Schedule of Proposed Action (SOPA) 04/01/2016 to 06/30/2016 White Mountain National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest) AMC Backcountry Facility Permit Renewal - Special use management In Progress: Scoping Start 07/01/2014 Expected:04/2016 Project Contact 04/2016 CE Marianne Leberman 603-536-6236 mleberman@fs.fed.us Description: Re-issue permits for the existing backcountry facilities (shelters and tentsites) currently operated by the Appalachian Mountain Club. No additional use or increases in capacity are proposed as part of this project. Location: Invasive dandelion removal in the alpine zone UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Coos, Grafton. LEGAL - Not Applicable. Backcountry facilities operated by AMC. - Wildlife, Fish, Rare plants Developing Proposal Est. Scoping Start 05/2016 Expected:06/2016 06/2016 CE *NEW LISTING* Description: Manually remove dandelions from the alpine zone on Mt. Washington for up to 5 years. Removal could occur at currently known and yet-to-be-discovered sites in Wilderness, Alpine Garden RNA, and the alpine zone management area. Location: Loon Pond Dam Reconstruction Daniel Sperduto 603-536-6225 danieldsperduto@fs.fed .us UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Mount Washington. - Watershed management - Special use management In Progress: Scoping Start 07/31/2015 CE Expected:04/2016 05/2016 Jon Morrissey 970-642-4439 jmorrissey@fs.fed.us Description: The proposal is to issue a 20-year special use permit to provide the Town of Lincoln access to the Loon Pond Dam. The town owns the dam and needs access to reconstruct it in response to NHDES letter of deficiency and to maintain it into the future. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43389 Location: 04/01/2016 04:10 am MT UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. The dam is on Loon Pond west of Loon Mountain Ski Area in the town of Lincoln, NH. Page 1 of 9 White Mountain National Forest Project Name Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest) Monitoring Plan Transition - Land management planning CE *NEW LISTING* Expected:05/2016 05/2016 Stacy Lemieux 603-536-6222 slemieux@fs.fed.us Description: Update Monitoring Plan to be consistent with 2012 Planning Rule. Will result in Administrative Change to Forest Plan and is NOT a NEPA decision. NEPA project webpage used to increase visibility for public convenience. Comment period closes 3/31/2016. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48081 Location: Northern Pass Transmission Line Special Use Permit In Progress: Scoping Start 11/05/2015 Project Contact UNIT - White Mountain National Forest All Units. STATE - Maine, New Hampshire. COUNTY - Oxford, Carroll, Coos, Grafton. LEGAL - Not Applicable. White Mountain National Forest. - Special use management EIS *UPDATED* In Progress: DEIS NOA in Federal Register 07/31/2015 Est. FEIS NOA in Federal Register 11/2016 Expected:03/2017 03/2017 Tiffany Benna 603-536-6241 tbenna@fs.fed.us Description: Proposed power transmission line that would cross the WMNF in an existing corridor in Stark and between Easton and Woodstock. US Dep't of Energy is leading the NEPA analysis. WMNF decision is whether to issue a special use permit to cross the Forest. Web Link: http://www.northernpasseis.us/ Location: White Mountain National Forest Albany South Project EA *UPDATED* Androscoggin Ranger District (excluding Projects occurring in more than one District) R9 - Eastern Region Patricia Nasta - Recreation management In Progress: Expected:01/2017 04/2017 207-824-2813 - Wildlife, Fish, Rare plants Scoping Start 07/15/2013 pnasta@fs.fed.us - Forest products Est. Comment Period Public - Watershed management Notice 04/2016 - Road management Description: An integrated resource management project that proposes vegetation management to improve wildlife habitat and forest health conditions, as well as recreation, watershed and transportation system improvements. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39614 Location: 04/01/2016 04:10 am MT UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. For more information, see the project website at: www.northernpasseis.us. UNIT - Androscoggin Ranger District. STATE - Maine. COUNTY - Oxford. LEGAL - Not Applicable. Town of Stoneham, Oxford County, ME. Page 2 of 9 White Mountain National Forest Project Name White Mountain National Forest Corridor 19 Snowmobile Trail Relocation Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Androscoggin Ranger District (excluding Projects occurring in more than one District) - Recreation management Developing Proposal Est. Scoping Start 06/2016 Expected:08/2016 Project Contact 08/2016 CE Helon Hoffer 603-466-2713 x1211 hhoffer@fs.fed.us Description: Relocation of existing snowmobile trail to avoid access issues related to privately owned land. Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Corridor 19 Snowmobile, Town of Shelburne, NH. Heather Mckenny Deer Ridge Integrated Resource - Recreation management 04/2017 In Progress: Expected:02/2017 Project 603-536-6135 - Wildlife, Fish, Rare plants Scoping Start 10/01/2015 hmckenny@fs.fed.us - Forest products Est. Comment Period Public EA Vegetation management Notice 06/2016 *UPDATED* (other than forest products) - Watershed management - Minerals and Geology - Road management Description: An integrated resource project designed to move the South Pond South Habitat Mgt Unit (HMU) toward desired conditions through timber, wildlife habitat, recreation, and road improvements. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46507 Location: Maple Syrup Tree Tapping Permit UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Kilkenny Unit. - Special use management On Hold EA N/A N/A Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us Description: 5-year special use permit to place several hundred taps in sugar maple trees on 75 acres and use of existing old skid roads for tapping effort. Location: 04/01/2016 04:10 am MT UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Town of Randolph. Page 3 of 9 White Mountain National Forest Project Name White Mountain National Forest Moriah Brook Trail Bridge Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Androscoggin Ranger District (excluding Projects occurring in more than one District) - Recreation management CE Developing Proposal Est. Scoping Start 04/2016 Expected:07/2016 Project Contact 09/2016 Helon Hoffer 603-466-2713 x1211 hhoffer@fs.fed.us Description: Address the failing suspension bridge that provided hiker access from Wild River Campground to the western shore of the Wild River. Explore types of crossings that are sustainable for the area, and implement the most viable solution. Location: Parker Sugar Bush Special Use Permit Renewal UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Moriah Brook Trail. - Special use management Completed Actual: 12/03/2015 01/2016 CE *UPDATED* Description: Renew the expired 5 year special use permit that authorizes maple syrup tapping on 238 acres of NFS land. The permit expired in June, 2013. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42972 Location: White Mountain National Forest Amateur Radio Permit - Special use management R9 - Eastern Region In Progress: Scoping Start 07/01/2015 Expected:05/2016 06/2016 Tom Giles 603-528-8788 tjgiles@fs.fed.us Description: Five year special use permit to erect a mobile antennae and operate portable amateur radio equipment on various summits including Mount Martha, Mount Tom, Mount Osceola, Mount Flume and North Twin for about two days each, once per summer. Location: 04/01/2016 04:10 am MT UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Town of Randolph, Coos County, New Hampshire: 238 acres of NFS land in Compartment 31, stands 4, 45, and 46. Pemigewasset Ranger District (excluding Projects occurring in more than one District) CE *UPDATED* Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Summits including Mount Martha, Mount Tom, Mount Osceola, Mount Flume and North Twin. Page 4 of 9 White Mountain National Forest Project Name White Mountain National Forest Bowen Brook Integrated Resource Management EA *UPDATED* Project Purpose Decision Expected Implementation Desiree Johnston 09/2016 - Recreation management In Progress: Expected:06/2016 603-447-5448 x128 - Wildlife, Fish, Rare plants dajohnston@fs.fed.us - Forest products - Vegetation management (other than forest products) - Watershed management - Road management Description: An integrated resource project designed to move the Wild Ammonoosuc North Habitat Mgt Unit (HMU) toward desired conditions through timber, wildlife habitat, recreation, fisheries and aquatic management, road improvements and decommissioning. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43974 UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Towns of Bath, Easton and Landaff, Grafton County, NH. - Recreation management Developing Proposal Est. Scoping Start 04/2016 Expected:07/2016 08/2016 CE *NEW LISTING* UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Woodstock, NH. - Recreation management - Facility management In Progress: Scoping Start 01/01/2016 CE *UPDATED* Expected:05/2016 08/2016 James Abbe 603-536-6105 jabbe@fs.fed.us Description: The Guyot Campsite Reconfiguration Project would repair and rehabilitate the Guyot Shelter, address high levels of visitor use and the associated impacts, and remove structures from the Pemigewasset Wilderness. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48216 Location: 04/01/2016 04:10 am MT James Abbe 603-536-6105 jabbe@fs.fed.us Description: This project would move a section of the Corridor 14 trail off of private lands to UFSF lands to eliminate concerns about long-term sustainability. Location: Guyot Campsite Reconfiguration Project Project Contact R9 - Eastern Region Pemigewasset Ranger District (excluding Projects occurring in more than one District) Location: Elbow Pond Snowmobile Trail Relocation Planning Status UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Guyot Campsite. Page 5 of 9 White Mountain National Forest Project Name White Mountain National Forest Lake of the Clouds Hut Septic Replacement Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Pemigewasset Ranger District (excluding Projects occurring in more than one District) - Recreation management - Special use management Developing Proposal Est. Scoping Start 04/2016 Expected:06/2016 07/2016 CE *UPDATED* UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Lake of the Clouds, White Mountains Presidential Range between Mt. Monroe and Mt. Washington, Sargents Purchase, NH. - Recreation management Developing Proposal Est. Scoping Start 04/2016 Expected:07/2016 08/2016 CE *NEW LISTING* James Abbe 603-536-6105 jabbe@fs.fed.us Description: The Bruhawachet Sno-Trackers Snowmobile Club is proposing to re-route and upgrade a trail to 1) address safety concerns by eliminating a 90-degree turn and providing consistent trail width and 2) to improve the connectivity of the trail network. Location: Pemigewasset Wilderness Thoreau Falls Bridge Removal Project Jennifer Burnett 603-536-1315 jburnett@fs.fed.us Description: Replacement of failing septic system at Lake of the Clouds Hut, operated under special use permit by the Appalachian Mountain Club. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47896 Location: North Trail Snowmobile Reroute and Upgrade Project Contact UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Ellsworth. - Recreation management - Special area management EA In Progress: Scoping Start 08/04/2015 Est. Comment Period Public Notice 05/2016 Expected:02/2017 02/2017 James Abbe 603-536-6105 jabbe@fs.fed.us Description: Dismantle bridge using Wilderness-appropriate tools, break up and scatter wood component and break up and bury or scatter concrete abutments at least 100 feet from perennial water, pack out any hardware. Monitor crossing, harden banks if necessary. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46602 Location: 04/01/2016 04:10 am MT UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Livermore (unincorporated), Grafton County, New Hampshire. Page 6 of 9 White Mountain National Forest Project Name White Mountain National Forest Project Purpose Planning Status Decision Expected Implementation Project Contact R9 - Eastern Region Pemigewasset Ranger District (excluding Projects occurring in more than one District) Ryan Twomey Sugarloaf Campground Utility - Facility management In Progress: Expected:06/2016 07/2016 Improvement and Zealand Road 603-536-6103 Scoping Start 10/14/2015 Repaving Project rtwomey@fs.fed.us Description: CE The proposed action includes: repaving Zealand Road, providing water and power to 15 sites at Sugarloaf I and provide pressurized potable water at Sugarloaf II. Amenities at the host sites would also be upgraded. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46533 Location: Tripoli Road Campsite Relocation and Roadside Hazard Tree Removal Project EA *UPDATED* Heather Mckenny - Recreation management In Progress: Expected:08/2016 09/2016 603-536-6135 - Watershed management Comment Period Public Notice hmckenny@fs.fed.us - Facility management 02/17/2016 Description: Relocation and redesign of all of the campsites along Tripoli Road to sites along adjacent spur roads to mitigate safety and resource concerns. Removal of hazard trees along Tripoli Road and spur roads to address safety concerns. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=31039 Location: White Mountain National Forest Doublehead Recreation Management UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Not Applicable. Town of Carroll, Coos County, New Hampshire. UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Not Applicable. Tripoli Road, Mack Brook Road and Hix Mountain Spur Road between Exit 31 on I-93 and the town of Waterville Valley. R9 - Eastern Region Saco Ranger District (excluding Projects occurring in more than one District) - Recreation management EA *UPDATED* In Progress: Scoping Start 01/25/2016 Est. Comment Period Public Notice 05/2016 Expected:10/2016 10/2016 Brian Johnston (603) 447-5448, X109 bmjohnston@fs.fed.us Description: Construct a new parking lot for Doublehead cabin visitors and ski trail users. Construct approximately 0.5 miles of new trail to connect the proposed parking lot to the ski trail. Decommission New Path hiking trail, approximately 1.4 miles. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47897 Location: 04/01/2016 04:10 am MT UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Doublehead Mountain and vicinity (NH State Highway 16B/FS Road 324), Jackson, NH. Page 7 of 9 White Mountain National Forest Project Name White Mountain National Forest Hall Trail to Maple Mountain Trail X-C Ski Connector Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Saco Ranger District (excluding Projects occurring in more than one District) - Recreation management - Special use management In Progress: Scoping Start 01/01/2016 Expected:04/2016 04/2016 CE *UPDATED* CE *UPDATED* UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Jackson Ski Touring Foundation, Jackson, NH. Jason Lyle 10/2016 - Recreation management Developing Proposal Expected:08/2016 603-447-5448 - Forest products Est. Scoping Start 04/2016 jasonslyle@fs.fed.us - Vegetation management (other than forest products) Description: Silviculturally treat vegetation in Jigger Johnson campground to enhance recreation experience and stand resiliency. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47841 Location: Langdon Shelter Removal UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Jigger Johnson Campground. - Recreation management Cancelled N/A N/A CE *UPDATED* UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Mt. Stanton Trail, Town of Bartlett. - Watershed management Developing Proposal Est. Scoping Start 04/2016 Expected:05/2016 05/2016 CE *NEW LISTING* Jessie Dubuque 541-247-3651 jdubuque@fs.fed.us Description: Restore approximately 100 ft of the streambed to prevent formation of additional side channels Location: 04/01/2016 04:10 am MT Dylan Alden 603-447-5448 dalden@fs.fed.us Description: Removal of an underutilized structure which is in need of significant repair Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48458 Location: Meserve Brook Channel Restoration Joseph Gill 603-466-2713 x1221 jgill@fs.fed.us Description: Jackson Ski Touring Foundation proposal to decommission 0.6 miles of the Hall Trail and construct a safer, more sustainable connector (0.5 mile) to the Maple Mountain trail. 0.3 miles of new trail will be on an old skid road; 0.2 will be new trail. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47894 Location: Intervale Vegetation Enhancement Project Project Contact UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Not Applicable. Meserve Brook, Town of Jackson. Page 8 of 9 White Mountain National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 04/01/2016 04:10 am MT Page 9 of 9 White Mountain National Forest