Wisconsin Lakes Convention Coordinating and Evaluating a Successful AIS Control Project March 31, 2010 Tim Hoyman & Eddie Heath Presentation Outline • AIS Monitoring & Treatment Planning • Not for nuisance control projects • Intended for ecosystem restoration • Example Case Studies • Eagle River Chain of Lakes, Vilas County • Mt. Morris Lake, Waushara County Onterra , Lake Management Planning EWM: mid July – mid Sept. CLP: mid June – early July Peak Biomass Survey Treatment Results: Decreased density Decreased area Treatment Occurs Verify & refine treatment areas Onterra , Lake Management Planning Annual Assessments: Qualitative - Density ratings Quantitative - Point-intercept sub-sampling Annual Monitoring & Treatment Cycle Spring Pretreatment Survey Tune treatment strategy Create Treatment Strategy Treatment area creation & obtain conditional permit Eagle River Chain of Lakes Project Overview • Completion of Lake Management Planning activities during 2007 • 3-year control plan of EWM using herbicides (2008-2010) • Volunteer EWM Surveys • Pre- & post treatment monitoring Onterra LLC Lake Management Planning , Volunteer EWM Surveys • Initial training by Onterra staff – 2007 • Identification • GPS & note taking • Data transfer • Refresher course – 2008 Onterra LLC Lake Management Planning , Volunteer EWM Surveys • Divide responsibility, mark EWM occurrences on chain • Onterra visits locations and accurately maps areas to set up treatments Eagle River Chain 10 Lakes, 2 River Sections 62 miles of Shoreline 3,500 acres Onterra LLC Lake Management Planning , 2007 EWM Peak Biomass Survey 2008 EWM Peak Biomass Survey 2008 EWM Peak Biomass Survey 2009 Treatment Areas 2008 EWM Peak Biomass Survey 2009 Treatment Areas 2009 Treatment Areas 2009 EWM Peak Biomass Survey Summer 2008 EWM Surveys Summer 2009 EWM Surveys Acres of EWM by Density Rating 160.0 143 140.0 2008 Acres (Total: 270) 2009 Acres (Total: 263) 120.0 99 100.0 80.0 72 74 60 60.0 40.0 31 24 17 20.0 13 0 0.0 Highly Scattered Scattered Dominant Highly Dominant Surface Matting All (N=774) Yellow Birch (N=115) Watersmeet (N=165) Voyageur (N=4) Scattering Rice (N=177) Otter (N=21) Lynx (N=14) Post-treatment 08/09 Eagle (N=42) Duck (N=16) Cranberry (N=134) Catfish (N=86) EWM Percent Occurrence in Point-intercept Locations 100.0 EWM Occurrence in Point-intercept Locations Pre-treatment 08/08 Faded Bars are not Statistically Significant (p<0.05) 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 Wild celery Water stargrass Vasey's pondweed Variable pondweed Stoneworts Small pondweed Slender naiad Ribbon-leaf pondweed Pickerelweed Lesser duckweed Leafy pondweed Large-leaf pondweed Illinois pondweed Fries' pondweed Forked duckweed Floating-leaf bur-reed Flat-stem pondweed Fern pondweed Common waterweed Dicots Common bur-reed Clasping-leaf pondweed White water lily Watershield Water marigold Spatterdock Northern water milfoil Coontail Common bladderwort Change in Percent Frequency 30 EWM Occurrence in Point-intercept Locations 25 Statistically Signif icant (p < 0.05) 20 Not Statistically Signif icant ( p > 0.05) 15 10 5 0 -5 -10 -15 -20 -25 Monocots and Macroalgae -30 ERC Control Project Results Through 2009 Treatment Monitoring (2009) • 65% decline in EWM occurrence (46.0% in 2008 to 16.3% in 2009) • Similar acreage of EWM mapped, but shift towards reduced density Volunteer Data • Most areas of chain were surveyed • Data was very good and timely Other ULERCLC Efforts • Hand Removal • Vilas County website • CBCW volunteer coordinator Onterra LLC Lake Management Planning , Mt. Morris Lake Project Overview • Completion of Lake Management Planning activities during winter 2005-06 • 4-year control plan of CLP using herbicides (2006-2009) • Pre- & Post Treatment Monitoring • Point-intercept sub-sampling • Dredge sampling for turions Onterra LLC Lake Management Planning , Curly-leaf Pondweed Life Cycle Onterra LLC Lake Management Planning , 2006 Original Treatment Plan 2006 Original Treatment Plan 2006 Modified Treatment Plan 31.6 Acres 2007 Treatment Plan 27.1 Acres 2008 Treatment Plan 28.6 Acres 2009 Treatment Plan 28.6 Acres Monitoring Program Point-intercept sub-sampling • Collected previous to herbicide application (April-May) • Compare to following spring Onterra LLC Lake Management Planning , Curly-leaf Pondweed Occurrence 70% CLP Percent Occurrence in Point-Intercept Locations 60% 50% 40% 30% 20% 10% 0% Onterra LLC Lake Management Planning , Curly-leaf Pondweed Occurrence 70% 60% CLP Percent Occurrence in Point-Intercept Locations 56.8% 50% 40% 30% 20% 10% 0% 2006 (N=118) Onterra LLC Lake Management Planning , Curly-leaf Pondweed Occurrence 70% 60% CLP Percent Occurrence in Point-Intercept Locations 56.8% 50% 40% 36.4% Significant Decrease 30% 20% 10% 0% 2006 (N=118) Onterra LLC Lake Management Planning , 2007 (N=118) Curly-leaf Pondweed Occurrence 70% 60% CLP Percent Occurrence in Point-Intercept Locations 56.8% 50% 40% 36.4% Significant Decrease 30% 20% 16.1% Significant Decrease 10% 0% 2006 (N=118) Onterra LLC Lake Management Planning , 2007 (N=118) 2008 (N=118) Curly-leaf Pondweed Occurrence 70% Significant Decrease 60% CLP Percent Occurrence in Point-Intercept Locations 56.8% 50% 40% 36.4% Significant Decrease 30% 20% 16.1% Significant Decrease 10% Significant Decrease 4.2% 0% 2006 (N=118) Onterra LLC Lake Management Planning , 2007 (N=118) 2008 (N=118) 2009 (N=118) Monitoring Program Dredge sampling for turions • Following treatment (summer) using same sampling locations • Compare to following summer Onterra LLC Lake Management Planning , Curly-leaf Turion Sampling 30.0 25.0 Turion % Prevalence 20.0 15.0 Year 2006 2007 2008 2009 10.0 5.0 Total 102 135 116 66 % Prevalence 25.0 23.2 22.9 16.9 Average 0.9 1.2 1.0 0.6 Range 1-14 1-23 1-21 1-18 0.0 2006 Onterra LLC Lake Management Planning , 2007 2008 2009 Mt. Morris Control Project Results Point-intercept sub-sampling • 65% decline in CLP occurrence (58.6% in 2006 to 4.2% in 2009) Turion dredge sampling • Reductions observed in 2009 • Limitations of technique? Update Lake Management Plan • Successfully received WDNR Lake Planning Grants during February 2010 cycle • Replicate 2006 surveys for comparisons Onterra LLC Lake Management Planning , Tim Hoyman & Eddie Heath – Onterra, LLC