ENGINEERING TECHNICAL INFORMATION SYSTEM FIELD NOTESTECHNICAL REPORTS DATA RETRIEVALe MANAGEMENT PROFESSIONAL DEVELOPMENT VOLUME 11 NUMBER 4 Noteý ield BIBLIOGRAPHY OF ENGINEERING AND S. DEVELOPMENT PUBLICATIONS FOREST SERVICE APRIL S U.S. DEPARTMENT OF AGRICULTURE 1979 UýS FIELD NOTES ENGINEERING Volume Number 4 11 has been developed of employees respon-sibility Information of the contained United the for The of any of others The that text in may be the publication must not or policy except engineers and engineering not construed by by other than of this-information names use does not in this publication constitute an is official its its own employees. for the information and endorsement or approval to the exclusion suitable. be intended guidance by the United States Department of Agriculture or service product use firm or corporation of the reader. Such convenience for and its contractors Service Department of Agriculture-Forest and State agencies. The Department of Agriculture assumes no interpretation or of trade use publication States Federal cooperating this in as FSM exclusively the represents recommended references. personal Because technicians opinions or approved should of the respective procedures of the type read each of material in the publication issue however for engineers. U.S. FOREST SERVICE DEPARTMENT OF AGRICULTURE Washington D.C. author and mandatory instructions 20013 this publication all is ENGINEERING AND ED8T PUBLICATIONS Engi-neering BIBLIOGRAPHY OF num-ber This bibliography contains Staff Equipment in the Development information on publications of the in the Washington Office and in the Centers. field Field Notes The listing is arranged by the series of publications document Technical etc. title Reports author Engineering It is not a comprehensive list and and date of publication. cited with each are group. previous compilations pre-viously a-vailable lists material published during 1977 and 1978. This bibliography No. 11 November 1977 for Refer to Field Notes Vol. of these are material. Copies publications published Personnel Forest Service to upon request by writing or 9 calling Service--USDA TIC P.O. Box 2417 Washington DC 20013 FTS 8 235-1424 Telephone Forest Engineering 1 ENGINEERING FIELD NOTES Headquar-ters. This is a monthly newsletter published publication to exchange information and ideas of a technical and administrative engineering nature among Forest Service personnel Station and Area If you are not now receiving a copy and would like one ask Office or the Information to your Manager Coordinator Regional increase the number of copies sent to your office. FIELD NOTES 1977 AND America Joins American Society Conversion. The World. a Metric 11-15. 1977 American Heyward T. for Testing Field Notes of Computer DeKalb Victor Brownhouse April 9 Part M. 1977 9 Forest Service. Field Notes 10 Models for Transportation Field Notes 9 October Road. Study 6-8. Hatfield June 1978 System 1977 Field Notes Systems. Franklin B. D. Taylor 9 R. Update--Alternate Energy Sources. Field Notes 9 14-15. February 1977 Career Counseling Field Notes 9 for Furen Walter Engineering May 1977 Field Notes Personnel. 1-2. 2 E. Davey 1-14. 1-8. Part 1 9 Weller Cable Yarding Systems Helping to Solve Fuels Management Field Notes 9 Taylor Heyward T. December 1977 Cadastral Engineering. 1978 18-19. David Analysis. Field Notes Buildings Handbook Charles June 1 and Materials Instruction on Metric Part 1 47-55. June 1977 in the A. Jr. Brief History of Measurement June 1977 21-24. The Field Notes Society of Agricultural Engineers. Field Notes 9 13-14. April 1977 Automobile Fuel Economy and Broadway Ollie Benefits BY TITLE 1978 Problems. 12-14. 10 E. April Duane. Chain Saws. Taylor Heyward 21-22. Field Notes T. With Compatibility of Electrical Weller Charles Concrete Repair Vanderpoel Concrete 1977 Equipment Field Notes 9 R. the Vesuvius Field Notes of Al. Tinker Toy 1-4. Bridge. Electric March 1977 13-18. Dam Larson Field Furen Walter Field Notes Ed. Standards of Metric 36-43. 1977 Notes Wire. Applications. March 1978 21-24. 10 1978 July 1978 Opfer Bill. and Field Notes Remote-Sensing Weber Frederick July 9 Frederick. August Field Notes of a.High-Altitude Forestry 10 9-11. for Development Development E. Richards Lehr Leon of Water Resources. 10 Field Notes August 1978 Designation June 12. Coghlan Gerald and 13-18. October 1978 10 Nelson Rick. Update. Safety 25-26. Service. Dam. Criminal Liability of the Field Engineer. 9-12. Field Notes 10 May 1978 Curve Widening. 1978 September 10 9 Part 1 Pallet System for Field Notes 10 P. An Evaluation. Hinshaw Diamond Core Drilling With Air-1977 Field Notes 10 1-5. May 1978 Bob and Northrup Jim. Personnel. Directory of Geotechnical/Materials 11-21. August 1977 Documentation of Field Notes EDT Board 9 Meets June 1978 Emergency Relief March 1977 Road in Missoula. 21-23. Funds. 13-14. 13-15. Energy From Water. 1977 1-2. System March 1977 Energy Conservation. 1977 Design 11. RDS. Strickland Hyde Jerry M. 3 Harold Harold Field 9 Taylor Heyward Taylor Heyward Strickland Field Notes L. L. T. Field Notes Field Notes Field Notes Notes 9 T. 9 9 May February 10 The Strickland Engineering Notes Certification Field Tests Program. 1978 August 10 Career. 23-24. July 1978 and Geometronics A Step Harold L. Field Notes 10 Engineer 19-20. in Your Strickland Harold. Field L. Treat-ment. at San Dimas Equipment Development T. Field Notes 9 August 1977 Heyward Center. Taylor 26-29. Figueroa Mountain Rubberized Chipseal Bituminous Surface Penzkover Jim Sheen Chuck and Perkins Sheldon. Field Notes 10 1978 February 1-8. A-nalysis. Forest Service Notes FRT Geometronics L. Geometronics Harold 1977 Furen Walter 28-30. L. 3-8. R. A History Region. 17-23. 1-7. Strickland 19-20. Harold Strickland Neumann Edmund Liability. Highway Safety October Field A. Investment Decision Policies and Field Notes 9 September 1977 Development Program Where We Are. Field Notes 10 September 1978 Graphic Display 8-17. James of Digitizing Techniques. Application Strickland Field Notes 9 24-25. September 1977 April 1978 Wallace Wolfe E. Geometronics Service Center. October 1977 20-21. Governmental Studies. of Dams on Transportation Study Harold Safety February 9 C. L. Field Field Notes Method for Comparing Alternate Routes. and Wong Peter.. Field Notes 10 April Traffic 1977. Control. Furen Walter 19. of Explosives Adolphson Use Ray. by the Forest Field Notes 9 Impact of Metrication on the Construction Notes 9 Part 1 June 1977 25-35. Improve the Forest Service Host Image. Notes 10 17-18. September_1978 4 E. Service Clementson 10 Cox 1978 Field Notes Rocky September Industry. Notes 9 Mountain 1977 Field W. C. Field 9 Our Congressional Correspondence. Field Notes 10 17-18. May 1978 Strickland Improving International Conference Field Notes Island Lake Creek Timber Culvert. Anderson Glen R. Field Notes Lessons From Implementing III National Notes 10 Location Notes Forest Analysis Low-Volume Notes 10 May 1978 H. L. T. and 6-8. Methods Analysis Edward Sullivan The Field C. 4-16. Centers. of District July 1978 Farkas 4-16. Strickland Bibliography. 9-10. February 1977 Andrew. Z. Harold Roads 9 Taylor Heyward Robert McDonald Transportation Experience. July 1978 10 Roads. on Low-Volume 23-25. July 1977 9 Harold L. Field Field A Trans-port/Logging A for the Analysis of Programming Approach for Timber Sale. Systems Cox Wallace R. Field Notes 9 3-12. May 1977 Mathematical Wong Peter. Method Moonier Lines Marking Boundary Dennis. Field Notes 9 Metric Conversion Act Part 1 June 1977 Metric Editorial of Guide. July 1977 Public 1975 3-10. Field Notes 73-82. Metric Education Guide for Employee 56-72. Part 1 June 1977 The 16-20. Whats Metrication 88-92. Metrication of Field Notes 9 94-168. Part Field Notes 9 Field Notes Field Notes 9 Part 1 Design for Timber 13-22. July 1977 Monitoring of Turbidity Levels Systems. Taylor Heyward in T. 11-12. 5 Transport. Surface-Source Field Notes 10 Part 9 1 9 June June 1977 Control 9 9 Field Notes June 1977 1 the National Standards for Traffic Part 1 June 1977 44-46. Minimum-Cost Network Field Notes Next Law Training. Metric System of Measurement. 1977 25 Calculator. 5-12. the HP Using of and Wong Devices. Peter. Drinking-Water February 1978 Monthly Billing For Electric Notes 1978 February 10 Service. Furen Walter 10-11. Field E. Native Log Stringer Bridge Research. Frank W. Tuomi Muchmore Field Notes 9 Roger L. and Wolfe Ronald. October 1977 9-17. New Aerial Photography Format Being Evaluated. Harold L. Field Notes 10 November 1978 Strickland Con-struction New Forest Notes --New 9. Service General Provisions of Roads and Bridges. April 1977 9-10. Mapping Program Affects Forest Field Notes 9 January 1977 Noise Pollution Prediction Notes September 9 and Specifications Weller Charles R. Service. 26-27. for Field Strickland 18-19. Method. 1977 1-2. Taylor Heyward Harold Field T. Nomograph for Load Ration Log Stringer Bridges. Larsen E. and Rankenberg Field Notes 15-18. B. 10 June 1978 Organizational Study. Strickland 13-15. February 1978 A Harold Field Notes L. January W. 10 Pavement Design and Management System for Forest Service Roads--A Working Model. Field Notes Taylor Heyward T. 1977 L. 9 20. Roads--Im-plementation Taylor Pavement Design 1978 3-4. and Management System Heyward T. for Forest Service Field Notes 10 November Specifica-tions. Planned Revision of 1977 Road and Bridge Construction Field Notes 10 Furen Walter E. May 1978 Polypropylene Fabric as a Reinforcement of Muskeg Subgrade Construction. Lively Morris and Vischer William A. Notes 9 March 1977 4-10. Presidential Statement on the Metric Conversion Field Notes Part 1 June 1977 1-2. 9 The Act of Problems of Using Standard Specifications Without for Specific Design Conditions. Coghlan Gerald T. Field Notes 9 March 1977 1-3. Procedure Lamit for Land Model. Management Wong September 1978 Integrated With Peter and Swarthout 1-14. 6 13-16. in Road Field 1975. Adjusting Skip. Transportation--The Bob. Field Notes 10 Resource R. Conservation Field Notes 9 and Recovery of 1976. 15-17. Act 1977 January Information Display System RIDS. Field Notes 10 20-21. April 1978 Resource Review of Road Charles Weller Charles Strickland and Bridge Preconstruction Activity. Field Notes 9 26-27. July 1977 R. Harold L. Weller Revision of Formula for Location Analysis of District Centers. Field Notes 10 Farkas Z. Andrew. iii. September 1978 Road Design System. 1977 18. Taylor Heyward Roads and Synthetic Fabrics. March 1978 18-20. Furen Walter Notes July 1978 10 1-3. Self-Closing Trail Gate--Field 1. 1978 Skycrane Frank 1977 Saves the Day in W. and Williams Alaska. May Russell Jr. 1978 February 9. McRae Solid Waste Management Guidelines Field Notes Furen Walter E. Stabilization of the Foundation Field Notes Standard 10 J. Gregory L. Field Notes January for Bridge 9-15. March 1978 Gary. 9 10 Field October 10 Muchmore August Field Notes Robert. 10 Field Notes Field Notes for Beverage 10 E. and Pingel Comment. 5-10. Skyline Analysis Program. A Ted Zeally October 9 Field Notes E. Furen Walter Sanitary Engineering Workshop. 21. August 1978 Self-Closing-Trail Gate. Field Notes T. 10 Containers. 1978 Footing. 27-28. Yager Duane. Forest Service Scale for Resource Aerial Photography. Harold L. Field Notes 9 11-12. April 1977 Strickland Steep-Slope August Seeder 1978 Developed. 22-24. Taylor Heyward Study of Service-Wide Harold L. Styrofoam Ice Shannon J. T. Engineering Computer System. Field Notes 9 24-25. August 1977 Field Notes Strickland Chest-Corrects Battery Failure Problem. Field Notes 10 September 1978 15-16. 7 Clark 10 Process for Evaluation Harold Strickland and Rehabilitation Field Notes 10 of Disturbed January L. Progress in Consultation and Standards--More Charles R. Field Notes Bridge. Weller About Regional Notes in Participation 10 March 1978 EDT Program. Field Notes George. Field Notes L. of 1977 December 9 Furen Taylor Heyward 16-17. 20-23. Systems. Removal of Abandoned Log Stringer Bridges by Use Krajnak Press-Lam 9-10. Harold Strickland the 25-26. May 1977 9 of Engineering Computer Proposal for Management E. Field Notes 9 December 1977 Walter Regional Engineers Meeting. December 1977 11. Lands. 1978 9 Field T. Explosives. 1-8. Report on the Status of Safety Design Standards for Low-Volume Roads. Field Notes 9 Furen Walter E. 23. August 1977 Research Publications. 1977 1-13. Technology 1978. Transfer. Colley A. Strickland 19-20. Traffic Surveillance Survey. 16-19. May 1977 Field Notes L. Harold E. Field Notes Taylor Heyward Underwater Duane. Repair of Bridge Field Notes 10 Unified Rock Classification Notes 10 1978 November 10 System. 6-18. United States Metric Measurement June 1977 83-87. Use Use of Photographs Field Notes 10 of Reinforced Olympic 1977 Earth 1-5. 1978 Plans. 1-7. Companys Retaining Erwin Dave. Engineering January 9 Furen Walter 5. Converts. Construction August System. Field Notes Williamson Douglas National Forest. Office 10 Field Notes Washington in T. June 10 Footing. Lallum Lyle and Yager 1-8. March 1978 1978 November Field Notes L. Trained Operators for Wastewater Treatment September 9 Staff 1978 8 Field Notes Branchfield 9 Part 1 Paul. Structures on the Field Notes 9 April Organizational 1-21. Field A. Directory. What Bugs Engineers Most About Report Writing. 9 1-14. Field Notes January 1977 Six Rivers What to the Happened John. Field Notes Wiring Systems Notes for Sewage 1977 Materials Notes 1977 August 9 Engineering January 10 October 10 Field Mutch 1-4. 1978 Frank. Taylor Heyward Workshop. 23-24. C Bowman 3-11. Stations. Lift Method. Design 1978 Smith Terry Field Field T. A Serv-ice FIELD NOTES BY AUTHOR 1977 AND 1978 Tim-ber History of Ray. Mountain Region. Rocky 17-23. Adolphson Anderson Glen R. Culvert. Robert and McDonald 10 Field Notes May What Bowman John. Method. Happened 10 Field Notes Use Branchfield Paul. 10 Field Notes Ollie A. Economy in the Broadway Explosives Use by the Forest Field Notes 9 September 1977 to the October H. 6-8. Six Rivers 1978 of Photographs August 1978 Island Lake Creek 1978 in Field Design 3-11. Construction Plans. 1-7. Jr. and Hatfield David. Automobile Fuel Field Notes 10 Forest Service. June 1978 1-14. Styrofoam Ice Chest Corrects Clark Shannon J. September 1978 Problem. Field Notes 10 Clementson W. C. Improve the Forest 1978 Service Battery 15-16. Host 17-18. Failure Image. Field The Spec-ifications Notes September 10 Gerald Coghian T. Skip. Without Field Notes 9 Adjusting March 1977 Gerald T. Vesuvius Dam. Coghlan Problems of Using for Specific Design Standard Conditions 1-3. and Vanderpoel 10 Field Notes Concrete Repair of 13-18. October 1978 Al. the Com-paring Colley A. 1977 Cox Wallace L. Research Publications. Field Notes 9 September 1-13. R. and Alternate Graphic Display Method for Wong Peter. 8-17. Field Notes 10 Routes. April 1978 9 Cox Tim-ber A R. and Wong Peter. Mathematical Programming for the Analysis of Transport/Logging Systems for Sale. Field Notes 9 3-12. May 1977 Wallace Approach Career Counseling 1-2. May 1977 Davey E. Duane. Field Notes DeKalb Victor 9 Personnel. for Engineering Benefits of Computer Models Field Notes 9 System Analysis. October Struc-tures Erwin for Transportation 1977 1-8. Dave. Use of Reinforced Earth Companys Retaining on the Olympic National Forest. Field Notes 9 1977 Farkas M. April 1-5. Z. Notes Location Andrew. July 1978 10 Analysis 17-22. Centers. District of Field Farkas Z. Andrew. Revision of Formula for Location Analysis of District Centers. Field Notes 10 iii. September 1978 Franklin B. D. April 1977 The Brownhouse 6-8. Road. Study Furen Walter E. Cadastral Engineering. Furen Walter E. Dam 1978 18-19. 25-26. Safety Update. Field Notes Field Notes Field Notes April 10 10 9 July 1978 FRT Furen Walter E. Decision Study on Transportation Investment Policies and Analysis. Field Notes 9 September 1977 28-30. Furen Walter October E. Highway Safety Traffic 1977 Furen Walter E. Furen Walter E. Control. Field Notes 9 19. Monthly Billing for Electric Service. Field Construc-tion Notes 10 February 1978 Planned Revision Specifications. Furen Walter Systems. Furen Walter E. for Low-Volume Furen Walter March E. 1978 Notes of Field Notes 1977 Road 10 for Management Proposal Field E. 10-11. 9 December and Bridge 13-16. May 1978 of Engineering 9-10. 1977 Computer Report on the Status of Safety Design Standards Roads. Field Notes 9 23. August 1977 Roads and Synthetic 18-20. 10 Fabrics. Field Notes 10 Furen Walter E. Furen Walter E. Furen Walter E. 1978 Sanitary Field Notes Workshop. Engineering 10 Sys-tem. Eco-nomy August 21. Solid Waste Management Guidelines for Beverage Field Notes 10 27-28. January 1978 Containers. Trained Operators for Wastewater Field Notes Hatfield in 10 1978 November Treatment 5. Automobile David and Broadway Ollie A. Jr. the Forest Service. Field Notes Fuel June 1978 10 1-14. Diamond Core Drilling With Hinshaw Bob and Northrup Jim. An Evaluation. Field Notes 10 Air-1977 May 1978 Hyde Jerry 1977 M. 1-2. Energy From Water. Field Notes 9 1-5. February Foot-ing. Removal of Abandoned Log Stringer Bridges by Use Krajnak George. 1-8. Field Notes 9 December 1977 of Explosives. Underwater Repair Lallum Lyle and Yager Duane. 1-8. Field Notes 10 March 1978 of Bridge W. Larsen E. Larson Ed. B. and Rankenburg Nomograph for Load Ration Field Notes 10 15-18. June 1978 Bridges. Stringer 1977 Concrete Tinker 1-4. Lehr Leon and Field Notes Opfer Bill. August 10 Toy Bridge. Designation 1978 May of Water 9-11. Lively Morris and Vischer William Reinforcement of Muskeg 9 Notes March 1977 Field Notes A. Log July 9 Resources. Polypropylene Fabric as a Construction. Field in Road Subgrade Tim-ber L. Gregory Muchmore Skycrane Saves 5-10. 1977 McDonald Robert Culvert. McRae Robert February J. 25 in W. and Williams Russell Jr. Field Notes 9 August Alaska. and Anderson 10 Field Notes Glen R. Island Lake Creek May 1978 Skyline Analysis Program. A Calculator. Frank W. Muchmore Skycrane Saves 1977 Frank H. 1978 Moonier Dennis. HP the Day 4-10. 6-8. Field Notes 10 9. Method of Marking Field Notes 9 Boundary Lines July 1977 Using the 5-12. Gregory L. and Williams Russell Jr. Field Notes 9 the Day in Alaska. August May 5-10. 11 Frank W. Toumi Roger L. and Wolfe Field-Notes Log Stringer Bridge Research. 9-17. Mutch Frank. Wiring Systems for Sewage Notes 9 August 1977 1-4. Curve Widening. Nelson Rick. 13-18. Lift Field Notes Native. October-1977 Ronald.. Muchmore 9 Stations. 10 Field 1978 August Air-1977 Neumann Edmund Governmental C. 1978 April Jim and Hinshaw Northrup Liability. 1-7. Field Notes Bob. Diamond Core Drilling Field Notes 10 May 1978 An Evaluation. 10 With 1-5. Moun-tain Moun-tain Opfer Bill and Lehr Leon. Field Notes August 10 Jim Sheen Chuck Penzkover Chipseal Rubberized Notes Perkins February 10 Sheldon Resources. and Perkins Sheldon. Figueroa Bituminous Surface Treatment. Field 1-8. Jim and Sheen Chuck. Figueroa Field Chipseal Bituminous Surface Treatment. February 10 1978 of Water 9-11. Penskover Rubberized Notes Designation 1978 1978 Pingel Gary and Zeally 10 Notes July 1978 1-8. Self Closing Ted. Trail Gate. Field 1-3. B. and Larsen E. W. Nomograph Field Notes 10 Stringer Bridges. June Rankenburg for Load 1978 Ration 15-18. Log Moun-tain Richards Frederick. Field Notes 10 Criminal Liability of the Field Engineer. May 1978 9-12. Sheen Chuck Penzkover Jim and Perkins Sheldon. Figueroa Rubberized Field Chipseal Bituminous Surface Treatment. Notes February 10 Smith Terry Strickland March What C. Field Notes 9 Harold 1977 1978 1-8. Bugs Engineers January 1977 L. Emergency Most About Report 1-14. Relief 13-14. Funds. Strickland 1977 Harold 13-15. L. Energy Conservation. Strickland Harold L. The Your Career. Field Notes Field Notes Field Notes and Geometronics 23-24. July 1978 Engineer 10 12 Writing. 9 9 May A Step in Strickland Harold L. Notes 10 August Tech-niques. Strickland Strickland Are. Engineering 1978 19-20. Certification Program. Field Harold L. Geometronics Application of Digitizing Field Notes 9 September 1977 24-25. Geometronics Development Program 10 September 1978 19-20. Harold L. Field Notes Strickland Harold October 1977 Geometronics L. Service 20-21. Center. Harold L. Improving Our Congressional Field Notes 10 17-18. May 1978 Strickland Where We Field Notes 9 Correspondence. Evalu-ated. Strickland Notes 9 Harold Low-Volume L. Roads 9-10. 1977 February Bibliography. Field Serv-ice. Feb-ruary Strickland Strickland Strickland Harold L. Field Notes Harold 10 New Harold L. Field Notes 1978 New 9 Aerial Photography 1978 November Mapping January Program Affects 1977 Organizational L. Format 1-2. 13-15. 18-19. Study. Being Forest Field Notes 10 Process for Evaluation and Rehabilitation Field Notes 10 25-26. January 1978 Strickland Harold L. Disturbed Lands. Strickland Harold L. December 1977 Regional 11. Engineers Meeting. of Field Notes 9 A Re-source Resource Information 20-21. April 1978 Harold Field Notes 10 Strickland Strickland 11-12. L. Harold Display System RIDS. Standard Forest Service Scale for Field Notes 9 April 1977 L. Aerial Photography. Harold L. Study of Service-Wide Field Notes 9 August 1977 System. Strickland Engineering 24-25. Computer Anal-ysis Strickland Harold June 1978 Sullivan Edward Methods July 1978 Technology L. 19-20. C. Transfer. Field Notes 10 Lessons From Implementing The National Forest 4-16. 13 Transportation Field Notes Experience. 10 Swarthout Bob and Wong Peter. Procedure for Land Lamit Model. Integrated With Transportation--The Notes 10 1-14. September 1978 Management Engi-neers. Taylor Heyward The T. Field Notes Taylor Heyward 9- T. Taylor Heyward T. Taylor Heyward June 1978 Field Notes Chain Saws. 21-22. Field Notes April 1977 of Agricultural 13-14. Cable Yarding Systems Helping T. Management Problems. Taylor Heyward American Society Field Notes Documentation of March 1977 9 T. EDT Board Meets 21-23. Road 11. Solve to December 9 Field 10 1977 Field Notes T. 9 Taylor Heyward T. Taylor Heyward T. International July 1977 Conference 23-25. Engineering 23-24. 10 Development on Low-Volume 1977 Materials 1978 RDS. Field Notes Field Tests at San Dimas Equipment Taylor Heyward T. Center. Field Notes 9 26-29. August 1977 Taylor Heyward 1978 September Design System in Missoula. Fuels 12-14. Roads. Field Workshop. Surface-Source Notes January 10 Monitoring System. Drinking-Water 11-12. of Turbidity Levels Field Notes 10 in 1978 February Janu-ary For-es Taylor Heyward Notes Taylor Heyward Forest T. Service 1977 Taylor Heyward Service 1978 T. Noise Pollution Prediction September 9 3-4. Taylor Heyward 20. T. A 1977 Pavement Design and Management Field Notes Field Notes 10 Regional Participation March 1978 16-17. Taylor Heyward T. Road Design Taylor Heyward T. 1977 August 18. 1978 Field Pavement Design and Management System Roads--A Working Model. Field Notes 9 Roads--Implementation. T. Method. 26-27. Steep-Slope System. Seeder 22-24. 14 in System for November 10 EDT Program. Field Notes Developed. for 9 i October Field Notes 10 Taylor Heyward May 1977 Traffic Surveillance T. Survey. 16-19. Field Notes 9 Vesu-vius Toumi Roger L. Muchmore Frank W. Log Stringer Bridge 9-18. Vanderpoel Al Dam. Reinforcement Field Notes 9 a Weber Frederick Pallet System Native Ronald. 1977 October 9 Repair of the 13-18. and Lively Morris. Polypropylene Fabric of Muskeg Subgrade in Road Construction. March 1977 P. March 1978 Sources. and Wolfe Field Notes and Coghlan Gerald. Concrete Field Notes 10 October 1978 Vischer William A. Weller Charles Research. 4-10. of a High-Altitude Development Remote-Sensing Field Notes 10 Applications. for Forestry 21-24. R. Buildings Handbook Update--Alternate 9 12-14. February 1977 Energy Field Notes Weller Charles Electric R. Compatibility of Electrical Equipment Service. Field Notes 9 12. March 1977 New Forest Service General Provisions for Construction of Roads and Bridges. Specifications Notes 9 1977 9-10. April Weller Charles as R. Weller Charles R. Progress in Consultation About the Press-Lam Bridge. Field Notes With and Field and Standards--More 9 May 1977 20-23. Ac-tivity. Resource Conservation Weller Charles R. Field Notes 9 1976. January 1977 Weller Charles R. Review Field Notes Williams Russell Jr. May Skycrane Saves the Day 5-10. 1977 Williamson Douglas Field Notes 10 A. of Road July 9 1978 6-18. Forest Service Safety James A. 3-8. Notes 9 February 1977 Ronald Muchmore Stringer Bridge 9-17. Frank Research. W. of Dams and Toumi Field Notes 9 15 of Frank W. August 9 Unified Rock Classification November Act and Bridge Preconstruction 1977 26-27. Gregory L. and Muchmore in Alaska. Field Notes Wolfe Wolfe and Recovery 15-17. System. Studies. Roger L. October Field Native Log 1977 Com-parin A Peter. Minimum-Cost Network Design Field Notes 9 13-22. July 1977 Wong for Timber Transport. Tim-be Wong Peter and Cox Wallace Alternate Routes. Wong Peter and Cox Wallace Graphic Display Method for Field Notes 10 April 1978 R. Mathematical R. for the Analysis Sale. Field Notes 9 Approach of Transport/Logging May 1977 8-17. Programming Systems for 3-12. Procedure for Land Management Peter and Swarthout Bob. Field Lamit Model. Integrated With Transportation--The Notes 10 1-14. September 1978 Wong Foot-ing. Foot-ing Yager Duane. for Bridge Stabilization of the Foundation 10 9-15. March 1978 Field Notes Yager Duane and Lallum Lyle. Underwater Repair Field Notes 10 1-8. March 1978 Zeally Ted Notes 10 and Pingel Gary. July 1978 1-3. of Bridge Self-Closing Trail Gate. 16 Field discus-sions ENGINEERING The TECHNICAL REPORTS ETR series are detailed Reports Engineering Technical of specific engineering topics or closely-related subjects. ENGINEERING TECHNICAL Measurement of Soil Creep by REPORTS Inclinometer. BY TITLE ETR-7100-4. Ziemer ETR-7700-10. Robert. Status September 1977. of Emulsified Report Asphalt Williamson Ronald. Stereogram-Useful June Philip. Tool Engineering in TECHNICAL Stereogram-Useful June 1978. ETR-7100-6. Region in Geology. 6. ETR-7100-6. 1978. ENGINEERING Durgin Philip. Pavements March 197 REPORTS BY AUTHOR Tool Engineering in Durgin Geology. ETR-7100-4. Williamson Ronald. in Ziemer Region 6. Status Report of ETR-7700-10. March Robert. Measurement of Soil 1977. September ENGINEERING TECHNICAL Measurement ETR-7100-6. Stereogram-Useful June 1978. September Philip. ETR-7700-10. Region Status 6. Report Williamson 1977. Creep REPORTS by Asphalt Pavements Inclinometer. BY NUMBER Soil.Creep by Inclinometer. ETR-7100-4. Robert. of 1977. Emulsified Tool in Engineering of Emulsified March Ronald. 17 Asphalt 1977. Ziemer Geology. Pavements Durgin in ENGINEERING SERIES MANAGEMENT Series contains publications The-Engineering Management serving a several disciplines special purpose or reader and those involving that are applied to a specific problem. ENGINEERING Aggregate Basic Base EM-7110-1. for Forest Road Contracting EM-7720-4. April 1978. Fish Migration Self-Study. 1979. Self-Study. 1977. January Trail BY TITLE January January EM-7110-1d. Inspection. SERIES EM-7110-le. Surfacing. Mathematics. Concrete MANAGEMENT 1979. Maintenance Self-Study. in Region 3. --Fores Fundamentals FRT Passage. EM-7100-12. of Digitizing. September 1978. EM-7140-3. Study Policy Team Reprot--Transportation Investment Policies and Analysis. EM-8320. June 1977. Decision Service General Provisions Standard Specifications Construction of Roads and Bridges. EM-7720-100. 1977. Measurements. EM-7110-la. Proposal for Management November 1977. Road Bridge Statistical February to 1977. of Engineering Preconstruction Approach January Instrument Self-Study. Computer Engineering. for System. EM-7720-3. Calibration. EM-7710-3. July 1977. EM-7100-11. 1978. Analysis Topographic Spanish. August System 1977. TOPAS. 18 EM-7140-la. Translated into ENGINEERING EM-7110-1. Basic EM-7100-11. MANAGEMENT Mathematics. Statistical January Approach BY NUMBER 1977. to Instrument Self-Study. Calibration. 1978. February EM-7100-12. Fish Migration EM-7110-1a. Measurements. EM-7110-1d. Concrete EM-7110-le. Aggregate EM-7140-1a. Topographic EM-7140-3. Fundamentals EM-7710-3. Proposal November 1977. EM-7720-4. SERIES Passage. January Inspection. Base 1977. System of Digitizing. for Management for Forest Contracting April 1978. 1979. Self-Study. January TOPAS. August Self-Study. 1979. August 1977. 1978. of Engineering Road 1978. Self-Study. January Surfacing. Analysis September Computer Trail Maintenance System. in Specifi-cations Region 3. EM-7720-100. Forest Service for Construction EM-7720-3. Road Bridge General Provisions Standard of Roads and Bridges. 1977. Preconstruction Engineering. July 1977. EM-8320. FRT Study Policy Team Report--Transportation Decision Policies and Analysis. June 1977. Investment 19 pro-duced EQUIPMENT DEVELOPMENT AND TEST PUBLICATIONS and Test Reports Equipment EDT series are Development the Centers at Forest Service Equipment through Development San Dimas California SDEDC and Missoula Montana MEDC. The These publications are the result of projects assigned to the Centers by the Chief for the evaluation and development of equipment to meet the needs of Forest land managers in the field. Copies of these publications may be obtained from the TIC ton office or by requests to the Centers at the addresses Forest Service--USDA San Dimas Equipment Center Development 444 E. Bonita Avenue San Dimas California Washing-. below. Forest Service--USDA Missoula Equipment Center Development Fort Missoula Missoula Montana 59801 91773 An Equip Tips is a brief description of new equipment techniques or operating An EDT Report is a general procedures. the results of studies publication containing investigations tests evaluations or extension development projects. materials de-tailed Other reports prepared by the Centers are published as papers for technical society meetings and transactions bulletins descriptive are pamphlets and special purpose articles. Project Records engineering reports which generally include procedures techniques systems of measurement results analyses special circumstances conclusions and recommendations rationale. Special and Other Reports are published on an as-needed for these documents or films should be directed as the source. The following abbreviations A. Project B. Equipment C. Special D. Equip were used in the listing Records Development and Other Test Reports Tips 20 basis. to the Reports Requests Center listed Source - M Forest Service Equipment at Missoula Montana Development Center Source - SD Forest at San Development Center Articles Volume 9 published prior to Number 11 October Service January Aerial Burning for Equipment Plant Control Ramberg Airtanker Retardant Base Tour 1976 are listed in Field 1977. CATEGORY CODE AUTHOR TITLE Equipment Dimas California Richard James W. Notes CENTER SOURCE NUMBER DATE C M 7722/ 2805/ 2627 2-77 A SD 2655 4-77 D M A M B SD Equipment Alternating Current for Traffic Surveil-lance Sites An Analysis of 7777/ 2304 11-77 2-77 Substrates Inks Paints for Im-proving Outdoor it Posters Catalytic Converter Exhaust Harrison Robin 5100- 2-77 17 System Tempera-ture Tests Case History Traffic Counter Service Repair A A M Chain-Flail A SD D M D SD 10-76 6-76 Barker Develop-ment Chain-Saw Evaluation Canale Research Chemicals Support Equipment to Reduce Delays in Hose Lays 21 7761/ 2811/ 2508 12-77 7-76 CATEGORY CODE AUTHOR TITLE CENTER SOURCE NUMBER DATE Chemicals SupEquipment port .t Reduce in Hose Lays A SD 10-76 Chemical Fire Retardant Test Methods A SD 3-76 B SD 10-76 A M 7767/ 2215/ 2689 10-77 Fric-tion Corro-sion Clearing Grub- bing Dispos-ing of Road struction Con-Slash Controlling BitStinging Insects at ing Campsites Putman Stuart Correcting Vertical Fish Barriers Dimeo Art A M 7726/ 2217/ 2613 9-77 Criteria Standards for Drift Sampling Forest Pesti-cide Spray Ekblad Robert A M 7752/ 2218/ 2353 10-77 D SD 7823/ 1301/ 1423 7-78 Miller Warren C M 7771/ 2508/ 1456 6-77 Cummings YarderDesign Verification Test Cluste A M 7851/ 2205/ 8035 9-78 Deadman Prellwitz A SD 7724/ 1204/ 2640 12-77 Jr. Cross-Linked Polyethylene Vault Toilet Riser Crosscut Manual Saw Anchors Lee H. Allan Rodney J. 22 CATEGORY CODE AUTHOR TITLE The Design Installation of an Instrumenta-tion System to Monitor SOURCE CENTER NUMBER DATE C M of Development the FS Trail Traffic Counter B M 9-76 Developing Testing a Shear/ Plow for Constru tion A M 8-76 of Development Specifications for Painted Metal Signs A M 1-77 Dormancy Meter to Determine Physiological Activity of Nursery Stock C M Emergency Medical Field Station C M B SD Oregon State University 263634 8-77 Green-house Environ-ment Fire-line Energy Dissipators for Flumes and Culvert$ Pickett Ted L. 7741/ 2505/ 7086 2-77 5-76 7700- 4-77 12 EquipmentMounted Air D M 2-76 A M 8-76 C M 5-76 Fil-tering System Evaluating Industries Bowie Vac-U-Seed Harvester Evaluating Need for the to Predict Timber Environ-mental Monitoring Harvesting Im-pacts 23 CATEGORY CODE AUTHOR TITLE CENTER SOURCE A M A M Evaluation of Frames Backpack A M Evaluation C M A SD PreEvaluating cision Seeders for FS Nurseries Evaluating Ventura Seeders Lott Jim and Lowman Ben of Interregional Travelway NUMBER DATE 8-76 7824/ 2208/ 2522 9-78 3-76 Clo-sure Rehabili-tation Problems Evaluation of Kelly Ryan Dudley.Thomas Jr. 7771- 12-77 12 Wheels Karsky Richard A M A M A SD 7824/ 1203/ 2608 7-78 A SD 7957/ 1201/ 8062 1-79 Fireline Explosive Use Purchase In-structions C M 12-76 Fitness Capacity C M 2-77 Evaluating Methods for Joining Polyethylene Pipe Evaluation of the Vermeer Model TS-44A Tree Spade for Transplanting Trees on Surface-Mined Land Field Equipment for Precommercial Slash Thinning Treatment FieldRetardant cement McKenzie Dan W. Miller Marshall Pickett Ted L. System Work 24 7822/ 2210/ 8108 12-78 2-76 CATEGORY CODE AUTHOR TITLE SOURCE CENTER NUMBER DATE C M 7761/ 2512 11-77 Fitness Trail How to Build the Trail Sign the Trail Use the Trail D M 7761/ 2512 7-77 Grapples for Forest Residues Concentration Removal D Fitness Sharkey Brian J. Jukkala Arthur H. Randall Herzberg Trail 8059 10-78 A SD 7824/ 1210/ 8059 10-78 A M 7752/ 2219/ 2354 11-77 C M 7728/ 2503 2-77 D SD 7723/ 1308 10-77 A M 7757/ 2212/ 2528 6-77 Helicopter Noise on Its Effects Personnel--a A SD 9-76 Implement Hitch for Forest Operations C SD 12-76 Improved Method for Joining Plastic Pipe D M Grapples for Forest Residues Concentration Removal Cammack Guiding Spray Aircraft With Closed Circuit Jasumback C. Fred Tony TV Handbook Equipment for Reclaiming Strip Mined Land Brown Darrell The Hazard to Hearing From Control Avalanche Devices Helicopter Dust Abatement System Randall Herzberg Bellusci Al Pre-liminary Survey 25 7822/ 2304 12-78 CATEGORY CODE AUTHOR CENTER SOURCE NUMBER DATE B M 7160-3 11-78 B M 7700-9 8-77 A SD 7004 3-77 D M 7861/ 2303 11-78 D SD 7822/ 1202/ 2532 1-78 A M 7726/ 2214/ 7080 8-77 of Investigation Needs Equipment for Chemically Treating Hard-woods Conifers A M 2-76 Lessening Waste in C SD 4-76 Liquid Concentrate Fire Re-tardant Blenders for Ground Tankers A SD 10-76 Mechanically Harvesting Seeds in Southern Orchards A M 2-76 TITLE Improving FS Outdoor Posters Colvert Inductive Loop Traffic Surveil-lance Equipment DeLand Injection of Sewage Wastes Into the Soil A Report on the Benner Gene DeLynn Loren C. F. State-of-the-Art Insect Sting Emergency Medication for Interseeder Rocky Bushy Terrain Progress Moden Walter Jr. McKenzie Dan W. Stevens Richard Report An Investigaof Equipfor Rejuvenating Browse tion ment Dimeo Art Energy Road-Tire Vehicle-Driver System 26 CATEGORY CODE AUTHOR TITLE Meterological Data Supplement Ekblad Robert Miller Guy Flavell Thomas Meterology Pesticide Application Ekblad Robert CENTER SOURCE NUMBER DATE A M 7734/ 2213/ 2425 6-77 C M 7734/ 2810/ 2425 6-77 Missoula DeWinger Users Guide C M 7924/ 2601 1-79 Mobile Equipment for Servicing Recirculating Chemical Toilets Pumping Vault Toilets A SD B SD Mobile Hammermill for Inplace Process-ing of Oversize Rock Modified Hodder Fisher Phillip Knudsen B. H. Robert Tour James 7700- 3-79 13 J. A M 7722/ 2220/ 2631 12-77 A SD 7823/ 1207/ 7033 8-78 A M 7761/ 2216/ 7070 10-77 A M 7922/ 2201/ 2629 1-79 A M 7823/ 2204/ 2618 1-78 Gouger TurMonitoring bidity of Surface-Source 3-76 W. Drinking-Water Systems Motor Grader Seatbelts Holsapple Mulching-Tilling Equipment for Soil Condi- Summerfield Lester Dallas tioning A New HandThrown Charge for Avalanche Control Lott James R. 27 CENTER NUMBER CATEGORY CODE SOURCE D M 1-76 New Slide Insert for Physical Calculator D M 6-76 Nomex Clothing D M 7751/ 2305 8-77 Non-Electrical Gravity-Feed Low-Flow D SD 7723/ 1301 7-77 Nursery Equipment Catalog C M 10-76 100-Man Medical Treatment Kits C M 5-76 Orthographic Projector D M 10-76 Orthographic Projector A M 10-76 A M for the Design of Efficient Forest Residues A SD 12-76 Potential C M 11-76 C M AUTHOR TITLE New Fuse Safety Igniter Fit-ness DATE Low-Pressure Chlori-nators Outdoor Testing of Reflective Sign Materials Nettleton Thomas Parameters 7971/ 2204/ 7064 1-79 Reduc-tion Machinery for Heating Western Tree Seedling Greenhouses With Geothermal Energy Progress Report Reforestation Program 28 7724/ 2812 8-77 TITLE CATEGORY AUTHOR CENTER CODE SOURCE Rating Method-Chain Saw Hazard C M Recent Resource Publications D M A SD Water Recreation WasteUsage Water Characterization Cook Brian NUMBER DATE 3-76 7823/ 2301 8-78 7771/ 10-77 1203/ 2523 Remote Sensing for Big Game Counts A M 12-76 Resource cations D M 2-76 A M 10-76 C M 10-76 A SD A SD Safe Lightweight Hand Clippers D M 7724/ 2308 11-77 Seed C M 7724/ 2815/ 2670 10-77 D SD 7722/ 1307 7-77 Publi- Results of Two Timber Manage-ment Equipment Needs Surveys Main- Reviewing taining Specifi-cations at the FS Equipment Devel-opment Center Missoula Road tion DeterioraStudies Roadside Jones David L. DitchMachine 7877/ 1205/ 2609 4-78 4-76 Cleaning Development Collection System Seed Dribblers 29 CATEGORY CODE SOURCE D SD 7767/ 1305 7-77 D SD 7824/ 1209/ 2640 7-78 D SD 7767/ 1304 8-77 A SD 7767/ 1201/ 2523 8-77 A M 7851/ 2207/ 2659 9-78 Steep-Slope Scarifier/ Seeder C SD Steep-Slope Seeder for Roadside Slope D SD 7977/ 1301 2-79 Streambed D SD 7826/ 1303 6-77 Substitute Anchor System D SD 7824/ 1201/ 2640 1-78 Summary--Smokejumper Injuries Parachute C M AUTHOR TITLE Silencing Fire Camp Equipment Skyline Anchor Dynamics Test University Washington of Sound Measuring Instruments Sound Measuring Instruments Harrison Robin Static-Line Load Required for Anchors Static-Line Load Requirements for Smokejumpers Being Taken Into Tow T. CENTER NUMBER DATE A Tietz John Jackson George 10-76 Re-vegetation Gravel Sampler Mal-functions 30 1-77 CATEGORY CODE AUTHOR TITLE Survey of HighProduction Grass Seed Collectors Surveying Road Maintenance Needs A System Monitoring Greenhouse vironment for En- SOURCE CENTER NUMBER DATE A SD Besse LaMoure A M 7771/ 2211/ 2521 4-77 Larsen John Lott J. R. C M 7824/ 2805/ 2549 12-78 D M A SD A SD A M Traffic Surveillance Equipment 1-77 6-76 Reports Trailer Tractix ComEquations puter Algorithm for Curve Revised Della-Moretts Leonard and Hanna Lorne E. 7877/ 1208/ 2526 9-78 Widen-ing Trailer Tractix Equations Program for Curve 10-76 Com-puter Widen-ing A Transplant System for ReSurvegetating face Mined Land Treetop System Larsen John Knudsen Robert D Marking TS-2A Airtanker Evaluation Bailes Edward Updated Vault Toilet Concepts Cook Phase E. 7822/ 2209/ 2630 11-78 7724 12-77 C SD 7051 4-77 B SD 2300 8-78 II Brian 13 D Updated Vault Toilet Concepts 31 SD 2300 8-78 .TITL Uphill Puller CATEGORY AUTHOR Tree Harrison Robin Vault Toilet-Design T. CENTER NUMBER. CODE SOURCE D SD C SD A SD 7924/ 1202/ 8058 4-79 D M 7951/ 2301 8-78 7824/ 1206/ 2694 DATE 12-78 2-76 Consider-ations Vehicular Classification of Forest Soils Della-Moretts Leonard B. Slopes Water Gel Explosives for Building Fireline tr U.S. GOVERNMENT PRMTMIG OPfiCE 1979-627-366/1807 32 INVITATION TO READERS OF FIELD NOTES Every reader is a you would of an article for Field Notes. author potential share with a news you have If we item or ac-curate short article Material to Service engineers you invite send to it for Field Notes. in publication like submitted the to Office for Washington should publication be reviewed by the Washing-ton Office Regional respective and informative to of that see interest to the information Forest Service is current timely FSM 7113. Engineers technically The length of may vary from several short sentences to several typewritten pages however short articles or news items are preferred. All material submitted to the Office should be typed double-spaced and ideally all illustrations should be original material submitted drawings prints glossy Field Notes is Field to personnel should Regional R-1 and Forest from the Washington available their Forests Office directly Service retirees. If to all you Regional are not Station currently and on the ask your Office Manager or the Regional Engineering Technical Data Systems to increase the number of copies sent to your office. of back issues are Copies list Coordinator also negatives. distributed from the Washington Area Headquarters mailing or submit material for publication or questions concerning Field Notes Coordinators Melvin Dittmer M. R-2 Royal R-3 Juan Gomez Coordinators Office. should Ryser direct R-4 Ted Wood R-9 Fred R-5 Walt Weaver R-10 F. R-6 Kjell R-8 Bob questions WO Bakke format editing problems to Attn P.O. - USDA Staff Engineering Gordon L. RP-E Bldg Rome Editor Box 2417 Washington Telephone D.C. Hintsala Baxandall Al Colley Bowers concerning Forest Service W. 20013 Area Code 703 235-8198 publishing dates and other