Schedule of Proposed Action (SOPA) 07/01/2014 to 09/30/2014 Willamette National Forest

advertisement
Schedule of Proposed Action (SOPA)
07/01/2014 to 09/30/2014
Willamette National Forest
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
Project Name
Project Purpose
Planning Status
Decision
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region, Regionwide (excluding Projects occurring in more than one Region)
Christine Pyle
Aquatic Invasive Species order - Wildlife, Fish, Rare plants
Developing Proposal
Expected:05/2014
05/2014
to prevent the spread or
503-808-2691
Est. Scoping Start 05/2014
introduction of aquatic invasive
cdpyle@fs.fed.us
species
Description: The purpose of this order is to prevent the spread or introduction of aquatic invasive plant or animal species.
CE
Public involvement is targeted for the Umatilla, Willamette, Mt. Baker-Snoqualmie, Gifford Pinchot, and Colville
NFs.
*NEW LISTING*
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44360
Location:
UNIT - R6 - Pacific Northwest Region All Units. STATE - Oregon, Washington. COUNTY - Asotin, Clark,
Columbia, Cowlitz, Ferry, Garfield, King, Klickitat, Lewis, Pend Oreille, Pierce, Skagit, Skamania, Snohomish,
Stevens, Walla Walla, Whatcom, Baker, Clackamas, Douglas, Grant, Jefferson, Lane, Linn, Marion, Morrow,
Umatilla, Union, Wallowa, Wheeler. LEGAL - Not Applicable. Order will apply to all Forests in Region 6, however
targeted scoping is with the Umatilla, Gifford Pinchot, Mt. Baker/Snoqualmie, Willamette and Colville NFs tribal and
public scoping lists.
R6 - Pacific Northwest Region
Willamette National Forest, Occurring in more than one District (excluding Forestwide)
Riparian Weed Treatment
Project
EA
- Vegetation management
(other than forest products)
- Watershed management
In Progress:
Notice of Initiation 03/25/2013
Est. Comment Period Public
Notice 07/2014
Expected:09/2014
10/2014
Jennifer Lippert
541-225-6440
jlippert@fs.fed.us
Description: Develop treatment options for five riparian weed populations found throughout the Willamette National Forest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42022
Location:
Willamette National Forest
07/01/2014 03:22 am MT
UNIT - Middle Fork Ranger District, Sweet Home Ranger District, McKenzie River Ranger District. STATE Oregon. COUNTY - Lane, Linn. Sweet Home R.D. -Two Girls Cr.; McKenzie R.D.-Lookout Cr.; Middle Fork
R.D.- N. Fk. M. Fk. Willamette, Middle Fk. Willamette River.
Detroit Ranger District (excluding Projects occurring in more than one District)
Page
1 of 20
R6 - Pacific Northwest Region
Willamette National Forest
Project Name
Willamette National Forest
2014 Lands Permits
Project Purpose
- Special use management
Developing Proposal
Est. Scoping Start 09/2014
Expected:11/2014
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
12/2014
Penny Keen
503-854-4202
pkeen@fs.fed.us
Description: Renew three lands special use permits, Bureau of Reclamation Weather station, City of Idanha Water system, and
Breitenbush Hot Springs Mobile radio Service new term of 10 years. This is an administrative action no ground
disturbance will take place.
Location:
2014 Marion Creek Stream
Restoration
Decision
Detroit Ranger District (excluding Projects occurring in more than one District)
CE
*NEW LISTING*
Planning Status
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. Bureau of
Reclamation Weather Station T.10S., R6E, SECTION 3
City of Idanha Waterline - T.10S., R6E. SECTION 22
Breitenbush Hot Spring Mobile Radio Service - T.9S., R7E. SECTION 16.
- Wildlife, Fish, Rare plants
- Watershed management
In Progress:
Scoping Start 04/24/2014
Expected:06/2014
07/2014
CE
Darrin Neff
503-854-4219
daneff@fs.fed.us
Description: This project would improve fish habitat and curb bank erosion by adding large wood complexes in the side
channels of lower Marion Creek. It is anticipated to enhance recreational viewings of spring chinook spawning near
the new Day Use Area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43806
Location:
2014 Recreation Permits
- Special use management
CE
*NEW LISTING*
Developing Proposal
Est. Scoping Start 09/2014
Expected:10/2014
12/2014
Penny Keen
503-854-4202
pkeen@fs.fed.us
Description: Renew three recreation special use permits Detroit Lake Marina, Kanes Marina, and Chemeketans Club to a new
term of 10 years. This is an administrative action no ground disturbance will take place.
Location:
07/01/2014 03:22 am MT
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. Marion Forks
Creek at the Marion Forks Fish Hatchery and Day Use area.
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. Kanes
Marina T.10S., R6E, SECTION 2
Detroit Marina - T.10S., R6E. SECTION 1
Chemeketans Club - T.10S., R7E. SECTION 27
.
Page
2 of 20
Willamette National Forest
Project Name
Willamette National Forest
Project Purpose
Planning Status
Decision
Detroit Ranger District (excluding Projects occurring in more than one District)
Buck Tule
EA
Project Contact
R6 - Pacific Northwest Region
Lynise Medley
- Land management planning
In Progress:
Expected:11/2014
01/2015
503-854-4228
- Wildlife, Fish, Rare plants
Notice of Initiation 03/16/2012
lmedley@fs.fed.us
- Forest products
Est. Comment Period Public
- Vegetation management
Notice 08/2014
(other than forest products)
- Fuels management
- Minerals and Geology
Description: Timber harvest is proposed in densely stocked second growth stands generally ranging in age from 40 to 150
years old, and includes stands within Riparian Reserves and approximately 40 acres in the Jefferson LateSuccessional Reserve.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38487
Location:
City of Detroit Water System
Update
Expected
Implementation
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - T11S, R6E, Sections 13,
14, 22 - 28, 33-36 , T11S, R7E, Sections 16-21, 28-32, T12S, R6E, Sections 1-3, 12, 13, T12S, R7E, Sections
5-8, 17-20. The main portion of the project area is bounded by Fisher Point, Trappers Butte and Scar Mountain to
the west, Parish Lake Road to the south, Buck Mountain and Coffin Mountain to the north and Highway.
- Special use management
In Progress:
Scoping Start 04/04/2011
CE
Expected:09/2014
10/2014
Penny Keen
503-854-4202
pkeen@fs.fed.us
Description: Fence to be installed around water building on Breitenbush Rd. Install emergency drainline from water storage
tank. Reissue special use permit.
Location:
Humbug Creek Dispersed Sites
Rehabilitation
CE
Darrin Neff
- Recreation management
Developing Proposal
Expected:06/2014
07/2014
503-854-4219
- Wildlife, Fish, Rare plants
Est. Scoping Start 04/2014
daneff@fs.fed.us
- Watershed management
Description: The project will lessen impacts to federally listed fish habitat by decreasing sediment inputs, increasing the shade
component and reducing the chance for petroleum products from vehicles entering the water by rehabilitating two
dispersed campsites.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43805
Location:
07/01/2014 03:22 am MT
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - T10S, R5E, sec 1; T9S, R5E,
sec 36. Breitenbush Rd. and City of Detroit.
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - T9S, R6E Sec 16 &21.
T9S, R6E Sec 16 &21, Humbug Creek Watershed, 4697 road system.
Page
3 of 20
Willamette National Forest
Project Name
Willamette National Forest
McCoy Motorized Rec. Area
Improvements 2014-2015
Project Purpose
Planning Status
Decision
Detroit Ranger District (excluding Projects occurring in more than one District)
- Recreation management
On Hold
N/A
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
N/A
CE
Bradford Peterson
503-854-3894
bcpeterson@fs.fed.us
Description: This project will include the installation of a covered picnic shelter at the lower staging area, and the expansion of
the upper staging area.
Location:
Meadow Enhancement
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. Multiple locations within the McCoy
Motorized Recreation Area.
- Wildlife, Fish, Rare plants
CE
In Progress:
Scoping Start 03/28/2013
Expected:11/2014
05/2015
Daryl Whitmore
503-854-4225
dwhitmore@fs.fed.us
Description: Meadow enhancement and rehabilitation in 3 meadows on the Detroit Ranger District. Enchancements include
tree removal, limbing, slash burning and monitoring.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40864
Location:
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T11S, R07E, sec 26, 27; T12S
R07E sec 29, 34. Dusty, Big and Marion Creek Meadows.
Christopher Donaldson
Recreation and Administravbite - Recreation management
Completed
Actual: 05/14/2014
05/2014
Site Hazardous Fuels
503-854-3892
- Special area management
Reduction
cdonaldson@fs.fed.us
- Fuels management
Facility
management
CE
Description: Project was formerly called "2012 Rec/Admin HF". This project proposes to cut and burn or chip brush and trees
less than 10 inches in diameter at 4.5 feet from ground level (DBH) to increase the defensible space around district
infrastructure.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40109
Location:
07/01/2014 03:22 am MT
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - T10S R5E Sec 5, T11S
R7E Sec15, T12S R2E Sec 2, T10S R7E Sec 25, T10S R8E Sec 18, T13S R7E Sec 4, T12S R7E Sec 27, T10S
R5E Sec 3. Halls Ridge Repeater, Marion Forks Guard Station, Camp Pioneer, Pamelia, Whitewater and Duffy
Trailheads, Maxwell Snow Park, Detroit Ranger Station.
Page
4 of 20
Willamette National Forest
Project Name
Willamette National Forest
Project Purpose
Planning Status
Decision
Detroit Ranger District (excluding Projects occurring in more than one District)
Special Forest Products Sales
- Forest products
Completed
Actual: 05/16/2014
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
06/2014
CE
Sue Crowder
503-854-4204
sjcrowder@fs.fed.us
Description: The proposed action is to implement the sale of Special Forest Products in a permit and contract-controlled
manner which regulates activities and manages the forest environment and meets the demand for these products
by the public.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43803
Location:
Str8 Thinning Restoration
CE
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. District
wide.
- Wildlife, Fish, Rare plants
- Forest products
In Progress:
Scoping Start 03/28/2013
Expected:09/2014
10/2014
Sue Crowder
503-854-4204
sjcrowder@fs.fed.us
Description: Reduce stocking levels of stands 6-9 inches in diameter, 500-800 TPA. Offer biomass products such as posts
and poles and firewood and other SFP such as bough and beargrass.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41544
Location:
Willamette National Forest
2014 Recreation Residence
Septic Repair
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - T. 11 S., R. 6 E., Sections
26, 27, 34 and 35, Willamette Meridian. Upper North Santiam and Detroit Reservoir/Blowout watersheds.
McKenzie River Ranger District (excluding Projects occurring in more than one District)
- Special use management
In Progress:
Scoping Start 03/24/2014
CE
Expected:09/2014
R6 - Pacific Northwest Region
10/2014
Denise Mercer
541-822-7224
dmercer@fs.fed.us
Description: This proposal is to replace the septic system of Recreation Residence Cabin #27 in the Delta A Tract. The would
include a septic tank between 1000 - 1500 gallons, a drain field of up to 150' and transmission lines from the cabin
to the tank.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43957
Location:
07/01/2014 03:22 am MT
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16 S, R5E, Sec 16.
55311 Delta Rd.
Page
5 of 20
Willamette National Forest
Project Name
Willamette National Forest
Project Purpose
Planning Status
Decision
McKenzie River Ranger District (excluding Projects occurring in more than one District)
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
Denise Mercer
2014 Various District-wide
10/2014
- Special use management
In Progress:
Expected:08/2014
Term Special Use Authorization
541-822-7224
Scoping Start 03/24/2014
Reissuances
dmercer@fs.fed.us
Description:
CE
Proposal to reissue 7 existing term special use permits. The term of each authorization would be 20-30 years
(depending on type). There will be no change in the authorized facilities or increase in the scope or intensity of
authorized activities.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43960
Location:
410 Road Hazardous Fuels
Reduction Project
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane, Linn. LEGAL - T16S, R5E Sec 16
& T16S, R5E, Sec 20 & T16S, R4E, Sec 14 & T 16S, R6E, Sec 10 & T16S, R6E, Sec 16
& T16S, R5E, Sec 22 & T16S, R6E, Sec 11. Delta Road ; King Road ; Rd 15 to Blue River Reservoir
Road ; near Hwy 126 - Rd 302 on the North side of the McKenzie River ; the McKenzie Air Strip ; near King Rd ;
near Scott Creek.
- Fuels management
In Progress:
Scoping Start 11/08/2012
Expected:08/2014
10/2014
CE
Brenda Hallmark
541-822-7228
bhallmark@fs.fed.us
Description: A 94 acre hazardous fuels reduction project to aid in wildfire prevention and management. There would be an
understory thin (<7" dbh), completed with hand and mechanical work. Brush will be piled and burned,
underburned, or chipped and scattered.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41526
Location:
Bend Broadband Hoodoo Butte
Fiberoptic Backhaul Project
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S R5E Sec 19, 30.
Located south and west of FS 19 Road and adjacent transmission lines; north and east of the South Fork of the
McKenzie River;and west of Strube Flats.
- Special use management
In Progress:
Scoping Start 05/15/2014
CE
*NEW LISTING*
07/2014
Shari Monson
541-225-6424
smonson@fs.fed.us
Description: This project will provide Sprint (located in the American Tower Facility) on Hoodoo Butte with a fiber optic
connection ("back haul") back to the Bend Communication/Crown Castle building.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44469
Location:
07/01/2014 03:22 am MT
Expected:07/2014
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T.13S., R.8E., Section
34, W.M. Lane County, OR. Hoodoo Butte.
Page
6 of 20
Willamette National Forest
Project Name
Willamette National Forest
Big Hoodoo Project
EA
Project Purpose
Decision
McKenzie River Ranger District (excluding Projects occurring in more than one District)
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
Kevin Moran
- Forest products
In Progress:
Expected:09/2014
10/2014
541-822-7255
- Vegetation management
Objection Period Legal Notice
Actual: 09/05/2012
kmoran@fs.fed.us
(other than forest products)
05/26/2014
Description: This project is being reissued with a new decision. The purpose of the project is to reduce hazardous fuels and
improve forest health to protect values at risk in the Hoodoo/Big Lake area through 2,135 acres of treatments in the
Santiam Pass area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36179
Location:
Blue River Upper Compound
Administrative Site Disposal
Planning Status
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S R7E Sec.¿s 24,25,
36; T13S R7.5E Sec.¿s 21-28, 33-36; T14S R7E Sec. 1; T14S R7.5E Sec.¿s 1-4, 9-11. Santiam Pass area
south of Hwy 20, in and around Hoodoo Ski Area and Big Lake.
- Facility management
On Hold
N/A
N/A
EA
Shane Kamrath
541-822-7233
skamrath@fs.fed.us
Description: The sale of the site which consists of six structures, a paved road, gravel driveways and roads, paved and
graveled parking and loading areas, a gravel stockpile, and timber/vegetation areas.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38416
Location:
Boundary Thin Project
CE
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 21; T16S, R4E;
W.M. Lane County. Forest road 2620-130.
- Forest products
- Fuels management
In Progress:
Scoping Start 03/14/2014
Expected:07/2014
12/2014
Shadie Nimer
541-822-7271
snimer@fs.fed.us
Description: To commercially thin 70 acres in a 50 year old stand using ground base equipment. This project will also include
two gaps 1-3 acres in size to promote understory forbs and shrubs.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43934
Location:
07/01/2014 03:22 am MT
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S, R7E, Section 31.
Located on Forest road 2672 Ikenick road.
Page
7 of 20
Willamette National Forest
Project Name
Willamette National Forest
Carmen-Smith Campus
Improvements
Project Purpose
Planning Status
Decision
McKenzie River Ranger District (excluding Projects occurring in more than one District)
- Special use management
- Facility management
In Progress:
Scoping Start 03/24/2014
Expected:07/2014
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
07/2014
CE
Shane Kamrath
541-822-7233
skamrath@fs.fed.us
Description: Replace office and manufactured home to accommodate local snow loading with a design compatible with historic
character of the site. Water system upgrades to be in compliance with state regulations and meet future demands.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43940
Location:
Cingular-Mt. Hagan Tower
Upgrades &
Generator/Propane Tank
Installation
CE
- Special use management
- Facility management
CE
In Progress:
Scoping Start 05/15/2014
Expected:07/2014
07/2014
Shari Monson
541-225-6424
smonson@fs.fed.us
Description: Complete updates needed to upgrade to LTE capacity of existing Cingular/AT&T tower at Mt. Hagen,
including the removal of 2 existing antennas, placement of 4 new antennas, and installation of a generator and
propane tank.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43946
Location:
Cub Thin Project
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T15S, R6E Sec 12.
Eugene Water and Electric Board's Carmen-Smith Hydroelectric Dam operators' residential campus.
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 35, T. 16S.,
R.3E. Mt. Hagan, McKenzie River District of the Willamette National Forest.
- Forest products
- Fuels management
In Progress:
Scoping Start 03/14/2014
Expected:10/2014
06/2015
Burtchell Thomas
541-822-7258
bthomas03@fs.fed.us
Description: The project proposes to commercially thin two stands for a total of 65 acres. The units are second-growth stands
that are approximately 42 years old. The units would be harvested with ground base and skyline equimpmnet.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43947
Location:
07/01/2014 03:22 am MT
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R7E, Section 6;
T15S, R7E, Section 31. Cub Thin Project is located on Forest Service road 2653760 and 2653762.
Page
8 of 20
Willamette National Forest
Project Name
Willamette National Forest
French Pete Creek Crossing
Repair
Project Purpose
Planning Status
Decision
McKenzie River Ranger District (excluding Projects occurring in more than one District)
- Recreation management
In Progress:
Scoping Start 04/22/2013
Expected:10/2014
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
11/2014
CE
Edward Cross
541-822-7231
etcross@fs.fed.us
Description: A project to harden the creek crossing at milepost 2.1 of the French Pete Creek Trail (Tr. No. 3311) in the Three
Sisters Wilderness at French Pete Creek crosing. This would construct a step-down drain style approach to
mitigate erosion.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41528
Location:
Goose
EIS
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T18S, R5E, Sec. 3.
Milepost 2.1 of the French Pete Creek Trail (Tr. No. 3311) in the Three Sisters Wilderness.
- Wildlife, Fish, Rare plants
- Forest products
- Fuels management
In Progress:
NOI in Federal Register
04/30/2014
Est. DEIS NOA in Federal
Register 07/2014
Expected:10/2014
Actual: 09/13/2010
10/2014
Guenther Castillon
541-822-7214
gcastillon@fs.fed.us
Description: The proposed action will commercially harvest stands 25-120 year-old (2,134 acres), reduce fuels in the WUI
(588 acres), and re-introduce fire in a natural fuels underburn (80 acres).
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=29829
Location:
Green Mountain Project
EIS
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T 16S R 5E Sec: 1-5,
9-16, 24. T 16S R 6E Sec: 3-11, 13-25. T 16S R 7E 18, 19, 30. The Goose Project area is located on the
MRRD within the Upper McKenzie Watershed (5th field). It falls within the McKenzie Bridge Community.
- Forest products
- Vegetation management
(other than forest products)
- Watershed management
In Progress:
DEIS NOA in Federal Register
04/11/2014
Est. FEIS NOA in Federal
Register 10/2014
Expected:12/2014
06/2015
Guenther Castillon
541-822-7214
gcastillon@fs.fed.us
Description: Proposes to thin ~4,786 acres (4.9% of the Project Area) and regenerate ~800 acres (0.8% of the Project Area) of
forests across a sum of approximately 5,586 acres within the Green Mountain Project Area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40858
Location:
07/01/2014 03:22 am MT
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16SR4E s36;
T16SR5E s31-32; T17SR4E s01-13; T17SR5E s05-34; T17SR6E s19,30; T18SR4E s01,12; T18SR5E s01-36;
T18SR6E s06-36; T18SR7E s31-35; T19SR5E s01-24; T19SR6E s1-36; T19SR7E s02-31; T20SR6E s01. The
Green Mountain Project area is located within the Cougar Reservoir, Augusta Creek, Roaring River, and Elk Creek
subwatersheds (6th field) of the South Fork McKenzie River Watershed (5th field).
Page
9 of 20
Willamette National Forest
Project Name
Willamette National Forest
King Castle Reroute
Project Purpose
Planning Status
Decision
McKenzie River Ranger District (excluding Projects occurring in more than one District)
- Recreation management
CE
In Progress:
Scoping Start 03/24/2014
Expected:04/2015
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
05/2015
Edward Cross
541-822-7231
etcross@fs.fed.us
Description: A project to reroute a 1.25 Mi. of the King Caslte trail (Tr. No. 4326) to maintain the trails general character. This
project would require removing brush, disturbing the ground (18-22%u201D wide), and removing trees less than
12 inches dbh.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43949
Location:
Knob Boughs
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R5E, Sec. 28
& 21. King's Castle, McKenzie River District, Willamette National Forest.
- Forest products
Completed
Actual: 04/30/2014
08/2014
CE
Shadie Nimer
541-822-7271
snimer@fs.fed.us
Description: The Knob Boughs project would remove approximately one hundred eighty-one tons (362,000 pounds) of
coniferous boughs over 723 acres, under a three-year commercial contract.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43939
Location:
Lamb Thin Project
CE
*NEW LISTING*
- Forest products
- Fuels management
In Progress:
Scoping Start 05/05/2014
Expected:10/2014
11/2014
Shadie Nimer
541-822-7271
snimer@fs.fed.us
Description: To commercially thin three stands for a total of 70 acres in 41 year old stands using ground base equipment. This
project will include 51 acres of commercial thinning, 2 acres of gaps, and 17 acres of skips.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44388
Location:
07/01/2014 03:22 am MT
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane, Linn. LEGAL - T15S, R7E,
Section 10,14,15,22,23,27,33,& 34; T16S, R7E, Section 2,3,& 4. Forest Service roads 2649 and
2649640.
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T17S, R6E, Sections 9,
15, & 16 Lane County. The Lamb Thin project is located off Forest Service roads 1993 and 1995.
Page
10 of 20
Willamette National Forest
Project Name
Willamette National Forest
Lane Electric Underground
Power Projects 2014-2017
Project Purpose
Planning Status
Decision
McKenzie River Ranger District (excluding Projects occurring in more than one District)
- Special use management
- Facility management
Completed
Actual: 05/01/2014
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
05/2014
CE
Denise Mercer
541-822-7224
dmercer@fs.fed.us
Description: Replacement of overhead electrical system with underground system on Hwy 126 between Horse Creek Road and
the McKenzie River Ranger Station. Upgrade of existing underground system along Hwy 242 between Camp Yale
and Camp White Branch.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43951
Location:
Lang Thin Project
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Hwy 126: T16S, R5E,
Sec 13 and T16S, R6E Sec 17, 18. Hwy 242 T16S, R6E, Sec 14, 15, 24 and T16S, R6E, Sec 19, 20, 21. Hwy
126 MP 51.5 to MP 53 and Hwy 242 MP 56 to MP 62.
- Forest products
On Hold
CE
N/A
N/A
Shadie Nimer
541-822-7271
snimer@fs.fed.us
Description: Project will commercially thin one stand for a total of 70 acres. The stand is approximately 65 years old and would
be harvested with ground based and skyline equipment using existing skid trails as much as possible.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41223
Location:
Lookout Mountain Meadow
Restoration
CE
Ruby Seitz
- Wildlife, Fish, Rare plants
Developing Proposal
Expected:04/2015
09/2015
541-822-7256
- Vegetation management
Est. Scoping Start 03/2015
ruseitz@fs.fed.us
(other than forest products)
- Fuels management
Description: The purpose of this project is to restore native meadow habitat by cutting and girdling small diameter trees, and
subsequently implementing a prescribed fire across an approximately 347-acre project area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43955
Location:
07/01/2014 03:22 am MT
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 24 & 25, T16S,
R4E. Stand is located on Forest roads 1900408 and 1900409.
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T15S, R6E, Sections
31, 32; T16S, R6E, Section 6. Lookout Mountain Meadow.
Page
11 of 20
Willamette National Forest
Project Name
Willamette National Forest
Project Purpose
Planning Status
Decision
McKenzie River Ranger District (excluding Projects occurring in more than one District)
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
Edward Cross
541-822-7231
etcross@fs.fed.us
Lost Creek, Tamolitch Valley
and Roaring River Bridge
Replacements
- Recreation management
CE
Description: A project to replace three trail bridges that need replacement. Two bridges are located on the McKenzie River
National Recreation Trail (MRNRT) (Tr. No. 3507). Another bridge crosses Roaring River on the Roaring River
Ridge Trail (Tr. No. 3312).
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41530
Location:
Lower South Fork McKenzie
River Enhancement Project
CE
CE
*NEW LISTING*
10/2014
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T14S,R7E,Sec30 &
T16S,R6E,Sec10 & T19S,R5.5E,Sec12. Lost Creek, Tamolitch Valley on the McKenzie River National Recreation
Trail and Roaring River crossing of the Roaring River Ridge Trail.
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S R4E Sections
23,24; T16S R4.5E Sections 24,25; T16S R5E Sections 19,30,31. Lower South Fork McKenzie River.
- Forest products
- Fuels management
In Progress:
Scoping Start 05/19/2014
Expected:08/2014
10/2014
Shadie Nimer
541-822-7271
snimer@fs.fed.us
Description: To commercially thin a 80 year old stand that is 56 acres. The stand will include a one-1 acre gap and 30 acres of
skips. The purpose of this project is to reduce ladder fuels, manage camping, and improve the security adjacent to
Ranger Station.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44476
Location:
07/01/2014 03:22 am MT
Expected:07/2014
Kate Meyer
06/2015
- Wildlife, Fish, Rare plants
Developing Proposal
Expected:06/2015
541-822-7230
- Vegetation management
Est. Scoping Start 02/2015
kmmeyer@fs.fed.us
(other than forest products)
- Watershed management
Description: Using heavy equipment, stream channels would be reconstructed, up to 1,500 pieces of large wood would be
placed along stream channels, gravel would be placed to improve spawning, and boardwalks, water crossings, and
trails would be constructed.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43959
Location:
MRRS Thin Project
In Progress:
Scoping Start 04/22/2013
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R06E; Sections
17 & 18. The MRRS Thin Project is located at the 53 mile point on the south side of Hwy 126 that is adjacent
to the McKenzie River Ranger Station (MRRS).
Page
12 of 20
Willamette National Forest
Project Name
Willamette National Forest
McKenzie River Trail Reroute
Project
Project Purpose
Planning Status
Decision
McKenzie River Ranger District (excluding Projects occurring in more than one District)
- Recreation management
Developing Proposal
Est. Scoping Start 02/2015
Expected:04/2015
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
05/2015
CE
Edward Cross
541-822-7231
etcross@fs.fed.us
Description: A project to reroute several sections of the McKenzie River National Recreation Trail (No. 3507). Sections of the
trail were constructed too steep, resulting in trenching and erosion. Other sections of the trail are too close to the
McKenzie River.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43956
Location:
Muskee Thin Project
CE
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T15S,R6E,Sec. 14, 13,
24, 26 & T16S,R6E,Sec.11, 10, 9, 17, 18 & T14S,R7E,Sec. 5,8,17,30,31. McKenzie River Trail.
- Forest products
- Fuels management
In Progress:
Scoping Start 03/14/2014
Expected:08/2014
04/2015
Shadie Nimer
541-822-7271
snimer@fs.fed.us
Description: The project proposes to commercially thin three 43 year old stands, one is 42 acres, 16 acres, and 9 acres. In
addition to the thinning, approximately 10-15% of the stand will have gaps ranging in size from one to three acres.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43950
Location:
Pass Thin Project
CE
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S, R7E, Section 29
& 32. Project area is on Forest Service roads 2664510 and 2664508.
- Forest products
- Fuels management
Completed
Actual: 04/30/2014
06/2015
Shadie Nimer
541-822-7271
snimer@fs.fed.us
Description: To commercially thin approximately 34 acres in a 40 year old stand using ground base and skyline equipment.
This project will also include five gaps one acre in size to promote understory forbs and shrubs.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43929
Location:
07/01/2014 03:22 am MT
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane, Linn. LEGAL - T16S,R6E,
Section 24 Lane Co; T14S,R7E, Section 31 Linn Co. The Pass Thin project is located off Highway 243 on Forest
Service roads 205/206 and off High 126 on Forest Service road 740.
Page
13 of 20
Willamette National Forest
Project Name
Willamette National Forest
Project Purpose
Planning Status
Decision
McKenzie River Ranger District (excluding Projects occurring in more than one District)
Power Plant Bypass Road
Realignment
EA
- Wildlife, Fish, Rare plants
- Special use management
- Road management
In Progress:
Comment Period Public Notice
11/09/2012
Est. Objection Period Legal
Notice 07/2014
Expected:07/2014
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
04/2015
Shane Kamrath
541-822-7233
skamrath@fs.fed.us
Description: Realignment of the existing bypass Forest Service Road 2672690 around the Eugene Water and Electric Board's
Carmen power house in order to provide safe and adequate access for construction of the fish passage facilities at
trailbridge reservoir.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41242
Location:
Prescribed Fire in Wilderness:
Scott Mountain
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T 15 S R 6 E, SEC 1 &
12. Trailbridge Reservoir.
- Fuels management
EA
In Progress:
Notice of Initiation 01/09/2013
Est. Comment Period Public
Notice 08/2014
Expected:10/2014
11/2014
Matt Peterson
541-225-6421
mbpeterson@fs.fed.us
Description: The project would use prescribed fire in the Mt. Washington Wilderness area to modify vegetation and fuels to
sufficiently reduce the threats to values outside of wilderness in order to allow fire to play a more natural role within
wilderness.
Web Link: http://www.fs.usda.gov/detail/willamette/landmanagement/resourcemanagement/?cid=stelprdb5383417
Location:
Revised Trapper Project
EA
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - The legal description for
the project area is T15S, R07E, sections 23, 24, 25, 26, 27, 34, 35, 36; T15S, R07½ E, sections 21, 22, 26, 27, 28,
33, 34; and T16S, R07E, sections 2 and 3. The project area includes the Mt. Washington Wilderness area on the
McKenzie River Ranger District.
- Wildlife, Fish, Rare plants
- Forest products
In Progress:
Objection Period Legal Notice
05/19/2014
Expected:07/2014
09/2014
Cheryl Friesen
541-822-7226
cfriesen@fs.fed.us
Description: A Supplemental Environmental Assessment will be prepared to disclose effects of harvesting timber on about 33
acres already under contract and to respond to analysis deficiencies identified by the 2011 U.S. District Court
decision.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41259
Location:
07/01/2014 03:22 am MT
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T14S, R5E, Sections 34
and 35, W.M. About 13 miles NE of Blue River, OR, adjacent to FS Road 1517.
Page
14 of 20
Willamette National Forest
Project Name
Willamette National Forest
Project Purpose
Planning Status
Decision
McKenzie River Ranger District (excluding Projects occurring in more than one District)
Sand Mountain Trail Repair and - Recreation management
Reroute
In Progress:
Scoping Start 03/24/2014
Expected:03/2015
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
06/2015
CE
Saren Whitney
541-822-7243
slwhitney@fs.fed.us
Description: Proposal to reconstruct portions of the Sand Mountain Lookout trail. Trees (<12 in) along the trail prism would
and trail tread would be cut. The old trail would require a series of check dams placed to slow sediment and fill in
the old trail.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43958
Location:
Verde Mtn. Floral Greens
Project
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S R7.5E Section 1.
Sand Mountain.
- Forest products
Completed
Actual: 06/14/2014
09/2014
CE
Shadie Nimer
541-822-7271
snimer@fs.fed.us
Description: The project would remove floral greens: beargrass, salal, fern fronds, and vine maple/ceanothus sticks. This would
occur on approximately 18,760 acres of the McKenzie River Ranger District. The sale of these products will be
done under permits.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43942
Location:
Wildlife Habitat Enhancement
and Restoration Project 2014
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T17S, R5E, Section 2833; T18S, R4E, Section 1,2,11-15,23,24; T18S, R5E, Section 3,7,11,14-23,26-30. Project area is bounded by
Forest roads 1985, 2618, 1927, and 19.
- Wildlife, Fish, Rare plants
In Progress:
Scoping Start 03/24/2014
Expected:07/2014
CE
09/2014
Penny Harris
541-822-7265
pjharris@fs.fed.us
Description: Browse would be cut back to enhance forage for elk and deer. Wildlife trees and down wood would be created to
enhance habitat for cavity excavators, nesters, bats, amphibians, mammals, fungi, arthropods, bryophytes and
other organisms.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43892
Location:
Willamette National Forest
07/01/2014 03:22 am MT
UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane, Linn. LEGAL - T14S R7E Sec. 7,
18; T14S R6E Sec. 13; T15S R6E Sec. 12, 13, 25; T15S R7E Sec. 18, 30; T16S R4E Sec. 22; T16S R5E Sec. 4,
5, 8, 9, 31; T16S R6E Sec. 17; T16S R7E Sec. 29, 33; T18S R6E Sec. 32. Across the McKenzie River Ranger
District in both Lane and Linn Counties.
Middle Fork Ranger District (excluding Projects occurring in more than one District)
Page
15 of 20
R6 - Pacific Northwest Region
Willamette National Forest
Project Name
Willamette National Forest
Outlook Landscape Diversity
Project
EA
Project Purpose
CE
Decision
Middle Fork Ranger District (excluding Projects occurring in more than one District)
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
Tim Bailey
01/2015
- Special area management
In Progress:
Expected:12/2014
541-782-5248
- Wildlife, Fish, Rare plants
Scoping Start 01/14/2013
tbailey01@fs.fed.us
- Forest products
Est. 215 Comment Period Legal
- Vegetation management
Notice 09/2014
(other than forest products)
- Fuels management
- Watershed management
- Road management
Description: Commercial thinning and fuels reduction on 4300 ac. of plantations; 110 mi. of road maintenance, closure of 130
mi. of road; special habitat restoration; 260 ac. of early-seral habitat maintenance/creation; snag creation, noxious
weed abatement.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40122
Location:
Respect the River - Fall Creek
Planning Status
UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Townships 20 and 21 South,
Ranges 1 and 2 East, of the Willamette Meridian. Federal portions of the Lookout Point 5th-field watershed near
the Lookout Point Reservoir near the cities of Westfir and Lowell, OR.
- Recreation management
- Watershed management
Completed
Actual: 01/01/2014
06/2014
Lisa Kurian
541-782-5312
lkurian@fs.fed.us
Description: Resource damage will be minimized and restored at the dispersed campsites by providing a riparian buffer,
planting native vegetation, subsoiling compacted soils, deterring campsite area growth and educational signage.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41185
Location:
Staley Creek Stream
Restoration
UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. The project will take place along Fall
Creek from Forest Service boundary near Dolly Varden campground to confluence with Buzzard Creek and major
tributaries including Portland Creek and Hehe Creeks.
- Wildlife, Fish, Rare plants
- Watershed management
In Progress:
Scoping Start 01/06/2014
CE
Expected:08/2014
07/2015
John Dixon
541-782-5208
jdixon@fs.fed.us
Description: Stabilization of approx. 200 ft. of eroding stream bank, including large woody debris jam construction. Trees with
root wads attached will be gathered and large trees will be hauled to the project area for bank stabilization and log
jam construction.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40115
Location:
07/01/2014 03:22 am MT
UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T24S, R4E, NW 1/4 of
Section 19. The location is at the former Pope and Talbot bridge crossing of Staley Creek on Forest Road 2134244. This is located at approximately the 1.7 mile mark on Forest Road 2134.
Page
16 of 20
Willamette National Forest
Project Name
Willamette National Forest
Upper Little Fall LSR Density
Management Project
EA
Project Purpose
Decision
Middle Fork Ranger District (excluding Projects occurring in more than one District)
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
Kenneth Barbee
- Forest products
Developing Proposal
Expected:10/2015
12/2015
541-782-5233
- Vegetation management
Est. Notice of Initiation 09/2014
kbarbee02@fs.fed.us
(other than forest products)
- Fuels management
- Watershed management
- Road management
Description: The Middle Fork Ranger District of the Willamette National Forest proposes density management on about 1720
acres of young plantations located in the Little Fall Creek subwatershed.The project would include the
reconstruction of existing roads.
Location:
Winberry Campground
Decommission
Planning Status
UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T17S, R1E, Sections 47,9,17,18, T17S, R2E, Sections 1-3,10, and 11 of the Willamette Meridian. This area is in the Little Fall Creek
fifth-field watershed located approximately 16 miles northeast of the city of Lowell.
- Recreation management
Completed
Actual: 02/20/2014
05/2014
CE
Karl Dietzler
541-782-5338
kdietzler@fs.fed.us
Description: This campground receives a high amount of vandalism and homeless use and is the only developed receation site
in this drainage. Improvements to be removed include 2 shelters, 5 fire rings, all picnic tables, all site numbers, the
well, Romtec toilet.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42615
Location:
Willamette National Forest
2014 Sweet Home White Oak
Enhancement Project
UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T19S, R2E, Section 19, NE
1/4 of SW 1/4. In Winberry Creek drainage, at jct of FS Roads 1902 and 1802-150.
Sweet Home Ranger District (excluding Projects occurring in more than one District)
- Vegetation management
(other than forest products)
Developing Proposal
Est. Scoping Start 06/2014
CE
*NEW LISTING*
09/2014
Alice Smith
541-367-9215
acsmith@fs.fed.us
Description: Release established oak trees and propagate new oak trees from collected acorns from the site.
Location:
07/01/2014 03:22 am MT
Expected:07/2014
R6 - Pacific Northwest Region
UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. There are
two stands one near Two Girls Creek and the other near Moose Creek. Both stands are in the South Santiam
watershed.
Page
17 of 20
Willamette National Forest
Project Name
Willamette National Forest
Project Purpose
Planning Status
Decision
Sweet Home Ranger District (excluding Projects occurring in more than one District)
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
Tiffany Young
Big Game Forage Enhancement - Wildlife, Fish, Rare plants
In Progress:
Expected:08/2014
09/2014
(Canyon and Owl Creek
928-368-5111
Scoping Start 03/11/2013
Watersheds)
tayoung@fs.fed.us
Description:
CE
Enhance 40 acres of big game habitat including: browse cutback, planting and seeding native forage species, and
collecting native seed for use in following years.
Location:
Cascadia Day Use Forest Plan
Amendment and Site
Development
UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. Canyon and
Owl Creek Watersheds.
- Land management planning
EA
In Progress:
Notice of Initiation 02/07/2013
Est. Comment Period Public
Notice 08/2014
Expected:10/2014
01/2015
Jonathan Meier
541-367-3557
jmeier02@fs.fed.us
Description: Proposed Forest Plan amendment to change about 10 ac. of an administrative site MA 13B to Developed
Recreation MA 12a. Also, construct parking area for 8-10 vehicles, plant low-maintenance landscaping, and
construct ADA interpretive tail.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41511
Location:
Cool Soda
EA
*NEW LISTING*
Anita Leach
- Wildlife, Fish, Rare plants
In Progress:
Expected:12/2014
02/2015
541-367-9218
- Forest products
Notice of Initiation 12/11/2013
agleach@fs.fed.us
- Vegetation management
Est. Comment Period Public
(other than forest products)
Notice 09/2014
- Fuels management
Description: Implement vegetation-related projects from Cool Soda All Lands Restoration Proposal. Thin 545 ac. of young
stands, regen 71 ac. for noble fir boughs, regen 14 acres in mature stand, fuel treatments, special forest products,
traditional resources
Location:
07/01/2014 03:22 am MT
UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T 13 S, R 2 E, Section 36.
South Santiam Watershed.
UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S, R4E, Sections 1, 1114, 24 and 25; T13S, R5E, Sections 3-10, 14-22, 28-30. In north eastern portion of the South Santiam
watershed. About 30 miles east of Sweet Home, Oregon.
Page
18 of 20
Willamette National Forest
Project Name
Willamette National Forest
Project Purpose
Planning Status
Decision
Sweet Home Ranger District (excluding Projects occurring in more than one District)
Lodgepole Flats Forest Plan
Amendment #54
- Land management planning
Completed
Actual: 04/24/2014
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
05/2014
CE
Anita Leach
541-367-9218
agleach@fs.fed.us
Description: (Minor revision to name of project). The project proposes to change the north section of Park Creek Semiprimitive Nonmotorized Dispersed Recreation Management Area to a Special Habitat Management Area. This is a
Forest Plan revision.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34422
Location:
Menagerie Seasonal Closure
Boundary Change for Species
Protection
CE
Amanda Colton
- Regulations, Directives,
In Progress:
Expected:11/2014
01/2015
541-367-3540
Orders
Scoping Start 10/05/2012
arcolton@fs.fed.us
- Recreation management
- Wildlife, Fish, Rare plants
Description: Proposed change to existing seasonal closure boundary to provide species protection during the critical nesting
and fledging period.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38620
Location:
Smith Prairie Meadow
Maintenance
UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T 13S, R 7 E, Sections 5-8.
Upper McKenzie Watershed.
UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S, R4E, Sections. 14,
15, 22 and 23. Menagerie Wilderness.
- Wildlife, Fish, Rare plants
In Progress:
Scoping Start 08/09/2011
CE
Expected:08/2014
09/2014
Tiffany Young
928-368-5111
tayoung@fs.fed.us
Description: Enhance and maintain meadow complex by reducing encroachment of conifers (remove saplings under 4 inches),
seed collection, girdling 1-2 trees/acre under 12 inches DBH and falling 1 tree/acre for down wood.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36704
Location:
07/01/2014 03:22 am MT
UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S, R6E, section 1;
T14S, R7E, section 6, Willamette Meridian. Smith Prairie in the Upper McKenzie watershed.
Page
19 of 20
Willamette National Forest
Project Name
Willamette National Forest
Toll Joe
EA
Project Purpose
Planning Status
Decision
Sweet Home Ranger District (excluding Projects occurring in more than one District)
- Forest products
- Fuels management
Completed
Actual: 06/06/2014
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region
07/2014
Anita Leach
541-367-3538
agleach@fs.fed.us
Description: Accelerate development of structural complexity in the LSR and strategically manage hazardous fuels along
Highway 20. Improve health, vigor and contribute wood products in matrix. 880 ac. 36-80yr.old stands, 100 acres
of 81-105 yr. old stands
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36918
Location:
UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S, R4E, Sec. 36; T13S,
R5E, Sec. 26, 28, 31-36; T13S, R6E, Sec.31; T14S, R4E, Sec. 1, 12 and 13; T14S, R5E, Sec. 1-24, 27-29; and
T14S, R6E, Sec. 6,7,8,17 and 18. South Santiam watershed.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial
status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited
bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at
(202) 720-2600 (voice and TDD).
To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA
is an equal opportunity provider and employer.
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
07/01/2014 03:22 am MT