ENGINEERING TECHNICAL FIELD NOTES TECHNICAL MANAGEMENT DATA RETRIEVAL INFORMATION PROFESSIONAL REPORTS DEVELOPMENT SYSTEM 7ý VOLUME An NUMBER 5 iNotes NOW-Field Diamond Core 10 Drilling with Air-1977 Lvaluation Island Lake Creek Timber Culvert Criminal Liability of the Field Engineer Washington Office News FOREST SERVICE MAY 1978 US ý_ý U.S. DEPARTMENT OF AGRICULTURE UýS ENGINEERING Volume Information FIELD NOTES Number 10 5 respon-sibility of the cooperating for The contained United in this has publication been developed States Federal the Department of Agriculture-Forest and State agencies. The Department interpretation or use for Service its of Agriculture of this information of employees guidance by other than its own employees. of trade firm or corporation names in this publication is for the information of the reader. Such use does not constitute an official endorsement or use product of others The that may be text in the be construed or policy except not approval States Department as represents the recommended personal of Agriculture exclusively opinions or approved Because by FSM references. and engineering technicians should intended and to the exclusion suitable. publication must not engineers by the United or service its assumes no convenience of any and contractors of the read of the respective procedures of material type each issue FOREST SERVICE DEPARTMENT OF AGRICULTURE Washington D.C. 20013 in however for engineers. U.S. mandatory the author and instructions publication this publication all is DIAMOND CORE DRILLING AN WITH AIR - 1977 EVALUATION Jim Northrup Engineer/Geologist Idaho Panhandle NF Bob Hinshaw Geotechnical and Materials Engineer Region 1 During the spring of 1977 Bob Hinshaw and Jim Northrup of Region 1 discussed the possibility and advantages of core drilling using air instead of water as a drill medium for subsurface investigations. The Wyoming and Montana highway departments had been using air in some coring experience--100 His operations and Northrup had used it in California. percent core recovery with air in ground in which 60 to 70 percent recovery was normal--was encouraging. Northrup and Hinshaw agreed that the 1977 drill season. be evaluated during the use of air should project chosen for evaluation was the proposed Kelly Creek quarry on St. Maries Zone Idaho Panhandle National Forest the rock is highly The quarry site had been partially drilled using fractured diabase. water during the 1976 field season and the results had been discouraging With this kind of recovery with generally less than 50 percent recovery. to evaluate the quality of the site since it was not it was not possible known if the lost material had been usuable or not. The the 1977 the Regional Office rented an Ingersoll-Rand 600-cfm Four holes were drilled in the Kelly Creek site with psi compressor. a truck mounted Mobile B-50 drill using air with a bentonite-detergent foam. The core barrels and bits were standard types designed for use with water. Three holes were drilled at the same locations which core had produced poor The first hole was cored with a recovery in 1976. BHR wireline core barrel the same size used in 1976. Two core barrels were stuck in the first hole the remaining coring was done with NC size The the next larger size with no problems. following is a summary of In July 120 the results. 1 The increased core recovery was impressive see recovery in Hole lA drilled with air was 72 percent as compared to 51 percent with water in Hole 2 the recovery was 73 percent with air as compared with 26 percent with water in Hole 3 the recovery was 92 percent with air as compared with 51 percent with water. This increase was not merely the result of the larger core as is shown by the BHR recovery in Hole IA. Coring with air and bentonite Core Recovery. figures. The NC 1 foam 2 definitely resulted recovery and thus in a significant increase in core evaluation of the materials source. enabled Core Bit Wear. Part of the initial concern was the potential increasing the wear of the diamond bit when drilling with air. In 1976 the average endurance distance of five bits used with water was 31.6 feet 9.63 meters. In 1977 the average distance of one bit used with air was 48.5 feet 14.78 meters. Two other bits used with air were not worn out after 20 feet 6.10 meters. of While the data is not sufficient to draw a final bit wear conclusion when air is used appears to be less than that when water is used. One factor that would contribute to higher bit wear with water use is the grounding up and washing away of much of the material not recovered from the water bit would have to cut more material than one like the air bit that was getting better recovery. Also from the size and amount of the cuttings obtained with air it appears that air was much more efficient in removing from the hole. cuttings the hole. Thus condi-tions Diamond core drilling with air may be beneficial in certain situations where water is not available and where difficult drilling exist and core recovery with water is poor. The results of this project are promising enough to warrant further use and evaluation. Improvements may be possible in the future with the use of core barrels and bits especially designed for use with air. 1 2 2 Air BHR Water Wireline 5 Wireline - 5 Inner BHR barrel did not lock 10 10. 51 w % Average w 72% Average 15 15 m D 20 20 25 25 30 30 0 25 50 Percent Figure 1. of Core HoZe 75 100 0 Recovery No. 50 25 Percent 1A--Core recovery comparison air vs. of Core 75 Recovery water. 100 Air NC Water Wireline 10 10 Y ý Wireline 5 5 E BHR M 7300 15 Average o o 26% Average 15 0 20- 20 25 25 30 0 50 25 of Core Percent Figure 2. 75 100 30 0 No. 2--Core recovery comparison 75 50 Percent Recovery Hole 25 air vs. of Core Recovery water. 100 Air NC Water Wireline 5F-10 BHR Wireline 5 10 92% Average w w 115 15 CL 51% Average - - aai D O vn 20 20 25 25 30 0 50 25 Percent Figure 3. of Core HoZe 75 100 30 0 25 Recovery No. 3--Core 50 Percent recovery comparison air vs. of Core water. 75 Recovery 100 ISLAND Robert LAKE CREEK TIMBER CULVERT McDonald H. Glen Inspector R. Anderson Engineer National Forest III Chippewa Region 9 Project Bridge constructed of native logs in the 1940s had both an inadequate load capacity and widthThere was no practical the width of the log abutments or to determine their method to increase the decision was made to replace the structure. condition therefore The Island Lake Creek A cost analysis to compare materials and installation costs of concrete structural plate and timber culverts revealed the following Installation Costs Materials Plate Timber Box Twin $8400 Culvert Box Concrete Structural 8236 Arch Pipe 66681 Culvert actual bid price for the timber culvert was $8000 including the contractors overhead and 1The profit. A contract to remove the bridge install the timber culvert change channel and raise the road grade was awarded to N. E. Fallgren on September 15 1976. Laporte Minnesota the of Construction The first phase of construction 100 feet 30.48 meters channel was was to install the timber culvert about north of the bridge. Next the channel change with a dragline to route the stream through the culvert. was executed The old bridge was removed and borrow was hauled to the site so the road could be graded. Marsh material which was removed in excavating the new as deposited in the old channel and placed on the road slopes topsoil. was 18 inches 45.72 centimeters below the bottom bottom of the excavation was sand. Eighteen inches 45.72 centimeters of gravel fill was placed and compacted to form the Culvert of the excavation culvert. The 6 for the culvert. The bottom sections of the culvert were placed on The sides and center wall were installed gravel bed. and held in place with temporary bracing and the top of the structure was lowered into the walls fig. 1. The floor wall and top sections were made of laminated pieces that dovetailed. bed the in-stalled Because the contractor was careful to assure that all parts were major problems were encountered in the culvert assembly. It is very important on a structure of this type to have a perfectly solid and level bed. The walls must be held in a true The backfill must be brought vertical position. up equally on the sides to assure that the pressures are equal and there are no distortions. level and vertical no Conclusion Island Lake Creek timber culvert project was very successful and the structure blended nicely with the landscape In addition to fig. 2. the treated being the most economical alternative timber culvert also met land management objectives. Other timber culvert installations on The the have use as spillways Chippewa including been equally successful. on small wildlife impoundments rt My It Figure 1. and groove joints and scrap used to hold section in place Tongue 7 lumber are surroundings. Culvert Timber Creek Lake 8 its complements Island completed The 2. Figure oa CRIMINAL LIABILITY OF THE FIELD ENGINEER Reprinted from Engineering Issues October 1977 pages 287-289 with the American permission of Society of Civil Engineers. tribu-lations following article documents the trials and of a State Department of Transportation engineer. He was a Resident Engineer on a construction job on which a serious accident occurred. Because he was the states representative he became embroiled in a The In costly and frustrating legal battle. Forest Service of increased ZegaZ activism engineers should be informed and aware of and alert totheir potential personal involvement in accidents. The old saying Safety is everybodys business takes on added dimensions when personal liability may be involved. prolonged this age constru-tion-related --Heyward T. Assistant Technological 9 Taylor Director Improvements OCTOBER 13265 1977 CRIMINAL LIABILITY OF THE FIELD ENGINEERa By Lunch was always time Jr. as an lunch with a oiler apprentice Mass. for Francis Germain good time in Worcester he would shut the crane down and take off for ironworkers the M. ASCE Richards Frederick his father and their fascinating high of the tales steel. On end the 16 1968 April a applied 1145 a.m. Mr. Germain Sr. it on the fixed end rested at 8 dropped 2-ton 1814-kg No. Span girder for strain to the crane At 1235 p.m. Resident Horan heard Engineer John R. bridge first upon the expansion 13608-kg girder locked it a roar terrific coming Bridge at Southbridge Street. He left his field office and observed the beams had collapsed traffic. Fire A under the lunchtime vehicular from the that 2000-gal 7.6-m3 gasoline tank were trapped in the holocaust. to 15-ton and climbed downfor lunch. the lifted the rescue beams additional victims trapped fell was burning and some vehicles and drivers truck Horan saw two when suddenly entombing the already of the contractors was there a men second entrapped victims attempting roar large with along their intended rescuers. The final dead eight of toll the which disaster And seriously injured. took then it less was than 5 min to develop three over But not for the Resident R. Horan of Public Works-John Engineer for the Department than 15000 other resident engineers connected with had shown simply Highway control work with of resident as Mr. but merely monitor operation Horan knew Horan have no the work this and knew that to assure The by the Commonwealth of Massachusetts. by the lateral buckling of the unsupported compression and could have been avoided by torsion of the section as proscribed accompanied of erection by the employment realized that erection an operation Note. -Discussion a written request paper such engineers was characterized flange of industry the Worcester day on his highway project of the American Association of State that and specifications. the plans more like Handbook states that methods the was the policy failure for Construction Officials over conformance this up The Expressway. who the construction is procedures area open must be for which of the American he was not responsible March 1 1978. To extend the until with the Editor filed part of the copyrighted Proceedings procedures compatible with the design. Horan were listed in the general category of methods Engineering Society of Civil of closing thus date Publications Professional Issues-Journal Engineers and Vol. he would one of Professional 103 No. month ASCE. This Activities E14 October 1977. a Presented Exposition Assoc. at held Civ. the September at Philadelphia Engr. N.Y. 27-October Pa. Preprint State Dept. 1 1976 ASCE Annual of Transportation 287 10 Convention 2761. Rochester N.Y. and OCTOBER 288 1977 Common-wealth be involved not in the criminal The Involved sought system of Massachusetts He Involved alone He upon was ensnared in the sea of or He liability. to civil proceedings. the entire responsibility of the rest his fragile shoulders. entrapped implicated and finally submerged was prosecuted by a vigorous Attorney General. at the inquest. He was indicted by the Grand jury on in Superior Court by Judge manslaughter. He was arraigned John M. Noonan. He became personally responsible for $27750 in legal expenses. And according to Horan he suffered many personal and other hardships due was three to interrogated counts the And of proceedings for a period in excess of five years. then it was over John R. Horan was found not by a directed to happened of verdict of a resident Worcester the who engineer showed simply of anything could this have guilty How Court. Superior up work for on the day a disaster They And did it did they Center ASCE Engineering And after the collapse it Crossroads Va. Baileys did they Nov. they are they will construction at Skyline and injuring 34 others Civil workers of collapse New the and Chronicle Bushnells Basin Democrat And And 14 1975. after the it tower under of a killing York doing it in Alabama. do it whenever an engineering State Canal Barge at 30 1974. October disaster and a resident occurs can be found. engineer Who are they According to the former New York State assistant District Attorney Vincent P. Mitrano Monroe County they are the ones who will not explicitly define the responsibilities of the resident engineer in the contract documents. These some are fat the politicians themselves protected the hardships The who others from that under $45000 to the Discretionary 79 Digest are associated engineers chief $25000 and who with this engineers district salary who range are Rule Transportation are absolutely immune from liability. person in the queue after the fat cats is the resident engineer becomes for the disaster and is indicted and thus shoulders responsible full THE SOLUTION Massachusetts a statement that the resident resident to specifically Alfano so that at financial burden along state officials from enacted the state of Public with OF OFFICERS shall save from financial by also resident have a moral loss and should engineer AND EMPLOYEES loss and the other hardships. harmless engineer and mentions title. financial least the hierarchy. The Hearing Examiner Commonwealth Works each contract should contain Alfano defines the responsibilities of the resident engineer INDEMNIFICATION J. Department engineer According The inverted triangle for the engineering responsibility of the According to Domenico the the next the of in liability Board R.R.D. Research all cats commissioners and OF THE will The 11 insist not that have following to to protect legislation carry form is the be full suggested. STATE indemnify a-ising out of responsibility all officers any claim demand and employees suit or of judgment LIABILITY by reason of alleged negligence that such officer or employee or other act at the time 289 by such officer or employee provided were sustained was acting damages of his duties and within the scope of his employment and discharge such damages did not result from the willful and wrongful act or gross of such officer or employee McKinneys Consolidated Laws of New negligence York Annotated Public Officers Law 17. in the that CONCLUSION Certainly before the the time to enact disaster. The time legislation beneficial to act is to the resident engineer is now 1.1 12 ia WASHINGTON CONSULTATION OFFICE AND NEWS STANDARDS Walter E. Furen Assistant Director PLANNED REVISION OF 1977 ROAD AND BRIDGE CONSTRUCTION SPECIFICATIONS facili-tate thor-oughly The 1977 Forest Service General Provisions and Standards Specifications for Construction of Roads and Bridges were quickly developed to implementation of Section 14i of the National Forest Management Act small business road option. from the outset that the specifications would be reviewed and updated as soon as practical. The updated version expected to be available for field use by August 1 1979. It was intended is A standing committee has been appointed to ensure that the necessary information is gathered evaluated and incorporated into the revision. 1978 committee members will have secured documented By September 1 suggestions from such sources as External Sources 1. 2. 3. 4. 5. 6. 7. 8. Timber industry representatives organizations Testing laboratories performing tests required by specifications Federal Agencies American Road and Transportation Builders Association Contractors Material suppliers and manufacturers Other interest National Forest users including special groups A.G.C. such as sportsmen conservationists concerned with road recreationists environmentalists and specifications. Internal Sources 2. Contracting Officers from Administrative Timber Sales Admninistration Officers 3. Fiscal 1. 4. and Accounting Resource Specialists Management 13 persons Services involved with claims slash disposal roadside vegetation a. Fire Management b. developing water supplies etc. Range Management fencing cattleguards specifica-tions d. e. Fish c. etc. excavation developing water supplies structures and Wildlife structures drainage clearing grubbing roadside revegetation etc. developing water supplies 7. Engineers - preconstruction construction Certified ERs CORs and Inspectors Office of General Council 8. Other 5. 6. staff Committee members Wilson Leland Fansher information are seeking Address Service USDA Federal Building Missoula MO 59801 Forest Walt Forest Service USDA Engineering Staff 8th Avenue P.O. Box 25127 8-234-4892 CO 80225 Service USDA - 25th Ogden Engineering Staff 8-474-2417 8-586-6251 Street UT 84401 8-415-825-2245 Service USDA GME Morello Drive Pleasant Hill CA 94523 Forest Forest Service USDA 319 Pine SW Portland Bruce Medford Phone i Service USDA Engineering Staff Federal Building 517 Gold Avenue SW. NM 87102 Albuquerque Forest Gerry Vossenkemper follows West Harry Gillette Austin Thompson as 8-585-3308 Lakewood 324 etc. Engineering Staff Forest 11177 Brooks material appropriate as Member Earl seeding etc. Recreation roadside treatments signing etc. Watershed and water planning erosion control groups OR Street Service USDA Peachtree Road Atlanta GA 9800 Engineering P.O. Box Staff 8-423-2409 Staff 8-257-3367 3623 97208 Forest 1720 Lab 30309 14 Engineering NW Committee members continued Member Ken Thompkins Address Service USDA Engineering West Wisconsin Ave. Forest 633 Milwaukee Tom Williams Jack Sundt DAngelo 53203 Service USDA Engineering Staff Office Building P.O. 1628 99802 Juneau AK Service USDA Federal Building Forest Forest Forest P.O. Services Staff 8-585-3580 Admin. Services Staff 8-235-8165 59801 2417 DC 20013 DC 20013 Service USDA Box 8-247-4051 2417 Washington P.O. 7267 Admin. Service USDA Box Forest MO Service USDA Box Washington Bud Unruh 8-362-1370 907-586-Federal P.O. Ben Carson WI Staff Forest Missoula Dario Phone Engineering Staff 8-235-9843 2417 Washington DC 20013 Inputs from persons who have been working with the 1977 specifications in will be especially valuable for preparing and administering contracts the identification of errors and problem areas. All interested parties invited to submit to committee members. A format similar are suggestions to the following is desirable. 15 To Comments and on Recommendations 1977 Forest Service General Provisions and Standard Specifications for Construction of Roads and Bridges Submitted Date by Section No. Page No. Title Paragraph No. Line No. Present Text Recommended Reasons 16 Sentence No. Reads Text OPERATIONS Harold L. Assistant IMPROVING main formal Strickland Director OUR CONGRESSIONAL CORRESPONDENCE communication conducting our author reviewer a personal responsibility to the reader for the quality and content of each letter. Everyone you write to deserves the best regardless of who they are or what position Letters are business. they the Each and tool used in signer has hold. increasing amount of Congressional correspondence reaching the or as final drafts Washington Office either as information copies lack of attention to and review. shows a writing editing An Here are examples some Example 1 -- Letter to a Senator-February 6 1978 A design was prepared and a project agreement..negotiated.. 1978 for repair of the bridge. on September 30 High work water prevented on the bridge last fall and repairs were to be delayed until late this spring when the water lowers. Obviously meant the there is a date project agreement error will paragraph unless the writer be negotiated...on September 30 1978. in this January thaw and heavy rains again inundated bridge beneath over five feet of water causing further shifting of piers and finally a break in the The recent the superstructure. The paragraph could be revised to read The January thaw and heavy rains caused further shifting of the piers and a break in the deck making the bridge impassable. It 130 is anticipated feet plus or that the minus new long structure will be approximately anticipate proposing ...W replacement... in Fiscal Year 1980... since repair of the present structure will not solve the problems with the low water structure. The last paragraph of the example is difficult to follow and not very meaningful. A suggested revision is 17 approxi-mately a new structure situation long will be proposed for funding in Fiscal Year 1980 since repairing the present structure will not prevent flooding damage. correct To 130 Example the feet -- Letter to 2 a Congressman-February 6 1978 we have no authority to snowplow roads for the private residences living on private land along However First of all residences suggested revision for this do not sentence is live the along road. A we have no authority to snowplow roads for private the road. whose homes are located along However citizens Example homes road. -- Letter to 3 a Congressman-November There are approximately 500 miles roads privately State lane usually unsurfaced and owned and 9 1977 of National Forest which are narrow one capable of only low travel speeds. Roads could are immovable facilities be revised to read There are and approximately 500 State and privately-owned lane usually unsurfaced are miles roads and incapable of speed The sentence of National Forest which are narrow one designed only for low-speed traffic. from Congressional They were taken examples. Line and two were was a Officer signed by Regional correspondence that of these Line Officers. We are also aware some Forest signed by in the exist in which Washington correspondence originates same problems We make did not up these one Office. harder to ensure that our correspondence is readable Review what you write Ask yourself if you would understandable. if face-to-face. Remember that the the same words were use you talking not more confusion. reader is looking for information or answers We all must work and if will request a brief statement Congressmen and Senators with book. Make the statement with a brief respond respond so Be factual and be positive. the information that is being requested. and unalbe to find it say so. do not know the are If you answer you be in our various sure that our correspondence We are specialists fields Frequently do not indicates this. 18 TO READERS OF FIELD NOTES INVITATION Every reader author of an potential a is article for Field Notes. If you have news a item or accu-rate short you would article in publication Field submitted Material to share like with Service we engineers Notes. to the Office Washington be reviewed should publication for to send you invite it for by the Washing-ton respective Office Regional informative and submitted may however short articles Field is the number of Washington Each short to 7113. The length of pages typewritten several submitted to the material All should illustrations Washington Forests and Forest copies FSM sentences items are preferred. all current timely technically Service-wide engineers several is be original drawings or sent Manager Office directly Service or the to your office. retirees. Regional to all you If Information Copies of back issues Regional are not are Station and currently on the Coordinator to increase also from the available Office. Region questions information photos. your Office ask list to from distributed from the Area Headquarters mailing or news and white Notes vary the be typed double-spaced should black glossy that of interest material Office to see has an Information Coordinator to and material for publication. R-1 Melvin R-2 Royal R-3 Juan Coordinators Dittmer R-4 M. Ryser R-5 Gomez should direct The whom Coordinators Kjell R-8 Bob Bowers Bakke concerning personnel Forest Engineering Fred Hintsala R-10 F. WO format editing Staff Washington Rm. 1108 RP-E L. Rome D.C. 20013 or Rita E. Wright Telephone Area Code 703-235-8198 W. Baxandall Al Colley publishing dates Service Attn Gordon P.O. Box 2417 submit both R-9 problems to USDA should are Ted Wood Jim McCoy R-6 questions field and other