DRAFT (D) (A) (B)

advertisement
Chabot-Las Positas Community College District
Facilities Modernization Program
Funded by Measure B
Data Date: August 26, 2013
Project Budget
Summary
DRAFT
Fund
Fund Description
(A)
(B)
(C)
(D)
Current
Budget
Actual Expenditures
to Date
Unpaid
Commitments
Remaining Budget
A - (B+C) = D
CHABOT COLLEGE
50200.552110 Library Building - 100 (F) w/ Seismic Strengthening
287,427
468,398
1,133,104
562,116
3,615
567,373
50200.552130 Classroom Buildings 300, 500 (E,F)
11,521,021
10,740,754
13,740
766,528
50200.552170 Instructional Office Building 400 (H)
18,357,569
18,351,668
-
5,901
50200.552180 Classroom Buildings 800, 900, 1000 (E,F)
5,023,788
5,023,788
-
-
50200.552210 Buildings - 1100, 1500, 2000 (F)
2,412,201
20,966
-
2,391,234
11,949,400
10,523,546
260,435
1,165,419
6,785,877
5,963,646
31,021
791,209
50200.552280 Classroom Buildings - 1700, 1800 (E,F)
10,490,096
3,866,045
2,862,502
3,761,548
50200.552290 Science Lecture Hall / Planetarium (F)
3,264,445
3,264,445
-
-
419,340
13,933
80,781
324,626
50200.552320 Health Science Building - 2200 (E,F)
2,786,371
2,786,371
-
-
50200.552330 Student Union/Cafeteria Building - 2300 (E,F,Y)
4,357,798
340,477
6,378
4,010,943
50200.552430 Building 3400, Automotive Technology (E,F)
2,350,000
1,156,648
635,941
557,411
50200.552440 Building 3500, Early Childhood Center (E,F)
81,226
81,226
-
-
50200.552111 B100 TV Studio
50200.552120 Administration Building - 200 (E,K,N,Y)
50200.552220 Buildings - 1200, 1300, PAC Plaza (E,F,N)
50200.552240 Industrial Technology Buildings - 1400, 1600 (E,F)
50200.552310 Biological Classrooms & Labs - 2100 (F)
50200.552460 Building 3800 Bookstore / Energy (J)
7,200,000
168,125
6,444,175
168,125
4,299,763
4,299,763
-
37,095,244
37,088,465
6,779
83,000
1,573,000
21,807,022
18,428,708
2,934,828
443,487
50200.552491 PE Complex - Strength & Fitness Center, Bldg 4000 (F)
6,802,000
6,113,410
246,077
442,513
50200.552500 Athletic Fields / Tennis Courts (E,F)
7,002,283
7,101,547
-
50200.552510 Grand Court (F)
1,744,014
15,394
-
1,728,620
50200.552520 Campus Repairs (E,F)
4,492,671
1,763,856
41,382
2,687,433
50200.552530 Temporary Faculty Offices (F)
1,466,208
1,466,208
-
-
50200.552480 Community and Student Services Center, Bldg 700 (E,F,I)
50200.552481 Chabot Hesperian Landscape
50200.552490 Physical Education Complex Buildings (F)
1,656,000
(0)
(99,264)
Chabot-Las Positas Community College District
Facilities Modernization Program
Funded by Measure B
Data Date: August 26, 2013
Project Budget
Summary
DRAFT
Fund
Fund Description
50200.552540 Classroom/Lab Equipment & Library Materials (F)
50200.552560 CC Project & Construction Management (Y)
50200.552590 Central Plant (Mech Conv Def Bldgs / IT Infrastructure) (B,K)
50200.552620 Parking Lots A & B and G & H (F)
(A)
(B)
(C)
(D)
Current
Budget
Actual Expenditures
to Date
Unpaid
Commitments
Remaining Budget
A - (B+C) = D
14,550,000
8,707,980
399,744
5,442,276
7,913,485
4,695,169
1,568,051
1,650,266
27,909,591
26,201,313
106,474
1,601,803
9,420,654
9,420,204
450
50200.552621 Soccer Field Improvements (F)
977,743
977,743
-
-
50200.552622 Parking Lot Security and Marquee
788,800
579,000
209,800
50200.552630 Maintenance & Operations Facility (H)
224,445
224,445
-
-
50200.552640 Swimming Pool (E,F)
2,198,900
2,074,246
-
124,654
50200.552650 Miscellaneous Site Work / Campus Security (F)
2,885,899
2,362,056
22,931
500,912
50200.552651 Campus Signage
50200.552660 Photo Voltaic Project (K)
CHABOT COLLEGE TOTALS
357,500
(0)
357,500
12,254,171
12,070,157
183,014
1,000
254,146,752
205,993,721
10,534,540
37,618,492
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552110
552110
552110
552110
552110
552110
552110
552110
552110
Fund Title
Library Building - 100 (F)
Library Building - 100 (F)
Library Building - 100 (F)
Library Building - 100 (F)
Library Building - 100 (F)
Library Building - 100 (F)
Library Building - 100 (F)
Library Building - 100 (F)
Library Building - 100 (F)
Account
588402
6202
6210
6215
6222
622201
6235
6241
6401
Account Title
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
9,325.54
310,000.00
36,674.46
31,000.00
46,500.00
3,100,000.00
46,500.00
93,000.00
3,673,000.00
31,000.00
93,000.00
310,000.00
4,107,000.00
5887BD PROJECT CONTINGENCY
294,555.00
10,164.11
(3,000.00)
(693.22)
(300,000.00)
1,025.89
(1,025.89)
0.00
93,000.00
4,200,000.00
Page 3 of 152
Budget
Adjustments
0.00
Current Budget
% of
Constru
ction
9,325.54
604,555.00
10,164.11
33,674.46
31,000.00
45,806.78
2,800,000.00
46,500.00
93,000.00
3,674,025.89
0.3%
21.6%
0.4%
1.2%
1.1%
1.6%
29,974.11
93,000.00
310,000.00
1.1%
3.3%
11.1%
1.7%
3.3%
31.2%
4,107,000.00
93,000.00
3.3%
4,200,000.00
18.8%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552120
552120
552120
552120
552120
552120
552120
552120
552120
552120
552120
552120
552120
552120
552120
Fund Title
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Administration Building - 200 (E,K,N,Y)
Account
2303
3320
3520
3620
2101
588402
6202
6215
6222
622201
6235
6241
6401
640101
640105
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
MOVING/RELOCATION EXPENSE
DESIGN
SPECIALTY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
FF&E >$5,000, CAPITALIZED
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
1,330.00
79,000.00
10,520.00
7,900.00
11,850.00
790,000.00
7,900.00
72,840.09
19,850.52
1,001,190.61
28,785.00
(256,226.01)
(1,580.00)
220,019.98
4,281.02
0.00
0.00
21,313.17
1,133,103.78
Page 4 of 152
164.60
12.30
1.81
2.03
180.74
4,539.27
7,900.00
23,700.00
79,000.00
1,111,790.61
5887BD PROJECT CONTINGENCY
Budget
Adjustments
0.00
Current Budget
% of
Constru
ction
164.60
12.30
1.81
2.03
180.74
5,869.27
79,000.00
39,305.00
7,900.00
11,850.00
533,773.99
6,320.00
292,860.07
24,131.54
1,001,190.61
0.0%
0.0%
0.0%
0.0%
0.0%
1.1%
14.8%
7.4%
1.5%
2.2%
7,900.00
23,700.00
79,000.00
1.5%
4.4%
14.8%
1.2%
54.9%
4.5%
0.88
1,111,790.61
21,313.17
4.0%
1,133,103.78
24.7%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552130
552130
552130
552130
552130
552130
552130
552130
552130
552130
552130
552130
552130
552130
552130
552130
Fund Title
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Classroom Buildings 300, 500 (E,F)
Consolidation #1, Buildings 300/500
Account
2303
3320
3520
3620
2101
5730
588402
6202
6210
6215
6222
622201
6235
6241
6401
640101
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
ATTORNEY FEES
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 5 of 152
BOARD
APPROVED
BUDGET 11/08
6,480.00
700,000.00
130,462.14
100,810.00
121,500.00
9,487,916.00
101,250.00
956,093.81
29,514.19
11,634,026.14
Budget
Adjustments
6,277.76
480.87
35.70
76.62
6,870.95
9,716.61
3,188.44
174,249.79
472,055.55
11,116.32
(15,020.84)
(813,490.99)
(30,310.28)
(181,624.45)
Current Budget
6,277.76
480.87
35.70
76.62
6,870.95
9,716.61
9,668.44
874,249.79
472,055.55
141,578.46
85,789.16
121,500.00
8,674,425.01
101,250.00
925,783.53
29,514.19
11,452,401.69
-
% of
Constru
ction
0.1%
0.0%
0.0%
0.0%
0.1%
0.1%
0.1%
10.1%
5.4%
1.6%
1.0%
1.4%
1.2%
10.7%
0.3%
32.0%
62,000.00
305,378.33
810,000.00
(62,000.00)
(305,378.33)
(810,000.00)
0.0%
0.0%
0.0%
12,811,404.47
(1,359,002.78)
11,452,401.69
327,326.13
(258,706.51)
68,619.62
0.8%
13,138,730.60
(1,617,709.29)
11,521,021.31
0.8%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552150
552150
552150
552150
552150
552150
552150
Fund Title
Social Sciences Classrooms, Bldg 500 (E,F)
Social Sciences Classrooms, Bldg 500 (E,F)
Social Sciences Classrooms, Bldg 500 (E,F)
Social Sciences Classrooms, Bldg 500 (E,F)
Social Sciences Classrooms, Bldg 500 (E,F)
Social Sciences Classrooms, Bldg 500 (E,F)
Social Sciences Classrooms, Bldg 500 (E,F)
Consolidation #1, Buildings 300/500 (552130)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 6 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
552170
Fund Title
Account
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
Instructional Office Building 400 (H)
2101
2301
2302
2303
3220
3320
3420
3520
3620
3720
2101
588402
6202
6210
6215
6222
622201
6235
6241
6401
640101
Account Title
REGULAR
HOURLY
HOURLY REGULAR
OVERTIME
PERS OTHER CLASS EMPLOYEES
OASDHI OTHER CLASS EMPLOYEES
H & W OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
ARS-CLASS OTHER
PAYROLL & RELATED
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
1,252,500.00
190,479.26
82,709.00
219,600.00
14,216,944.19
111,160.64
838,410.00
16,911,803.09
156.67
2,418.18
1,681.81
6,546.12
43.60
549.09
66.38
36.73
131.68
167.74
11,798.00
7,309.29
32,508.65
556,888.78
22,172.98
3,611.37
88,130.00
784,647.05
11,898.91
(77,083.75)
3,884.75
1,445,766.03
79,367.53
694,096.00
(79,367.53)
17,685,266.62
5887BD PROJECT CONTINGENCY
314,013.95
17,999,280.57
Page 7 of 152
Budget
Adjustments
(694,096.00)
672,302.50
(314,013.95)
358,288.55
Current Budget
156.67
2,418.18
1,681.81
6,546.12
43.60
549.09
66.38
36.73
131.68
167.74
11,798.00
7,309.29
1,285,008.65
556,888.78
212,652.24
86,320.37
307,730.00
15,001,591.24
123,059.55
761,326.25
3,884.75
18,357,569.12
-
% of
Constru
ction
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.1%
0.0%
8.6%
3.7%
1.4%
0.6%
2.1%
0.8%
5.1%
0.0%
22.4%
0.0%
0.0%
0.0%
18,357,569.12
18,357,569.12
0.0%
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552180
552180
552180
552180
552180
552180
552180
552180
552180
552180
552180
552180
552180
552180
552180
552180
552180
Fund Title
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Classroom Buildings 800, 900, 1000 (E,F)
Consolidation #2&7, Buildings 800/900&1000
Account
2303
3320
3520
3620
2101
5110
588402
6202
6210
6215
6222
622201
6235
6241
6401
640101
640105
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
PROFESSIONAL SERVICES
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
FF&E >$5,000, CAPITALIZED
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 8 of 152
BOARD
APPROVED
BUDGET 11/08
2,337.73
179.03
1.16
28.49
2,546.41
11,320.17
793,867.34
68,329.00
48,381.46
43,275.00
3,755,452.42
27,856.00
338,110.09
175,483.03
5,264,620.92
Budget
Adjustments
25.00
(32,669.42)
103,704.09
(3,715.41)
3,669.38
(6,942.50)
(285,953.22)
(18,991.37)
(63,486.56)
53,802.92
9,724.43
(240,832.66)
37,555.00
375,545.00
(37,555.00)
(375,545.00)
5,677,720.92
(653,932.66)
224,387.90
(224,387.90)
5,902,108.82
(878,320.56)
Current Budget
2,337.73
179.03
1.16
28.49
2,546.41
25.00
11,320.17
761,197.92
103,704.09
64,613.59
52,050.84
36,332.50
3,469,499.20
8,864.63
274,623.53
229,285.95
9,724.43
5,023,788.26
-
% of
Constru
ction
0.1%
0.0%
0.0%
0.0%
0.1%
0.0%
0.3%
21.9%
3.0%
1.9%
1.5%
1.0%
0.3%
7.9%
6.6%
0.3%
44.8%
0.0%
0.0%
0.0%
5,023,788.26
5,023,788.26
0.0%
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552190
552190
552190
552190
552190
552190
552190
Fund Title
Humanities Classrooms, Bldg 900 (E,F)
Humanities Classrooms, Bldg 900 (E,F)
Humanities Classrooms, Bldg 900 (E,F)
Humanities Classrooms, Bldg 900 (E,F)
Humanities Classrooms, Bldg 900 (E,F)
Humanities Classrooms, Bldg 900 (E,F)
Humanities Classrooms, Bldg 900 (E,F)
Consolidation #2, Buildings 800/900 (552180)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 9 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552200
552200
552200
552200
552200
552200
552200
Fund Title
Art Classrooms & Studios, Bldg 1000 (E,F)
Art Classrooms & Studios, Bldg 1000 (E,F)
Art Classrooms & Studios, Bldg 1000 (E,F)
Art Classrooms & Studios, Bldg 1000 (E,F)
Art Classrooms & Studios, Bldg 1000 (E,F)
Art Classrooms & Studios, Bldg 1000 (E,F)
Art Classrooms & Studios, Bldg 1000 (E,F)
Consolidation #7, Buildings 800/900/1000 (552180)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 10 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552210
552210
552210
552210
552210
552210
552210
552210
552210
552210
552210
552210
552210
552210
Fund Title
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Buildings - 1100, 1500, 2000 (F)
Consolidation #8, Buildings 1100/1500/2000
Account
2303
3320
3520
3620
2101
588402
6202
6210
6215
6222
622201
6235
6241
6401
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
0.00
4,580.82
529,714.20
74,876.31
53,544.02
79,457.13
5,297,142.00
47,971.42
161,911.46
6,249,197.36
52,971.42
158,914.26
529,714.20
6,990,797.24
5887BD PROJECT CONTINGENCY
1,322.35
101.32
21.29
16.39
1,461.35
1,355.34
(1,461.35)
1,355.34
(1,355.34)
-
158,914.26
7,149,711.50
Page 11 of 152
Budget
Adjustments
-
Current Budget
% of
Constru
ction
1,322.35
101.32
21.29
16.39
1,461.35
4,580.82
529,714.20
1,355.34
74,876.31
53,544.02
79,457.13
5,295,680.65
47,971.42
161,911.46
6,250,552.70
0.0%
0.0%
0.0%
0.0%
0.00
0.1%
10.0%
0.0%
1.4%
1.0%
1.5%
51,616.08
158,914.26
529,714.20
1.0%
3.0%
10.0%
0.9%
3.1%
0.18
6,990,797.24
158,914.26
3.0%
7,149,711.50
17.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552220
552220
552220
552220
552220
552220
552220
552220
552220
552220
552220
552220
552220
552220
552220
552220
552220
552220
552220
552220
Fund Title
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Buildings - 1200, 1300, PAC Plaza (E,F,N)
Consolidation #6, Buildings 1200/1300/PAC
Account
2303
3320
3520
3620
2101
5610
5611
5711
5730
588402
6202
6210
6215
6222
622201
6235
6241
6401
640101
640105
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
RENTAL OF EQUIPMENT
RENTAL OF FACILITIES
LEGAL ADVERTISING
ATTORNEY FEES
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
FF&E >$5,000, CAPITALIZED
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 12 of 152
BOARD
APPROVED
BUDGET 11/08
0.00
459.92
2,964.00
671,976.00
58,028.55
64,562.23
95,884.50
6,290,120.00
69,903.75
205,816.50
111,603.47
7,571,318.92
62,901.00
188,704.00
629,012.00
Budget
Adjustments
385.72
29.26
5.42
4.78
425.18
2,646.01
8,000.00
Current Budget
% of
Constru
ction
22,605.80
28,024.00
432,600.00
41,971.45
851.59
34,495.50
2,943,947.12
(15,954.35)
(160,449.20)
22,433.50
12,524.40
3,374,121.00
385.72
29.26
5.42
4.78
425.18
2,646.01
8,000.00
459.92
25,569.80
700,000.00
432,600.00
100,000.00
65,413.82
130,380.00
9,234,067.12
53,949.40
45,367.30
134,036.97
12,524.40
10,945,439.92
0.0%
0.0%
0.0%
0.0%
0.00
0.0%
0.1%
0.0%
0.0%
0.3%
7.6%
4.7%
1.1%
0.7%
1.4%
(62,901.00)
(188,704.00)
76,188.00
705,200.00
0.0%
0.0%
7.6%
0.6%
0.5%
1.5%
0.1%
0.19
8,451,935.92
3,198,704.00
11,650,639.92
197,463.67
101,296.00
298,759.67
3.2%
8,649,399.59
3,300,000.00
11,949,399.59
10.9%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552230
552230
552230
552230
552230
552230
552230
552230
Fund Title
PAC / Plaza Building - 1300 (E,F,N)
PAC / Plaza Building - 1300 (E,F,N)
PAC / Plaza Building - 1300 (E,F,N)
PAC / Plaza Building - 1300 (E,F,N)
PAC / Plaza Building - 1300 (E,F,N)
PAC / Plaza Building - 1300 (E,F,N)
PAC / Plaza Building - 1300 (E,F,N)
PAC / Plaza Building - 1300 (E,F,N)
Consolidation #6, Buildings 1200/1300/PAC (552220)
Account
5711
6202
6215
6222
622201
6235
6241
6401
Account Title
LEGAL ADVERTISING
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 13 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552240
552240
552240
552240
552240
552240
552240
552240
552240
552240
552240
552240
552240
552240
552240
552240
552240
552240
552240
Fund Title
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Industrial Technology Buildings - 1400, 1600 (E,F)
Consolidation #10, Buildings 1400/1600
Account
2303
3320
3520
3620
2101
5110
5730
588402
6202
6210
6215
6222
622201
6235
6241
6401
640101
640105
6422
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
PROFESSIONAL SERVICES
ATTORNEY FEES
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
FF&E >$5,000, CAPITALIZED
SOFTWARE
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 14 of 152
BOARD
APPROVED
BUDGET 11/08
3,160.00
455,400.00
83,787.73
56,925.00
56,925.00
3,795,000.00
56,925.00
303,600.00
4,811,722.73
37,950.00
113,850.00
379,500.00
Budget
Adjustments
2,606.31
199.64
22.45
31.79
2,860.19
1,472.50
Current Budget
% of
Constru
ction
48,156.26
78,359.72
370,264.93
(3,196.78)
9,820.00
32,075.00
1,027,048.20
12,275.00
(232,502.02)
2,706.38
26,962.02
2,611.44
1,378,912.84
2,606.31
199.64
22.45
31.79
2,860.19
1,472.50
51,316.26
533,759.72
370,264.93
80,590.95
66,745.00
89,000.00
4,822,048.20
69,200.00
71,097.98
2,706.38
26,962.02
2,611.44
6,190,635.57
0.1%
0.0%
0.0%
0.0%
0.1%
0.0%
0.0%
1.1%
11.1%
7.7%
1.7%
1.4%
1.8%
(37,950.00)
(113,850.00)
71,358.25
450,858.25
0.0%
0.0%
9.3%
1.4%
1.5%
0.1%
0.6%
0.1%
28.4%
5,343,022.73
1,298,471.09
6,641,493.82
113,850.00
30,532.75
144,382.75
3.0%
5,456,872.73
1,329,003.84
6,785,876.57
12.3%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552250
552250
552250
552250
552250
552250
552250
Fund Title
Technology Building - 1500 (F)
Technology Building - 1500 (F)
Technology Building - 1500 (F)
Technology Building - 1500 (F)
Technology Building - 1500 (F)
Technology Building - 1500 (F)
Technology Building - 1500 (F)
Consolidation #8, Buildings 1100/1500/2000 (552210)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 15 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552260
552260
552260
552260
552260
552260
552260
552260
Fund Title
Engineering Building - 1600 (F)
Engineering Building - 1600 (F)
Engineering Building - 1600 (F)
Engineering Building - 1600 (F)
Engineering Building - 1600 (F)
Engineering Building - 1600 (F)
Engineering Building - 1600 (F)
Engineering Building - 1600 (F)
Consolidation #10, Buildings 1400/1600 (552240)
Account
588402
6202
6215
6222
622201
6235
6241
6401
Account Title
BOARD
APPROVED
BUDGET 11/08
Budget
Adjustments
Current Budget
MOVING/RELOCATION EXPENSE
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
23,106.00
117,840.00
15,397.09
9,820.00
14,730.00
940,042.00
12,275.00
29,460.00
1,162,670.09
(23,106.00)
(117,840.00)
(15,397.09)
(9,820.00)
(14,730.00)
(940,042.00)
(12,275.00)
(29,460.00)
(1,162,670.09)
-
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
9,400.00
28,201.00
98,200.00
(9,400.00)
(28,201.00)
(98,200.00)
-
1,298,471.09
(1,298,471.09)
-
30,532.75
(30,532.75)
-
1,329,003.84
(1,329,003.84)
-
5887BD PROJECT CONTINGENCY
Page 16 of 152
% of
Constru
ction
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
Fund Title
552270 Building 1700 (E,F)
552270 Building 1700 (E,F)
Consolidation #9, Buildings 1700/1800 (552280)
Account
6215
6235
Account Title
SPECIALITY CONSULTING
CONSTRUCTION
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 17 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552280
552280
552280
552280
552280
552280
552280
552280
552280
552280
552280
552280
552280
552280
552280
Fund Title
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Classroom Bldgs 1700, 1800 (E,F)
Consolidation #9, Buildings 1700/1800
Account
2303
3320
3520
3620
2101
588402
6202
6210
6215
6222
622201
6235
6241
6401
640101
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
3,130.44
236.84
33.43
38.56
3,439.27
21,151.01
235,512.00
140,767.43
74,774.75
28,676.92
(9,624.43)
(2,124,447.83)
(28,676.92)
1,670,686.35
66,880.95
77,570.00
3,130.44
236.84
33.43
38.56
3,439.27
21,151.01
1,011,212.00
140,767.43
207,119.82
106,246.92
106,730.57
5,632,552.17
48,893.08
1,833,584.76
137,278.59
9,248,975.62
0.1%
0.0%
0.0%
0.0%
0.00
0.4%
18.0%
2.5%
3.7%
1.9%
1.9%
77,570.00
232,710.00
775,700.00
(77,570.00)
232,710.00
775,700.00
0.0%
4.1%
13.8%
-
232,710.00
10,490,095.62
Page 18 of 152
Current Budget
% of
Constru
ction
775,700.00
132,345.07
77,570.00
116,355.00
7,757,000.00
77,570.00
162,898.41
70,397.64
9,171,405.62
10,257,385.62
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
0.9%
32.6%
2.4%
0.64
10,257,385.62
232,710.00
4.1%
10,490,095.62
22.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552290
552290
552290
552290
552290
552290
552290
552290
552290
552290
552290
552290
552290
552290
552290
552290
552290
552290
Fund Title
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Science Lecture Hall / Planetarium (F)
Account
2301
2303
3220
3320
3520
3620
2101
5730
588402
6202
6210
6215
6222
622201
6235
6241
6401
640101
Account Title
HOURLY
OVERTIME
PERS OTHER CLASS EMPLOYEES
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
ATTORNEY FEES
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 19 of 152
BOARD
APPROVED
BUDGET 11/08
Budget
Adjustments
759.50
2,560.00
558,600.00
40,129.01
32,000.00
48,000.00
3,349,318.00
41,286.91
100,000.00
4,172,653.42
89.41
1,577.81
8.68
127.72
5.00
20.31
1,828.93
(655.08)
22,498.00
220,551.67
(14,263.01)
(10,870.00)
7,440.00
(1,041,223.78)
(36,296.16)
(66,635.27)
9,416.30
(908,208.40)
33,493.00
100,480.00
334,932.00
(33,493.00)
(100,480.00)
(334,932.00)
4,641,558.42
(1,377,113.40)
56,227.81
(56,227.81)
4,697,786.23
(1,433,341.21)
Current Budget
89.41
1,577.81
8.68
127.72
5.00
20.31
1,828.93
759.50
1,904.92
581,098.00
220,551.67
25,866.00
21,130.00
55,440.00
2,308,094.22
4,990.75
33,364.73
9,416.30
3,264,445.02
-
% of
Constru
ction
0.0%
0.1%
0.0%
0.0%
0.0%
0.0%
0.1%
0.0%
0.1%
25.2%
9.6%
1.1%
0.9%
2.4%
0.2%
1.4%
0.4%
41.4%
0.0%
0.0%
0.0%
3,264,445.02
3,264,445.02
0.0%
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552300
552300
552300
552300
552300
552300
552300
Fund Title
Science / Math Building - 2000 (F)
Science / Math Building - 2000 (F)
Science / Math Building - 2000 (F)
Science / Math Building - 2000 (F)
Science / Math Building - 2000 (F)
Science / Math Building - 2000 (F)
Science / Math Building - 2000 (F)
Consolidation #8, Buildings 1100/1500/2000 (552210)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 20 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552310
552310
552310
552310
552310
552310
552310
552310
Fund Title
Biological Classrooms & Labs - 2100 (F)
Biological Classrooms & Labs - 2100 (F)
Biological Classrooms & Labs - 2100 (F)
Biological Classrooms & Labs - 2100 (F)
Biological Classrooms & Labs - 2100 (F)
Biological Classrooms & Labs - 2100 (F)
Biological Classrooms & Labs - 2100 (F)
Biological Classrooms & Labs - 2100 (F)
Account
6201
6202
6215
6222
622201
6235
6241
6401
Account Title
BUILDING ALTERATIONS & IMPROV
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 21 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
552320
Fund Title
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Health Science Building - 2200 (E,F)
Account
2101
2303
3120
3320
3420
3520
3620
3720
2101
5210
5610
588402
6202
6210
6215
6222
622201
6235
6241
6401
640101
Account Title
REGULAR
OVERTIME
STRS OTHER CLASS EMPLOYEES
OASDHI OTHER CLASS EMPLOYEES
H & W OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
ARS-CLASS OTHER
PAYROLL & RELATED
TRAVEL EXPENSE
RENTAL OF EQUIPMENT
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 22 of 152
BOARD
APPROVED
BUDGET 11/08
Budget
Adjustments
15,555.23
310,000.00
75,500.00
46,500.00
46,500.00
3,400,000.00
46,500.00
141,438.45
64,723.92
4,146,717.60
1,805.77
1,363.25
12.20
130.62
123.72
12.62
38.35
65.93
3,552.46
77.75
1,251.15
(12,148.21)
(74,840.00)
115,882.72
(40,922.87)
(25,370.86)
(15,860.00)
(1,227,601.71)
(19,236.38)
(78,078.64)
12,947.74
(1,360,346.85)
34,000.00
102,000.00
340,000.00
(34,000.00)
(102,000.00)
(340,000.00)
4,622,717.60
(1,836,346.85)
51,000.00
(51,000.00)
4,673,717.60
(1,887,346.85)
Current Budget
1,805.77
1,363.25
12.20
130.62
123.72
12.62
38.35
65.93
3,552.46
77.75
1,251.15
3,407.02
235,160.00
115,882.72
34,577.13
21,129.14
30,640.00
2,172,398.29
27,263.62
63,359.81
77,671.66
2,786,370.75
-
% of
Constru
ction
0.1%
0.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.2%
0.0%
0.1%
0.2%
10.8%
5.3%
1.6%
1.0%
1.4%
1.3%
2.9%
3.6%
28.3%
0.0%
0.0%
0.0%
2,786,370.75
2,786,370.75
0.0%
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552330
552330
552330
552330
552330
552330
552330
552330
552330
552330
552330
552330
552330
552330
552330
552330
552330
Fund Title
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Student Union/Cafeteria Building - 2300 (E,F,Y)
Account
2303
3320
3520
3620
3621
5647
588402
6201
6202
6215
6222
622201
6235
6241
6401
640101
640105
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
EQUIP MAINT - ALL OTHER SERVIC
MOVING/RELOCATION EXPENSE
BUILDING ALTERATIONS & IMPROV
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
FF&E >$5,000, CAPITALIZED
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
3,668.00
322,500.00
48,375.00
32,250.00
48,375.00
3,225,000.00
32,250.00
56,926.27
40,203.79
3,809,548.06
37,631.35
(254,538.75)
(33,114.30)
35,007.23
202,926.43
-
-
96,750.00
4,357,798.06
Page 23 of 152
329.02
24.75
3.62
4.07
361.46
11,726.58
32,250.00
96,750.00
322,500.00
4,261,048.06
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
Current Budget
% of
Constru
ction
329.02
24.75
3.62
4.07
361.46
11,726.58
3,668.00
37,631.35
322,500.00
48,375.00
32,250.00
48,375.00
2,970,461.25
32,250.00
23,811.97
75,211.02
202,926.43
3,809,548.06
0.0%
0.0%
0.0%
0.0%
0.00
0.4%
0.1%
1.3%
10.9%
1.6%
1.1%
1.6%
32,250.00
96,750.00
322,500.00
1.1%
3.3%
10.9%
1.1%
0.8%
2.5%
6.8%
28.2%
4,261,048.06
96,750.00
3.3%
4,357,798.06
18.5%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552350
552350
552350
552350
552350
552350
552350
Fund Title
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Consolidation #3, PE Complex (552490)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 24 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552360
552360
552360
552360
552360
552360
552360
Fund Title
PE Health/Faculty Offices & Clsrms, Bldg 2600 (F)
PE Health/Faculty Offices & Clsrms, Bldg 2600 (F)
PE Health/Faculty Offices & Clsrms, Bldg 2600 (F)
PE Health/Faculty Offices & Clsrms, Bldg 2600 (F)
PE Health/Faculty Offices & Clsrms, Bldg 2600 (F)
PE Health/Faculty Offices & Clsrms, Bldg 2600 (F)
PE Health/Faculty Offices & Clsrms, Bldg 2600 (F)
Consolidation #3, PE Complex (552490)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 25 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552370
552370
552370
552370
552370
552370
552370
Fund Title
PE Classroom & Labs, Bldg 2700 * (F)
PE Classroom & Labs, Bldg 2700 * (F)
PE Classroom & Labs, Bldg 2700 * (F)
PE Classroom & Labs, Bldg 2700 * (F)
PE Classroom & Labs, Bldg 2700 * (F)
PE Classroom & Labs, Bldg 2700 * (F)
PE Classroom & Labs, Bldg 2700 * (F)
Consolidation #3, PE Complex (552490)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 26 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552380
552380
552380
552380
552380
552380
552380
Fund Title
PE Classroom & Labs, Bldg 2800 * (F)
PE Classroom & Labs, Bldg 2800 * (F)
PE Classroom & Labs, Bldg 2800 * (F)
PE Classroom & Labs, Bldg 2800 * (F)
PE Classroom & Labs, Bldg 2800 * (F)
PE Classroom & Labs, Bldg 2800 * (F)
PE Classroom & Labs, Bldg 2800 * (F)
Consolidation #3, PE Complex (552490)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 27 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552390
552390
552390
552390
552390
552390
552390
Fund Title
Physical Education Classroom, Bldg 2900 * (F)
Physical Education Classroom, Bldg 2900 * (F)
Physical Education Classroom, Bldg 2900 * (F)
Physical Education Classroom, Bldg 2900 * (F)
Physical Education Classroom, Bldg 2900 * (F)
Physical Education Classroom, Bldg 2900 * (F)
Physical Education Classroom, Bldg 2900 * (F)
Consolidation #3, PE Complex (552490)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 28 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552430
552430
552430
552430
552430
552430
552430
552430
552430
552430
552430
552430
552430
552430
552430
552430
552430
Fund Title
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Building 3400, Automotive Technology (E,F)
Account
2303
3320
3420
3520
3620
2101
5152
5541
588402
6202
6210
6215
6222
622201
6235
6241
6401
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
H & W OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
CONTRACT SECURITY SERVICES
DATA COMMUNICATIONS
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 29 of 152
BOARD
APPROVED
BUDGET 11/08
Budget
Adjustments
Current Budget
% of
Constru
ction
-
2,083.26
159.57
501.81
15.01
25.39
2,785.04
10,000.00
30,000.00
74,298.22
154,120.00
60,125.00
43,991.74
24,050.00
36,075.00
1,552,500.00
21,243.00
120,250.00
2,129,438.00
2,083.26
159.57
501.81
15.01
25.39
2,785.04
10,000.00
30,000.00
74,298.22
154,120.00
60,125.00
43,991.74
24,050.00
36,075.00
1,552,500.00
21,243.00
120,250.00
2,129,438.00
0.1%
0.0%
0.0%
0.0%
0.0%
0.2%
0.6%
1.9%
4.8%
9.9%
3.9%
2.8%
1.5%
2.3%
1.4%
7.7%
37.2%
-
5,012.00
120,250.00
5,012.00
120,250.00
0.0%
0.3%
7.7%
-
2,254,700.00
2,254,700.00
-
95,300.00
95,300.00
6.1%
-
2,350,000.00
2,350,000.00
14.2%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552440
552440
552440
552440
552440
Fund Title
Building 3500, Early Childhood Center (E,F)
Building 3500, Early Childhood Center (E,F)
Building 3500, Early Childhood Center (E,F)
Building 3500, Early Childhood Center (E,F)
Building 3500, Early Childhood Center (E,F)
Account
Account Title
5110
6202
6235
6401
640101
PROFESSIONAL SERVICES
DESIGN
CONSTRUCTION
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
274.63
87,253.32
13,603.13
101,131.08
101,131.08
Page 30 of 152
274.63
(274.63)
(19,905.57)
(19,905.57)
101,131.08
5887BD PROJECT CONTINGENCY
Budget
Adjustments
Current Budget
274.63
67,347.75
13,603.13
81,225.51
-
(19,905.57)
(19,905.57)
% of
Constru
ction
0.4%
0.0%
0.0%
20.2%
20.6%
0.0%
0.0%
0.0%
81,225.51
81,225.51
0.0%
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552450
552450
552450
552450
552450
552450
552450
Fund Title
Building 3600 (F,Y)
Building 3600 (F,Y)
Building 3600 (F,Y)
Building 3600 (F,Y)
Building 3600 (F,Y)
Building 3600 (F,Y)
Building 3600 (F,Y)
Consolidation #5, Temporary Faculty Offices (552530)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 31 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
Fund Title
552460 Building 3800 Bookstore / Energy (J)
552460 Building 3800 Bookstore / Energy (J)
Account
Account Title
7110 DEBT RETIREMENT
711010 DEBT INTEREST
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
4,025,185.00
274,578.27
4,299,763.27
-
4,025,185.00
274,578.27
4,299,763.27
-
-
4,299,763.27
Page 32 of 152
Current Budget
4,299,763.27
5887BD PROJECT CONTINGENCY
Budget
Adjustments
4,299,763.27
-
-
4,299,763.27
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
552480
Fund Title
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Community and Student Services Center * (E,F,I)
Account
2301
2303
3220
3320
3420
3520
3620
3720
2101
5730
588402
6201
6202
6210
6215
6222
622201
6235
6241
6401
640101
640105
Account Title
HOURLY
OVERTIME
PERS OTHER CLASS EMPLOYEES
OASDHI OTHER CLASS EMPLOYEES
H & W OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
ARS-CLASS OTHER
PAYROLL & RELATED
ATTORNEY FEES
MOVING/RELOCATION EXPENSE
BUILDING ALTERATIONS & IMPROV
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
FF&E >$5,000, CAPITALIZED
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 33 of 152
BOARD
APPROVED
BUDGET 11/08
Budget
Adjustments
Current Budget
3,979.44
6,514.20
22.13
462.12
188.80
30.32
127.93
26.28
11,351.22
2,829.38
7,378.00
28,435.00
3,325,236.87
750,483.65
254,505.67
183,142.22
541,280.00
30,538,354.23
363,256.43
1,100,595.51
3,368.35
16,188.12
37,126,404.65
% of
Constru
ction
464.97
35.62
0.23
5.67
506.49
3,166,641.00
265,478.57
332,167.27
722,480.00
28,987,848.91
329,677.25
791,225.40
34,596,024.89
3,979.44
6,049.23
22.13
426.50
188.80
30.09
122.26
26.28
10,844.73
2,829.38
7,378.00
28,435.00
158,595.87
750,483.65
(10,972.90)
(149,025.05)
(181,200.00)
1,550,505.32
33,579.18
309,370.11
3,368.35
16,188.12
2,530,379.76
289,878.00
2,898,785.00
(289,878.00)
(2,898,785.00)
37,784,687.89
(658,283.24)
37,126,404.65
939,356.21
(441,716.76)
497,639.45
1.6%
38,724,044.10
(1,100,000.00)
37,624,044.10
1.6%
-
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.1%
10.9%
2.5%
0.8%
0.6%
1.8%
1.2%
3.6%
0.0%
0.1%
21.6%
0.0%
0.0%
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552490
552490
552490
552490
552490
552490
552490
552490
552490
552490
552490
552490
552490
552490
552490
552490
552490
552490
552490
Fund Title
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Physical Education Complex Buildings (F)
Consolidation #3, PE Complex
Account
2303
3320
3520
3620
2101
5210
5611
5620
5730
588402
6202
6210
6215
6222
622201
6235
6241
6401
640101
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
TRAVEL EXPENSE
RENTAL OF FACILITIES
M&O VENDOR REPAIRS
ATTORNEY FEES
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
10,319.04
2,355,090.00
114,698.43
170,677.88
253,482.00
17,832,117.00
211,235.00
506,964.00
21,454,583.35
27,112.50
1,940.50
45,025.46
144,910.00
680,000.00
58,809.78
(94,917.41)
48,238.00
(724,634.04)
(11,995.47)
(325,670.03)
3,706.03
(146,280.39)
178,321.00
534,964.00
1,783,218.00
(178,321.00)
(534,964.00)
(1,783,218.00)
23,951,086.35
(2,642,783.39)
317,935.92
24,269,022.27
Page 34 of 152
Budget
Adjustments
1,085.56
83.17
12.14
13.42
1,194.29
180,783.39
(2,462,000.00)
Current Budget
1,085.56
83.17
12.14
13.42
1,194.29
27,112.50
1,940.50
55,344.50
2,500,000.00
680,000.00
173,508.21
75,760.47
301,720.00
17,107,482.96
199,239.53
181,293.97
3,706.03
21,308,302.96
-
% of
Constru
ction
0.4%
0.0%
0.0%
0.0%
0.4%
0.0%
0.2%
0.0%
0.0%
0.3%
14.6%
4.0%
1.0%
0.4%
1.8%
1.2%
1.1%
0.0%
24.9%
0.0%
0.0%
0.0%
21,308,302.96
498,719.31
2.9%
21,807,022.27
2.9%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552491
552491
552491
552491
552491
552491
552491
552491
552491
Fund Title
PE Complex - Strength & Fitness Center, Bldg 4000 (F)
PE Complex - Strength & Fitness Center, Bldg 4000 (F)
PE Complex - Strength & Fitness Center, Bldg 4000 (F)
PE Complex - Strength & Fitness Center, Bldg 4000 (F)
PE Complex - Strength & Fitness Center, Bldg 4000 (F)
PE Complex - Strength & Fitness Center, Bldg 4000 (F)
PE Complex - Strength & Fitness Center, Bldg 4000 (F)
PE Complex - Strength & Fitness Center, Bldg 4000 (F)
PE Complex - Strength & Fitness Center, Bldg 4000 (F)
Sub-Project, PE Complex (552490)
Account
5110
5730
6210
6215
6222
622201
6235
6241
6401
Account Title
PROFESSIONAL SERVICES
ATTORNEY FEES
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 35 of 152
BOARD
APPROVED
BUDGET 11/08
-
Budget
Adjustments
95.00
10,000.00
410,000.00
26,000.00
40,000.00
204,000.00
5,577,000.65
169,013.00
Current Budget
% of
Constru
ction
6,436,108.65
95.00
10,000.00
410,000.00
26,000.00
40,000.00
204,000.00
5,577,000.65
169,013.00
6,436,108.65
0.0%
5.9%
7.4%
0.5%
0.7%
3.7%
3.0%
0.0%
21.2%
-
203,891.35
203,891.35
0.0%
0.0%
3.7%
-
6,640,000.00
6,640,000.00
-
162,000.00
162,000.00
2.9%
-
6,802,000.00
6,802,000.00
6.6%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552500
552500
552500
552500
552500
552500
552500
552500
552500
552500
552500
552500
552500
552500
552500
552500
552500
552500
Fund Title
Account
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
Athletic Fields / Tennis Courts (E,F)
2303
3320
3520
3620
2101
5611
5730
5822
6202
6210
6215
6222
622201
6235
6241
6401
640101
640105
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
RENTAL OF FACILITIES
ATTORNEY FEES
UPS/FED EX SERVICE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
FF&E >$5,000, CAPITALIZED
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 36 of 152
BOARD
APPROVED
BUDGET 11/08
1,440.00
3,587.35
117.83
698,715.62
6,414.80
44,755.00
121,487.00
5,536,715.60
143,747.00
14,176.50
6,571,156.70
Budget
Adjustments
768.64
58.87
5.53
9.37
842.41
109,198.29
(28,750.00)
234,039.81
(12,778.79)
144,408.47
(41,021.40)
315.21
1,201.63
9,426.03
416,881.66
(55,367.00)
Current Budget
% of
Constru
ction
768.64
58.87
5.53
9.37
842.41
1,440.00
112,785.64
117.83
669,965.62
234,039.81
6,414.80
31,976.21
121,487.00
5,681,124.07
102,725.60
315.21
15,378.13
9,426.03
6,988,038.36
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
2.0%
0.0%
11.8%
4.1%
0.1%
0.6%
2.1%
0.0%
0.0%
0.3%
55,367.00
416,956.40
(402,711.37)
14,245.03
7,043,480.10
(41,196.71)
7,002,283.39
1,332.08
(1,332.08)
7,044,812.18
(42,528.79)
7,002,283.39
1.8%
0.0%
0.3%
0.2%
23.0%
0.0%
0.3%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552510
552510
552510
552510
552510
552510
Fund Title
Grand Court (F)
Grand Court (F)
Grand Court (F)
Grand Court (F)
Grand Court (F)
Grand Court (F)
Account
6202
6215
6222
622201
6235
6241
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
155,879.88
5,000.00
13,119.89
19,484.99
1,298,999.00
16,237.49
1,508,721.25
5887BD PROJECT CONTINGENCY
12.0%
0.4%
1.0%
1.5%
-
155,879.88
5,000.00
13,119.89
19,484.99
1,298,999.00
16,237.49
1,508,721.25
12,990.00
38,970.00
129,899.90
1.0%
3.0%
10.0%
-
53,433.00
1,744,014.15
Page 37 of 152
Current Budget
12,990.00
38,970.00
129,899.90
1,690,581.15
% of
Constru
ction
Budget
Adjustments
-
1.3%
16.1%
1,690,581.15
53,433.00
4.1%
1,744,014.15
18.1%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552520
552520
552520
552520
552520
552520
552520
552520
552520
552520
552520
552520
552520
552520
552520
552520
552520
552520
552520
552520
Fund Title
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Campus Repairs (E,F)
Account
2303
3220
3320
3420
3520
3620
2101
5630
5711
5822
588402
6120
6202
6210
6215
6222
622201
6235
6241
6401
Account Title
OVERTIME
PERS OTHER CLASS EMPLOYEES
OASDHI OTHER CLASS EMPLOYEES
H & W OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
DEFERRED MAINTENANCE
LEGAL ADS
UPS/FED EX SERVICE
MOVING/RELOCATION EXPENSE
SITE IMPROVEMENTS
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 38 of 152
BOARD
APPROVED
BUDGET 11/08
377.28
30.72
330,000.00
4,911.50
82,427.47
33,000.00
49,500.00
3,300,000.00
33,000.00
99,000.00
3,932,246.97
Budget
Adjustments
9,436.29
564.34
715.26
149.38
97.36
114.10
11,076.73
22,018.49
487.50
50,000.00
(170,826.61)
85,255.00
(5,742.50)
(1,654,276.61)
(30,000.00)
(1,692,008.00)
Current Budget
% of
Constru
ction
9,436.29
564.34
715.26
149.38
97.36
114.10
11,076.73
22,018.49
377.28
30.72
487.50
50,000.00
159,173.39
4,911.50
167,682.47
27,257.50
49,500.00
1,645,723.39
33,000.00
69,000.00
2,240,238.97
0.6%
0.0%
0.0%
0.0%
0.0%
0.0%
0.7%
1.3%
0.0%
0.0%
0.0%
3.0%
9.7%
0.3%
10.2%
1.7%
3.0%
0.0%
0.0%
20.1%
2.0%
4.2%
36.1%
33,000.00
99,000.00
330,000.00
(33,000.00)
(99,000.00)
330,000.00
4,394,246.97
(1,824,008.00)
2,570,238.97
97,375.47
1,825,056.28
1,922,431.75
116.8%
4,491,622.44
1,048.28
4,492,670.72
136.9%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552530
552530
552530
552530
552530
552530
552530
552530
552530
552530
552530
552530
552530
552530
552530
Fund Title
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Temporary Faculty Offices (F)
Consolidation #5, Temporary Faculty Offices
Account
2303
3320
3520
3620
2101
588402
6202
6210
6215
6222
622201
6235
6241
6401
640101
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 39 of 152
BOARD
APPROVED
BUDGET 11/08
Budget
Adjustments
24,558.38
110,579.44
60,031.50
11,918.00
17,700.00
1,214,198.56
5,750.00
7,908.87
7,891.13
1,460,535.88
849.86
65.11
2.54
10.38
927.89
3,419.00
(12,416.11)
34,202.25
(3,826.84)
(11,918.00)
(9,600.00)
8,131.15
(2,917.50)
(329.30)
12,142.00
44,000.00
(12,142.00)
1,516,677.88
(50,469.46)
46,959.63
(46,959.63)
1,563,637.51
(97,429.09)
5,672.54
(44,000.00)
Current Budget
849.86
65.11
2.54
10.38
927.89
27,977.38
98,163.33
34,202.25
56,204.66
8,100.00
1,222,329.71
2,832.50
7,579.57
7,891.13
1,466,208.42
-
% of
Constru
ction
0.1%
0.0%
0.0%
0.0%
0.1%
2.3%
8.0%
2.8%
4.6%
0.0%
0.7%
0.2%
0.6%
0.6%
20.0%
0.0%
0.0%
0.0%
1,466,208.42
1,466,208.42
0.0%
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552540
552540
552540
552540
552540
552540
552540
552540
552540
552540
552540
552540
552540
552540
552540
552540
552540
Fund Title
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Classroom/Lab Equipment & Library Materials (F)
Account
4329
5610
5641
5647
5711
5833
588402
6201
6215
6301
6401
640101
640105
6421
6422
7110
711010
Account Title
SPECIAL PROGRAM SUPPLIES
RENTAL OF EQUIPMENT
MAINTENANCE - SOFTWARE
EQUIP MAINT - ALL OTHER SERVIC
LEGAL ADS
CATALOGING SERVICE
MOVING/RELOCATION EXPENSE
BUILDING ALTERATIONS & IMPROV
SPECIALTY CONSULTING
LIBRARY BOOKS & MATERIALS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
FF&E >$5,000, CAPITALIZED
COMPUTERS/SOFTWARE
SOFTWARE
DEBT PRINCIPAL
DEBT INTEREST
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
10,387.58
7,856.88
159.10
99,000.00
5,067.75
19,222.33
100,000.00
1,500,000.00
4,268,958.00
7,009,607.50
1,500,000.00
29,519.97
220.89
14,550,000.00
14,550,000.00
Page 40 of 152
2,466.17
12,573.84
(810.00)
127,364.16
(494,086.87)
(1,500,232.73)
(2,172,284.07)
2,277,552.43
(1,312,648.75)
60,105.82
(3,000,000.00)
14,550,000.00
5887BD PROJECT CONTINGENCY
Budget
Adjustments
Current Budget
2,466.17
22,961.42
7,046.88
159.10
99,000.00
5,067.75
146,586.49
100,000.00
1,005,913.13
2,768,725.27
4,837,323.43
2,277,552.43
187,351.25
60,105.82
29,519.97
220.89
11,550,000.00
-
(3,000,000.00)
11,550,000.00
3,000,000.00
3,000,000.00
-
14,550,000.00
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
552560
Fund Title
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
CC Project & Construction Management (Y)
Account
2111
3221
3321
3421
3521
3621
2101
4301
5210
5301
5540
5610
5711
5730
5820
5822
5850
588402
6202
620203
6210
6213
6214
6215
6235
6401
640101
Account Title
MANAGEMENT
PERS-CLASS ADMINISTRATORS
OASDHI CLASS MANAGERS
H & W CLASS MANAGERS
SUI CLASS MANAGERS
WCI CLASS MANAGERS
PAYROLL & RELATED
OFFICE SUPPLIES
TRAVEL EXPENSE
INSTITUTIONAL MEMBERSHIPS
TELEPHONE SERVICE
RENTAL OF EQUIPMENT
LEGAL ADVERTISING
ATTORNEY FEES
POSTAL & DELIVERY SERVICE
UPS/FED EX SERVICE
LICENSES & PERMITS
MOVING/RELOCATION EXPENSE
DESIGN
DESIGN; REPROGRAPHICS
PROJECT/CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROGRAM MANAGEMENT
SPECIALITY CONSULTING
CONSTRUCTION
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
1,076,342.00
1,076,342.00
30,892.00
3,095.00
21,600.00
34,250.00
52,080.00
5,314.00
68,740.00
11,275.00
238,578.00
12,000.00
246,237.00
3,938,154.34
411,739.50
603,631.51
1,138,564.00
18,795.00
8,109.00
6,742.50
7,929,138.85
342,634.99
8,271,773.84
Page 41 of 152
-
1,100.00
3,000.00
(2,876.43)
(10,678.18)
81,825.28
(369,246.55)
20,000.00
(91,147.10)
1,776.43
(369,246.55)
7,929,138.85
5887BD PROJECT CONTINGENCY
Budget
Adjustments
Current Budget
% of
Constru
ction
1,076,342.00
1,076,342.00
30,892.00
3,095.00
1,100.00
3,000.00
21,600.00
34,250.00
52,080.00
5,314.00
68,740.00
8,398.57
227,899.82
12,000.00
328,062.28
3,568,907.79
411,739.50
623,631.51
1,047,416.90
18,795.00
8,109.00
8,518.93
7,559,892.30
-
(369,246.55)
10,958.00
(358,288.55)
7,559,892.30
353,592.99
7,913,485.29
4.7%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
Fund Title
552570 IT Infrastructure (B)
552570 IT Infrastructure (B)
552570 IT Infrastructure (B)
Consolidation #4, Central Utility Plant (552590)
Account
6202
6235
6241
Account Title
DESIGN
CONSTRUCTION
TESTS & INSPECTIONS
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 42 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552580
552580
552580
552580
552580
552580
Fund Title
Mechanical Conversion Deferred Buildings (K)
Mechanical Conversion Deferred Buildings (K)
Mechanical Conversion Deferred Buildings (K)
Mechanical Conversion Deferred Buildings (K)
Mechanical Conversion Deferred Buildings (K)
Mechanical Conversion Deferred Buildings (K)
Consolidation #4, Central Utility Plant (552590)
Account
6202
6215
6222
622201
6235
6241
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 43 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
Fund Title
Account
552590
552590
552590
552590
552590
552590
552590
552590
552590
552590
552590
552590
552590
552590
552590
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Central Plant (Mech Conv Def Bldgs/IT Infrastructure) (B,K)
Consolidation #4, Central Utility Plant
2303
3220
3320
3420
3520
3620
2101
6202
6210
6215
6222
622201
6235
6237
6241
Account Title
OVERTIME
PERS OTHER CLASS EMPLOYEES
OASDHI OTHER CLASS EMPLOYEES
H & W OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
CONSTRUCTION, EXT WARRANTY
TESTS & INSPECTIONS
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
2,012.57
153.50
6.03
24.54
2,196.64
1,794,840.00
119,500.00
167,225.70
248,355.00
22,557,000.00
244,462.50
25,133,579.84
1,323.93
83.35
101.40
159.63
3.98
16.13
1,688.42
(687,126.87)
360,339.81
5,565.00
(92,301.45)
33,152.50
2,978,530.28
335,294.00
(159,130.80)
2,776,010.89
225,570.00
2,255,700.00
(225,570.00)
27,614,849.84
5887BD PROJECT CONTINGENCY
Page 44 of 152
Budget
Adjustments
(2,255,700.00)
294,740.89
575,150.15
(575,150.15)
28,189,999.99
(280,409.26)
Current Budget
3,336.50
83.35
254.90
159.63
10.01
40.67
3,885.06
1,107,713.13
360,339.81
125,065.00
74,924.25
281,507.50
25,535,530.28
335,294.00
85,331.70
27,909,590.73
-
% of
Constru
ction
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
4.3%
1.4%
0.5%
0.3%
1.1%
1.3%
0.3%
9.3%
0.0%
0.0%
0.0%
27,909,590.73
27,909,590.73
0.0%
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552600
552600
552600
552600
552600
552600
552600
Fund Title
Performing Arts Theater Expansion (E,F,N)
Performing Arts Theater Expansion (E,F,N)
Performing Arts Theater Expansion (E,F,N)
Performing Arts Theater Expansion (E,F,N)
Performing Arts Theater Expansion (E,F,N)
Performing Arts Theater Expansion (E,F,N)
Performing Arts Theater Expansion (E,F,N)
Consolidation #6, Buildings 1200/1300/PAC (552220)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 45 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552610
552610
552610
552610
552610
552610
Fund Title
Performing Arts Entry Plaza (E,F,N)
Performing Arts Entry Plaza (E,F,N)
Performing Arts Entry Plaza (E,F,N)
Performing Arts Entry Plaza (E,F,N)
Performing Arts Entry Plaza (E,F,N)
Performing Arts Entry Plaza (E,F,N)
Consolidation #6, Buildings 1200/1300/PAC (552220)
Account
6202
6215
6222
622201
6235
6241
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
Current Budget
-
-
-
Page 46 of 152
-
-
5887BD PROJECT CONTINGENCY
Budget
Adjustments
-
-
-
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552620
552620
552620
552620
552620
552620
552620
552620
552620
552620
552620
552620
552620
552620
552620
552620
Fund Title
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Parking Lots A & B and G & H (F)
Account
2303
3320
3520
3620
2101
5152
5730
588402
6202
6210
6215
6222
622201
6235
6241
6401
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
CONTRACT SECURITY SERVICES
ATTORNEY FEES
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
Page 47 of 152
BOARD
APPROVED
BUDGET 11/08
Budget
Adjustments
Current Budget
300.16
22.99
0.90
3.66
327.71
28,000.00
66,603.43
1,120,300.00
43,180.00
101,000.00
150,000.00
8,604,768.86
125,000.00
10,239,180.00
(1,077,995.09)
(18,004.91)
800.00
(353,421.60)
50,000.00
342,578.40
500,000.00
(50,000.00)
(342,578.40)
(500,000.00)
11,131,758.40
(1,246,000.00)
9,885,758.40
370,849.67
(70,000.00)
300,849.67
4.0%
11,502,608.07
(1,316,000.00)
10,186,608.07
4.0%
386,012.32
6,737.50
(800.00)
349,828.58
300.16
22.99
0.90
3.66
327.71
28,000.00
452,615.75
6,737.50
1,119,500.00
349,828.58
43,180.00
101,000.00
150,000.00
7,526,773.77
106,995.09
800.00
9,885,758.40
% of
Constru
ction
-
0.0%
0.0%
0.0%
0.0%
0.0%
0.4%
6.0%
0.1%
14.9%
4.6%
0.6%
1.3%
2.0%
1.4%
0.0%
31.3%
0.0%
0.0%
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552621
552621
552621
552621
552621
552621
552621
552621
552621
Fund Title
Soccer Field Improvements (F)
Soccer Field Improvements (F)
Soccer Field Improvements (F)
Soccer Field Improvements (F)
Soccer Field Improvements (F)
Soccer Field Improvements (F)
Soccer Field Improvements (F)
Soccer Field Improvements (F)
Soccer Field Improvements (F)
Sub-Project, Parking Lots A & B and G & H (552620)
Account
588402
6202
6210
6215
6222
622201
6235
6241
6401
Account Title
MOVING/RELOCATION EXPENSE
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
-
5887BD PROJECT CONTINGENCY
-
Page 48 of 152
Budget
Adjustments
7,117.83
129,855.00
49,943.08
1,606.00
6,100.00
15,600.00
760,271.00
7,250.00
977,742.91
977,742.91
977,742.91
Current Budget
7,117.83
129,855.00
49,943.08
1,606.00
6,100.00
15,600.00
760,271.00
7,250.00
977,742.91
-
% of
Constru
ction
0.9%
17.1%
6.6%
0.2%
0.8%
2.1%
1.0%
0.0%
28.6%
0.0%
0.0%
0.0%
977,742.91
977,742.91
0.0%
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552630
552630
552630
552630
552630
552630
552630
Fund Title
Maintenance & Operations Facility (H)
Maintenance & Operations Facility (H)
Maintenance & Operations Facility (H)
Maintenance & Operations Facility (H)
Maintenance & Operations Facility (H)
Maintenance & Operations Facility (H)
Maintenance & Operations Facility (H)
Account
6202
6215
6222
622201
6235
6241
6401
Account Title
DESIGN
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
224,444.50
224,444.50
-
224,444.50
224,444.50
-
-
224,444.50
Page 49 of 152
Current Budget
224,444.50
5887BD PROJECT CONTINGENCY
Budget
Adjustments
224,444.50
-
-
224,444.50
% of
Constru
ction
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552640
552640
552640
552640
552640
552640
552640
552640
Fund Title
Swimming Pool (E,F)
Swimming Pool (E,F)
Swimming Pool (E,F)
Swimming Pool (E,F)
Swimming Pool (E,F)
Swimming Pool (E,F)
Swimming Pool (E,F)
Swimming Pool (E,F)
Account
5730
6202
6210
6215
6222
622201
6235
6241
Account Title
ATTORNEY FEES
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
2,600.50
69,400.00
7,234.50
11,025.00
2,001,584.90
64,526.46
2,156,371.36
2,156,371.36
Page 50 of 152
313,905.20
30,600.00
120,660.34
4,800.00
7,978.79
(525.00)
(430,915.43)
(3,975.11)
42,528.79
2,156,371.36
5887BD PROJECT CONTINGENCY
Budget
Adjustments
Current Budget
316,505.70
100,000.00
120,660.34
4,800.00
15,213.29
10,500.00
1,570,669.47
60,551.35
2,198,900.15
-
42,528.79
42,528.79
% of
Constru
ction
20.2%
6.4%
7.7%
0.3%
1.0%
0.7%
3.9%
40.0%
0.0%
0.0%
0.0%
2,198,900.15
2,198,900.15
0.0%
0.0%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552650
552650
552650
552650
552650
552650
552650
552650
552650
552650
552650
552650
552650
552650
552650
552650
552650
552650
Fund Title
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Miscellaneous Site Work / Campus Security (F)
Account
2303
3320
3520
3620
2101
5630
6120
6202
6210
6215
6222
622201
6235
6241
6401
640101
640105
6422
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
DEFERRED MAINTENANCE
SITE IMPROVEMENTS
DESIGN
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
FF&E $200 - $999.99
FF&E $1,000 - $4,999.99
FF&E >$5,000, CAPITALIZED
SOFTWARE
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
5887BD PROJECT CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
70,000.00
240,325.00
7,070.00
28,000.00
2,696,952.16
8,750.00
3,051,097.16
577.81
44.28
1.73
7.04
630.86
3,937.13
51,939.00
(9,645.86)
46,498.28
109,200.00
(992,366.01)
113,113.88
69,236.29
26,242.17
14,401.40
(566,812.86)
Current Budget
0.0%
0.0%
0.0%
0.0%
0.0%
0.2%
3.0%
3.5%
2.7%
20.5%
0.4%
1.6%
0.0%
0.0%
7.9%
(7,000.00)
(26,187.14)
134,079.00
3,218,363.30
(600,000.00)
2,618,363.30
25,035.21
600,000.00
-
% of
Constru
ction
577.81
44.28
1.73
7.04
630.86
3,937.13
51,939.00
60,354.14
46,498.28
349,525.00
7,070.00
28,000.00
1,704,586.15
8,750.00
113,113.88
69,236.29
26,242.17
14,401.40
2,484,284.30
7,000.00
26,187.14
134,079.00
3,243,398.51
Page 51 of 152
Budget
Adjustments
0.5%
6.6%
4.1%
1.5%
0.8%
45.7%
625,035.21
36.7%
3,243,398.51
44.5%
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT
Chabot College
Organization Budget Status Report by Account
As of August 26, 2013
Fund
552660
552660
552660
552660
552660
552660
552660
552660
552660
552660
552660
552660
Fund Title
Photo Voltaic Project (K)
Photo Voltaic Project (K)
Photo Voltaic Project (K)
Photo Voltaic Project (K)
Photo Voltaic Project (K)
Photo Voltaic Project (K)
Photo Voltaic Project (K)
Photo Voltaic Project (K)
Photo Voltaic Project (K)
Photo Voltaic Project (K)
Photo Voltaic Project (K)
Photo Voltaic Project (K)
Account
2303
3320
3420
3520
3620
2101
6210
6215
6222
622201
6235
6241
Account Title
OVERTIME
OASDHI OTHER CLASS EMPLOYEES
H & W OTHER CLASS EMPLOYEES
SUI OTHER CLASS EMPLOYEES
WCI OTHER CLASS EMPLOYEES
PAYROLL & RELATED
PROJECT/CONSTRUCTION MANAGEMENT
SPECIALITY CONSULTING
PLAN CHECK & OTHER FEES
DSA INSPECTION (IOR)
CONSTRUCTION
TESTS & INSPECTIONS
6200BD DESIGN CONTINGENCY
6203BD BID CONTINGENCY
6236BD CONSTRUCTION CONTINGENCY
BOARD
APPROVED
BUDGET 11/08
49,000.00
1,200.00
72,000.00
11,700,000.00
62,500.00
11,884,700.00
TOTAL CHABOT COLLEGE
TOTAL DESIGN CONTINGENCY
TOTAL BID CONTINGENCY
TOTAL CONSTRUCTION CONTINGENCY
SUB-TOTAL
TOTAL PROJECT CONTINGENCY
TOTAL BOARD APPROVED BUDGET
Page 52 of 152
1,960.16
150.15
128.74
5.88
23.89
2,268.82
53,519.58
(49,000.00)
346.00
(32,800.00)
430,568.87
(35,432.63)
369,470.64
11,884,700.00
5887BD PROJECT CONTINGENCY
Budget
Adjustments
1,960.16
150.15
128.74
5.88
23.89
2,268.82
53,519.58
1,546.00
39,200.00
12,130,568.87
27,067.37
12,254,170.64
-
369,470.64
911,550.00
(911,550.00)
12,796,250.00
(542,079.36)
228,672,549.66
Current Budget
11,961,627.52
% of
Constru
ction
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.4%
0.0%
0.0%
0.3%
0.2%
1.0%
0.0%
0.0%
0.0%
12,254,170.64
12,254,170.64
240,634,177.18
1,422,625.95
2,485,387.13
14,170,837.50
(1,287,895.76)
(1,836,330.87)
(10,065,499.77)
134,730.19
649,056.26
4,105,337.73
246,751,400.24
(1,228,098.88)
245,523,301.36
5,599,101.97
3,024,348.88
8,623,450.85
252,350,502.21
1,796,250.00
254,146,752.21
0.0%
0.0%
FY05
FY06
-
FY07
-
FY08
4,560.09
82,400.00
4,765.45
-
86,960.09
4,765.45
FY09
FY10
FY11
54,326.95
693.22
31,500.00
1,765.97
4,595.40
-
55,020.17
Page 53 of 152
37,861.37
FY12
57,015.00
681.58
57,696.58
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
9,325.54
225,241.95
3,140.77
4,595.40
242,303.66
38,652.50
38,652.50
FY05
FY06
-
FY07
-
FY08
-
29,991.00
809.08
4,319.11
12,496.88
12,286.57
5,128.19
100,996.53
FY09
-
FY10
982.00
557.00
FY11
3,613.19
31,490.00
27,178.36
540.00
16,556.89
3,217.09
13,259.08
2,145.09
-
-
45,257.25
17,033.17
Page 54 of 152
37,248.28
FY12
717.08
7,815.00
66,983.00
2,060.00
106,722.51
2,135.93
186,433.52
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
5,869.27
39,305.00
127,369.45
2,600.00
149,844.44
20,886.70
392,096.94
164.60
12.30
1.81
2.03
180.74
92,310.73
3,720.00
73,807.86
170,019.33
FY05
FY06
-
FY07
-
FY08
-
206,564.78
45,610.00
-
-
252,174.78
FY09
FY10
FY11
2,677.60
205.10
19.28
32.65
2,934.63
40,731.02
113.04
3,000.00
1,990.00
-
1,081.75
3,623.81
69,872.79
85,455.87
12,530.20
3,170.18
242.81
9.50
38.64
3,461.13
80,508.12
51,927.77
25,770.76
5,042.06
212,501.61
158,679.97
35,031.40
10,875.00
1,335,782.89
1,639.75
1,950.98
24,300.00
2,678,644.28
2,055.75
246,809.40
33,075.00
2,577,986.00
30,666.25
241,286.02
1,522,813.04
3,113,477.21
3,055,916.92
195,451.96
Page 55 of 152
FY12
429.98
32.96
6.92
5.33
475.19
1,002.56
36,629.84
54,352.41
12,298.90
39,746.12
14,325.00
1,816,064.05
9,128.50
328,849.79
2,312,872.36
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
6,277.76
480.87
35.70
76.62
6,870.95
1,081.75
9,668.43
801,529.10
350,416.02
126,362.28
85,469.16
85,575.00
8,408,477.22
45,480.25
577,610.17
10,498,540.33
14,240.35
14,240.35
FY05
FY06
-
FY07
1,682.81
7,789.01
208,041.96
1,313.49
32,673.00
1,755.63
13,770.00
140.00
66,957.64
241,843.60
FY08
FY09
-
FY10
-
Page 56 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
209,724.77
9,102.50
46,443.00
1,895.63
308,801.24
-
FY05
FY06
-
FY07
40,925.00
-
FY08
-
FY09
-
617,338.65
382,809.50
13,002.30
74,680.00
44,196.30
1,534.00
34,770.00
1,578,691.58
18,315.46
-
1,217.72
3,502.27
42,142.72
767,319.89
2,060,316.84
FY10
147,852.50
168,137.49
55,889.70
157,920.00
8,326,720.74
90,875.11
8,947,395.54
156.67
2,418.18
1,681.81
6,002.86
43.60
470.37
14.77
29.34
119.17
167.74
11,104.51
7,309.29
45,855.00
231,075.02
39,126.92
115,040.00
4,710,094.46
8,530.70
760,697.33
5,928,833.23
Page 57 of 152
FY11
543.26
78.72
51.61
7.39
12.51
693.49
23,000.00
58,372.82
2,090.35
384,684.46
618.29
469,459.41
FY12
27,228.00
1,461.69
9,656.37
1,400.00
628.92
3,884.75
44,259.73
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
156.67
2,418.18
1,681.81
6,546.12
43.60
549.09
66.38
36.73
131.68
167.74
11,798.00
7,309.29
1,285,008.65
459,047.02
154,305.57
85,870.37
307,730.00
15,001,591.24
123,059.55
761,326.25
3,884.75
18,259,727.36
(5,901.37)
(5,901.37)
FY05
FY06
-
FY07
-
FY08
7,482.20
298,665.66
17,374.05
-
-
323,521.91
2,337.73
179.03
1.16
28.49
2,546.41
3,837.97
173,729.71
42,488.57
11,851.84
26,802.50
2,506,576.97
3,335.70
478.71
2,771,648.38
FY09
FY10
-
15,111.78
41,913.42
11,478.02
9,530.00
892,083.16
412.00
247,728.34
189,354.99
9,724.43
1,417,336.14
FY11
-
25.00
(76,588.11)
25,963.88
25,956.07
1,444.39
2,224.99
(72,351.94)
18,150.00
15,798.74
(105,733.04)
Page 58 of 152
46,356.06
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
2,337.73
179.03
1.16
28.49
2,546.41
25.00
11,320.17
436,875.11
67,877.30
53,966.59
32,895.27
36,332.50
3,344,458.19
3,747.70
264,005.79
189,354.99
9,724.43
4,453,129.45
-
FY05
FY06
-
FY07
1,682.81
7,788.49
153,156.26
1,314.01
17,374.06
41,675.00
1,755.63
14,770.00
140.00
85,793.41
205,956.05
FY08
FY09
-
FY10
-
Page 59 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
154,839.07
9,102.50
17,374.06
56,445.00
1,895.63
291,749.46
-
FY05
8,741.98
9,461.24
FY06
FY07
6,099.16
146.14
59,972.41
2,731.30
7,903.60
490.00
69,946.33
8,539.74
FY08
1,781.51
1,781.51
FY09
FY10
-
Page 60 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
14,987.28
1,781.51
67,876.01
3,221.30
89,728.82
-
FY05
FY06
0.00
-
FY07
0.00
-
FY08
0.00
-
FY09
0.00
-
FY10
FY11
0.00
0.00
0.00
371.00
1,355.34
12,923.08
13,145.00
12,517.98
1,355.34
4,098.57
30,166.65
Page 61 of 152
12,888.98
FY12
1,322.35
101.32
21.29
16.39
1,461.35
1,461.35
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
1,322.35
101.32
21.29
16.39
1,461.35
371.00
26,796.40
13,145.00
4,098.57
45,872.32
0.00
-
FY05
FY06
FY07
0.00
0.00
147.58
82.38
FY08
0.00
FY09
0.00
FY10
0.00
-
65,742.75
1,801.70
57,840.36
1,190.00
-
FY11
FY12
0.00
0.00
62,740.08
25,804.23
9,600.00
387,168.56
68,638.99
23,462.84
41,977.18
55,400.00
11,867.49
960.00
4,722.47
5,101.59
119,110.32
59,030.36
-
60,122.47
98,144.31
Page 62 of 152
534,075.06
231.41
17.73
3.72
2.87
255.73
2,646.01
1,750.00
8,541.46
134,447.02
133,704.96
9,165.75
22,970.64
53,040.00
3,464,766.58
44,185.53
3,875,473.68
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
231.41
17.73
3.72
2.87
255.73
2,646.01
1,750.00
229.96
8,541.46
584,355.66
228,148.18
42,228.59
64,947.82
53,040.00
3,655,617.18
48,137.23
4,722.47
4,751,057.79
154.31
11.53
1.70
1.91
169.45
7,300.00
4,111.60
6,539.52
46,704.99
155,967.80
17,729.67
466.00
57,860.00
5,104,311.09
5,837.51
6,965.86
12,512.00
11,536.05
5,438,011.54
FY05
147.58
5,812.50
22,702.15
FY06
FY07
82.38
5,665.00
302.16
164,307.83
1,941.70
67,450.17
1,330.00
239,051.74
69,091.33
FY08
2,971.63
2,971.63
FY09
FY10
-
Page 63 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
229.96
14,751.29
231,758.00
3,271.70
333,816.85
-
FY05
FY06
-
14,503.61
FY07
-
2,448.31
4,186.39
117,736.47
5,009.30
FY08
FY09
-
-
0.01
-
58,514.53
1,820.00
FY10
-
240,853.96
17,741.58
-
FY11
-
1,348.58
92,854.06
21,684.59
4,400.00
25,210.00
520.00
FY12
2,192.21
167.93
15.78
26.66
2,402.58
414.10
31.71
6.67
5.13
457.61
1,472.50
14,609.34
64,631.30
151,034.38
30,960.00
9,598.68
12,639.98
148,634.22
4,300.00
35,160.00
1,509,724.27
30,538.75
14,298.15
2,706.38
53,840.00
2,521,288.62
24,961.60
16,160.43
26,486.23
14,519.00
130,061.98
60,385.63
-
258,595.54
146,017.23
Page 64 of 152
2,906,374.48
1,769,530.54
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
2,606.31
199.64
22.45
31.79
2,860.19
1,472.50
28,004.91
429,669.31
339,094.77
39,660.00
25,210.00
89,000.00
4,207,263.89
62,849.65
30,458.58
2,706.38
26,486.23
5,285,484.40
3,773.98
4,904.85
29,997.79
(4,300.00)
335.59
560,334.98
(1,136.35)
593,910.84
FY05
FY06
-
FY07
-
FY08
-
FY09
-
FY10
-
Page 65 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
-
-
FY05
FY06
-
FY07
-
-
FY08
FY09
12,286.00
7,601.86
19,887.86
10,820.00
FY10
5,850.00
FY11
-
45,965.16
1,728.05
64,363.21
Page 66 of 152
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
23,106.00
5,850.00
53,567.02
1,728.05
84,251.07
-
FY05
FY06
13,250.00
2,185.00
15,374.57
2,185.00
FY07
FY08
-
FY09
-
FY10
-
Page 67 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
15,435.00
17,559.57
-
FY05
FY06
-
13,250.00
15,374.57
FY07
-
FY08
-
FY09
-
1,682.82
1,477.18
-
9,973.49
1,314.01
-
37,623.00
1,895.62
14,321.00
140.00
-
112,884.76
44,171.23
-
FY10
-
FY11
229,704.50
3,580.23
5,600.00
262.84
20.14
1.89
3.11
287.98
4,789.00
595,853.55
20,509.89
8,780.00
77,071.91
17,936.60
-
238,884.73
Page 68 of 152
1,665.75
726,894.68
FY12
129,295.72
67,745.53
32,353.74
27,375.01
(5,402.60)
4,713.74
256,081.14
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
262.84
20.14
1.89
3.11
287.98
4,789.00
958,013.77
91,835.65
71,271.24
104,446.92
64,478.00
2,035.62
4,713.74
1,665.75
1,394,291.11
2,867.60
216.70
31.54
35.45
3,151.29
9,354.17
80,155.80
105,251.31
29,103.99
21,107.16
1,839,311.42
3,914.00
297,630.14
65,215.20
2,454,194.48
FY05
FY06
-
FY07
-
759.50
172,672.50
FY08
FY09
216,675.50
21,130.00
-
-
-
173,432.00
237,805.50
FY10
89.41
1,577.81
8.68
127.72
5.00
20.31
1,828.93
1,926.78
59,736.00
58,962.59
17,446.00
10,480.00
200,828.50
3,077.50
9,416.30
361,873.67
(21.86)
107,124.00
138,600.57
8,420.00
FY11
-
24,890.00
11,589.10
44,800.00
1,958,848.60
1,555.75
32,346.95
160.00
148,417.12
357.50
1,017.78
2,293,502.94
186,431.50
Page 69 of 152
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
89.41
1,577.81
8.68
127.72
5.00
20.31
1,828.93
759.50
1,904.92
581,098.00
209,152.26
25,866.00
21,130.00
55,440.00
2,308,094.22
4,990.75
33,364.73
9,416.30
3,253,045.61
-
FY05
FY06
-
FY07
193.62
341.50
193.62
341.50
FY08
FY09
-
FY10
-
Page 70 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
535.12
535.12
-
FY05
FY06
-
FY07
-
FY08
-
FY09
-
FY10
-
Page 71 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
-
3,258.00
10,675.00
13,933.00
FY05
FY06
-
-
FY07
-
FY08
-
FY09
-
-
14,220.00
140.00
-
2,215.80
177,865.12
22,413.90
18,700.88
21,129.14
10,720.00
379,818.00
21,124.00
46,502.66
-
653,986.84
1,682.81
1,477.19
7,594.88
972.50
36,724.00
2,105.62
98,507.50
-
FY10
1,805.77
624.69
12.20
74.04
123.72
7.30
29.62
65.93
2,743.27
77.75
1,251.15
1,191.22
46,594.88
66,970.25
5,203.87
19,920.00
1,722,323.36
3,894.00
49,458.07
12,992.73
1,932,620.55
Page 72 of 152
FY11
FY12
738.56
56.58
5.32
8.73
809.19
7,540.00
637.50
19,312.93
(44.99)
28,254.63
211.33
211.33
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
1,805.77
1,363.25
12.20
130.62
123.72
12.62
38.35
65.93
3,552.46
77.75
1,251.15
3,407.02
235,160.00
89,595.48
33,109.63
21,129.14
30,640.00
2,172,398.29
27,263.62
49,458.07
12,947.74
2,760,083.51
-
FY05
FY06
-
FY07
-
FY08
-
FY09
-
FY10
-
11,726.58
FY11
-
-
5,113.83
1,635.28
6,997.66
16,840.41
8,632.94
40,203.79
-
11,269.59
-
-
40,203.79
Page 73 of 152
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
3,263.80
11,532.44
14,796.24
11,726.58
6,749.11
50,465.25
11,532.44
91,742.97
329.02
24.75
3.62
4.07
361.46
35,607.38
4,498.02
20,874.57
187,392.55
248,733.98
FY05
FY06
FY07
30,267.71
-
-
30,344.71
FY08
FY09
-
FY10
-
Page 74 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
30,267.71
30,344.71
-
FY05
FY06
FY07
28,511.83
-
-
28,511.83
FY08
FY09
-
FY10
-
Page 75 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
28,511.83
28,511.83
-
FY05
FY06
FY07
50,450.60
-
-
50,450.60
FY08
FY09
-
FY10
-
Page 76 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
50,450.60
50,450.60
-
FY05
FY06
FY07
62,041.60
-
-
62,041.60
FY08
FY09
-
FY10
-
Page 77 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
62,041.60
62,041.60
-
FY05
FY06
FY07
53,734.46
-
-
53,734.46
FY08
FY09
-
FY10
-
Page 78 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
53,734.46
53,734.46
-
FY05
FY06
FY07
FY08
FY09
FY10
FY11
2,083.26
-
-
-
-
-
2,083.26
159.57
501.81
15.01
25.39
701.78
4,200.00
-
-
-
-
-
Page 79 of 152
2,083.26
4,901.78
FY12
39,011.93
12,254.00
51,265.93
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
2,083.26
159.57
501.81
15.01
25.39
2,785.04
4,200.00
39,011.93
12,254.00
58,250.97
93,271.47
40,249.39
4,460.00
13,943.00
935,753.75
10,719.29
1,098,396.90
FY05
FY06
FY07
FY08
80,950.88
FY10
FY11
-
274.63
-
Page 80 of 152
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
274.63
(274.63)
274.63
-
67,347.75
-
FY09
-
-
274.63
67,347.75
81,225.51
-
FY05
FY06
-
15,470.70
FY07
FY08
-
FY09
-
FY10
-
Page 81 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
15,470.70
-
FY05
4,025,185.00
274,578.27
4,299,763.27
FY06
FY07
FY08
FY09
FY10
FY11
-
-
-
-
Page 82 of 152
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
4,025,185.00
274,578.27
4,299,763.27
-
FY05
FY06
FY07
FY08
FY09
FY10
464.97
35.62
0.23
5.67
-
-
-
506.49
-
3,979.44
6,049.23
22.13
426.50
188.80
30.09
122.26
26.28
10,844.73
FY11
2,700.38
7,378.00
297,861.60
-
1,580,938.86
645,899.65
18,423.16
170,050.00
440,188.96
161,672.08
38,814.11
4,870.00
306,320.00
12,613,756.17
303,955.90
13,869,577.22
1,217.73
3,502.28
61,483.00
25,520.00
2,836,567.72
-
299,079.33
1,817,962.47
3,569,976.86
170,386.86
299,523.09
73,985.24
205,840.00
14,077,971.00
54,230.03
1,094,327.49
3,368.35
16,188.12
16,014,042.91
Page 83 of 152
7,367.98
99,182.16
14,599.21
939,866.41
350.49
6,268.02
1,070,334.65
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
180,743.76
5,395.00
3,600.00
16,015.75
205,754.51
3,979.44
6,514.20
22.13
462.12
188.80
30.32
127.93
26.28
11,351.22
2,700.38
7,378.00
3,323,387.67
560,377.33
207,304.72
180,315.00
541,280.00
30,484,177.05
363,256.43
1,100,595.51
3,368.35
16,188.12
36,846,727.95
129.00
28,435.00
23,066.89
51,630.89
FY05
FY06
-
FY07
-
FY08
-
57,639.10
FY09
-
236,360.12
12,855.00
760.00
-
-
-
57,639.10
249,975.12
FY10
3,240.00
919,930.17
26,734.48
20,140.00
34,900.00
2,720.00
90,690.75
2,420.00
1,100,775.40
FY11
-
FY12
-
37.17
2.85
0.60
0.46
41.08
8,512.50
306,330.17
50,065.02
16,518.30
63,800.00
4,000.00
247,291.00
3,706.03
691,710.52
Page 84 of 152
326,117.92
29,424.56
5,927.50
168.30
330,169.00
5,960.00
697,767.28
1,940.50
15,509.68
154,799.92
163,572.62
15,980.00
8,276.17
79,960.00
8,535,633.62
92,093.53
112,958.92
9,189,278.54
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
37.17
2.85
0.60
0.46
41.08
11,752.50
1,940.50
15,509.68
2,001,177.40
269,796.68
71,420.80
107,904.47
86,680.00
9,203,784.37
100,473.53
112,958.92
3,706.03
11,987,145.96
1,048.39
80.32
11.54
12.96
1,153.21
12,232.94
3,480.00
17,062.96
142,023.13
307,077.59
825.00
129,720.00
5,495,225.25
60,196.88
38,629.20
6,207,626.16
FY05
FY06
FY07
FY08
FY09
FY10
2,645.41
11,836.12
-
-
-
-
-
FY11
206,148.59
6,480.00
146,440.00
3,686,433.33
55,601.54
20,961.53
4,094,623.46
Page 85 of 152
FY12
95.00
153,088.19
49,760.00
1,576,711.00
117,212.71
1,896,866.90
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
95.00
2,645.41
371,072.90
202,680.00
5,263,144.33
172,814.25
6,012,451.89
69,099.00
(3,801.25)
65,297.75
FY05
FY06
-
205.00
FY07
-
46,499.78
FY08
3,587.35
117.83
444,262.62
5,764.80
44,755.00
3,132.00
205.00
56,534.70
23,368.32
1,837,391.12
1,440.00
181,139.98
FY09
FY10
-
FY11
-
768.64
58.87
5.53
9.37
842.41
2,419.78
13,510.98
220,118.48
10,229.70
75,194.75
5,380.00
679.59
11,488.67
1,223.06
94,762.00
3,137,074.08
51,604.70
4,973.95
25,862.50
1,128,024.91
24,816.72
3,470,994.71
1,275,750.91
9,202.55
86,006.21
(5,408.17)
315.21
1,103.00
9,426.03
111,012.85
Page 86 of 152
233,672.62
FY12
535.22
535.22
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
768.64
58.87
5.53
9.37
842.41
1,440.00
240,171.81
117.83
699,205.75
77,097.40
5,764.80
44,755.00
120,624.50
4,351,105.20
97,513.57
315.21
15,279.50
9,426.03
6,986,097.13
27.60
27.60
FY05
FY06
-
FY07
-
FY08
-
14,670.00
14,670.00
FY09
FY10
FY11
724.00
-
Page 87 of 152
-
724.00
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
15,394.00
15,394.00
-
FY05
FY06
FY07
FY08
FY09
FY10
FY11
-
-
-
-
-
4,858.56
520.20
371.68
2,357.73
176.67
-
34.98
57.44
5,842.86
37.96
29.22
2,601.58
-
-
377.28
487.50
30.72
10,750.00
46,662.02
385,496.00
1,700.00
946.42
445,585.16
39,956.25
3,202.00
22,709.00
FY12
(1,942.25)
1,709.50
13,056.45
250.00
957,895.80
11,047.72
82,600.20
3,502.28
1,035,188.05
99,176.18
-
1,000.00
80,826.61
-
-
Page 88 of 152
-
87,669.47
5,455.00
6,571.96
743.63
165.00
16,024.67
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
7,216.29
520.20
548.35
72.94
86.66
8,444.44
377.28
30.72
487.50
48,764.00
4,911.50
87,882.47
7,821.96
1,507,562.24
16,250.00
1,111.42
1,683,643.53
2,220.00
44.14
166.91
149.38
24.42
27.44
2,632.29
23,044.49
5,891.00
46,000.00
1,600.00
1,044.88
80,212.66
FY05
FY06
-
FY07
-
FY08
22,230.08
24,558.38
71,454.25
FY09
FY10
849.86
65.11
2.54
10.38
927.89
3,419.00
4,479.00
957.78
823.73
319,767.17
166,771.88
325,203.95
171,942.50
FY11
-
56,204.66
8,100.00
735,790.66
2,832.50
-
-
22,230.08
898,940.45
Page 89 of 152
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
849.86
65.11
2.54
10.38
927.89
27,977.38
98,163.33
1,781.51
56,204.66
8,100.00
1,222,329.71
2,832.50
1,418,316.98
-
FY05
FY06
FY07
1,670.00
1,035.94
45,329.64
3,500.08
15,788.41
159.10
770.99
3,926.75
89,733.69
1,883.13
49,662.04
1,943.37
1,141.00
89,263.87
5,432.05
29,519.97
220.89
556,896.35
869,465.48
FY08
5,287.58
169.63
5,376.88
6,017.08
19,222.33
63,884.18
310,791.70
709,296.83
2,131.17
181,919.20
1,089,094.66
FY09
1,302,773.33
FY10
2,394.99
5,194.83
FY11
71.18
128.16
4,810.00
69,732.21
245,227.10
280,060.87
412,937.31
4,344.56
131,524.00
196,983.86
85,440.43
263,647.65
39,992.16
6,913.98
1,025,388.46
725,177.92
918,963.75
Page 90 of 152
190,965.11
81,822.44
(1,448.88)
640,639.92
FY12
6,461.93
127,236.00
219,532.80
154,742.47
262,808.30
590,053.88
8,458.27
1,369,293.65
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
2,466.17
22,961.42
169.63
7,046.88
159.10
5,881.47
5,067.75
146,586.49
4,810.00
899,965.50
994,950.78
1,401,608.00
1,907,278.76
187,351.25
59,708.97
29,519.97
220.89
7,857,053.60
435.78
4,676.10
178,109.22
151,059.52
175,692.89
340,555.88
396.85
850,926.24
FY05
FY06
-
148.53
FY07
-
3,293.85
15,228.98
1,389.49
1,165.59
246.30
7.61
211.84
18,249.81
1,506.49
2,079.40
40.46
10.72
1,275.00
1,106.88
9,562.19
406,327.95
6,265.00
258,852.80
106,883.10
19,708.81
618,371.00
538,062.09
4,123.39
412.47
25,383.19
961,708.30
152,886.70
89,673.46
149,524.94
1,576,085.68
FY08
129,701.76
12,070.05
9,928.53
4,745.63
64.80
1,581.00
158,091.77
3,891.62
394.46
3,631.16
852.26
1,571.42
9,454.25
10,500.00
97,841.51
919,215.02
237,963.03
1,455.00
1,366.60
6,742.50
1,453,509.70
FY09
FY10
FY11
129,701.76
12,228.31
7,574.28
4,593.97
389.12
1,581.01
156,068.45
6,425.40
272.95
105,293.34
12,592.70
7,841.52
4,715.37
389.14
1,581.00
132,413.07
6,073.92
341.43
735.26
279.34
1,444.24
2,823.56
2,524.33
1,119.24
3,217.98
1,194.53
3,360.66
891.83
1,483.71
43,021.41
205,401.26
33,096.16
154,675.57
50,112.42
101,375.88
947.00
47,919.22
175.00
11,068.48
9,713.67
1,688.67
3,181.67
409.99
468,261.08
348,683.39
327,968.34
Page 91 of 152
129,701.74
13,887.19
7,840.79
4,806.47
933.85
1,553.25
158,723.29
1,690.82
315.40
727.00
FY12
128,454.57
14,031.12
7,807.91
5,307.74
2,068.07
1,592.05
159,261.46
2,272.18
158.04
1,403.14
640.85
1,415.21
38,111.02
105,365.82
3,230.57
311,858.29
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
638,082.15
66,198.86
42,158.62
24,415.48
3,852.59
8,100.15
782,807.85
20,353.94
1,482.28
727.00
1,014.60
16,775.30
2,079.40
4,739.17
11,059.70
1,275.00
13,577.64
10,912.47
298,234.78
2,447,741.85
411,739.50
604,006.51
485,393.72
1,455.00
6,646.93
6,742.50
5,642,799.57
106,837.62
12,197.67
6,290.80
4,913.42
1,175.18
1,320.56
132,735.25
587.48
2,150.84
665.11
1,144.04
3,857.31
107,107.78
(720.00)
1,776.43
249,304.24
FY05
FY06
-
FY07
-
FY08
-
FY09
-
FY10
-
Page 92 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
-
-
FY05
FY06
-
FY07
-
FY08
-
FY09
-
FY10
-
Page 93 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
-
-
FY05
FY06
-
FY07
-
426,375.77
FY08
669,875.36
FY09
2,954.81
83.35
225.67
159.63
8.86
36.02
3,468.34
11,462.00
106,900.79
61,130.00
FY10
FY11
FY12
381.69
29.23
1.15
4.65
416.72
26,375.00
48,474.89
125,732.50
7,370,583.78
129,495.00
13,481,002.00
59,150.52
29,403.91
26,659.36
25,320.00
3,085,772.00
18,728.24
8,259,769.77
62,558.25
13,856,016.38
4,045.21
3,230,767.72
4,572.12
7,301.09
750.00
54,026.00
-
-
426,375.77
Page 94 of 152
66,649.21
(8,335.96)
960.00
89,144.32
81,768.36
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
3,336.50
83.35
254.90
159.63
10.01
40.67
3,885.06
1,107,713.13
170,623.43
124,210.00
67,548.29
281,507.50
23,937,357.78
143,170.32
85,331.70
25,921,347.21
4,600.07
85,649.68
90,249.75
FY05
FY06
-
FY07
-
FY08
-
FY09
-
FY10
-
Page 95 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
-
-
FY05
FY06
-
FY07
-
FY08
-
FY09
-
FY10
-
Page 96 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
-
-
FY05
FY06
-
FY07
-
FY08
-
302,400.00
19,440.00
14,418.90
466,896.00
55,737.10
47,962.50
4,824,770.92
16,173.06
0.00
0.00
309,133.83
5,445,398.48
FY09
FY10
300.16
22.99
0.90
3.66
327.71
152,924.02
196,977.00
123,852.49
1,606.00
6,275.54
28,200.00
1,862,623.94
13,507.16
756.33
2,387,050.19
FY11
91,232.06
21,270.00
29,984.12
FY12
80,386.43
26,976.00
14,131.28
1,379.16
455,567.42
27,797.00
598,053.60
150,669.87
Page 97 of 152
15,818.15
36,220.00
18,814.20
4,800.00
356,227.59
5,781.00
437,660.94
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
300.16
22.99
0.90
3.66
327.71
19,440.00
354,779.56
1,050,739.00
186,782.09
1,606.00
63,391.80
80,962.50
7,526,986.87
35,461.22
756.33
9,327,966.91
16,554.33
10,647.14
1,600.00
4,992.79
33,794.26
FY05
FY06
-
FY07
-
FY08
-
FY09
-
-
FY10
FY11
6,627.83
23,306.76
19,262.15
490.00
27,603.28
30,680.93
12,000.00
422,439.00
5,585.00
3,600.00
337,832.00
1,665.00
489,220.74
401,871.21
Page 98 of 152
FY12
1,222.96
687.50
1,910.46
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
7,117.83
52,133.00
49,943.08
15,600.00
760,271.00
7,937.50
893,002.41
(687.50)
(687.50)
FY05
FY06
FY07
173,292.50
-
-
173,292.50
FY08
51,152.00
51,152.00
FY09
FY10
-
Page 99 of 152
FY11
-
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
-
224,444.50
224,444.50
-
FY05
FY06
FY07
69,400.00
-
-
1,931,859.51
43,096.34
2,044,355.85
FY08
FY09
-
10,500.00
(38,870.69)
13,799.05
(14,571.64)
15,830.35
850.00
1,322.93
4,800.00
2,220.29
FY10
FY11
109,247.04
148,092.48
3,917.48
2,615.07
5,782.12
25,023.57
118,946.64
Page 100 of 152
900.00
151,607.55
FY12
42,912.83
418.65
(450,000.00)
(406,668.52)
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
316,082.70
70,250.00
8,274.13
4,800.00
2,220.29
10,500.00
1,448,770.94
57,795.39
1,918,693.45
423.00
423.00
FY05
FY06
-
FY07
-
FY08
-
FY09
-
FY10
577.81
44.28
1.73
7.04
630.86
-
FY11
-
-
-
-
-
31,689.42
142,148.00
14,808.86
107,192.00
-
19,920.00
1,565,794.77
1,860.00
74,950.57
23,497.70
107,192.00
1,761,412.19
90,390.29
24,823.57
1,325.87
Page 101 of 152
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
1,341.03
2,800.00
8,255.00
3,210.56
69,236.29
26,242.17
14,401.40
125,486.45
577.81
44.28
1.73
7.04
630.86
46,498.28
249,340.00
2,666.90
22,720.00
1,672,498.04
1,860.00
3,210.56
69,236.29
26,242.17
14,401.40
2,109,304.50
42,783.00
(880.00)
760.00
109,903.32
152,566.32
FY05
FY06
-
FY07
-
FY08
-
FY09
-
1,960.16
150.15
128.74
5.88
23.89
2,268.82
51,115.29
FY10
1,937.70
466.59
(26,496.00)
161,004.93
(346.00)
1,417,213.17
1,200.00
39,200.00
10,395,524.89
27,067.37
10,516,376.37
162,942.63
(26,375.41)
31,567,731.77
59,984,138.55
36,540,744.06
26,496.00
1,390,717.17
-
6,008,482.09
-
3,973,852.37
-
12,017,091.21
FY11
Page 102 of 152
16,256,265.66
Prior Fiscal Year Current Fiscal
Expenses
Year Expenses
FY12
-
21,799,851.87
1,960.16
150.15
128.74
5.88
23.89
2,268.82
53,519.58
1,200.00
39,200.00
11,946,900.99
27,067.37
12,070,156.76
188,148,157.58
-
17,845,562.92
Prior Fiscal
Year Exp Adj
(Prolog Only)
6,470.89
6,470.89
Current Fiscal
Year Expense
Adjustments
-
-
% of
Total Expenses to Construct
Date
ion
9,325.54
263,894.45
9,611.66
4,595.40
287,427.05
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Encumbrances
Reservations
323,777.50
-
323,777.50
-
Commitment
Adjustments
-
-
-
Unpaid
Commitments
323,777.50
323,777.50
Available Balance
0.00
16,883.05
552.45
33,674.46
26,404.60
45,806.78
2,800,000.00
46,500.00
93,000.00
3,062,821.34
29,974.11
93,000.00
310,000.00
3,495,795.45
93,000.00
3,588,795.45
Page 103 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
42,977.24
3,244.84
-
-
-
% of
Total Expenses to Construct
Date
ion
164.60
12.30
1.81
2.03
180.74
5,869.27
39,305.00
219,680.18
6,320.00
266,629.54
24,131.54
562,116.27
0.7%
0.1%
0.0%
0.0%
0.7%
2.7%
0.0%
17.9%
0.0%
0.0%
2.9%
121.4%
11.0%
1.57
Encumbrances
Reservations
Commitment
Adjustments
10,094.72
-
-
-
(6,480.05)
-
10,094.72
-
(6,480.05)
-
-
Unpaid
Commitments
3,614.67
3,614.67
Available Balance
0.00
0.00
0.00
0.00
0.00
0.00
79,000.00
0.00
7,900.00
11,850.00
314,093.81
0.00
22,615.86
0.00
0.00
435,459.67
7,900.00
23,700.00
79,000.00
546,059.67
21,313.17
567,372.84
Page 104 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
56,371.03
72,525.93
9,179.50
Current Fiscal
Year Expense
Adjustments
-
-
46,443.00
1,895.63
12,044.15
29,514.19
227,973.43
-
-
% of
Total Expenses to Construct
Date
ion
6,277.76
480.87
35.70
76.62
6,870.95
1,081.75
9,668.43
872,140.48
422,941.95
135,541.78
85,469.16
85,575.00
8,454,920.22
47,375.88
589,654.32
29,514.19
10,740,754.11
0.1%
0.0%
0.0%
0.0%
0.1%
0.0%
0.1%
10.3%
5.0%
1.6%
1.0%
1.0%
0.6%
7.0%
0.3%
27.0%
Encumbrances
Reservations
-
-
Commitment
Adjustments
1,824.36
-
-
11,915.25
-
-
-
13,739.61
-
-
Unpaid
Commitments
1,824.36
11,915.25
13,739.61
Available Balance
0.00
0.00
0.00
0.00
0.00
8,634.86
0.01
284.95
49,113.60
6,036.68
320.00
35,925.00
219,504.79
41,958.87
336,129.21
0.00
697,907.97
0.00
0.00
0.00
697,907.97
68,619.62
766,527.59
Page 105 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(209,724.77)
(9,102.50)
(46,443.00)
(1,895.63)
(308,801.24)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 106 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
97,841.76
58,346.67
450.00
97,841.76
-
-
% of
Total Expenses to Construct
Date
ion
156.67
2,418.18
1,681.81
6,546.12
43.60
549.09
66.38
36.73
131.68
167.74
11,798.00
7,309.29
1,285,008.65
556,888.78
206,750.87
86,320.37
307,730.00
15,001,591.24
123,059.55
761,326.25
3,884.75
18,351,667.75
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.1%
0.0%
8.6%
3.7%
1.4%
0.6%
2.1%
0.8%
5.1%
0.0%
0.22
Encumbrances
Reservations
-
-
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
(0.00)
0.00
0.00
0.00
0.00
0.00
(0.00)
0.00
0.00
0.00
5,901.37
0.00
0.00
(0.00)
0.00
0.00
0.00
5,901.37
0.00
0.00
0.00
5,901.37
0.00
5,901.37
Page 107 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
324,322.81
35,826.79
10,647.00
19,155.57
125,041.01
5,116.93
10,617.74
39,930.96
570,658.81
Current Fiscal
Year Expense
Adjustments
-
-
% of
Total Expenses to Construct
Date
ion
2,337.73
179.03
1.16
28.49
2,546.41
25.00
11,320.17
761,197.92
103,704.09
64,613.59
52,050.84
36,332.50
3,469,499.20
8,864.63
274,623.53
229,285.95
9,724.43
5,023,788.26
0.1%
0.0%
0.0%
0.0%
0.1%
0.0%
0.3%
21.9%
3.0%
1.9%
1.5%
1.0%
0.3%
7.9%
6.6%
0.3%
44.8%
Encumbrances
Reservations
Commitment
Adjustments
-
-
-
-
-
-
-
-
-
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
0.00
0.00
0.00
(0.00)
0.00
(0.00)
Page 108 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(154,839.07)
(9,102.50)
(17,374.06)
(56,445.00)
(1,895.63)
(291,749.46)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 109 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(14,987.28)
(1,781.51)
(67,876.01)
(3,221.30)
(89,728.82)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 110 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
0.00
(25,441.06)
535.12
(24,905.94)
Current Fiscal
Year Expense
Adjustments
0.00
-
-
% of
Total Expenses to Construct
Date
ion
1,322.35
101.32
21.29
16.39
1,461.35
371.00
1,355.34
13,680.12
4,098.57
20,966.38
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Encumbrances
Reservations
Commitment
Adjustments
0.00
-
0.00
-
0.00
-
-
-
-
Unpaid
Commitments
0.00
-
Available Balance
0.00
0.00
0.00
0.00
0.00
4,209.82
529,714.20
(0.00)
61,196.19
53,544.02
79,457.13
5,295,680.65
47,971.42
157,812.89
6,229,586.32
51,616.08
158,914.26
529,714.20
6,969,830.86
158,914.26
7,128,745.12
Page 111 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
0.00
Current Fiscal
Year Expense
Adjustments
0.00
229.96
15,760.29
660.00
2,712.50
-
231,758.00
3,271.70
29,640.90
106,881.00
-
334,476.85
-
% of
Total Expenses to Construct
Date
ion
385.72
29.26
5.42
4.78
425.18
2,646.01
9,050.00
459.92
4,111.60
15,080.98
646,820.94
384,775.98
62,670.76
65,413.82
110,900.00
8,991,686.27
57,246.44
36,606.76
124,115.47
11,536.05
10,523,546.18
0.6%
0.0%
0.0%
0.0%
0.01
0.0%
0.1%
0.0%
0.0%
0.2%
7.2%
4.3%
0.7%
0.7%
1.2%
0.6%
0.4%
1.4%
0.1%
0.18
Encumbrances
Reservations
0.00
0.00
-
-
Commitment
Adjustments
8,144.77
31,083.83
-
0.00
(6,539.52)
(14,619.48)
22,703.31
201,366.63
1,733.11
1,810.93
6,624.51
273,467.09
-
(1,500.00)
(53,028.96)
(1,733.11)
4,695.81
(72,725.26)
Unpaid
Commitments
0.00
1,605.25
16,464.35
21,203.31
148,337.67
6,506.74
6,624.51
200,741.83
Available Balance
0.00
0.00
0.00
0.00
0.00
0.00
(1,050.00)
0.00
(4,111.60)
8,883.57
36,714.71
47,824.02
16,125.93
0.00
19,480.00
94,043.18
(3,297.04)
2,253.80
3,296.99
988.35
221,151.91
0.00
0.00
705,200.00
926,351.91
298,759.67
1,225,111.58
Page 112 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(229.96)
(14,751.29)
(231,758.00)
(3,271.70)
(333,816.85)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 113 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
23,106.00
747.99
5,850.00
53,567.02
Current Fiscal
Year Expense
Adjustments
-
-
-
1,728.05
84,251.07
-
% of
Total Expenses to Construct
Date
ion
2,606.31
199.64
22.45
31.79
2,860.19
1,472.50
3,773.98
51,110.91
435,322.15
369,092.56
41,210.00
25,545.59
89,000.00
4,821,165.89
61,713.30
32,186.63
2,706.38
26,486.23
5,963,646.31
0.1%
0.0%
0.0%
0.0%
0.1%
0.0%
0.1%
1.1%
9.0%
7.7%
0.9%
0.5%
1.8%
1.3%
0.7%
0.1%
0.5%
0.0%
23.7%
Encumbrances
Reservations
Commitment
Adjustments
53.93
26,911.70
-
(2,754.85)
152,767.76
-
-
(148,701.61)
-
-
(151,456.46)
2,611.44
182,344.83
Unpaid
Commitments
53.93
24,156.85
4,066.15
2,611.44
30,888.37
Available Balance
0.00
0.00
0.00
0.00
0.00
0.00
(3,773.98)
151.42
74,280.72
1,172.37
39,380.95
41,199.41
0.00
(3,183.84)
7,486.70
38,911.35
0.00
475.79
0.00
196,100.89
0.00
0.00
450,858.25
646,959.14
144,382.75
791,341.89
Page 114 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 115 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(23,106.00)
(5,850.00)
-
(53,567.02)
(1,728.05)
(84,251.07)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 116 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(15,435.00)
(17,559.57)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 117 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
(13,404.00)
14,822.14
1,800.00
16,543.00
18,154.23
70,397.64
17,559.57
Current Fiscal
Year Expense
Adjustments
-
-
% of
Total Expenses to Construct
Date
ion
3,130.44
236.84
33.43
38.56
3,439.27
14,143.17
1,024,765.57
197,086.96
115,197.37
106,246.92
21,107.16
1,920,332.42
5,949.62
320,498.11
137,278.59
3,866,045.16
0.2%
0.0%
0.0%
0.0%
0.2%
0.7%
53.4%
10.3%
6.0%
5.5%
1.1%
0.3%
16.7%
7.1%
101.3%
Encumbrances
Reservations
7,007.84
210,749.08
-
77,669.29
-
65,881.00
6,351,488.40
33,850.00
6,746,645.61
-
Commitment
Adjustments
(362,302.65)
(128,092.46)
(16,719.75)
(68,445.00)
(3,307,763.49)
(1,785.00)
(3,885,108.35)
Unpaid
Commitments
7,007.84
(151,553.57)
(128,092.46)
60,949.54
(2,564.00)
3,043,724.91
32,065.00
2,861,537.26
Available Balance
0.00
0.00
0.00
0.00
0.00
0.00
138,000.00
71,772.93
30,972.91
0.00
88,187.41
668,494.84
10,878.46
1,513,086.65
0.00
2,521,393.20
0.00
232,710.00
775,700.00
3,529,803.20
232,710.00
3,762,513.20
Page 118 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
11,399.41
-
-
11,399.41
-
% of
Total Expenses to Construct
Date
ion
89.41
1,577.81
8.68
127.72
5.00
20.31
1,828.93
759.50
1,904.92
581,098.00
220,551.67
25,866.00
21,130.00
55,440.00
2,308,094.22
4,990.75
33,364.73
9,416.30
3,264,445.02
0.0%
0.1%
0.0%
0.0%
0.0%
0.0%
0.1%
0.0%
0.1%
25.2%
9.6%
1.1%
0.9%
2.4%
0.2%
1.4%
0.4%
41.4%
Encumbrances
Reservations
Commitment
Adjustments
-
-
-
-
-
-
-
-
-
-
-
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
0.00
(0.00)
0.00
(0.00)
0.00
0.00
0.00
(0.00)
0.00
(0.00)
Page 119 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(535.12)
(535.12)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 120 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
% of
Total Expenses to Construct
Date
ion
3,258.00
10,675.00
13,933.00
Encumbrances
Reservations
53,185.00
53,185.00
-
Commitment
Adjustments
-
-
Unpaid
Commitments
53,185.00
53,185.00
Available Balance
(3,258.00)
(63,860.00)
0.00
0.00
0.00
0.00
0.00
0.00
(67,118.00)
0.00
0.00
0.00
(67,118.00)
0.00
(67,118.00)
Page 121 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
26,287.24
1,467.50
Current Fiscal
Year Expense
Adjustments
-
-
13,901.74
64,723.92
26,287.24
-
% of
Total Expenses to Construct
Date
ion
1,805.77
1,363.25
12.20
130.62
123.72
12.62
38.35
65.93
3,552.46
77.75
1,251.15
3,407.02
235,160.00
115,882.72
34,577.13
21,129.14
30,640.00
2,172,398.29
27,263.62
63,359.81
77,671.66
2,786,370.75
0.1%
0.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.2%
0.0%
0.1%
0.2%
10.8%
5.3%
1.6%
1.0%
1.4%
1.3%
2.9%
3.6%
28.3%
Encumbrances
Reservations
-
-
-
-
-
-
Commitment
Adjustments
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
0.00
0.00
(0.00)
0.00
0.00
(0.00)
0.00
0.00
0.00
(0.00)
0.00
0.00
0.00
(0.00)
0.00
(0.00)
Page 122 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
11,269.59
-
-
% of
Total Expenses to Construct
Date
ion
329.02
24.75
3.62
4.07
361.46
11,726.58
35,607.38
22,516.72
71,339.82
198,924.99
340,476.95
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Encumbrances
Reservations
1,295.25
3,871.20
5,166.45
-
Commitment
Adjustments
-
-
1,211.77
1,211.77
Unpaid
Commitments
1,295.25
3,871.20
1,211.77
6,378.22
Available Balance
0.00
0.00
0.00
0.00
0.00
0.00
3,668.00
2,023.97
322,500.00
48,375.00
32,250.00
48,375.00
2,970,461.25
32,250.00
0.00
0.00
2,789.67
3,462,692.89
32,250.00
96,750.00
322,500.00
3,914,192.89
96,750.00
4,010,942.89
Page 123 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(30,267.71)
(30,344.71)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 124 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(28,511.83)
(28,511.83)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 125 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(50,450.60)
(50,450.60)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 126 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(62,041.60)
(62,041.60)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 127 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
(53,734.46)
(53,734.46)
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 128 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
-
-
-
% of
Total Expenses to Construct
Date
ion
2,083.26
159.57
501.81
15.01
25.39
2,785.04
4,200.00
132,283.40
40,249.39
4,460.00
12,254.00
13,943.00
935,753.75
10,719.29
1,156,647.87
0.2%
0.0%
0.1%
0.0%
0.0%
0.3%
0.0%
0.0%
0.4%
14.1%
4.3%
0.5%
1.3%
1.5%
1.1%
0.0%
23.6%
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
27,198.66
-
(5,362.06)
10.00
-
11,632.00
655,131.63
20,868.00
24,940.38
739,780.67
-
(93,575.38)
(10,344.29)
(109,281.73)
-
Unpaid
Commitments
21,836.60
10.00
11,632.00
561,556.25
10,523.71
24,940.38
630,498.94
Available Balance
0.00
0.00
0.00
0.00
0.00
0.00
10,000.00
30,000.00
70,098.22
0.00
19,875.61
39,521.74
11,796.00
10,500.00
55,190.00
0.00
95,309.62
342,291.19
0.00
5,012.00
120,250.00
467,553.19
95,300.00
562,853.19
Page 129 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
13,603.13
-
Current Fiscal
Year Expense
Adjustments
-
% of
Total Expenses to Construct
Date
ion
274.63
67,347.75
13,603.13
81,225.51
Encumbrances
Reservations
Commitment
Adjustments
0.4%
0.0%
0.0%
20.2%
20.6%
-
-
-
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 130 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
(15,470.70)
Current Fiscal
Year Expense
Adjustments
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 131 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
% of
Total Expenses to Construct
Date
ion
4,025,185.00
274,578.27
4,299,763.27
Encumbrances
Reservations
-
-
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 132 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
190,106.32
42,220.95
2,827.22
Current Fiscal
Year Expense
Adjustments
-
-
190,106.32
-
% of
Total Expenses to Construct
Date
ion
3,979.44
6,514.20
22.13
462.12
188.80
30.32
127.93
26.28
11,351.22
2,829.38
7,378.00
28,435.00
3,323,387.67
750,483.65
249,525.67
183,142.22
541,280.00
30,507,243.94
363,256.43
1,100,595.51
3,368.35
16,188.12
37,088,465.16
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.1%
10.9%
2.5%
0.8%
0.6%
1.8%
1.2%
3.6%
0.0%
0.1%
21.6%
Encumbrances
Reservations
-
-
-
-
-
-
-
-
Commitment
Adjustments
-
1,399.20
-
-
4,980.00
400.00
6,779.20
-
-
-
-
Unpaid
Commitments
1,399.20
4,980.00
400.00
6,779.20
Available Balance
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
450.00
(0.00)
0.00
0.00
0.00
30,710.29
(0.00)
0.00
0.00
0.00
31,160.29
0.00
0.00
0.00
31,160.29
497,639.45
528,799.74
Page 133 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
222,315.20
44,512.56
77.00
(32,969.00)
Current Fiscal
Year Expense
Adjustments
-
233,935.76
-
% of
Total Expenses to Construct
Date
ion
1,085.56
83.17
12.14
13.42
1,194.29
23,985.44
3,480.00
1,940.50
32,572.64
2,365,515.73
621,386.83
71,497.80
75,760.47
216,400.00
14,699,009.62
160,670.41
151,588.12
3,706.03
18,428,707.88
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.2%
0.0%
0.0%
0.2%
16.1%
4.2%
0.5%
0.5%
1.5%
1.1%
1.0%
0.0%
25.4%
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
360.00
9,798.19
159,510.38
-
800.00
(800.00)
(21,257.30)
17,399.20
85,320.00
2,609,637.34
27,026.59
1,056.29
2,910,107.99
-
(600.00)
371.00
-
(21,486.30)
Unpaid
Commitments
1,160.00
8,998.19
138,253.08
17,399.20
85,320.00
2,609,637.34
26,426.59
1,427.29
2,888,621.69
Available Balance
0.00
0.00
0.00
0.00
0.00
0.00
1,967.06
(3,480.00)
0.00
13,773.67
(3,768.81)
58,613.17
84,611.21
0.00
0.00
(201,164.00)
12,142.53
28,278.56
0.00
(9,026.61)
0.00
0.00
0.00
(9,026.61)
498,719.31
489,692.70
Page 134 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
35,660.00
35,660.00
-
% of
Total Expenses to Construct
Date
ion
95.00
2,645.41
371,072.90
35,660.00
202,680.00
5,332,243.33
169,013.00
6,113,409.64
0.0%
1.6%
7.0%
0.0%
0.7%
3.8%
3.2%
0.0%
16.2%
Encumbrances
Reservations
Commitment
Adjustments
-
1,320.00
244,757.32
-
-
-
246,077.32
-
-
Unpaid
Commitments
1,320.00
244,757.32
246,077.32
Available Balance
0.00
7,354.59
38,927.10
26,000.00
4,340.00
0.00
0.00
0.00
0.00
76,621.69
0.00
0.00
203,891.35
280,513.04
162,000.00
442,513.04
Page 135 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
(29,261.88)
158,165.47
650.00
(12,993.00)
-
1,321,300.00
-
115,422.47
-
% of
Total Expenses to Construct
Date
ion
768.64
58.87
5.53
9.37
842.41
1,440.00
240,199.41
117.83
669,943.87
235,262.87
6,414.80
31,762.00
120,624.50
5,672,405.20
97,513.57
315.21
15,279.50
9,426.03
7,101,547.20
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
4.2%
0.0%
11.8%
4.1%
0.1%
0.6%
2.1%
1.7%
0.0%
0.3%
0.2%
25.2%
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
-
-
-
-
-
-
-
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
(127,413.77)
0.00
21.75
(1,223.06)
0.00
214.21
862.50
8,718.87
5,212.03
0.00
98.63
0.00
(113,508.84)
0.00
0.00
14,245.03
(99,263.81)
0.00
(99,263.81)
Page 136 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
% of
Total Expenses to Construct
Date
ion
15,394.00
15,394.00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
155,879.88
5,000.00
13,119.89
19,484.99
1,283,605.00
16,237.49
1,493,327.25
12,990.00
38,970.00
129,899.90
1,675,187.15
53,433.00
1,728,620.15
Page 137 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
(200.00)
200.00
-
Current Fiscal
Year Expense
Adjustments
-
-
-
% of
Total Expenses to Construct
Date
ion
9,436.29
564.34
715.26
149.38
97.36
114.10
11,076.73
23,044.49
377.28
30.72
487.50
5,891.00
48,764.00
4,911.50
133,682.47
8,021.96
1,509,162.24
16,250.00
2,156.30
1,763,856.19
0.6%
0.0%
0.0%
0.0%
0.0%
0.0%
0.7%
1.5%
0.0%
0.0%
0.0%
0.4%
3.2%
0.3%
8.9%
0.5%
0.0%
1.1%
0.1%
16.9%
Encumbrances
Reservations
-
-
-
-
-
-
1,813.00
80,000.00
-
-
81,813.00
-
Commitment
Adjustments
-
(46,000.00)
5,568.74
(40,431.26)
Unpaid
Commitments
1,813.00
34,000.00
5,568.74
41,381.74
Available Balance
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(1,026.00)
0.00
0.00
0.00
42,296.00
110,409.39
0.00
0.00
19,235.54
49,500.00
130,992.41
16,750.00
66,843.70
435,001.04
0.00
0.00
330,000.00
765,001.04
1,922,431.75
2,687,432.79
Page 138 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
32,420.74
Current Fiscal
Year Expense
Adjustments
-
-
7,579.57
7,891.13
47,891.44
-
% of
Total Expenses to Construct
Date
ion
849.86
65.11
2.54
10.38
927.89
27,977.38
98,163.33
34,202.25
56,204.66
8,100.00
1,222,329.71
2,832.50
7,579.57
7,891.13
1,466,208.42
0.1%
0.0%
0.0%
0.0%
0.1%
2.3%
8.0%
2.8%
4.6%
0.0%
0.7%
0.2%
0.6%
0.6%
20.0%
Encumbrances
Reservations
Commitment
Adjustments
-
-
-
-
-
-
-
-
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 139 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
-
(169.63)
255.47
19,325.00
190,172.26
1,971,717.47
-
-
-
% of
Total Expenses to Construct
Date
ion
2,901.95
22,961.42
4,676.10
7,046.88
159.10
6,136.94
5,067.75
146,586.49
24,135.00
1,078,074.72
1,336,182.56
3,549,018.36
2,247,834.64
187,351.25
60,105.82
29,519.97
220.89
8,707,979.84
Encumbrances
Reservations
-
Commitment
Adjustments
-
-
15,148.73
54,531.21
8,930.08
132,307.46
-
-
641.47
7,036.63
85,227.05
-
210,917.48
-
92,905.15
Unpaid
Commitments
15,148.73
55,172.68
15,966.71
217,534.51
303,822.63
Available Balance
(435.78)
0.00
(4,676.10)
0.00
0.00
92,863.06
0.00
0.00
75,865.00
(87,310.32)
1,377,370.03
1,272,338.36
(187,816.72)
0.00
0.00
0.00
0.00
2,538,197.53
0.00
0.00
0.00
2,538,197.53
3,000,000.00
5,538,197.53
Page 140 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
-
-
-
539.10
-
-
(1,096,749.73)
413,310.33
(1,196,934.73)
-
-
% of
Total Expenses to Construct
Date
ion
744,919.77
78,396.53
48,449.42
29,328.90
5,027.77
9,420.71
915,543.10
20,941.42
1,482.28
727.00
1,553.70
18,926.14
2,079.40
5,404.28
12,203.74
1,275.00
13,577.64
10,912.47
302,092.09
1,458,099.90
411,739.50
604,006.51
897,984.05
1,455.00
6,646.93
8,518.93
4,695,169.08
Encumbrances
Reservations
-
-
-
-
-
13,433.12
548,648.25
26,978.36
589,059.73
Commitment
Adjustments
-
-
-
12,537.07
(148,841.07)
(136,304.00)
Unpaid
Commitments
25,970.19
399,807.18
26,978.36
452,755.73
Available Balance
331,422.23
(78,396.53)
(48,449.42)
(29,328.90)
(5,027.77)
(9,420.71)
160,798.90
9,950.58
1,612.72
373.00
1,446.30
21,600.00
15,323.86
50,000.60
(90.28)
56,536.26
7,123.57
214,322.18
1,087.53
0.00
1,711,000.71
0.00
19,625.00
122,454.49
17,340.00
1,462.07
0.00
2,411,967.49
0.00
0.00
0.00
2,411,967.49
353,592.99
2,765,560.48
Page 141 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 142 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 143 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
189,716.38
Current Fiscal
Year Expense
Adjustments
-
189,716.38
-
% of
Total Expenses to Construct
Date
ion
3,336.50
83.35
254.90
159.63
10.01
40.67
3,885.06
1,107,713.13
360,339.81
124,210.00
72,148.36
281,507.50
23,937,357.78
228,820.00
85,331.70
26,201,313.34
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
4.6%
1.5%
0.5%
0.3%
1.2%
1.0%
0.4%
9.5%
Encumbrances
Reservations
106,474.00
106,474.00
Commitment
Adjustments
-
-
-
-
Unpaid
Commitments
106,474.00
106,474.00
Available Balance
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
855.00
2,775.89
0.00
1,598,172.50
0.00
0.00
1,601,803.39
0.00
0.00
0.00
1,601,803.39
0.00
1,601,803.39
Page 144 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 145 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
% of
Total Expenses to Construct
Date
ion
-
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 146 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
(79,396.00)
143,871.09
5,127.83
1,229.29
(5,655.29)
58,443.09
Current Fiscal
Year Expense
Adjustments
0.00
% of
Total Expenses to Construct
Date
ion
300.16
22.99
0.90
3.66
327.71
19,440.00
354,779.56
987,897.33
341,300.32
6,733.83
64,621.09
82,562.50
7,526,324.37
35,461.22
756.33
9,420,204.26
0.0%
0.0%
0.0%
0.0%
0.0%
0.3%
4.7%
0.0%
13.1%
4.5%
0.1%
0.9%
1.1%
0.5%
0.0%
25.2%
Encumbrances
Reservations
-
-
4,790.17
-
450.00
-
-
5,240.17
-
Commitment
Adjustments
(4,790.17)
(4,790.17)
Unpaid
Commitments
450.00
450.00
Available Balance
0.00
0.00
0.00
0.00
0.00
8,560.00
97,836.19
6,737.50
131,602.67
8,528.26
36,446.17
36,378.91
67,437.50
(0.60)
71,533.87
43.67
465,104.14
0.00
0.00
0.00
465,104.14
300,849.67
765,953.81
Page 147 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
77,722.00
Current Fiscal
Year Expense
Adjustments
-
1,606.00
6,100.00
85,428.00
-
% of
Total Expenses to Construct
Date
ion
7,117.83
129,855.00
49,943.08
1,606.00
6,100.00
15,600.00
760,271.00
7,250.00
977,742.91
0.9%
17.1%
6.6%
0.2%
0.8%
2.1%
1.0%
0.0%
28.6%
Encumbrances
Reservations
-
Commitment
Adjustments
-
-
-
-
-
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 148 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
% of
Total Expenses to Construct
Date
ion
224,444.50
224,444.50
Encumbrances
Reservations
-
-
Commitment
Adjustments
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 149 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
Current Fiscal
Year Expense
Adjustments
-
29,750.00
112,386.21
-
12,993.00
155,129.21
-
% of
Total Expenses to Construct
Date
ion
316,505.70
100,000.00
120,660.34
4,800.00
15,213.29
10,500.00
1,448,770.94
57,795.39
2,074,245.66
21.8%
6.9%
8.3%
0.3%
1.1%
0.7%
4.0%
43.2%
Encumbrances
Reservations
Commitment
Adjustments
-
-
-
-
-
-
Unpaid
Commitments
Available Balance
-
0.00
0.00
0.00
0.00
0.00
0.00
121,898.53
2,755.96
124,654.49
0.00
0.00
0.00
124,654.49
0.00
124,654.49
Page 150 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
-
100,185.00
100,185.00
-
% of
Total Expenses to Construct
Date
ion
577.81
44.28
1.73
7.04
630.86
42,783.00
46,498.28
349,525.00
2,666.90
22,720.00
1,671,618.04
2,620.00
113,113.88
69,236.29
26,242.17
14,401.40
2,362,055.82
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
2.6%
0.0%
2.8%
20.9%
0.2%
1.4%
0.2%
6.8%
4.1%
1.6%
0.9%
41.3%
Encumbrances
Reservations
-
-
9,156.00
-
-
3,600.00
7,375.00
2,800.00
6,250.00
29,181.00
-
Commitment
Adjustments
-
(6,250.00)
(6,250.00)
Unpaid
Commitments
9,156.00
3,600.00
7,375.00
2,800.00
22,931.00
Available Balance
0.00
0.00
0.00
0.00
0.00
3,937.13
0.00
60,354.14
0.00
0.00
4,403.10
1,680.00
25,593.11
3,330.00
(0.00)
0.00
0.00
0.00
99,297.48
0.00
0.00
134,079.00
233,376.48
625,035.21
858,411.69
Page 151 of 152
Prior Fiscal
Year Exp Adj
(Prolog Only)
-
Current Fiscal
Year Expense
Adjustments
1,960.16
150.15
128.74
5.88
23.89
2,268.82
53,519.58
1,546.00
39,200.00
11,946,554.99
27,067.37
12,070,156.76
-
346.00
(346.00)
-
-
-
% of
Total Expenses to Construct
Date
ion
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.4%
0.0%
0.0%
0.3%
0.2%
1.0%
Encumbrances
Reservations
-
-
-
-
183,013.88
183,013.88
Commitment
Adjustments
-
-
-
-
Unpaid
Commitments
183,013.88
183,013.88
Available Balance
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,000.00
0.00
1,000.00
0.00
0.00
0.00
1,000.00
0.00
1,000.00
(0.00)
-
205,993,720.50
#DIV/0!
12,716,865.25
-
(4,340,196.66)
8,376,668.59
26,263,788.09
134,730.19
649,056.26
4,105,337.73
with Design, Bid & Construction Contg's
31,152,912.27
8,623,450.85
bottom line" with Project Contingencies
Page 152 of 152
39,776,363.12
Download