FPOENGINEERING TECHNICAL INFORMATION SYSTEM FIELD NOTESTECHNICAL REPORTS DATA RETRIEVALMANAGEMENT PROFESSIONAL DEVELOPMENT VOLUME -pp 12 NUMBER 6 Notes Field TRANSPORTATION CYLINDERS of CONCRETE CONSTRUCTION MATERIALS SAMPLING TESTING BINDERS s FOREST SERVICE STANDARD SPECIFICATIONS AUTOSTRESS BRIDGE CHANGES EQUIPMENT DEVELOPMENT FOREST SERVICE JUNE S or U.S. DEPARTMENT OF AGRICULTURE 1980 UýiS ENGINEERING Volume Information contained 12 has NOTES FIELD Number 6 been developed for of employees and its respon-sibility of the United Federal cooperating for States the in this publication Department of Service Agriculture-Forest guidance its contractors and State agencies. The Department of Agriculture interpretation or use of this information by other than assumes no its own employees. and of trade firm or corporation names in this publication is for the information does not constitute official endorsement convenience of the reader. Such use an or approval The use of any product of others The that or service may be text in the publication must not be construed or policy except engineers not by the United States Department as represents the recommended personal exclusively opinions or approved Because by FSM references. should and engineering technicians intended to the exclusion of the respective procedures issue however FOREST SERVICE DEPARTMENT OF AGRICULTURE Washington D.C. author and mandatory instructions of material in the publication of the type read each for engineers. U.S. 1 of Agriculture suitable. 20013 this publication all is TRANSPORTATION Robert CYLINDERS CONCRETE OF Wildman D. Engineering Technician National Forest Sawtooth Region 4 Representa-tives and Contracting Officers Inspectors As all Construction know full concrete cylinders are difficult to transport to They usually end up in the rear of a pickup the testing facility. Until recently there has not and around. rolling together clanging the well enough to have them to tie together a cylinders been way remain upright while driving on rough winding mountain roads. Now there is a way the cylinder carrier shown in figures 1 2 and full cylinders. The 3 has alleviated the problem of transporting carrier shown was designed to hold eight cylinders but it could be The 8-cylinder carrier can be constructed made larger or smaller. from the following materials Plywood 2 - 3/4 in. 19.1 2 - 3/4 in. 19.1 2 - 3/4 2 - 3/4 in. 19.1 Finishing Padding x mm 1/2 in. 1/2 419.1 in. 914.4 x x mm in. 215.9 mm 16 x 36 x mm 215.9 x 8 x x mm 1/2 8 x in. 457.2 x mm in. 19.1 18 x mm x 36 x 914.1 in. mm x x mm 16 1/2 419.1 x 34 in. mm bottom short in. mm 1/2 876.3 and top side long side bottom in. mm insert nails foam or rubber Empty cylinders blowing off. may be transported 1 upside down to keep lids from MEN D fi 4 .iC 1VEi$L rtx N kffi. i fi ut N C .f k B fi $i fi ufi A E fi B fi D A I-- B -.I A ý--- B ---I A I-- B -H A B -ý A C DIMENSIONS A 2 IN. 50.8 MM B 6 1/2 165.1 C IN. MM Figure 1. 36 D IN. 914.4 MM Cylinder carrier 1 1/2 E IN. 38.1 MM top view 18 IN. 457.2 MM 3/4 IN. 19.1 MM PLYWOOD WITH LAYOUT AS IN SAME FIG. 1. B A w 1 25.4 MM MINIMUM 1-3/4-M-44.4-r MM IN. TO MAXIMUM PADDED DIMENSIONS A 3 B 10 IN. 76.2 MM Figure 2. 254 Cylinder carrier IN. MM side view BOTTOM Bob Figure 3. Cylinder carrier corner view CONSULTATION 9 Walter Assistant CONSTRUCTION MATERIALS STANDARDS Furen Director E. SAMPLING TESTING HANDBOOK J. Mandigo Engineer Washington Office E. Materials 1977 Region published a materials handbook for construction and materials field personnel. The publication proved to be quite convenient field reference in as well as in several as a Region 1 2 Within the next other years Regions provided adjacent Regions. and materials personnel. similar information to their construction In 1 consid-ered an internal need for a similar publication Region 9 Recognizing Office in the matter to the attention of the Washington brought that Service-wide handbook should be 1979 and suggested a brief to several of the the a Regions by inquiry Washington Based on the recognized need and the Office confirmed that need. potential efficiency of preparing and updating one Service-wide handbook versus several individual efforts development of the and into the spring of proceeded during the winter of 1979-1980 1980. A task force consisting of Bob Hinshaw Region 1 Duane Ted Stuart Region 5 Bob Harmon Region Logan Region and Jim Mandigo WO collaborated on the handbook. hand-book sev-eral Region-2 Con-struction 3 The handbook 9 combines new material with information taken from the Region-1 and Region-3 handbooks and several State publications. training material FHWA handbook The result is a publication that is applicable Service-wide and is consistent with Forest Service Standard Specifications for the of Roads and Bridges EM-7720-100 1979 edition. sources including sam-pling The handbook incorporates a glossary of sampling and testing terms and chapters on safety sampling techniques and testing procedures. Standard test methods published by the American Association of State Officials Highway and Transportation AASHTO which are frequently needed in the field are also included. Revised schedules for and testing frequencies are presented as are new standard forms with comprehensive examples. 5 pro-spective con-struction Because the handbook contains new material the decision was made for a review by to distribute a limited number of draft copies users. The review will take place during the 1980 season revisions will be made during the winter with planned for the spring of 1981. publication The quality of the final publication depends largely on cooperation Reviewers during the field review process. are asked to give it a fair trial and provide comments and suggestions. Your help is greatly appreciated. 6 BINDERS FOR FOREST SERVICE CONSTRUCTION OF ROADS STANDARD SPECIFICATIONS FOR BRIDGES EM-7720-100 E. Unruh and Maintenance Office Washington M. Construction Engineer bind-ers 1979 StandardýSpec-ifications EM-7720-100 fall of a new edition of Forest Service was Construction of Roads and Bridges for trimmed and drilled for looseleaf printed 1500 copies were At the same time special and distributed for in-Service use. use for a period of 4 to looseleaf binders intended for heavy-duty distributed. 6 years were ordered and Many of the covers separated and from the spines during shipment many more were found to be since then. In the de-fective require-ments com-pleted We have binders that will meet our new heavy-duty purchased is as soon as production and they will be distributed the 1979 shipment. to those who received 7 THE AUTOSTRESS BRIDGE Bruesch Chief Highway Structures Engineer Washington Office L. D. with the The Forest Service has entered into a collection agreement and Steel Institute to construct and field test American Iron AISI steel a new method called a Autostress girder bridge designed by National Forest. which is to be installed on the Mt. Baker-Snoqualmie Forester R. E. in The agreement signed by Regional June Worthington 1980 calls for a single-lane two-span continuous bridge over the Whitechuck River about 90 miles 144.8 kilometers northeast of AISI enlisted the Forest Services help Seattle Washington. of the availability of the heavy logging equipment loads. be-cause in-duced sav-ings load-factor Autostress design method is an extension of the presently to utilize the load-factor design method and was developed After a few ability of a redundant steel structure to shakedown. of a sufficiently heavy load such a bridge will develop passages moments and stresses caused by plastic deformations in the case of the proposed Whitechuck River Bridge these will develop over the of similar loads the moments pier. During subsequent passages will ensure elastic behavior and are analogous to the moments in a concrete beam by prestressing. The moments and stresses Cost are produced automatically hence the name Autostress. in comparison to the cost of a might run 5 to 10 percent designed structure. The used The collection agreement signed by AISI and the Forest Service involves others The U.S. Steel Corporation Research Laboratory Monroeville Pennsylvania will perform the initial design for the steel girders the FHWA Western Bridge Office under contract to will prepare the design and drawings and the the Forest Service under Civil Engineering Department University of Washington The agreement to AISI will perform the field testing. AISI to bear all costs over and above that of the most cost install. effective structure that the Forest Service normally would con-tract re-quires con-cept the bridge is to be constructed Under the present schedule during the summers of 1981 and 1982 field testing will follow immediately. The test results will be used then to support inclusion of the in the AASHTO bridge design specifications. 9 TECHNOLOGICAL IMPROVEMENTS Harold L. Strickland Assistant Director CHANGES AT EQUIPMENT DEVELOPMENT Farnum M. Burbank Development Chief Equipment Office Washington CENTERS Engineer presen-tation Foresters and Directors meeting in Missoula the recent Regional Montana we had an opportunity to brief the group about new events Dr. Tom Nelson introduced the within Equipment Development. It is no longer business as usual with the brief statement for Equipment Development. At self-examination Admin-istrative few years we have gone through a critical We asked the our organization and procedures. Staff for help in analyzing our operations and Management efforts. From these the results of everyones we have evaluated was the look. One of the first considerations a new we developed restructuring of the organization to provide stronger leadership Office. from the Washington Consequently the Centers have been units of the Washington Office with the reassigned as detached Center Managers reporting to the Assistant Director for This will provide Improvements Division of Engineering. direction as well and consistent technical and administrative needs. to management as optimum responsiveness Over the past of uni-fied Technologi-cal Implemen-tation empha-size proce-dures and Selection of a new Project Evaluation development change and I want to Process PESIP- is a significant There will be systematic certain important features. for benefits analysis estimates of probability of success environmental safety and and engineering assessments of economic their will be measured against All projects other impacts. proposed The contributions to the Resource Planning Act program targets. selection process will highlight a national system of priority based on the Chiefs goals skills available functional The final program will be the and funding available. National Forest System whose Chief for of the Deputy responsibility of all the this analysis will be based on systematic decisions in operation will a linear already We use program mentioned. criteria of of the funding use programs thereby making optimal other identifiable or quantifiable or skills available priorities The set-ting re-quirements ele-ments 11 poten-tial factors. The system provides excellent opportunities for closer with Research and selection coordination the during analysis phase and with State and Private Forestry during the implementation phase. The linear program also aids in the identification of Center workloads and required skill mixes well in advance of the start of work. Pro-cedures This only part of the total engineering development cycle. and test phase and are being prepared for the development the We will keep you informed of implementation and use phase. progress. is accord-ing for pro-vide the Starting with FY 1982 the Center budgets will be prepared to standard Forest Service formats. We believe the standard formats will eliminate the misunderstanding and confusion that have occurred in the past due to our different procedures and will the opportunity for better budgetary administration and control. 12 CHANGES-IN ENGINEERING ENGINEERING FIELD NOTES FIELD NOTES JANUARY-FEBRUARY 1980 The GPO contractor incorrectly placed the figure captions Please mark your copy so that the caption for on page 2. Figure 1 identifies the photograph on the left side of the page the caption for Figure 2 describes the photograph on the right side. ENGINEERING FIELD NOTES MARCH 1980 cor-rect In production of the March issue Figure 4 on page 11 was 90 clockwise thereby showing the rotated inadvertently underside of the bridge in a vertical Please position. this error by marking the right side of the photograph to indicate the top of the figure. Under please The Hobo correct Engineer Huskley page to read 17 paragraph Huckeby. 1 line 4 13 o U. S. GOVERNMENT PRINTING OFFICE 1980 620-222/3727 INVITATION TO READERS OF FIELD NOTES author of an article for Field Notes. If Every reader is a potential you have a news item or short article you would like to share with Service engineers we invite you to send it for publication in Field Notes. ac-curate Material submitted the to Office Washington for publication should be reviewed by the Washing-ton Office to Regional respective and of informative material submitted however short articles Office should drawings may be the that interest to from vary or news information is current Forest Service Engineers several sentences short items are preferred. and typed double-spaced All to timely FSM 7113. The length several typewritten material submitted ideally all technically to pages the should illustrations of be original or negatives. prints glossy see distributed from the Washington Office directly to all Regional Station and Forests and Forest Service retirees. If you are not currently on the list ask your Office Manager or the Regional Data Systems Technical Engineering Field Notes is Area Headquarters mailing Coordinator also to Field personnel to their increase the number of copies sent from the Washington available should Regional submit your office. Copies of back issues are material for publication or questions Field Notes concerning Coordinators R-1 Melvin R-2 Royal R-3 Juan Gomez Coordinators to Office. Dittmer M. should Ryser direct R-4 Ted Wood R-9 Rich Wilson R-5 Paul Stutes R-10 Jack Van R-6 Kjell R-8 Michael questions WO Bakke concerning format editing Engineering Attn P.O. USDA RP-E Bldg L. Rome Editor Service - Staff Gordon Box 2417 Washington Telephone Lear Colley Martin problems to Forest Al D.C. 20013 Area Code 703 235-8198 publishing dates and other