Schedule of Proposed Action (SOPA) 04/01/2016 to 06/30/2016 National Forests In Mississippi This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name National Forests In Mississippi C-Spire Fiber Optic Line: Highways 18 and 35 Project Purpose Planning Status Decision Expected Implementation R8 - Southern Region Bienville Ranger District (excluding Projects occurring in more than one District) - Special use management Completed Actual: 01/15/2016 01/2016 CE *UPDATED* UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Smith. LEGAL - Not Applicable. The proposed project is located in Smith County T3N, R6E Sections 26 and 36; T3N, R6E Section 26 and 36; T3N, R8E Section 31; and T3N, R8E Sections 7,18, and 19. Boring within ROW Hwy 18 and 35. - Special use management Completed Actual: 01/15/2016 01/2016 CE *UPDATED* Christina Harper 601-469-3811 cnharper@fs.fed.us Description: C Spire is requesting a special use permit to install underground conduit/cable across approximately 2.60 miles of National Forest land in order to upgrade the existing telecommunications in the local area, Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46668 Location: Mississippi Resources, LLC Oil and Gas Exploration Christina Harper 601-469-3811 cnharper@fs.fed.us Description: C-Spire is requesting a special use permit to install underground conduit/cable across approximately 4 miles of National Forest land in order to upgrade the existing telecommunications in the local area. Location: C-Spire Fiber Optic Line: Highways 80 and 35 Project Contact UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Scott. LEGAL - Not Applicable. The proposed project will cross National Forest land in Scott County T6N,R7E, Sections 13,14, and 15; T6N, R8E Section 33; and T6N, R9E Section 17. Directional boring within ROW Hwy 80 & 35. - Minerals and Geology - Special use management On Hold CE N/A N/A Marc Weathersby 601-469-3811 maweathersby@fs.fed.u s Description: The Bienville National Forest has received a request from MS Resources, LLC for a Permit to Drill USA 21-12 #1, permitted to 16,500 feet for an exploratory test on Lease MSES-056720. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42882 Location: 04/01/2016 04:09 am MT UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Smith. LEGAL - The proposal is located in Township 4 North, Range 8 East, Section 21 of Smith County, Mississippi. The MS Resources, LLC proposed well pad project is located approximately 2 miles southeast of Lorena, MS off of Forest Service Road 504A. Page 1 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Shockaloe Horse Trail culvert replacements Project Purpose Planning Status Decision Expected Implementation R8 - Southern Region Bienville Ranger District (excluding Projects occurring in more than one District) - Recreation management - Watershed management In Progress: Scoping Start 08/19/2014 Expected:10/2015 Project Contact 11/2015 CE Marc Weathersby 601-469-3811 maweathersby@fs.fed.u s Description: The Shockaloe Horse trail is 23 miles in length. We're replacing approximately 28 old rusted out metal culverts along the trail. In the ephemeral drains along the trail we're building drain-dips out of crushed limestone rock. Location: Smith County Bridge Replacement UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Scott. LEGAL - T7N, R7E, Sections 13,14,23,24,25,26,27,34,35 & 36; and T6N, R7E, Sections 1,2,3,10,11,12,13,14 & 15 Scott Cty, MS. The Shockaloe Horse Trail is located on the Bienville National Forest between Forest and Morton just north of U.S. Highway 80. - Watershed management - Road management In Progress: Scoping Start 09/15/2015 Expected:01/2016 01/2016 CE Christina Harper 601-469-3811 cnharper@fs.fed.us Description: Smith County Board of Supervisors is proposing to replace bridges on two county roads that cross the Bienville NF, County Road 538B and County Road 538E. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48307 Location: Southern Pine EPA power line construction UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Smith. LEGAL - Not Applicable. The proposed project are located in Section 3 and 12 of Township 4 North Range 6 East of Smith County, MS. - Special use management In Progress: Scoping Start 08/28/2013 Expected:11/2015 CE 11/2015 Marc Weathersby 601-469-3811 maweathersby@fs.fed.u s Description: Southern Pine EPA has proposed to construct a new 14.4 KV power line across Bienville National Forest Systems lands. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42289 Location: National Forests In Mississippi 04/01/2016 04:09 am MT UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Newton. LEGAL - Township 5 North, Range 10 East, Sections 27 & 28, of Newton County, Mississippi. The Southern Pine EPA proposed power line right-ofway is located approximately 1 1/2 miles west of State Hwyway 505 and adjacent to the New-Logan Road. Chickasawhay Ranger District (excluding Projects occurring in more than one District) Page 2 of 20 R8 - Southern Region National Forests In Mississippi Project Name National Forests In Mississippi ASI Tea Company proposes commercial harvest of yaupon CE *NEW LISTING* Project Purpose Decision Expected Implementation - Forest products In Progress: - Vegetation management Scoping Start 01/29/2016 (other than forest products) Description: Harvest by hand yaupon leaves and twigs. Expected:04/2016 Project Contact R8 - Southern Region Chickasawhay Ranger District (excluding Projects occurring in more than one District) Location: Commercial Thinning in Compartment 369, Stand 15 Planning Status 05/2016 Andy Barwick 601-428-0594 ajbarwick@fs.fed.us UNIT - Chickasawhay Ranger District. STATE - Mississippi. COUNTY - Greene, Jones, Wayne. LEGAL - Not Applicable. Chickasawhay ranger district Jones, Wayne, & Greene Counties, Mississippi. - Wildlife, Fish, Rare plants - Forest products On Hold N/A N/A CE Andy Barwick 601-4280594 ajbarwick@fs.fed.us Description: Commercial thin a 50-acre stand to improve RCW habitat. Location: UNIT - Chickasawhay Ranger District. STATE - Mississippi. COUNTY - Jones. LEGAL - Section 12, T6N, R10W. Ten miles North of Richton, Mississippi. Special Use Road for South Mississippi Free Will Baptist Youth Camp - Special use management CE Description: Renewal of a special use authorization for an existing road approximately 175 feet long. In Progress: Scoping Start 02/09/2016 Expected:04/2016 05/2016 Jacob Rhyne 850-926-3561 ext6545 jdrhyne@fs.fed.us *UPDATED* Location: Watershed Health Restoration, and Maintenance in the Sand Hill Creek Analysis Unit EA *UPDATED* Andy Barwick - Wildlife, Fish, Rare plants In Progress: Expected:07/2016 09/2016 601-4280594 - Forest products Comment Period Public Notice ajbarwick@fs.fed.us - Vegetation management 05/21/2015 (other than forest products) - Fuels management Description: Longleaf restoration, commercial thinning, midstory reduction, red cockaded woodpecker management, and prescribed burning for the recovery of theatened and endangered species in the Sand Hill Creek Analysis Unit. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35528 Location: 04/01/2016 04:09 am MT UNIT - Chickasawhay Ranger District. STATE - Mississippi. COUNTY - Wayne. LEGAL - Section 10, T6N, R8W. Six miles southwest of Clara, Mississippi. UNIT - Chickasawhay Ranger District. STATE - Mississippi. COUNTY - Wayne. LEGAL - Sections 25, 26, 34, 35, 36, T6N, R8W. Seven miles North of Sand Hill, Mississippi. Page 3 of 20 National Forests In Mississippi Project Name National Forests In Mississippi AT&T Job Number 57C00275N Project Purpose - Special use management - Special use management - Special use management Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 11/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 11/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 11/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Description: Install buried fiber optic cable within existing maintained county road right-of-way. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49157 Location: 04/01/2016 04:09 am MT Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Township 5 South, Range 11 West, Sections 11, 12 & 14. Success, Vogle, Yet, and 508 Roads. - Special use management CE *NEW LISTING* 11/2016 Description: Install buried fiber optic line in existing maintained county road rights-of-way. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49155 Location: AT&T Job Number 57C00374N Expected:10/2016 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Township 4 South, Range 13 West, Sections 1, 2 & 11. West McHenry, Perkinston-Silver Run, and Hickman Firetower Roads. CE *NEW LISTING* R8 - Southern Region Description: Install buried fiber optic cable within existing maintained county road rights-of-way. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49152 Location: AT&T Job Number 57C00366N Developing Proposal Est. Scoping Start 04/2016 Project Contact UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Township 4 South, Range 11 West, Section 19 and Township 4 South, Range 12 West, Sections 14 & 23. Glenn Lott, Mack Lott, and Riceville Roads. CE *NEW LISTING* Expected Implementation Description: Install buried fiber optic cable within existing maintained county road rights-of-way. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49156 Location: AT&T Job Number 57C00281N Decision De Soto Ranger District (excluding Projects occurring in more than one District) CE *NEW LISTING* Planning Status UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Township 5 South, Range 10 West, Section 20. Blackwell Farm Road. Page 4 of 20 National Forests In Mississippi Project Name National Forests In Mississippi AT&T Job Number 57C00375N Project Purpose - Special use management Expected Implementation Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 R8 - Southern Region 11/2016 - Special use management Completed Actual: 02/12/2016 04/2016 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Section 11, T5S, R11W. Approximately one mile south of Bethel Road along the east side of Success Road. - Special use management CE *UPDATED* 02/2017 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us In Progress: Scoping Start 11/13/2015 Expected:08/2016 09/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Description: Access to private land completely surrounded by National Forest. Location: 04/01/2016 04:09 am MT Expected:01/2017 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - George. LEGAL - Sec. 4, T1S, R8W, George County, MS. Leaf, MS. - Special use management CE *UPDATED* Developing Proposal Est. Scoping Start 10/2016 Description: Provide access over an existing route to Salem Cemetery Location: Alexander Access Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Description: Install approx. 900 feet of buried fiber optic cable within the right-of-way of Success Road, and 370 feet of aerial fiber optic cable to be placed on existing poles to provide upgraded telecommunication services. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47617 Location: Access to Salem Cemetery Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Township 5 South, Range 11 West, Sections 1, 2 & 11 and Township 4 South, Range 11 West, Sections 23, 26 & 35. Road 542, Bethel, Airey Tower, Joe Bill, and Martha Redmond Roads. CE *UPDATED* Project Contact Description: Install buried fiber optic cable within existing maintained county road rights-of-way. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49159 Location: AT&T Service for Harrison Experimental Forest Decision De Soto Ranger District (excluding Projects occurring in more than one District) CE *NEW LISTING* Planning Status UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Sec. 36, T1N, R11W, Perry County, MS. Between Hwy. 29 and Black Creek. Page 5 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Project Purpose CE Expected Implementation Developing Proposal Est. Scoping Start 10/2016 Expected:01/2017 R8 - Southern Region 02/2017 - Special use management Developing Proposal Est. Scoping Start 10/2016 Expected:06/2017 07/2017 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest. LEGAL - Sections 7, 17, 20 & 29, T2N, R12W. West side of State Highway 49 within existing cleared right-of-way. - Special use management CE *UPDATED* 07/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Developing Proposal Est. Scoping Start 04/2016 Expected:08/2016 09/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Description: Request for access to private land. Location: 04/01/2016 04:09 am MT Expected:06/2016 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Sec. 34, Township 2 North, Range 9 West, St. Stephens Meridian. Perry County, Mississippi. - Special use management CE *UPDATED* In Progress: Scoping Start 01/22/2015 Description: Request for access to private land surrounded by National Forest land. Location: Dorothy Franklin Access Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Description: Install buried fiber optic cable within right-of-way of State Highway 49. Location: Darren Methe Access Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Sec. 5, Township 4 South, Range 10 West & Sec. 32, Township 3 South, Range 10 West, St. Stephens Meridian. Stone County, Mississippi. CE *UPDATED* Project Contact Description: Request for access to private land surrounded by National Forest land. Location: Contact Network Fiber Optic Cable Installation Decision De Soto Ranger District (excluding Projects occurring in more than one District) Charles and Clark Bond Access - Special use management *UPDATED* Planning Status UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest. LEGAL - Sec. 22 & 23, Township 2 North, Range 12 West, St. Stephens Meridian. Forrest County. Page 6 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Franklin Telephone Service for Carter Project Purpose Planning Status Decision Expected Implementation R8 - Southern Region De Soto Ranger District (excluding Projects occurring in more than one District) - Special use management Developing Proposal Est. Scoping Start 06/2016 Expected:10/2016 11/2016 CE *NEW LISTING* UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Section 23, Township 1 North, Range 11 West. Janice-Brooklyn Road. - Special use management CE *UPDATED* - Special use management In Progress: Scoping Start 05/28/2014 Expected:05/2016 03/2017 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 11/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Description: Construct a 496'x504' well pad and 155' access road to drill for oil on Federal Leases MSES054565 & MSES054570. Complete for production if producible quantities of oil are found, or rehabilitate if none are found. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49163 Location: 04/01/2016 04:09 am MT Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Section 27, T1S, R10W. Black Creek, upstream from Fairley Bridge Road; north of existing right-of-way. - Minerals and Geology CE *NEW LISTING* 02/2017 Description: Relocate a section of natural gas pipeline that has become exposed due to erosion along the banks of Black Creek. New r/w 50' wide, with add'l 25' temp work space needed. Directional bore under Black Creek. Rehabilitation of abandoned r/w. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42858 Location: Laurentide Well 4S-9W-18X Expected:01/2017 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Sec. 19 & 30, Township 3 South, Range 9 West, St. Stephens Meridian. Stone County, Mississippi. CE *UPDATED* Developing Proposal Est. Scoping Start 10/2016 Description: Request for access to private land surrounded by National Forest land Location: Gulf South Pipeline Relocation Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Description: Install 1,065 feet of buried copper cable within existing maintained road rights-of-way to provide telecommunications to a private residence. Location: Glenn Lott Access Project Contact UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Township 4 South, Range 9 West, Section 18. Approximately 13 miles east of McHenry, Mississippi; off of Forest Service Road 401D. Page 7 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Laurentide Well 5S-10W-13X Project Purpose - Minerals and Geology - Minerals and Geology Expected:10/2016 11/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 11/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Township 5 South, Range 10 West, Section 14. Approximately 12 miles north-northwest of D'Iberville, Mississippi; off of Forest Service Road 426B. - Special use management CE *UPDATED* R8 - Southern Region Description: Construct a 426'x478' well pad and 298' access road to drill for oil on Federal Leases MSES054842 & MSES054845. Complete for production if producible quantities of oil are found, or rehabilitate if none are found. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49164 Location: Pat Davis Access Developing Proposal Est. Scoping Start 04/2016 Project Contact UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Township 5 South, Range 10 West, Section 13. Approximately 11 miles north-northwest of D'Iberville, Mississippi. West of Forest Service Road 426. CE *NEW LISTING* Expected Implementation Description: Construct a 425'x425' well pad and 589' access road to drill for oil on Federal Leases MSES054843 & MSES054844. Complete for production if producible quantities of oil are found, or rehabilitate if none are found. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49162 Location: Laurentide Well 5S-10W-14X Decision De Soto Ranger District (excluding Projects occurring in more than one District) CE *NEW LISTING* Planning Status In Progress: Scoping Start 01/22/2015 Expected:06/2016 07/2016 Rebecca Ladnier 601-928-4422 reladnier@fs.fed.us Description: Provide access to private land over an existing woods road. Location: UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Sec. 36, T2N, R9W, Perry County, Mississippi, St. Stephens Meridian. North of Little Creek Road. Pearl River Valley EPA Powerline Relocation - Job No. 6720 - Special use management CE Description: Relocate powerline from woods to public road right-of-way. Cancelled N/A N/A Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us *UPDATED* Location: 04/01/2016 04:09 am MT UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Pearl River. LEGAL - Section 8, T1S, R14W. Adjacent to Gumpond Beall Road. Page 8 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Project Purpose Planning Status Decision Expected Implementation Project Contact R8 - Southern Region De Soto Ranger District (excluding Projects occurring in more than one District) Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Pearl River Valley EPA Powerline Upgrade and Relocation along Hwy. 15 - Special use management CE Description: Relocate an overhead powerline to a new location along a state highway, upgrade the line from 7,200 to 14,400 volts, and remove abandoned poles and wire. *UPDATED* Location: Pearl River Valley EPA Service for Keel Developing Proposal Est. Scoping Start 08/2016 Expected:02/2017 04/2017 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Sec. 20 & 29, T3S, R9W, St. Stephens Meridian, Stone County, MS. Highway 15, Stone County, MS. - Special use management Developing Proposal Est. Scoping Start 04/2016 Expected:07/2016 08/2016 CE *UPDATED* Description: Construct a single phase overhead power line, approx. 3,070 feet in length, to provide power to a future residence. Location: Pearl River Valley EPA Service for Talley UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Section 24, T2S, R10W. Extending west from Rosalee Road along the north side of Highway 26, then northwesterly to private land. - Special use management In Progress: Scoping Start 11/13/2015 CE *UPDATED* EA *UPDATED* 07/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Section 34, T1N, R11W. North of New York Road, off of Forest Service Road 319I. Tate Thriffiley 01/2017 - Wildlife, Fish, Rare plants In Progress: Expected:12/2016 601-584-8488 Ext. 111 - Vegetation management Scoping Start 05/26/2015 tatethriffiley@fs.fed.us (other than forest products) Est. Comment Period Public - Fuels management Notice 06/2016 Description: Ecosystem restoration & maintenance, T&E species habitat improvement, and hazardous fuels management achieved by prescribed burning. Location: 04/01/2016 04:09 am MT Expected:06/2016 Description: Construct a single phase overhead power line, approx. 900 feet in length, to provide power to a future residence. Location: Programmatic Prescribed Burning EA Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest, George, Greene, Harrison, Jackson, Pearl River, Perry, Stone. LEGAL - Not Applicable. De Soto Ranger District. Page 9 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Project Purpose Planning Status Decision Expected Implementation Project Contact R8 - Southern Region De Soto Ranger District (excluding Projects occurring in more than one District) Catherine Bailey 601-965-1663 cjbailey@fs.fed.us Reissuance of Special Use Permit to Errol Bradley for Access - Special use management CE Description: Reissue a Special Use Permit to Errol Bradley for access to private property. No changes in the land use are proposed. Location: Reissuance of Special Use Permit to Plains Pipeline In Progress: Scoping Start 10/27/2015 Expected:05/2016 06/2016 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Section 21, T3S, R9W. North of Vestry Road. - Special use management In Progress: Scoping Start 03/25/2016 Expected:07/2016 08/2016 CE *UPDATED* Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Description: Reissue a Special Use Permit to Plains Pipeline for a new term to authorize continued operation and maintenance of an existing crude oil pipeline. No changes in authorized facilities or increases in the scope or intensity of activities is planned. Location: UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest, Perry. LEGAL - Not Applicable. West of Highway 49 and north of Highway 26. Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Reissuance of Special Use Permit to Red Wolf Wilderness Adventures - Special use management CE Description: Reissue permit to provide outfitter and guide services on Black Creek. There will no change in scope or intensity of activities. *UPDATED* Location: Reissuance of Special Use Permit to Singing River EPA In Progress: Scoping Start 10/27/2015 Expected:04/2016 05/2016 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Not Applicable. Moody's, Janice, Cypress Creek, and Fairley Bridge Landings on Black Creek. - Special use management Developing Proposal Est. Scoping Start 01/2016 CE Expected:07/2016 08/2016 Catherine Bailey 601-965-1663 cjbailey@fs.fed.us Description: Reissue a Special Use Permit for continued operation and maintenance of existing electric power lines. No new land use is proposed. Location: 04/01/2016 04:09 am MT UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest, George, Greene, Perry. LEGAL Not Applicable. Numerous locations of distribution and service lines across the Forest, north of Highway 26. Page 10 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Project Purpose Planning Status Decision Expected Implementation Project Contact R8 - Southern Region De Soto Ranger District (excluding Projects occurring in more than one District) Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Reissue Special Use Permit to Florida Gas Transmission Company - Special use management CE Description: Reissue the special use permit for a new term for continued operation and maintenance of an existing natural gas pipeline. No changes in the area authorized or the scope or intensity of activities is proposed. *UPDATED* Location: Ronnie Robertson Access - Special use management - Special use management Expected:08/2016 In Progress: Scoping Start 03/01/2016 Expected:04/2016 - Special use management 05/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Developing Proposal Est. Scoping Start 04/2016 Expected:07/2016 08/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Description: Install approximately 1,813 feet of overhead powerline to serve a residence. Location: 04/01/2016 04:09 am MT Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Section 18, T4S, R9W, St. Stephens Meridian. Off Forest Service road 401D. CE *NEW LISTING* 09/2016 Description: Issue a new authorization to a new owner to replace an expired authorization for access to a private residence. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48927 Location: Singing River EPA Service for Olier In Progress: Scoping Start 01/21/2015 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest. LEGAL - Sec. 3, Township 1 North, Range 13 West, St. Stephens Meridian. Forrest County, Mississippi. CE *NEW LISTING* 07/2016 Description: Request for access to private land surrounded by National Forest land Location: Saucier Access Expected:06/2016 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest, George, Perry. LEGAL - Not Applicable. East and west of Highway 49 and north of Highway 26. CE *UPDATED* In Progress: Scoping Start 01/12/2015 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Jackson. LEGAL - Section 13, Township 5 South, Range 9 West. Double Still Road. Page 11 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Success Community Sign Project Purpose - Special use management - Special use management - Special use management 04/01/2016 04:09 am MT In Progress: Scoping Start 01/21/2015 Expected:07/2016 08/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us In Progress: Scoping Start 12/28/2015 Expected:04/2016 05/2016 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Developing Proposal Est. Scoping Start 10/2016 Expected:01/2017 02/2017 Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us Description: Grant Special Use Permit for access to private land that is a complete inholding within the National Forest. Location: National Forests In Mississippi Rebecca Ladnier 601-528-6169 reladnier@fs.fed.us UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Sec. 1, T6S, R10W, Harrison County, MS. White Plains Road. - Special use management CE *UPDATED* 11/2016 Description: Reissuance of a permit for access across National Forest land to a private residence. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40268 Location: Woods Alliston Access Expected:10/2016 UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Sec. 34, Township 1 North, Range 11 West, St. Stephens Meridian. Perry County, Mississippi. CE *UPDATED* R8 - Southern Region Description: Request for access to private land surrounded by National Forest land. Location: Trebotich Access Developing Proposal Est. Scoping Start 08/2016 Project Contact UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Section 25, T5S, R11W. Intersection of Highway 67 and Success Road. CE *UPDATED* Expected Implementation Description: Harrison County Board of Supervisors and District 5 Road Dept. propose to install a sign for the community of Success and maintain a small area around the sign by mowing and ornamental plantings. Area is within the existing road right-of-way. Location: Todd Talley Access Decision De Soto Ranger District (excluding Projects occurring in more than one District) CE *UPDATED* Planning Status UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Sec. 23 &30, T3S, R9W, Stone County, MS; St. Stephens Meridian. Red Creek. Delta Ranger District (excluding Projects occurring in more than one District) Page 12 of 20 R8 - Southern Region National Forests In Mississippi Project Name National Forests In Mississippi Reissue Special Use Permit DEL0011 to Kinder Morgan Project Purpose Planning Status Decision Expected Implementation R8 - Southern Region Delta Ranger District (excluding Projects occurring in more than one District) - Special use management Developing Proposal Est. Scoping Start 04/2015 Expected:06/2015 Project Contact 06/2015 CE Michael Whittington 662-873-6256 mswhittington@fs.fed.u s Description: Renewal of Special Uses Permit, Kinder Morgan Location: National Forests In Mississippi December 23, 2015 Tornado Recovery - Forest products - Fuels management EA *UPDATED* Expected:05/2016 05/2016 Michael Whittington 662-236-6550 mswhittington@fs.fed.u s UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton, Marshall. LEGAL - State of Mississippi, Marshall County; T3S,R1W; T3S,R2W; T4S, R2W; Benton County; T2S, R1E; T2S,R2E; T3S,R1E. Tornado damaged National Forest lands distributed through Marshall and Benton Counties. - Wildlife, Fish, Rare plants In Progress: Expected:08/2016 - Vegetation management Scoping Start 08/01/2012 (other than forest products) Est. Comment Period Public - Fuels management Notice 04/2016 Description: Yearly prescribed burning program across the Holly Springs Location: 04/01/2016 04:09 am MT In Progress: Comment Period Public Notice 02/08/2016 Description: Holly Springs National Forest is proposing treatment of approximately 1200 acres of Tornado damaged timber. The proposed treatment will salvage sales to reduce hazardous fuels and reduce the risk of disease and pest outbreak. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48820 Location: Prescribed Burning Program R8 - Southern Region Holly Springs Ranger District (excluding Projects occurring in more than one District) EA *NEW LISTING* UNIT - Delta Ranger District. STATE - Mississippi. COUNTY - Sharkey. LEGAL - Sec. 4, T10N, R6W, Sharkey County, MS. General Forested Area, Bottomland Hardwood Forest. 10/2016 John Townsend 662-285-3264/662236-6550 jtownsend@fs.fed.us UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton, Lafayette, Marshall, Tippah, Union, Yalobusha. LEGAL - Not Applicable. Spread across the Holly Springs, all counties, virtually all compartments. Page 13 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Project Purpose Planning Status Decision Expected Implementation R8 - Southern Region Holly Springs Ranger District (excluding Projects occurring in more than one District) Special Use Permit for Access - - Special use management Cook In Progress: Scoping Start 08/09/2012 Expected:02/2016 Project Contact 02/2016 CE Caren Briscoe 662-236-6550 ext 241 carenbriscoe@fs.fed.us Description: Access to a private tract of land across National Forest System. Existing road, no ground disturbance, no timber harvest. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40156 Location: UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton. LEGAL - T 4 S, R 2 E, Section 29. Benton County, MS - off McGee Road. Special Use Permit for Access - - Special use management Hartsoe In Progress: Scoping Start 08/09/2012 Expected:02/2016 02/2016 CE Caren Briscoe 662-236-6550 ext 241 carenbriscoe@fs.fed.us Description: Access to a private tract of land across National Forest System. Existing road, no ground disturbance, no timber harvest. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40157 Location: UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton. LEGAL - T 4 S, R 1 W, Section 27. Benton County, MS - off Lower Gurley Road. Special Use Permit for Access - - Special use management Jirimiwi Hunting Club In Progress: Scoping Start 09/17/2012 Expected:02/2016 02/2016 CE Caren Briscoe 662-236-6550 ext 241 carenbriscoe@fs.fed.us Description: Access to a private tract of land across National Forest System. Existing road, no ground distubance, no timber harvest. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40163 Location: UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton. LEGAL - T 3 S, R 1 W, Section 24. Benton County, MS - off Reaves Road. Special Use Permit for Access - - Special use management Jones In Progress: Scoping Start 08/24/2012 CE Expected:02/2016 02/2016 Caren Briscoe 662-236-6550 ext 241 carenbriscoe@fs.fed.us Description: Access to a tract of private land across National Forest System. Existing road, no ground disturbance, no timber harvest. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40158 Location: 04/01/2016 04:09 am MT UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton. LEGAL - T 4 S, R 2 E, Section 21. Benton County, MS - off CR 801. Page 14 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Project Purpose Planning Status Decision Expected Implementation R8 - Southern Region Holly Springs Ranger District (excluding Projects occurring in more than one District) Special Use Permit for Access - - Special use management Thompson In Progress: Scoping Start 09/17/2012 Expected:02/2016 Project Contact 02/2016 CE Caren Briscoe 662-236-6550 ext 241 carenbriscoe@fs.fed.us Description: Access to a private tract of land across National Forest System. Existing road, no ground disturbance, no timber harvest. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40161 Location: Special Use Permit for Utility AT&T Fiber Optic UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton. LEGAL - T 4 S, R 1 W, Section 1. Benton County, MS - off Royston Road. - Special use management In Progress: Scoping Start 02/08/2016 Expected:04/2016 05/2016 CE *NEW LISTING* James Schiller 662-285-3264 jschiller@fs.fed.us Description: SUP for fiber optic underground in existing road row Location: UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton, Marshall. LEGAL - T3S R1W T4S R1W. existing forest service and county roads in existing cleared ROW. Special User Permit amendment for utility - TV EPA Electric Line - Special use management CE Description: power line to pipeline to install safety equipment In Progress: Scoping Start 02/08/2016 Expected:05/2016 06/2016 James Schiller 662-285-3264 jschiller@fs.fed.us *NEW LISTING* Location: Telecommunications Tower Project For The Yalobusha Unit on the Holly Springs National Forest CE 04/01/2016 04:09 am MT UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Yalobusha. LEGAL - T24N R5E. Along FDR 832. - Facility management In Progress: Scoping Start 09/22/2014 Expected:03/2016 03/2016 James Schiller 662-285-3264 jschiller@fs.fed.us Description: Construction of a new telecommunications tower on the Yalobusha Unit of the Holly Springs National Forest. The tower will be 100 feet tall and will be built on the footprint of an old fire tower site located on Forest Service. Location: UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Choctaw. LEGAL - The telecommunications tower location will be in Section 29, Township 25 North, Range 5 East, Yalobusha County, MS. The telecommunications tower location will be in Section 29, Township 25 North, Range 5 East, Yalobusha County, MS. Page 15 of 20 National Forests In Mississippi Project Name National Forests In Mississippi 126B Salvage Project Purpose Planning Status Decision Expected Implementation R8 - Southern Region Homochitto Ranger District (excluding Projects occurring in more than one District) - Forest products Completed Actual: 02/22/2016 02/2016 CE *NEW LISTING* UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Wilkinson. LEGAL - T4N, R1W, Sections 20, 21, 26, 27. Scattered damage on both sides of Forest Road 126B, approximately 9 miles west of Crosby, MS, in Wilkinson County. - Special use management CE *NEW LISTING* Jay Pittman 601-384-5876 japittman@fs.fed.us Description: Commercial salvage of dead/damaged trees from a wind storm on approximately 70 acres. No road construction or reforestation is needed. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48632 Location: 192C Underground Utility Project Contact In Progress: Scoping Start 02/25/2016 Expected:04/2016 04/2016 Michael Everett 601-384-5876 meverett@fs.fed.us Description: Request to allow Southwest MS EPA to install a buried power line, approx. 1,200ft long, within the roadbed of FR 192C. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48940 Location: UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Amite. LEGAL - T4N, R2E, Section 24, Amite County, MS. Forest Road 192C, approximately 2 miles NE of Crosby, MS., off West Homochitto Road. Fred Bein 2014 First Thinning/Restoration - Wildlife, Fish, Rare plants 02/2016 In Progress: Expected:02/2016 Project 601-384-2814 - Forest products Scoping Start 04/11/2014 fjbein@fs.fed.us Vegetation management Est. Comment Period Public EA (other than forest products) Notice 10/2015 - Fuels management - Watershed management Description: The analysis and potential thinning/restoration of approximately 13,407 acres of overstocked plantations to improve the overall health of the forest, wildlife habitats, and insect/disease susceptibility. Project was begun as HFRA 1st Thin. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44332 Location: 04/01/2016 04:09 am MT UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Adams, Franklin. LEGAL - Not Applicable. The Clear Springs and Sandy Creek areas are located West of Meadville; roughly bounded by the Homochitto River on the East and South and the Forest proclamation boundary on the North and West. Page 16 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Clear Springs Rec Area Hazard Reduction Project Purpose Planning Status Decision Expected Implementation R8 - Southern Region Homochitto Ranger District (excluding Projects occurring in more than one District) - Recreation management - Forest products Completed Actual: 01/15/2016 02/2016 CE *NEW LISTING* CE *NEW LISTING* CE In Progress: Scoping Start 03/11/2016 Expected:04/2016 04/2016 Michael Everett 601-384-5876 meverett@fs.fed.us Description: Request for access and maintenance of approximately 2,600ft of FS Road 101A to access private property. No work outside the existing corridor clearing limits is expected. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48939 UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Franklin. LEGAL - T6N, R1E, Sect. 47 in Franklin County, MS. FS Road 101A, approximately 3 miles South of Roxie, MS. Michael Everett - Forest products In Progress: Expected:10/2015 10/2015 601-384-5876 - Watershed management Scoping Start 08/19/2015 meverett@fs.fed.us - Road management Description: Application by Amite County to replace a low weight bridge on East Homochitto Rd. with a precast concrete bridge over Brown Branch Creek. Removal of timber on 1.6 acres for proposed ROW. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47809 Location: 04/01/2016 04:09 am MT UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Franklin. LEGAL - T5N, R2E, Section 2. Upper camping loop of Clear Springs Recreation Area, approximately 5 miles WSW of Meadville, MS, in Franklin County. - Special use management - Road management Location: East Homochitto Rd. Bridge Replacement Jay Pittman 601-384-5876 japittman@fs.fed.us Description: Removal of felled trees killed by bark beetles from a developed campsite to maintain safety of forest visitors. Location: Coyote Tree Farm Access Project Contact UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Amite. LEGAL - T4N, R2E, Sec. 37. East Homochitto Road approximately 5 miles North of Gloster, MS, over Brown Branch Creek. Page 17 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Homochitto Gravel Pits EA *UPDATED* Project Purpose - Minerals and Geology - Road management EA *UPDATED* R8 - Southern Region Expected:02/2016 02/2016 Andy Hunter 601-928-4422 Ext.26 aehunter@fs.fed.us In Progress: Scoping Start 02/01/2016 Expected:03/2016 03/2016 Michael Everett 601-384-5876 meverett@fs.fed.us Description: Allowing use of 1 acre of National Forest land adjacent to Springhill Missionary Baptist Church for use as a parking lot. Includes removal of trees and earthwork. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48700 UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Franklin. LEGAL - T6N, R1E, Section 44. Adjacent to MS Hwy. 33, approximately 4.5 miles south of Roxie, MS, at the Springhill Missionary Baptist Church. Orin Sampson 04/2016 - Wildlife, Fish, Rare plants Completed Actual: 03/30/2016 601-384-5876 ex.174 - Forest products ojsampson@fs.fed.us - Vegetation management (other than forest products) - Watershed management - Road management Description: Examination and analysis of approximately 12,950 acres of the Homochitto NF for natural resource needs and opportunities. Activities may include thinning, stand regeneration, wildlife habitat and recreation enhancement, road work, and other projects. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33315 Location: 04/01/2016 04:09 am MT In Progress: Project Contact UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Amite, Franklin, Wilkinson. LEGAL T3N,R2E,sec.3,4; T4N,R3E,sec.17; T3N,R2E,sec.9; T4N,R4E,sec.5; T7N,R3E,sec.35; T7N,R3E,sec.32; T6N,R5E,sec.32; T4N,R1E,sec.34. Union Church Pit, 106C Pit, East Woodsman Springs Pit, 153a2 Pit, 110c1 Pit, Applewhite Pit, Bogue Chitto Road Pit, and 154 Pit. See vicinity map for locations. - Special use management Location: Landscape Analysis Unit 4 (LAU-4) Expected Implementation Description: The expansion of one existing gravel pit and development of up to 7 new gravel pits to provide for road reconstruction and maintenance needs of the Forest and local counties. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42389 CE *NEW LISTING* Decision Homochitto Ranger District (excluding Projects occurring in more than one District) Location: Hwy. 33 Church Parking Planning Status UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Franklin. LEGAL - T6N,R3E, Sec.13,14-19,30-31; T6N,R4E, Sec.1-5,7-10; T7N,R3E, Sec.34-35; T7N,R4E, Sec. 3-5,8-10,15-17,20-29,32-36; T7N,R5E, Sec.17-20,29-31; T8N,R4E, Sec.27-28,32-34. . Approximately 1/4 mile north of Bude, Mississippi, in Franklin County. Generally bounded on the East by FR113 and FR111, and on the South and West by the Forest Boundary. Page 18 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Pinnacle Sign and Access CE *NEW LISTING* Project Purpose Special Use Permit for Utility Bruce Telephone Fiber Optic Decision Expected Implementation - Special use management - Road management In Progress: Scoping Start 02/01/2016 Expected:03/2016 03/2016 UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Amite. LEGAL - T4N, R2E, Section 29, Amite County, MS. Forest Road 106E, off East Homochitto Road, approximately 5 miles North of Gloster, Mississippi. R8 - Southern Region Tombigbee Ranger District (excluding Projects occurring in more than one District) - Special use management In Progress: Scoping Start 02/01/2016 Expected:04/2016 04/2016 UNIT - Tombigbee Ranger District. STATE - Mississippi. COUNTY - Chickasaw. LEGAL - T12S R3 and 4E. FDR 903 901 also known as CR 124 413. - Special use management In Progress: Scoping Start 12/02/2015 Expected:04/2016 04/2016 CE *UPDATED* UNIT - Tombigbee Ranger District. STATE - Mississippi. COUNTY - Chickasaw. LEGAL - T12S R4E S5. Along FDR 912 in pipeline ROW. - Special use management In Progress: Scoping Start 12/24/2014 CE *UPDATED* Expected:01/2016 Actual: 02/29/2016 02/2016 James Schiller 662-285-3264 jschiller@fs.fed.us Description: Fiber optic underground - Hwy 25 ROW Location: 04/01/2016 04:09 am MT James Schiller 662-285-3264 jschiller@fs.fed.us Description: overhead powerline along FDR 912 0.35 miles Location: Special Use Permit for Utility Telepak Fiber Option T15N James Schiller 662-285-3264 jschiller@fs.fed.us Description: SUP fiber optic in existing road ROW T12S R3 and 4 E Location: Special Use Permit for Utility Pontotoc EPA Michael Everett 601-384-5876 meverett@fs.fed.us Description: Request for use and maintenance of FS Road 106E to access private property; transfer of a sign to the new owners of Brushy Creek Horse Ranch. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48701 CE *NEW LISTING* Project Contact R8 - Southern Region Homochitto Ranger District (excluding Projects occurring in more than one District) Location: National Forests In Mississippi Planning Status UNIT - Tombigbee Ranger District. STATE - Mississippi. COUNTY - Winston. LEGAL - T15N, R13E, S 6,29,31,32. Project will take place in the Hwy 25 ROW between Louisville,MS and Starkville, MS. Page 19 of 20 National Forests In Mississippi Project Name National Forests In Mississippi Special Use Permit for Utility Troy Water Assoc Project Purpose Planning Status Decision Expected Implementation R8 - Southern Region Tombigbee Ranger District (excluding Projects occurring in more than one District) - Special use management In Progress: Scoping Start 12/02/2015 Expected:04/2016 04/2016 CE *UPDATED* UNIT - Tombigbee Ranger District. STATE - Mississippi. COUNTY - Chickasaw. LEGAL - T12S R4E S5. Along FDR 912 within pipeline ROW. - Special use management Completed CE *UPDATED* James Schiller 662-285-3264 jschiller@fs.fed.us Description: Underground waterline along FDR 912 Location: special use permit for utility Telepac Cspire Fiber Optic Project Contact Actual: 02/29/2016 02/2016 James Schiller 662-285-3264 jschiller@fs.fed.us Description: T16N R13E underground fiber optic Hwy 25 Location: UNIT - Tombigbee Ranger District. STATE - Mississippi. COUNTY - Winston. LEGAL - T16N R13E S9,10,20,21. ROW Hwy 25 between Louisville and Starkville. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 04/01/2016 04:09 am MT Page 20 of 20 National Forests In Mississippi