Chabot College A-Z Index Find People Faculty & Staff Translate Quick Links Search Facilities Committee Home Page Next Meeting! Thursday, 14 May Noon, Room 405 Seismic presentation 23 April Agenda from Spring 2014 Minutes of Prior Meetings (2013-2014) NOTEWORTHY Request Log Update (5/8) Earth Day Activities! (4/22) President's Brown Bag (11/25) Campus Signage Project Updated Building # needs! (10/3/14) Building 100 Information Building 1600 Plans Building 2100 Plans Plans & Updates Past meetings (2012-2013) (on-campus intranet only) FACILITIES & SUSTAINABILITY COMMITTEE Building 100 Renovation Plans, Presentations, And Documents Title Date Author/Source Welcome & Building 100 Presentation to Facilities Committee 11/14/2013 Marci Corcoran Chabot College Library Facility Improvements 11/14/2013 Pedro Reynoso File Type Word Chabot-Las Positas Community College District Master Plan PPT Presentation (pdf document) Library Usage Statistics and Summary of Needs currently out 11/14/2013 http://www.chabotcollege.edu/facilities/Program%20Definition%20-%20Building%20100.asp[5/30/2015 2:08:36 PM] Norman Buchwald Word Description Marcia Corcoran welcomed the Facilities Committee to the Library on 11/14/13, and shared some of the history behind our campus' efforts to renovate Building 100 in general and the Library in particular. Visual summary of needs and of how the Chabot College library is currently used by our students. This handout was provided to the Facilities Committee at our 11/14 meeting; you'll find statistics on student usage of the Library, as well as a Chabot College Measure B Bond Information Latest Measure B Update (4/14) User Groups of scope summary of what is currently in-scope and not in scope for consideration for additional funding. Ranking of Requested items not in current scope (as of 10/13). 10/10/2013 Pedro Reynoso Word Bldg 100 Notes from User Group on September 25, 2013 Building 100 User Group Report and "Wish List" 9/25.2013 Deonne Kunkel Word Bldg 100 Notes from User Group on September 13, 2013 Building 100: Scaling Community 5/15/2013 Marcia Corcoran Word Library Remodel Presentation 5/16/2013 Norman Buchwald, Pedro Reynoso, and Heather Hernandez PPT Building 100 Project: Draft First and Second Floor Plan and Project Schedule 5/16/2013 Steinberg Architects PPT Current Draft of the plan for Building 100 lower and upper floor renovation. 5/16/2013 Sean McFarland, Skye Ontiveros link https://vimeo.com/65829074 5/16/2013 Sujoy Sarkar link "For Lack of Space" Building 100 Video Presentation President Sperling's Brown Bag Open Forum Examples of Faculty/Student Academic Support needs to be met by Building 100; Data from PATH, Learning Assistants, and visits overall by students to facility. Presentation with images of Chabot's current library and examples of Hartnell College library as a comparison. http://youtu.be/7IeYvq1sIkg Back to Facilities Committee Home Page Chabot College Last Updated: 11/14/13 - sh Questions/Input: Blackboard Access your Bookstore class website Search and register for classes online Map | Parking | Emergency Info | Safety & Security | Jobs | Events | Contact Us | About © Chabot College 2012. 25555 Hesperian Blvd. Hayward, CA. 94545 http://www.chabotcollege.edu/facilities/Program%20Definition%20-%20Building%20100.asp[5/30/2015 2:08:36 PM] Library Student Email shildreth@chabotcollege.edu Student Portal Chabot-Las Positas Community College District Phone: (510) 723-6600 | Last updated on 11/14/2013