Project Name
10/01/2014 to 12/31/2014
Willamette National Forest
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
R6 - Pacific Northwest Region, Regionwide (excluding Projects occurring in more than one Region)
Aquatic Invasive Species order to prevent the spread or introduction of aquatic invasive species
CE
- Wildlife, Fish, Rare plants Developing Proposal
Est. Scoping Start 05/2014
Expected:05/2014 05/2014
Description:
The purpose of this order is to prevent the spread or introduction of aquatic invasive plant or animal species.
Public involvement is targeted for the Umatilla, Willamette, Mt. Baker-Snoqualmie, Gifford Pinchot, and Colville
NFs.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44360
Christine Pyle
503-808-2691 cdpyle@fs.fed.us
Location: UNIT - R6 - Pacific Northwest Region All Units. STATE - Oregon, Washington. COUNTY - Asotin, Clark,
Columbia, Cowlitz, Ferry, Garfield, King, Klickitat, Lewis, Pend Oreille, Pierce, Skagit, Skamania, Snohomish,
Stevens, Walla Walla, Whatcom, Baker, Clackamas, Douglas, Grant, Jefferson, Lane, Linn, Marion, Morrow,
Umatilla, Union, Wallowa, Wheeler. LEGAL - Not Applicable. Order will apply to all Forests in Region 6, however targeted scoping is with the Umatilla, Gifford Pinchot, Mt. Baker/Snoqualmie, Willamette and Colville NFs tribal and public scoping lists.
Willamette National Forest, Forestwide (excluding Projects occurring in more than one Forest)
Issuance of Priority Use
Outfitter and Guiding Special
Use Permits
CE
*NEW LISTING*
R6 - Pacific Northwest Region
- Special use management Developing Proposal
Est. Scoping Start 10/2014
Expected:11/2014 12/2014 Shari Monson
541-225-5243 smonson@fs.fed.us
Description:
The forest proposes to issue 2- 10 year priority use permits to outfitters and guides already under under special use permit for operation in wilderness and non-wilderness.
Location: UNIT - Willamette National Forest All Units. STATE - Oregon. COUNTY - Deschutes, Klamath, Lane, Linn,
Marion. LEGAL - Not Applicable. Willamette, Deschutes, Siuslaw and Mt Hood National Forests.
Willamette National Forest, Occurring in more than one District (excluding Forestwide) R6 - Pacific Northwest Region
10/01/2014 08:53 am MT Page 1 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest, Occurring in more than one District (excluding Forestwide)
Riparian Weed Treatment
Project
EA
R6 - Pacific Northwest Region
- Vegetation management
(other than forest products)
- Watershed management
In Progress:
Objection Period Legal Notice
09/19/2014
Expected:11/2014 05/2015 Jennifer Lippert
541-225-6440 jlippert@fs.fed.us
Description:
Develop treatment options for five riparian weed populations found throughout the Willamette National Forest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42022
Location: UNIT - Middle Fork Ranger District, Sweet Home Ranger District, McKenzie River Ranger District. STATE -
Oregon. COUNTY - Lane, Linn. Sweet Home R.D. -Two Girls Cr.; McKenzie R.D.-Lookout Cr.; Middle Fork
R.D.- N. Fk. M. Fk. Willamette, Middle Fk. Willamette River.
Willamette National Forest Detroit Ranger District (excluding Projects occurring in more than one District)
2014 Lands Permits
CE
Location:
R6 - Pacific Northwest Region
- Special use management Developing Proposal
Est. Scoping Start 09/2014
Expected:11/2014 12/2014 Penny Keen
503-854-4202 pkeen@fs.fed.us
Description:
Renew three lands special use permits, Bureau of Reclamation Weather station, City of Idanha Water system, and
Breitenbush Hot Springs Mobile radio Service new term of 10 years. This is an administrative action no ground disturbance will take place.
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. Bureau of
Reclamation Weather Station T.10S., R6E, SECTION 3
City of Idanha Waterline - T.10S., R6E. SECTION 22
Breitenbush Hot Spring Mobile Radio Service - T.9S., R7E. SECTION 16.
2014 Marion Creek Stream
Restoration
CE
- Wildlife, Fish, Rare plants
- Watershed management
Web Link:
Location:
Completed Actual: 07/10/2014 http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43806
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. Marion Forks
Creek at the Marion Forks Fish Hatchery and Day Use area.
08/2014 Darrin Neff
503-854-4219 daneff@fs.fed.us
Description: This project would improve fish habitat and curb bank erosion by adding large wood complexes in the side channels of lower Marion Creek. It is anticipated to enhance recreational viewings of spring chinook spawning near the new Day Use Area.
10/01/2014 08:53 am MT Page 2 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest Detroit Ranger District (excluding Projects occurring in more than one District)
2014 Recreation Permits
CE
R6 - Pacific Northwest Region
- Special use management Developing Proposal
Est. Scoping Start 09/2014
Expected:10/2014 12/2014 Penny Keen
503-854-4202 pkeen@fs.fed.us
Description: Renew three recreation special use permits Detroit Lake Marina, Kanes Marina, and Chemeketans Club to a new term of 10 years. This is an administrative action no ground disturbance will take place.
Buck Tule
EA
Location:
.
UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. Kanes
Marina T.10S., R6E, SECTION 2
Detroit Marina - T.10S., R6E. SECTION 1
Chemeketans Club - T.10S., R7E. SECTION 27
- Land management planning
- Wildlife, Fish, Rare plants
- Forest products
- Vegetation management
(other than forest products)
- Fuels management
- Minerals and Geology
In Progress:
Notice of Initiation 03/16/2012
Est. Comment Period Public
Notice 10/2014
Expected:12/2014 01/2015 Lynise Medley
503-854-4228 lmedley@fs.fed.us
Description:
Timber harvest is proposed in densely stocked second growth stands generally ranging in age from 40 to 150 years old, and includes stands within Riparian Reserves and approximately 40 acres in the Jefferson Late-
Successional Reserve.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38487
City of Detroit Water System
Update
CE
Location: UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - T11S, R6E, Sections 13,
14, 22 - 28, 33-36 , T11S, R7E, Sections 16-21, 28-32, T12S, R6E, Sections 1-3, 12, 13, T12S, R7E, Sections
5-8, 17-20. The main portion of the project area is bounded by Fisher Point, Trappers Butte and Scar Mountain to the west, Parish Lake Road to the south, Buck Mountain and Coffin Mountain to the north and Highway.
- Special use management In Progress:
Scoping Start 04/04/2011
Expected:10/2014 11/2014 Penny Keen
503-854-4202 pkeen@fs.fed.us
Description: Fence to be installed around water building on Breitenbush Rd. Install emergency drainline from water storage tank. Reissue special use permit.
Location: UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - T10S, R5E, sec 1; T9S, R5E, sec 36. Breitenbush Rd. and City of Detroit.
10/01/2014 08:53 am MT Page 3 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest Detroit Ranger District (excluding Projects occurring in more than one District) R6 - Pacific Northwest Region
Humbug Creek Dispersed Sites
Rehabilitation
CE
- Recreation management
- Wildlife, Fish, Rare plants
- Watershed management
Completed Actual: 09/18/2014 http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43805
10/2014 Darrin Neff
503-854-4219 daneff@fs.fed.us
Description:
The project will lessen impacts to federally listed fish habitat by decreasing sediment inputs, increasing the shade component and reducing the chance for petroleum products from vehicles entering the water by rehabilitating two dispersed campsites.
Web Link:
McCoy Motorized Rec. Area
Improvements 2014-2015
CE
Meadow Enhancement
CE
Location: UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - T9S, R6E Sec 16 &21.
T9S, R6E Sec 16 &21, Humbug Creek Watershed, 4697 road system.
- Recreation management On Hold N/A N/A Bradford Peterson
503-854-3894 bcpeterson@fs.fed.us
Description: This project will include the installation of a covered picnic shelter at the lower staging area, and the expansion of the upper staging area.
Location: UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. Multiple locations within the McCoy
Motorized Recreation Area.
- Wildlife, Fish, Rare plants In Progress:
Scoping Start 03/28/2013
Expected:12/2014 05/2015 Daryl Whitmore
503-854-4225 dwhitmore@fs.fed.us
Description: Meadow enhancement and rehabilitation in 3 meadows on the Detroit Ranger District. Enchancements include tree removal, limbing, slash burning and monitoring.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40864
Str8 Thinning Restoration
CE
Location: UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T11S, R07E, sec 26, 27; T12S
R07E sec 29, 34. Dusty, Big and Marion Creek Meadows.
- Wildlife, Fish, Rare plants
- Forest products
In Progress:
Scoping Start 03/28/2013
Expected:03/2015 04/2015
Description:
Reduce stocking levels of stands 6-9 inches in diameter, 500-800 TPA. Offer biomass products such as posts and poles and firewood and other SFP such as bough and beargrass.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41544
Sue Crowder
503-854-4204 sjcrowder@fs.fed.us
Location: UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - T. 11 S., R. 6 E., Sections
26, 27, 34 and 35, Willamette Meridian. Upper North Santiam and Detroit Reservoir/Blowout watersheds.
10/01/2014 08:53 am MT Page 4 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest McKenzie River Ranger District (excluding Projects occurring in more than one District)
2014 Recreation Residence
Septic Repairs
CE
R6 - Pacific Northwest Region
- Special use management In Progress:
Scoping Start 03/24/2014
Expected:09/2014 10/2014 Denise Mercer
541-822-7224 dmercer@fs.fed.us
Description: This proposal is to replace two septic systems of Recreation Residence Cabin #13 & #27 in the Delta A Tract. The would include a septic tank between 1000 - 1500 gallons, a drain field of up to 150' and transmission lines from the cabin to the tank.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43957
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16 S, R5E, Sec 16.
55311 Delta Rd.
2014 Various District-wide
Term Special Use Authorization
Reissuances
CE
- Special use management In Progress:
Scoping Start 03/24/2014
Expected:10/2014 01/2015
Description:
Proposal to reissue 7 existing term special use permits. The term of each authorization would be 20-30 years
(depending on type). There will be no change in the authorized facilities or increase in the scope or intensity of authorized activities.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43960
Denise Mercer
541-822-7224 dmercer@fs.fed.us
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane, Linn. LEGAL - T16S, R5E Sec 16
& T16S, R5E, Sec 20 & T16S, R4E, Sec 14 & T 16S, R6E, Sec 10 & T16S, R6E, Sec 16
& T16S, R5E, Sec 22 & T16S, R6E, Sec 11. Delta Road ; King Road ; Rd 15 to Blue River Reservoir
Road ; near Hwy 126 - Rd 302 on the North side of the McKenzie River ; the McKenzie Air Strip ; near King Rd ; near Scott Creek.
Bend Broadband Hoodoo Butte
Fiberoptic Backhaul Project
CE
- Special use management In Progress:
Scoping Start 05/15/2014
Expected:11/2014 01/2015 Shari Monson
541-225-6424 smonson@fs.fed.us
Description: This project will provide Sprint (located in the American Tower Facility) on Hoodoo Butte with a fiber optic connection ("back haul") back to the Bend Communication/Crown Castle building.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44469
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T.13S., R.8E., Section
34, W.M. Lane County, OR. Hoodoo Butte.
10/01/2014 08:53 am MT Page 5 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest McKenzie River Ranger District (excluding Projects occurring in more than one District)
Blue River Upper Compound
Administrative Site Disposal
EA
R6 - Pacific Northwest Region
- Facility management Expected:01/2015 http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38416
03/2015 Shane Kamrath
541-822-7233 skamrath@fs.fed.us
Description:
The sale of the site which consists of six structures, a paved road, gravel driveways and roads, paved and graveled parking and loading areas, a gravel stockpile, and timber/vegetation areas.
Web Link:
In Progress:
Notice of Initiation 05/14/2014
Est. Comment Period Public
Notice 10/2014
Cingular-Mt. Hagan Tower
Upgrades &
Generator/Propane Tank
Installation
CE
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 21; T16S, R4E;
W.M. Lane County. Forest road 2620-130.
- Special use management
- Facility management
In Progress:
Scoping Start 05/15/2014
Expected:11/2014 02/2015 Shari Monson
541-225-6424 smonson@fs.fed.us
Description: Complete updates needed to upgrade to LTE capacity of existing Cingular/AT&T tower at Mt. Hagen, including the removal of 2 existing antennas, placement of 4 new antennas, and installation of a generator and propane tank.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43946
Cub Thin Project
CE
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 35, T. 16S.,
R.3E. Mt. Hagan, McKenzie River District of the Willamette National Forest.
- Forest products
- Fuels management
In Progress:
Scoping Start 03/14/2014
Expected:12/2014 06/2015
Description:
The project proposes to commercially thin two stands for a total of 65 acres. The units are second-growth stands that are approximately 42 years old. The units would be harvested with ground base and skyline equimpmnet.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43947
Shadie Nimer
541-822-7271 snimer@fs.fed.us
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R7E, Section 6;
T15S, R7E, Section 31. Cub Thin Project is located on Forest Service road 2653760 and 2653762.
10/01/2014 08:53 am MT Page 6 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest McKenzie River Ranger District (excluding Projects occurring in more than one District)
French Pete Creek Crossing
Repair
CE
R6 - Pacific Northwest Region
- Recreation management In Progress:
Scoping Start 04/22/2013
Expected:11/2014 02/2015 Edward Cross
541-822-7231 etcross@fs.fed.us
Description: A project to harden the creek crossing at milepost 2.1 of the French Pete Creek Trail (Tr. No. 3311) in the Three
Sisters Wilderness at French Pete Creek crosing. This would construct a step-down drain style approach to mitigate erosion.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41528
Goose
EIS
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T18S, R5E, Sec. 3.
Milepost 2.1 of the French Pete Creek Trail (Tr. No. 3311) in the Three Sisters Wilderness.
- Wildlife, Fish, Rare plants
- Forest products
- Fuels management
In Progress:
NOI in Federal Register
04/30/2014
Est. DEIS NOA in Federal
Register 11/2014
Expected:02/2015
Actual: 09/13/2010
03/2015 Shane Kamrath
541-822-7233 skamrath@fs.fed.us
Description: The proposed action will commercially harvest stands 25-120 year-old (1,598 acres)and reduce fuels in the WUI
(600 acres).
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=29829
Green Mountain Project
EIS
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T 16S R 5E Sec: 1-5,
9-16, 24. T 16S R 6E Sec: 3-11, 13-25. T 16S R 7E 18, 19, 30. The Goose Project area is located on the
MRRD within the Upper McKenzie Watershed (5th field). It falls within the McKenzie Bridge Community.
- Forest products
- Vegetation management
(other than forest products)
- Watershed management
In Progress:
NOI in Federal Register
04/11/2014
Est. DEIS NOA in Federal
Register 11/2014
Expected:03/2015 06/2015 James Rudisill
541-822-2703 jamesrudisill@fs.fed.us
Description: Proposes to thin ~3,003 acres (3.0% of the Project Area) and regenerate ~324 acres (0.3% of the Project Area) of forests across a sum of approximately 3,327 acres within the Green Mountain Project Area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40858
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16SR4E s36;
T16SR5E s31-32; T17SR4E s01-13; T17SR5E s05-34; T17SR6E s19,30; T18SR4E s01,12; T18SR5E s01-36;
T18SR6E s06-36; T18SR7E s31-35; T19SR5E s01-24; T19SR6E s1-36; T19SR7E s02-31; T20SR6E s01. The
Green Mountain Project area is located within the Cougar Reservoir, Augusta Creek, Roaring River, and Elk Creek subwatersheds (6th field) of the South Fork McKenzie River Watershed (5th field).
10/01/2014 08:53 am MT Page 7 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest McKenzie River Ranger District (excluding Projects occurring in more than one District)
King Castle Reroute
CE
R6 - Pacific Northwest Region
- Recreation management In Progress:
Scoping Start 03/24/2014
Expected:04/2015 05/2015 Edward Cross
541-822-7231 etcross@fs.fed.us
Description: A project to reroute a 1.25 Mi. of the King Caslte trail (Tr. No. 4326) to maintain the trails general character. This project would require removing brush, disturbing the ground (18-22%u201D wide), and removing trees less than
12 inches dbh.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43949
LangDam Project
EA
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R5E, Sec. 28
& 21. King's Castle, McKenzie River District, Willamette National Forest.
- Forest products
- Vegetation management
(other than forest products)
In Progress:
Notice of Initiation 07/07/2014
Est. Comment Period Public
Notice 01/2015
Expected:06/2015 09/2015 Shadie Nimer
541-822-7271 snimer@fs.fed.us
Description: Proposes to commercially thin timber stands up to 120 years of age on approximately 733 acres. The purpose and need for this project is to improve stand conditions in terms of density and structure, and maintain stand health and vigor.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41223
Lookout Mountain Meadow
Restoration
CE
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 22-26, 35, &
36, T16S, R4E; Sections 24, 25, & 36, T16S, R4.5E; Sections 19, 20, 27-35, T16S, R5E; and Sections 4 & 5,
T17S, R5E. The project area is located around Forest road 1900,1900408, and 1900411; north of Cougar
Reservoir.
- Wildlife, Fish, Rare plants
- Vegetation management
(other than forest products)
- Fuels management
Developing Proposal
Est. Scoping Start 03/2015
Expected:04/2015 09/2015 Ruby Seitz
541-822-7256 ruseitz@fs.fed.us
Description: The purpose of this project is to restore native meadow habitat by cutting and girdling small diameter trees, and subsequently implementing a prescribed fire across an approximately 347-acre project area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43955
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T15S, R6E, Sections
31, 32; T16S, R6E, Section 6. Lookout Mountain Meadow.
10/01/2014 08:53 am MT Page 8 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest McKenzie River Ranger District (excluding Projects occurring in more than one District)
Lost Creek, Tamolitch Valley and Roaring River Bridge
Replacements
CE
R6 - Pacific Northwest Region
- Recreation management In Progress:
Scoping Start 04/22/2013
Expected:11/2014 01/2015 Edward Cross
541-822-7231 etcross@fs.fed.us
Description: A project to replace three trail bridges that need replacement. Two bridges are located on the McKenzie River
National Recreation Trail (MRNRT) (Tr. No. 3507). Another bridge crosses Roaring River on the Roaring River
Ridge Trail (Tr. No. 3312).
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41530
Lower South Fork McKenzie
River Enhancement Project
CE
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T14S,R7E,Sec30 &
T16S,R6E,Sec10 & T19S,R5.5E,Sec12. Lost Creek, Tamolitch Valley on the McKenzie River National Recreation
Trail and Roaring River crossing of the Roaring River Ridge Trail.
- Wildlife, Fish, Rare plants
- Vegetation management
(other than forest products)
- Watershed management
Developing Proposal
Est. Scoping Start 02/2015
Expected:06/2015 06/2015 Kate Meyer
541-822-7230 kmmeyer@fs.fed.us
Description: Using heavy equipment, stream channels would be reconstructed, up to 1,500 pieces of large wood would be placed along stream channels, gravel would be placed to improve spawning, and boardwalks, water crossings, and trails would be constructed.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43959
MRRS Thin Project
CE
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S R4E Sections
23,24; T16S R4.5E Sections 24,25; T16S R5E Sections 19,30,31. Lower South Fork McKenzie River.
- Forest products
- Fuels management
In Progress:
Scoping Start 05/19/2014
Expected:12/2014 04/2015
Description:
To commercially thin a 80 year old stand that is 56 acres. The stand will include a one-1 acre gap and 30 acres of skips. The purpose of this project is to reduce ladder fuels, manage camping, and improve the security adjacent to
Ranger Station.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44476
Shadie Nimer
541-822-7271 snimer@fs.fed.us
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R06E; Sections
17 & 18. The MRRS Thin Project is located at the 53 mile point on the south side of Hwy 126 that is adjacent to the McKenzie River Ranger Station (MRRS).
10/01/2014 08:53 am MT Page 9 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest McKenzie River Ranger District (excluding Projects occurring in more than one District)
McKenzie River Trail Reroute
Project
CE
R6 - Pacific Northwest Region
- Recreation management Developing Proposal
Est. Scoping Start 02/2015
Expected:04/2015 05/2015 Edward Cross
541-822-7231 etcross@fs.fed.us
Description: A project to reroute several sections of the McKenzie River National Recreation Trail (No. 3507). Sections of the trail were constructed too steep, resulting in trenching and erosion. Other sections of the trail are too close to the
McKenzie River.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43956
Muskee Thin Project
CE
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T15S,R6E,Sec. 14, 13,
24, 26 & T16S,R6E,Sec.11, 10, 9, 17, 18 & T14S,R7E,Sec. 5,8,17,30,31. McKenzie River Trail.
- Forest products
- Fuels management
In Progress:
Scoping Start 03/14/2014
Expected:11/2014 05/2015
Description:
The project proposes to commercially thin three 43 year old stands, one is 42 acres, 16 acres, and 9 acres. In addition to the thinning, approximately 10-15% of the stand will have gaps ranging in size from one to three acres.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43950
Shadie Nimer
541-822-7271 snimer@fs.fed.us
Power Plant Bypass Road
Realignment
EA
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S, R7E, Section 29
& 32. Project area is on Forest Service roads 2664510 and 2664508.
- Wildlife, Fish, Rare plants
- Special use management
- Road management
In Progress:
Comment Period Public Notice
11/09/2012
Est. Objection Period Legal
Notice 11/2014
Expected:01/2015 04/2015 Shane Kamrath
541-822-7233 skamrath@fs.fed.us
Description:
Realignment of the existing bypass Forest Service Road 2672690 around the Eugene Water and Electric Board's
Carmen power house in order to provide safe and adequate access for construction of the fish passage facilities at trailbridge reservoir.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41242
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T 15 S R 6 E, SEC 1 &
12. Trailbridge Reservoir.
10/01/2014 08:53 am MT Page 10 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest McKenzie River Ranger District (excluding Projects occurring in more than one District)
Prescribed Fire in Wilderness:
Scott Mountain
EA
R6 - Pacific Northwest Region
- Fuels management
Web Link:
In Progress:
Notice of Initiation 01/09/2013
Est. Comment Period Public
Notice 10/2014
Expected:01/2015 02/2015 Matt Peterson
541-225-6421 mbpeterson@fs.fed.us
Description:
The project would use prescribed fire in the Mt. Washington Wilderness area to modify vegetation and fuels to sufficiently reduce the threats to values outside of wilderness in order to allow fire to play a more natural role within wilderness.
http://www.fs.usda.gov/detail/willamette/landmanagement/resourcemanagement/?cid=stelprdb5383417
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - The legal description for the project area is T15S, R07E, sections 23, 24, 25, 26, 27, 34, 35, 36; T15S, R07½ E, sections 21, 22, 26, 27, 28,
33, 34; and T16S, R07E, sections 2 and 3. The project area includes the Mt. Washington Wilderness area on the
McKenzie River Ranger District.
Sand Mountain Trail Repair and
Reroute
CE
- Recreation management In Progress:
Scoping Start 03/24/2014
Expected:03/2015 06/2015 Saren Whitney
541-822-7243 slwhitney@fs.fed.us
Description: Proposal to reconstruct portions of the Sand Mountain Lookout trail. Trees (<12 in) along the trail prism would and trail tread would be cut. The old trail would require a series of check dams placed to slow sediment and fill in the old trail.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43958
Wildlife Habitat Enhancement and Restoration Project 2014
CE
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S R7.5E Section 1.
Sand Mountain.
- Wildlife, Fish, Rare plants In Progress:
Scoping Start 03/24/2014
Expected:12/2014 05/2015
Description:
Browse would be cut back to enhance forage for elk and deer. Wildlife trees and down wood would be created to enhance habitat for cavity excavators, nesters, bats, amphibians, mammals, fungi, arthropods, bryophytes and other organisms.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43892
Penny Harris
541-822-7265 pjharris@fs.fed.us
Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane, Linn. LEGAL - T14S R7E Sec. 7,
18; T14S R6E Sec. 13; T15S R6E Sec. 12, 13, 25; T15S R7E Sec. 18, 30; T16S R4E Sec. 22; T16S R5E Sec. 4,
5, 8, 9, 31; T16S R6E Sec. 17; T16S R7E Sec. 29, 33; T18S R6E Sec. 32. Across the McKenzie River Ranger
District in both Lane and Linn Counties.
10/01/2014 08:53 am MT Page 11 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest Middle Fork Ranger District (excluding Projects occurring in more than one District)
Hills Creek-Lookout Point
Geotechnical Drill Project
CE
R6 - Pacific Northwest Region
- Special use management Completed Actual: 08/13/2014 09/2014 Kenneth Barbee
541-782-5233 kbarbee02@fs.fed.us
Description: This project proposes that testing would entail clearing & leveling two 40 ft by 10 ft work pads to set up the drilling equipment at each proposed structure location. This project is to determine foundation depth for future tower replacement.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45035
Outlook Landscape Diversity
Project
EA
Location: UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T21S,R3E, Section 21 and
22. La Duke Road.
- Special area management
- Wildlife, Fish, Rare plants
- Forest products
- Vegetation management
(other than forest products)
- Fuels management
- Watershed management
- Road management
In Progress:
Scoping Start 01/14/2013
Est. 215 Comment Period Legal
Notice 12/2014
Expected:03/2015 04/2020 Tim Bailey
541-782-5248 tbailey01@fs.fed.us
Description: Commercial thinning and fuels reduction on 4300 ac. of plantations; 110 mi. of road maintenance, closure of 130 mi. of road; special habitat restoration; 260 ac. of early-seral habitat maintenance/creation; snag creation, noxious weed abatement.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40122
Staley Creek Stream
Restoration
CE
Location: UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Townships 20 and 21 South,
Ranges 1 and 2 East, of the Willamette Meridian. Federal portions of the Lookout Point 5th-field watershed near the Lookout Point Reservoir near the cities of Westfir and Lowell, OR.
- Wildlife, Fish, Rare plants
- Watershed management
On Hold N/A N/A
Description:
Stabilization of approx. 200 ft. of eroding stream bank, including large woody debris jam construction. Trees with root wads attached will be gathered and large trees will be hauled to the project area for bank stabilization and log jam construction.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40115
John Dixon
541-782-5208 jdixon@fs.fed.us
Location: UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T24S, R4E, NW 1/4 of
Section 19. The location is at the former Pope and Talbot bridge crossing of Staley Creek on Forest Road 2134-
244. This is located at approximately the 1.7 mile mark on Forest Road 2134.
10/01/2014 08:53 am MT Page 12 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest Middle Fork Ranger District (excluding Projects occurring in more than one District)
Upper Little Fall LSR Density
Management Project
EA
Location:
R6 - Pacific Northwest Region
- Forest products
- Vegetation management
(other than forest products)
- Fuels management
- Watershed management
- Road management
Developing Proposal
Est. Notice of Initiation 09/2014
Expected:11/2015 03/2016 Kenneth Barbee
541-782-5233 kbarbee02@fs.fed.us
Description:
The Middle Fork Ranger District of the Willamette National Forest proposes density management on about 1720 acres of young plantations located in the Little Fall Creek subwatershed.The project would include the reconstruction of existing roads.
UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T17S, R1E, Sections 4-
7,9,17,18, T17S, R2E, Sections 1-3,10, and 11 of the Willamette Meridian. This area is in the Little Fall Creek fifth-field watershed located approximately 16 miles northeast of the city of Lowell.
Willamette National Forest Sweet Home Ranger District (excluding Projects occurring in more than one District)
2014 Sweet Home White Oak
Enhancement Project
CE
R6 - Pacific Northwest Region
- Vegetation management
(other than forest products)
In Progress:
Scoping Start 06/10/2014
Expected:12/2014 05/2015 Alice Smith
541-367-9215 acsmith@fs.fed.us
Description: Release established oak trees and propagate new oak trees from collected acorns from the site.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44520
Location: UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. There are two stands one near Two Girls Creek and the other near Moose Creek. Both stands are in the South Santiam watershed.
Big Game Forage Enhancement
(Canyon and Owl Creek
Watersheds)
CE
- Wildlife, Fish, Rare plants In Progress:
Scoping Start 03/11/2013
Expected:12/2014 04/2015 Tiffany Young
928-368-5111 tayoung@fs.fed.us
Description: Enhance 40 acres of big game habitat including: browse cutback, planting and seeding native forage species, and collecting native seed for use in following years.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41514
Location: UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. Canyon and
Owl Creek Watersheds.
10/01/2014 08:53 am MT Page 13 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest Sweet Home Ranger District (excluding Projects occurring in more than one District)
Cascadia Day Use Forest Plan
Amendment and Site
Development
EA
R6 - Pacific Northwest Region
- Land management planning Expected:12/2014 http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41511
01/2015 Jonathan Meier
541-367-3557 jmeier02@fs.fed.us
Description:
Proposed Forest Plan amendment to change about 10 ac. of an administrative site MA 13B to Developed
Recreation MA 12a. Also, construct parking area for 8-10 vehicles, plant low-maintenance landscaping, and construct ADA interpretive tail.
Web Link:
In Progress:
Notice of Initiation 02/07/2013
Est. Comment Period Public
Notice 10/2014
Cool Soda
EA
Menagerie Seasonal Closure
Boundary Change for Species
Protection
CE
Location: UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T 13 S, R 2 E, Section 36.
South Santiam Watershed.
- Wildlife, Fish, Rare plants
- Forest products
- Vegetation management
(other than forest products)
- Fuels management
In Progress:
Notice of Initiation 12/11/2013
Est. Comment Period Public
Notice 10/2014
Expected:01/2015 03/2015 Anita Leach
541-367-9218 agleach@fs.fed.us
Description: Implement vegetation-related projects from Cool Soda All Lands Restoration Proposal. Thin 545 ac. of young stands, regen 71 ac. for noble fir boughs, regen 14 acres in mature stand, fuel treatments, special forest products, traditional resources
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43264
Location: UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S, R4E, Sections 1, 11-
14, 24 and 25; T13S, R5E, Sections 3-10, 14-22, 28-30. In north eastern portion of the South Santiam watershed. About 30 miles east of Sweet Home, Oregon.
- Regulations, Directives,
Orders
- Recreation management
- Wildlife, Fish, Rare plants
On Hold N/A N/A Amanda Colton
541-367-3540 arcolton@fs.fed.us
Description: Proposed change to existing seasonal closure boundary to provide species protection during the critical nesting and fledging period.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38620
Location: UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S, R4E, Sections. 14,
15, 22 and 23. Menagerie Wilderness.
10/01/2014 08:53 am MT Page 14 of 15 Willamette National Forest
Project Name Project Purpose Planning Status Decision
Expected
Implementation
Project Contact
Willamette National Forest Sweet Home Ranger District (excluding Projects occurring in more than one District)
Smith Prairie Meadow
Maintenance
CE
R6 - Pacific Northwest Region
- Wildlife, Fish, Rare plants In Progress:
Scoping Start 08/09/2011
Expected:12/2014 05/2015 Tiffany Young
928-368-5111 tayoung@fs.fed.us
Description: Enhance and maintain meadow complex by reducing encroachment of conifers (remove saplings under 4 inches), seed collection, girdling 1-2 trees/acre under 12 inches DBH and falling 1 tree/acre for down wood.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36704
Special Forest Product Sales
SHRD 2014
CE
*NEW LISTING*
Location: UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S, R6E, section 1;
T14S, R7E, section 6, Willamette Meridian. Smith Prairie in the Upper McKenzie watershed.
- Forest products Developing Proposal
Est. Scoping Start 10/2014
Expected:01/2015 01/2015 Lindsay Anderson
541-367-3485 landerson02@fs.fed.us
Description:
Hand gathering of a variety of special forest products within 150 feet or roads open to public access.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45269
Location: UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. 150 Feet either side of roads open to public on Sweet Home Ranger District.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at
(202) 720-2600 (voice and TDD).
To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
10/01/2014 08:53 am MT Page 15 of 15 Willamette National Forest