SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI HST MOSES SMOV3B PROJECT REVIEW JAN. 25, 2001 SMOV3B PROJECT REVIEW 25 JAN 01 HST AGENDA MOSES INTRO Walyus 5 min OVERVIEW Biagetti 15 STIS Valenti 15 WFPC2 Casertano 15 ACS O’Dea/DeMarchi 30 NCS Pulkkinen 20 NICMOS Noll 30 ERO Fruchter/Ford 15 FGS Nelan 10 PCS Gakenheimer 10 EPS Seftas 10 TCS Cruz 10 CLOSING Biagetti/Walyus 5 ============ 190 = 3hr 10 SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI OVERVIEW OF SMOV PLANNING PROCESS HST MOSES SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI SMOV = Servicing Mission Observatory Verification SMOV3B = SMOV following SM3B SMOV CONCEPT STATEMENT 1998-00 STSCI, SMOV Mgmt Team STScI SMOV Team, 441 SMOV Planning Team REQUIREMENTS DEFINITION BASELINE PLAN 2001 STScI SMOV Team, 441 SMOV Planning Team SMOV Project Review, 25Jan01 PROPOSAL SUBMISSION STScI SMOV Team, 441 SMOV Planning Team PROPOSAL IMPLEMENTATION OPERATIONS PLANNING SMOV OPERATIONS (& SMOV CLOSURE) STScI Proposal Implementation Team SMOV Ops Working Group, 441 SMOV Planning Team SMOV Ops Team, SMOV TTRB HST MOSES DOCUMENTATION SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI • SMOV3B LEVEL III REQUIREMENTS – SMO-1000, App. J – Baselined with CCR 4781, 9/19/00 • SMOV PLAN DOCUMENT – SMR 3021 – Draft available today – Final version within 2 weeks for CCB submission HST MOSES • SMOV3B GOALS SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI Timely Recommissioning of the HST Observatory for Science Operations – Recommission existing SIs for science - WFPC2, STIS, FGS, NICMOS – Commission the newly installed SIs for science – ACS • Recommissioning of Observatory Systems for normal operations – PCS, EPS (PCU, SAIII) • Validation of other Orbital Replacements & Installations – NCS, NOBL (TCS) • Early Release Observations (EROs) – Demonstration of ACS & NICMOS science capabilities HST MOSES • SUCCESS-ORIENTED SCHEDULING – – – • SCHEDULE ACTIVITIES AS EARLY AS TECHNICALLY POSSIBLE ASSUMING SUCCESS OF ITS PREREQUISITES UNLESS HEALTH & SAFETY ISSUE UNLESS MORE RIGOROUS ENGINEERING APPROACH IS INEXPENSIVE CONTAMINATION PREVENTION – • SOME SMOV3B POLICIES & CONSTRAINTS SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI V1 BRIGHT EARTH AVOIDANCE (BEA) • Complete avoidance for first 12 days of SMOV • Days 13 – 42, no more than 20% exposure to bright earth – WFPC2 remains warm until after BEA period – No WFPC2 pure parallels throughout SMOV – ACS SBC HIGH VOLTAGE OFF FOR FIRST 30 DAYS BEA SCIENCE – SMOV3A - FGS & STIS SCIENCE PERFORMED WHERE POSSIBLE IN BEA – SMOV3B – FEASIBILITY IS STILL TO BE DETERMINED HST MOSES SMOV3B CONTINGENCY PLANS SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI • BEA – STIS observation to enable BEA termination – Option to continue BEA • Separate contingency plans for FGS & each SI – See below for each SI HST MOSES SMOV Synopsis 29 Nov Launch => 6 Dec Release SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI • BEA Phase – – – – – – BEA for first 12 days following Release Pointing Control System checked out and normal attitude control resumes WFPC2 remains in Protect Decon for BEA period STIS CCD & MAMAs reactivated • Pre-NCS baseline jitter & image equality tests FGS recommissioned for pointing control and astrometry • Pre-NCS baseline jitter test NCS activated and NICMOS recooled • Post-BEA Phase – – – – – WFPC2 recooled, calibrated, and recommissioned for science STIS & FGS perform NCS steady-state jitter & image quality tests STIS calibrated and recommissioned for science ACS optically aligned/focused, calibrated, and commissioned for science, EROs NICMOS optically aligned/focused, calibrated, and commissioned for science, EROs HST MOSES SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI SMOV3B BRIGHT EARTH AVOIDANCE (BEA) PERIOD 18DEC01 (EST) PCS/FGS RECOMMISSION ASTROMETRY ENABLED NCS FILL PROCEDURE 6DEC01 (EST) RELEASE FGS PRE-NCS JITTER TEST NCS ACTIVATION AND NICMOS COOLDOWN (~ 6 DAYS) E N D O F ACS ACTIVATION (CCDs) Y STIS ACTIVATION PRE-NCS JITTER & IMAGE QUAL CHECKS STIS ENDBEA TEST N WFPC2 PROTECT SAFE & PROTECT DECON EXTEND BEA CONTINGENCY B E A HST SMOV3B POST-BEA MOSES SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI WFPC2 EROs (TBD) ~26DEC E N D O F B E A WFPC2 COOLDOWN & UV MON WFPC2 SCIENCE ENABLED ~23DEC WFPC2 CALIBRATIONS ACS FOCUS & ALIGNMENT STIS CALIBRATIONS STIS SCIENCE ENABLED ~20DEC ACS CALIBRATIONS ACS EROs ~6FEB ACS SCIENCE ENABLED ~6FEB NICMOS FINE OPT ALIGN NICMOS CALIBRATIONS STIS/FGS JITTER & IMAGE QUAL (NCS STEADY STATE) NICMOS EROs ~30JAN NICMOS SCIENCE ENABLED ~30JAN NOTE: Calibrations for each SI schedule beyond the ERO & science enable dates. HST MOSES SCIENCE,EROs, SI CALIBRATIONS SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI • These milestones are preliminary estimates, subject to change as detailed planning proceeds. • SCIENCE ENABLINGS (GO, GTO, EROs) – – – – – • FGS STIS (MAMAs & CCD) WFPC2 ACS NICMOS ~ 11DEC01 ~ 20DEC01 ~ 23DEC01 ~ 06FEB02 ~ 06FEB02 SMOV3B CALIBRATIONS COMPLETE – – – – – FGS STIS WFPC2 NICMOS ACS ~ 25DEC01 ~ 01JAN02 ~ 06JAN02 ~ 04FEB02 ~ 15FEB02 HST MOSES SMOV3B RESOURCE SUMMARY ACTIVITIES/ EXT. POST-BEA EST. SCI. DATA SI PROPOSALS PRIME ORBITS VOL. (GBITS)* ========== ============ ============= ============== 9 32 34 WFPC2 9 20 25 STIS 29 181 190 ACS 24 71 179 NICMOS 5 2 -FGS 1 10 -PCS ============ ============= ============== 77 316 428 SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI DURATION (WEEKS) NOTES =========== ================================ 4 6 ALSO 6 ORB. P RE-SM3B FOR REF. STARS 11 11 P ARALLEL ORBS ~ 50 2 2 VEH. DIST. TEST P OST NCS TURN-ON ============ 11 => GBITS/WEEK = 39 => ORBITS/WEEK = * Ref. High Data Volume SMOV requirements and TDRS downlink capability, Alan Patterson, SPST, Jan. 2001 29 OVERALL ASSESSMENT HST MOSES (my opinion) SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI • Plan is feasible and robust • All SI teams are SMOV-experienced • Plan is flexible wrt NCS/NICMOS uncertainties – Key is cool-down characterization during BEA • Data volumes, rates, and downlink requirements – need close attention, prior to scheduling phase – Ref. High Data Volume SMOV requirements and TDRS downlink capability, Alan Patterson, Jan. 2001 • Recommendation for dual-SSR usage at least during SMOV HST MOSES SMOV3B SCIENCE DATA VOLUME ESTIMATES SMOV3b PROJECT REVIEW 25jan01 Carl Biagetti/STScI SMOV3B DAILY/WEEKLY DATA VOLUME (Gbits) 18.00 16.00 14.00 WFPC2 12.00 STIS 10.00 NICMOS 8.00 ACS 6.00 4.00 2.00 0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 GBITS (including 30% eng. overhead) 20.00 SMOV DAY/WEEK