Schedule of Proposed Action (SOPA) 07/01/2015 to 09/30/2015 Willamette National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact R6 - Pacific Northwest Region, Regionwide (excluding Projects occurring in more than one Region) James Capurso Aquatic Invasive Species order - Wildlife, Fish, Rare plants Completed Actual: 03/03/2015 07/2015 to prevent the spread or 208-557-5780 introduction of aquatic invasive jcapurso@fs.fed.us species Description: The purpose of this order is to prevent the spread or introduction of aquatic invasive plant or animal species. CE Public involvement is targeted for the Umatilla, Willamette, Mt. Baker-Snoqualmie, Gifford Pinchot, and Colville NFs. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44360 Location: Willamette National Forest 2014 Lands Permits UNIT - R6 - Pacific Northwest Region All Units. STATE - Oregon, Washington. COUNTY - Asotin, Clark, Columbia, Cowlitz, Ferry, Garfield, King, Klickitat, Lewis, Pend Oreille, Pierce, Skagit, Skamania, Snohomish, Stevens, Walla Walla, Whatcom, Baker, Clackamas, Douglas, Grant, Jefferson, Lane, Linn, Marion, Morrow, Umatilla, Union, Wallowa, Wheeler. LEGAL - Not Applicable. Order will apply to all Forests in Region 6, however targeted scoping is with the Umatilla, Gifford Pinchot, Mt. Baker/Snoqualmie, Willamette and Colville NFs tribal and public scoping lists. Detroit Ranger District (excluding Projects occurring in more than one District) - Special use management CE Developing Proposal Est. Scoping Start 07/2015 Expected:08/2015 R6 - Pacific Northwest Region 10/2015 Penny Keen 503-854-4202 pkeen@fs.fed.us Description: Renew three lands special use permits, Bureau of Reclamation Weather station, City of Idanha Water system, and Breitenbush Hot Springs Mobile radio Service new term of 10 years. This is an administrative action no ground disturbance will take place. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44631 Location: 07/01/2015 04:34 am MT UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. Bureau of Reclamation Weather Station T.10S., R6E, SECTION 3 City of Idanha Waterline - T.10S., R6E. SECTION 22 Breitenbush Hot Spring Mobile Radio Service - T.9S., R7E. SECTION 16. Page 1 of 21 Willamette National Forest Project Name Willamette National Forest 2014 Recreation Permits Project Purpose Planning Status Decision Detroit Ranger District (excluding Projects occurring in more than one District) - Special use management CE Developing Proposal Est. Scoping Start 07/2015 Expected:08/2015 Expected Implementation Project Contact R6 - Pacific Northwest Region 10/2015 Penny Keen 503-854-4202 pkeen@fs.fed.us Description: Renew three recreation special use permits Detroit Lake Marina, Kanes Marina, and Chemeketans Club to a new term of 10 years. This is an administrative action no ground disturbance will take place. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44630 Location: Bingham Fire Dozer Line Rehabilitation CE Darrin Neff 07/2015 - Special area management In Progress: Expected:07/2015 503-854-4219 - Wildlife, Fish, Rare plants Scoping Start 02/05/2015 daneff@fs.fed.us - Fuels management - Watershed management Description: This project will repair a section of the Bingham Fire dozer line by removing up to 30 trees of the pushed and pulled from the site to be used in fish restoration projects. Remaining pushed/pulled trees will be scattered to mimic surrounding stand. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45889 Location: Blowout-Divide Creeks Log Placement UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. Kanes Marina T.10S., R6E, SECTION 2 Detroit Marina - T.10S., R6E. SECTION 1 Chemeketans Club - T.10S., R7E. SECTION 27 . UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. The legal location is T11S, R7 1/2E, Section 27. - Wildlife, Fish, Rare plants - Watershed management Developing Proposal Est. Scoping Start 08/2015 CE *NEW LISTING* 07/2016 Jamie Sheahan Alonso (503) 854-4217 jsheahanalonso@fs.fed. us Description: This restoration project would improve habitat for rainbow and cutthroat trout and increase sediment storage along 1.0 miles of central Blowout Creek and 0.7 miles of lower Divide Creek. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47095 Location: 07/01/2015 04:34 am MT Expected:01/2016 UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. Upper Blowout Creek T 11 S, R 06 E, Sections 5, 6, 7 & 8: Blowout & Divide Creeks restoration reaches, Lower Divide Creek Rock Pit T 11 S, R 05 E, Section 31; and T 11 S, R 06 E, Section 6: Roads 10 & 1011 roadside large wood sources . Page 2 of 21 Willamette National Forest Project Name Willamette National Forest Project Purpose EA City of Detroit Root Rot Timber Sale Project Contact R6 - Pacific Northwest Region UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - T11S, R6E, Sections 13, 14, 22 - 28, 33-36 , T11S, R7E, Sections 16-21, 28-32, T12S, R6E, Sections 1-3, 12, 13, T12S, R7E, Sections 5-8, 17-20. The main portion of the project area is bounded by Fisher Point, Trappers Butte and Scar Mountain to the west, Parish Lake Road to the south, Buck Mountain and Coffin Mountain to the north and Highway. Grady McMahan - Forest products Developing Proposal Expected:07/2015 08/2015 503-854-4200 - Vegetation management Est. Scoping Start 06/2015 gmcmahan@fs.fed.us (other than forest products) Description: The proposal is to remove a pocket of hazardous root rot infected trees adjacent to private property in the City of Detroit. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47094 Location: City of Detroit Water System Update Expected Implementation Lynise Medley - Land management planning In Progress: Expected:07/2015 07/2015 503-854-4228 - Wildlife, Fish, Rare plants Scoping Start 02/05/2015 lmedley@fs.fed.us - Forest products - Vegetation management (other than forest products) - Fuels management - Minerals and Geology Description: Timber harvest is proposed in densely stocked second growth stands generally ranging in age from 40 to 150 years old, and includes stands within Riparian Reserves and approximately 40 acres in the Jefferson LateSuccessional Reserve. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38487 Location: *NEW LISTING* Decision Detroit Ranger District (excluding Projects occurring in more than one District) Buck Tule CE Planning Status UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. Within the City of Detroit T.10S., R.5E., Section 2. - Special use management In Progress: Scoping Start 04/04/2011 CE Expected:10/2015 11/2015 Penny Keen 503-854-4202 pkeen@fs.fed.us Description: Fence to be installed around water building on Breitenbush Rd. Install emergency drainline from water storage tank. Reissue special use permit. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34398 Location: 07/01/2015 04:34 am MT UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - T10S, R5E, sec 1; T9S, R5E, sec 36. Breitenbush Rd. and City of Detroit. Page 3 of 21 Willamette National Forest Project Name Willamette National Forest Project Purpose EIS *NEW LISTING* Project Contact R6 - Pacific Northwest Region UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. T.10S. R.7E. Sec. 09. Lynise Medley - Recreation management Developing Proposal Expected:11/2016 04/2017 503-854-4228 - Wildlife, Fish, Rare plants Est. NOI in Federal Register lmedley@fs.fed.us - Forest products 08/2015 - Vegetation management (other than forest products) - Watershed management - Road management Description: Treatments will occur in second growth forests, including commercial thinning (~1732 acres), regeneration (~52 acres), sugar pine restoration (~ 200 acres), riparian reserve treatment, viewshed enhancements, meadow restoration, PCT and pruning. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47109 Location: McCoy Motorized Rec. Area Improvements 2014-2015 Expected Implementation Bradford Peterson - Recreation management In Progress: Expected:07/2015 08/2015 503-854-3894 - Heritage resource Scoping Start 01/12/2015 bcpeterson@fs.fed.us management - Road management Description: Installation of a road closure device, such as a gate, at the 2233-635 road. Installation of educational signage at two locations in the vicinity. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45884 Location: Hwy 46 North Decision Detroit Ranger District (excluding Projects occurring in more than one District) FS Rd 2233-635/Outerson Mtn Traffic Control CE Planning Status UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. Breitenbush Watershed, Marion County, Oregon.T 9 S, R 6 E, sections 1, 11 %u2013 15, 21 %u2013 28, 35 and 36, T 9 S, R 7 E, sections 3 %u2013 22 and 30, T 9 S, R 8 E, section 7. - Recreation management On Hold CE N/A N/A Bradford Peterson 503-854-3894 bcpeterson@fs.fed.us Description: This project will include the installation of a covered picnic shelter at the lower staging area, and the expansion of the upper staging area. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41139 Location: 07/01/2015 04:34 am MT UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. Multiple locations within the McCoy Motorized Recreation Area. Page 4 of 21 Willamette National Forest Project Name Willamette National Forest Str8 Thinning Restoration CE Project Purpose Planning Status Decision Detroit Ranger District (excluding Projects occurring in more than one District) - Wildlife, Fish, Rare plants - Forest products Completed Actual: 04/01/2015 Expected Implementation Project Contact R6 - Pacific Northwest Region 09/2015 Sue Crowder 503-854-4204 sjcrowder@fs.fed.us Description: Reduce stocking levels of stands 6-9 inches in diameter, 500-800 TPA. Offer biomass products such as posts and poles and firewood and other SFP such as bough and beargrass. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41544 Location: Willamette National Forest Air Thin Project UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - T. 11 S., R. 6 E., Sections 26, 27, 34 and 35, Willamette Meridian. Upper North Santiam and Detroit Reservoir/Blowout watersheds. McKenzie River Ranger District (excluding Projects occurring in more than one District) - Forest products CE In Progress: Scoping Start 03/31/2014 Expected:08/2015 R6 - Pacific Northwest Region 03/2016 Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: The project proposes to commercially thin one stand that is 28 acres. The stand is 60 years old with Douglas fir being the primary species. The stand consist of an estimated 140 trees per acre with an average diameter of 17.0 inches. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46283 Location: Benson and Obsidian Trail Reroutes UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R6E, Sections 9, 10, 15, & 16. The project area is located at the McKenzie Airstrip and can be accessed by Forest road 2600320. - Recreation management Developing Proposal Est. Scoping Start 09/2015 CE *NEW LISTING* 06/2016 Edward Cross 541-822-7231 etcross@fs.fed.us Description: The proposed project would reroute approximately 2.2 miles of the Obsidian Trail (FS Trail 3528) and one mile of the Benson Lake Trail (FS Trail 3502). Reroutes would reduce erosion and maintenance. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46849 Location: 07/01/2015 04:34 am MT Expected:01/2016 UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. Trails are located to east and west of Highway 242 near McKenzie Pass. The Benson Trail is located in the Mount Washington Wilderness and the Obsidian Trail is located in the Three Sisters Wilderness. Page 5 of 21 Willamette National Forest Project Name Willamette National Forest Blue River Upper Compound Administrative Site Disposal Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) - Facility management EA In Progress: Notice of Initiation 05/14/2014 Est. Comment Period Public Notice 08/2015 Expected:05/2016 Expected Implementation Project Contact R6 - Pacific Northwest Region 10/2016 Shane Kamrath 541-822-7233 skamrath@fs.fed.us Description: The sale of the site which consists of six structures, a paved road, gravel driveways and roads, paved and graveled parking and loading areas, a gravel stockpile, and timber/vegetation areas. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38416 Location: Cingular-Mt. Hagan Tower Upgrades & Generator/Propane Tank Installation CE - Special use management - Facility management CE On Hold N/A N/A Shari Monson 541-225-6424 smonson@fs.fed.us Description: Complete updates needed to upgrade to LTE capacity of existing Cingular/AT&T tower at Mt. Hagen, including the removal of 2 existing antennas, placement of 4 new antennas, and installation of a generator and propane tank. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43946 Location: Cub Thin Project UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 21; T16S, R4E; W.M. Lane County. Forest road 2620-130. UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 35, T. 16S., R.3E. Mt. Hagan, McKenzie River District of the Willamette National Forest. - Forest products - Fuels management Completed Actual: 05/18/2015 07/2015 Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: The project proposes to commercially three stands for a total of 70 acres. The units are second-growth stands that are approximately 42 years old. The units would be harvested with ground base and skyline equipment. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43947 Location: 07/01/2015 04:34 am MT UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R7E, Section 6; T15S, R7E, Section 31. Cub Thin Project is located on Forest Service road 2653760, 2653762, and 2653765. Page 6 of 21 Willamette National Forest Project Name Willamette National Forest Delta A Cabin Expansion Project Purpose - Special use management In Progress: Scoping Start 05/22/2015 Expected:07/2015 Expected Implementation Project Contact R6 - Pacific Northwest Region 07/2015 Denise Mercer 541-822-7224 dmercer@fs.fed.us Description: The proposed project would authorize modification of cabin #27 in the Delta A recreation residence tract. Modification would include expansion to house a hot water tank. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47002 Location: Delta A Cabin Improvements Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) CE *NEW LISTING* Planning Status UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. Cabin #27 of the Delta A tract. 55311 Delta Road. - Special use management Completed Actual: 05/28/2015 06/2015 CE Denise Mercer 541-822-7224 dmercer@fs.fed.us Description: The proposed project would authorize modification (installation of half bathroom) of cabin on lot 8/9 of the Delta A recreation residence tract. Modification would include installation of new transmission lines for existing water and septic. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46317 Location: Flat Country Floral Greens Project UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. Cabin on lot 8/9 of the Delta A Recreation Residence Tract at 55217 Delta Drive. - Forest products CE Completed This project has changed to a CE that does not require a written decision document and will be removed from the SOPA. 07/2015 Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: This project would remove floral greens: beargrass, salal, fern fronds, and vine maple/ceanothus sticks. This would occur on approximately 28,523 acres of the McKenzie River Ranger District. The sell of these products will be done under permits. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46393 Location: 07/01/2015 04:34 am MT UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane, Linn. LEGAL - T14S,R7E Sec 31-33; T15S,R6E Sec 1,12,13,24-26,35,36; T15S,R7E Sec 3-9,15-22,27-34; T16S,R6E Sec 1,2,11-13; T16S,R7E Sec 4-9,16-18. The project area is bounded by Forest roads 2664 (Robinson Cr.) to the north, 2657640/835 to the east, 2647 (Cupola Rd.) to the south and Hwy 126 on the west. Page 7 of 21 Willamette National Forest Project Name Willamette National Forest Flat Top Thin Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) - Forest products CE In Progress: Scoping Start 03/31/2014 Expected:08/2015 Expected Implementation Project Contact R6 - Pacific Northwest Region 06/2016 Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: The project proposes to commercially thin a 60 year old stand that is 70 acres. In addition to the thinning, approximately 10-15% of the stand will have gaps ranging in size from one to three acres. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46282 Location: French Pete Creek Crossing Repair UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R6E, Section 17 & 20. Project area is off Forest road 2643410. - Recreation management On Hold N/A N/A CE Edward Cross 541-822-7231 etcross@fs.fed.us Description: The proposed project would harden the creek crossing at mile 2.1 of the French Pete Creek Trail (FS Trail 3311) to mitigate erosion. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41528 Location: Fresca Thin CE *NEW LISTING* - Forest products - Fuels management In Progress: Scoping Start 04/21/2015 Expected:02/2016 06/2016 Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: The proposed project would thin two 44 year old managed stands; one is 38 acres the other is 30 acres. In addition to the thinning, approximately eight acres of gaps will be placed between the two stands. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46884 Location: 07/01/2015 04:34 am MT UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T18S, R5E, Sec. 3. Mile 2.1 of the French Pete Creek Trail (FS Trail 3311) in the Three Sisters Wilderness. UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T15S, R6E Sections 3 & 10. Forest roads 2655504 & 2655507. Page 8 of 21 Willamette National Forest Project Name Willamette National Forest Goose EIS 2015 EIS Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) - Wildlife, Fish, Rare plants - Forest products - Fuels management In Progress: DEIS NOA in Federal Register 03/06/2015 Est. FEIS NOA in Federal Register 07/2015 Expected:10/2015 Expected Implementation Project Contact R6 - Pacific Northwest Region 05/2016 Elysia Retzlaff 541-822-7214 elysiamretzlaff@fs.fed.u s Description: The Goose Project proposes to commercially harvest and reduce fuels on approximately 2,452 acres on the Willamette National Forest near the community of McKenzie Bridge, Oregon. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45853 Location: Green Mountain Project EIS UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T 16S R 5E Sec: 1-5, 9-16, 24. T 16S R 6E Sec: 3-11, 13-25. T 16S R 7E 18, 19, 30. The Goose Project area is located on the McKenzie River Ranger District within the Upper McKenzie Watershed (5th field). It is located in the McKenzie Bridge Community. - Forest products - Vegetation management (other than forest products) - Watershed management In Progress: NOI in Federal Register 04/11/2014 Est. DEIS NOA in Federal Register 06/2015 Expected:01/2016 06/2016 James Rudisill 541-822-2703 jamesrudisill@fs.fed.us Description: Proposes to thin ~3,003 acres (3.0% of the Project Area) and regenerate ~324 acres (0.3% of the Project Area) of forests across a sum of approximately 3,327 acres within the Green Mountain Project Area. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40858 Location: King Castle Reroute UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16SR4E s36; T16SR5E s31-32; T17SR4E s01-13; T17SR5E s05-34; T17SR6E s19,30; T18SR4E s01,12; T18SR5E s01-36; T18SR6E s06-36; T18SR7E s31-35; T19SR5E s01-24; T19SR6E s1-36; T19SR7E s02-31; T20SR6E s01. The Green Mountain Project area is located within the Cougar Reservoir, Augusta Creek, Roaring River, and Elk Creek subwatersheds (6th field) of the South Fork McKenzie River Watershed (5th field). - Recreation management CE Developing Proposal Est. Scoping Start 09/2015 Expected:01/2016 06/2016 Edward Cross 541-822-7231 etcross@fs.fed.us Description: The proposed project would reroute approximately 1.25 miles of the King Castle Trail (FS Trail 4326). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43949 Location: 07/01/2015 04:34 am MT UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R5E, Sec. 28 & 21. King's Castle, McKenzie River District, Willamette National Forest. Page 9 of 21 Willamette National Forest Project Name Willamette National Forest LangDam Project EA Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) - Forest products - Vegetation management (other than forest products) In Progress: Notice of Initiation 07/07/2014 Est. Comment Period Public Notice 09/2015 Expected:02/2016 Expected Implementation Project Contact R6 - Pacific Northwest Region 06/2016 Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: Proposes to commercially thin timber stands up to 120 years of age on approximately 733 acres. The purpose and need for this project is to improve stand conditions in terms of density and structure, and maintain stand health and vigor. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41223 Location: Lookout Mountain Meadow Restoration CE UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 22-26, 35, & 36, T16S, R4E; Sections 24, 25, & 36, T16S, R4.5E; Sections 19, 20, 27-35, T16S, R5E; and Sections 4 & 5, T17S, R5E. The project area is located around Forest road 1900,1900408, and 1900411; north of Cougar Reservoir. Ruby Seitz - Wildlife, Fish, Rare plants On Hold N/A N/A 541-822-7256 - Vegetation management ruseitz@fs.fed.us (other than forest products) - Fuels management Description: The purpose of this project is to restore native meadow habitat by cutting and girdling small diameter trees, and subsequently implementing a prescribed fire across an approximately 347-acre project area. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43955 Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T15S, R6E, Sections 31, 32; T16S, R6E, Section 6. Lookout Mountain Meadow. Edward Cross 541-822-7231 etcross@fs.fed.us Lost Creek, Tamolitch Valley and Roaring River Bridge Replacements - Recreation management CE Description: A project to replace three trail bridges that need replacement. Two bridges are located on the McKenzie River National Recreation Trail (MRNRT) (Tr. No. 3507). Another bridge crosses Roaring River on the Roaring River Ridge Trail (Tr. No. 3312). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41530 Location: 07/01/2015 04:34 am MT On Hold N/A N/A UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T14S,R7E,Sec30 & T16S,R6E,Sec10 & T19S,R5.5E,Sec12. Lost Creek, Tamolitch Valley on the McKenzie River National Recreation Trail and Roaring River crossing of the Roaring River Ridge Trail. Page 10 of 21 Willamette National Forest Project Name Willamette National Forest Lower South Fork McKenzie River Enhancement Project CE Project Purpose Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) Expected Implementation Project Contact R6 - Pacific Northwest Region Kate Meyer - Wildlife, Fish, Rare plants Developing Proposal Expected:01/2016 05/2016 541-822-7230 - Vegetation management Est. Scoping Start 06/2015 kmmeyer@fs.fed.us (other than forest products) - Watershed management Description: Using heavy equipment, stream channels would be reconstructed, up to 1,500 pieces of large wood would be placed along stream channels, gravel would be placed to improve spawning, and boardwalks, water crossings, and trails would be constructed. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43959 Location: McKenzie River Trail Reroute Planning Status UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S R4E Sections 23,24; T16S R4.5E Sections 24,25; T16S R5E Sections 19,30,31. Lower South Fork McKenzie River. - Recreation management CE Developing Proposal Est. Scoping Start 09/2015 Expected:01/2016 06/2016 Edward Cross 541-822-7231 etcross@fs.fed.us Description: The proposed project would reroute several sections of the McKenzie River National Recreation Trail (#3507) to prevent trenching and erosion. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43956 Location: Muskee Thin CE UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T15S,R6E,Sec. 14, 13, 24, 26 & T16S,R6E,Sec.11, 10, 9, 17, 18 & T14S,R7E,Sec. 5,8,17,30,31. McKenzie River Trail. - Forest products - Fuels management Completed Actual: 05/11/2015 08/2015 Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: The project proposes to commercially thin three 43 year old stands, one is 42 acres, 16 acres, and 9 acres. In addition to the thinning, approximately 10-15% of the stand will have gaps ranging in size from one to three acres. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43950 Location: OHV Trail 46 Reroute UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S, R7E, Section 29 & 32. Project area is on Forest Service roads 2664510 and 2664508. - Recreation management Completed Actual: 06/12/2015 07/2015 CE *NEW LISTING* Description: The proposed project would reroute approximately .1 mile of OHV Trail 46 (OHV Class III). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47015 Location: 07/01/2015 04:34 am MT Edward Cross 541-822-7231 etcross@fs.fed.us UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. OHV Trail 46 is located at the Santiam Pass OHV area near Hoodoo Ski Area. Page 11 of 21 Willamette National Forest Project Name Willamette National Forest Ollie Thin Project Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) - Forest products CE In Progress: Scoping Start 03/31/2014 Expected:07/2015 Expected Implementation Project Contact R6 - Pacific Northwest Region 04/2016 Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: The project proposes to commercially thin a 65 year old stand that is 52 acres. In addition to the thinning, approximately 10-15% of the stand will have gaps ranging in size from one to three acres. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46273 Location: Peggy Creek Disposal Site Expansion UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T15S, R7E, Sections 7, 8, 17, & 18. Project area is on Forest roads 2657830 & 2657834. - Special use management Developing Proposal Est. Scoping Start 06/2015 CE *NEW LISTING* EA Brandon Green 541-822-7218 bkgreen@fs.fed.us UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. Peggy Creek Disposal site is located on the west side of Road 2650 at milepost .30. Existing disposal site is a long term centrally located sited used by the Forest Service, EWEB, and ODOT. Shane Kamrath - Wildlife, Fish, Rare plants On Hold N/A N/A 541-822-7233 - Special use management skamrath@fs.fed.us - Road management Description: Realignment of the existing bypass Forest Service Road 2672690 around the Eugene Water and Electric Board's Carmen power house in order to provide safe and adequate access for construction of the fish passage facilities at trailbridge reservoir. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41242 Location: 07/01/2015 04:34 am MT 06/2016 Description: The proposed project would expand the current Peggy Creek disposal site allowing for an additional 9,000 to 12,000 cubic yards of geologic spoils (waste). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46851 Location: Power Plant Bypass Road Realignment Expected:01/2016 UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T 15 S R 6 E, SEC 1 & 12. Trailbridge Reservoir. Page 12 of 21 Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) Prescribed Fire in Wilderness: Scott Mountain - Fuels management EA In Progress: Notice of Initiation 01/09/2013 Est. Comment Period Public Notice 07/2015 Expected:10/2015 Expected Implementation Project Contact R6 - Pacific Northwest Region 10/2015 Matt Peterson 541-225-6421 mbpeterson@fs.fed.us Description: The project would use prescribed fire in the Mt. Washington Wilderness area to modify vegetation and fuels to sufficiently reduce the threats to values outside of wilderness in order to allow fire to play a more natural role within wilderness. Web Link: http://www.fs.usda.gov/detail/willamette/landmanagement/resourcemanagement/?cid=stelprdb5383417 Location: SR Salvage CE *NEW LISTING* UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - The legal description for the project area is T15S, R07E, sections 23, 24, 25, 26, 27, 34, 35, 36; T15S, R07½ E, sections 21, 22, 26, 27, 28, 33, 34; and T16S, R07E, sections 2 and 3. The project area includes the Mt. Washington Wilderness area on the McKenzie River Ranger District. Shadie Nimer - Forest products In Progress: Expected:07/2015 10/2015 541-822-7271 - Fuels management Scoping Start 04/21/2015 snimer@fs.fed.us - Road management Description: The proposed project would remove approximately 15 dead and dying hazard trees that have a failure zone of hitting Forest Road 2672655. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46885 Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S, R6E Section 25. Forest road 2672655. Sand Mountain Trail Repair and - Recreation management Reroute In Progress: Scoping Start 03/24/2014 CE Expected:07/2015 09/2015 Saren Whitney 541-822-7243 slwhitney@fs.fed.us Description: The proposed project would repair and reroute portions of the Sand Mountain Lookout trail to prevent erosion and further trail damage. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43958 Location: 07/01/2015 04:34 am MT UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S R7.5E Section 1. Sand Mountain. Page 13 of 21 Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) Upper Foley Trail Reroute - Recreation management CE *NEW LISTING* Developing Proposal Est. Scoping Start 09/2015 Expected:01/2016 Expected Implementation Project Contact R6 - Pacific Northwest Region 06/2016 Edward Cross 541-822-7231 etcross@fs.fed.us Description: The proposed project would reroute approximately one mile of the Foley Ridge Trail (FS Trail 3511) to prevent and reduce heavy erosion. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46850 Location: Wildlife Habitat Enhancement and Restoration Projects 2015 UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. The section proposed for reroute is approximately eight miles from the nearest trailhead and approximately one mile before the trail intersects with the Pacific Crest Trail in Three Sisters Wilderness. - Wildlife, Fish, Rare plants Completed Actual: 04/20/2015 06/2015 CE Penny Harris 541-822-7265 pjharris@fs.fed.us Description: The proposed project would include 738 acres of browse cutback, 34 acres of early seral habitat restoration, 26 acres of prescribed burning, creation of 1529 wildlife trees and 2050 down wood trees. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46384 Location: Wolf Boughs Project UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane, Linn. LEGAL - T14SR7E S 18&19; T15SR6E S 2-4,10,11,14,22,23,25; T15SR7E S 8,17,18,30; T16SR4E S 22,23,27,28,33,34; T16SR5E S 4-9; T16SR6E S 23,25,26,36; T16SR7E S 31; T17SR5E S 28,29,33; T18R4E S 1-4,8,10,11,14,17. Recently commercially thinned units, old plantations with low conifer stocking and the McKenzie Airstrip. - Forest products CE In Progress: Scoping Start 02/26/2015 Expected:07/2015 08/2015 Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: The Wolf Boughs project would remove approximately one hundred thirty-one tons (62,000 pounds) of coniferous boughs over 123 acres, under contracts or permits. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46401 Location: Willamette National Forest 07/01/2015 04:34 am MT UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S, R6E Sections 30, 31, & 36. Forest roads 1500618, 1500735 & 1500734. Middle Fork Ranger District (excluding Projects occurring in more than one District) Page 14 of 21 R6 - Pacific Northwest Region Willamette National Forest Project Name Willamette National Forest Deception Fire Reforestation CE *NEW LISTING* Project Purpose CE *NEW LISTING* Decision Middle Fork Ranger District (excluding Projects occurring in more than one District) - Vegetation management (other than forest products) In Progress: Scoping Start 06/10/2015 Expected:09/2015 Expected Implementation Project Contact R6 - Pacific Northwest Region 04/2016 Lisa Helmig 715-762-5106 lhelmig@fs.fed.us Description: The Middle Fork Ranger District is proposing to replant approximately 325 acres in plantations within the Deception Complex Fire that affected the Willamette National Forest . The purpose is to re-establish forest cover with a mix of native conifers. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47106 Location: Meadow and Forage Restoration Planning Status UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T21S, R2E, Sections-10, 11, 14,15, 23, 26,27,28. This project is approximately 2 miles southeast of the town of Westfir along FS road 5850 and 5847. Molly Juillerat - Wildlife, Fish, Rare plants In Progress: Expected:10/2015 01/2016 541-782-5350 - Vegetation management Scoping Start 02/10/2015 mjuillerat@fs.fed.us (other than forest products) Description: The purpose of this project is to cover maintenance burning and whip felling for the next 10 years as needed to stop encroachment and maintain the meadows. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46949 Location: UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. These meadows fall within one of the listed watersheds as follows:Upper Middle Fork Watershed, Hills Creek, Hills Creek Reservoir,Middle Fork Willamette, and the North Fork of the Middle Fork. Middle Fork Trail Improvements - Recreation management Project Completed CE Actual: 06/03/2015 06/2015 Kevin Rowell 541-782-5305 karowell@fs.fed.us Description: Proposing to reroute 1200 feet of unsustainable trail, rebuild four trail bridges and build one new bridge. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46199 Location: 07/01/2015 04:34 am MT UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T24S R4E Sec.11 and T24S R5E Sec.18,28. Project location is approximately 30 miles SE of the town of Oakridge. Near Indigo Springs Campground. Page 15 of 21 Willamette National Forest Project Name Willamette National Forest Outlook Landscape Diversity Project EA Project Purpose Expected Implementation Project Contact R6 - Pacific Northwest Region Allen Hambrick 07/2016 - Special area management In Progress: Expected:02/2016 541-782-5217 - Wildlife, Fish, Rare plants Scoping Start 01/14/2013 afhambrick@fs.fed.us - Forest products Est. 215 Comment Period Legal - Vegetation management Notice 10/2015 (other than forest products) - Fuels management - Watershed management - Road management Description: Commercial thinning and fuels reduction on 4300 ac. of plantations; 110 mi. of road maintenance, closure of 130 mi. of road; special habitat restoration; 260 ac. of early-seral habitat maintenance/creation; snag creation, noxious weed abatement. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40122 UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Townships 20 and 21 South, Ranges 1 and 2 East, of the Willamette Meridian. Federal portions of the Lookout Point 5th-field watershed near the Lookout Point Reservoir near the cities of Westfir and Lowell, OR. Skookum Campground Bridges - Recreation management CE In Progress: Scoping Start 02/10/2015 Expected:08/2015 09/2015 Kevin Rowell 541-782-5305 karowell@fs.fed.us Description: To replace one failed and one rotten (eminent failure) trail bridge. One bridge is 31%u2019 long and has Western red cedar hand railing. The second bridge is 11.5 feet long and leads users over a small creek into Skookum CG. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46947 Location: Staley Creek Stream Restoration Decision Middle Fork Ranger District (excluding Projects occurring in more than one District) Location: *NEW LISTING* Planning Status UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T19S R5SE Sec 24. This project is located at the Skookum Campground. Near the NE side of Waldo Lake Wilderness. - Wildlife, Fish, Rare plants - Watershed management In Progress: Scoping Start 02/10/2015 CE Expected:10/2015 07/2016 Joseph Helstab 541-782-5328 jmhelstab@fs.fed.us Description: Stabilization of approx. 200 ft. of eroding stream bank, including large woody debris jam construction. Trees with root wads attached will be gathered and large trees will be hauled to the project area for bank stabilization and log jam construction. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40115 Location: 07/01/2015 04:34 am MT UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T24S, R4E, NW 1/4 of Section 19. The location is at the former Pope and Talbot bridge crossing of Staley Creek on Forest Road 2134244. This is located at approximately the 1.7 mile mark on Forest Road 2134. Page 16 of 21 Willamette National Forest Project Name Willamette National Forest Upper Little Fall LSR Density Management Project EA Project Purpose 2014 Sweet Home White Oak Enhancement Project Decision Middle Fork Ranger District (excluding Projects occurring in more than one District) Expected Implementation Project Contact R6 - Pacific Northwest Region Kenneth Barbee - Forest products On Hold N/A N/A 541-782-5233 - Vegetation management kbarbee02@fs.fed.us (other than forest products) - Fuels management - Watershed management - Road management Description: The Middle Fork Ranger District of the Willamette National Forest proposes density management on about 1720 acres of young plantations located in the Little Fall Creek subwatershed.The project would include the reconstruction of existing roads. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43203 Location: Willamette National Forest Planning Status UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T17S, R1E, Sections 47,9,17,18, T17S, R2E, Sections 1-3,10, and 11 of the Willamette Meridian. This area is in the Little Fall Creek fifth-field watershed located approximately 16 miles northeast of the city of Lowell. Sweet Home Ranger District (excluding Projects occurring in more than one District) - Vegetation management (other than forest products) In Progress: Scoping Start 06/10/2014 CE Expected:10/2015 R6 - Pacific Northwest Region 11/2015 Alice Smith 541-367-9215 acsmith@fs.fed.us Description: Release established oak trees and propagate new oak trees from collected acorns from the site. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44520 Location: UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. There are two stands one near Two Girls Creek and the other near Moose Creek. Both stands are in the South Santiam watershed. Tiffany Young Big Game Forage Enhancement - Wildlife, Fish, Rare plants On Hold N/A N/A (Canyon and Owl Creek 928-368-5111 Watersheds) tayoung@fs.fed.us Description: CE Enhance 40 acres of big game habitat including: browse cutback, planting and seeding native forage species, and collecting native seed for use in following years. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41514 Location: 07/01/2015 04:34 am MT UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. Canyon and Owl Creek Watersheds. Page 17 of 21 Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Decision Sweet Home Ranger District (excluding Projects occurring in more than one District) Expected Implementation Project Contact R6 - Pacific Northwest Region Jonathan Meier 541-367-3557 jmeier02@fs.fed.us Cascadia Day Use Forest Plan Amendment and Site Development - Land management planning EA Description: Proposed Forest Plan amendment to change about 10 ac. of an administrative site MA 13B to Developed Recreation MA 12a. Also, construct parking area for 8-10 vehicles, plant low-maintenance landscaping, and construct ADA interpretive tail. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41511 Location: Cool Soda EA CE 06/2015 UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T 13 S, R 2 E, Section 36. South Santiam Watershed. UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S, R4E, Sections 1, 1114, 24 and 25; T13S, R5E, Sections 3-10, 14-22, 28-30. In north eastern portion of the South Santiam watershed. About 30 miles east of Sweet Home, Oregon. Amanda Colton - Regulations, Directives, On Hold N/A N/A 541-367-3540 Orders arcolton@fs.fed.us - Recreation management - Wildlife, Fish, Rare plants Description: Proposed change to existing seasonal closure boundary to provide species protection during the critical nesting and fledging period. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38620 Location: 07/01/2015 04:34 am MT Actual: 04/07/2015 Anita Leach - Wildlife, Fish, Rare plants Completed Actual: 05/15/2015 08/2015 541-367-9218 - Forest products agleach@fs.fed.us - Vegetation management (other than forest products) - Fuels management Description: Implement vegetation-related projects from Cool Soda All Lands Restoration Proposal. Thin 545 ac. of young stands, regen 71 ac. for noble fir boughs, regen 14 acres in mature stand, fuel treatments, special forest products, traditional resources Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43264 Location: Menagerie Seasonal Closure Boundary Change for Species Protection Completed UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S, R4E, Sections. 14, 15, 22 and 23. Menagerie Wilderness. Page 18 of 21 Willamette National Forest Project Name Willamette National Forest Moose Creek and Quartzville Dispersed Sites Project Project Purpose Planning Status Decision Expected Implementation R6 - Pacific Northwest Region Sweet Home Ranger District (excluding Projects occurring in more than one District) - Recreation management - Watershed management Completed Actual: 05/20/2015 Project Contact 05/2015 CE Jonathan Meier 541-367-3557 jmeier02@fs.fed.us Description: Closing large dispersed sites that have been consistent problem areas for illegal camping, dumping of trash, improper waste disposal, and natural resource degradation. Sites will remain open for day use activities and increased day access to water. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46292 Location: ODOT Right of Way UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S, R3E, Sections 27 and 34. T11S, R4E, Sections 25-28 and 33-34. Along Moose Mtn. Road (2027) 1/8 mile from the junction with Highway 20 and Moose Creek Rd (2025), approximately 1 mile from beginning of road. Various sites along Quartzville Creek. - Special use management CE Developing Proposal Est. Scoping Start 06/2015 Expected:08/2015 09/2015 Penny Keen 503-854-4202 pkeen@fs.fed.us Description: Granting right-of-way to ODOT for Sheep Creek bridge replacement on highway 20. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46426 Location: Re-route of Road 2041 UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. T13S, R5E, Section 28 at milepost 56.64 on Highway 20 where Sheep Creek crosses the highway. - Road management CE In Progress: Scoping Start 03/05/2015 Expected:06/2015 07/2015 Daniel Matthews 541-367-3812 danielwmatthews@fs.fe d.us Description: Relocate about 500-600 feet of road 2041 where its alignment has shifted due to an active slide. Replace and realign 5-6 foot culvert. Remove rock from the abandoned portion of road and use on relocated portion. Decommission abandoned roadbed. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46428 Location: 07/01/2015 04:34 am MT UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. Milepost 11.1 on the 2041 road. Page 19 of 21 Willamette National Forest Project Name Willamette National Forest Smith Prairie Meadow Maintenance Project Purpose Planning Status Decision Sweet Home Ranger District (excluding Projects occurring in more than one District) - Wildlife, Fish, Rare plants In Progress: Scoping Start 08/09/2011 Expected:07/2015 Expected Implementation Project Contact R6 - Pacific Northwest Region 08/2015 CE Tiffany Young 928-368-5111 tayoung@fs.fed.us Description: Enhance and maintain meadow complex by reducing encroachment of conifers (remove saplings under 4 inches), seed collection, girdling 1-2 trees/acre under 12 inches DBH and falling 1 tree/acre for down wood. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36704 Location: Special Forest Product Sales SHRD 2015 UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S, R6E, section 1; T14S, R7E, section 6, Willamette Meridian. Smith Prairie in the Upper McKenzie watershed. - Forest products In Progress: Scoping Start 03/18/2015 CE Expected:07/2015 07/2015 Lindsay Anderson 541-367-3485 landerson02@fs.fed.us Description: Hand gathering of a variety of special forest products within road prism and up to within 450 feet or roads open to public access. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45269 Location: Trout Creek EA Anita Leach - Wildlife, Fish, Rare plants Developing Proposal Expected:10/2016 06/2017 541-367-9218 - Forest products Est. Notice of Initiation 06/2015 agleach@fs.fed.us - Vegetation management (other than forest products) Description: In managed and natural stands: Promote health, vigor, diversity and complexity ~1770 ac. Mimic mixed-severity fire ~720 ac. Improve hardwood habitat ~290 ac. Improve traditional resources. Generate revenue to improve existing roads. Treat fuels. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46279 Location: 07/01/2015 04:34 am MT UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. 150 Feet either side of roads open to public on Sweet Home Ranger District. UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T12S, R4E, Sec.34; T12S, R5E, Sec. 19,29,30-32; T13S, R3E, Sec.11-15, 22-27, 34-36; T13S, R4E, Sec. 1-12, 14-36; T13S, R5E, Sec.5,6; T14S, R3E, Sec 1-3, 12; T14S, R4E, Sec. 1-15. Trout Creek, Moose Creek and portions of Canyon Creek within the South Santiam watershed. Page 20 of 21 Willamette National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 07/01/2015 04:34 am MT Page 21 of 21 Willamette National Forest