September 11, 2008 12 Noon, Room 1506 In attendance: See attached sheets State Budget / Construction Funding Update State Budget process is in a crisis No statewide educational facilities bond for November 2008 These bonds used to fund Community College capital projects System is left with 2008/09 budget - only 8 new projects (no 1700/1800) No November bond also impacted 2009/10 Capital Outlay Plan System can only use funds from previous existing bonds Only 19 new start 09/10 projects being initiated throughout State Great News, Chabot College 1700/1800 made the list for 2009/10 funding State calls it Math/Science Modernization This is only one year later than anticipated (should get OK to proceed Sep. 2009) State Contributes $9.5M, Chabot must match $9.5M Chabot contribution currently not budgeted Disappointing News, Other projects (FPPs) shifted to future pending further bonds Chabot FPP projects are B100, Library and B1600, Engineering 2010/11 earliest start, greater shift more likely (3-5 years) However – given this unprecedented interruption of funding – State will allow us to revise our FPPs without losing schedule Committee supported revising/resubmitting Library FPP to request a new building Approximately a 6 month process – due to State June 30, 2009 Allows us to explore the potential with the user group and a consultant Chabot College Budget Process Update Working with Board of Trustees to update Measure B, 5-year plan budget Existing projects under construction and/or in planning are within budget Important to prioritize remaining projects Chabot College Facilities and Sustainability Committee Minutes September 11, 2008 Pg. 2 Final Measure B Projects A spreadsheet was distributed showing the final projects and their budgets 8 projects left to complete, grouped for greater efficiency and savings Total Project Budgets - $46.7M Funding Variance – ($20.8M) assuming state contributions The spreadsheet was explained in detail Priorities were discussed – with $46.7M in our campus construction fund, what projects do we want to fully budget and move ahead with? We need to queue up the next projects for design It was agreed that the number one priority is to fully fund B1700/1800 so that the $9.5M contribution from the state can be captured, but that requires reallocating $9.5M of existing budgets from existing projects. No suggestions were made to fully defer existing projects but it was suggested that we could do very light remodeling to the Administration and Faculty Office buildings. The committee asked the chair to investigate how much could be saved by not doing a full remodel on those buildings. It was also agreed that Chabot should proceed with revising the current Library FPP request for state funding from a renovation project to a newly constructed project. Since any potential funding is so far in the future we can take advantage of the opportunity to investigate the potential with an architect without losing time. Additional comments regarding the campus budgeting process: Put students first and minimize work on faculty offices. Building 200 work can be minimized. Many projects are anticipated to be moving to B100 (WRAC, tutoring, PATH, learning skills) and must be accommodated. Put those projects that benefit the public and students first. Prioritize B2300 so campus safety can be increased and it will benefit students also. Health Center needs a new home – perhaps B2300 first floor B2300 mezzanine could be turned into a 300 – 400 seat lecture space/conference center by inserting a floor over the cafeteria. The PAC entry plaza project would be a great benefit to students, public and Chabot image. B1400/1600 would benefit students in Industrial Technology and improve safety. Industrial Tech has seen increased enrollments. Perhaps we should use the B1600 budget to remodel rooms for B1400. The music program is growing fast. PAC expansion budget should be used to benefit those spaces serving music and drama classes. Solar Panels Project / Proposed Schedule Nov. 1, 2008 Lot “J” Demolition – Temporary Lot “J” also closed Dec. 20, 2008 Lot “J” Paving complete – Temp Lot “J” open Dec. 20, 2008 Begin Lot “J” Solar Canopies Chabot College Facilities and Sustainability Committee Minutes September 11, 2008 Pg. 3 Feb. 6, 2009 Dec. 16, 2008 Jan 19, 2009 Jan 19, 2009 April 1, 2009 Lot “J” Complete Close 1/2 “G” Lot for concrete footings (finals week) Finish Lot “G” canopies – before start of school semester Begin Lot “G” PV Panels one aisle at a time all work complete This schedule represents additional disruption of our parking lots but is sequenced to minimize disruption. It was pointed out that it would be advantageous to have completed the proposed alterations to Lot “G” before closing off parts of it. Marquee Sign Committee The committee reviewed the previously suggested list of the sub-committee. It was suggested that the following individuals be part of the new Marquee design committee. Mike Seaton, Gordon Watt, Susan May, Roger Noyes, Heidi Finberg, Dale Wagoner. It was suggested that Roger Noyes may wish to ask someone else in his program and that a student representative be invited. The architect, tBP has been retained to lead the group through a design process. Project Status Update Was distributed for review Rumor Control There were no rumors but a question was asked: how far along are we with the Measure B Bond work? Subsequent answer (not given at meeting): Chabot College has contracted for over $104M of total budgeted construction dollars which represents over 60% of our total construction dollars. Question was asked about whether we were on budget. Answer: All projects currently complete, under construction or in design are within budget. The budgets of the remaining campus projects have not been touched. Good of the Order JoAnn Giordano, chair of the accreditation facilities committee, asked to be put on the following agenda to share discussions that her committee has had. End of Meeting Chabot College