Schedule of Proposed Action (SOPA) 04/01/2016 to 06/30/2016 Hiawatha National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Hiawatha National Forest, Occurring in more than one District (excluding Forestwide) Bass Boot EA *UPDATED* Project Contact Joanne Sanfilippo 09/2016 - Wildlife, Fish, Rare plants In Progress: Expected:08/2016 970-870-2210 - Forest products Scoping Start 01/17/2014 jmsanfilippo@fs.fed.us - Vegetation management Est. Comment Period Public (other than forest products) Notice 04/2016 - Fuels management - Watershed management Description: Project involves vegetation management, wildlife habitat improvement, and fuels management. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42995 Location: UNIT - Rapid River Ranger District, Manistique Ranger District, Munising Ranger District. STATE - Michigan. COUNTY - Schoolcraft, Alger, Delta. LEGAL - T 44 N, R 17 W. T 44 N, R 17 W. Cloverland Electric Cooperative - Special use management Special Use Permit Amendment EA *UPDATED* In Progress: Scoping Start 10/15/2013 Est. Comment Period Public Notice 06/2016 Expected:11/2016 12/2016 Robert West 906-643-7900 robertwest@fs.fed.us Description: Special Use Permit Amendment for the construction of three new underground lines and the adoption of a new Operation and Maintenance Plan. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40849 Location: Nahma Multi-Use Trail Construction UNIT - Manistique Ranger District, St. Ignace Ranger District, Sault Ste. Marie Ranger District. STATE Michigan. COUNTY - Chippewa, Delta, Mackinac. LEGAL - Not Applicable. St. Ignace, Sault Ste. Marie, and Manistique Ranger Districts. - Recreation management In Progress: Scoping Start 07/15/2015 CE *UPDATED* 07/2016 Rebecca Cain 906-387-2512 rcain@fs.fed.us Description: Construct approximately 3 miles of multi-use trail (both motorized and non-motorized use) between Nahma Junction and the community of Nahma to improve year-round recreational opportunities. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44158 Location: 04/01/2016 04:10 am MT Expected:05/2016 UNIT - Rapid River Ranger District, Manistique Ranger District. STATE - Michigan. COUNTY - Delta. LEGAL - T 40 N, R 19 W, Sections 6, 7, 17, 20. From US Highway 2 (T 40 N, R 19 W, Section 6) at Nahma Junction travelling south along FH-13 to Nahma (T 40 N, R 19 W, Section 20). Page 1 of 9 Hiawatha National Forest Project Name Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Hiawatha National Forest, Occurring in more than one District (excluding Forestwide) Plumb Bruno Integrated Resource Management EA *UPDATED* Shirley Frank - Recreation management In Progress: Expected:02/2017 03/2017 559-920-6358 - Wildlife, Fish, Rare plants Scoping Start 02/04/2015 safrank@fs.fed.us - Forest products Est. Comment Period Public - Vegetation management Notice 08/2016 (other than forest products) - Fuels management - Watershed management - Road management Description: The proposed action includes vegetation management, recreation facilities rehabilitation, wildlife habitat improvement, hazardous fuels reduction, riparian structure management, non-native invasive plant control, and road system work. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48026 Location: USGS Ground Water Level Monitoring UNIT - Rapid River Ranger District, Manistique Ranger District, Munising Ranger District. STATE - Michigan. COUNTY - Schoolcraft, Alger, Delta. LEGAL - Not Applicable. The analysis area is located on the west unit of the Hiawatha National Forest. Munising is the closest town, but Marquette, Wetmore and Manistique are also located in the general vicinity. - Special use management Developing Proposal Est. Scoping Start 04/2016 Expected:05/2016 CE *NEW LISTING* 04/01/2016 04:10 am MT 06/2016 Daniel Aklufi 906-428-5827 daklufi@fs.fed.us Description: Continued use by USGS of three existing ground water monitoring wells. Monitoring will include installation of small steel structures to well casings for housing instruments. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49238 Location: Hiawatha National Forest Project Contact UNIT - Munising Ranger District, St. Ignace Ranger District, Sault Ste. Marie Ranger District. STATE - Michigan. COUNTY - Alger, Chippewa, Mackinac. LEGAL - T64N R4W Section 24 SE 1/4; T42N R2W Section 7 NE 1/4; T45N R19W Section 25 NW 1/4. The three wells are located in Alger, Chippewa and Mackinac Counties, Michigan. Manistique Ranger District (excluding Projects occurring in more than one District) Page 2 of 9 R9 - Eastern Region Hiawatha National Forest Project Name Hiawatha National Forest Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Manistique Ranger District (excluding Projects occurring in more than one District) 2015 Recreation Residence Improvements - Recreation management - Special use management In Progress: Scoping Start 07/16/2015 Expected:04/2016 Project Contact 05/2016 CE Brenda Rebitzke 906-474-6442 brebitzke@fs.fed.us Description: Recreation residence improvements to include: Crooked Lake Lot 18 porch addition, Crooked Lake Lot 2 dock addition, Sturgeon River Lot 5 power pole installation, and Steuben Lake Lot 7 dock & shed replacement, fence & dock installation. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47341 *UPDATED* Location: UNIT - Manistique Ranger District. STATE - Michigan. COUNTY - Schoolcraft. LEGAL - Not Applicable. Crooked Lake, Sturgeon River, and Steuben Lake. Joanne Sanfilippo 906-474-6442 jmsanfilippo@fs.fed.us Great Lakes Distance Riders Pine Marten Run Event 5-Year Special Use Permit Issuance - Special area management - Special use management CE Description: Great Lakes Distance Riding Association requests five-year recreation special use permit for annual Pine Marten Run Distance Ride (equestrian) occurring the last weekend in June. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49225 *NEW LISTING* Location: Hiawatha National Forest In Progress: Scoping Start 03/29/2016 UNIT - Manistique Ranger District. STATE - Michigan. COUNTY - Schoolcraft. LEGAL - T44N R18W Sections 20-36 and T43N R18W Sections 1 and 2. Pine Marten Run Trail System within the Ironjaw Semi-primitive Nonmotorized Area. - Special use management Completed CE R9 - Eastern Region Actual: 01/06/2016 02/2016 Charles Marsh 308-432-0300 crmarsh@fs.fed.us Description: The Alger Delta Mirror Lake Project is associated with the Alger Delta Electric Cooperative Association. They are proposing to install 1.5 miles of new electrical line along Mirror Lake Road in Sections 21 and 22 of T45N, R19W. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48502 Location: 04/01/2016 04:10 am MT 06/2016 Munising Ranger District (excluding Projects occurring in more than one District) Alger Delta Mirror Lake Project *UPDATED* Expected:05/2016 UNIT - Munising Ranger District. STATE - Michigan. COUNTY - Alger. LEGAL - Sections 21 and 22, T45N, R19W. The Alger Delta Cooperative Association project is located along a 1.5 mile corridor on Mirror Lake Road in Sections 21 and 22 of T45N, R19W (south of Buckhorn Rd.). Page 3 of 9 Hiawatha National Forest Project Name Hiawatha National Forest Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Munising Ranger District (excluding Projects occurring in more than one District) American Transmission Company Au Train 69 kV Transmission Line - Special use management CE Description: Proposed project consists of maintenance and replacement of select structures Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49250 *NEW LISTING* Location: Au Train River Public Access, Parking and Rehabilitation In Progress: Scoping Start 03/30/2016 Expected:04/2016 Project Contact 05/2016 Charles Marsh 308-432-0300 crmarsh@fs.fed.us UNIT - Munising Ranger District. STATE - Michigan. COUNTY - Alger. LEGAL - Not Applicable. Au Train 69kV Transmission Line. - Recreation management EA *NEW LISTING* In Progress: Scoping Start 01/04/2016 Est. Comment Period Public Notice 03/2017 Expected:06/2017 09/2017 Rebecca Cain 906-387-2512 rcain@fs.fed.us Description: Collaborative project with Au Train Township to address access, parking and erosion issues along Au Train River. Proposed action would include development of new parking and access sites and rehabilitation of river bank erosion. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49226 Location: Brownie Number 10 Cabin Removal UNIT - Munising Ranger District. STATE - Michigan. COUNTY - Alger. LEGAL - T46 R20 Sections 5 and 6; T47 R20, Sections 31, 32 and 33; T46 R21 Section 1; T47 R21 Section 36. Au Train River Access. - Special use management In Progress: Scoping Start 05/12/2015 CE *UPDATED* 06/2016 Eric Drake 906-428-5800 ericdrake@fs.fed.us Description: Removal by owner of a private structure and improvements from NFS lands on Grand Island and restoration of disturbed areas upon termination of recreation residence special use permit. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46626 Location: 04/01/2016 04:10 am MT Expected:05/2016 UNIT - Munising Ranger District. STATE - Michigan. COUNTY - Alger. LEGAL - T 47 N, R 19 W, Section 22. Grand Island, Michigan. Page 4 of 9 Hiawatha National Forest Project Name Hiawatha National Forest Project Purpose Planning Status Decision Expected Implementation Project Contact R9 - Eastern Region Munising Ranger District (excluding Projects occurring in more than one District) Charles Marsh Skandia West Branch Township - Special use management In Progress: Expected:06/2016 06/2016 Water Authority Special Use 308-432-0300 Scoping Start 09/17/2015 Permit Renewal and Well crmarsh@fs.fed.us Installation Description: The Skandia/West Branch Township Water Authority requests a renewal of a 30-year special use permit (SUP), CE the inclusion of the water tank location into the SUP, and permission to dig a new well. *UPDATED* Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48496 Location: Valley Spur Trailhead Improvements UNIT - Munising Ranger District. STATE - Michigan. COUNTY - Marquette. LEGAL - Overall project area is in the SW, NW to NW, SW of Section 29, T46N, R23W. The proposed new well location is in the NW, NW, SW of Section 29, T46N, R23W. Project area is located on the east side of US 41, approximately ½ mile north of the intersection between US41 and M94. - Recreation management In Progress: Scoping Start 05/18/2015 Expected:04/2016 05/2016 CE Description: The project consists of expansion of the parking lot at Valley Spur Trailhead, construction of a garage to house ski trail grooming equipment, installing a yurt, replacing toilet building. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40379 *UPDATED* Location: Hiawatha National Forest Rebecca Cain 906-387-2512 rcain@fs.fed.us UNIT - Munising Ranger District. STATE - Michigan. COUNTY - Alger. LEGAL - T46N R19W Section 20. Valley Spur trailhead is 8 miles southwest of Munising, MI. R9 - Eastern Region Rapid River Ranger District (excluding Projects occurring in more than one District) Joanne Sanfilippo 906-474-6442 jmsanfilippo@fs.fed.us American Transmission Company (ATC) Earth Removal Project - Special use management CE Description: ATC proposes to remove earth beneath existing transmission line in Delta County to improve ground-to-wire clearance. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49224 *NEW LISTING* Location: 04/01/2016 04:10 am MT Developing Proposal Est. Scoping Start 04/2016 Expected:05/2016 06/2016 UNIT - Rapid River Ranger District. STATE - Michigan. COUNTY - Delta. LEGAL - Section 13 of T41N, R21N and Sections 22 and 23 of T41N, R20W. There are four grading locations along an established transmission line. Page 5 of 9 Hiawatha National Forest Project Name Hiawatha National Forest Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Rapid River Ranger District (excluding Projects occurring in more than one District) Camp Cooks Integrated Resource Management EA *NEW LISTING* Ebli Road Authorization and Canull Road Authorization Joanne Sanfilippo - Recreation management In Progress: Expected:01/2018 01/2018 906-474-6442 - Wildlife, Fish, Rare plants Scoping Start 09/10/2015 jmsanfilippo@fs.fed.us - Forest products Est. Comment Period Public - Vegetation management Notice 08/2017 (other than forest products) - Fuels management - Watershed management - Road management Description: Integrated resource management project addressing ecological and cultural resource needs at a landscape scale. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49255 Location: UNIT - Rapid River Ranger District. STATE - Michigan. COUNTY - Schoolcraft, Delta. LEGAL - Not Applicable. The analysis area is extends north from the town of Nahma along the Sturgeon River and east to the Indian River near Little Murphy Creek. - Special use management In Progress: Scoping Start 09/11/2015 Expected:04/2016 06/2016 CE *UPDATED* Project Contact Joanne Sanfilippo 970-870-2210 jmsanfilippo@fs.fed.us Description: The HIF proposes road authorizations for access to the Tony Ebli property and the Jeff Canull property that they have recently purchased. Previous owners had road authorizations to access the properties. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48500 Location: UNIT - Rapid River Ranger District. STATE - Michigan. COUNTY - Delta. LEGAL - Ebli Road Authorization: NW quarter, NE quarter Section 14, T43N, R19W and Canull Road Authorization: SW, NW Section 5 of T43N, R20W. Ebli: Access is by FR 2317 and a dirt trail and a wooden boardwalk. Canull: South of Pole Lake. Joanne Sanfilippo 970-870-2210 jmsanfilippo@fs.fed.us Pasi Road Authorization Renewal and Sundstrom Road Authorization Renewal - Special use management CE Description: The HIF is proposing road authorization renewals for access to the Allan Pasi property and the Mark Sundstrom property. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48497 *UPDATED* Location: 04/01/2016 04:10 am MT In Progress: Scoping Start 09/17/2015 Expected:05/2016 06/2016 UNIT - Rapid River Ranger District. STATE - Michigan. COUNTY - Delta. LEGAL - Pasi Road Authorization: T39N, R20W, Sundstrom Road Authorization: SW, NE of Section 6, T38N, R21W. Pasi: Property is 1/8th of a mile away from County Road 503 Sundstrom: Property access road is in the SW, NE of Section 6, T38N, R20W on the Stonington Peninsula. Page 6 of 9 Hiawatha National Forest Project Name Hiawatha National Forest Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region Rapid River Ranger District (excluding Projects occurring in more than one District) Rapid River Cross Country Ski Trailhead Improvements - Recreation management Completed Actual: 11/02/2015 01/2016 CE *UPDATED* Raco Natural Resource Management EA Rebecca Cain 906-387-2512 rcain@fs.fed.us Description: This project would increase the size of the existing ski trailhead parking lot and would involve installation of a storage building for trail grooming equipment. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46700 Location: Hiawatha National Forest Project Contact UNIT - Rapid River Ranger District. STATE - Michigan. COUNTY - Delta. LEGAL - Township 42 North, Range 21 West, Section 19. Rapid River Cross Country Ski Trailhead. R9 - Eastern Region Sault Ste. Marie Ranger District (excluding Projects occurring in more than one District) - Wildlife, Fish, Rare plants - Forest products - Fuels management *UPDATED* In Progress: Scoping Start 06/01/2014 Est. Comment Period Public Notice 04/2016 Expected:07/2016 08/2016 Lyn Hyslop 906-643-7900 lhyslop@fs.fed.us Description: Manage natural resources to restore ecological conditions of a fire-dependent sand-plain. Adaptive management will be used to harvest and regenerate trees, manage fuels and improve habitat for fire-adapted species like Kirtland's warbler. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45336 Location: Riparian Habitat Restoration and Improvement UNIT - Sault Ste. Marie Ranger District. STATE - Michigan. COUNTY - Chippewa. LEGAL - Not Applicable. Raco Sand Plains area in north central part of the Eastern Administrative Unit of the Hiawatha National Forest. - Wildlife, Fish, Rare plants - Watershed management Completed Actual: 03/07/2016 CE *UPDATED* 04/01/2016 04:10 am MT Jon Reattoir 906-428-5273 jreattoir@fs.fed.us Description: Restore and enhance hydrologic structure and improve habitat. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48532 Location: Hiawatha National Forest 03/2016 UNIT - Sault Ste. Marie Ranger District. STATE - Michigan. COUNTY - Chippewa. LEGAL - Not Applicable. T47N, R6W; T47N, R5W; T45N, R5W; T44N, R5W; T44N, R4W. St. Ignace Ranger District (excluding Projects occurring in more than one District) Page 7 of 9 R9 - Eastern Region Hiawatha National Forest Project Name Hiawatha National Forest Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region St. Ignace Ranger District (excluding Projects occurring in more than one District) East Lake Road Reconstruction - Facility management EA *UPDATED* In Progress: Scoping Start 06/05/2014 Est. Comment Period Public Notice 04/2016 Expected:06/2016 Project Contact 06/2016 Nicole Molitor 906-428-5835 nicolegmolitor@fs.fed.u s Description: The primary purpose of this project is to provide safe, more reliable access along East Lake Road while maintaining the remarkable natural features this area has to offer. The project will include culvert improvements and road reconstruction. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43475 Location: UNIT - St. Ignace Ranger District. STATE - Michigan. COUNTY - Chippewa, Mackinac. LEGAL - T42N, R4W, sections 29, 32, 20, 17, 16, 9, 10, and 3, T43N, R4W, sections 34, 27, 22, 15, 10, and 3,and T44N, R4W, sections 34, 27, and 28. The reconstruction of East Lake Road spans from Charles Moran Road in Brevort Township of Mackinac County to H40 in Trout Lake Township of Chippewa County, Michigan. Little Bear Creek North Country - Recreation management In Progress: Expected:04/2016 05/2016 Trail Relocation and Boardwalk Scoping Start 03/27/2014 Removal Description: Relocate trail to a dryer location away from wetlands and remove old boardwalk. CE *UPDATED* Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44118 Location: Frances Verwiebe 906-428-5267 fverwiebe@fs.fed.us UNIT - St. Ignace Ranger District. STATE - Michigan. COUNTY - Chippewa. LEGAL - T 44 R 4 sections 25,26,27, 34,35,36. North Country Trail segment near Little Bear Creek. Lyn Hyslop 906-643-7900 lhyslop@fs.fed.us St. Martin's Point and Government Island Dispersed Recreation Improvements - Recreation management EA Description: Improve dispersed recreation opportunities; fix resource damage; do Outfitter and Guide needs assessment; rehabilitate unauthorized OHV trails; improve Search Bay Road (FR3436) to maintenance level (ML)3 road; close or decommission some ML1 roads. Location: 04/01/2016 04:10 am MT On Hold N/A N/A UNIT - St. Ignace Ranger District. STATE - Michigan. COUNTY - Chippewa, Mackinac. LEGAL - T41N R1W sections 9 and 10; T41N R2W sections 2,3,10 and 11; T42N R2W sections 22-27 and 34-36. St.Martins Point is located by north shore of Lake Huron, east of St. Martins Bay and west of Search Bay. Government Island is nestled in the Les Cheneaux Islands near the north shore of Lake Huron. Page 8 of 9 Hiawatha National Forest Project Name Hiawatha National Forest White Spruce EA EA *NEW LISTING* Project Purpose Planning Status Decision Expected Implementation R9 - Eastern Region St. Ignace Ranger District (excluding Projects occurring in more than one District) - Forest products - Vegetation management (other than forest products) In Progress: Scoping Start 03/07/2016 Est. Comment Period Public Notice 01/2017 Expected:04/2017 Project Contact Samuel Barnes 906-643-7900 smbarnes@fs.fed.us 06/2017 Description: Salvage dead and dying white spruce plantations that are being impacted by spruce budworm. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48567 Location: UNIT - St. Ignace Ranger District. STATE - Michigan. COUNTY - Chippewa, Mackinac. LEGAL - Not Applicable. These stands are scattered throughout the St. Ignace and Sault Ste. Marie districts. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 04/01/2016 04:10 am MT Page 9 of 9 Hiawatha National Forest