General Contractor: Power Construction Company,LLC Subcontractor: PROJECT SPECIFIC AGREEMENT Project: Mr. David's Flooring International, LLC Power Job No. COD Homeland Security Training Cente 52820 865 West Irving Park Road Date: Itasca, IL 60143 Telephone: 847/250-4600 SEP-18-2015 General Description of the Work: 847/250-4600 Contact Person: Brian Goth Fax: MASTER TERMS Carpet, Resilient Flooring and The terms and conditions of the Master Subcontract Agreement dated MAR-13-2014 between Contractor and Subcontractor shall govern this Project Specific Agreement and are fully incorporated herein by reference. Subcontractor shall perform the work required by this Project Specific Agreement in accordance with the following: 1. BASIC INFORMATION Project: COD Homeland Security Training Center Job Site Address: 425 Fawell Boulevard, Glen Ellyn, IL Owner: College of DuPage Architect (or engineer): Legat Architects General Contract Date: APR-18-2014 Anticipated Project Start Date: AUG-14-2014 Anticipated Project Substantial Completion Date: AUG-05-2015 $105,331.00 2. CONTRACT SUM: 3. THE WORK - See Exhibit A attached. 4. CONTRACT DOCUMENTS - See Exhibit B attached. 5. INSURANCE REQUIREMENTS - See Exhibit C attached. 6. ADDITIONAL PROVISIONS - See Exhibit D attached. The parties acknowledge and agree that (i) from time to time the parties may execute by way of electronic signature, (ii) such electronic signatures are sufficient to bind the party who purports to so executes by way of electronic signature, and (iii) each party shall be entitled to rely on the electronic signature of the other party. Mr. David's Flooring International, LLC Power Construction Company,LLC Subcontractor General Contractor {{ Brian {{ Mary Groth*_es_:signer1:signature}} {{Account Executive *_es_:signer1:title}} Document Integrity Verified *_es_:signer2:signature}} Ann Lukowicz {{Project Executive *_es_:signer2:title}} EchoSign Transaction Number: XFCTT6E3V4WXV3A Subcontract Agreement between Power Construction Company, LLC and Mr. David’s Flooring International, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT A THE WORK The following is a general description of Subcontractor's Work. Also included is a list of certain portions of the Contract Documents that bear upon the performance of Subcontractor’s Work; provided, however, that such list is included solely for the convenience of Subcontractor and is not necessarily comprehensive. Other portions of the Contract Documents also may bear upon the performance of Subcontractor’s Work, and therefore, Subcontractor is responsible to independently review all Contract Documents for applicability to Subcontractor’s Work. Subcontractor is responsible to perform all Subcontractor’s Work required by the Contract Documents, and all other work reasonably inferable from the Contract Documents as necessary to produce the results intended, regardless of whether expressly set forth in the following description; provided, however, that Subcontractor is not required to perform items specifically identified below as excluded from Subcontractor’s Work. SPECIFICATION SECTION: Division 00 Division 01 03 30 00 03 54 00 09 05 61 09 65 00 09 68 13 TITLE: Bidding and Contract Requirements General Requirements Cast-in-Place Concrete Cast Underlayment (as applicable) Common Work Results for Flooring Preparation Resilient Flooring and Accessories Carpet Tile Inclusions: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Weekly Certified Payroll is required. All carpet, resilient and rubber flooring including all rubber base. Rubber tile Rubber stair treads and risers Provide moisture mitigation for all rubber tile areas Resilient base Resilient edge strips at unprotected or exposed edges Carpet tile Provide high moisture adhesive at carpet tile Scribe, cut, and fit materials to all permanent fixtures on or penetrating the floor surface. Subcontractor is responsible for proper installation at concrete expansion and control joints Transition strips and thresholds to like or unlike materials. Contractor to provide all ramping required for acceptable installation tolerances. Caulking of this contractors work as required and to all adjacent contractors work. Coordinate setting of floor drains. Protect adjacent contractors work. Perform moisture tests and ensure content in slabs is at or below manufacturer’s recommendations. Contractor will notify the CM in writing in the event that any concrete slab is above the allowable threshold as required by the manufacturer and contract documents. Provide and install all required floor preparation as required per manufacturer’s requirements and contract documents.” Contractor to include broom cleaning and scraping of floor area prior to installation. Subcontractor is responsible for review of condition prior to placement of carpet. Initiation of installation indicates acceptability of flooring substrate Mock-up may be incorporated into final construction Upon completion of work, this subcontractor will provide protection of installed materials by placing protective plastic over the flooring materials not covered above. 1 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A Subcontract Agreement between Power Construction Company, LLC and Mr. David’s Flooring International, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT A THE WORK 22. Include floor leveling of 1” for the scope of this work. Any unused leveling per this note will be credited back to the Owner per the unit price value. The scope is to be reviewed and approved by Power Construction prior to installation. 23. Performance Bond and Labor and Material Payment Bond in accordance with Article 10 of the Master Agreement between Contractor and Subcontractor. Exclusions: 1. 2. Ceramic tile. Taxes in accordance with the Illinois Department of Revenue letter referenced in Exhibit D. Schedule: Subcontractor acknowledges and agrees that time is of the essence in completing the Work. Work to be performed in accordance with the project schedule as developed and updated by the General Contractor. This contractor to meet or reduce schedule durations in contract documents. Mr. David’s Flooring International, LLC Power Construction Company, LLC {{ Brian Groth*_es_:signer1:signature}} {{ *_es_:signer2:signature}} Mary Ann Lukowicz 2 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A Subcontract Agreement between Power Construction Company, LLC and Mr. David’s Flooring International, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT B CONTRACT DOCUMENTS DRAWING INDEX SHEET TITLE DATE G-001 G-002 C-100 C-200 C-201 C-202 C-203 C-300 C-400 C-500 C-501 C-502 C-600 S-000 S-101A S-101B S-102A S-102B S-200 S-201 S-300 S-400 S-401 A-000 A-101A A-101B AC-101A AC-101B AF-101A AF-101B AR-100 A-200 A-210 A-211 A-212 A-213 A-300 A-310 A-311 A-312 A-400 A-410 A-500 A-501 A-502 A-510 A-520 A-600 A-610 A-900 TITLE SHEET CONSTRUCTION OPERATIONS PLAN EXISTING CONDITIONS SITE PREPARATION PLAN EROSION CONTROL PLAN EROSION CONTROL DETAILS EROSION CONTROL NOTES LAYOUT & MATERIALS PLAN GRADING PLAN STORM DRAINAGE PLAN UTILITY PLAN UTILITY DETAILS SITE DETAILS GENERAL NOTES BASEMENT PLAN AND FIRST FLOOR PLAN – MODULE A FIRST FLOOR PLAN – MODULE B ROOF PLAN – MODULE A AND WIND GIRT PLAN ROOF PLAN – MODULE B FOUNDATION DETAILS FOUNDATION DETAILS PRECAST DETAILS STEEL DETAILS STEEL DETAILS CODE INFORMATION BASEMENT AND FIRST FLOOR PLAN – MODULE A FIRST FLOOR PLAN – MODULE B BASEMENT AND FIRST FLOOR REFLECTED CEILING PLAN – MODULE A FIRST FLOOR REFLECTED CEILING PLAN – MODULE B BASEMENT AND FIRST FLOOR FINISH PLAN – MODULE A FIRST FLOOR FINISH PLAN – MODULE B ROOF PLAN BUILDING ELEVATIONS ENLARGED FLOOR PLAN, EXTERIOR AND INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS BUILDING SECTIONS WALL SECTIONS WALL SECTIONS WALL SECTIONS ENLARGED PLANS TOILET PLAN, ELEVATIONS, MOUNTING HEIGHTS STAIR PLANS AND SECTIONS DETAILS DETAILS DETAILS PRECAST DETAILS TYPICAL ROOF DETAILS DOOR SCHEDULE AND TYPES, PARTITION TYPES, MOUNTING HEIGHTS GLAZING ELEVATIONS PERSPECTIVES 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 3 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A Subcontract Agreement between Power Construction Company, LLC and Mr. David’s Flooring International, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT B CONTRACT DOCUMENTS SPECIFICATION INDEX SPEC SECTION DESCRIPTION DATE DIV. 00 DIV. 01 02 10 00 02 41 00 03 10 00 03 20 00 03 30 00 03 35 11 03 54 00 04 05 11 04 20 02 05 40 00 06 10 00 06 20 00 06 25 00 06 64 00 07 14 00 07 21 19 07 42 13 07 42 64 07 42 65 07 54 00 07 62 00 07 72 00 07 84 00 07 90 05 08 11 13 08 14 16 08 31 00 08 33 26 08 38 00 08 42 30 08 43 13 08 44 13 08 56 54 08 65 30 08 71 00 08 80 00 08 91 00 09 06 61 09 21 16 09 30 00 09 51 00 09 65 00 09 68 13 09 84 00 09 90 00 10 11 01 10 21 13 10 22 13 10 22 26.33 10 26 01 ALL SECTIONS ALL SECTIONS TREE AND PLANT PROTECTION DEMOLITION CONCRETE FORMING AND ACCESSORIES CONCRETE REINFORCING CAST-IN-PLACE CONCRETE CONCRETE FLOOR FINISHES CAST UNDERLAYMENT MASONRY MORTARING AND GROUTING SINGLE WYTHE UNIT MASONRY COLD-FORMED METAL FRAMING ROUGH CARPENTRY FINISH CARPENTRY PREFINISHED BAMBOO VENEER PANELING CUSTOM CABINETS FLUID-APPLIED WATERPROOFING FOAMED-IN-PLACE INSULATION METAL WALL PANELS METAL COMPOSITE MATERIAL WALL PANELS THERMAL AND AIR BARRIER WALL SYSTEM THERMOPLASTIC MEMBRANE ROOFING – FULLY ADHERED SHEET METAL FLASHING AND TRIM ROOF ACCESSORIES FIRESTOPPING JOINT SEALERS STEEL DOORS AND FRAMES FLUSH WOOD DOORS ACCESS DOORS AND PANELS SIDE FOLDING GRILLES SOUND CONTROL/BULLET RESISTANT DOORS AUTOMATIC DOOR OPERATORS ALUMINUM-FRAMED STOREFRONTS GLAZED ALUMINUM CUTRAIN WALLS SECURITY AND DETENTION WINDOWS VERTICAL LIFT ACOUSTICAL DOORS DOOR HARDWARE GLAZING LOUVERS COMMON WORK RESULTS FOR FLOORING PREPARATION GYSPUM BOARD ASSEMBLIES TILING ACOUSTICAL CEILINGS RESILIENT FLOORING AND ACCESSORIES CARPET TILE ACOUSTIC ROOM COMPONENTS PAINTING AND COATING VISUAL DISPLAY BOARDS SOLID CORE REINFORCED COMPOSITE (SCRC) TOILET PARTITIONS WIRE MESH PARTITIONS OPERABLE PANEL PARTITIONS CORNER GUARDS AND WALL RUB STRIPS 4 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A Subcontract Agreement between Power Construction Company, LLC and Mr. David’s Flooring International, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT B CONTRACT DOCUMENTS 10 28 00 10 42 00 10 44 00 11 67 20 12 24 00 12 26 00 31 10 00 31 20 00 31 23 00 31 25 00 32 12 16 32 13 12 32 13 14 32 13 73 33 11 00 33 31 00 33 41 00 TOILET AND BATH ACCESSORIES EMERGENCY AID SPECIALTIES FIRE EXTINGUISHERS, CABINETS AND ACCESSORIES FIRING RANGE EQUIPMENT WINDOW SHADE SYSTEM COUNTERTOPS SITE PREPARATION EARTH MOVING FOUNDATION EXCAVATING AND BACKFILLING EROSION AND SEDIMENT CONTROLS ASPHALT PAVING CAST-IN-PLACE CONCRETE (SITE) CONCRETE CURBS SITE JOINT SEALANTS SITE WATER UTILITY DISTRIBUTION PIPING & FITTINGS SANITARY SEWERS STORM DRAINAGE PIPING OTHER DOCUMENTS TITLE DATE ADDENDUM NUMBER 1 BID RELEASE NUMBER 3 C-500 – STORM DRAINAGE PLAN SKETCH A-SK02 – CEILING DETAIL SKETCH A-SK03 – PARTIAL ROOF PLAN 06/27/2014 06/27/2014 06/27/2014 06/27/2014 Mr. David’s Flooring International, LLC Power Construction Company, LLC {{ Brian Groth*_es_:signer1:signature}} {{ *_es_:signer2:signature}} Mary Ann Lukowicz 5 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A Subcontract Agreement between Power Construction Company, LLC and Mr. David’s Flooring International, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT C INSURANCE REQUIREMENTS Adequate Certificates of Insurance, with additional insured endorsements attached, in carriers having an A.M. Best rating of A-/VII or better and licensed to do business in the State of Illinois, shall be filed with General Contractor before commencement of Subcontractor’s Work. Fax transmissions of such certificates should be sent to General Contractor at 847-214-6044. General Contractor acknowledges that Subcontractor has provided a Blanket Certificate of Insurance for all work performed under written agreement. The following requirements are for documentation purposes only. However, Subcontractor's Blanket Certificate of Insurance must be current and in compliance throughout the duration of project and in accordance with Contract Documents. If at any time Subcontractor's Blanket Certificate of Insurance becomes non-compliant, it is agreed that Subcontractor will immediately provide a project specific Certificate of Insurance in accordance with the requirements described below. Name of Certificate Holder: Power Construction Company, LLC 8750 W. Bryn Mawr Ave., Suite 500 Chicago, IL 60631 Project Description: COD Homeland Security Training Center including “miscellaneous Work at same location” 425 Fawell Blvd Glen Ellyn, IL 60137 A. Commercial General Liability - Including coverage for Premises-Operations, Independent Contractors’ liability, Products and Completed Operations, Contractual Liability, Personal Injury, and Broad Form Property Damage (including coverage for Explosion, Collapse, and Underground hazards) with limits not less than the following: Each Occurrence $ 1,000,000 General Aggregate per Project $ 2,000,000 Per Project or Per Location Aggregate $ 2,000,000 Personal and Advertising Injury: $ 1,000,000 Products - Completed Operations Aggregate $ 2,000,000 Completed Operations insurance maintained for a minimum period of two (2) years after Substantial Completion. Such Policy shall include a Blanket Additional Insured listed herein with a Blanket Waiver of Subrogation in favor of Additional Insured’s. B. Auto Liability - Single limit bodily injury and property damage combined for owned, non-owned, and leased vehicles with a limit not less than the following: Each Occurrence: $ 1,000,000 C. Excess Umbrella Liability - Combined single limit bodily injury and property damage with a limit not less than the following: Each Occurrence $ 5,000,000 General Aggregate $ 5,000,000 Such Policy shall include a “Broad as Primary Endorsement” or “Follow Form Endorsement”. D. Worker’s Compensation - In accordance with the laws of the State of Illinois including Employer’s Liability insurance with a limit not less than the following: Bodily Injury by Accident $ 500,000 each accident Bodily Injury by Disease $ 500,000 policy limit Bodily Injury by Disease $ 500,000 each employee 6 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A Subcontract Agreement between Power Construction Company, LLC and Mr. David’s Flooring International, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT C INSURANCE REQUIREMENTS Such Policy shall include a Blanket Waiver of Subrogation for those agreed to by written contract. E. Contractors’ Equipment Floater – Subcontractor shall maintain Contractors’ Equipment Floater Insurance for owned or leased equipment and tools under its care, custody and control as required for the performance of Subcontractor’s duties. ADDITIONAL INSURED Commercial General Liability and Excess Umbrella Liability policies described above shall include the following as additional insured’s, including their officers, directors, and employees (the spelling of these parties must be exactly correct): Power Construction Company LLC (General Contractor) Power Contracting and Engineering Corp. (General Contractor) Power Construction Company (General Contractor) College of DuPage, its board of trustees/regents, employees, agents, and volunteers (Owner) Legat Architects (Architect) KJWW Engineering (Structural Engineer) SmithGroup JJR (Civil Engineer) AMSCO Engineering, Inc (MEP Engineering) MWL Architects (Public Safety Consultant) Stan Roller and Associates (Acoustical Engineer) Brubaker Design (Design Consultant) And any additional to be added The underlying coverage afforded to the additional insured under these policies shall be primary and noncontributory insurance. If the additional insured has other insurance that is applicable to the loss, such other insurance shall be in excess to the Subcontractor’s insurance. The amount of the subcontractor’s liability under this policy shall not be reduced by the existence of such other insurance. A Blanket Additional Insured Endorsement shall be provided so that the coverage afforded to the additional insured’s shall apply to “Ongoing Operations” and “Completed Operations-Hazards.” It is further agreed that the coverage afforded to the additional insured shall not apply to the sole negligence of the additional insured’s. Cancellation Clause: 30 days written notice. Failure to provide the projects insurance shall not relieve the Subcontractor of any liability it may have under this Agreement or at law. Mr. David’s Flooring International, LLC Power Construction Company, LLC {{ Brian Groth*_es_:signer1:signature}} {{ Mary Ann Lukowicz *_es_:signer2:signature}} 7 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A Subcontract Agreement between Power Construction Company, LLC and Mr. David’s Flooring International, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT D ADDITIONAL PROVISIONS 1. Safety: Strict compliance with all OSHA requirements and additional safety requirements as described in the General Contractor’s Subcontractor Site Safety Requirements and Procedures manual located at http://www.powerconstruction.net/safety_req.html are made part of this Agreement. Strict compliance with all Quality requirements specified in the Contract Documents and further described in the General Contractor’s Quality Guidelines located at http://www.powerconstruction.net/businesspartners/pdf/PowerQualityGuidelines.pdf are made a part of this Agreement. 2. Unit Prices: The following unit prices include all necessary labor, materials, insurance, overhead and profit, and payment and performance bonds. Furnish and install CPT-1 $4.108 /SF Furnish and install CPT-10 $3.639 /SF Furnish and install RT-1 $8.991 /SF Furnish and install rubber base $2.122 /LF Furnish and install moisture barrier adhesive including all preparation required $ 5.00/SF Furnish and install floor leveling compound including all preparation required $2.00 3. /SF Hourly Rates: The following hourly rates include all necessary labor, insurance, overhead and profit, and payment and performance bonds. Subcontractor acknolwedges that the hourly wage rates are subject to audit and subsequent modification if necessary to comply with the General Contract. All hourly rates to be submitted for review and approval by COD auditor. 4. Alternates: Not Applicable 5. Submittals: Subcontractor acknowledges that all submittals other than samples for this Project shall be submitted in electronic format as Adobe Acrobat (.pdf) files and that these files shall be generated directly from the originating software. Subcontractor understands that this is a requirement and condition of this Agreement. Subcontractor shall submit files which are more than 5MB by uploading them to the website or ftp site established for this Project. Subcontractor can submit files which are less than 5MB either through e-mail or uploading them to the website or ftp site established for this Project. Consult General Contractor for instructions or questions regarding uploading submittal files. Subcontractor shall separately submit hard copies of submittals, if any, requiring a signature or a seal stamp. In addition, Subcontractor shall provide hard copies of any other submittals requested by General Contractor. 8 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A Subcontract Agreement between Power Construction Company, LLC and Mr. David’s Flooring International, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT D ADDITIONAL PROVISIONS Shop drawing submittals shall be properly identified and referenced in accordance with the Contract Documents. Product data submittals for each construction system shall be collected into a single submittal. Three (3) product samples shall be submitted for each required sample submittal. a. b. c. d. e. Name or trade designation. Quality or grade, and further designation to identify the item or material. Applicable specification section and/or drawing number. Name of manufacturer or producer. Name of General Contractor, Subcontractor and Project. Subcontractor shall transmit to General Contractor submittals to permit adequate time for review and, if necessary, re-submittal in order to avoid any delay to construction progress due to late or untimely submittals. 6. Change Order Overhead and Profit: Maximum allowable percentages for overhead and profit are limited to 10% for overhead and 0% for profit with no additional markup allowed for bond premiums (unless said additional markup for bond premiums is specifically allowed by the General Contract, and General Contractor received payment for same). For work performed by Sub-Subcontractors, markup shall be limited to 0%. 7. Additional Exhibits: Illinois Department of Revenue Letter dated January 15, 2010 (1 page) Labor Rate Sheet (1 page) COD Bond Forms (4 pages) Billing Instructions (1 page) 8. Sales Tax Exemption: E9997-3391-06 9. Payment and Performance Bonds: Subcontractor shall provide and pay for a Performance Bond and a Labor and Material Payment Bond. In addition, subcontractor shall provide a Multiple Obligee Rider. 10. Contract Sum Calculation: The Contract Sum was calculated as follows: Description of Work Base Bid Qty Cost 1 LS $ 105,331 The above contract sum calculation is to be used only for accounting purposes and not for any other purpose. Mr. David’s Flooring International, LLC Power Construction Company, LLC {{ Brian Groth*_es_:signer1:signature}} {{ *_es_:signer2:signature}} Mary Ann Lukowicz 9 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A 10 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A 11 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A 12 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A 13 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A 14 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A 15 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A 16 Document Integrity Verified EchoSign Transaction Number: XFCTT6E3V4WXV3A