Soluzioni innovative di Full Service per Impianti Produttivi Farmaceutici Flavio Beretta ABB PS&S

advertisement
Soluzioni innovative di Full Service per
Impianti Produttivi Farmaceutici
Flavio Beretta
ABB PS&S
Asset Performance Services
Maintenance Engineering & Consulting Manager
1
• ABB Facts
• ABB Consulting Service
Processes & Competences
• Maintenance Quality System,
Calibration & Metrological
Laboratory
• ABB Full Service®
• Process – phases
• Key performance Indicators
• Full Service Partnership
Development (First Step)
2
Facts about ABB
Power
Products
Sales: $6.4 billion
Transformers,
high- and
medium-voltage
switchgear,
breakers,
automation relays
•
•
•
•
•
3
Power
Systems
Automation
Products
Sales: $5.9 billion
Sales: $4.0 billion
Substations,
FACTS, HVDC,
HVDC Light, power
plant & network
automation
Low-voltage
products, drives,
motors, power
electronics, and
instrumentation
Headquarters: Zurich, Switzerland
About 104,000 employees in
around 100 countries
Orders in 2005: $23.6 billion
Revenues in 2005: $22.4 billion
Listed on Stockholm, Swiss & New
York exchanges; traded on virt-x
•
Process
Automation
Sales: $5.0 billion
Control systems
and applicationspecific
automation
solutions for
process industries
Robotics
Sales: $1.7 billion
Robots, peripheral
devices and
modular
manufacturing
solutions for
industry
A leading power and automation
technology company with strong
market positions in its core
businesses
ABB Global - Local Service
ABB Service Competencies Globally Projected with Local Resources:
„
Global revenues of $3,7BUS (2005)
„
ABB develops advanced tools, training and methods for Maintenance Excellence
„
Over 20,000 direct service employees worldwide
„
Strong local organizations in more than 40 countries
„
Local service organizations provide speed in responding to problems,
language and cultural alignment
„
They are backed up by a global service infrastructure of product and solutions
experts, advanced software tools, and a global communications infrastructure
„
Together we can deliver specific expertise anywhere and anytime it is needed
Maintenance
Maintenance developed
developed as
as Core
Core Competence
Competence
4
ABB Services Spectrum
Performance
Performance Directed
Directed
Maintenance
Maintenance Partnerships
Partnerships
Designed to Compliment
And Enhance Each Customer’s
Unique Maintenance Strategy
Self
Self Maintenance
Maintenance
5
Dedicated to Industrial Maintenance
„
6
ABB pioneered the Full Service
partnership concept
„
We deliver these services in more
than 22 countries around the world
„
The total number of employees in
Full Service business is over 6,000
„
We currently have over 150 active
Full Service Partnership
Agreements
„
Industry specific organizational
support for Oil & Gas, Metals &
Mining, Pulp & Paper, Chemicals,
Life & Scienze, Electronics, and
Food & Beverage
Consult
Collaborate
Create Value
• ABB Facts
• ABB Consulting Service
Processes & Competences
• Maintenance Quality System,
Calibration & Metrological
Laboratory
• ABB Full Service®
• Process – phases
• Key performance Indicators
• Full Service Partnership
Development (First Step)
7
ABB Consulting Service
Maintenance engineers and consultants support every
Performance Service contract during definition &
delivery and provide consulting services to assist clients
in managing their maintenance activities
•
•
•
•
•
•
•
•
•
•
•
8
Plant performance benchmarking
Maintenance excellence and best practices
Organization and competency development
Performance improvement, e.g. energy
efficiency or process improvement
Quality Assurance & Validation Improvement
GxP / impact Assessment
Metrological Laboratory & Calibrations
Computer System Validation
Health, safety and environment
Change management
Project engineering and support
Over 600 reliability & maintenance consultants
World Class Reliability ® Benckmark
Total Plant Reliability®
Process
People
Equipment/Tools
Measurement
Project mgt.
Performance mgt.
RCM /RBI
Block Diagrams
Material mgt
Multi-Skills
LCC
Reliability data mgt.
Contractor mgt.
ODR
Standardization
Customer
Scheduling
Team management
Predictive tasks
Training
Planning
Roles & Resp.
Basic PM & Calibr.
Financials
Safety & Quality
Org. structure
Impact Assessment
Business process
Work Identification
Vision & mission
Failure investigation
Bad Actors
Asset Management
Empowerment
Prevention
Reliability Scorecard
Business Management Processes and Alignment
World Class Reliability™ Benchmark
Industry Best Practices
9
Integrated Systematic Processes
Leadership
Policy & Strategy
Results
Partnership Fulfillment
Maintenance Concept
Client
Value
ABB
Value
Maintenance Operations
Plant Performance Improvement
Quality Assurance & Validation
HSE
Quality
10
People
Management
Finance and
Cost
Supply Chain
People Value
Information
ABB Full Service® Site Execution Phases
Partnership Fulfillment
Deploy Common
Strategy
Communicate Client
Value
Listen to the
Customer
Renew Contract
Maintenance Concept
Understand
Plant
Requirements
Perform
Reliability
Studies
Establish
Maintenance
Plans
Install Maintenance
Management
System
Manage Life
Cycle
Maintenance Operations
Generate Workorders
Prepare Work-orders
Execute Work-orders
Complete
Work-orders
Plant Performance Improvement
Capture Actual
Performance
Improve Equipment
Performance
Implement Best
Practices
Deploy New
Technologies
Quality Assurance and Validation Improvement
Jointly
define/refine QAV
migration strategy
11
Assess current QAV
status in relation to
agreed scope
Refine QAV
Master Plan
Implement
QAV Master
Plan
Manage
Quality
Lifecycle
QA & Validation Improvement- Activities
Quality Assurance & Validation Improvement
Jointly
define/refine
QAV migration
strategy
• Arrange QAV
strategy sessions
• Clarify and
articulate joint QAV
approach
• Define R&Rs
• Agree policies &
procedures
• Agree ABB QAV
scope
• Agree cont.
improvement
objectives & KPIs
• Identify milestones
and define
timescales
12
Assess current
QAV status in
relation to
agreed scope
• Review policies,
proceedures,
methodologies
• Check audit history
• Undertake QAV
review of a sample
of ”in scope” QAV
systems and
processes
• Documented
documentation gap
analysis of in scope
existing systems
• Assess transferring
people and culture
Refine QAV
Master Plan
• Organise annual
QAV joint review
•Inspection /
audit findings
•KPI’s
•Continuous
improvement
•Regulatory
change
• Prepare and issue
annual QAV report +
recommendations
Implement QAV
Master Plan
• Delivery of agreed
scope:
•Operations
•Projects
•Improvements
• Manage resource
•Training
•Recruitment
•Competence
Manage Quality
Lifecycle
• Manage QAV lifecycle:
•Concept
•Design
•Implementation
•Operations
•Change
•Retirement
•Replacement /
• Migration
• Audit readiness
•Documentation
•People
• Maintain currency
•Regulatory
developments
•Periodic review
•Revalidation
•Change control
Scope of Validation Services
Life Cycle
Change control
URS and VP may be reversed
Validation Plan (VP)
Validation Report
(VR)
Business Processes &
User Requirements
Specification (URS)
SOPs
Migration Specification,
Build and Qualification
Supplier Audit/
Part 11 assessment
Functional Design
Specification (FDS)
GxP assessment defines
critical functions, data and
configuration and later can
include traceability to
qualification protocols
Training records
GxP/Risk Assessment
Hardware & Software
Design and Configuration
Specification
PQ should continue after
go live to fully test
operational performance
Cutover Qualification
(CQ)
Performance Qualification (PQ1)
Other End-User
Documentation
Operational Qualification (OQ)
Update Part 11
assessment
Installation Qualification (IQ)
Software Integration Testing
Good Programming Practice &
Software Source Code Review
Traceability within the
specifications and the GxP
Assessment
13
Performance Qualification
(PQ2)
The OQ box could be split into:
Functional OQ,
System Integration Qualification (SIQ)
- focusing on interfaces,
Only qualify critical
configuration, functionality
and data
GxP Competence
•
•
14
ABB Engineering Services QA&Validation team
• Review of compliance with cGMP/GAMP requirements / impact
assessment.
• Optimization of maintenance procedures.
• Assessment of impact on validation
• Interpretation of pharma regulations and design guides across
all core disciplines
• Rapid Change-Over
Full Service process inherently supports regulatory
environment
• Builds on well defined and documented processes;
• Provides methods and tools to define and follow appropriate
detailed SOPs for maintenance;
Maintenance Concept - Tools
Maintenance Concept
Understand
Plant
Requirements
• Codification
standard
• Standard industry
equipment tree
15
Perform
Reliability
Studies
Establish
Maintenance
Plans
Install Maintenance
Management
system
Manage Life
Cycle
• Equipment
classification
• FME(C)A
• 5 Maintenance
Strategies
• CBM-Techniques
• RCM Turbo
• ELMAS
• Impact
Assessmet
• Industry specific
PMs
• Basic PM
summary
• Standard job
plans
• Back to basics
• Lubrication
review plan
• Basic operator
care
• Autonomous
Maintenance
• Risk Based
Inspections
(RBI+)
• Load instructions
• CMMSDatastream
• Predefined
Failure Codes
• Maintenance
types
• Priority matrix
• CMMS –
Datastream
• Life Cycle plan
template
• Maintenance
Plan Review
(MPR)
• Reliability
Modeling
(RAMP)
• Early Equipment
Management
• Design reviews
• LCC/LCP
• ABB Facts
• ABB Consulting Service
Processes & Competences
• Maintenance Quality System,
Calibration & Metrological
Laboratory
• ABB Full Service®
• Process – phases
• Key performance Indicators
• Full Service Partnership
Development (First Step)
16
Maintenance Quality System
E.g. SOP’s
17
Maintenance Quality System
E.g. SOP’s
18
Maintenance Quality System
E.g. SOP’s
19
Calibration & Metrological Laboratory
E.g. SOP’s
20
Calibration & Metrological Laboratory
Use customized CMMS to do:
• Reverse traceability for reference standards
• Inspection forms for “As Found” and “As Left” variance
results with Pass/Fail auto triggers
• Process control limits and manufacturer-recommended
specifications
• Custom reports for FDA calibration certification
• Expands processes to regulated equipment
• Reduce total cost of calibration by eliminating paperwork,
cost of second-system validation, and frequent
calibrations
21
Calibration & Metrological Laboratory
Equipment Classification
22
Calibration & Metrological Laboratory
Equipment Classification
23
Calibration & Metrological Laboratory
Equipment Classification
24
Calibration & Metrological Laboratory
Metrological chain
25
Calibration & Metrological Laboratory
Calibration Report – Loop check
26
Calibration & Metrological Laboratory
Calibration Report – Loop check
27
Calibration & Metrological Laboratory
Calibration Report – Single check
28
Calibration & Metrological Laboratory
Calibration Report – Single check
29
• ABB Facts
• ABB Consulting Service
Processes & Competences
• Maintenance Quality System,
Calibration & Metrological
Laboratory
• ABB Full Service®
• Process – phases
• Key performance Indicators
• Full Service Partnership
Development (First Step)
30
ABB Full Service® Process - milestones
ABB Full Service® -Process
Prospecting
Screening
Common
business
fit
Partnership
development
Mobilization
Contract
Implementation management &
Infra in
place and
readiness
to start
Win-win-win
ABB FS with
agreement
MMMP
implemented
Business
case
identified
Strategy
check
31
Feasibility
Study
development
Value
created
and
contract
renewed
ABB Full Service® Process - phases
ABB Full Service® -Process
Screening
Regional sales
• Present
business
concept
• Agree on
business fit
• Complete
Confidentiality
Agreement
• Buy in from
Organization
• Agree on
Feasibility
Study
Sign Letter of
Authorization
(LOA)
32
Feasibility
Study
Partnership
development
Mobilization
Project mgr
Project mgr
LOA
LOI
Agreement
Start-up
• Prepare the
Feasibility Study
• Establish
Partnership
Development
team
• Deploy start-up
resources
• Implement
MMMP
• Set up site
organization and
facilities
• Train needed
new skills &
knowledge
• Implement
communication
and support
processes
• Employ new
maintenance
practices
• Perform on-site
assessment
• Quality
Assurance &
Validation
assessment
• Analyze
improvement
potential
• Present
Feasibility Study
results and ABB
Proposal
(Improvement
potentials ($))
Sign Letter of
Intent (LOI)
• Build the solid
foundation
• Develop
Maintenance
Management and
Master Plan
(MMMP)
• Develop Quality
Assurance &
Validation Master
Plan (QAVMP)
• Develop
mobilization and
communication
plan
Sign Maintenance
Alliance
Agreement
Start-up mgr
Implementation
• Engage
subcontractors
• Prepare MMMP
implementation
• Prepare QAVMP
implementation
ABB manages
people & assets
Contract
management &
development
Start-up&site mgr Site mgr
• Implement new
performance
measurement
system
• Update MMMP
Contract renewal
• Manage
Win/Win/Win
Partnership
• Implement
continuous
Performance
Improvement
• Report Client
Value
• Assess Site
Quality
• Update MMMP
• Update QAVMP
• Update QAVMP
Maintenance
Strategy
& Tools in Force
Contract
Renewal
Key Partnership Commitments
In a role of Maintenance Service Partner, ABB commits to:
• Provide a comprehensive benchmark maintenance assessment of
current customer performance relative to industry leaders
• Jointly develop Preventive maintenance & Calibration plans that
enhance the customer’s business strategies
• Jointly develop Computer System Validation activities
• Jointly develop GxP Impact Assessment to define critical Equipment
• Write specific SOP’s and Implement the Maintenance Quality System
• Identify and continuously track relevant maintenance and production
Key Performance Indicators (KPIs)
• Provide competent leadership and resources to deliver jointly
identified goals
• Set-up continuous competence development to respond production
challenges
• Develop and implement the selected maintenance tools and
approaches such as OEE and Reliability Centered Maintenance
• Improve production effectiveness by utilizing ABB’s world-class
maintenance management processes, tools and approaches
33
Success Factor Manufacturing Excellence
z
z
z
Reduction of Labour Cost
Reduction of Spare Parts
Increase of assets expected life
Cost:
Capacity:
z Increase
capacity of the process
z Increase availability of the process
z Improve reliability of the process
z Improve relationship between
maintenance, production, management
and suppliers
34
Safety / Quality:
z Improve
the Quality of output
z Target zero defect in process
z Target zero break down of
equipment
z Enhance safety measures and
environmental awareness
z Guarantee respect of specific
industries’ rules (FDI,GMp, GLp.)
Key Performance Indicators, Example
Safety
Ed.v.tot.
Maintenance cost/unit
Tavoite
Ed.12 kk tot.
Moving average
Ed.v.tot.
60 %
Kk tot.
Availability
Ed.v.tot.
tavoite
Tavoite
Ed.12 kk tot.
Moving average
100 %
55 %
50 %
45 %
40 %
95 %
35 %
30 %
25 %
20 %
´96
´97
´98
´99
´00
90 %
0
Oct Nov Dec Jan Feb Mar Apr May Jun
Jul
´96
Aug Sep
OEE
´97
´98
´99
´00
Jan Feb Mar
Apr May Jun
Jul
Aug Sep Oct Nov Dec
Customer satisfaction
Ed.v.tot.
Tavoite
Ed.12 kk tot.
´96
´97
´98
Ed.v.tot.
Tavoite
Ed.12 kk tot.
´00
Ed.v.tot.
Moving average
90 %
Jul
Aug Sep
Kk tot.
tavoite
50
100 %
95 %
Oct Nov Dec Jan Feb Mar Apr May Jun
Urgent maintenance work
Moving average
100 %
´99
95 %
85 %
90 %
80 %
75 %
85 %
70 %
80 %
65 %
75 %
60 %
55 %
70 %
50 %
65 %
45 %
40 %
´96
´97
´98
´99
´00
60 %
Oct
Nov Dec
Jan Feb
Mar
Apr
May Jun
Jul
Aug Sep
Tavoite
´97
´98
´99
´00
0
Oct
Nov Dec
Jan Feb
Mar
Apr
May Jun
Jul
Aug Sep
Training days
Completed PM-%
Ed.v.tot.
´96
Ed.12 kk tot.
Moving average
Ed.v.tot.
´96
´97
´98
´99
´00
tavoite
Ed.v.tot.
35
´98
´99
110 %
105 %
105 %
100 %
100 %
95 %
95 %
90 %
90 %
85 %
85 %
80 %
80 %
´00
Mar
Tavoite
110 %
Apr
May
Jun
Jul
Aug Sep Oct
Nov Dec
Ed.12 kk tot.
Moving average
75 %
70 %
´97
Feb
Employee survey
Kk tot.
75 %
´96
Jan
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug Sep
´96
´97
´98
´99
´00
0
70 %
Jan Feb Mar
Apr May Jun
Jul
Aug Sep Oct Nov Dec
´96
´97
´98
´99
´00
Oct
Nov Dec
Jan Feb
Mar
Apr
May Jun
Jul
Aug Sep
Full Service Key Deliverable: OEE*
Theoretical production time
Planned production time
Available operating
time
Net operating
time
Valuable
operating
time
Stand-still
losses
Speed
losses
Yield
losses
* Overall Equipment Effectiveness
36
Planned
downtime
Planning
Factor
„Six major losses“
OEE* =
1
Breakdowns
2
Setup &
adjustment
Availability
Factor
3
Idling and
minor stops
4
Reduced
Prod. speed
5
Defects
& reworks
6
Start-up
losses
x
Performance
Factor
x
Quality
Factor
Joint Mission: Production Effectiveness
Factory 1 : layout
Improvement
teams
RCA action
RCM program
Real TPI/
Process Data
Management
Gross
GrossOperating
OperatingTime
Time
Net
NetOperating
OperatingTime
Time
Valuable
Valuable
Operating
Operating
Time
Time
Unplanned
Unplanned
down Time
down Time
Losses
Losses
Loss
Lossofof
speed
speed
Loss of
Loss of
Quality
Quality
Equipment
Equipment Failure
Failure
Setup
Setup &
& Adjustment
Adjustment
Idling
Idling &
& Minor
Minor Stops
Stops
Reduced
Reduced Speed
Speed
Defects
Defects in
in Process
Process
Start
Start up
up Losses
Losses
Capture plant performance in real time
37
Potential Impact of Maintenance
OEE
Planned downtime
100 %
Downtime losses
Equipment failure,
maintenance, set-up
& adjustment
Speed losses
Reduced speed,
minor stoppages
Quality losses
Defects and start-up
losses
Valuable
operating time
50 %
38
Effective maintenance organisation & processes / TPM
Consistent OEE measurement and analysis
CMMS as a systematic tool
Reliability analysis of equipment
Preventive maintenance & Calibrations
Systematic methods for continuous improvement / Kaizen
Set-up time reduction/ SMED
Equipment life-cycle management
x
Improved machine setting
Accurate follow-up of minor stoppages
Optimization and increasing speed of robots and other equipment
x
Systematic search for quality losses’ root causes
Systematic management of calibration
Example of O.E.E. result
Available operating time
2136 h
Not planned production
200 h
Preventive maintenance & Calibration
57 h
Planned production time
1879 h
Technical downtime
20 h
Change over downtime
40 h
Organisation downtime
13 h
Gross production time
1776 h
Net production time
Quality losses
Valuable operating time
39
Availability
94,51 %
30 h
Technology downtime
Speedlosses
Planning factor =87,97 %
OEEpf = 74,81 %
Performance
94,00%
Quality
95,73 %
107 h
1669 h
71 h
1598 h
OEE = 85,05 %
Technical Availability
98,93 %
Examples of ABB Full Service® OEE Improvement
84%
Chemical & Life
Sciences plant
Paper mill
90%
83%
85%
Actual
82%
Contract
80%
81%
80%
75%
79%
70%
78%
77%
65%
Year 1
Year 2
Year 3
Year 0
Year 1
Electronics
70%
80%
60%
70%
50%
60%
40%
50%
30%
40%
20%
30%
10%
20%
04
12
04
11
04
10
04
09
04
08
04
07
04
06
04
05
04
04
04
03
04
02
04
01
40
Year 3
Year 4
Year 5
Steel mill
80%
0
Year 2
Year 1
Year 2
Year 3
Year 4
10%
0%
Ar
e
a1
Ar
e
a2
Ar
e
a3
Ar
e
a4
Ar
e
a5
Examples of ABB Full Service® Cost Reduction
Chemical plant
Electronics
15 000 000 €
250,000
13 500 000 €
Maintenance hours
reduced by 40%
200,000
12 000 000 €
10 500 000 €
9 000 000 €
150,000
7 500 000 €
6 000 000 €
100,000
4 500 000 €
50,000
3 000 000 €
1 500 000 €
Start-up
After 3 yrs
Year 1
Paper mill
Year 2
Year 3
Year 4
Year 5
Year 6 E
Manufacturing
160%
17% reduction
140%
Production volume
Maintenance cost
Maintenance cost/ton
$/t
120%
100%
80%
60%
40%
Year 1
41
Year 2
Year 3
Year 1
Year 2
Year 3
Year 4
• ABB Facts
• ABB Consulting Service
Processes & Competences
• Maintenance Quality System,
Calibration & Metrological
Laboratory
• ABB Full Service®
• Process – phases
• Key performance Indicators
• Full Service Partnership
Development (First Step)
42
Where Do We Go From Here?
• ABB Proposal:
• Conduct a Feasibility Study
• Perform quantitative and qualitative analyses against
industry leaders
• Define improvement potential in areas of OEE and
maintenance as an outcome of the assessment
• developed during the first Year
• Present the Business Case for taking further action
• Implement structured process to identify financial
improvement potential
• Decisions will be based on the outcome of the
assessment
• ABB commits to improvements at each phase
43
Analysis scheme
BOTTOM -UP
Quantitative
Analysis
Qualitative
Analysis
44
TOP -DOWN
„
Analysis of Maintenance
Management Approach
„
Maintenance Benchmark
comparison
„
Analysis of Maintenance System
„
Analysis of Productivity
„
Analysis of Maintenance Activities
„
„
Analysis of Assets
Analysis of Direct Maintenance
Spend
„
Analysis of Indirect
Maintenance Costs
Qualitative Analysis of the Site
„
For this we use a slightly modified version of the questionnaire for
Self-assessment of our ABB Full Service® sites.
„
The performance excellence is checked according to the EFQM
Excellence Model (European Foundation for Quality Management)
„
45
All info captured in Benchmark database
Maintenance Management Approach - Result
Leadership
1
Business Results
0,8
„ Profitability
0,6
„ Effectiveness &
0,4
efficiency
„ Role of maintenance
„ Building relationship
„ Cost Management
Maint & Prod Mgmnt
„ Strategy development &
implementation
„ Knowledge exchange &
networking
0,2
People Results
People Management
0
„ Competence management
„ Competence &
motivation
„ Motivation management
„ Safety & environment
Resource
Management
Client Results
„ HSE mgmnt
„ Finance &
cost mgmnt
„ Client satisfaction
„ Information mgmnt
„ Client value
Maintenance Functions
Your plant
Benchmarking against 75 % level
of our Full Service sites
46
„ Material mgmnt
„ Partnership
„ Contractor mgmnt
„ Maintenance concept
„ Facilities, tools, etc
„ Maintenance operations
„ Plant performance improvements
„ Shutdown mgmnt
Results of the Feasibility study
„
The Feasibility Report contains
the following information:
Expectations of a feasibility study
State of assets
100%
Human relations
The ”road” from the present situation
to the desired one
47
20%
M
Concept, Competence
Resources
State of assets
100%
Human relations
OEE/effectiveness
si
Vi
l
oa
/g
on
Technical documentation
n
ti o
Ac l an
p
c
ur
so
Re
Tools and methods
e
nc
ete
mp
Co
n
tio
va
oti
Human resources
60%
Organization
40%
20%
Maintenance methods
0%
Spare parts
Maintenance planning
„
The vision (the “desired” situation)
„
Improvement potentials with the corresponding
impact on the result of the company
„
Recommendations of what to do to achieve
improvements plan
„
How to continue
Technical documentation
Maintenance costs
Subcontracting
Maintenance management
Present situation
Maintenance methods
Maintenance costs
Maintenance planning
Subcontracting
Maintenance management
Desired situation
es
Customer
satisfaction
The result of
Maintenance
the maintenance
processes
Collaborators’
Information/
development
analysis
80%
Workshops, etc
Organization
0%
Spare parts
© ABB Performance Services - 5
The current situation (the “as is”
situation). Strengths and weaknesses
of the current maintenance operations
60%
40%
Workshops, etc
Action plan
„
OEE/effectiveness
80%
Human resources
Strategic
planning
Management
ABB Full Service® Maintenance
Outsourcing
For Pharmaceutical Production
Improve manufacturing performance
& maintain compliance
48
Download