Schedule of Proposed Action (SOPA) 04/01/2016 to 06/30/2016 National Forests In Mississippi

advertisement
Schedule of Proposed Action (SOPA)
04/01/2016 to 06/30/2016
National Forests In Mississippi
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
Project Name
National Forests In Mississippi
C-Spire Fiber Optic Line:
Highways 18 and 35
Project Purpose
Planning Status
Decision
Expected
Implementation
R8 - Southern Region
Bienville Ranger District (excluding Projects occurring in more than one District)
- Special use management
Completed
Actual: 01/15/2016
01/2016
CE
*UPDATED*
UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Smith. LEGAL - Not Applicable. The
proposed project is located in Smith County T3N, R6E Sections 26 and 36; T3N, R6E Section 26 and 36; T3N,
R8E Section 31; and T3N, R8E Sections 7,18, and 19. Boring within ROW Hwy 18 and 35.
- Special use management
Completed
Actual: 01/15/2016
01/2016
CE
*UPDATED*
Christina Harper
601-469-3811
cnharper@fs.fed.us
Description: C Spire is requesting a special use permit to install underground conduit/cable across approximately 2.60 miles of
National Forest land in order to upgrade the existing telecommunications in the local area,
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46668
Location:
Mississippi Resources, LLC Oil
and Gas Exploration
Christina Harper
601-469-3811
cnharper@fs.fed.us
Description: C-Spire is requesting a special use permit to install underground conduit/cable across approximately 4 miles of
National Forest land in order to upgrade the existing telecommunications in the local area.
Location:
C-Spire Fiber Optic Line:
Highways 80 and 35
Project Contact
UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Scott. LEGAL - Not Applicable. The
proposed project will cross National Forest land in Scott County T6N,R7E, Sections 13,14, and 15; T6N, R8E
Section 33; and T6N, R9E Section 17. Directional boring within ROW Hwy 80 & 35.
- Minerals and Geology
- Special use management
On Hold
CE
N/A
N/A
Marc Weathersby
601-469-3811
maweathersby@fs.fed.u
s
Description: The Bienville National Forest has received a request from MS Resources, LLC for a Permit to Drill USA 21-12 #1,
permitted to 16,500 feet for an exploratory test on Lease MSES-056720.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42882
Location:
04/01/2016 04:09 am MT
UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Smith. LEGAL - The proposal is located in
Township 4 North, Range 8 East, Section 21 of Smith County, Mississippi. The MS Resources, LLC proposed well
pad project is located approximately 2 miles southeast of Lorena, MS off of Forest Service Road 504A.
Page
1 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Shockaloe Horse Trail culvert
replacements
Project Purpose
Planning Status
Decision
Expected
Implementation
R8 - Southern Region
Bienville Ranger District (excluding Projects occurring in more than one District)
- Recreation management
- Watershed management
In Progress:
Scoping Start 08/19/2014
Expected:10/2015
Project Contact
11/2015
CE
Marc Weathersby
601-469-3811
maweathersby@fs.fed.u
s
Description: The Shockaloe Horse trail is 23 miles in length. We're replacing approximately 28 old rusted out metal culverts
along the trail. In the ephemeral drains along the trail we're building drain-dips out of crushed limestone rock.
Location:
Smith County Bridge
Replacement
UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Scott. LEGAL - T7N, R7E, Sections
13,14,23,24,25,26,27,34,35 & 36; and T6N, R7E, Sections 1,2,3,10,11,12,13,14 & 15 Scott Cty, MS.
The Shockaloe Horse Trail is located on the Bienville National Forest between Forest and Morton just north of U.S.
Highway 80.
- Watershed management
- Road management
In Progress:
Scoping Start 09/15/2015
Expected:01/2016
01/2016
CE
Christina Harper
601-469-3811
cnharper@fs.fed.us
Description: Smith County Board of Supervisors is proposing to replace bridges on two county roads that cross the Bienville
NF, County Road 538B and County Road 538E.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48307
Location:
Southern Pine EPA power line
construction
UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Smith. LEGAL - Not Applicable. The
proposed project are located in Section 3 and 12 of Township 4 North Range 6 East of Smith County, MS.
- Special use management
In Progress:
Scoping Start 08/28/2013
Expected:11/2015
CE
11/2015
Marc Weathersby
601-469-3811
maweathersby@fs.fed.u
s
Description: Southern Pine EPA has proposed to construct a new 14.4 KV power line across Bienville National Forest Systems
lands.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42289
Location:
National Forests In Mississippi
04/01/2016 04:09 am MT
UNIT - Bienville Ranger District. STATE - Mississippi. COUNTY - Newton. LEGAL - Township 5 North, Range
10 East, Sections 27 & 28, of Newton County, Mississippi. The Southern Pine EPA proposed power line right-ofway is located approximately 1 1/2 miles west of State Hwyway 505 and adjacent to the New-Logan Road.
Chickasawhay Ranger District (excluding Projects occurring in more than one District)
Page
2 of 20
R8 - Southern Region
National Forests In Mississippi
Project Name
National Forests In Mississippi
ASI Tea Company proposes
commercial harvest of yaupon
CE
*NEW LISTING*
Project Purpose
Decision
Expected
Implementation
- Forest products
In Progress:
- Vegetation management
Scoping Start 01/29/2016
(other than forest products)
Description: Harvest by hand yaupon leaves and twigs.
Expected:04/2016
Project Contact
R8 - Southern Region
Chickasawhay Ranger District (excluding Projects occurring in more than one District)
Location:
Commercial Thinning in
Compartment 369, Stand 15
Planning Status
05/2016
Andy Barwick
601-428-0594
ajbarwick@fs.fed.us
UNIT - Chickasawhay Ranger District. STATE - Mississippi. COUNTY - Greene, Jones, Wayne. LEGAL - Not
Applicable. Chickasawhay ranger district Jones, Wayne, & Greene Counties, Mississippi.
- Wildlife, Fish, Rare plants
- Forest products
On Hold
N/A
N/A
CE
Andy Barwick
601-4280594
ajbarwick@fs.fed.us
Description: Commercial thin a 50-acre stand to improve RCW habitat.
Location:
UNIT - Chickasawhay Ranger District. STATE - Mississippi. COUNTY - Jones. LEGAL - Section 12, T6N,
R10W. Ten miles North of Richton, Mississippi.
Special Use Road for South
Mississippi Free Will Baptist
Youth Camp
- Special use management
CE
Description: Renewal of a special use authorization for an existing road approximately 175 feet long.
In Progress:
Scoping Start 02/09/2016
Expected:04/2016
05/2016
Jacob Rhyne
850-926-3561 ext6545
jdrhyne@fs.fed.us
*UPDATED*
Location:
Watershed Health Restoration,
and Maintenance in the Sand
Hill Creek Analysis Unit
EA
*UPDATED*
Andy Barwick
- Wildlife, Fish, Rare plants
In Progress:
Expected:07/2016
09/2016
601-4280594
- Forest products
Comment Period Public Notice
ajbarwick@fs.fed.us
- Vegetation management
05/21/2015
(other than forest products)
- Fuels management
Description: Longleaf restoration, commercial thinning, midstory reduction, red cockaded woodpecker management, and
prescribed burning for the recovery of theatened and endangered species in the Sand Hill Creek Analysis Unit.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35528
Location:
04/01/2016 04:09 am MT
UNIT - Chickasawhay Ranger District. STATE - Mississippi. COUNTY - Wayne. LEGAL - Section 10, T6N,
R8W. Six miles southwest of Clara, Mississippi.
UNIT - Chickasawhay Ranger District. STATE - Mississippi. COUNTY - Wayne. LEGAL - Sections 25, 26, 34,
35, 36, T6N, R8W. Seven miles North of Sand Hill, Mississippi.
Page
3 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
AT&T Job Number 57C00275N
Project Purpose
- Special use management
- Special use management
- Special use management
Developing Proposal
Est. Scoping Start 04/2016
Expected:10/2016
11/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Developing Proposal
Est. Scoping Start 04/2016
Expected:10/2016
11/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Developing Proposal
Est. Scoping Start 04/2016
Expected:10/2016
11/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Description: Install buried fiber optic cable within existing maintained county road right-of-way.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49157
Location:
04/01/2016 04:09 am MT
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Township 5 South,
Range 11 West, Sections 11, 12 & 14. Success, Vogle, Yet, and 508 Roads.
- Special use management
CE
*NEW LISTING*
11/2016
Description: Install buried fiber optic line in existing maintained county road rights-of-way.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49155
Location:
AT&T Job Number 57C00374N
Expected:10/2016
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Township 4 South, Range
13 West, Sections 1, 2 & 11. West McHenry, Perkinston-Silver Run, and Hickman Firetower Roads.
CE
*NEW LISTING*
R8 - Southern Region
Description: Install buried fiber optic cable within existing maintained county road rights-of-way.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49152
Location:
AT&T Job Number 57C00366N
Developing Proposal
Est. Scoping Start 04/2016
Project Contact
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Township 4 South, Range
11 West, Section 19 and Township 4 South, Range 12 West, Sections 14 & 23. Glenn Lott, Mack Lott, and
Riceville Roads.
CE
*NEW LISTING*
Expected
Implementation
Description: Install buried fiber optic cable within existing maintained county road rights-of-way.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49156
Location:
AT&T Job Number 57C00281N
Decision
De Soto Ranger District (excluding Projects occurring in more than one District)
CE
*NEW LISTING*
Planning Status
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Township 5 South,
Range 10 West, Section 20. Blackwell Farm Road.
Page
4 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
AT&T Job Number 57C00375N
Project Purpose
- Special use management
Expected
Implementation
Developing Proposal
Est. Scoping Start 04/2016
Expected:10/2016
R8 - Southern Region
11/2016
- Special use management
Completed
Actual: 02/12/2016
04/2016
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Section 11, T5S, R11W.
Approximately one mile south of Bethel Road along the east side of Success Road.
- Special use management
CE
*UPDATED*
02/2017
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
In Progress:
Scoping Start 11/13/2015
Expected:08/2016
09/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Description: Access to private land completely surrounded by National Forest.
Location:
04/01/2016 04:09 am MT
Expected:01/2017
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - George. LEGAL - Sec. 4, T1S, R8W,
George County, MS. Leaf, MS.
- Special use management
CE
*UPDATED*
Developing Proposal
Est. Scoping Start 10/2016
Description: Provide access over an existing route to Salem Cemetery
Location:
Alexander Access
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Description: Install approx. 900 feet of buried fiber optic cable within the right-of-way of Success Road, and 370 feet of aerial
fiber optic cable to be placed on existing poles to provide upgraded telecommunication services.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47617
Location:
Access to Salem Cemetery
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Township 5 South,
Range 11 West, Sections 1, 2 & 11 and Township 4 South, Range 11 West, Sections 23, 26 & 35. Road 542,
Bethel, Airey Tower, Joe Bill, and Martha Redmond Roads.
CE
*UPDATED*
Project Contact
Description: Install buried fiber optic cable within existing maintained county road rights-of-way.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49159
Location:
AT&T Service for Harrison
Experimental Forest
Decision
De Soto Ranger District (excluding Projects occurring in more than one District)
CE
*NEW LISTING*
Planning Status
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Sec. 36, T1N, R11W, Perry
County, MS. Between Hwy. 29 and Black Creek.
Page
5 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Project Purpose
CE
Expected
Implementation
Developing Proposal
Est. Scoping Start 10/2016
Expected:01/2017
R8 - Southern Region
02/2017
- Special use management
Developing Proposal
Est. Scoping Start 10/2016
Expected:06/2017
07/2017
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest. LEGAL - Sections 7, 17, 20 &
29, T2N, R12W. West side of State Highway 49 within existing cleared right-of-way.
- Special use management
CE
*UPDATED*
07/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Developing Proposal
Est. Scoping Start 04/2016
Expected:08/2016
09/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Description: Request for access to private land.
Location:
04/01/2016 04:09 am MT
Expected:06/2016
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Sec. 34, Township 2 North,
Range 9 West, St. Stephens Meridian. Perry County, Mississippi.
- Special use management
CE
*UPDATED*
In Progress:
Scoping Start 01/22/2015
Description: Request for access to private land surrounded by National Forest land.
Location:
Dorothy Franklin Access
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Description: Install buried fiber optic cable within right-of-way of State Highway 49.
Location:
Darren Methe Access
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Sec. 5, Township 4 South,
Range 10 West & Sec. 32, Township 3 South, Range 10 West, St. Stephens Meridian. Stone County, Mississippi.
CE
*UPDATED*
Project Contact
Description: Request for access to private land surrounded by National Forest land.
Location:
Contact Network Fiber Optic
Cable Installation
Decision
De Soto Ranger District (excluding Projects occurring in more than one District)
Charles and Clark Bond Access - Special use management
*UPDATED*
Planning Status
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest. LEGAL - Sec. 22 & 23, Township 2
North, Range 12 West, St. Stephens Meridian. Forrest County.
Page
6 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Franklin Telephone Service for
Carter
Project Purpose
Planning Status
Decision
Expected
Implementation
R8 - Southern Region
De Soto Ranger District (excluding Projects occurring in more than one District)
- Special use management
Developing Proposal
Est. Scoping Start 06/2016
Expected:10/2016
11/2016
CE
*NEW LISTING*
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Section 23, Township 1
North, Range 11 West. Janice-Brooklyn Road.
- Special use management
CE
*UPDATED*
- Special use management
In Progress:
Scoping Start 05/28/2014
Expected:05/2016
03/2017
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Developing Proposal
Est. Scoping Start 04/2016
Expected:10/2016
11/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Description: Construct a 496'x504' well pad and 155' access road to drill for oil on Federal Leases MSES054565 &
MSES054570. Complete for production if producible quantities of oil are found, or rehabilitate if none are found.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49163
Location:
04/01/2016 04:09 am MT
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Section 27, T1S, R10W.
Black Creek, upstream from Fairley Bridge Road; north of existing right-of-way.
- Minerals and Geology
CE
*NEW LISTING*
02/2017
Description: Relocate a section of natural gas pipeline that has become exposed due to erosion along the banks of Black
Creek. New r/w 50' wide, with add'l 25' temp work space needed. Directional bore under Black Creek.
Rehabilitation of abandoned r/w.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42858
Location:
Laurentide Well 4S-9W-18X
Expected:01/2017
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Sec. 19 & 30, Township 3
South, Range 9 West, St. Stephens Meridian. Stone County, Mississippi.
CE
*UPDATED*
Developing Proposal
Est. Scoping Start 10/2016
Description: Request for access to private land surrounded by National Forest land
Location:
Gulf South Pipeline Relocation
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Description: Install 1,065 feet of buried copper cable within existing maintained road rights-of-way to provide
telecommunications to a private residence.
Location:
Glenn Lott Access
Project Contact
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Township 4 South, Range 9
West, Section 18. Approximately 13 miles east of McHenry, Mississippi; off of Forest Service Road 401D.
Page
7 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Laurentide Well 5S-10W-13X
Project Purpose
- Minerals and Geology
- Minerals and Geology
Expected:10/2016
11/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Developing Proposal
Est. Scoping Start 04/2016
Expected:10/2016
11/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Township 5 South,
Range 10 West, Section 14. Approximately 12 miles north-northwest of D'Iberville, Mississippi; off of Forest
Service Road 426B.
- Special use management
CE
*UPDATED*
R8 - Southern Region
Description: Construct a 426'x478' well pad and 298' access road to drill for oil on Federal Leases MSES054842 &
MSES054845. Complete for production if producible quantities of oil are found, or rehabilitate if none are found.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49164
Location:
Pat Davis Access
Developing Proposal
Est. Scoping Start 04/2016
Project Contact
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Township 5 South,
Range 10 West, Section 13. Approximately 11 miles north-northwest of D'Iberville, Mississippi. West of Forest
Service Road 426.
CE
*NEW LISTING*
Expected
Implementation
Description: Construct a 425'x425' well pad and 589' access road to drill for oil on Federal Leases MSES054843 &
MSES054844. Complete for production if producible quantities of oil are found, or rehabilitate if none are found.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49162
Location:
Laurentide Well 5S-10W-14X
Decision
De Soto Ranger District (excluding Projects occurring in more than one District)
CE
*NEW LISTING*
Planning Status
In Progress:
Scoping Start 01/22/2015
Expected:06/2016
07/2016
Rebecca Ladnier
601-928-4422
reladnier@fs.fed.us
Description: Provide access to private land over an existing woods road.
Location:
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Sec. 36, T2N, R9W, Perry
County, Mississippi, St. Stephens Meridian. North of Little Creek Road.
Pearl River Valley EPA
Powerline Relocation - Job No.
6720
- Special use management
CE
Description: Relocate powerline from woods to public road right-of-way.
Cancelled
N/A
N/A
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
*UPDATED*
Location:
04/01/2016 04:09 am MT
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Pearl River. LEGAL - Section 8, T1S,
R14W. Adjacent to Gumpond Beall Road.
Page
8 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Project Purpose
Planning Status
Decision
Expected
Implementation
Project Contact
R8 - Southern Region
De Soto Ranger District (excluding Projects occurring in more than one District)
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Pearl River Valley EPA
Powerline Upgrade and
Relocation along Hwy. 15
- Special use management
CE
Description: Relocate an overhead powerline to a new location along a state highway, upgrade the line from 7,200 to 14,400
volts, and remove abandoned poles and wire.
*UPDATED*
Location:
Pearl River Valley EPA Service
for Keel
Developing Proposal
Est. Scoping Start 08/2016
Expected:02/2017
04/2017
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Sec. 20 & 29, T3S, R9W,
St. Stephens Meridian, Stone County, MS. Highway 15, Stone County, MS.
- Special use management
Developing Proposal
Est. Scoping Start 04/2016
Expected:07/2016
08/2016
CE
*UPDATED*
Description: Construct a single phase overhead power line, approx. 3,070 feet in length, to provide power to a future residence.
Location:
Pearl River Valley EPA Service
for Talley
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Section 24, T2S, R10W.
Extending west from Rosalee Road along the north side of Highway 26, then northwesterly to private land.
- Special use management
In Progress:
Scoping Start 11/13/2015
CE
*UPDATED*
EA
*UPDATED*
07/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Section 34, T1N, R11W.
North of New York Road, off of Forest Service Road 319I.
Tate Thriffiley
01/2017
- Wildlife, Fish, Rare plants
In Progress:
Expected:12/2016
601-584-8488 Ext. 111
- Vegetation management
Scoping Start 05/26/2015
tatethriffiley@fs.fed.us
(other than forest products)
Est. Comment Period Public
- Fuels management
Notice 06/2016
Description: Ecosystem restoration & maintenance, T&E species habitat improvement, and hazardous fuels management
achieved by prescribed burning.
Location:
04/01/2016 04:09 am MT
Expected:06/2016
Description: Construct a single phase overhead power line, approx. 900 feet in length, to provide power to a future residence.
Location:
Programmatic Prescribed
Burning EA
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest, George, Greene, Harrison, Jackson,
Pearl River, Perry, Stone. LEGAL - Not Applicable. De Soto Ranger District.
Page
9 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Project Purpose
Planning Status
Decision
Expected
Implementation
Project Contact
R8 - Southern Region
De Soto Ranger District (excluding Projects occurring in more than one District)
Catherine Bailey
601-965-1663
cjbailey@fs.fed.us
Reissuance of Special Use
Permit to Errol Bradley for
Access
- Special use management
CE
Description: Reissue a Special Use Permit to Errol Bradley for access to private property. No changes in the land use are
proposed.
Location:
Reissuance of Special Use
Permit to Plains Pipeline
In Progress:
Scoping Start 10/27/2015
Expected:05/2016
06/2016
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Section 21, T3S, R9W.
North of Vestry Road.
- Special use management
In Progress:
Scoping Start 03/25/2016
Expected:07/2016
08/2016
CE
*UPDATED*
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Description: Reissue a Special Use Permit to Plains Pipeline for a new term to authorize continued operation and maintenance
of an existing crude oil pipeline. No changes in authorized facilities or increases in the scope or intensity of
activities is planned.
Location:
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest, Perry. LEGAL - Not Applicable.
West of Highway 49 and north of Highway 26.
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Reissuance of Special Use
Permit to Red Wolf Wilderness
Adventures
- Special use management
CE
Description: Reissue permit to provide outfitter and guide services on Black Creek. There will no change in scope or intensity
of activities.
*UPDATED*
Location:
Reissuance of Special Use
Permit to Singing River EPA
In Progress:
Scoping Start 10/27/2015
Expected:04/2016
05/2016
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Not Applicable. Moody's,
Janice, Cypress Creek, and Fairley Bridge Landings on Black Creek.
- Special use management
Developing Proposal
Est. Scoping Start 01/2016
CE
Expected:07/2016
08/2016
Catherine Bailey
601-965-1663
cjbailey@fs.fed.us
Description: Reissue a Special Use Permit for continued operation and maintenance of existing electric power lines. No new
land use is proposed.
Location:
04/01/2016 04:09 am MT
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest, George, Greene, Perry. LEGAL Not Applicable. Numerous locations of distribution and service lines across the Forest, north of Highway 26.
Page
10 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Project Purpose
Planning Status
Decision
Expected
Implementation
Project Contact
R8 - Southern Region
De Soto Ranger District (excluding Projects occurring in more than one District)
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Reissue Special Use Permit to
Florida Gas Transmission
Company
- Special use management
CE
Description: Reissue the special use permit for a new term for continued operation and maintenance of an existing natural gas
pipeline. No changes in the area authorized or the scope or intensity of activities is proposed.
*UPDATED*
Location:
Ronnie Robertson Access
- Special use management
- Special use management
Expected:08/2016
In Progress:
Scoping Start 03/01/2016
Expected:04/2016
- Special use management
05/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Developing Proposal
Est. Scoping Start 04/2016
Expected:07/2016
08/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Description: Install approximately 1,813 feet of overhead powerline to serve a residence.
Location:
04/01/2016 04:09 am MT
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Section 18, T4S, R9W, St.
Stephens Meridian. Off Forest Service road 401D.
CE
*NEW LISTING*
09/2016
Description: Issue a new authorization to a new owner to replace an expired authorization for access to a private residence.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48927
Location:
Singing River EPA Service for
Olier
In Progress:
Scoping Start 01/21/2015
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest. LEGAL - Sec. 3, Township 1 North,
Range 13 West, St. Stephens Meridian. Forrest County, Mississippi.
CE
*NEW LISTING*
07/2016
Description: Request for access to private land surrounded by National Forest land
Location:
Saucier Access
Expected:06/2016
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Forrest, George, Perry. LEGAL - Not
Applicable. East and west of Highway 49 and north of Highway 26.
CE
*UPDATED*
In Progress:
Scoping Start 01/12/2015
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Jackson. LEGAL - Section 13, Township 5
South, Range 9 West. Double Still Road.
Page
11 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Success Community Sign
Project Purpose
- Special use management
- Special use management
- Special use management
04/01/2016 04:09 am MT
In Progress:
Scoping Start 01/21/2015
Expected:07/2016
08/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
In Progress:
Scoping Start 12/28/2015
Expected:04/2016
05/2016
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Developing Proposal
Est. Scoping Start 10/2016
Expected:01/2017
02/2017
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
Description: Grant Special Use Permit for access to private land that is a complete inholding within the National Forest.
Location:
National Forests In Mississippi
Rebecca Ladnier
601-528-6169
reladnier@fs.fed.us
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Sec. 1, T6S, R10W,
Harrison County, MS. White Plains Road.
- Special use management
CE
*UPDATED*
11/2016
Description: Reissuance of a permit for access across National Forest land to a private residence.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40268
Location:
Woods Alliston Access
Expected:10/2016
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Perry. LEGAL - Sec. 34, Township 1 North,
Range 11 West, St. Stephens Meridian. Perry County, Mississippi.
CE
*UPDATED*
R8 - Southern Region
Description: Request for access to private land surrounded by National Forest land.
Location:
Trebotich Access
Developing Proposal
Est. Scoping Start 08/2016
Project Contact
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Harrison. LEGAL - Section 25, T5S, R11W.
Intersection of Highway 67 and Success Road.
CE
*UPDATED*
Expected
Implementation
Description: Harrison County Board of Supervisors and District 5 Road Dept. propose to install a sign for the community of
Success and maintain a small area around the sign by mowing and ornamental plantings. Area is within the
existing road right-of-way.
Location:
Todd Talley Access
Decision
De Soto Ranger District (excluding Projects occurring in more than one District)
CE
*UPDATED*
Planning Status
UNIT - De Soto Ranger District. STATE - Mississippi. COUNTY - Stone. LEGAL - Sec. 23 &30, T3S, R9W,
Stone County, MS; St. Stephens Meridian. Red Creek.
Delta Ranger District (excluding Projects occurring in more than one District)
Page
12 of 20
R8 - Southern Region
National Forests In Mississippi
Project Name
National Forests In Mississippi
Reissue Special Use Permit
DEL0011 to Kinder Morgan
Project Purpose
Planning Status
Decision
Expected
Implementation
R8 - Southern Region
Delta Ranger District (excluding Projects occurring in more than one District)
- Special use management
Developing Proposal
Est. Scoping Start 04/2015
Expected:06/2015
Project Contact
06/2015
CE
Michael Whittington
662-873-6256
mswhittington@fs.fed.u
s
Description: Renewal of Special Uses Permit, Kinder Morgan
Location:
National Forests In Mississippi
December 23, 2015 Tornado
Recovery
- Forest products
- Fuels management
EA
*UPDATED*
Expected:05/2016
05/2016
Michael Whittington
662-236-6550
mswhittington@fs.fed.u
s
UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton, Marshall. LEGAL - State of
Mississippi, Marshall County; T3S,R1W; T3S,R2W; T4S, R2W; Benton County; T2S, R1E; T2S,R2E; T3S,R1E.
Tornado damaged National Forest lands distributed through Marshall and Benton Counties.
- Wildlife, Fish, Rare plants
In Progress:
Expected:08/2016
- Vegetation management
Scoping Start 08/01/2012
(other than forest products)
Est. Comment Period Public
- Fuels management
Notice 04/2016
Description: Yearly prescribed burning program across the Holly Springs
Location:
04/01/2016 04:09 am MT
In Progress:
Comment Period Public Notice
02/08/2016
Description: Holly Springs National Forest is proposing treatment of approximately 1200 acres of Tornado damaged timber.
The proposed treatment will salvage sales to reduce hazardous fuels and reduce the risk of disease and pest
outbreak.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48820
Location:
Prescribed Burning Program
R8 - Southern Region
Holly Springs Ranger District (excluding Projects occurring in more than one District)
EA
*NEW LISTING*
UNIT - Delta Ranger District. STATE - Mississippi. COUNTY - Sharkey. LEGAL - Sec. 4, T10N, R6W,
Sharkey County, MS. General Forested Area, Bottomland Hardwood Forest.
10/2016
John Townsend
662-285-3264/662236-6550
jtownsend@fs.fed.us
UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton, Lafayette, Marshall, Tippah,
Union, Yalobusha. LEGAL - Not Applicable. Spread across the Holly Springs, all counties, virtually all
compartments.
Page
13 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Project Purpose
Planning Status
Decision
Expected
Implementation
R8 - Southern Region
Holly Springs Ranger District (excluding Projects occurring in more than one District)
Special Use Permit for Access - - Special use management
Cook
In Progress:
Scoping Start 08/09/2012
Expected:02/2016
Project Contact
02/2016
CE
Caren Briscoe
662-236-6550 ext 241
carenbriscoe@fs.fed.us
Description: Access to a private tract of land across National Forest System. Existing road, no ground disturbance, no timber
harvest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40156
Location:
UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton. LEGAL - T 4 S, R 2 E, Section
29. Benton County, MS - off McGee Road.
Special Use Permit for Access - - Special use management
Hartsoe
In Progress:
Scoping Start 08/09/2012
Expected:02/2016
02/2016
CE
Caren Briscoe
662-236-6550 ext 241
carenbriscoe@fs.fed.us
Description: Access to a private tract of land across National Forest System. Existing road, no ground disturbance, no timber
harvest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40157
Location:
UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton. LEGAL - T 4 S, R 1 W,
Section 27. Benton County, MS - off Lower Gurley Road.
Special Use Permit for Access - - Special use management
Jirimiwi Hunting Club
In Progress:
Scoping Start 09/17/2012
Expected:02/2016
02/2016
CE
Caren Briscoe
662-236-6550 ext 241
carenbriscoe@fs.fed.us
Description: Access to a private tract of land across National Forest System. Existing road, no ground distubance, no timber
harvest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40163
Location:
UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton. LEGAL - T 3 S, R 1 W,
Section 24. Benton County, MS - off Reaves Road.
Special Use Permit for Access - - Special use management
Jones
In Progress:
Scoping Start 08/24/2012
CE
Expected:02/2016
02/2016
Caren Briscoe
662-236-6550 ext 241
carenbriscoe@fs.fed.us
Description: Access to a tract of private land across National Forest System. Existing road, no ground disturbance, no timber
harvest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40158
Location:
04/01/2016 04:09 am MT
UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton. LEGAL - T 4 S, R 2 E, Section
21. Benton County, MS - off CR 801.
Page
14 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Project Purpose
Planning Status
Decision
Expected
Implementation
R8 - Southern Region
Holly Springs Ranger District (excluding Projects occurring in more than one District)
Special Use Permit for Access - - Special use management
Thompson
In Progress:
Scoping Start 09/17/2012
Expected:02/2016
Project Contact
02/2016
CE
Caren Briscoe
662-236-6550 ext 241
carenbriscoe@fs.fed.us
Description: Access to a private tract of land across National Forest System. Existing road, no ground disturbance, no timber
harvest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40161
Location:
Special Use Permit for Utility AT&T Fiber Optic
UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton. LEGAL - T 4 S, R 1 W,
Section 1. Benton County, MS - off Royston Road.
- Special use management
In Progress:
Scoping Start 02/08/2016
Expected:04/2016
05/2016
CE
*NEW LISTING*
James Schiller
662-285-3264
jschiller@fs.fed.us
Description: SUP for fiber optic underground in existing road row
Location:
UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Benton, Marshall. LEGAL - T3S R1W
T4S R1W. existing forest service and county roads in existing cleared ROW.
Special User Permit
amendment for utility - TV EPA
Electric Line
- Special use management
CE
Description: power line to pipeline to install safety equipment
In Progress:
Scoping Start 02/08/2016
Expected:05/2016
06/2016
James Schiller
662-285-3264
jschiller@fs.fed.us
*NEW LISTING*
Location:
Telecommunications Tower
Project
For The Yalobusha Unit on the
Holly
Springs National Forest
CE
04/01/2016 04:09 am MT
UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Yalobusha. LEGAL - T24N R5E. Along
FDR 832.
- Facility management
In Progress:
Scoping Start 09/22/2014
Expected:03/2016
03/2016
James Schiller
662-285-3264
jschiller@fs.fed.us
Description: Construction of a new telecommunications tower on the Yalobusha Unit of the Holly Springs National Forest. The
tower will be 100 feet tall and will be built on the footprint of an old fire tower site located on Forest Service.
Location:
UNIT - Holly Springs Ranger District. STATE - Mississippi. COUNTY - Choctaw. LEGAL - The
telecommunications tower location will be in Section 29, Township 25 North, Range 5 East, Yalobusha County,
MS. The telecommunications tower location will be in Section 29, Township 25 North, Range 5 East, Yalobusha
County, MS.
Page
15 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
126B Salvage
Project Purpose
Planning Status
Decision
Expected
Implementation
R8 - Southern Region
Homochitto Ranger District (excluding Projects occurring in more than one District)
- Forest products
Completed
Actual: 02/22/2016
02/2016
CE
*NEW LISTING*
UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Wilkinson. LEGAL - T4N, R1W, Sections
20, 21, 26, 27. Scattered damage on both sides of Forest Road 126B, approximately 9 miles west of Crosby, MS,
in Wilkinson County.
- Special use management
CE
*NEW LISTING*
Jay Pittman
601-384-5876
japittman@fs.fed.us
Description: Commercial salvage of dead/damaged trees from a wind storm on approximately 70 acres. No road construction or
reforestation is needed.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48632
Location:
192C Underground Utility
Project Contact
In Progress:
Scoping Start 02/25/2016
Expected:04/2016
04/2016
Michael Everett
601-384-5876
meverett@fs.fed.us
Description: Request to allow Southwest MS EPA to install a buried power line, approx. 1,200ft long, within the roadbed of FR
192C.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48940
Location:
UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Amite. LEGAL - T4N, R2E, Section 24,
Amite County, MS. Forest Road 192C, approximately 2 miles NE of Crosby, MS., off West Homochitto Road.
Fred Bein
2014 First Thinning/Restoration - Wildlife, Fish, Rare plants
02/2016
In Progress:
Expected:02/2016
Project
601-384-2814
- Forest products
Scoping Start 04/11/2014
fjbein@fs.fed.us
Vegetation
management
Est.
Comment
Period
Public
EA
(other than forest products)
Notice 10/2015
- Fuels management
- Watershed management
Description: The analysis and potential thinning/restoration of approximately 13,407 acres of overstocked plantations to improve
the overall health of the forest, wildlife habitats, and insect/disease susceptibility. Project was begun as HFRA 1st
Thin.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44332
Location:
04/01/2016 04:09 am MT
UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Adams, Franklin. LEGAL - Not
Applicable. The Clear Springs and Sandy Creek areas are located West of Meadville; roughly bounded by the
Homochitto River on the East and South and the Forest proclamation boundary on the North and West.
Page
16 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Clear Springs Rec Area Hazard
Reduction
Project Purpose
Planning Status
Decision
Expected
Implementation
R8 - Southern Region
Homochitto Ranger District (excluding Projects occurring in more than one District)
- Recreation management
- Forest products
Completed
Actual: 01/15/2016
02/2016
CE
*NEW LISTING*
CE
*NEW LISTING*
CE
In Progress:
Scoping Start 03/11/2016
Expected:04/2016
04/2016
Michael Everett
601-384-5876
meverett@fs.fed.us
Description: Request for access and maintenance of approximately 2,600ft of FS Road 101A to access private property. No
work outside the existing corridor clearing limits is expected.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48939
UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Franklin. LEGAL - T6N, R1E, Sect. 47 in
Franklin County, MS. FS Road 101A, approximately 3 miles South of Roxie, MS.
Michael Everett
- Forest products
In Progress:
Expected:10/2015
10/2015
601-384-5876
- Watershed management
Scoping Start 08/19/2015
meverett@fs.fed.us
- Road management
Description: Application by Amite County to replace a low weight bridge on East Homochitto Rd. with a precast concrete bridge
over Brown Branch Creek. Removal of timber on 1.6 acres for proposed ROW.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47809
Location:
04/01/2016 04:09 am MT
UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Franklin. LEGAL - T5N, R2E, Section 2.
Upper camping loop of Clear Springs Recreation Area, approximately 5 miles WSW of Meadville, MS, in Franklin
County.
- Special use management
- Road management
Location:
East Homochitto Rd. Bridge
Replacement
Jay Pittman
601-384-5876
japittman@fs.fed.us
Description: Removal of felled trees killed by bark beetles from a developed campsite to maintain safety of forest visitors.
Location:
Coyote Tree Farm Access
Project Contact
UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Amite. LEGAL - T4N, R2E, Sec. 37. East
Homochitto Road approximately 5 miles North of Gloster, MS, over Brown Branch Creek.
Page
17 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Homochitto Gravel Pits
EA
*UPDATED*
Project Purpose
- Minerals and Geology
- Road management
EA
*UPDATED*
R8 - Southern Region
Expected:02/2016
02/2016
Andy Hunter
601-928-4422 Ext.26
aehunter@fs.fed.us
In Progress:
Scoping Start 02/01/2016
Expected:03/2016
03/2016
Michael Everett
601-384-5876
meverett@fs.fed.us
Description: Allowing use of 1 acre of National Forest land adjacent to Springhill Missionary Baptist Church for use as a parking
lot. Includes removal of trees and earthwork.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48700
UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Franklin. LEGAL - T6N, R1E, Section 44.
Adjacent to MS Hwy. 33, approximately 4.5 miles south of Roxie, MS, at the Springhill Missionary Baptist Church.
Orin Sampson
04/2016
- Wildlife, Fish, Rare plants
Completed
Actual: 03/30/2016
601-384-5876 ex.174
- Forest products
ojsampson@fs.fed.us
- Vegetation management
(other than forest products)
- Watershed management
- Road management
Description: Examination and analysis of approximately 12,950 acres of the Homochitto NF for natural resource needs and
opportunities. Activities may include thinning, stand regeneration, wildlife habitat and recreation enhancement,
road work, and other projects.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33315
Location:
04/01/2016 04:09 am MT
In Progress:
Project Contact
UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Amite, Franklin, Wilkinson. LEGAL T3N,R2E,sec.3,4; T4N,R3E,sec.17; T3N,R2E,sec.9; T4N,R4E,sec.5; T7N,R3E,sec.35; T7N,R3E,sec.32;
T6N,R5E,sec.32; T4N,R1E,sec.34. Union Church Pit, 106C Pit, East Woodsman Springs Pit, 153a2 Pit, 110c1 Pit,
Applewhite Pit, Bogue Chitto Road Pit, and 154 Pit. See vicinity map for locations.
- Special use management
Location:
Landscape Analysis Unit 4
(LAU-4)
Expected
Implementation
Description: The expansion of one existing gravel pit and development of up to 7 new gravel pits to provide for road
reconstruction and maintenance needs of the Forest and local counties.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42389
CE
*NEW LISTING*
Decision
Homochitto Ranger District (excluding Projects occurring in more than one District)
Location:
Hwy. 33 Church Parking
Planning Status
UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Franklin. LEGAL - T6N,R3E, Sec.13,14-19,30-31; T6N,R4E, Sec.1-5,7-10; T7N,R3E, Sec.34-35;
T7N,R4E, Sec. 3-5,8-10,15-17,20-29,32-36; T7N,R5E, Sec.17-20,29-31; T8N,R4E, Sec.27-28,32-34.
. Approximately 1/4 mile north of Bude, Mississippi, in Franklin County. Generally bounded on the East by FR113
and FR111, and on the South and West by the Forest Boundary.
Page
18 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Pinnacle Sign and Access
CE
*NEW LISTING*
Project Purpose
Special Use Permit for Utility Bruce Telephone Fiber Optic
Decision
Expected
Implementation
- Special use management
- Road management
In Progress:
Scoping Start 02/01/2016
Expected:03/2016
03/2016
UNIT - Homochitto Ranger District. STATE - Mississippi. COUNTY - Amite. LEGAL - T4N, R2E, Section 29,
Amite County, MS. Forest Road 106E, off East Homochitto Road, approximately 5 miles North of Gloster,
Mississippi.
R8 - Southern Region
Tombigbee Ranger District (excluding Projects occurring in more than one District)
- Special use management
In Progress:
Scoping Start 02/01/2016
Expected:04/2016
04/2016
UNIT - Tombigbee Ranger District. STATE - Mississippi. COUNTY - Chickasaw. LEGAL - T12S R3 and 4E.
FDR 903 901 also known as CR 124 413.
- Special use management
In Progress:
Scoping Start 12/02/2015
Expected:04/2016
04/2016
CE
*UPDATED*
UNIT - Tombigbee Ranger District. STATE - Mississippi. COUNTY - Chickasaw. LEGAL - T12S R4E S5.
Along FDR 912 in pipeline ROW.
- Special use management
In Progress:
Scoping Start 12/24/2014
CE
*UPDATED*
Expected:01/2016
Actual: 02/29/2016
02/2016
James Schiller
662-285-3264
jschiller@fs.fed.us
Description: Fiber optic underground - Hwy 25 ROW
Location:
04/01/2016 04:09 am MT
James Schiller
662-285-3264
jschiller@fs.fed.us
Description: overhead powerline along FDR 912 0.35 miles
Location:
Special Use Permit for Utility Telepak Fiber Option T15N
James Schiller
662-285-3264
jschiller@fs.fed.us
Description: SUP fiber optic in existing road ROW T12S R3 and 4 E
Location:
Special Use Permit for Utility Pontotoc EPA
Michael Everett
601-384-5876
meverett@fs.fed.us
Description: Request for use and maintenance of FS Road 106E to access private property; transfer of a sign to the new
owners of Brushy Creek Horse Ranch.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48701
CE
*NEW LISTING*
Project Contact
R8 - Southern Region
Homochitto Ranger District (excluding Projects occurring in more than one District)
Location:
National Forests In Mississippi
Planning Status
UNIT - Tombigbee Ranger District. STATE - Mississippi. COUNTY - Winston. LEGAL - T15N, R13E, S
6,29,31,32. Project will take place in the Hwy 25 ROW between Louisville,MS and Starkville, MS.
Page
19 of 20
National Forests In Mississippi
Project Name
National Forests In Mississippi
Special Use Permit for Utility Troy Water Assoc
Project Purpose
Planning Status
Decision
Expected
Implementation
R8 - Southern Region
Tombigbee Ranger District (excluding Projects occurring in more than one District)
- Special use management
In Progress:
Scoping Start 12/02/2015
Expected:04/2016
04/2016
CE
*UPDATED*
UNIT - Tombigbee Ranger District. STATE - Mississippi. COUNTY - Chickasaw. LEGAL - T12S R4E S5.
Along FDR 912 within pipeline ROW.
- Special use management
Completed
CE
*UPDATED*
James Schiller
662-285-3264
jschiller@fs.fed.us
Description: Underground waterline along FDR 912
Location:
special use permit for utility Telepac Cspire Fiber Optic
Project Contact
Actual: 02/29/2016
02/2016
James Schiller
662-285-3264
jschiller@fs.fed.us
Description: T16N R13E underground fiber optic Hwy 25
Location:
UNIT - Tombigbee Ranger District. STATE - Mississippi. COUNTY - Winston. LEGAL - T16N R13E
S9,10,20,21. ROW Hwy 25 between Louisville and Starkville.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial
status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited
bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at
(202) 720-2600 (voice and TDD).
To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA
is an equal opportunity provider and employer.
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
04/01/2016 04:09 am MT
Page
20 of 20
National Forests In Mississippi