ENGINEERING TECHNICAL INFORMATION SYSTEM -Poll NOTESTECHNICAL REPORTS DATA RETRIEVAL MANAGEMENT PROFESSIONAL DEVELOPMENT FIELD VOLUME NUMBER 4 Notes ield NEW DEVELOPMENT 12 IN CLEARING ROADS PRACTICAL SOLAR APPLICATIONS IMPROVE ENERGY EFFICIENCY IN FOREST SERVICE BUILDINGS FACILITIES WASHINGTON OFFICE NEWS FOREST SERVICE APRIL 1980 s sw4 US U.S. DEPARTMENT OF AGRICULTURE 11ýS ENGINEERING Volume Information 12 NOTES FIELD Number 4 has been developed for guidance of employees of Department Agriculture-Forest Service its and its contractors and State agencies. The Department of Agriculture assumes no contained this respon-sibility of the United Federal cooperating for The the interpretation or use of the of any product of others that of this -information publication or policy except engineers and engineering by in this publication as own employees. for the information and an official endorsement or approval States Department of Agriculture to the exclusion FSM exclusively the represents recommended references. personal opinions or approved Because technicians should of the respective procedures issue FOREST SERVICE Washington D.C. 20013 in however DEPARTMENT OF AGRICULTURE author and mandatory instructions of the type of material read each for engineers. U.S. III is its suitable. be construed names by other than use does not constitute by the United or service may be text in the intended Such reader. must not not publication use of trade firm or corporation convenience The in States the publication this publication all is A NEW DEVELOPMENT IN CLEARING ROADS Tom L. Condos Civil Engineer Tahoe National Forest An innovative product is now on the market that can cut clearing costs and timber sale road construction time. The product is a shovel. It is front-end currently being used by a special power local road construction on the Tahoe National Forest. company cater-pillar equip-ment consists of a faller a D-7 typical clearing operation a choke setter and two laborers. The people and cut fall and remove the right-of-way timber. They remove the stumps and slash piling it at regular intervals alongside the road and transport it with a loader and truck or burn it in piles on the road. The Corpora-tion The new method still requires the faller the caterpillar and choke setter for right-of-way timber however a power shovel is Model 225 manufactured also needed. by the Caterpillar is an example of this type of power shovel. kilo-grams The power shovel bucket has been removed and replaced with a clam shell fig. 1. Both the front and rear of the clam shell are activated The flotation-type track has a fig. 2. hydraulically of 6 inch contact 0.42 pressure ground pounds per square the width of the tracks is 10 feet 3.05 per centimeter meters which minimizes ground disturbance. The to machine 40 can be used to pioneer new roads with side slopes up One way to overcome the greater slopes is to use caterpillar to pioneer the road for the machine percent. a medium-sized fig. 3. The clam can remove stumps power shovel clear a road in inches centimeters diameter. For larger stumps 61.0 is utilized. with a The machine works like a caterpillar stringer weeds from the It tree someone pulling garden. fig. grabs a stump or brush fig. 5 with the clam shell and pulls it out of shakes the dirt off the roots and loads the debris the ground. It It can dig out larger stumps but the into a dump truck fig. 6. inefficient. becomes operation How does up to a 24 4 1 Figure 1CaterpiZZar power shovel with clam sheZZ attachment. Figure 2-HydraulicaZZy activated clam sheZZ 2 Figure 3--Pioneered road with cleared side slopes. Figure 4oCZam shell removing a tree 3 Figure 5.--CZam sheZZ grubbing brush. it 6--Power shovel Figure into 4 a dump loading truck. debris distur-bance 7 in-stallation This type of clearing operation is much cleaner and faster than a medium-sized caterpillar with a brushrake. There is less to the soil and when the road has been completed fig. bucket for the the clam can be replaced with the conventional of culverts. Culvert installation time can be cut in half by using the machines size and versatility. esti-mated in-vestment Figure 7--Finishedroad cleared by shell attachment. Model 225 with clam The cost to rent a Caterpillar Model 225 is $200000 per month based upon 220 hours of operation. Thecost of diesel fuel at five gallons per hour and the $800000 cost of the clam for a total operational shell attachment must be considered The average time required to clear a 14-foot 4.27-meter timber 6 1/2 road with a 30 percent side slope is approximately minutes the load. Minimizing slack time is equipments per dump-truck number of the when determining trucks and the haul paramount distance for each project. 5 The following compares National Forest 1. $1407.55 per acre 2. the two methods of clearing the Tahoe typical clearing method is $3478.00 per acre per hectare while the cost for Model 225 is $2050 $829.64 per hectare. The The average rate with heavy brush 91.44 meters per day for the typical 1000 feet 304.8 meters per day for Model feet on and medium pole clearing method is 300 and dis-advantages 225. rates and the initial cost of clams are economic of this type of equipment the physical disadvantages are its instability on steep ground while pioneering roads and the dust it creates while loading trucks. High rental It is apparent that the economic benefits offered by expeditious road clearing and minimal environmental effects make this special front-end shovel a viable asset to Forest Service road building operations. 6 PRACTICAL SOLAR APPLICATIONS James M. Kocer P. Resident Engineer R-3 E. de-signing Two buildings at the Albuquerque Tree Nursery heating systems that should be of interest to heating systems. have practical solar others who are em-ployee The first system completed in April 1979 cones in the seed extraction The process. constructed in the summer of 1980 will be lunchroom facility. used to heat the second system to be used to heat an is Both concepts are similar and use the sloped roof of the building solar collector. The collector consists of a bottom course of standard metal roofing and a 4-inch 10.16-centimeter air space with a 5-ounce 0.14-kilogram corrugated fiberglass top course fig. 1. as the pur-lins. The fiberglass panels are supported by 4-inch 10.16-centimeter webbed holostuds on 4-foot 1.22-meter centers. The metal panels are also supported on 4-foot 1.22-meter centers by cross the metal panels there are 6 inches Directly beneath 15.24 centimeters of batt fiberglass insulation with a vapor barrier. The 6000-square-foot 557.45-square-meter Extractory Building are enclosed on the sides and top the south bottom line panels is open and screened. The entrapped heated air is drawn up the roof line then pulled down through five separate ductworks on the north wall by 1/2-hp inline centrifugal fans. The cone trays are stacked 12 feet 3.66 meters high along the north wall and the heated air is discharged into the bottom tray. Air flow is assisted through the trays by exhaust fans located on the north wall near the top of the trays. The designer estimated a differential of 35-40F 1.7-4.4C between ambient and delivered air for the month of October. A table of actual is shown on page 9. recordings If temperatures are too warm in excess of 110F 43.3C for pine the seeds will be damaged or killed. Therefore at the top of each ductwork the system has motorized dampers fig. which are operated by a remote thermostat allowing ambient air to mix with heated air when Because the system is rarely used during the summer necessary. months temperatures in the solar cap may build to over 150F 65.5C. Manual dampers and another thermostat for the existing dampers are installed to allow the trapped heated air to escape. 1 temper-ature differ-ential 2 7 Figure l.--Solar collector on sloped -oof. I Figure 2.--Ductwork with 8 motorized dampers. TEMPERATURE READINGS OF SEED DATE TIME WEATHER 11/5/79 1400 clear 11/6/79 0840 1225 SYSTEM CHUTE MAIN F AMBIENT AIR 84 61 58 75 45 60 58 53 45 clear clear clear 78 72 50 55 58 57 clear clear clear 46 44 52 60 82 78 64 55 1600 clear clear clear 1000 1230 1400 1600 clear clear clear clear 85 50 83 78 62 60 60 1100 clear clear 88 95 48 54 clear clear clear clear 86 98 46 55 88 62 58 thin clouds overcast thick clouds 1535 thin clouds direct sun rain in a.m. 0850 11/7/79 HEATING EXTRACTORY 56 no 11/14/79 1200 1400 1600 11/15/79 1010 1200 1400 1230 11/16/79 1400 12/5/79 12/6/79 1300 1000 1230 12/7/79 1440 1600 Air delivered at cone 81 77 60 60 57 58 trays. differ-ences The employee ti system is lunchroom facility will be heated flow diagram fig. with 3 mechanical using the same two main 1. The 3180-square-foot 295.45-square-meter solar cap enclosed on all sides returning air to the cap from inside the building. downline The backup system involves electric from the three 3/4-hp fans. Region Architectural 2. 5 Section designed 9 both heating systems. elements DI C 0/A SOLAR ROOFTOP PANELS AIR Cf D2-DAMPER D2A TO D2 LINKED \OPPOSITE FEX 0 I 2 N SOL FAN 2 I EH \ 3 j GD 2 \ I3 O/A \ C O L GRILLES FOR FEX B/OR R/A INTERIOR 4 ..- O -. TH L H2 HI Q C ý. NTROL PANE 3/4 TO BUILDING EVAP COOLERS2 10 CW 1-I/2 HW SUPPLY 11 I. WHI CW SUPPLY 0 lb. 2 P-CWTO RESTROOM 13 3. FLOAT SV I/4 I/4 V3 6. I/4 V 2 8. 1/2 V 9. VACUUM 3/4 DRAIN 10. AT 11. 1-1/2 13. 14. 15 VALVE 5. 12. 14 INTERFACE CONTROL SCHEMATIC 7. 12 R/A 2. 4. 2 ý 0/A COMMONS O TO I-1/2 2 Tai CI TYP 1/4 CEILING t-O TRANSFER ONLY EVAPI INCLUDING 6 TRAP I BREAKER SYSTEM V 3/4 3/4 3/4 WITH I EVAP HIGH POINT I RELIEF V1 DRAIN 5. 12 177 IS Figure 17. 3CW 18. 1.5 SERVICE SO X 2 DEEP ROCK PIT cool-ing 3.--Mechanical DRY flow water diagram heater 10 solar heat water WELL supply. evaporating RECENT ACTIVITIES IN FOREST TO IMPROVE SERVICE OWNED ENERGY EFFICIENCY BUILDINGS AND IN RELATED NEW CONSTRUCTION FACILITIES George J. Lippert Facilities Engineer WO Re-gional famil-iar The following report was sent recently to all Foresters and Directors for their information. We are including it here so you may also become with energy conservation efforts in new Should you desire more information regarding site conditions design parameters and costs with the projects you should contact the Regional Director of Engineering responsible for that project. construc-tions. 90-75 associ-ated All new Forest Service buildings are being designed to ASHRAE the most widely accepted standard in the country for energy efficient building design. Building envelope heating ventilation and air conditioning energy efficiency standards are Several units have been using this standard since prescribed. 1975. In many instances the standards have been exceeded. Standards fol-lowing BUILDING AND FACILITY DESIGN In addition to this general treatment several projects have had unique energy conservation design features incorporated. The list keyed C--completed UC--under construction F--funded or P--proposed indicates the current status of projects in this category Region 1 --Wise River Ranger Montana. Passive UC Office Beaverhead solar collector National Forest Trombe Wall concept. --Spotted Bear Range Station Flathead National Forest Montana. Installation of 50kW water-driven power plant for entire administration site to replace existing diesel-powered generators. UC 11 --Red River Ranger Station Nez Perce National Forest Idaho. Duplex employee residences including energy efficient architectural interior design with of south-facing glass wood stoves masonry heat and insulation levels. storage high concentra-tion F expo-sure --Belt Creek Work Center Lewis and Clark National Forest Montana. Residence of passive/active solar design. Building sited partly below grade with southwest for solar passive heating. Active solar heating for hot water and partial space proposed. P --Standard units. 4-person Crew Quarters modules to Uses active solar hot water heat. --Region 1--Recreation. a specific recreation P Solar-heated site. hot P water 12-person shower at --Two projects are included in the Solar in Federal Buildings Program which is listed separately in this report. Region pas-sive 2 --Recreation Toilet Buildings. One hundred twenty-four vault toilet buildings at various sites utilizing solar ventilation systems. C Region 3 --Seed Extractory Building Albuquerque Nursery Cibola National Passive solar collector Forest New Mexico. Blowers distribute designed as a double roof system. heated air for cone drying. C Albuquerque Nursery Cibola National Same system as Seed Extractory Building with exception of air returning to the solar furnace auxilary heater. cap and integral electric --Commons Building Forest New Mexico. UC Region 5 Fire Station Los Padres National Forest Crew quarters with passive/active solar system utilizing black tile double roof system as passive solar collector. Gravity ventilation and earthen berms are passive features shutters solar domestic hot water is an active feature. --Arroyo Seco California. circula-tion P 12 Modoc --Big Valley Ranger Station Office Addition National Forest California. Active solar collectors to assist in the heating of the existing building and the addition. Flat plate collectors used. Funded under DOE/ERDA Demonstration Program. Fed-eral C --Two projects are included in the list of Solar in is listed separately Buildings Program which this report. Region in 6 earth-en Office Redmond Air Center Deschutes National Forest Oregon. Passive solar heating through Trombe Walls and thermal mass of building. Solar roof reflectors/shutters overhangs screens and berms are also used. --Dispatchers P --Medford Nursery Rouge River National Forest Oregon. Active solar domestic hot water system. UC --Cone-Dryer/Seed Extractory Dorena Seed Orchard Umpqua National Forest Oregon. Passive solar collector Blowers distribute designed as a double roof system. hot air to seed trays. UC --Dufer Ranger Office Addition Mt. Hood National Forest Passive design to obtain partial solar gain Oregon. for heating and gravity ventilation to assist existing No thermal storage heating and ventilation systems. YACC project. provided. P sys-tems --Solar Domestic Hot Water Systems Mt. Baker Snogualmie National Forest Washington. solar assistance Packaged for existing domestic hot water systems. Active for installation at several locations on Forest. P Region air-type Na-tional 8 Ranger Office Jefferson National Forest Active solar space heating system using Virginia. flat plate solar collectors and salt storage. --Newcastle F so-lar Civilian Conservation Schenck Centers Forests in North Carolina. Hybrid active/ passive solar system using hot attic air collection rock storage commonly referred to as the Clemson attic design concept. --Residence UC 13 and --Bathhouse and Four-unit Flush Toilet Buildings Houston Recreation Flat Area National Forests in Alabama. solar collectors for hot water. plate Pas-sive Ran-gers Nation-al heat-ing em-ployed UC --Two-unit Vault Toilets Various solar ventilation system. Locations UC in R-8. --Combined Research Project Laboratory and District Northeast Office Station and Daniel Boone Active solar heating and Forest Berea Kentucky. boiler for backup cooling system with wood-fired and cooling. Passive design concepts are also such as partial undergrounding and placement and protection of windows to obtain winter solar gain and a percentage of summer solar gain. UC District Ranger Dwelling National Forests --Highlands North Carolina. Multifuel furnace heating system which can use either wood or fuel oil. in C Shop Lyndon B. Johnson Civilian Conservation Multifuel Centers National Forests in North Carolina. --Welding C furnace heating fuel oil. system which can use either wood or Creek Civilian Conservation Center Cherokee National Flat plate solar Forest Tennessee. collectors for hot water. --Dormitory Jacobs UC Arkan-sas. Ranger Office Ouachita National Forest will collect heat Hybrid active/passive system and store it in salt a entering through clerestory The system will also include passive storage unit. storage walls. --Womble P Region 9 --Washburn Ranger Office Chequamegon Wisconsin. Solar hot water heating --Murphysboro Illinois. utilizes a --Saco Ranger Hampshire. Office. National system. Forest UC Ranger Office Shawnee National Forest passive solar elements and Incorporates wood burning system. supplemental F F Office White Design Mountain National Forest New similar to the Murphysboro concepts 14 incor-porate sup-plemental P Civilian Conservation --Administration Building Golconda National Illinois. Will Forest Center Shawnee utilize solar and design concepts passive wood heating system. Conserva-tion P Civilian --Administration Building Blackwell Center Nicolet National Forest Wisconsin. as Golconda Project. Pacific Same Southwest This is the --Fresno Laboratory Fresno California. first phase of combined passive/active solar-assisted Passive features include heating and cooling system. in the solar thermal mass incorporated courtyard patio and double roof an windowscreens furniture atrium Funded under Grant. system. DOE/ERDA C The second phase is included in the Solar in Federal Buildings Program listed separately in this report. Northeast --Berea Project Office. Included in R-8 report. Southeast Laboratory/Headquarters Building --Forestry Science Southeast Forest Experiment Station Asheville North Carolina. Included in the Solar in Federal Building is listed separately in this report. which Program ELECTRICAL POWER PHOTO VOLATAI CS GENERATION FROM SOLAR ENERGY under the Federal Photovoltaics Several projects have been.funded Utilization Program 95-619. Approximately $2.0 million has PL been provided to the Forest Service under Cycles II and III of in two more cycles is planned. the program. Participation I Ninety-one projects in R-2 R-3 These range from small repeater transmission. Domestic power i.e. lighting refrigeration etc. was included at sites at or near a lookout tower. co-located --Telecommunications. R-4 R-5 and R-8. sites to microwave 15 --Water and Wastewater and R-4. These Ten projects in R-2 Pumping. range from small wildlife water pumps to major water sources for recreation Three range water wells are included in this R-3 guzzler areas. category. camp-ground --Domestic Power Supplies. Eight projects including lookout tower power supplies to YACC camps for lighting boat ramps and parking lot security R-3 has five projects that will be mounted lights. crew trailers. atop --Ventilation Systems. Two hundred forty-six projects. Solar-powered ventilation units will be installed Service-wide. These units are similar to approximately ten units the San Dimas Equipment Center Development has been testing. The larger project is to provide further data on actual use and to demonstrate the of photovoltaic for systems improving in recreation area toilet buildings. via-bility condi-tions --Others. Battery chargers for watershed instruments. Fed-era men-tioned SOLAR BUILDINGS PROGRAM DEMONSTRATIONS IN FEDERAL THERMAL A decision on six applications submitted under DOEs Solar in Building Program PL 95-619 should be received in February 1980. Some applications included completion of previously projects. Califor-nia. solar-assis-ted --Fresno Laboratory Pacific Southwest Fresno The request is for completion of the heating and cooling system begun under DOE/ERDA Demonstration Grant. Bernar-dino domes-tic --dig Bear Lake Visitor Information Center San National The request is for Forest California. hybrid solar system that includes passive ventilation active solar-assisted space heating/cooling and hot water. a Cali-fornia. --Chilao Visitor Center Angeles National Forest This request is for a hybrid solar system that includes passive ventilation active and domestic hot water. space heating/cooling solar-assis-ted 16 Building --Forestry Sciences Laboratory/Headquarters Southeast Forest Experiment Station Asheville North Carolina. T His request of is for installation domestic hot water and space heating system is This a new construction system. project. -a solar-assisted For-est --Powell Ranger Station Office Clearwater National Idaho. This request is for installation of solar for a solar-assisted air-to-air heat pump system panels in an existing office. The original office 1977 was with mind. in future retrofitting designed instrumenta-tion National River Ranger Station Office Beaverhead for the This project is Forest Montana. of passive solar collector Trombe Wall. --Wise 17 WASHINGTON OFFICE TECHNOLOGICAL NEWS IMPROVEMENTS Harold L. Strickland Assistant Director A Look Backwards--Forest LOW-VOLUME ROADS Service Impressions SECOND Adrian INTERNATIONAL CONFERENCE PeZzner Low-Volume at-tended. im-pression Chief Materials Engineer The Research Board held a major conference Transportation on Roads August 20-23 1979. Because of the importance of this conference 50 Forest Service transportation engineers the Forest Service attendees Following the conference were surveyed by means of a questionnaire to determine their of the conference and the conferences overall relevance to their work assignment. atten-dance per-cent spe-cific il-lustrate confer-ence. Forest Service attendees had a positive attitude this conference and an overall feeling that their was worthwhile. Most of the engineers felt that 25-50 of the subject matter presented at the conference had their work. to application However the attendees were unable to quantify cost savings that might be achieved as a result of something learned at the conference. The narrative comments the are supplied by respondents particularly interesting and a wide range of_opinions and impressions of the Generally the toward re-plies We would like to thank those Forest time to complete the questionnaire. and the summary is presented 19 Service personnel who took the We have summarized the here for your information. SUMMARY OF REPLIES FROM SERVICE QUESTIONNAIRE ON SECOND INTERNATIONAL FOREST ROADS LOW-VOLUME 1. I a. be com-puter consider myself to A support specialist involved in Forest Service transportation i.e. geotechnical engineering signs bridges science b. CONFERENCE etc.. main-tenance An engineering manager working full or part transportation engineering i. e. Regional Assistant Regional Engineer preconstruction time in Engineer or engineer. c. Not connected engineering in in any direct way with the Forest Service. Support Specialist Engineering Manager 14 24 in-cluding Total 2. I at a. estimate Questionnaires that the direct Received costs to $ the Government for my attendance 700. b. 1000. c. 1300. d. 1600. e. 2000. $700-1600 700-1600 Support Specialist Engineering Manager My overall follows a. 38 travel per diem salary etc. the conference were Range 3. transportation reaction to the conference Average $1042 983 can be summed up as It was worthless boring and had no connection with my work. only the very remotest connection would have been better off by not attending. 20 or I I confer-ence. It was a nice but there was b. change from my regular little of value for me schedule the work at con-ference im-portance booster. the By attending better of the gained a understanding of my work in low-volume roads and a better of the vital role played by low-volume understanding roads throughout the world. was It c. real morale a I 20 79% 18-16-14-12--10 6-610 57% 8 g r w 12% 28 % I 2 2 1% 1% A B A C C Answer Answer 4. B con-cerned Insofar as I technical specific found the sessions to my work are applications various papers presented at the I attended to be relevant as follows a. Not b. No c. About 25 percent. d. About 33 percent. e. As much f. Considerably at all. more than 10 as 50 percent. percent. greater 21 than 50 percent. 6-4N 10 10 8 8 U N 6 - o 4 N 2 37% 33% 42% 14% 14% C LU 1% A 16% 4 21% -I 2 1% I B C D E A F 1% B C Answer It 5. has been have months 2 since I the the conference. Already b. Stored the conference in my memory bank. Perhaps in the future a situation may arise to which I can apply some of the knowledge I gained while attending the meeting. c. Made definite plans to make use of the information that was presented d. Already I conference. pre-sented used some of the the conference. some portion of at the conference. information 2-V X10 m 10 and ideas 41% ý 8 33% 8 50% 6 0 F E a. forgotten about attended at r D Answer 25% 6 28% 4- S_ al 21% c w 2 1% A 4 B C A D Answer 22 B C Answer D 6. be-lieve of something I learned at this conference I can make an improvement in the way I have been I estimate the carrying out a particular operation. in next the will be 5-year period potential savings Because I because did not learn useful. a. Nothing b. allow me Nothing because what I did learn will to do my job better give me more alternatives such or improve my analytical capabilities--but improvements are not possible to quantify in terms of I 1 2 3 cost anything savings. c. Less than $10000. d. Between $10000-$50000. e. Between $50000-$100000. f. Greater than $100000. g. Considerable but I cannot estimate the savings. 20 18 66% 16 14 12 10 r g 8 r U N 0 Ln 10 42% 6 4 w 21% A B C D 20% 4 21% 14% 2 6 2 E F A G B 1% 1% C D Answer Answer 23 1% E F G 7. I received a. Took the Proceedings from this conference home put away and will probably which never look I at again. b. Tried c. Scanned or read a few of I am keeping my personal intend to refer to it as d. Read read and review for potential application to my work but I gave up. There was either nothing that applied to my work or those papers that did apply were so technical or impractical that they were not worth my time. to fu-ture. the more interesting papers. and copy of the Proceedings the need arises in the 1 one or more papers in detail. The papers is supports what I am doing now causing me to consider changing my operations to take of what I have learned or advantage gives me many ideas for future followup. either Read will e. 2 3 from cover to cover. become my most useful I expect the reference. Proceedings 20 18 16 0 14 54% 12-45% 10-S.-57% 10 8-5 8 -D W 6 28% 4 4 14% 2 2 A B 6 C D A E Answer B C Answer 24 D E future involvement Concerning by the Forest conferences of this type I recommend 8. Service in a. Against any further involvement whatsoever either in assisting TRB plan the conference or in allowing Forest Service employees to attend. b. Considerably reduced attendance by Forest Service employees. Require much stronger specific for attendance by Forest Service attendees and require attendees to advise their supervisors what they learned at the conference and how they to apply it. c. That the Forest Service judge each conference on its I own merits. believe the Forest Service involvement in this conference i.e. planning number and type of personnel attending and postconference of proceedings was the right response for a major conference on a subject area of considerable to the Forest Service. importance in-tend justifi-cations distribu-tion d. an-nouncements substantial involvement i.e. more about the conference more Forest Service authored papers more Forest Service attendees and more postconference followup. Far more 20 18 79% 16-14-r 12-ro S_ W 10 f 8 r 6 C1 71% cn10 I 2-U-3 r- r c 4- 4- 21% 16% 2 1% A B C A D Answer 1% B C Answer 25 D 9. this conference the benefits of attending Evaluating is a essentially The benefits depend subjective process. on --The technical --The meeting quality of the conference. facilities. --The attitude of the attendee toward his work. --The attitude of the attendee toward conferences and meetings. --The quality of the published coming from the meeting. proceedings and reports recog-nize --An individuals at his ability to look objectively work decide where improvements are needed and when a specific presentation or report will or will not be useful in making the needed improvements. be-lieve Insofar as this conference is concerned knowing what know now about the conference and the Proceedings I I my attendance a. Was not justified. will be. worth future. any I the doubt cost whether either the benefits now or in if the b. Was probably justified. It was a good conference and I learned something useful. I hope to be able to both now as well as in apply some of this knowledge the future. c. Was I definitely justified. can now do some parts of better because of attendance. my job Furthermore my as a result of what I have learned I am now making or plan to make changes that will have short-term and the costs of my long-term benefits that far outweigh attendance. 26 I 1 20 18 16 14 54% 12 10 10 a a 8 r U 6 0 4 V 2 a. CL 35% 42% 33% 8 6 4 21% 2 1% A A C B Answer 10. B C Answer in-dividual collec-tive em-ployees. Please give us any comments you have regarding your attendance at this conference and the attendance at this conference by Forest Service meet-ings cooper-ative. COMMENTS Supervisors may have if supervisors session rather than a BY SUPPORT SPECIALISTS attitude toward justifiably-negative with plans for a training are approached another meeting they may be more pre-sentations The quality of the papers and applicability of the information were much less than. at the first conference I hope that the of future sessions will be on a higher level. Forest Service participation in this conference was more low key than in the first Low-Volume Road Conference and this is good. It seems that more interest needs to be generated for county road agencies to participate. management 27 There were too many Forest or two from the Washington should be sufficient. The to road roughness Service Office people at the conference. and one or two from each One Region operating costs as related that concepts may warrant further Service. index and vehicle maintenanceare interesting examination by the Forest many of us professional growth may tend to stagnate. I was gratified to be reawakened to a larger world of circumstances being resolved in innovative ways. With case In my similar Some of the papers presented were too deep into research it was difficult to determine if the results were meaningful or could be to field use. adapted The who most beneficial papers were those actually use the technology. a U.S. GOVERNMENT PRINTING OFFICE 1980-620-222/3714 30 presented by field people INVITATION TO READERS OF FIELD NOTES Every reader of an article for Field Notes. author a potential is you would you have If news item or a ac-curate article short Material to share with we Service engineers invite send to you for it Field Notes. in publication like submitted the to Office Washington for publication should be reviewed by the Washing-ton Office Regional respective and of informative material submitted however short drawings is or interest Office Manager to increase the their should Regional R-1 Melvin R-2 Royal R-3 FSM 7113. The length several typewritten illustrations all technically to of pages the should be original of copies sent submit to all office. Station currently Technical Engineering your Regional are not and on the Data Systems Copies of back issues are Office. material for publication or questions concerning Field Notes Coordinators Dittmer M. Ryser Juan Gomez Coordinators timely material submitted ideally or the Regional number available from the Washington personnel All to from the Washington Office directly to and Forest Service retirees. If you mailing list ask your Field and double-spaced Engineers sentences short news items are preferred. Forests also several current is or negatives. distributed. to information Forest Service to from Area Headquarters Coordinator the that see vary be typed prints glossy Field Notes may articles Office should to should direct R-4 Ted Wood R-9 Rich Wilson R-5 Paul Stutes R-10 Jack Van Lear R-6 Kjell R-8 Michael questions WO Bakke concerning Martin format editing problems to Forest Service Engineering Attn P.O. - USDA Staff Gordon L. RP-E Bldg Rome Editor Box 2417 Washington Telephone Al Colley D.C. 20013 Area Code 703 235-8198 publishing dates and other