ENGINEERING TECHNICAL L NOTES FIELD INFORMATION SYSTEM DATA RETRIEVAL Volume 6 Number You Should Specification Washington REPORTS CURRENT TEXTS AWARENESS Notes Field Something TECHNICAL 11 Know November About For Environment Office Engineering Oil 1974 Heating Systems Protection News Readers UýS FOREST SERVICE U.S. DEPARTMENT OF AGRICULTURE ENGINEERING FIELD NOTES This publication technical or administrative the personal procedures mandatory the all This publication Headquarters. is If you are for this purpose. not now FSM receiving a. However should technicians Office to all one like Coordinator to increase the number of copies because approved of the type of material in Regional Station and Area ask your Office sent to your from the Washington of back issues are also available Copies represents or each issue. read directly and would copy recommended as references. for engineers. from the Washington distributed Information Regional and engineering engineers personnel. policy except by not intended to be exclusively is publication Service The text in the publication author and must not be construed or instructions Forest and ideas of a information exchange engineering to published among nature of the respective opinions This publication newsletter monthly a is Manager or the office. Office Use Form 710060 and can be ordered on Form 7100-60. submitted to the Washington Material Office to the information see that several typewritten edit for all FSM Service-wide engineers grammar pages. 7113. The However short articles Editor This - monthly Forest be original drawings R-6 Kjell Groven R-8 Ernest R-3 Bill R-9 Ron Pokrandt R4 Fleet R-10 Bill R-5 Jim McCoy WO Al Colley newsletter and its is published not constitute Service of this information an official Department by other than names evaluation product or service to the exclusion USDA for distribution retirees only. The The use of trade firm or corporation does should submit both questions Allen concerning format is editing its conclusion dates etc. to of the U. S. Department Fran Owsley of Agriculture assumes no responsibility for the own employees. and convenience recommendation may Quinn D. C. 20250. of Agriculture for the information of others which Bakke publishing employees and Vischer Washington to and photos. Bob Hinshaw Stanton to will should be typed double-spaced Office field personnel Strohschein Regional submitted may vary from several sentences Office are preferred. The Washington and white or glossy black whom by the respective items R-2 of Engineering Forest or use news reviewed R-1 should direct questions Service interpretation or be accurate informative and of interest to submitted to the Washington Region has an Information Coordinator to The Coordinators material for publication. are Division of material length Each Coordinators should for publication current timely technically is only. All material illustrationsshould Office be suitable. endorsement of the reader. Such or approval use of any FIELD NOTES SOMETHING YOU SHOULD KNOW ABOUT OIL HEATING SYSTEMS By Herman Gardner The crisis energy and resultant efficiency and economy study The involved study atomizing The oil initial adjusted Wenatchee Technician Engineering fuel oil National a recent price escalation prompted on the Lake Wenatchee District Wenatchee that are heated by forced nine buildings Forest warm air heating system National furnaces Forest. with gun-type burners. inspection led to the tenants were generally unaware of been deficiencies. were Obvious problem indicators The systems had probably never that the heating conclusion methods and other than by eyeball draft regulators barometric dampers were not level some were stuck and notice-able all were very The dirty. flame had blowtorch burner characteristics short and white with a loud sound. Three furnaces were installed in small closets that either had no combustion air source or had the air source intentionally blocked for the mistaken purpose of heat. conserving caused combustion air soot and oily At the conclusion checking kit One was snow which from closed to prevent on the buildup their own flues eaves. escaping heat from melting roof These furnaces as further evidenced were obtaining by the amount of dust in the closets. of the visual consisting ice inspection the Forest decided to invest in a combustion of ABacharach.CO2 Analyzer costing $62.10. This measures CO2 stack emissions. The analyzer is inserted into a small hole between the furnace breach and the damper which to read percent allows a flue gas sample to be taken at this point and expanded CO2. of tempera-tures ATempoint at Dial Thermometer the furnace costing or boiler outlet. I $13.80. This measures flue gas A Pocket inches This basic kit efficiency. check oil Draft Gage costing $16.39. This measures flue vacuum draft in of water. provided the means No for minor adjustments and an increase combustion in attempt was made to clean furnaces change nozzles improve fireboxes or pump pressure but in every instance combustion efficiency was increased with The only minor adjustments. following BEFORE ADJUSTMENT Stack Bldg. Number 2071 F Temp. 600 table reflects CO2 8.5 % Efficiency 73 of these adjustments AFTER ADJUSTMENT Stack % the results F Temp. 500 % CO2 10 REMARKS %Efficiency 79 Office small Plugged and not dirty Changed 1206 Damper 670 9 72 570 12 76 Residence .035 to Damper set pipe level. damper setting .0 from leak air under burner. in sloping and could not level noz-zle or adjust. Oversize too much or might account draft for exces-sive noz-Residence stack 1202 630 8.5 72 540 9 77 temperature. Flame ragged. New or centering zle of nozzle re-duce in burner tube might excess 1200 550 4.5 60 510 720 8 67 620 air. 78 Excess 77 Smaller nozzle soot in stack. re-Residence 9.5 Residence 1209 11 duce stack 1211 600 6 65 550 9.5 76 600 5.5 63 520 8.5 75 500 6 70 350 might temperature. Residence 2270 Shop 1301 13 84 Bunkhouse Door to furnace closet Combustion closed. from obtained air flue. center-Warehouse 2271 650 7.5 68 650 Fire 9 72 new and Needs smaller ing tube nozzle perhaps or of nozzle in burner to improve combus-tion and lower stack temperature. 2 con-sequences. When adjustments necessary people should are Following reference Step 1. is to precautions Set the outline that should be taken and within hole in the emission using instructions maintain the fire. with added Punch and percent of CO2 combustion efficiency Calculate or from the draft regulator away Check the stack temperature with the analyzer. supplied burner efficiency oil pipe at least 6 inches of the furnace. 12 inches be aware of and understand the possible for checking room temperature to well above thermostat a 1/4-inch drill a procedural using the approx-imately Generally modern chart. analyzer 500 F about a that provide oil equipment burning is engineered CO2 stack temperature a 10-percent to standards emission and exam-ple Know-ing com-puted combustion 80-percent -Precaution When 1. adequate the oil burner efficiency. located is for combustion provision of opening to the outside air in 2 yields approximately oil or closet there should 2 140000 Btu the For of one gallon per hour. a rate oil at minimum opening can be follows as 140000 Btu X 1000 Btu A room without sufficient own flue usually around air 280 2 square inches forces square inches the burner to consume damper and the barometric combustion gases from 02 of oxygen the percent be very low. Step 2. The plumb. be generally call for 2 square inches codes for each 1000 Btu per hour of burner capacity. a given burner has a nozzle supplying that room a small Building air. draft regulator It should be be checked should free moving in its to see that the axis pivot bearing and free is may and the face level of any dirt its is that might combus-tion affect its balance. instructions Efficiency greater at 2.. Look be introduced Step 3. .0 than at .0 but for and repair visible through nozzle is a -soft yellow- the shutters until outside the building visible the burner until the oil .0 vacuum glass smoke supply no smoke emission or firebox hitting the firebox inches the of water. to carry All combustion air should flame atomization is air A ragged flame good as supply with smoke showing Close the inspection hole disappears. possible openings. wall indicates either the need by closing the primary or orange-colored to observe air following flue. or improper oil pressure. If fuel the flame proceed with adjustment there to leaks in the firebox. air Observe the flame through the inspection new .0 and the burner. with streams of liquid unvaporized for a a hole the draft must be sufficient out of the firebox and up the by-products Precaution the draft gage stem in a 1/4-inch the draft regulator to maintain set is Insert smoke emission shutter must be opened invisible. 3 from the slightly indicated by shutter until Open open and proceed chimney. If smoke is at the tip. if and the process repeated Precaution A 3. smoking burner Carbon cleaning. Remember both. expert qualified Step and the nozzle improperly adjusted and the furnace is accumulate rapidly and will This situation could ignition points. If and soot that extra air pump oil are to analyze is will may bridge soon need the gap between of lead to an explosion a fire or a combination than better too little air. suspect do not attempt an adjustment or Hire a repair. and correct the malfunction. and percent of CO2 using instructions Repeat the check of the stack temperature combustion with the Calculate the efficiency using the analyzer analyzer. supplied 4. chart. adjustment If percent in Precaution 4. efforts there will be a corresponding have been successful increase readings. Be sure that there are no combustion odors at the furnace and no smoke from the chimney. These efficiency with provided clean-burning checks are easily not attempt to get more at the expense nozzle then and draft have of a the furnace for type and size and the the services of a professional smoky hazardous cleaned the oil for operation Generally you are gage. that will produce about 80-percent combination cannot be attained and complete instructions understood the analyzer thermometer fire combustion fire. chamber If striving Do efficiency. the 80-percent checked are for a range for leaks the pressure checked. efficien-cy Combus-tion analyzed Always enlist perform Steps figures Anyone the 1 through next 4. this Street Refrigerating New York NY are not confident that your repairman supply Insist interested in pursuing of Heating you time he cleans your furnace and Automatic Fuel-Burning Society if subject in of your own ability to you with combustion or adjusts your burner. more depth Equipment in and Air Conditioning 10017. 4 should read Fuels and the guide published Engineers by the American ASHRAE 345 East 47th FOR ENVIRONMENT PROTECTION SPECIFICATION By Civil Joel M. Marshik Sawtooth Engineer National Forest engi-neers. pro-tect Protecting the environment during a construction Proper protection. measures begin the field with the inspector. construction operation the office is with the a problem facing many designer and continue on in But neither the designer nor the inspector performs the actual operation the contractor the environment in he must know does. what is Therefore the contractor if and to be protected in is some expected to how instances to draw-ings. protect it. Informing the contractor and the various of what documents that he make will be required to do is accomplished by the contract up e.g. general provisions it Army Corps of Engineers Seattle District has adopted to inform and educate about environmental The their present better communication methods. between what the designer intended same. The A resulted from a desire Protection They felt that before is office and field was necessary. personnel built and the inspector the contractor of that committees a result the contractor by the Corps to improvements could be achieved In many enforced committee was formed to resolve these differences and make specification measures the measures. entitled Environment specification improve protection and specifications Any one of these can be used to inform the contractor about the protection required of him. The purpose of this article is to describe a new specification that a instances were not the recommendation. recommendation. specifica-tion In addition manual to the specification provides contractor and illustrates his The labor force. how the manual ILLUSTRATED they also created a manual or pamphlet form some important environmental cartoon in following paragraph from the and the specification complement supplement. dos and donts first The to the page of the each other ENVIRONMENTAL PROTECTION MEASURES. Some environ-mental of the environmental protection measures included these specifications in in-cluded Con-struction have been selected protection as subjects for illustrations. measures are identified These and numbered of the specification to which they apply. section illustrated The as EPMs illustrations in the pam-phlet in a pamphlet entitled Operations in dated these specifications. as dos respective illustrate contractual Environmental March 1971. Protection EPMs 1 approved methods environmental 5 in are referenced identified in the and concepts requirements Measures for through 32 The equipment and methods are to accomplish the a general way. They not intended are to provide detail work must be accomplished All guidance. posi-tive in strict accordance with the specification. donts practices identified as Besides improving techniques the specification established regular meetings between several operations shall prevent the pamphlet. the new guidelines concerning training. as Contractor specification the following remaining examples a help accomplish this on-the-job training sessions and and the contractor. officer The would develop To of protecting the environment. the contracting the requirement for monthly of construction in the Corps hoped toward the importance attitude The EPMs deal EPM No. specifically 1 illustrates with a variety illustrate. 1 EPM No. monthly contract. goal 1.-The for the He and that Contractor purpose shall of emphasize restoration shall conduct emphasizing should that be frequent on the job training courses the environmental prevention necessary protection damage to the environment only when damage is unavoidable. of 6 not requirements is the less of than the primary t f 46 10 zw. ice //J//ýCi EPM No. 19.-The a preparing base use of for culverts within equipment and for channel streams shall diversion only. be held to that necessary for ve3 y _ý _ Ai-a ý - inter-ference EPM No. 21.-The or disturbance Contractor shall perform to the safe passage all work and spawning in of a manner game fish. to prevent any w 1 C ý-3 l Ij \\ chem-ical EPM No. 23.-Approved treatment light ýd 13 h NIN lar EPM 111@ oil 11t temporary methods of bituminous lpRN4iIN treatment 6k4quy$104 or equal stabilization consisting ra Phil No. 27.-Waste materials shall not be dumped 8 of sprinkling methods shall be provided on slopes.. to control dust. pro-tection envi-ronment con-tract. The Corps realizes that this specification and the environment draws attention but it was covered The by scattered contractor what protection in Before is. knew never measures will The it may author Division be irreparable at any wishes to acknowledge Department of the this the assistance Army Seattle Editors P. L. Note documents important of the of him. making Now is not of Sydney up the he is able to see An increase serious damage is and Division Environmental Protection using both contract a Response on Highway ASCE was helpful in Measures for Construction 250 per copy from Office of Administrative Army Corps Seattle Services of Engineers District 1519 Alaska Seattle Steinborn Chief Engineering the pamphlet Cole and S. Steinborn which appeared U.S. Once cheap. who District Corps of Engineers Protection and Construction of the Construction how protection cost. Operations Reservoirs by the various of the environment Measures for Construction Journal in that a specification aware of was issued exactly what was expected Environment Design specification statements copy of the specification Environmental They now have be necessary and to bid the project accordingly. costs will result but protection done problems involving construction all and makes the contractor to the environment of that environment not solve will has reduced the number. Way South Washington 9 98134 in provided Environmental of these. In Relocations the March preparing Operations this a Protection addition for Mountain 1974 issue of article. may be purchased for WASHINGTON OFFICE ENGINEERING NEWS OPERATIONS Harold Strickland L. Assistant Director REMOTE SENSING Chief and Staff recently determined that The remote sensing of Engineering would be assigned to responsibilities air-craft National Forest Systems. for maintaining Remote communication effective with non-Forest was assigned the primary responsibility and coordination throughout Service and the Forest Service organizations on remote sensing. the use of electromagnetic sensing involves or space Director platforms energy data from great distances to gather and often equipment special for measuring or interpreting physical information. We are currently Forest investigating several Primarily Programs. equipment and technology to management of remote sensing technology to National applications the use of remote sensing research involves this and display earth resources collect Following are brief descriptions of activities. data presently activities and new results to be used in land underway area in this Cooperative FAP Project NASA with efforts are being continued on a program known Johnson at the Space Center as in Forestry Applications The purpose Houston. of cano-py this program is to investigate of remote sensing technology the application for the inventory photog-raphy Applica-tion of forest resources. categories as camera and met with has a thermal limited success There have been varying erosion. and crown closure diameter Early this with McDonnell problems geologic map data combined overlays use of high altitude infrared mapping An the areas of vegetation in accomplishment report Forestry be released in Service entered November. into a cooperative the State of Utah the generation agriculture Soil of thematic The program basis. 10 is map overlays attempting and computer agreement Conservation inventory recreation impact with multistage sampling on a production such mapping and Company investigate in scanners a multispectral of success will Forest and interpretation areas of land use surveys land form hazards and natural resource location. multispectral useful of Utah to urban encroachment as the 1974 summerthe The scanner. degrees Douglas Astronautics and the University using multispectral determination. FY Project Accomplishment in data collection addressed project scope timber wildlife soil and range a metric camera The Service for such water pollution to processing show that can generate solv-ing catego-ries It shown has clear that few ERTS high was this type of information invaluable for large altitude areas at the national level flights while local aircraft for will made it is undergo change found that most of the problems of the resource managers not be solved with the spectral resolution of the is information of the number of of boundary placement has not been for generating also may provide data a final determination Although or the accuracy It years. of multispectral analysis problems. techniques traditional the next could computer can be classified that in that management resource areas will ERTS multispectral regional needs require even lower Although scanner. now be met can level only by flights to collect the required data. LARS We at INSTAAR at the Laboratory for Applications with are cooperating Purdue University the Institute through Colorado University in the use of ERTS-1 of Remote Sensing and Alpine for Arctic Research imagery to identify and catalog Colorado and Wyoming. To Experi-ment ecosystem components in high-elevation date model plots have been established Remote sensing researchers Station continued South Dakota. imagery. strong work at at to develop classification possibilities for effective of current status. and scope of the in be published we intend a west scanner truth. and Range the Black scanner data. and enlargements prints of multispectral will in improved computer processing from multispectral As new projects are launched ground Southwest Forest of eight land use types processing in pattern recognition was developed for obtaining good quality Automatic zones locations to facilitate the Pacific and mapping classification Progress reports of these ongoing activities nature several on reflectance They are attempting tapes for automatic technique to alpine-type Georgia of ERTS An improved ERTS of test site showed data. periodically to keep to keep area of Hills you informed you as abreast to the activity. we will be continually searching new developments and applications for remote sensing technology. We would appreciate other information from if become of in the hearing aware or you you any project activity In redeeming our responsibility in the remote sensing field for area of remote sensing. 11 TECHNOLOGICAL IMPROVEMENTS Heyward Taylor T. Assistant Director EPA WATER QUALITY PROTECTION GUIDE - LOGGING ROADS During the month of September Office and the Washington from the Environmental Stations received Regions and Experiment several EPA Agency Protection a rough draft of Water 312-page - Guide Quality Protection Logging Roads. was selected to make a unified response by Forest supplied a unified Service Improvements. Technological report was delivered to 16 pages to feasible EPA to restate comments the comments Office comments Using Service. and Standards Consultation On September 22 the Forest Services response to EPA Region I in Seattle Washington. Our response 3 pages comments. of general comments on the specific all Staff Unit Engineering well as the Washington as by both publishing the report in regarding Office for the Forest a joint effort comments and of detailed expressed as EPA and Stations Regions was prepared response to The Washington the present its EPA Serious form. made Guide that were contained were concerns Although and the it is not the following from the general comments express some of our main concerns extracted about the report contermi-nous The Guide sedimentation. United does not a frame of reference establish the reader the Of 15.6 amount answers provided It that are produced in of sediments supported by documented percent In the Region million tons of sediment yearly. the total sediment production what what percent is due to man what Of the portion due to silvicultural Of the portion due to logging roads what percent would be helpful if States River the report the Pacific Northwest told area and questions due to man-associated causes and is due to silvicultural what percent activities is is activities due to logging roads due to logging roads that have and operated in conformity with practices the effect sediment attributed on water quality over a period to properly Repeatedly throughout principal source of sedimentation. in percent designed constructed maintained good engineering What was of the United the Columbia due to natural causes is the portion been planned rivers X area data for the following Of erosion The States produces 185 tons of sediment annually. discharge 491 million tons of sediment per year. alone discharges with respect to or perspective Survey each square mile of the According to the U.S. Geological forested watersheds the Guide In fact the of time for that portion and managed engineered the reader Guide has been attributed 12 is states to roads. logging told that logging that 90 percent It also of roads states roads are the of accelerated that back slopes up to 85 percent contribute total of the of sedimentation but precision as to the pinpoint only precision as to quantity such sedimentation. sedimentation Unfortunately not is Although and the inexactness of the the state precise nor unchallengeable as we did not of the - not the previous as the Guide itself describes the difficulties of sediment source location it acknowledge that many of the of statements imply. of sediment measurement nevertheless numerous quotes to logging We roads. are from Forest quotations source measuring and locating sources of art in that attribute the sediment source with great assurance if and up to 30 percent road sedimentation first-year All this implies a great deal of preciseness in measurements road sedimentation. studies would be remiss Service authored impreci-sion reports. Nonetheless measurement accepted if view of the previously stated in and location it many of the statements qualified on which the statements more credible if the aforementioned more objective and better and pointed believe out the the report would be far on sediment measurement difficulties were brought out very source location and quotations Furthermore we are based. with sediment source difficulties the Guide would be far would seem it and sediment the Guide and fully discussed. sedi-mentation early in Engi-neers The Guide no information gives that would be tolerable on the threshold level need to know what with respect of sedimentation level Armed with such knowledge and procedures to flora and fauna of sedimentation with respect or guidance is to the levels of nor does the Guide give information quality deterioration. to water a hazard to public health and safety. engineers can design an array of sediment minimizing devices so as to prevent beyond sedimentation the total allowable sedimentation. ter-rain. exorbi-tant Of course the levels should be with realistic Logging roads in as the Guide is not really address this problem. presently written absolutely no sedimentation Northwest are located the Pacific of the costs and the benefits consideration The Guide does for a particular level of sedimentation. would seem that full in is It tolerable. mountainous steep treacherous contribu-tion Even were possible for logging roads if zero sedimentation This price would be directly price. would substantially contribute to the state of the art if it roads within related to specific would identify general portions and work quality as affected Editors Note make Guide could tolerable constructing comments were of wood an and a meaningful of sedimentation levels at products maintaining and operating with them in reinforced We of the Guide. Service reservations on the Guide and EPA would come and discuss logging these tolerable levels. The aforementioned with The to inflation. the costs and the benefits of designing it transferred to the consumers make preparing hopeful are appropriate by many that revisions. useful guidelines detailed EPA on will We comments which consider the Forest have offered to meet the protection of water by logging roads. Improve-ments This news item and the related and Consultation activity were a joint effort between and Standards. 13 Technological AND STANDARDS CONSULTATION Charles R. Weller Assistant Director LASER RANGE POLE LASER The using fact will it. it However has we have so well is The center line. The of and photomultipliers now occur signal carrier will when used false within its in difficulties inherent limits. In two more from RCA. The two new models ordered expected to extend to 2-1/2 filters well Important improvements center and the elimination work. Recently general and there have been some for one year has functioned it needed improvements. The range that in functioned include recognize Pole has been used Range be will in range the to ability readings. miles for average daylight and miles for night 5 have been improved to eliminate blank readings be improved to eliminate the of possibility false on readings frequently. 5-watt The radios were added to the system. by the addition of the 5-watt RCA The walkie-talkie. range 5-watt of the radio has been improved RCA replaces a 1-watt Bell Howell. new The radios have not mile in rugged terrain right line light or right. left The present up during readings of 1 in is sometimes indicate about where lights center it improved the center occurs because The reduced system daylight down is still hours. the The is because problem. to get a center center line the reflected intensity very difficult light is to a 5-to-10-second to split LASER line light is reading. almost 40000. 14 left and The blank often only half the intensity of either line lights by noting adequate. This the center always The full signal. the prism splits the reflected box in is shots of one-half to one because they get the usable even though the center ability On line light. do not always left and provides light right accuracies READERS EXCHANGE FIELD NOTES This section of descriptions of work brief news under is way designed to successful provide you with an opportunity problems experiences share brief to requests for assistance or items. exper-iences tech-niques We anticipate lacking PI evaluating and having in some depth maximum fines. with mix design control testing would appreciate construction and cost analyses of bentonite to add plasticity the use of bentonite I beneficiated to methods maintenance an aggregate and your relevant references evaluation aggregate surfacing. Gary Schulze B. Materials Engineer Superior P.O. Improved and Disposal Utilization meeting of the American Society Chicago. During the 3 days of Logging Residue will of Agricultural Engineers December 10-12 of Forest industry research and engineering Complete information Engineers 2950 Niles is available Road St. disposal 218-727-6692 396 the Conrad Engineering with all of the latest on request Joseph of logging utilization residues. information 15 in be from subjects. of Agricultural Sirois Engineer Office will products will on these timely Washington winter Hotel 24 papers new Speakers Mechanical 882.435 Hilton _ Don GPO ext. topic at the sessions from the American Society Michigan 49085. Building 55801 be a featured at Forest Federal Duluth Minnesota be given on the various aspects of improved logging techniques from logging residues and treatment National Box 338