SMOV3B PROJECT REVIEW JAN. 25, 2001 SMOV3b PROJECT REVIEW

advertisement
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
HST
MOSES
SMOV3B PROJECT REVIEW
JAN. 25, 2001
SMOV3B PROJECT REVIEW
25 JAN 01
HST
AGENDA
MOSES
INTRO
Walyus
5 min
OVERVIEW
Biagetti
15
STIS
Valenti
15
WFPC2
Casertano
15
ACS
O’Dea/DeMarchi
30
NCS
Pulkkinen
20
NICMOS
Noll
30
ERO
Fruchter/Ford
15
FGS
Nelan
10
PCS
Gakenheimer
10
EPS
Seftas
10
TCS
Cruz
10
CLOSING
Biagetti/Walyus
5
============
190 = 3hr 10
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
OVERVIEW OF SMOV
PLANNING PROCESS
HST
MOSES
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
SMOV = Servicing Mission Observatory Verification
SMOV3B = SMOV following SM3B
SMOV CONCEPT STATEMENT
1998-00
STSCI, SMOV Mgmt Team
STScI SMOV Team, 441 SMOV Planning Team
REQUIREMENTS DEFINITION
BASELINE PLAN
2001
STScI SMOV Team, 441 SMOV Planning Team
SMOV Project Review, 25Jan01
PROPOSAL SUBMISSION
STScI SMOV Team, 441 SMOV Planning Team
PROPOSAL IMPLEMENTATION
OPERATIONS PLANNING
SMOV OPERATIONS
(& SMOV CLOSURE)
STScI Proposal Implementation Team
SMOV Ops Working Group, 441 SMOV Planning Team
SMOV Ops Team, SMOV TTRB
HST
MOSES
DOCUMENTATION
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
• SMOV3B LEVEL III REQUIREMENTS
– SMO-1000, App. J
– Baselined with CCR 4781, 9/19/00
• SMOV PLAN DOCUMENT
– SMR 3021
– Draft available today
– Final version within 2 weeks for CCB submission
HST
MOSES
•
SMOV3B GOALS
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
Timely Recommissioning of the HST Observatory for Science Operations
– Recommission existing SIs for science - WFPC2, STIS, FGS, NICMOS
– Commission the newly installed SIs for science – ACS
•
Recommissioning of Observatory Systems for normal operations
– PCS, EPS (PCU, SAIII)
•
Validation of other Orbital Replacements & Installations
– NCS, NOBL (TCS)
•
Early Release Observations (EROs)
– Demonstration of ACS & NICMOS science capabilities
HST
MOSES
•
SUCCESS-ORIENTED SCHEDULING
–
–
–
•
SCHEDULE ACTIVITIES AS EARLY AS TECHNICALLY POSSIBLE ASSUMING
SUCCESS OF ITS PREREQUISITES
UNLESS HEALTH & SAFETY ISSUE
UNLESS MORE RIGOROUS ENGINEERING APPROACH IS INEXPENSIVE
CONTAMINATION PREVENTION
–
•
SOME SMOV3B POLICIES &
CONSTRAINTS
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
V1 BRIGHT EARTH AVOIDANCE (BEA)
• Complete avoidance for first 12 days of SMOV
• Days 13 – 42, no more than 20% exposure to bright earth
– WFPC2 remains warm until after BEA period
– No WFPC2 pure parallels throughout SMOV
– ACS SBC HIGH VOLTAGE OFF FOR FIRST 30 DAYS
BEA SCIENCE
– SMOV3A - FGS & STIS SCIENCE PERFORMED WHERE POSSIBLE IN BEA
– SMOV3B – FEASIBILITY IS STILL TO BE DETERMINED
HST
MOSES
SMOV3B CONTINGENCY
PLANS
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
• BEA
– STIS observation to enable BEA termination
– Option to continue BEA
• Separate contingency plans for FGS & each SI
– See below for each SI
HST
MOSES
SMOV Synopsis
29 Nov Launch => 6 Dec Release
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
• BEA Phase
–
–
–
–
–
–
BEA for first 12 days following Release
Pointing Control System checked out and normal attitude control resumes
WFPC2 remains in Protect Decon for BEA period
STIS CCD & MAMAs reactivated
• Pre-NCS baseline jitter & image equality tests
FGS recommissioned for pointing control and astrometry
• Pre-NCS baseline jitter test
NCS activated and NICMOS recooled
• Post-BEA Phase
–
–
–
–
–
WFPC2 recooled, calibrated, and recommissioned for science
STIS & FGS perform NCS steady-state jitter & image quality tests
STIS calibrated and recommissioned for science
ACS optically aligned/focused, calibrated, and commissioned for science, EROs
NICMOS optically aligned/focused, calibrated, and commissioned for science, EROs
HST
MOSES
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
SMOV3B BRIGHT EARTH AVOIDANCE (BEA)
PERIOD
18DEC01 (EST)
PCS/FGS
RECOMMISSION
ASTROMETRY
ENABLED
NCS FILL PROCEDURE
6DEC01 (EST)
RELEASE
FGS PRE-NCS
JITTER TEST
NCS ACTIVATION
AND NICMOS
COOLDOWN
(~ 6 DAYS)
E
N
D
O
F
ACS ACTIVATION
(CCDs)
Y
STIS ACTIVATION
PRE-NCS JITTER
& IMAGE QUAL
CHECKS
STIS ENDBEA TEST
N
WFPC2 PROTECT SAFE
& PROTECT DECON
EXTEND BEA
CONTINGENCY
B
E
A
HST
SMOV3B POST-BEA
MOSES
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
WFPC2 EROs (TBD)
~26DEC
E
N
D
O
F
B
E
A
WFPC2 COOLDOWN
& UV MON
WFPC2 SCIENCE
ENABLED
~23DEC
WFPC2 CALIBRATIONS
ACS FOCUS
& ALIGNMENT
STIS CALIBRATIONS
STIS SCIENCE
ENABLED
~20DEC
ACS CALIBRATIONS
ACS EROs ~6FEB
ACS SCIENCE
ENABLED
~6FEB
NICMOS FINE OPT ALIGN
NICMOS CALIBRATIONS
STIS/FGS JITTER & IMAGE QUAL
(NCS STEADY STATE)
NICMOS EROs ~30JAN
NICMOS SCIENCE
ENABLED
~30JAN
NOTE: Calibrations for each SI schedule beyond the
ERO & science enable dates.
HST
MOSES
SCIENCE,EROs, SI
CALIBRATIONS
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
•
These milestones are preliminary estimates, subject to change as detailed
planning proceeds.
•
SCIENCE ENABLINGS (GO, GTO, EROs)
–
–
–
–
–
•
FGS
STIS (MAMAs & CCD)
WFPC2
ACS
NICMOS
~ 11DEC01
~ 20DEC01
~ 23DEC01
~ 06FEB02
~ 06FEB02
SMOV3B CALIBRATIONS COMPLETE
–
–
–
–
–
FGS
STIS
WFPC2
NICMOS
ACS
~ 25DEC01
~ 01JAN02
~ 06JAN02
~ 04FEB02
~ 15FEB02
HST
MOSES
SMOV3B RESOURCE SUMMARY
ACTIVITIES/ EXT. POST-BEA EST. SCI. DATA
SI
PROPOSALS PRIME ORBITS VOL. (GBITS)*
========== ============ ============= ==============
9
32
34
WFPC2
9
20
25
STIS
29
181
190
ACS
24
71
179
NICMOS
5
2
-FGS
1
10
-PCS
============ ============= ==============
77
316
428
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
DURATION
(WEEKS)
NOTES
=========== ================================
4
6 ALSO 6 ORB. P RE-SM3B FOR REF. STARS
11
11 P ARALLEL ORBS ~ 50
2
2 VEH. DIST. TEST P OST NCS TURN-ON
============
11 => GBITS/WEEK =
39
=> ORBITS/WEEK =
* Ref. High Data Volume SMOV requirements and TDRS downlink capability,
Alan Patterson, SPST, Jan. 2001
29
OVERALL ASSESSMENT
HST
MOSES
(my opinion)
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
• Plan is feasible and robust
• All SI teams are SMOV-experienced
• Plan is flexible wrt NCS/NICMOS uncertainties
– Key is cool-down characterization during BEA
• Data volumes, rates, and downlink requirements
– need close attention, prior to scheduling phase
–
Ref. High Data Volume SMOV requirements and TDRS downlink
capability, Alan Patterson, Jan. 2001
• Recommendation for dual-SSR usage at least during SMOV
HST
MOSES
SMOV3B SCIENCE DATA
VOLUME ESTIMATES
SMOV3b PROJECT
REVIEW
25jan01
Carl Biagetti/STScI
SMOV3B DAILY/WEEKLY DATA VOLUME (Gbits)
18.00
16.00
14.00
WFPC2
12.00
STIS
10.00
NICMOS
8.00
ACS
6.00
4.00
2.00
0.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
GBITS (including 30% eng. overhead)
20.00
SMOV DAY/WEEK