Schedule of Proposed Action (SOPA) 10/01/2015 to 12/31/2015 White Mountain National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest) AMC Backcountry Facility Permit Renewal - Special use management In Progress: Scoping Start 07/01/2014 Expected:10/2015 Project Contact 10/2015 CE Marianne Leberman 603-536-6236 mleberman@fs.fed.us Description: Re-issue permits for the existing backcountry facilities (shelters and tentsites) currently operated by the Appalachian Mountain Club. No additional use or increases in capacity are proposed as part of this project. Location: Forest-wide Driveway Permit Reissuance UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Coos, Grafton. LEGAL - Not Applicable. Backcountry facilities operated by AMC. - Special use management Completed Actual: 08/12/2015 08/2015 CE Dylan Alden 603-447-5448 dalden@fs.fed.us Description: Reissuance of approx. ten existing permits for driveways across National Forest system land to access private property because permits recently expired or will expire soon. Permits to be reissued for 20 years; approved activities will not change. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46068 Location: Loon Pond Dam Reconstruction UNIT - White Mountain National Forest All Units. STATE - Maine, New Hampshire. COUNTY - Oxford, Carroll, Coos, Grafton. LEGAL - Not Applicable. Locations across the Forest. - Watershed management - Special use management In Progress: Scoping Start 07/31/2015 CE Expected:04/2016 05/2016 Jon Morrissey 970-642-4439 jmorrissey@fs.fed.us Description: The proposal is to issue a 20-year special use permit to provide the Town of Lincoln access to the Loon Pond Dam. The town owns the dam and needs access to reconstruct it in response to NHDES letter of deficiency and to maintain it into the future. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43389 Location: 10/01/2015 04:26 am MT UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. The dam is on Loon Pond west of Loon Mountain Ski Area in the town of Lincoln, NH. Page 1 of 10 White Mountain National Forest Project Name Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest) Northern Pass Transmission Line Special Use Permit - Special use management EIS *UPDATED* In Progress: DEIS NOA in Federal Register 07/31/2015 Est. FEIS NOA in Federal Register 02/2016 Expected:06/2016 Project Contact 07/2016 Tiffany Benna 603-536-6241 tbenna@fs.fed.us Description: Proposed power transmission line that would cross the WMNF in an existing corridor in Stark, Easton, Lincoln, Woodstock. US Dep't of Energy is leading the NEPA analysis. WMNF decision is whether to issue a special use permit to cross the Forest. Web Link: http://www.northernpasseis.us/ Location: White Mountain National Forest Albany South Project EA *UPDATED* Patricia Nasta - Recreation management In Progress: Expected:08/2016 09/2016 207-824-2813 - Wildlife, Fish, Rare plants Scoping Start 07/15/2013 pnasta@fs.fed.us - Forest products Est. Comment Period Public - Watershed management Notice 10/2015 - Road management Description: An integrated resource management project that proposes vegetation management to improve wildlife habitat and forest health conditions, as well as recreation, watershed and transportation system improvements. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39614 UNIT - Androscoggin Ranger District. STATE - Maine. COUNTY - Oxford. LEGAL - Not Applicable. Town of Stoneham, Oxford County, ME. - Recreation management Completed CE *UPDATED* Actual: 09/23/2015 10/2015 Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us Description: Construct a loop hiking trail of ~1 mile from the Androscoggin Ranger Station, on the Fifth Hole Trail to beaver ponds, then parallel to the river back to the office. For employees and visitors, and for conservation education programs. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41627 Location: 10/01/2015 04:26 am MT R9 - Eastern Region Androscoggin Ranger District (excluding Projects occurring in more than one District) Location: Androscoggin Ranger District Education and Wellness Trail UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. For more information, see the project website at: www.northernpasseis.us. UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Androscoggin Ranger Station, Gorham, NH. Page 2 of 10 White Mountain National Forest Project Name White Mountain National Forest Barry Conservation Camp Improvements Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Androscoggin Ranger District (excluding Projects occurring in more than one District) - Special use management - Facility management Completed Actual: 08/13/2015 Project Contact 08/2015 CE Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us Description: Improve facilities, site, and recreation services at the Barry Conservation Camp. Includes construction of a covered archery range, 2 portable shotgun houses & a dining hall addition, as well as landscaping & water/septic system repair/replacement Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. New Hampshire Fish and Game Berlin Fish Hatchery in Berlin, NH. Heather Mckenny Deer Ridge Integrated Resource - Recreation management Developing Proposal Expected:12/2016 04/2017 Project 603-536-6135 - Wildlife, Fish, Rare plants Est. Scoping Start 10/2015 hmckenny@fs.fed.us - Forest products EA - Vegetation management *UPDATED* (other than forest products) - Watershed management - Minerals and Geology - Road management Description: An integrated resource project designed to move the South Pond South Habitat Mgt Unit (HMU) toward desired conditions through timber, wildlife habitat, recreation, and road improvements. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46507 Location: Harvard Cabin System Upgrades UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Kilkenny Unit. - Special use management - Facility management Cancelled CE *UPDATED* N/A Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us Description: Proposal to allow Harvard Mountaineering Club to install a 30-foot tower to hold solar panels at cabin was denied. Proposal for solar panels in a different configuration will be considered if submitted in the future. Location: 10/01/2015 04:26 am MT N/A UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Harvard Cabin. Page 3 of 10 White Mountain National Forest Project Name White Mountain National Forest Maple Syrup Tree Tapping Permit Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Androscoggin Ranger District (excluding Projects occurring in more than one District) - Special use management On Hold N/A N/A EA *UPDATED* UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Town of Randolph. - Recreation management CE *NEW LISTING* Developing Proposal Est. Scoping Start 04/2016 09/2016 Helon Hoffer 603-466-2713 x1211 hhoffer@fs.fed.us UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Moriah Brook Trail. - Special use management In Progress: Scoping Start 04/09/2014 CE *UPDATED* Expected:07/2016 Description: Address the failing suspension bridge that provided hiker access from Wild River CG to the western shore of the Wild River. Explore types of crossings that are sustainable for the area, and implement the most viable solution. Location: Parker Sugar Bush Special Use Permit Renewal Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us Description: 5-year special use permit to place several hundred taps in sugar maple trees on 75 acres and use of existing old skid roads for tapping effort. Location: Moriah Brook Trail Bridge Project Contact Expected:01/2016 01/2016 Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us Description: Renew the expired 5 year special use permit that authorizes maple syrup tapping on 238 acres of NFS land. The permit expired in June, 2013. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42972 Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Town of Randolph, Coos County, New Hampshire: 238 acres of NFS land in Compartment 31, stands 4, 45, and 46. Thomas Moore Randolph Mountain Club - Special use management In Progress: Expected:10/2015 12/2015 backcountry shelter special use - Facility management 603-466-2713 x226 Scoping Start 07/01/2015 permit renewal tmmoore@fs.fed.us Description: Renew for 10 years the permit authorizing the Randolph Mountain Club to utilize approximately 9 acres of NFS CE land for the purpose of occupying and maintaining four shelters and associated facilities: Gray Knob, Crag Camp, *UPDATED* Log Cabin, and the Perch. Location: 10/01/2015 04:26 am MT UNIT - Androscoggin Ranger District. STATE - Maine. COUNTY - Oxford. LEGAL - Not Applicable. Gray Knob, Crag Camp, Log Cabin, and the Perch shelters. Page 4 of 10 White Mountain National Forest Project Name White Mountain National Forest South Pond Road Association Special Use Permit Renewal Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Androscoggin Ranger District (excluding Projects occurring in more than one District) - Special use management Completed Actual: 08/12/2015 09/2015 CE *NEW LISTING* Amateur Radio Permit UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. South Pond South Road. - Special use management In Progress: Scoping Start 07/01/2015 - Recreation management - Watershed management Tom Giles 603-528-8788 tjgiles@fs.fed.us Completed Actual: 09/09/2015 10/2015 James Abbe 603-536-6105 jabbe@fs.fed.us Description: Reconstruct approximately 0.25 miles of the Bog Pond Snowmobile Trail so that its crossing of Harvard Brook is relocated to a more sustainable location that better protects soil and water resources. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44163 Location: 10/01/2015 04:26 am MT 12/2015 UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Summits including Mount Martha, Mount Tom, Mount Osceola, Mount Flume and North Twin. CE *UPDATED* Expected:10/2015 Description: Five year special use permit to erect a mobile antennae and operate portable amateur radio equipment on various summits including Mount Martha, Mount Tom, Mount Osceola, Mount Flume and North Twin for about two days each, once per summer. Location: Bog Pond Snowmobile Trail Relocation R9 - Eastern Region Pemigewasset Ranger District (excluding Projects occurring in more than one District) CE *UPDATED* Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us Description: The Androscoggin Ranger District of the White Mountain National Forest is proposing to renew the South Pond Road Association special use permit for a period of five years. Location: White Mountain National Forest Project Contact UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Bog Pond Trail in Lincoln, NH. Page 5 of 10 White Mountain National Forest Project Name White Mountain National Forest Bowen Brook Integrated Resource Management EA *UPDATED* Project Purpose Decision Expected Implementation Project Contact R9 - Eastern Region Pemigewasset Ranger District (excluding Projects occurring in more than one District) Desiree Johnston - Recreation management In Progress: Expected:05/2016 09/2016 603-447-5448 x128 - Wildlife, Fish, Rare plants Scoping Start 12/04/2014 dajohnston@fs.fed.us - Forest products Est. Comment Period Public - Vegetation management Notice 10/2015 (other than forest products) - Watershed management - Road management Description: An integrated resource project designed to move the Wild Ammonoosuc North Habitat Mgt Unit (HMU) toward desired conditions through timber, wildlife habitat, recreation, fisheries and aquatic management, road improvements and decommissioning. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43974 Location: Corridor 11 Snowmobile Trail Reroute Twin Mountain Planning Status UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Towns of Bath, Easton and Landaff, Grafton County, NH. - Recreation management In Progress: Scoping Start 04/01/2015 Expected:09/2015 10/2015 CE James Abbe 603-536-6105 jabbe@fs.fed.us Description: Relocate the existing snowmobile trail off of private land onto Forest Service lands to address private land owner concerns and eliminate safety concerns associated with the current trail location. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46525 Location: Lake of the Clouds Hut Septic Replacement UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Bethlehem, NH, Grafton County. - Recreation management - Special use management Developing Proposal Est. Scoping Start 02/2016 CE *NEW LISTING* 05/2016 Jana Johnson 603-447-5448 janajohnson@fs.fed.us Description: Replacement of failing septic system at Lake of the Clouds Hut, operated under special use permit by the Appalachian Mountain Club. Location: 10/01/2015 04:26 am MT Expected:05/2016 UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Lake of the Clouds, White Mountains Presidential Range between Mt. Monroe and Mt. Washington, Sargents Purchase, NH. Page 6 of 10 White Mountain National Forest Project Name White Mountain National Forest Mill Brook Connector Snowmobile Trail Relocation Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Pemigewasset Ranger District (excluding Projects occurring in more than one District) - Recreation management Completed Actual: 09/09/2015 10/2015 CE *UPDATED* Project Contact James Abbe 603-536-6105 jabbe@fs.fed.us Description: Relocate trail to a more stable location to provide access from Mill Brook Connector north through Agnew State Forest to Red Brook Rd. New location includes no new bridges, removal of one old bridge on Appleby Bk., & decomm. of unsustainable trails. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45470 Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Carroll and Jefferson, NH. James Abbe 603-536-6105 jabbe@fs.fed.us Pemigewasset Wilderness Thoreau Falls Bridge Removal Project - Recreation management - Special area management CE Description: Dismantle bridge using Wilderness-appropriate tools, break up and scatter wood component and break up and bury or scatter concrete abutments at least 100 feet from perennial water, pack out any hardware. Monitor crossing, harden banks if necessary. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46602 *UPDATED* Location: In Progress: Scoping Start 08/04/2015 Expected:11/2015 12/2015 UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Livermore (unincorporated), Grafton County, New Hampshire. Ryan Twomey 603-536-6103 rtwomey@fs.fed.us Sugarloaf I and II Campground Electrification and Water System Upgrades - Facility management EA Description: The proposed action includes: providing water and power to 15 sites at Sugarloaf I and provide pressurized potable water at Sugarloaf II. Amenities at the host sites would also be upgraded. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46533 *UPDATED* Location: Top Notch Triathlon Developing Proposal Est. Scoping Start 10/2015 Expected:04/2016 06/2016 UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Twin Mountain, Coos County, New Hampshire. - Special use management Completed CE Actual: 07/08/2015 08/2016 Thomas Moore 603-466-2713 x1226 tmmoore@fs.fed.us Description: This five year special use permit is to stage the bike portion of the Top Notch Triathlon using the Notchway and Scarface Trails. The Top Notch Triathlon is a one-day, annual event. Location: 10/01/2015 04:26 am MT UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. The bike portion of the Top Notch Triathlon would use the Notchway and Scarface Trails. Page 7 of 10 White Mountain National Forest Project Name White Mountain National Forest Tripoli Road Campsite Relocation and Roadside Hazard Tree Removal Project Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Pemigewasset Ranger District (excluding Projects occurring in more than one District) - Recreation management - Watershed management - Facility management EA In Progress: Notice of Initiation 12/15/2010 Est. Comment Period Public Notice 12/2015 Expected:06/2016 Project Contact 07/2016 Heather Mckenny 603-536-6135 hmckenny@fs.fed.us Description: Relocation and redesign of all of the campsites along Tripoli Road to sites along adjacent spur roads to mitigate safety and resource concerns. Removal of hazard trees along Tripoli Road and spur roads to address safety concerns. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=31039 Location: Washburn Challenge Special Use Permit UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Tripoli Road, Mack Brook Road and Hix Mountain Spur Road between Exit 31 on I-93 and the town of Waterville Valley. - Special use management Completed Actual: 07/08/2015 CE 07/2015 Tom Giles 603-528-8788 tjgiles@fs.fed.us Description: Five year special use permit to stage a fund raising event for the Museum of Science out of the Ammonoosuc Ravine Trail parking lot and trail, Jewell Trail, summit Mt Washington, descend to Hermit Lake and return. Location: White Mountain National Forest Dandiview Birch Hill Wildland Urban Interface (WUI) CE *UPDATED* Saco Ranger District (excluding Projects occurring in more than one District) R9 - Eastern Region John Neely - Wildlife, Fish, Rare plants In Progress: Expected:10/2015 10/2015 603-536-6261 - Vegetation management Scoping Start 05/19/2015 jneely@fs.fed.us (other than forest products) - Fuels management Description: Thin and remove small trees and shrubs to create a 40-70 foot wide shaded fuelbreak on NFS lands within the Wildland Urban Interface (WUI) located adjacent to the Birch Hill, Suren and Dandiview subdivisions in North Conway, NH. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45950 Location: 10/01/2015 04:26 am MT UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Carroll, Grafton County, NH. UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Dandiview, Suren Road and Birch Hill neighborhoods in North Conway, NH. Page 8 of 10 White Mountain National Forest Project Name White Mountain National Forest Doublehead Recreation Management Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Saco Ranger District (excluding Projects occurring in more than one District) - Recreation management Developing Proposal Est. Scoping Start 02/2016 Expected:10/2016 10/2016 EA *NEW LISTING* EA *NEW LISTING* UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Doublehead Mountain and vicinity (NH State Highway 16B/FS Road 324), Jackson, NH. Jason Lyle - Recreation management Developing Proposal Expected:10/2016 10/2017 603-447-5448 - Forest products Est. Scoping Start 01/2016 jasonslyle@fs.fed.us - Vegetation management (other than forest products) Description: Silviculturally treat vegetation in Jigger Johnson and Passaconaway campgrounds and adjacent stands to enhance recreation experience and stand resiliency. Includes site-specific Forest Plan amendment allowing whole-tree timber harvest on outwash soil Location: Maple Mountain to Popple Mountain X-C Ski Connector UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Jigger Johnson & Passaconaway Campgrounds and immediate vicinity. - Recreation management - Special use management Developing Proposal Est. Scoping Start 11/2015 CE *NEW LISTING* Expected:04/2016 04/2016 Joseph Gill 603-466-2713 x1221 jgill@fs.fed.us Description: Jackson Ski Touring Foundation proposal to decommission Hall Trail and construct a safer, more sustainable 0.5 mile connector between Maple Mountain and Popple Mountain trails. 0.2 miles of new trail will be on an old skid road; 0.3 will be new trail Location: 10/01/2015 04:26 am MT Jana Johnson 603-447-5448 janajohnson@fs.fed.us Description: Construct a new parking lot for Doublehead cabin visitors and ski trail users. Construct approximately 0.5 miles of new trail to connect the proposed parking lot to the ski trail. Decommission New Path hiking trail, approximately 1.4 miles. Location: Intervale Vegetation Enhancement Project Project Contact UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Jackson Ski Touring Foundation, Jackson, NH. Page 9 of 10 White Mountain National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 10/01/2015 04:26 am MT Page 10 of 10 White Mountain National Forest