ENGINEERING TECHNICAL FIELD INFORMATION NOTES DATA REPORTS TECHNICAL RETRIEVAL TEXTS CURRENT AWARENESS SYSTEM Field Volume J. Burke Manpower Faustin 1 and B. More on 2 January-February Forest Operations 1973 Using Algorithm Restricted Doyle Numbers and Scheduling Planning _A 5 Notes - and Ward W. Carson Programs and The Carson National Forest Padilla Land Surveying Reprint Articles--May Index of publishedField 1969 thru Notes December 1972 Fran Owsley US FOREST SERVICE U.S. DEPARTMENT OF AGRICULTURE ENGINEERING FIELD NOTES This is a monthly newsletter Forest Service among personnel. publication ideas The publication material the in is not intended publication to all published be exclusive and engineers to exchange Engineering information and However for engineers. engineering technicians because should issue. The is publication from the Washington and Research distributed Center Station Area Laboratory to provide all who wish a personal would like number the issues one are ask your Office Manager of copies sent Field that to your from also available intended It is Service copy. directly to all Adequate the type are printed you are not now receiving a personal copy and or the Regional Information Coordinator to increase Use form 7100-60 Washington Office and for this purpose. Copies of back can be ordered on form 7100-60. the material in the Field Notes be primarily written and used by Forest material from other publications may be used. however Engineers Note material should always be informative and cannot contain mandatory instructions The length of an article may vary from several or policy. sentences to several typewritten Material need not be typed neatly written pages. nor edited before or printed is acceptable Office. The Washington being submitted to the Washington Office will edit and prepare the camera cop- to accommodate our format and allowable space. Field has an Information Coordinator to whom field personnel and material for publication. The Coordinators are Each Region questions Information contained in R-10 Jim this. Department Federal and State agencies. the interpretation or use of The Fleet Stensatter Allen Groven Stanton WO McCoy Kjell The this - submit both should Bakke Ernest Quinn Ron Pokrandt Gerald Coghlan Al Colley has been developed for the guidance Forest Service its contractors and report of Agriculture U. S. the Dan Roper R-6 R-8 R-9 Gary R-1 R-2 R-3 R-4 R-5 of its employees of the cooperating Department of Agriculture assumes no responsibility information by other than its own employees. for use of trade firm or corporation names is for the information and convenience of Such use does not constitute an official evaluation conclusion recommendation reader. endorsement be suitable. or approval of any product of Forest Regional copies If office. the Office Offices. of read each monthly or service to the exclusion of others which may F E I L D N 0 T E S OPERATIONS PLANNING AND SCHEDULING FOREST RESOURCE ALGORITHM USING A RESTRICTED By Civil Engineer Doyle Burke Ward W. Carson Mechanical Engineer Pacific Northwest Forest and Range Experiment Station J. plan-ning INTRODUCTION timber sale operations such as timber harvesting that are not often construction have unique features these As with most large projects found in other industries. and where involve activities resources operations many overlap. Logging and road building are generally conducted in The personnel which include a remote and difficult environment. used may be full-time and the few equipment only a key employees remain It is that the and seasonal. personnel transitory important conditions and in site to changing operating flexible regards The scheduling and planning of such forest operations must Forest and road responsibil-ities pro-cedures. include consideration of all Managers and scheduling the project and characteristics. these planners of forest tool that assists them operations must have a planning of with the two major aspects for various phases 1. accountability 2. determination of whether of the project and existing resources are satisfactory in order to complete project or how much of the total be project program can accomplished with existing resources. the A planning and scheduling tool should be easy to use fast simple to change and update and inexpensive to implement and operate. Resource Allocation Program Version 1 REAP1 is such a tool and is available to Regions using the National Bureau of Standards It can also be made available.-to Regions using UNIVAC 1108 Computer. CDC 3100 Computers PECULIARITIES OF FOREST OPERATIONS Timber harvesting and forest road construction are examples of operations that are usually restricted by their available resources are generally working from a limited rather than by time. Projects resource pool. Working from a limited resource does not mean that time is of no importance in these operations but rather that time is not the controlling element in planning. 1 The major time restriction is the seasonal nature of the work. If a delay occurs an increase in production usually necessitates additional equipment and manpower that are not ordinarily justified from an economic standpoint. In tool and and restricted these that evaluates resource operations a need exists for a a fixed resource a proposed project against pool optimizes time rather than evaluating a project against time establishing resource requirements. avail-able METHODS AVAILABLE Several time-oriented techniques such as Critical Path Methods and Evaluation and Review CPM Program are Technique in various computer packages or modified manual systems. The basis of the resource allocation algorithms is time where the basic PERT To adjust for these restricted assumption is that time is critical. resources under a limited time schedule does not provide for optimum project durations without complicated mathematical programing which requires specialized input and output interpretation. Under these conditions acceptance at the field level has been low. allo-cation There are two methods 1. Resources are using 2. major criticisms of the The time available simply assigned after the resource schedule is generated constraints. input/output is so complex that it is seldom used. prob-lems CHARACTERISTICS REAP1 which OF PROGRAM REAP is a computer program that helps involve projects with restricted solve scheduling resources. The basic to assumption is that the project or operation being planned is subject to limited resources. Due to these limited resources the time on the will be different from one that had a project spent probably limited time schedule. Resource allocation on restricted resource operations is more complicated than on projects which must be completed within a given time. If the resources are insufficient to mobilize the project to its full capacity then it is necessary to decide which activities must be delayed and for how long. The is to minimize the object duration decide the project or approximate duration of the project subject to the resource restrictions. REAP1 accomplishes this by identifying a critical resource usage path through the project and 2 with-out and scheduling activities by allocating resources based on this path. progress monitoring operate on unordered lists of activities those The priorities of the precedent or successor relationships. remain or can which make the can unspecified activities project up subroutine calculated a administrative or by be assigned by decision of REAP1 for optimum allocation of resources. REAP1 can ALGORITHM OF REAP1 The Only the macro-structure of the REAP1 algorithm will be discussed. details of the micro-structure are beyond the scope of this article. arranges execution of the algorithm into a main The main program handles the scheduling program and two subroutines. This is supported by a of activities and assignment of resources. that subroutine Priority Determination PRIDET provides a computation other subroutine DATE The of priorities if this option is selected. the calendar processes the results of a completed schedule and provides The REAP1 program output. des-criptions Main ProLram and print out the information of activity priorities optional precedent activities and resource descriptions. resource requirements 1. Enter store es-tablish durations 2. Initialize and call subroutine PRIDET if selected to priorities. 3. Establish the workday being planned. Establish a priority to be is exercised. 4. 5. Search activity the a. the specified b. all its list examined for one if the priority option with priority precedent activities necessary resources that are complete if applicable available for and assignment to dis-covered c. the 6. activity. Schedule in step 5 a start and and assign finish workday the for all necessary resources activities. 3 activities to these If all 7. if not priorities have returning to step keep been 4 continue to step examined all priorities have been until examined. 8 8. Test for completion for all activities. If complete then continue to step if not complete search for the next workday on which an activity will be completed and resources are available and then return to step 3 to begin the assigning procedure again. 9 9. Prepare bar chart and resource assignment report and call subroutine DATE if selected to prepare and print the calendar for the schedule. Subroutine PRIDET 1. Establish activity factors requirements of each activity. determine all Use 3. activity factors the establish priorities for each resource and activity to successor information to activity. Return to main program. 4. Subroutine DATE Enter store 1. day date and start the precedent activity information for each successors of each activity. the Use 2. which reflect and length print out information describing schedule of workweek and list of nonproductive workdays. Locate workday in the calendar and sequentially assign workdays to calendar days while allowing for the workweek and nonproductive workdays. length 2. the initial net-work OUTPUT FROM The This the REAPI network example diagram of an example project is shown in figure 1. road will be used to illustrate a section of forest Some knowledge of project management output of REAP1. diagraming will be assumed. network diagram fig. 1 plus the resource The output from the program shown in supplied to REAP1. The data from the data are and 4 L 6 s /4 II - CG 9 2 18 It 17 CG22.5 Cr-30 2 1 \ 4 rytivlb Ex. 3 Move In Set 2 CG U Camp 8-9.5ýA- .11_5-13..1 1 2 2 32 Pit Dr 1/2 J Ld Ex.15-18. 4 10 Ex. 1/2 1 20-21 Shoot 1 ý 13 2 1 7_Ld2/2 Haul-20 IT N 92 1 / 2 Haul-30 1V 3 Up Move 1 Q h 1 1 2 2G M CMP-30 LEGEND Activity C G Clear and Ex. Excavate Dr. Drill Ld. Load Number Grub CMP Install Corr. Metal Finish Grid Roll Sub.Ex Sub-excavate Note The and Pipe Slade numbers following to the stations refer Example -- Ex.11.5-13 Ste. 1150 Figure the activity involved. means description Excavate to Sta. 13400. from l.--Network diagram of example Out 2 a /fUW 18 Clean 3 project. allo-cation figure title 2 proje convenient display as follows schedule upper left resource lower left and workday calendar lower right. is arranged for upper right bar chart prior-ity table The title shows 12 there are 34 activities eight resource types priority of -1 indicating the If priorities optimized by the program. resources and containing assignment is being were manually assigned this number number in the project. The bar chart schedule would be the largest priority is arranged with the activity number and left-hand side The duration fig. 2. the activity description along for each activity. The and priority -0 in the example are given numbers above the bar chart correspond to actual workdays on which The bars in the bar chart are an activity is started or completed. and and continue until the workday of the made up of 0s is started. At that time its duration is activity in question numbers indicating the time brought forward with succeeding A on any given workday. zero on the bar indicates that the that workday that resources assigned to activity will be available remain-ing s 000 0 for reassignment. For example activity duration of 3 days commences on workday on workday available 15 resources No. 14 26 Haul has 2 assigned to this for reassignment on workday 17. and the 0-20 with a remaining activity will be days work-day The resource allocation table is arranged to correspond with the bar chart The resource description on a workday basis fig. 2. is listed on the left-hand side followed by two numbers appearing The under each workday column. upper number indicates the activity and the lower number is the to which the resource is assigned The on which the resource will be available for reassignment. last number appearing to the extreme right is the number of days the For example resource in question was not used during the project. shovel and operator is not used until workday 5 resource number 3 and will be available at that time it is assigned to activity No. On workday it is reassigned to for reassignment on workday 8. This process activity No. 6 and will be available on workday 9. The continues the table until the completion of the project. across number 11 indicates this resource was not used on 11 days during the 5 8 project. workday calendar provides the calendar day corresponding to workday taking into account the number of workdays per week and etc. nonproductive workdays holidays shutdowns The the USE OF OUTPUT After the first resources or resource run the types scheduler can and add delete 6 adjust or the change number of activities. -2 ---AD -o 1--PROJLCT ACTIVITY AGT 1 no WE L IN LLEA0. AND DUR.PRI1 2 AAP $A.L.UP 3 3LSCRIPTLON . GRUB 0-6 CLEAR AND GRUB 6-11.5 ANO GRUB 11.5 -i b CLEAT 4XGAVATE 6-9.0 7 DUINY A_iA4AVR.T6 11S-1 9 DUAM/ 1Y E%GAVAL 15-16.5 It CLEAR AND GRU3 16-24 _12 DANNY 13 ..XGAJA 2u-21 AgAN9. 4RU9 29-42.3 A-4 WL IT SA Y -J 2 -N_ -Y 1 -Y -8 Y -0 2 -0 12 3 Yu4J Y 2 1 1 -J 2 -u 1 -Y 11 16 NA_F 21 LOAD 22 DRILL 2ND LOAD 2140 INUIT PIT 23 24 1ST DUN 25 INSTALL GUNNY 29 MAUL 4-20 CNP 2J-30 26-36 INSTALL CNP FINISH GRADFINISH GRADE CLEAN UP 3. 31 32 33 34 MOVE 1 -u YYU ý YU1i Y Y O4uY ýYOY ItY v 3 1 L OU 364.3 OY ýJJY 1p 2 1 6 -0 3 -Y 2 -V Y -1 3 -Y 1 1S-33 1 63434 2 1 003.400 3 JPERAT AND 1 u 2 1 AND DRIVER 4 _-J 2 1 3 1 Y J i6_404 1 0 JY 1 Y 1 O.J Y 1 J 2 u -J 1 u 1 J 1 _ _ - To--- 95316$ OR AVAIL - --.. TRUCK AND R DRIVER .. - TRUG AND ORI ASS ON - ItN 3 A S TO . ON IL UN AVAIL AYA 3 - 5 - 9 6 - 1 JYu 11 1u 1L 13_ - 15 1% Il 16 19 le 21 24. 2 93_ l 2 J ATE iTARTINL 247_ - d_ 431 29 t 33 3 4. 3 STARTING JJL PRODur DATE NON 2 2-2 S 5 2 S 2- 2- 2- S 5 S - AVAIL 2 2 2 3 5 i 5 3 -ASSIGN JO YER 4 1 ON . 9 -2 S -2- 2 - -L J 5 5 5 J 4 3 9 J_ 4 6 9 2 S 0 3 2- - - 2 5 - - 5 - 3 t 2 2 5 5 9 5 2 2 . t 5 2 2b _ 26 26 17 17 _ 1b 17 - 5 - - 17 - _ 26 26 17 Z _ 2b - -2 -2 -- S S 5 S 5 u 14 12 lb 4 26 17 - - - - WRK VE - 71 It 2i- 2A 2V 29 33 3 3. 17 17 21 27 29 31 to 17 37 17 IF 26 it 2c 20 2b 20 17 17 17 11 17 10 _ - 31 _ ASSIGN - AND 61R -to- AVA 1L JPERAT. 5 ON ASSIGN AVAIL LABORER L180ER TO JN f0 At S ON 7 - FALLER - FALL-R ASSIGN .. AVAIL - - - RILL - - AND - - OR - - - - - PONOERNAN 5RLO ROLLER - 12 AVAIL - - 17 17 17 it 17 15 19 19 19 lY 19 5 5 11 12 13 15 21 23 27 2e it 26 2e 26 11 13 13 17 17 17 37 17 5 1 13 1 2 - 2 2 2 21 3 S 5 5 S IS - i4 12 Y SY - __ GRADER - - ASSIGN AVAIL . UN - TO. ON TO UN - A7i1GN t0 AVA It - ON J V- 7..7 Y J Y J 0 -1- -4- 3 0 J- 3 -J1 Y 6 19 tl -4L 0. 0 6 0 S 10 - SL -- 12 .. 12 - .1 1 15 11Y 2 22 4 19 9 22 ib 14 2 1 13 i IN 13 lb 3 -8 T4 - ASSIGN AMU OPEKATO 11 MOTOR - AVAIL 1C It 9 1_ TO JM ASSIGN y IC _ 6 _ . b _ - la 1r 1 1 19 _ - - 19 _7 .7 19 - 19 17 22 2 22 24 17 -9 17 17- r 17- 36 19 2r 6 26 13 17 17 3 8 - 27 21 2 7 21 - 2 21 27 - 2b- ti z7_ 21 31 32 2Y NUMBLK UAY WORKDAYS OF PLK WEEK MUM DAYS r JUL ----- 11- 9 74 30 2 2r - It 31 19 31 - 36 24 24 29 31 2 2 T1 -7- -T- i 21 2 21 3 4 5 13 iY 14 17 17 11 17 27 27 27 27 tl -i 12 13 15 15 19 19 19 19 21 21 21 21 21 tl 21 20 24 22 22 22 24 24 24 24 2r 24 24 2 it - 24 it S4 14 14 14 Sr lr 31 32 32 14 as 24 U 32 10 b 4Y 4 14 5 12 .0 Y 4 6- Y L -Y- - -Y- Y 4 J J J 0 2% 24 1 1114 Y 4_ Y 0 Figure -4- -Y- -Y- -Y_ Y 0 Y 0 le -0 4 0- -1 - Y Y -46. 6 b 2.--Output -0- 0- lr -4- Y 1 3 9 11 24 73 6 31 Zb 114 O1 3 - 3 JUL ____ 27 t7 21 2-7- ld JUL 21 21 2. 2. 24 Sr 1- 32 32 26- 2- 62 li lr- 26 from program O 26 as REAP1. IS MUM T ..___J - - _. JUL J. - - WED S - 11 - - - ------- - 2v JU-. - - - 16 -- JUL I3 JUL JUL 12 .... FR1 19 3S 2u 6 AUG .... 7 UG ... 29 AUG 11 AUi ..-... 13 JUL -. ____ AUG 2 _O AUG 3 20 6 AUG -1S -A-- iJ 9 AU.G ----_ 3 - JUL JUL lr JUL _______ 1 1----- JUL 21 __ ___ . 1S JUL ------- JUL _U_ 22 ____ JUL _26_JUL 22 __ AUG v 2T AUG ------Y o 10 it __._... - SAT 13 23 AUL _ 2 - S ------- - AUG _-AUG AUG ._.... 31 - - JJUL 9 /_JUL 21 __ - _______ b_JUL 2r 13 JUL 10 -2--JUL F 7 d ..__ JUL .... 1 U3L ----- 11 19- 30 c 7 ___ 1v JUL JUL _ o 1-_- 1--JUL-. t3 - 27 21 DAY SL 17 1 . Y J 10 JU. ______ - 9 31. - Su r - - 3Y - 3 2 1 - TV. 1. ----- U. 3 y L7 - - INITIAL JUL NOW JUL 32 32 to - 10 Y SUM _ 21 - 3 2 15- 34 31 is --------2 3 - 29 17 1b - 27 17 30 24 S1- 7 31 27 it lb 71 33 29 1 16 1J LV 3 27 16 27 2A 33 10 14 32 2J 26 17 27 29 29 17 1V 31 - 10 - -L- 27 - LO- 1T - 2 S - 26 17 17- - 55 2 2 5 5 - _ INITIAL 26-12 SHOVELL 5 - -1 0 4 JOYY00J00LJ6 2 J0 JJY 31636.1 Y6Y JY 34.4 JY 1 yp/1JOJIOYL O9L DAY0Y 4 JY JJu OIJJOYJJuOLOLJuu0Y 1003 J4U464.4 YYY 0J14UL 44 2 J67JYýJJ444uYY4 ýYýJJUJuOU4YUu0uu4YYJYYY 0 LYUu u4UJOYU4.4/4 Y OYYYO 0YOOYO6YOJYYOuYJYJJ4u0uuYYUYOYOYJYUIiJLLYJ u JJ JY OL 003 A4 4YL 4I0LYLYJYLJJ4Y0.4 JJ 1360 JSV1YYVJ JU 046 YUYu UJJJ Y......41YY4.4 /Y G41Y4Y YNY300AJOU6uJOLu 00u04Jd0L40u 4JuJLG04LY LYJCL JJYYYJJY OOJJJOLU4.GULYUYJOu00JYOLYLL 44 L4JYu06u0YUOYUU YJ J6 JOJU0UJJGOYOYYOLUJJJJJ.uu4JUuJ4J00. YLYL CLJ4 uO3944 J13.66 040.330.404.400LOY44JJYJJYL04YJJYJOu0i1.4 JYuuYGY4 JV JYYJ1uuJY Du YY JY YY YJ4YJYYOJuYLY -YOVJU0JYOu 4416 YL - TRUCK - 1972 PR10Kli1ýS TTPC K45JJMCL 31tl-7 -AVAIL -A -------9 -...... LOADER i - 2 OOJJJO.4J4.004.4 3 _ APRIL. ii J GJY10JYL Y J 3ESOURCE 1972 NUMUEK RUN JA TL BJKKL 1V13f YEAR 3 - -J 2 FISCAL Y v -Y -0 1 OUT SCMLDUL. PKUJECT NAME PRUJLCT LXAMPLL 31 IV 4 1 5-15 29 0 3 J 2d 3r ........... YJJYJ030.O OYY J41306.O 00 J04.401YYuJ4JYOY4L O6 JJu0Y64GOYuYYu6JL 4 YOJJ0JOOYu0JJ 34.30 JJ O4 1303 u 061633 44/J00.4JYU40Y4uu0u4JuJOY304 vJYuJJ JO Y4G44 Y4 -Y 1 . 2v Y JY JVJJd3YY4u . 2 PIT PIT J-24 MAUL 2tl 27 PIT MALI MA.F 23 Y 1 ýýq-ýýJL3ýJ _ 22 AGT Y.uJ0J00LOI 4y 1Tu 21 19 0 Y4 JJOY000U 04LYU 2 00.69 JY 03136E YL 4140 JO J61.40YJOLLYJY ýVD1JJJ01YJOY4YG JYY 44u -0 3 It DUYLL 1 Y4 YU0 34.340.6 0109 JJ 30.306JYJ 00.01YJa -r 15 0 J11.1J0J14 1 1 13 SCNLUULEK .__9.4ý. 1 -1 . Y 11 Y 341.146 694.1. J. J EXCAVATE CLEAR AND 226-25.5 GU3 22.5-34 SUBAXCAVATL 26.9-3 CLEAN AND GRU3 PIT PIT ORI L.. 1ST-HALF 16 1 2 2. 60410YYOJ 2 YOJJJYJJY JUYu -Y -Y - 1 9 6 Y I __ -0 2 2 DWI 15 2 D 2 3 S L -Y 5 3 12 _ AJG over-project Adjustment of activities or resources will in general change duration. The bar chart and resource allocation table all in aid the designer identifying activities and resources which need be altered to meet his requirements. to accounting for daily and can be used resource usage predicting resource requirements The once costs are for cost estimating or cost accounting assigned. and understood device for bar chart is a useful presenting easily The resource allocation table is useful in and and discussing the overall project. re-source SUMMARY offers a planning REAP1 operations that accountability 1. and provides for scheduling tool for restricted for various phases of the project and determination of whether existing resources are satisfactory 2. complete the project or how much of the total project program can be accomplished with existing resources. to REAP1 simple to is user-oriented fast implement and operate. MANPOWER PROGRAMS By easy ANDTHE to CARSON change and update NATIONAL and FOREST Faustin B. Padilla Land Surveyor Carson National Forest as an agency of the United States Department and communities in committed individuals of Agriculture is to help life. their of rural areas to improve quality The Forest Service manpower programs which have been established in recent Federal agencies offer years under the administration of several to implement these the Forest Service unparalleled opportunities The programs. Northern New Mexico is one rural area in need of help to improve is The majority of the population in this area its quality of life. for water grazing firewood dependent on the Forest in some way is striving to help The Carson National Forest lumber or employment. - the area overcome its needs in following ways. the 8 To help alleviate the unemployment in this area the Carson We have found National Forest has utilized the manpower programs. that we not the in utilizing these only help unemployment programs skilled in we but people gained training many young problem employees. 1971 the Carson National Forest persons under the following programs In host was Pram to and Number of Enrollees NYC 64 Youth Opportunity Corps YOC 4 Operation Mainstream OMS 14 CEP 2 STEP 2 Neighborhood Youth trained 86 Corps Concentrated Employment Program Supplemental Training and Experimental Program performed by enrollees is varied. timber marking distributing mail and Work It includes typing filing Main-stream landline location duties. from Operation Supplemental Training and Experimental Program Concentrated combined and Employment Program and Neighborhood Youth Corps were used on survey crews under the title of survey aids. On landline location The enrollees who are taught simple the use surveying of projects enrollees participate in the Landline Location Program and safety principles surveying equipment computations. and concept is taught a step at a time to all enrollees each has an opportunity to work at the various positions on a survey Each enrollee becomes acquainted with correct procedures of crew. staying on line brushing line and measuring distances by horizontal The enrollee is chaining slope chaining and using distance meters. and clinometer. hand the of the level correct use bob taught plumb Each and enrollee is taught how to operate transits Subsequently-the theodolites and how accuracy can be obtained from each instrument. the enrollee is has acquired the basics in field work to compute his of the fundamental necessary taught calculations most of his knowledge while field notes. The enrollee acquires Any question that may arise during the actually doing the work. will be answered on the spot or marked down of course a working day Once he some to be discussed with all enrollees at 9 the next safety meeting. Instructions are given on Safety meetings are held weekly. sharpening tools and how to carry and use equipment along with other discussions After the safety session are open safety information. from the enrollees work and questions are on the previous weeks answered. A quick summary of the next weeks work is also given. As placed or find date 18 enrollees enrollees are other employment new enrollees programs have been used on the Landline Location Program. The Forest is making a planned effort to employ these enrollees on regular appointments when their training ends. are To acquired. from the manpower On the whole participants work has been satisfactory. The use men has accelerated the Forest Landline Location Program. These programs have helped to reduce the cost of surveys and allowed the Forest to stay within its allotted budget and organizational of these ceiling. MORE ON SURVEYING LAND I/ During the past year the Board has had many complaints about At a recent Board unqualified people performing land surveying work. considerable time devoted to from was hearing practitioners. meeting A typical complaint was that unregistered individuals working for Government Agencies or others were industry the Highway Department performing land surveying on weekends holidays and off time. Many unlicensed people performing surveys explain to registered and that they could not certify In spite of this disavowal of legal status by nor let it be recorded. the unregistered surveyors still in the course of time their surveys are accorded some degree of recognition and acceptance. the of these client that they were not The that when qualified and licensed complaint then continues discover the in surveyors errors many instances damage has been done to the property owners and they are both confused and angry. When the errors committed by these unlicensed people are discovered part of the adverse publicity and blame probably ttansfers to the employer of these unlicensed people even though unjustified. PRO-FESSIONAL 1/ Quoted 1972 from the STATE OF ALABAMA BOARD OF REGISTRATION FOR ENGINEERS AND LAND SURVEYORS NEWSBULLETIN November Issue No. 4. 10 15 sur-veyors We and land matter of real concern to the citizens the it to and for this reason we are bringing public owners attention hoping that employers will discourage their unlicensed that or engineers from making land surveys and we would hope boards bulletin this portion of the NEWSBULLETIN will be displayed on and other appropriate places. consider in Alabama this 11 INDEX OF PUBLISHED FIELD NOTES ARTICLES MA Y 1969 THR U DECEMBER 1972 Architecture Architecture and the Part Plays it by Harry Kevich Architect Region June 1971 Volume 3 Number 6 of the Administrative Construction 5 Office for the MI-WOK Ranger District by Harry Kevich 1970 Volume December the Handicapped for Designing National by Gary Marple November 1971 Volume Forest 2 Number Service Unitized - Some Forest in Agriculture Construction Handbook November 1970 Volume by Dan RO House July 1970 11 DISTOMAT of the Wild DI-10 1970 Volume 2 R-8 Surveyor Number 12 Instrument for an Old Discipline L. Reed Supervisory July-August 1971 Volume A New Number 73 Wood-Frame Number Robillard Cadastral December A New 2 R-5 Surveys Field Evaluation by W.G. and Harry Kevich and Reissued News Item A 11 Construction Revised Cadastral Unusual Problems Florida 3 Number by John Lamb Washington Office May 1969 Volume 1 Number 1 USDA 12 Slide-Tape 3 Engineer Numbers Program Corner Technician 7 Region 5 and 8 Search and Rescue California Style News Item March submitted 1971 Volume 3 by Daniel Number M. McVay 3 12 Washington Office A Sub-Routine for Use with the Monroe Epic 3000 Programmable Calculator Printing by Leroy Francis Lewis E. Cadastral Surveyor Marion-Sumter National 4 January-February 1972 Volume and Development Investigation Daniel June McVay M. 1969 Volume Managing Time the News Item 1 North Seeking H. H. H. and Daniel McVay 3 2 1 St. Civil Forest Engineer Forest 3 and 4 Surveyor Eastern Region Surveyor Eastern Region 1 9 Number 1 Washington Office 2 Land Surveyor Green Forest 4 Numbers 9 and 10 Processing in Regions 1969 Volume 3800A Cadastral Corners Butts Registered Distance M. by Daniel October 1970 Volume The Tomm Cadastral Number Number by Jim Hogan Washington News Item Numbers Staff Engineer of Tree Land Remote Computer D. 4 Regional October 1972 Volume H. by Ed Gyro Systems Mountain National The article Region Hedman 1969 Volume F. Office Washington Gyro Systems M. Preservation Hogan 2 Regional Hedman North Seeking September Surveying Gyro System January 1970 Volume by George Cadastral Engineer Eldorado National Forest Hedman North Seeking June and 2 1 of Survey Crews in the Eldorado National January 1971 Volume by Victor Number 1972 Volume March-April by Victor New of and James D. from an taken and Sam Fischer by Victor Numbers and Equipment Procedures by Office Supervisors Forest Joe Cadastral submitted by Daniel 2 1 Number 4 Meter McVay McVay November 1969 Volume Washington Office Number 10 Engineering M. 2 3 8 and Office 1 Program Washington Number 6 13 Office 9 Trees that Bear Witness Sumner Regional Cadastral Surveyor Region November 1969 Volume 1 Number 6 by L. Bruce 5 Computers Time Computer Sharing Montgomery February 1970 Volume by C. J. 2 Number 2 Contracting - Construction Material and Workmanship Reprinted 1 October 1969 Volume Network Number News Digest Service 5 Analysis System by James M. McCoy Staff Assistant Construction 1971 Volume March Contracts from June 1969 Administrative 3 Number Region 5 3 Environment A Quick Cure for Rock Defacements News Item submitted by Region 10 3 Number February 1971 Volume Getting Involved in Environmental by John Daly Region January 1970 Volume People by R. 2 Planning 8 2 Number 1 and Environment DArcy Bonnet October 1971 Volume Testimony at Number 10 the Environmental by Robin Harrison December 3 Denver 1971 Volume 3 Protection Colorado Number Hearing - October 1 1971 12 Geometronics A 3-Dimensional Plotting System by Washington Office November 1969 Volume 1 Number Olin Bockes Combined Right-of-Way 6 and Road Design by Max C. Montgomery San Bernardino May 1971 Volume 3 Number 5 Aerial Photography National 14 Forest for Aerial Photography Contracting by Clair L. Arneson and Richard 1 August 1969 Volume Hand Held Platen L. Number for Relative Orientation by Richard Brush Engineering Report on the 4 News Item July-August Models Numbers 1 Forest and 2 Technology Satellite by Ray P. Allison Washington Office 1972 Volume 4 Numbers 7 and 8 System Stereo Projection by Larry Huston Region 3 1 September 1969 Volume Utilization of 5-Drawer Flat by Richard G. Harris 1971 Volume April Office Boise National Resources Earth First of Stereo Technician January-February 1972 Volume Special Bradley Washington 3 Hearings Civil 3 Number 4 Map Cabinets Engineer Uinta Number a Layout Table as National Forest 4 and Laws House Subcommittee on the Federal Aid Highway Hearing Act of 1970 by F. J. Hammond 1970 Volume June Testimony at Development by Dave Denver 1971 Volume Traffic Regulations Forest Number Protection Number Hearing - October 1 Colorado 3 1971 12 and Law Enforcement on the National Road System Trask Washington September 6 the Environmental by Robin Harrison December 2 1969 Volume Office 1 Number 4 Miscellaneous An Easy Solution to Skylining News Item by C. D. Swarthout California Region July-August 1972 Volume Development 4 of Maintenance by John Platt San Bernardino May 1971 Volume Division Numbers Work 3 Number 7 of Engineering and 8 Standards National Forest 5 15 EDT - Report - 7160-2 Field Maintenance News Item by Reg Pragnell Washington May 1970 Volume 2 Number 5 Geology Engineering by Thomas K. Collins and The 2 Number 1970 Volume Effects of Deicing News Item by Byron Use of a Rotary S. Planning -A and 8 7 3 Region Assistant Director Division 2 Multiple 8 Use Coordination Office Number 7 by Fran Owsley Editor Washington 3 Letters from Engineering December 1970 As on Special Copyright Number 1970 Volume 2 Field Notes Office 3 Retirees Edition Christmas and Public Domain by Jeff Sirmon and Boone Richardson March of Engineering General 1971 Volume of Office Note to Authors of the 1970 Engineering and Haynes Teams Washington 1970 Volume News Items Qs P. Fable and a Fantasy by D. C. Turner March and John Number 12 2 Number Support Through Projects A 2 Item by D. C. Turner August 1970 Volume July Numbers Use Engineering Washington Public Trees 3 Region Multi-Discipline News 4 Staff Geologist 1970 Volume Multiple Forest 10 Rig for Investigation and Repair Drilling Boyd Staff Engineer December and Foss E. Dam of an Earthfill by John 9 7 on Coniferous Salt 1972 Volume July-August 4jNumbers Shaped Charges by James Lott July Signs Region Klamath National G. Hicks 1972 Volume September-October Lined Cavity Billie Wood Office Unstable a Massively in of Rotted Number Publications Washington 3 16 Office Whos Who in the Office Division Washington of Engineering Compiled by Fran Owsley Editor Washington 4 1972 Volume July-August Office Washington Division Numbers 7 and 8 of Engineering by Fran Owsley Editor Washington August 1969 Volume 1 Number 3 Office Directive Progress Office Proceedings - RO Divisions - October 1 Proceedings September 27 May June 1972 Volume 4 of Engineering Meeting Washington 1971 Numbers 5 and 6 Recreation Boat Dock at Atherton Creek Campground by Thomas G. Grant July 1970 Volume Bryants Fork -A 2 7 Temporary Campground by Richard G. Harris May 1971 Volume Number 3 Civil Engineer Uinta Number National Forest 5 Reservoir Guidelines for Evaluation of Small Thorn Region 6 by Stanley February 1971 Volume 3 Number Reservoir Sites A. 2 TIS Technical Information System by Norman Sears Washington Office August 1969 Volume 1 Number 3 The Technical Information System by Norman G. Sears Washington May 1969 Volume 1 Number 1 Office Training Programs Advanced Engineering Technical Furen Washington June 1969 Volume 1 Number by Walter E. Specialty Training Office 2 17 Program D. C. Region 2 Materials Training Conducted News Item by Martin Everitt Materials Engineer 3 Number May 1971 Volume A Meter/Recorder Region 2 5 Roads and Transportation Region 4 Materials Laboratory in - Trails General Logging Road Roughness and Cleveland J. Biller to Measure by Ross A. Phillips September 1971 Volume A Method for Elimination 3 Number of Double 9 Counting by Electronic Traffic Counters News Item by John 2 Appalachian National by Tom Fendley of Scenic William March-April Blower to 3 Network F. Schnelle Study Program Trail Number 1 Analysis to National Civil 1972 Volume Assist USDA Engineer 4 Numbers 3 Engineer Ottawa and Road Design Right-of-Way by Max Montgomery San Bernardino May 1971 Volume Service 3 National Forest Number Aerial Photography National Forest 5 That Survey by W. H. Boley Forest and Carl Fonnesbeck Engineer Manti-LaSal Supervisory January-February 1972 Volume Economic 1970 Volume Engineering Civil 4 Stability by Mel Dittmer 2 Engineer Region 3 1 4 and 2 Planning 3 Study of a Waste Area November 1971 Volume Forest Office Number Preconstruction National Numbers Analysis in Transportation by David B. Trask Washington March Forest 3 and 4 Number 4 Combined Control Forest with Burning During Clearing and Grubbing Operation 1972 Volume C. Forest 8 by Thomas Dooley Zone April National 8 Problems Transportation by Number Region January 1971 Volume Applications Willamette Sessions August 1970 Volume Engineer Number 11 18 in Steep Siuslaw Topography National Forest Forest by D. Service Road Turner C. Highway 3 Volume March 1971 Safety Program Safety Office Washington Number 3 Study News Item by Del Beedy Washington May 1970 Volume 2 Number 5 House Subcommittee by 2 Number 1970 Volume by D. D. McCarthy Angeles 3 1971 Volume Methods Ames L. National Construction Inspector 4 by J. Roadside by S. J. May 1970 Volume Roadway 1 L. Jones 1970 Volume Soil Section 1970 Volume Dimas 5 Design Using 2 Number P Levels on Class II Theory 4 - Line National 2 Number Elastic Survey Forest 3 Compaction Mold Reamer Recognition Region of 5 for his Roy Chapin Some Experience by Joseph S. A. December in Todd Department National Sierra Forest suggestion October 1969 Volume U. 6 EDC San Wilcox by Jon Anderson Kootenai March Number 2 Number Structural by David Running and 2 Ditch Cleaners News Item April 1 Office Washington November 1969 Volume Numbers Methods by Photogrammetric Design M. Cultice Forest Number 4 January-February 1972 Volume Road Wall Traffic Counter Reliability of Improving by Gerald Act of 1970 6 Aluminum Bin of a Prefabricated Installation April on the Federal Aid Highway Hearing Hammond F. J. June Office 1 Number Stepping Division 5 Slopes Engineer Bureau of Public of Transportation 1969 Volume 1 Number 7 19 Roads Stabilization of Roadside by Ernest 1970 Volume July Cutback Stepped 2 3 Number National The Advanced Missoula 3 Development System Planning Team 1 Number the Study November 1969 Volume Status of Guardrail Standardization May 1970 Volume 2 Reprint Number Traffic Regulations and Law Enforcement Development Machine April Trail L. from Highway Focus 5 on the National Road System by Dave Trask Washington September 1969 Volume by Harold Programs of the 6 by Richard A. Richter Trail Office 1 Number 4 Cattleguard Greer 1970 Volume 2 Number 4 Traffic Counter Deland Missoula Equipment Development January 1971 Volume 3 Number 1 by Loren Trail Center 5 Service by Current Equipment Number Transportation Forest Submitted Forest Forest 6 Traffic Counters News Item by the May 1971 Volume The 7 Slopes June 1971 Volume USDA Number Peterson Wallowa-Whitman by Clinton Testing Banks with Annual Grasses K. Ellersick F. Traffic Counters and Detectors by David B. Trask Washington August 1969 Volume Transportation by Conrad 1 Planning Number - A New Mandt and Ross November 1970 Volume Transportation 3 Approach Carter 2 Number 11 System Analysis and Resource by Victor M. DeKalb September Office 1971 Volume 3 Number 9 20 Planning Center - Drainage of Determining the Construction Grade Roads and Transportation A Method Trails by Lester M. Pence Jr. George Washington March 1971 Volume 3 Number 3 Culvert by in a Road Dip Drainage Band Sterling J. Forest Tools Installation EDC San Wilcox National 2 January 1970 Volume Dimas Number 1 Culvert Length Computations by Adams Harwell 2 Number May 1970 Volume 5 Development Overside Drain Report on 24-inch Rectangle by D. D. McCarthy Angeles National Forest 3 December 1971 Volume Effect of Sideslopes in by John Host Region Number 12 Culvert Length and Location 1 July-August 1971 Volume 3 Numbers 7 and 8 Energy Dissipators for Flumes and Culverts by Sterling J. EDC Wilcox 1 October 1969 Volume San Dimas Number 5 of a Bottomless Culvert on Glade Creek Installation by Thomas G. Grant Teton National 3 February 1971 Volume Wieland and Greg Watkins July-August 1971 Transportation Classification Volume Roads and of Crankcase Trails October 1972 Volume Numbers of 1969 Volume 1 Number National and 8 - Materials 3 9 and 10 Liqui-Road by Adrian Pelzner Washington June 7 Oils Region 4 Six Rivers 3 Numbers by Thomas W. Stockdale Evaluation Forest 2 Subdrain System Two-Layer by Walt Number Office 2 21 Forest Trial Use of New and Materials Products by Adrian Pelzner Washington Use of Rubber Additive in Roads and Transportation Effects of Rubber Additives by Edward Stuart III August 1970 Volume Transportation An Materials for Surface Asphalt 2 Number 1970 Volume 2 in 3 - Trails Concrete Asphalt 2 Number Roads and Paving 8 - Trails Structural Analysis of the Failure of a Longitudinal Oswald Region 6 3 Number February 1971 Volume Computation a Slide Rule by David Design Laminated Deck Timber Bridge by Hildegard Treatments Focus Reprint from Highway March Office 2 Number February 1970 Volume Offsets of a Parabolic of Vertical K. Crigger 2 Ashley National 3 July-August 1971 Volume Timber Crib Retaining Curve Using Forest Numbers 7 and 8 Study Wall News Item by Adrian Pelzner Washington Office 7 and 8 July-August 1972 Volume 4 Numbers Water A New Sanitation Method and Solid Waste for Water and Wastewater by H. A. Smallwood Washington September A 1969 Volume Nontechnical by Herbert Discussion 1 Sampling Office Number 4 of Sewage Smallwood Washington 2 Number January 1970 Volume Treatment and Pollution 1 for Aerating Determining Cost Air and Power Requirements by H. A. Smallwood Washington December 1969 Volume Solid Waste Management News Item June 1971 Volume 1 Office Number -a List 3 Number Control Office 7 of Available Literature 6 22 Sewage Wilderness by J. J. Wilderness in Engineering Byrne 2 1970 Volume April Winter Sports Tramways by Charles F. Dwyer Washington 3 Volume October 1971 Chair Lifts High Capacity Thruster 2 3 Supplemental Procedures Despain November 1970 Volume Wire Rope Safety by Loading and UnLoading Considerations Number 10 Caribou National Considerations Charles F. Forest Number 10 used in Load Testing 2 in Number of Chair Lifts the 11 New American National Dwyer Washington 1970 Volume EDITORS NOTE Due November-December to 2 Office Number 9 technical 1972 Standard Tramways Requirements for Aerial Passenger September the - and Tramways Lifts L. Number 10 Engineer October 1971 Volume by Verne Sheave Liners Brake Problem by Charles G. Bovey Gondola Drive Office Kinney E. October 1970 Volume Ski Lift and Ski Lifts of Friction for Ski Lift Coefficients by Robert Number 4 issue difficulties beyond our control of the Field Notes will not be distributed. 23