General Contractor: Power Construction Company,LLC Subcontractor: Project: Certified Construction Services, LLC 6415 N. Caldwell Avenue Chicago, IL COD Homeland Security Training Center 52820 SEP-15-2014 General Description of the Work: 773/792-0879 Contact Person: Power Job No. Date: 60646-2713 Telephone: 773/792-1377 Fax: PROJECT SPECIFIC AGREEMENT Project Layout Byron Gremley MASTER TERMS The terms and conditions of the Master Subcontract Agreement dated FEB-22-2005 between Contractor and Subcontractor shall govern this Project Specific Agreement and are fully incorporated herein by reference. Subcontractor shall perform the work required by this Project Specific Agreement in accordance with the following: 1. BASIC INFORMATION Project: COD Homeland Security Training Center Job Site Address: Owner: 425 Fawell Boulevard, Glen Ellyn, IL College of DuPage Architect (or engineer): Legat Architects General Contract Date: APR-18-2014 Anticipated Project Start Date: AUG-14-2014 Anticipated Project Substantial Completion Date: AUG-05-2015 2. CONTRACT SUM: $20,000.00 3. THE WORK - See Exhibit A attached. 4. CONTRACT DOCUMENTS - See Exhibit B attached. 5. INSURANCE REQUIREMENTS - See Exhibit C attached. 6. ADDITIONAL PROVISIONS - See Exhibit D attached. The parties acknowledge and agree that (i) from time to time the parties may execute by way of electronic signature, (ii) such electronic signatures are sufficient to bind the party who purports to so executes by way of electronic signature, and (iii) each party shall be entitled to rely on the electronic signature of the other party. Certified Construction Services, LLC Power Construction Company,LLC Subcontractor General Contractor {{ byron {{ Mary gremley*_es_:signer1:signature}} {{Byron Gremley*_es_:signer1:title}} Document Integrity Verified *_es_:signer2:signature}} Ann Lukowicz {{Project Executive *_es_:signer2:title}} EchoSign Transaction Number: XE7IVHG5C3E7L3C Subcontract Agreement between Power Construction Company, LLC and Certified Construction Services, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT A THE WORK The following is a general description of Subcontractor's Work. Also included is a list of certain portions of the Contract Documents that bear upon the performance of Subcontractor’s Work; provided, however, that such list is included solely for the convenience of Subcontractor and is not necessarily comprehensive. Other portions of the Contract Documents also may bear upon the performance of Subcontractor’s Work, and therefore, Subcontractor is responsible to independently review all Contract Documents for applicability to Subcontractor’s Work. Subcontractor is responsible to perform all Subcontractor’s Work required by the Contract Documents, and all other work reasonably inferable from the Contract Documents as necessary to produce the results intended, regardless of whether expressly set forth in the following description; provided, however, that Subcontractor is not required to perform items specifically identified below as excluded from Subcontractor’s Work. SPECIFICATION SECTION: Division 00 Division 01 TITLE: All Sections All Sections Inclusions: 1. 2. 3. 4. 5. 6. 7. 8. 9. Weekly Certified Payroll is required. Check Given boundary lines and Control Points Provide North/South and East/West control lines and benchmarks outside the Project Site on hardscape using crosses only NO Paint Provide North/South and East/West control lines and benchmarks staked inside the site include one refresh of these stakes Provide Stakes for the building footprint at the 4 corners of the building and the basement Before Excavation, give an as built of Existing Grade Elevations at these locations. Provide control lines at (1) locations east-west and (1) locations north-south within the building on each floor (Basement, Core First Floor, Range, North Classroom area) Provide benchmark within the building footprint on each floor area(Basement, Core First Floor, Range, North Classroom area) Trade contractor is to include all escalation and associated costs through the completion of the project in August 2015. Performance Bond and Labor and Material Payment Bond in accordance with Article 10 of the Master Agreement between Contractor and Subcontractor. Exclusions: 1. Taxes in accordance with the Illinois Department of Revenue letter referenced in Exhibit D. Schedule: Subcontractor acknowledges and agrees that time is of the essence in completing the Work. Work to be performed in accordance with the project schedule as developed and updated by the General Contractor. 1 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C Subcontract Agreement between Power Construction Company, LLC and Certified Construction Services, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT A THE WORK Certified Construction Services, LLC Power Construction Company, LLC {{ byron gremley*_es_:signer1:signature}} {{ *_es_:signer2:signature}} Mary Ann Lukowicz 2 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C Subcontract Agreement between Power Construction Company, LLC and Certified Construction Services, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT B CONTRACT DOCUMENTS DRAWING INDEX SHEET TITLE DATE G-001 G-002 C-100 C-200 C-201 C-202 C-203 C-300 C-400 C-500 C-501 C-502 C-600 S-000 S-101A S-101B S-102A S-102B S-200 S-201 S-300 S-400 S-401 A-000 A-101A A-101B AC-101A AC-101B AF-101A AF-101B AR-100 A-200 A-210 A-211 A-212 A-213 A-300 A-310 A-311 A-312 A-400 A-410 A-500 A-501 A-502 A-510 A-520 A-600 A-610 A-900 TITLE SHEET CONSTRUCTION OPERATIONS PLAN EXISTING CONDITIONS SITE PREPARATION PLAN EROSION CONTROL PLAN EROSION CONTROL DETAILS EROSION CONTROL NOTES LAYOUT & MATERIALS PLAN GRADING PLAN STORM DRAINAGE PLAN UTILITY PLAN UTILITY DETAILS SITE DETAILS GENERAL NOTES BASEMENT PLAN AND FIRST FLOOR PLAN – MODULE A FIRST FLOOR PLAN – MODULE B ROOF PLAN – MODULE A AND WIND GIRT PLAN ROOF PLAN – MODULE B FOUNDATION DETAILS FOUNDATION DETAILS PRECAST DETAILS STEEL DETAILS STEEL DETAILS CODE INFORMATION BASEMENT AND FIRST FLOOR PLAN – MODULE A FIRST FLOOR PLAN – MODULE B BASEMENT AND FIRST FLOOR REFLECTED CEILING PLAN – MODULE A FIRST FLOOR REFLECTED CEILING PLAN – MODULE B BASEMENT AND FIRST FLOOR FINISH PLAN – MODULE A FIRST FLOOR FINISH PLAN – MODULE B ROOF PLAN BUILDING ELEVATIONS ENLARGED FLOOR PLAN, EXTERIOR AND INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS BUILDING SECTIONS WALL SECTIONS WALL SECTIONS WALL SECTIONS ENLARGED PLANS TOILET PLAN, ELEVATIONS, MOUNTING HEIGHTS STAIR PLANS AND SECTIONS DETAILS DETAILS DETAILS PRECAST DETAILS TYPICAL ROOF DETAILS DOOR SCHEDULE AND TYPES, PARTITION TYPES, MOUNTING HEIGHTS GLAZING ELEVATIONS PERSPECTIVES 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 06/11/2014 3 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C Subcontract Agreement between Power Construction Company, LLC and Certified Construction Services, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT B CONTRACT DOCUMENTS SPECIFICATION INDEX SPEC SECTION DESCRIPTION DIV. 00 DIV. 01 ALL SECTIONS ALL SECTIONS DATE OTHER DOCUMENTS TITLE DATE ADDENDUM NUMBER 1 BID RELEASE NUMBER 3 C-500 – STORM DRAINAGE PLAN 06/27/2014 06/27/2014 Certified Construction Services, LLC Power Construction Company, LLC {{ byron gremley*_es_:signer1:signature}} {{ *_es_:signer2:signature}} Mary Ann Lukowicz 4 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C Subcontract Agreement between Power Construction Company, LLC and Certified Construction Services, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT C INSURANCE REQUIREMENTS Adequate Certificates of Insurance, with additional insured endorsements attached, in carriers having an A.M. Best rating of A-/VII or better and licensed to do business in the State of Illinois, shall be filed with General Contractor before commencement of Subcontractor’s Work. Fax transmissions of such certificates should be sent to General Contractor at 847-214-6044. General Contractor acknowledges that Subcontractor has provided a Blanket Certificate of Insurance for all work performed under written agreement. The following requirements are for documentation purposes only. However, Subcontractor's Blanket Certificate of Insurance must be current and in compliance throughout the duration of project and in accordance with Contract Documents. If at any time Subcontractor's Blanket Certificate of Insurance becomes non-compliant, it is agreed that Subcontractor will immediately provide a project specific Certificate of Insurance in accordance with the requirements described below. Name of Certificate Holder: Power Construction Company, LLC 8750 W. Bryn Mawr Ave., Suite 500 Chicago, IL 60631 Project Description: COD Homeland Security Training Center including “miscellaneous Work at same location” 425 Fawell Blvd Glen Ellyn, IL 60137 A. Commercial General Liability - Including coverage for Premises-Operations, Independent Contractors’ liability, Products and Completed Operations, Contractual Liability, Personal Injury, and Broad Form Property Damage (including coverage for Explosion, Collapse, and Underground hazards) with limits not less than the following: Each Occurrence $ 1,000,000 General Aggregate per Project $ 2,000,000 Per Project or Per Location Aggregate $ 2,000,000 Personal and Advertising Injury: $ 1,000,000 Products - Completed Operations Aggregate $ 2,000,000 Completed Operations insurance maintained for a minimum period of two (2) years after Substantial Completion. Such Policy shall include a Blanket Additional Insured listed herein with a Blanket Waiver of Subrogation in favor of Additional Insured’s. B. Auto Liability - Single limit bodily injury and property damage combined for owned, non-owned, and leased vehicles with a limit not less than the following: Each Occurrence: $ 1,000,000 C. Excess Umbrella Liability - Combined single limit bodily injury and property damage with a limit not less than the following: Each Occurrence $ 5,000,000 General Aggregate $ 5,000,000 Such Policy shall include a “Broad as Primary Endorsement” or “Follow Form Endorsement”. D. Worker’s Compensation - In accordance with the laws of the State of Illinois including Employer’s Liability insurance with a limit not less than the following: Bodily Injury by Accident $ 500,000 each accident Bodily Injury by Disease $ 500,000 policy limit Bodily Injury by Disease $ 500,000 each employee 5 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C Subcontract Agreement between Power Construction Company, LLC and Certified Construction Services, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT C INSURANCE REQUIREMENTS Such Policy shall include a Blanket Waiver of Subrogation for those agreed to by written contract. E. Contractors’ Equipment Floater – Subcontractor shall maintain Contractors’ Equipment Floater Insurance for owned or leased equipment and tools under its care, custody and control as required for the performance of Subcontractor’s duties. ADDITIONAL INSURED Commercial General Liability and Excess Umbrella Liability policies described above shall include the following as additional insured’s, including their officers, directors, and employees (the spelling of these parties must be exactly correct): Power Construction Company LLC (General Contractor) Power Contracting and Engineering Corp. (General Contractor) Power Construction Company (General Contractor) College of DuPage, its board of trustees/regents, employees, agents, and volunteers (Owner) Legat Architects (Architect) KJWW Engineering (Structural Engineer) SmithGroup JJR (Civil Engineer) AMSCO Engineering, Inc (MEP Engineering) MWL Architects (Public Safety Consultant) Stan Roller and Associates (Acoustical Engineer) Brubaker Design (Design Consultant) And any additional to be added The underlying coverage afforded to the additional insured under these policies shall be primary and noncontributory insurance. If the additional insured has other insurance that is applicable to the loss, such other insurance shall be in excess to the Subcontractor’s insurance. The amount of the subcontractor’s liability under this policy shall not be reduced by the existence of such other insurance. A Blanket Additional Insured Endorsement shall be provided so that the coverage afforded to the additional insured’s shall apply to “Ongoing Operations” and “Completed Operations-Hazards.” It is further agreed that the coverage afforded to the additional insured shall not apply to the sole negligence of the additional insured’s. Cancellation Clause: 30 days written notice. Failure to provide the projects insurance shall not relieve the Subcontractor of any liability it may have under this Agreement or at law. Certified Construction Services, LLC Power Construction Company, LLC 6 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C Subcontract Agreement between Power Construction Company, LLC and Certified Construction Services, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT C INSURANCE REQUIREMENTS {{ byron gremley*_es_:signer1:signature}} {{ Mary Ann Lukowicz *_es_:signer2:signature}} 7 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C Subcontract Agreement between Power Construction Company, LLC and Certified Construction Services, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT D ADDITIONAL PROVISIONS 1. Safety: Strict compliance with all OSHA requirements and additional safety requirements as described in the General Contractor’s Subcontractor Site Safety Requirements and Procedures manual located at http://www.powerconstruction.net/safety_req.html are made part of this Agreement. Strict compliance with all Quality requirements specified in the Contract Documents and further described in the General Contractor’s Quality Guidelines located at http://www.powerconstruction.net/businesspartners/pdf/PowerQualityGuidelines.pdf are made a part of this Agreement. 2. Unit Prices: Not Applicable 3. Hourly Rates: The following hourly rates include all necessary labor, insurance, overhead and profit, and payment and performance bonds. Subcontractor acknolwedges that the hourly wage rates are subject to audit and subsequent modification if necessary to comply with the General Contract. All labor rate sheets to be submitted for review and approval by COD Auditor. 4. Alternates: Not Applicable 5. Submittals: Subcontractor acknowledges that all submittals other than samples for this Project shall be submitted in electronic format as Adobe Acrobat (.pdf) files and that these files shall be generated directly from the originating software. Subcontractor understands that this is a requirement and condition of this Agreement. Subcontractor shall submit files which are more than 5MB by uploading them to the website or ftp site established for this Project. Subcontractor can submit files which are less than 5MB either through e-mail or uploading them to the website or ftp site established for this Project. Consult General Contractor for instructions or questions regarding uploading submittal files. Subcontractor shall separately submit hard copies of submittals, if any, requiring a signature or a seal stamp. In addition, Subcontractor shall provide hard copies of any other submittals requested by General Contractor. Shop drawing submittals shall be properly identified and referenced in accordance with the Contract Documents. Product data submittals for each construction system shall be collected into a single submittal. Three (3) product samples shall be submitted for each required sample submittal. a. b. c. d. e. Name or trade designation. Quality or grade, and further designation to identify the item or material. Applicable specification section and/or drawing number. Name of manufacturer or producer. Name of General Contractor, Subcontractor and Project. 8 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C Subcontract Agreement between Power Construction Company, LLC and Certified Construction Services, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT D ADDITIONAL PROVISIONS Subcontractor shall transmit to General Contractor submittals to permit adequate time for review and, if necessary, re-submittal in order to avoid any delay to construction progress due to late or untimely submittals. 6. Change Order Overhead and Profit: Maximum allowable percentages for overhead and profit are limited to 10% for overhead and 0% for profit with no additional markup allowed for bond premiums (unless said additional markup for bond premiums is specifically allowed by the General Contract, and General Contractor received payment for same). For work performed by Sub-Subcontractors, markup shall be limited to 0%. 7. Additional Exhibits: Illinois Department of Revenue Letter dated January 15, 2010 (1 page) Labor Rate Sheet (1 page) COD Bond Forms (4 pages) 8. Sales Tax Exemption: E9997-3391-06 9. Payment and Performance Bonds: Subcontractor shall provide and pay for a Performance Bond and a Labor and Material Payment Bond. In addition, subcontractor shall provide a Multiple Obligee Rider. 10. Contract Sum Calculation: The Contract Sum was calculated as follows: Description of Work Base Bid Qty Cost 1 LS $ 20,000 The above contract sum calculation is to be used only for accounting purposes and not for any other purpose. Certified Construction Services, LLC Power Construction Company, LLC 9 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C Subcontract Agreement between Power Construction Company, LLC and Certified Construction Services, LLC for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820). EXHIBIT D ADDITIONAL PROVISIONS {{ byron gremley*_es_:signer1:signature}} {{ *_es_:signer2:signature}} Mary Ann Lukowicz 10 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C 11 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C 12 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C 13 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C 14 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C 15 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C 16 Document Integrity Verified EchoSign Transaction Number: XE7IVHG5C3E7L3C