SMOV Summary I Title Type ACS to HOLD Load and Dump Onboard Memory special Science Data Buffer Check special CCD Functional stored CCD Temperature Set Point Determination special SBC Anomalous recover test special SBC Fold Analysis for Anomalous Recov. special SMOV Contamination Plan stored ACS to FGS alignment stored HRC Coronograph acquisition stored ACS corrector alignment, coarse stored ACS corrector alignment, fine stored ACS Image quality and PSF measurement stored HRC Coronograph repeatibility stored ACS Pointing stability stored Phase 1 2 6 6 6 6 6 6 6 6 6 PI 3 IDT STScI STScI 6 6 STScI IDT IDT IDT IDT 6 6 6 6 IDT IDT IDT 6 IDT 6 6 IDT 6 IDT IDT Phase 1 is basic verification, Phase 2 is required for GO/GTO Science, Phase 3 is required to complete the SMOV requirements. SMOV Summary II Title Type WFC FF/FF Stability stored HRC FF/FF Stability stored ACS Sensitivity stored SBC Detector Mini-Functional stored SBC Dark Current Measurement stored SBC PSF measurement stored SBC Flat Field Uniformity stored Scattered light in coronographic obs. stored ACS Ramp Filter Test stored SBC Geometric distorsion stored CCD Geometric distorsion stored ACS Grism/Prism Performance check stored ACS Polarization Capability Check stored ACS CCD Hot Pixel Annealing stored CCD Preflash test stored Phase 1 2 6 6 6 6 PI 3 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 STScI STScI STScI IDT IDT IDT STScI IDT IDT IDT IDT IDT IDT STScI STScI Phase 1 is basic verification, Phase 2 is required for science, Phase 3 is required to complete the SMOV requirements. CCD Functional Proposal ACS05 Description Purpose Measure (1) baseline performance and commandability of CCD subsystems,(2) CTE,(3) performance of compression algorithm, and(4) Routine monitoring SMOV requirement Verify functionality of Tungsten calibration lamps [J.10.4.3.1.7]. Demonstrate functionality of all 3 detectors [J.10.4.3.1.8]. Measure dark rate, read noise and CTE [J.10.4.3.4.2]. Details Orbits/Duration 14.05 (+ 22.5 for CTE) hrs (all internal) noncontiguous Data Volume 2068 MB (+ 3954 MB for CTE which can be delayed) Peak Rate 1.1 Gb/orbit Principal Investigator M. Sirianni & M. Clampin Dependencies ACS06, Set point determination Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 SBC Anomalous Recovery Test Proposal ACS08 Description Purpose This procedure will be used for the initial turn-on of the ACS MAMA detector and for recovery after an anomalous shutdown, as might result from a bright object violation or hardware problem. SMOV requirement Demonstrate functionality of all 3 detectors [J.10.4.3.1.8]. Details Orbits/Duration 3 stages with a total of 162 min spread over 2 days Data Volume 4 MB Peak Rate 0.1 Gb/orbit Principal Investigator C. Cox Dependencies 30 day after release. Implementation R/T commanding and monitoring of count rates. Chris O’Dea – SMOV 3B readiness review – 1/25/2001 SBC Fold Analysis for Anomalous Recovery Proposal ACS09 Description Purpose This is the follow-on to 9008 which establishes the voltage settings and tests the MAMA electronics in more detail. The fold analysis measures the distribution of charge cloud sizes providing an estimate of MCP gain. SMOV requirement Demonstrate functionality of all 3 detectors [J.10.4.3.1.8]. Details Orbits/Duration 64 min Data Volume 2 MB Peak Rate 0.1 Gb/orbit Principal Investigator C. Cox Dependencies ACS08, SBC Anomalous Recovery Implementation Special commanding. Chris O’Dea – SMOV 3B readiness review – 1/25/2001 SMOV Contamination Monitoring Proposal ACS10 Description Purpose Monitor UV sensitivity with HRC and SBC using observations of standard stars. SMOV requirement Manage operations to minimize risk of contamination. Monitor contamination [J.10.4.3.1.10]. Delay MAMA high voltage operation 30 days [J.10.4.3.1.11]. Details Orbits/Duration 3 orbits per week (1st 3 mo) = 36, then 3 per mo. Data Volume 455 MB Peak Rate 0.2 Gb/orbit Principal Investigator H. Tran Dependencies ACS14 Fine Corrector Alignment SBC: 30 day after release. Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 ACS to FGS Alignment Proposal ACS11 Description Purpose Map the ACS detector coordinate frame to the FGS frame using WFC and HRC observations of an astrometric field (NGC188) SMOV requirement Determine location of a reference HRC aperture with respect to the FGS reference frames [J.10.4.3.2.1]. Details Orbits/Duration 2 Orbits. Data Volume 214 MB Peak Rate 0.9 Gb/orbit Principal Investigator G. Hartig Dependencies ACS14 Fine Corrector Alignment Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 HRC Coronagraph Acquisition Proposal ACS12 Description Purpose Determine relative positions of field masks and Fastie finger and verify ability of FSW to perform pt source acq onto same. SMOV requirement Confirm relative positions of coronagraphic field masks and Fastie finger [J.10.4.3.2.2]. Demonstrate ability of FSW to perform point source acquisition onto coronagraphic spots [J.10.4.3.2.3]. Details Orbits/Duration 3 Orbits. Data Volume 40 MB Peak Rate 0.1 Gb/orbit Principal Investigator D. Golimowski Dependencies ACS11 ACS to FGS Alignment Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 ACS Coarse Corrector Alignment Proposal ACS13 Description Purpose Optimise ACS image quality over WFC and HRC fields by adjusting IM1 and M1 mechanisms in both tip/tilt and focus. SMOV requirement Encircled energy and image diameter shall be measured over a grid of focus and tilt positions for both IM1 and M1 correctors in order to set nominal corrector positions [J.10.4.3.3.1]. Details Orbits/Duration 6 Orbits. (3 sets of 2 orbits 24-48 hrs apart) Data Volume 642 MB Peak Rate 0.9 Gb/orbit Principal Investigator G. Hartig Dependencies ACS06 CCD Temperature Set Point Determination. Implementation Proposal with pre-planned uplink of new corrector mechanism positions. Chris O’Dea – SMOV 3B readiness review – 1/25/2001 ACS Fine Corrector Alignment Proposal ACS14 Description Purpose Optimise ACS image quality over WFC and HRC fields by performing a fine focus scan, setting optimal focus, and then performing a tip and tilt scan. SMOV requirement Encircled energy and image diameter shall be measured over a grid of focus and tilt positions for both IM1 and M1 correctors in order to set nominal corrector positions [J.10.4.3.3.1]. Details Orbits/Duration 14 Orbits. (2 sets of 7 orbits 24-48 hrs apart) Data Volume 2532 MB Peak Rate 0.9 Gb/orbit Principal Investigator G. Hartig Dependencies ACS13 ACS Coarse Corrector Alignment Implementation Proposal with R/T uplink before/after visit 2. Chris O’Dea – SMOV 3B readiness review – 1/25/2001 ACS Image Quality and PSF Meas. Proposal ACS15 Description Purpose Obtain a series of images to evaluate point source image quality over the FOV of HRC and WFC in normal imaging mode. SMOV requirement Measure image quality over the full FOV via broad and narrow band imaging of stars [J.10.4.3.3.2]. Measure the ACS PSF [J.10.4.3.3.5]. Details Orbits/Duration 4 Orbits. Data Volume 310 MB Peak Rate 1.1 Gb/orbit Principal Investigator G. Hartig Dependencies ACS11, ACS to FGS Alignment Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 HRC Coronagraph Repeatability Proposal ACS16 Description Purpose Monitor the stability of the HRC Coronagraph by repeatedly deploying the cal/coronagraph door mechanism and subsequently recording a quasiflat field image. SMOV requirement Monitor the internal flat field stability of ACS from the coronagraphic field stop to the HRC detector [J.10.4.3.3.3]. Details Orbits/Duration 4 Orbits. Data Volume 32 MB Peak Rate 0.1 Gb/orbit Principal Investigator D. Golimowski Dependencies ACS11 ACS to FGS Alignment Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 ACS Pointing Stability Proposal ACS17 Description Purpose Monitor the location and focus stability of external star images on the HRC and WFC during both thermally quiescent and worst-case thermal slew conditions. SMOV requirement Monitor the pointing and throughput stability of the OTA-ACS combination over several orbits [J.10.4.3.3.4]. Details Orbits/Duration 16 consecutive Orbits. Data Volume 42 MB (subarrays used to reduce total volume) Peak Rate 0.3 Gb/orbit Principal Investigator G. Hartig Dependencies ACS11 ACS to FGS Alignment Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 SBC Filter Wheel Checkout Proposal ACS21 Purpose SMOV requirement Description Operation of the SBC Filter Wheel will be tested. The filter wheel will be commanded to all 12 positions moving in one direction and then the other. Verify the performance of various mechanisms including the SBC filter wheel [J.10.4.3.1.6]. Details Orbits/Duration 10 minutes. Data Volume none Peak Rate none Principal Investigator C. Cox & R. Kimble Dependencies None Implementation Stored Commanding Chris O’Dea – SMOV 3B readiness review – 1/25/2001 SBC Dark Rate Measurement Proposal ACS22 Description Purpose Determine the SBC dark current by taking a series of ten 1800 sec darks, once per hour. SMOV requirement Measure the dark rate of the SBC MAMA detector [J.10.4.3.4.2]. Details Orbits/Duration 7 contiguous non-SAA orbits (10 hr). Data Volume 20 MB Peak Rate 0.1 Gb/orbit Principal Investigator R. Kimble Dependencies ACS08, SBC Anomalous Recovery Test Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 SBC Image Quality and PSF Measurement Proposal ACS23 Description Purpose Obtain a series of images to evaluate the point source image quality over the FOV of the SBC. Also observe with the HRC to determine relative aperture location. SMOV requirement Measure the camera mode image quality at the detectors over the FOV [J.10.4.3.3.2]. Measure the PSF in normal imaging mode [J.10.4.3.3.5] Relative aperture location [J.10.4.3.4.1] Details Orbits/Duration 3 Orbits. Data Volume 24 MB Peak Rate 0.1 Gb/orbit Principal Investigator G. Hartig Dependencies ACS11, ACS to FGS Alignment; ACS21, SBC Filter Wheel Checkout; (30 day delay) Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 Scattered Light in Coronagraph Observations Proposal ACS25 Description Purpose Determine the scattered light suppression of the HRC coronagraph as a function of position behind each coronagraphic mask. SMOV requirement Measure the ACS PSF in normal imaging and coronagraphic modes [J.10.4.3.3.5]. Details Orbits/Duration 5 Orbits. Data Volume 128 MB Peak Rate 0.2 Gb/orbit Principal Investigator G. Hartig Dependencies ACS12, HRC Coronagraph Acquisition Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 ACS Ramp Filter Test Proposal ACS26 Description Purpose Verify that the desired wavelength has been placed over the aperture and measure throughput at a few selected wavelengths. SMOV requirement Instrument sensitivity vs. wavelength shall be measured for a subset of modes [J.10.4.3.4.3]. Details Orbits/Duration 5 Orbits. Data Volume 422 MB Peak Rate 1.1 Gb/orbit Principal Investigator Z. Tsvetanov Dependencies ACS11, ACS to FGS Alignment Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 SBC and CCD Geometric Distortion Proposal ACS27,28 Description Purpose The geometric distortion of all ACS detectors will be determined using multiple pointing observations of globular clusters. SMOV requirement The plate scale, orientation, and geometric distortion shall be measured in each of the ACS channels by imaging an astrometric field [J.10.4.3.4.1] Details Orbits/Duration 8 Orbits. Additional L-Flat data will be used. Data Volume 422 MB Peak Rate 1.1 Gb/orbit Principal Investigator G. Meurer Dependencies ACS11, ACS to FGS Fine Alignment Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001 ACS Grism/Prism Performance Check Proposal ACS29 Description Purpose Measure the (1) dispersion (2) throughput as a function of wavelength, and (3) low-frequency flat field. Determine long wavelength fringe pattern in stellar spectra at several detector positions. SMOV requirement Measure instrument sensitivity vs wavelength for a subset of ACS modes [J.10.4.3.4.3]. Details Orbits/Duration 7 Orbits. Data Volume 752 MB Peak Rate 1.0 Gb/orbit Principal Investigator Z. Tsvetanov & W. Freudling Dependencies ACS11, ACS to FGS Alignment Implementation Proposal Chris O’Dea – SMOV 3B readiness review – 1/25/2001