R2R

advertisement
PROGRAMME
R2R
WP1: Traction
PROGRAMME: Roll2Rail
(the SHIFT2RAIL global targets).
PROBLEM STATEMENT: The Roll2Rail (R2R)
programme is a European rail innovation
funding vehicle that is a lighthouse programme
for Shift2Rail, this is WP1: Traction.
The aim is for the innovations to be developed
in this WP to be taken up by the Traction
activities within IP1 of SHIFT2RAIL.
SOLUTION: Three objectives are addressed by
this work package: contribute to increase of
capacity, system reliability and competitiveness
+
Project Details
BENEFITS:
CONTACT INFORMATION:
Amanda Webster
R&D and Technology Team
Network Rail
Milton Keynes
ADVANTAGES:
The Roll2Rail Work Packages (WP) have been
influenced to initiate EU rolling stock technologies
and are funded 100% by EU grant.
1
Solutions Catalogue (projects)
November 6, 2015
DRAFT for consideration
Risk reduction for Shift2Rail
Programme
PROJECTED IMPLEMENTATION
To TRL 4 by end of 2018
BENEFICIARIES:
Railway, Europe, GB Plc.
KEYCHALLENGES:
Gaining funding for UK ideas
SC10-R2R-01
PROGRAMME
R2R
WP2
Train Control
Management
System
+
PROGRAMME: Roll2Rail
PROBLEM STATEMENT: The Roll2Rail (R2R)
programme is a European rail innovation
funding vehicle that is a lighthouse programme
for Shift2Rail, this is WP2: Train Control
Management System.
based on wireless transmission for train control
and monitoring (TCMS) functions, infotainment
and CCTV, thus reducing or even completely
eliminating on board communication cables
and simplifying the train coupling procedure.
SOLUTION: The aim is to research on
technologies and architectures to allow new
generation of train communication systems
Project Details
BENEFITS:
CONTACT INFORMATION:
Amanda Webster
R&D and Technology Team
Network Rail
Milton Keynes
ADVANTAGES:
The Roll2Rail Work Packages (WP) have been
influenced to initiate EU rolling stock technologies
and are funded 100% by EU grant.
2
Solutions Catalogue (projects)
November 6, 2015
DRAFT for consideration
Risk reduction for Shift2Rail
Programme
PROJECTED IMPLEMENTATION
To TRL 4 by end of 2018
BENEFICIARIES:
Railway, Europe, GB Plc.
KEYCHALLENGES:
Gaining funding for UK ideas
SC10-R2R-02
PROGRAMME
PROGRAMME: Roll2Rail
R2R
WP3
Car Body Shell
+
PROBLEM STATEMENT: The Roll2Rail (R2R)
programme is a European rail innovation
funding vehicle that is a lighthouse programme
for Shift2Rail, this is WP3: Car Body Shell.
met by the new composite or multi-material
car body shell, as well as the definition of the
composite material technological solutions for
each car body shell subpart.
SOLUTION: The aim of the Work Package is the
creation of a technical framework and
recommendations to describe in detail all
characteristics and minimum conditions to be
Project Details
BENEFITS:
CONTACT INFORMATION:
Amanda Webster
R&D and Technology Team
Network Rail
Milton Keynes
ADVANTAGES:
The Roll2Rail Work Packages (WP) have been
influenced to initiate EU rolling stock technologies
and are funded 100% by EU grant.
3
Solutions Catalogue (projects)
November 6, 2015
DRAFT for consideration
Risk reduction for Shift2Rail
Programme
PROJECTED IMPLEMENTATION
To TRL 4 by end of 2018
BENEFICIARIES:
Railway, Europe, GB Plc.
KEYCHALLENGES:
Gaining funding for UK ideas
SC10-R2R-03
PROGRAMME
PROGRAMME: Roll2Rail
R2R
WP4
Running Gear
+
PROBLEM STATEMENT: The Roll2Rail (R2R)
programme is a European rail innovation
funding vehicle that is a lighthouse programme
for Shift2Rail, this is WP4: Running Gear.
way towards the implementation of innovative
technologies in the area of running gear.
SOLUTION: Running Gear aims at pathing the
Project Details
BENEFITS:
CONTACT INFORMATION:
Amanda Webster
R&D and Technology Team
Network Rail
Milton Keynes
ADVANTAGES:
The Roll2Rail Work Packages (WP) have been
influenced to initiate EU rolling stock technologies
and are funded 100% by EU grant.
4
Solutions Catalogue (projects)
November 6, 2015
DRAFT for consideration
Risk reduction for Shift2Rail
Programme
PROJECTED IMPLEMENTATION
To TRL 4 by end of 2018
BENEFICIARIES:
Railway, Europe, GB Plc.
KEYCHALLENGES:
Gaining funding for UK ideas
SC10-R2R-04
PROGRAMME
PROGRAMME: Roll2Rail
R2R
PROBLEM STATEMENT: The Roll2Rail (R2R)
programme is a European rail innovation
funding vehicle that is a lighthouse programme
for Shift2Rail, this is WP5: Brakes.
WP5: Brakes
SOLUTION: The homologation process for the
brake system raises the effort for the brake
system hardware, the testing of the brake
system and the documentation for the national
requirements.
+
Also the risk (time, cost) for the homologation
process in general is increased. Especially for
homologation in more than one country the
documentation and the verification is done
separately for each country.
Finally the effort for homologation and the risks
involved may be a constraint for innovation.
This project is about harmonisation across
Europe.
Project Details
BENEFITS:
CONTACT INFORMATION:
Amanda Webster
R&D and Technology Team
Network Rail
Milton Keynes
ADVANTAGES:
The Roll2Rail Work Packages (WP) have been
influenced to initiate EU rolling stock technologies
and are funded 100% by EU grant.
5
Solutions Catalogue (projects)
November 6, 2015
DRAFT for consideration
Risk reduction for Shift2Rail
Programme
PROJECTED IMPLEMENTATION
To TRL 4 by end of 2018
BENEFICIARIES:
Railway, Europe, GB Plc.
KEYCHALLENGES:
Gaining funding for UK ideas
SC10-R2R-05
PROGRAMME
R2R
WP6
Comfortable
and Attractive
Train Interiors
PROGRAMME: Roll2Rail
PROBLEM STATEMENT: The Roll2Rail (R2R)
programme is a European rail innovation
funding vehicle that is a lighthouse programme
for Shift2Rail, specifically WP6: Comfortable
and Attractive Train Interiors.
SOLUTION: To understand what defines
“attractiveness and comfort” for passengers,
using available research.
To define what does the rail industry need to
+
do to keep rail as the mode of transport of first
choice for passengers.
To understand the possible future needs of
passengers and propose technology and
service developments to anticipate these.
To define the boundary conditions that apply
to rail interior design.
To provide guidelines or best practice in
ensuring the “voice of the passenger” is
captured in future train specifications.
Project Details
BENEFITS:
CONTACT INFORMATION:
Amanda Webster
R&D and Technology Team
Network Rail
Milton Keynes
ADVANTAGES:
The Roll2Rail Work Packages (WP) have been
influenced to initiate EU rolling stock technologies
and are funded 100% by EU grant.
6
Solutions Catalogue (projects)
November 6, 2015
DRAFT for consideration
Risk reduction for Shift2Rail
Programme
PROJECTED IMPLEMENTATION
To TRL 4 by end of 2018
BENEFICIARIES:
Railway, Europe, GB Plc.
KEYCHALLENGES:
Gaining funding for UK ideas
SC10-R2R-06