D. T.B.D. Williams 5108 Proj Mgmt Scoping Estimating Kenan House - Security Fence Modifications T.B.D. T.B.D. SPR received 9/15/15. Physical Plant has completed some initial work prior to project funding. Currently examining possible changes in venting first. SPR received 12/23/15. Pickard 5193 Proj Mgmt Scoping Estimating 10/21/14 $125.0K SPR received 1/11/13. Funding received 4/26/13. Prebid conducted 11/19/13. Prework conference conducted 1/7/14. Work is underway. Additional funding received 7/14/14. Scope of work has been increased. Work is complete. Closeout is underway. Blume 4523 Fac Admin Closeout King Hall - Replace All Air Handlers T.B.D. T.B.D. SPR received 9/15/15. Blume 5110 Proj Mgmt Leutze Hall - Install ADA Push Button T.B.D. $14.1K SPR received 7/23/14. Funding requested 7/28/14. Seifert 4885 Sponsor Scoping Estimating Awaiting Funding Leutze Hall - Modifications to Vending Area T.B.D. $34.8K SPR received 10/21/14. Funding requested 11/11/14. McCarley 4917 Sponsor Awaiting Funding 3/15/16 $100.0K SPR received 11/2/15. Funding requested 12/15/15. Funding received 12/18/15. Blume 5162 Proj Mgmt Procurement SP 13-107 5162 883066 882000 680100- Kenan House - Solarium 945850 Refurbishment Study 152030- McNeill Hall - AV Upgrade in Room 945850 3084 Page 12 of 21 PROJECT MANAGEMENT PROJECT REPORT 5063 882000 1AP100- McNeill Hall - Multi-Office Renovations 945850 in McNeill and Trask 5/30/16 $205.0K SPR received 6/29/15. Funding requested 6/30/15. Funding received 7/22/15. Work is underway. Funding upgrade requested 8/13/15. Funding upgrade received 9/28/15. Punchlist walk-through held on 12/1/15. Funding upgrade requested 12/15/15. Funding upgrade received 12/17/15. R&R 416280 416280 Morton Hall - Replace Cooling Tower 6/30/15 $95.0K SPR generated 4/10/14. R&R Funding established 4/9/14. Work is complete. Morton Hall - Replace Door Hardware T.B.D. $46.0K SPR received 10/23/15. Funding requested 11/3/15. 6/30/15 $80.0K SPR generated 12/20/13. R&R funding established 12/20/13. T.B.D. T.B.D. SPR received 8/26/15. 190186- Multiple Buildings - 1292 Energy 945866 Improvements 6/30/15 $93.9K SPR generated 11/21/14. Funding established 11/21/14. Jaces boxes out for bid. Work awarded to ECS. Jace boxes received. Work is complete. Multiple Buildings - Bike Rack Installation Project Multiple Buildings - Install Lenel Keypad System T.B.D. T.B.D. SPR received 11/4/15. T.B.D. $18.4K SPR received 9/24/15. Access Management is scoping project. Funding requested 1/7/16. Multiple Buildings - Repair and Replace Submeters Multiple Buildings - Repair and Replace Chemical Feed Equipment T.B.D. $150.0K T.B.D. Multiple Buildings - Repair Utility Meters, Billable Multiple Buildings - Repair Utility Meters, Non-Billable Multiple Buildings - Storm Related Repairs 318505- Multiple Buildings - Summer Painting C 923510 R&R 413220 413220 Morton Hall - Upgrade Chiller Controls Multiple Athletic Facilities - Replace Sound Systems 4941 4991 180186 882000 January 12, 2016 Blume 5063 Proj Mgmt Construction McCarley 4819 Proj Mgmt Complete Guinn 5149 Sponsor Awaiting Funding McCarley 4738 Proj Mgmt Procurement Blume 5099 Proj Mgmt Scoping Estimating McCarley 4941 Proj Mgmt Complete Guinn 5164 Proj Mgmt McCarley 5120 Sponsor Scoping Estimating Awaiting Funding SPR received 8/28/15. Funding requested 9/2/15. Blume 5101 Sponsor $25.0K SPR received 8/28/15. Funding requested 9/2/15. Blume 5102 Sponsor T.B.D. T.B.D. SPR received 10/13/15. Blume 5144 Proj Mgmt T.B.D. T.B.D. SPR received 10/13/15. Blume 5145 Proj Mgmt T.B.D. $15.0K McCarley 5143 Sponsor 11/30/15 $80.0K SPR received 10/12/15. Requested funding 10/23/15. SPR received 2/27/15. Funding requested 3/16/15. Funding received 4/6/15. Contract awarded 4/30/15. Seifert 4991 Proj Mgmt Page 13 of 21 Awaiting Funding Awaiting Funding Scoping Estimating Scoping Estimating Awaiting Funding Construction PROJECT MANAGEMENT PROJECT REPORT Natatorium - Install Pool Water Heating System Natatorium - Install Water Belt Training System Natatorium - Install Water Fountain on Pool Deck Natatorium - Re-Orientate Roof Access Hatches Natatorium - Replace Handrails 5097 443811 T.B.D. T.B.D. SPR received 11/17/15. T.B.D. $26.1K T.B.D. T.B.D. SPR received 7/7/15. Funding requested 10/29/15. SPR received 12/18/15. T.B.D. $11.9K T.B.D. Natatorium - Replace HVAC Dektron Unit Osprey Hall - Install Electrical Outlets in Server Room January 12, 2016 Williams 5171 Proj Mgmt Guinn 5064 Sponsor Blume 5192 Proj Mgmt Williams 5167 Sponsor $64.0K SPR received 11/6/15. Funding requested 11/23/15. SPR received 5/5/14. Project linked to code review for Trask complex. Funding requested 8/26/15. Seifert 4849 Sponsor T.B.D. T.B.D. SPR received 9/15/15. Williams 5112 Proj Mgmt Scoping Estimating T.B.D. $12.5K SPR received 9/18/15. Funding requested 9/24/15. Additional funding requested 12/17/15. Guinn 5116 Sponsor Awaiting Funding 9/30/15 $10.1K SPR received 8/26/15. Funding established 8/26/15. Work is underway. Boyd 5097 Fac Admin Construction Parking Deck - Address Preventive Maintenance Needs T.B.D. $360.0K SPR received 10/26/15. Funding requested 12/9/15. Seifert 5148 Sponsor Awaiting Funding Parking Desk - Construct Customer Service Booth T.B.D. T.B.D. SPR received 11/24/15. Guinn 5177 Proj Mgmt Scoping Estimating 443811 Padrick House - Repairs and Improvements Scoping Estimating Awaiting Funding Scoping Estimating Awaiting Funding Awaiting Funding SP 15-003 883241 Parking Deck - Maintenance & Repairs 8/30/15 $210.0K SPR received 5/28/14. Funding requested 6/12/14. Funding received 7/2/14. Design is underway. Bids opened 12/3/14. Bids exceeded available funding. Project to be rebid on 4/15/15. Additional funding requested 4/10/15. Additional funding received 4/13/15. Bids received, PO written. Work begins 5/11/15. Work is complete. Punchlist items remaining. Punchlist items in progress. Seifert 4867 Proj Mgmt Complete 5028 882000 319248- Parking Lot B - Add Additional Parking 945950 10/15/15 $38.0K (Design Only) SPR received 4/16/15. Funding requested 6/11/15. Funding received 8/5/15. Work is underway. Blume 5028 Proj Mgmt Design T.B.D. $7.7K SPR received 10/28/15. Funding requested 11/11/15. Williams 5154 Sponsor Awaiting Funding Parking Lot EE - Structural Repairs to Bridge Between Lot EE and Suites Page 14 of 21 PROJECT MANAGEMENT PROJECT REPORT January 12, 2016 R&R 413270 413270 Physical Plant - Upgrades to Fuel Station 4/8/14 $36.5K SPR generated 11/22/13. Funded with R&R funds. Work is complete. McCarley 4729 Proj Mgmt Complete 4936 18015A 18015A- Randall Library - Code Related Actions 945864 6/30/15 $150.0K SPR generated 11/20/14. Funding established 11/20/14. Design PO has been awarded. Design is complete. Preparing to bid. Project is delayed due to time constraints. McCarley 4936 Proj Mgmt On Hold 5181 882000 151100- Randall Library - Install Security 945510 Cameras in Room 2043 2/15/16 $3.9K McCarley 5181 Proj Mgmt Construction Randall Library - Remodel TAC T.B.D. $28.8K SPR received 12/3/15. Funding requested 12/22/15. Funding received 1/7/16. Awarded 1/7/16. SPR received 3/3/15. Met with sponsor 3/19/15. Funding requested 4/29/15. McCarley 5000 Sponsor Awaiting Funding 180186- Randall Library - Replace Chilled Water 945862 Control Valve 6/30/15 T.B.D. SPR generated 11/21/14. Funding established 11/21/14. McCarley 4944 Proj Mgmt Scoping Estimating Randall Library - Renovate Second Floor into True Quiet Space T.B.D. T.B.D. SPR received 12/3/15. Blume 5182 Proj Mgmt Scoping Estimating Randall Library - Renovations to Rooms 2061 and 2062 T.B.D. T.B.D. SPR received 12/3/15. Guinn 5183 Proj Mgmt Scoping Estimating Seifert 4929 Fac Admin Closeout 4944 180186 4929 180540 180540- Randall Library - Structural Repairs 945850 6/30/15 $400.0K SPR generated 11/13/14. Funding provided 11/13/14. PO for initial work has been awarded. Work is complete. Closeout is underway. R&R 413280 413280 Randall Library - Structural Study 8/15/14 $15.0K SPR developed 12/20/13. R&R funding established 12/20/13. Design is complete. Analysis of report is underway. Design of intermediate repairs is complete. McCarley 4740 Proj Mgmt Complete 18014F S&BS - ADA Ramp 8/1/15 $54.3K Project developed 4/22/14. CAP # 8. See PM 4716. PueGilchrist 4840 ACSvcs Closeout 18014E S&BS - AHU Replacements 8/1/15 $950.0K Project developed 4/22/14. CAP # 7. See PM 4716. PueGilchrist 4839 ACSvcs Closeout 18014C S&BS - CEP Chiller Upgrades 8/1/15 $975.0K Project developed 4/22/14. CAP # 5. See PM 4716 PueGilchrist 4837 ACSvcs Closeout Page 15 of 21 PROJECT MANAGEMENT PROJECT REPORT R&R R&R 416210 413210 January 12, 2016 180540 S&BS - Contingency Repairs 6/30/15 $100.K Project developed 4/28/15. See PM 4716 for overall details. PueGilchrist 5037 ACSvcs Closeout 18014D S&BS - Hot & Chilled Water Lines 8/1/15 $950.0K Project developed 4/22/14. CAP # 6. See PM 4716. PueGilchrist 4838 ACSvcs Closeout 416210 S&BS - Improvements 8/1/15 $1.8M SPR developed 4/9/14. R&R funding established 4/8/14. See PM 4716. PueGilchrist 4812 ACSvcs Closeout 18014B S&BS - R&R Design 8/1/15 $920.7K Project developed 4/22/14. CAP # 4. See PM 4716. PueGilchrist 4836 ACSvcs Closeout S&BS - Renovations 8/1/15 $11.5M Design firm has been selected. Design is underway. CMR has been selected. Work is underway. Designer pre-final inspection 6/4/15. SCO final approval obtained 8/3/15. PueGilchrist 4716 ACSvcs Closeout 413210 S&BS- Fire Safety Upgrades 8/1/15 $475.0K SPR generated 5/5/14. See PM 4716. PueGilchrist 4850 ACSvcs Closeout 40428301 School of Nursing - Commissioning Services 6/30/11 $113.0K Work complete. Final report in progress. Project in closeout. Morgan 3724 ACSvcs Closeout Funded directly from main project CI 07-025 445702 40428301 School of Nursing - Regional Energy Plant - Phase I 7/31/10 $625K Work complete. Project in closeout. Morgan 3295 ACSvcs Closeout CI 09-024 445705 40428301 School of Nursing - Regional Energy Plant - Phase II 3/31/11 $ 2.0M Work complete. Punch list in progress. Project in closeout. Morgan 3857 ACSvcs Closeout SP 14-025 883110 319248- Schwartz Hall - Modify Parking Lot 945950 5/15/16 $460.0K SPR received 4/15/13. Funding requested 5/9/13. Funding received 9/12/13. Design contract has been awarded. Design is underway. DENR review is underway. Bids have been opened. PO for construction in process. Funding increase received 3/18/15. Blume 4603 Proj Mgmt Construction Page 16 of 21 PROJECT MANAGEMENT PROJECT REPORT 5139 5122 882000 882000 318500- Schwartz Hall - Replace Common 945850 Space Flooring 1/30/16 $50.0K SPR received 10/8/15. Funding requested 10/22/15. Funding received 11/10/15. PO issued; work to be completed during Christmas Break. Work completed 12/21/15. Shops at the Crossing - Install Outside Walk-Up Window T.B.D. T.B.D. Soccer Field - Grade Practice Field T.B.D. Soccer Field - Install Walkway Williams 5139 Proj Mgmt Complete SPR received 4/16/15. Seifert 5029 Proj Mgmt Scoping Estimating $7.2K SPR received 2/12/15. Funding requested 2/20/15. Blume 4979 Sponsor Awaiting Funding T.B.D. T.B.D. SPR received 6/11/15. McCarley 5060 Proj Mgmt Scoping Estimating Soccer Field - Replace Bleachers T.B.D. T.B.D. SPR received 5/22/15. Scoping in progress. McCarley 5051 Proj Mgmt Scoping Estimating Soccer Field - Replace Irrigation System T.B.D. $51.2K SPR received 8/21/15. Funding requested 10/29/15. Design complete and project will be put out to bid for pricing purposes. Williams 5095 Sponsor Awaiting Funding 11/30/15 $12.0K SPR received 9/29/15. Funding requested 10/12/15. Funding received 10/19/15. Funding upgrade requested 10/26/15. Funding upgrade requested 11/16/15. Guinn 5122 Proj Mgmt Procurement T.B.D. T.B.D. SPR received 10/8/15. McCarley 5126 Proj Mgmt Scoping Estimating 371020- Student Rec Center - Repair or Replace 945850 Windows 1/15/16 $72.6K SPR received 3/23/15. Funding requested 4/30/15. Funding received 5/19/15. Work scheduled 11/15/15. Work is complete. Blume 5016 Proj Mgmt Complete Student Rec Center - Replace Exisiting Metal Lockers T.B.D. T.B.D. SPR received 3/30/15. Funding requested 5/21/15. McCarley 5024 Sponsor Awaiting Funding 11/30/15 $850.00 Design Only SPR received 3/30/15. Funding requested 4/20/15. Funding received 5/8/15. Design underway. Seifert 5023 Proj Mgmt Design 371020- Student Rec Center and Rec Fields 945866 Install Temporary Power and Cut Off Switches Student Rec Center - Repair Ditch Behind Building 5016 5023 882000 882000 January 12, 2016 371020- Student Rec Center - Upgrade Pool 945866 Lighting Page 17 of 21 PROJECT MANAGEMENT PROJECT REPORT 5152 882000 January 12, 2016 371020- Student Rec Center - Wood Floor 945850 Refinishing 12/31/15 $15.1K SPR received 10/23/15. Funding requested 10/23/15. Funding received 11/10/15. Project awarded 11/25/15. Work is complete. Preparing closeout. McCarley 5152 Proj Mgmt Complete 40728303 Student Recreation Center Expansion 4/30/13 $35.3M Work is complete. PueGilchrist 3200 ACSvcs Closeout CI 10-018 443782 40728303 Student Recreation Center Expansion Infrastructure Relocation/Improvements 5/31/13 $1.0M Work complete. Closeout in progress. Morgan 4029 ACSvcs Closeout CI 10-017 443781 40728303 Student Recreation Center Expansion Site Clearing 6/15/11 $450.0K Work complete. Closeout in progress. Morgan 4028 ACSvcs Closeout 446900 40788301 Teaching Laboratory Building 8/17/12 $32.9M Work is complete. Closeout is underway. Wolfe 3668 ACSvcs Closeout Teaching Laboratory Building Assessment and Improvement of HVAC System Teaching Laboratory Building Fixtures, Furnishings and Equipment T.B.D. T.B.D. SPR received 8/26/15. Requested funding 8/26/15. Sharpe 5098 ACSvcs Awaiting Funding 5/15/13 $3.0M Funding requested 12/14/11. Funds received 2/23/12. Work is complete. Closeout in progress. Morgan 4338 ACSvcs Closeout T.B.D. $13.2K SPR received 11/2/15. Funding requested 11/30/15. Williams 5159 Sponsor Awaiting Funding NA $ 1.0M Project canceled. Scope of work moved to main project. Folder close-out in progress. Morgan 3858 ACSvcs Closeout CI 12-005 446902 40788301 Teaching Laboratory Building - Install Back-Up Cage Washer in Room 2040 CI 09-023 446901 40788301 Teaching Laboratory Building Regional Energy Plant - Phase III CI 12-007 446904 40788301 Teaching Laboratory Building Stormwater Improvements 4/30/13 $850.0K Funding requested 12/14/11. Funding received 2/24/12. Analysis underway. Work is complete. Closeout in progress. Morgan 4336 ACSvcs Closeout CI 12-006 446903 40788301 Teaching Laboratory Building - Water Main Improvements 10/15/12 $750.0K Work is complete. Closeout in progress. Morgan 4337 ACSvcs Closeout Telecom Center - Connect HVAC Unit to Generator T.B.D. $40.9K SPR received 9/16/14. Funding requested 10/17/14. Seifert 4900 Sponsor Awaiting Funding 6/30/15 $170.0K SPR generated 12/16/14. Funding assigned 12/16/14. Fire safety analysis is underway. Design contract awarded. Morgan 4961 ACSvcs Design 4961 18015A 18015A- Trask Coliseum - Code Related Issues 945864 Page 18 of 21 PROJECT MANAGEMENT PROJECT REPORT 4926 4902 882000 882000 319091- Trask Coliseum - Construct Academic 945850 Center January 12, 2016 11/20/15 $129.0K SPR received 11/4/14. Funding requested 1/28/15. Funding for design only received 5/19/15. Funding upgrade requested 6/4/15. Work is complete. Blume 4926 Proj Mgmt Complete Trask Coliseum -Construct Golf Cart Pad T.B.D. $35.0K SPR received 3/5/15. Funding requested 4/23/15. Seifert 5002 Sponsor Awaiting Funding Trask Coliseum - Evaluate Power Needs in Lobby T.B.D. T.B.D. SPR received 1/15/15. Morgan 4963 ACSvcs Scoping Estimating Trask Coliseum - Install Domestic Heating Hot Water System T.B.D. T.B.D. SPR received 11/17/15. Awaiting quote. Williams 5172 Proj Mgmt Scoping Estimating Trask Coliseum - Provide Additional Storage T.B.D. T.B.D. SPR received 2/12/15. Scoping in progress. McCarley 4978 Proj Mgmt Scoping Estimating 2/15/16 $475.0K SPR received 9/24/14. Estimate and funding request forwarded to project sponsor on 9/25/14. Funding received 10/9/14. Design is in progress. Sent to SCO for review. SCO approval received. Construction funding received. Work is underway and is at 60% complete. McCarley 4902 Proj Mgmt Construction T.B.D. $10.0K SPR received 10/6/15. Scoping repair possibilities before proving estimate. Funding requested 11/23/15. PO issued for existing boiler repair (through Phyiscal Plant, not project). Williams 5124 Sponsor Awaiting Funding 319099- Trask Coliseum - Renovations to Men's 945850 Basketball Locker Room Trask Coliseum - Replace Steam Boilers 5038 882000 319080- Trask Coliseum/Hanover Hall 945850 Sand/Repaint/Resurface Floors 12/31/15 $60.5K SPR received 5/8/15. Funding requested 5/21/15. Bob Williams met with sponsor. Funding will be available on 7/1/15. Preparing bid. Funding received 7/14/15. Work in progress. Hanover Hall work is complete. Trask work is complete other than drying time. Awaiting time from Athletics to complete small punch list items (likely December 2015). McCarley 5038 Proj Mgmt Construction R&R 416240 416240 Trask Coliseum - Sanitary Sewer Repairs 6/30/15 $100.0K SPR generated 4/10/14. R&R Funding established 4/9/14. Work is complete. McCarley 4815 Proj Mgmt Complete SP 11-159 882782 217206 Trask Coliseum - Theatrical Rigging System 6/30/15 $50.0K Special Project Authorization received 6/30/11. Scope of work being reconsidered. Morgan 4264 Proj Mgmt Scoping Estimating Page 19 of 21 PROJECT MANAGEMENT PROJECT REPORT January 12, 2016 R&R 414210 414210 Trask Coliseum - Upgrade Fire Alarm System (Design) 6/30/15 $282.7K SPR received 4/5/13. Estimate and funding request forwarded to project sponsor on 4/5/13. R&R funding received. Analysis and design is underway. McCarley 4595 Proj Mgmt Design SP 14-110 883195 318500- University Apartments - Replace 945850 Flooring 8/15/15 $38.0K SPR received 3/19/14. Funding requested 3/31/14. Funding received 4/13/14. PO has been awarded for material test in one unit. Work to be accomplished during summer break. Buildings A and B have been awarded. Building C is complete. Current scope is complete. McCarley 4800 Proj Mgmt Complete 5083 882000 318500- University Apartments - Replace 945850 Exterior Stair and Landing Lights 11/30/15 $9.0K SPR received 7/31/15. Funding requested 8/3/15. Funding received 9/23/15. Work is complete. Closeout is underway. Seifert 5053 Fac Admin Closeout Guinn 5137 Sponsor Awaiting Funding University Apartments - Replace Flooring T.B.D. #3.0K each SPR received 10/8/15. Funding requested apt 10/22/15. University Apartments - Replace Interior Doors and Frames T.B.D. $4.8K SPR received 10/8/15. Funding requested 10/22/15. Blume 5134 Sponsor Awaiting Funding University Apartments - Roof Condition Assessment T.B.D. $21.0K SPR received 2/27/15. Funding requested 3/4/15. Blume 4994 Sponsor Awaiting Funding SP 14-103 883186 218041- University Police - Design Facility 18014G- Upgrades 945850 3/31/15 $75.0K SPR received 2/18/14. Funding requested 3/18/14. Funding received 4/7/14. Design contract has been awarded. Design is complete. McCarley 4777 Proj Mgmt Complete 4968 18015A 18015A- University Police - Fire Alarm Head End 945860 6/30/15 $50.0K SPR developed and work funded 1/16/15. Design contract awarded. Morgan 4968 ACSvcs Scoping Estimating 5100 882000 218041- University Police - Install Fence 945966 2/1/16 $10.3K SPR received 8/28/15. Funding requested 11/16/15. Funding received 12/18/15. Guinn 5100 Proj Mgmt Procurement Wagoner CEP - Cooling Tower MakeUp Water Redesign 3-18300 Wagoner Hall - Chiller - Repair/Replace T.B.D. T.B.D. Williams 5107 Proj Mgmt 12/31/11 $125.0K SPR received 9/15/15. Awaiting approval from designer before estimate. Work complete. Closeout underway. Morgan 3146 ACSvcs Scoping Estimating Closeout SP 06-078 882121 Page 20 of 21 PROJECT MANAGEMENT PROJECT REPORT CI 10-006 5105 412101 882000 Wagoner Hall - Renovation/Expansion 7/31/12 $3.5M Work is complete. PueGilchrist 3916 ACSvcs Closeout Wagoner Hall - Renovations to Madeline Suite T.B.D. T.B.D. SPR received 12/5/14. Authority requested from GA. Morgan 4956 ACSvcs Scoping Estimating $31.6K SPR received 9/4/15. Funding requested 9/14/15. Funding received 10/7/15. PO issued, delivery expected in early December. Work to start December 14. Work completed 12/23/15. Williams 5105 Proj Mgmt Complete T.B.D. T.B.D. SPR generated 11/25/14. Designer generating concept designs. Morgan 4947 ACSvcs Scoping Estimating 11/30/14 Design Only $25.0K SPR generated 6/16/14. Funding requested 6/16/14. Funding received 7/2/14. Preliminary design is under review. Coordination meeting conducted on 8/19/14. Project presented to design review committee 10/7/14. Design revisions have been completed. Funding for construction has been requested. Lighting package paid for out of PM 4617, Cahill Curb and Gutter. Lighting phase in progress. Lighting Phase I is complete. McCarley 4872 Sponsor Complete (Phase I) T.B.D. T.B.D. Williams 5111 Proj Mgmt 4/5/12 $794.0K SPR received 9/15/15. Awaiting initial estimate from contractor. Work complete. Seifert 3637 ACSvcs Scoping Estimating Complete T.B.D. Aramark SPR received 12/5/14. Met with sponsor 3/18/15. Design in progress. Funded by Aramark. Approvals in progress. SCO approval received 5/8/15. Work in progress. Work is partially complete. Dishroom work in progress. Work is now complete. McCarley 4955 Proj Mgmt Complete 1/31/16 $110.0K SPR received 9/16/14. Funding requested 9/16/14. Funding received 10/7/14. Initial design is complete. Fee proposal has been requested for additional design effort. Seifert 4901 Proj Mgmt Design 318300- Wagoner Hall - Replace Walk-In Freezer 12/23/15 945866 Walton Drive - Feasibility Study SP 15-004 883237 443590 Walton Drive - Install Traffic Signal at Chancellors Walk Crossing Warehouse - Replace All HVAC Package Units Warwick Center - East Side Interior Renovation Aramark Aramark Warwick Center - Renovations to Dubs SP 15-018 882000 January 12, 2016 217112- Water Tower - Structural Repairs 945966 Page 21 of 21