PROGRAMME R2R WP1: Traction PROGRAMME: Roll2Rail (the SHIFT2RAIL global targets). PROBLEM STATEMENT: The Roll2Rail (R2R) programme is a European rail innovation funding vehicle that is a lighthouse programme for Shift2Rail, this is WP1: Traction. The aim is for the innovations to be developed in this WP to be taken up by the Traction activities within IP1 of SHIFT2RAIL. SOLUTION: Three objectives are addressed by this work package: contribute to increase of capacity, system reliability and competitiveness + Project Details BENEFITS: CONTACT INFORMATION: Amanda Webster R&D and Technology Team Network Rail Milton Keynes ADVANTAGES: The Roll2Rail Work Packages (WP) have been influenced to initiate EU rolling stock technologies and are funded 100% by EU grant. 1 Solutions Catalogue (projects) November 6, 2015 DRAFT for consideration Risk reduction for Shift2Rail Programme PROJECTED IMPLEMENTATION To TRL 4 by end of 2018 BENEFICIARIES: Railway, Europe, GB Plc. KEYCHALLENGES: Gaining funding for UK ideas SC10-R2R-01 PROGRAMME R2R WP2 Train Control Management System + PROGRAMME: Roll2Rail PROBLEM STATEMENT: The Roll2Rail (R2R) programme is a European rail innovation funding vehicle that is a lighthouse programme for Shift2Rail, this is WP2: Train Control Management System. based on wireless transmission for train control and monitoring (TCMS) functions, infotainment and CCTV, thus reducing or even completely eliminating on board communication cables and simplifying the train coupling procedure. SOLUTION: The aim is to research on technologies and architectures to allow new generation of train communication systems Project Details BENEFITS: CONTACT INFORMATION: Amanda Webster R&D and Technology Team Network Rail Milton Keynes ADVANTAGES: The Roll2Rail Work Packages (WP) have been influenced to initiate EU rolling stock technologies and are funded 100% by EU grant. 2 Solutions Catalogue (projects) November 6, 2015 DRAFT for consideration Risk reduction for Shift2Rail Programme PROJECTED IMPLEMENTATION To TRL 4 by end of 2018 BENEFICIARIES: Railway, Europe, GB Plc. KEYCHALLENGES: Gaining funding for UK ideas SC10-R2R-02 PROGRAMME PROGRAMME: Roll2Rail R2R WP3 Car Body Shell + PROBLEM STATEMENT: The Roll2Rail (R2R) programme is a European rail innovation funding vehicle that is a lighthouse programme for Shift2Rail, this is WP3: Car Body Shell. met by the new composite or multi-material car body shell, as well as the definition of the composite material technological solutions for each car body shell subpart. SOLUTION: The aim of the Work Package is the creation of a technical framework and recommendations to describe in detail all characteristics and minimum conditions to be Project Details BENEFITS: CONTACT INFORMATION: Amanda Webster R&D and Technology Team Network Rail Milton Keynes ADVANTAGES: The Roll2Rail Work Packages (WP) have been influenced to initiate EU rolling stock technologies and are funded 100% by EU grant. 3 Solutions Catalogue (projects) November 6, 2015 DRAFT for consideration Risk reduction for Shift2Rail Programme PROJECTED IMPLEMENTATION To TRL 4 by end of 2018 BENEFICIARIES: Railway, Europe, GB Plc. KEYCHALLENGES: Gaining funding for UK ideas SC10-R2R-03 PROGRAMME PROGRAMME: Roll2Rail R2R WP4 Running Gear + PROBLEM STATEMENT: The Roll2Rail (R2R) programme is a European rail innovation funding vehicle that is a lighthouse programme for Shift2Rail, this is WP4: Running Gear. way towards the implementation of innovative technologies in the area of running gear. SOLUTION: Running Gear aims at pathing the Project Details BENEFITS: CONTACT INFORMATION: Amanda Webster R&D and Technology Team Network Rail Milton Keynes ADVANTAGES: The Roll2Rail Work Packages (WP) have been influenced to initiate EU rolling stock technologies and are funded 100% by EU grant. 4 Solutions Catalogue (projects) November 6, 2015 DRAFT for consideration Risk reduction for Shift2Rail Programme PROJECTED IMPLEMENTATION To TRL 4 by end of 2018 BENEFICIARIES: Railway, Europe, GB Plc. KEYCHALLENGES: Gaining funding for UK ideas SC10-R2R-04 PROGRAMME PROGRAMME: Roll2Rail R2R PROBLEM STATEMENT: The Roll2Rail (R2R) programme is a European rail innovation funding vehicle that is a lighthouse programme for Shift2Rail, this is WP5: Brakes. WP5: Brakes SOLUTION: The homologation process for the brake system raises the effort for the brake system hardware, the testing of the brake system and the documentation for the national requirements. + Also the risk (time, cost) for the homologation process in general is increased. Especially for homologation in more than one country the documentation and the verification is done separately for each country. Finally the effort for homologation and the risks involved may be a constraint for innovation. This project is about harmonisation across Europe. Project Details BENEFITS: CONTACT INFORMATION: Amanda Webster R&D and Technology Team Network Rail Milton Keynes ADVANTAGES: The Roll2Rail Work Packages (WP) have been influenced to initiate EU rolling stock technologies and are funded 100% by EU grant. 5 Solutions Catalogue (projects) November 6, 2015 DRAFT for consideration Risk reduction for Shift2Rail Programme PROJECTED IMPLEMENTATION To TRL 4 by end of 2018 BENEFICIARIES: Railway, Europe, GB Plc. KEYCHALLENGES: Gaining funding for UK ideas SC10-R2R-05 PROGRAMME R2R WP6 Comfortable and Attractive Train Interiors PROGRAMME: Roll2Rail PROBLEM STATEMENT: The Roll2Rail (R2R) programme is a European rail innovation funding vehicle that is a lighthouse programme for Shift2Rail, specifically WP6: Comfortable and Attractive Train Interiors. SOLUTION: To understand what defines “attractiveness and comfort” for passengers, using available research. To define what does the rail industry need to + do to keep rail as the mode of transport of first choice for passengers. To understand the possible future needs of passengers and propose technology and service developments to anticipate these. To define the boundary conditions that apply to rail interior design. To provide guidelines or best practice in ensuring the “voice of the passenger” is captured in future train specifications. Project Details BENEFITS: CONTACT INFORMATION: Amanda Webster R&D and Technology Team Network Rail Milton Keynes ADVANTAGES: The Roll2Rail Work Packages (WP) have been influenced to initiate EU rolling stock technologies and are funded 100% by EU grant. 6 Solutions Catalogue (projects) November 6, 2015 DRAFT for consideration Risk reduction for Shift2Rail Programme PROJECTED IMPLEMENTATION To TRL 4 by end of 2018 BENEFICIARIES: Railway, Europe, GB Plc. KEYCHALLENGES: Gaining funding for UK ideas SC10-R2R-06