STAT 495, Fall 2003 Homework Assignment #7 1. A die-casting process is being used to make a cast housing that will be sold to a client who will perform further machining operations on the cast part. The weight of the part is a good indicator of process performance. The cast part has a target weight of 775 grams with a tolerance of ±20 grams. The data for 40 subgroups of 5 parts are presented below. The data file is available on the course webpage. Subgroup 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 X1 779 775 772 779 771 781 788 780 765 772 773 773 784 788 764 786 784 776 775 779 X2 782 763 782 776 763 767 777 777 772 773 774 770 774 770 771 773 767 781 769 775 X3 771 775 770 773 779 772 770 778 775 775 772 783 778 779 765 771 771 766 783 773 X4 771 779 790 780 776 783 765 786 784 775 776 778 779 788 778 778 759 774 779 775 X5 773 774 775 779 787 771 759 780 785 765 777 785 776 778 782 771 787 773 771 774 Subgroup 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 X1 779 776 781 781 784 785 783 774 777 759 782 766 777 789 782 773 783 782 782 777 X2 786 778 788 774 765 772 772 778 773 771 773 774 773 783 778 782 769 782 770 769 X3 785 788 784 772 765 776 772 774 774 785 776 779 777 771 766 767 777 780 770 780 X4 787 775 770 778 777 772 781 782 771 774 774 781 786 775 769 773 777 770 774 768 X5 784 789 782 760 779 778 766 793 783 780 785 773 774 782 767 770 761 772 775 779 (a) Verify that the process is in a state of statistical control by constructing and interpreting appropriate X and R control charts. (b) Construct a histogram of the 200 individual measurements. Comment on the shape of the histogram. (c) What proportion of the observed measurements are above the upper specification limit? below the lower specification limit? (d) Give values of the estimated process potential, C p and process performance, Cpk indices using the overall standard deviation of the 200 measurements. (e) What are the predicted (expected) proportion of future measurements that will be above the upper specification limit? below the lower specification limit? Use the overall standard deviation of the 200 measurements. (f) Give values of the estimated process potential, C p and process performance, Cpk indices using the average subgroup range, R. (g) What are the predicted (expected) proportion of future measurements that will be above the upper specification limit? below the lower specification limit? Use the the average subgroup range, R. (h) Is there much of a difference between your answers in parts d) and e) compared to those in f) and g)? (i) Summarize your findings in an executive summary that would be read by a person in management. You should include any graphs that may help management understand what is happening with this process. 2. A decision needs to be made regarding the possible purchase of some new casting equipment. Before proceeding further data is collected to assess the performance of the current equipment. An important part that will consume much of the run time of the equipment is to be used for the study. The width of the cast part at a crucial spot should be 3.000 ± 0.025 centimeters. Below are summarized data from 32 consecutive rational subgroups of size n=5. Analyze the data and comment on the capability of this process. Again summarize your findings for a busy executive and include any graphs you feel will help make your case. Subgroup 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 X 2.991 3.004 2.997 3.004 2.999 3.000 2.988 2.986 2.991 2.994 3.017 2.987 3.013 2.993 3.009 2.990 Range 0.038 0.027 0.049 0.033 0.043 0.070 0.044 0.050 0.064 0.048 0.070 0.051 0.060 0.019 0.044 0.043 Subgroup 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 X 3.005 3.008 3.001 3.000 2.993 2.982 2.990 3.003 3.007 2.998 3.012 2.996 2.997 3.004 2.987 3.002 Range 0.039 0.054 0.009 0.062 0.034 0.012 0.028 0.091 0.049 0.052 0.077 0.040 0.018 0.020 0.063 0.028