Schedule of Proposed Action (SOPA) 04/01/2016 to 06/30/2016 Willamette National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact R6 - Pacific Northwest Region, Regionwide (excluding Projects occurring in more than one Region) Aquatic Invasive Species order - Wildlife, Fish, Rare plants Completed Actual: 03/28/2016 03/2016 EA *UPDATED* Description: The purpose of this order is to prevent the spread or introduction of aquatic invasive plant or animal species on all Forests in R6. Public involvement is targeted for the Umatilla, Willamette, Mt. Baker-Snoqualmie, Gifford Pinchot, and Colville NFs. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47350 Location: UNIT - R6 - Pacific Northwest Region All Units. STATE - Oregon, Washington. COUNTY - Adams, Asotin, Benton, Chelan, Clallam, Clark, Columbia, Cowlitz, Douglas, Ferry, Franklin, Garfield, Grant, Grays Harbor, Island, Jefferson, King, Kitsap, Kittitas, Klickitat, Lewis, Lincoln, Mason, Okanogan, Pacific, Pend Oreille, Pierce, San Juan, Skagit, Skamania, Snohomish, Spokane, Stevens, Thurston, Wahkiakum, Walla Walla, Whatcom, Whitman, Yakima, Baker, Benton, Clackamas, Clatsop, Columbia, Coos, Crook, Curry, Deschutes, Douglas, Gilliam, Grant, Harney, Hood River, Jackson, Jefferson, Josephine, Klamath, Lake, Lane, Lincoln, Linn, Malheur, Marion, Morrow, Multnomah, Polk, Sherman, Tillamook, Umatilla, Union, Wallowa, Wasco, Washington, Wheeler, Yamhill. LEGAL - Not Applicable. Order will apply to all Forests in Region 6, however targeted scoping is with the Umatilla, Gifford Pinchot, Mt. Baker-Snoqualmie, Willamette and Colville NFs public scoping lists. Willamette National Forest, Forestwide (excluding Projects occurring in more than one Forest) Invasive Plant Management Amendment CE *NEW LISTING* R6 - Pacific Northwest Region - Land management planning Developing Proposal Expected:06/2016 07/2016 - Vegetation management Est. Scoping Start 01/2016 (other than forest products) Description: Amendment to add aminopyralid to list of approved herbicides on the Willamette NF. Jennifer Lippert 541-225-6440 jlippert@fs.fed.us Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48548 Location: UNIT - Willamette National Forest All Units. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. Willamette National Forest- whole forest. Willamette National Forest, Occurring in more than one District (excluding Forestwide) 04/01/2016 04:09 am MT James Capurso 208-557-5780 jcapurso@fs.fed.us Page 1 of 24 R6 - Pacific Northwest Region Willamette National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact R6 - Pacific Northwest Region Willamette National Forest, Occurring in more than one District (excluding Forestwide) Denise Mercer 541-822-7224 dmercer@fs.fed.us 2016 Renewal of Existing Permits for Outfitters and Guides - Special use management CE Description: The proposed project would renew existing outfitter and guide permits operating on the Willamette National Forest with Priority Use Permits for up to a 10-year term. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48612 *NEW LISTING* Location: Willamette National Forest 2014 Lands Permits Detroit Ranger District (excluding Projects occurring in more than one District) - Special use management Expected:05/2016 05/2016 Penny Keen 503-854-4202 pkeen@fs.fed.us Developing Proposal Est. Scoping Start 04/2016 Expected:05/2016 05/2016 Penny Keen 503-854-4202 pkeen@fs.fed.us Description: Renew three recreation special use permits Detroit Lake Marina, Kanes Marina, and Chemeketans Club to a new term of 10 years. This is an administrative action no ground disturbance will take place. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44630 Location: 04/01/2016 04:09 am MT Developing Proposal Est. Scoping Start 04/2016 R6 - Pacific Northwest Region UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. Bureau of Reclamation Weather Station T.10S., R6E, SECTION 3 City of Idanha Waterline - T.10S., R6E. SECTION 22 Breitenbush Hot Spring Mobile Radio Service - T.9S., R7E. SECTION 16. - Special use management CE *UPDATED* 02/2016 Description: Renew three lands special use permits, Bureau of Reclamation Weather station, City of Idanha Water system, and Breitenbush Hot Springs Mobile radio Service new term of 10 years. This is an administrative action no ground disturbance will take place. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44631 Location: 2014 Recreation Permits Actual: 02/29/2016 UNIT - Middle Fork Ranger District, Sweet Home Ranger District, Detroit Ranger District, McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane, Linn, Marion. LEGAL - Not Applicable. Various locations across Willamette National Forest. CE *UPDATED* Completed UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. Kanes Marina T.10S., R6E, SECTION 2 Detroit Marina - T.10S., R6E. SECTION 1 Chemeketans Club - T.10S., R7E. SECTION 27 . Page 2 of 24 Willamette National Forest Project Name Willamette National Forest Blowout Road 10 Dispersed Site Rehabilitation Project Purpose Planning Status Decision Detroit Ranger District (excluding Projects occurring in more than one District) - Recreation management - Watershed management In Progress: Scoping Start 03/15/2016 Expected:04/2016 Expected Implementation R6 - Pacific Northwest Region 05/2016 CE *NEW LISTING* UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. Forest Service Road 10, Blowout Road. - Wildlife, Fish, Rare plants - Watershed management In Progress: Scoping Start 03/15/2016 CE *UPDATED* CE *NEW LISTING* 07/2016 Jamie Sheahan Alonso (503) 854-4217 jsheahanalonso@fs.fed. us UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. Upper Blowout Creek T 11 S, R 06 E, Sections 5, 6, 7 & 8: Blowout & Divide Creeks restoration reaches, Lower Divide Creek Rock Pit T 11 S, R 05 E, Section 31; and T 11 S, R 06 E, Section 6: Roads 10 & 1011 roadside large wood sources . Penny Keen - Recreation management Developing Proposal Expected:05/2016 06/2016 503-854-4202 - Special area management Est. Scoping Start 04/2016 pkeen@fs.fed.us - Watershed management - Special use management - Facility management Description: Camp Pioneer is requesting authorization to install an vault for an outhouse next to the parking lot. Location: 04/01/2016 04:09 am MT Expected:05/2016 Description: This restoration project would improve habitat for rainbow and cutthroat trout and increase sediment storage along 1.0 miles of central Blowout Creek and 0.7 miles of lower Divide Creek. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47095 Location: Camp Pioneer Parking Lot Outhouse Dave Klug 503-854-4216 dklug@fs.fed.us Description: This project proposes to use a small tracked excavator with a specialized subsoiler attachment to de-compact the user-created roads and other side spurs. On-site boulders would be used again to re-close the spurs to vehicular traffic. Location: Blowout-Divide Creeks Log Placement Project Contact UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. Camp Pioneer. Page 3 of 24 Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Detroit Ranger District (excluding Projects occurring in more than one District) City of Detroit Water System Update - Special use management In Progress: Scoping Start 04/04/2011 CE *UPDATED* FS Rd 2233-635/Outerson Mtn Traffic Control *UPDATED* EIS *UPDATED* R6 - Pacific Northwest Region 09/2016 Penny Keen 503-854-4202 pkeen@fs.fed.us UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - T10S, R5E, sec 1; T9S, R5E, sec 36. Breitenbush Rd. and City of Detroit. UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. T.10S. R.7E. Sec. 09. Lynise Medley - Recreation management In Progress: Expected:05/2018 03/2019 503-854-4228 - Wildlife, Fish, Rare plants NOI in Federal Register lmedley@fs.fed.us - Forest products 03/09/2016 - Vegetation management Est. DEIS NOA in Federal (other than forest products) Register 04/2017 - Watershed management - Road management Description: Formerly Hwy 46 North. Treatments will occur in the Breitenbush Watershed, including commercial thinning, early seral creation, riparian reserve treatment, viewshed enhancements, meadow restoration, hazardous fuels treatments, PCT and pruning. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47109 Location: 04/01/2016 04:09 am MT Project Contact Bradford Peterson - Recreation management Cancelled N/A N/A 503-854-3894 - Heritage resource bcpeterson@fs.fed.us management - Road management Description: Installation of a road closure device, such as a gate, at the 2233-635 road. Installation of educational signage at two locations in the vicinity. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45884 Location: Hwy 46 Expected:09/2016 Expected Implementation Description: Fence to be installed around water building on Breitenbush Rd. Install emergency drainline from water storage tank. Reissue special use permit. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34398 Location: CE Decision UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. Breitenbush Watershed, Marion County, Oregon.T 9 S, R 6 E, sections 1, 11 %u2013 15, 21 %u2013 28, 35 and 36, T 9 S, R 7 E, sections 3 %u2013 22 and 30, T 9 S, R 8 E, section 7. Page 4 of 24 Willamette National Forest Project Name Willamette National Forest Jeff Bridge Fish Drop Project Purpose - Wildlife, Fish, Rare plants In Progress: Scoping Start 03/15/2016 Expected:09/2016 Expected Implementation R6 - Pacific Northwest Region 11/2016 - Recreation management Cancelled N/A N/A CE *NEW LISTING* UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. Multiple locations within the McCoy Motorized Recreation Area. - Wildlife, Fish, Rare plants - Forest products Developing Proposal Est. Scoping Start 04/2016 - Recreation management Sue Crowder 503-854-4204 sjcrowder@fs.fed.us In Progress: Scoping Start 08/07/2015 Expected:05/2016 07/2016 Brandon Haraughty 503-854-4222 bharaughty@fs.fed.us Description: Sections of trail route are unsustainable. Excessive erosion on overly steep trail grades in burned area soil is causing heavy damage to the trail route. Rerouting these trail sections will create stable tread surface and reduce erosion issues. Location: 04/01/2016 04:09 am MT 06/2017 UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. T. 10 S., R. 6 E., Sec 13; T. 10 S., R. 7 E., Sec 18; Headwaters North Santiam River Watershed. CE *UPDATED* Expected:01/2017 Description: This project would improve forest health by decreasing competition, releasing the canopy, stimulating tree and ground vegetation growth rates, and reducing fuel loading in over stocked stands. Location: Minto Pass Trail #3437 Reroutes Bradford Peterson 503-854-3894 bcpeterson@fs.fed.us Description: This project will include the installation of a covered picnic shelter at the lower staging area, and the expansion of the upper staging area. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41139 Location: McCoy Thinning Project Darrin Neff 503-854-4219 daneff@fs.fed.us UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. Breitenbush Watershed, T.09S., R.07E., Sec. 21, NE1/4. CE *UPDATED* Project Contact Description: This project develops a fish drop site in order to drop chinook salmon spawners at the Jefferson Bridge off Road 4685 into the North Fork Breitenbush River. Location: McCoy Motorized Rec. Area Improvements 2014-2015 Decision Detroit Ranger District (excluding Projects occurring in more than one District) CE *NEW LISTING* Planning Status UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. T12S R8E Secs. 1,2, 12, 18. Page 5 of 24 Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Decision Detroit Ranger District (excluding Projects occurring in more than one District) Pacific Crest Trail #2000 Minto Pass Vicinity Reroute - Recreation management Developing Proposal Est. Scoping Start 05/2016 Expected:11/2016 Expected Implementation R6 - Pacific Northwest Region 06/2017 CE *NEW LISTING* UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. T12S R8E Sec. 17. - Recreation management Developing Proposal Est. Scoping Start 06/2016 Expected:11/2016 07/2017 CE *NEW LISTING* UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. T9S R8E Secs. 26,35, T10S R8E Secs. 2, 11, Breitenbush Watershed. - Recreation management Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 06/2017 CE *NEW LISTING* UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. Pacific Crest Trail. T13S R7.5E Sec. 13. - Wildlife, Fish, Rare plants Developing Proposal Est. Scoping Start 04/2016 CE *NEW LISTING* Expected:09/2016 05/2017 Daryl Whitmore 503-854-4225 dwhitmore@fs.fed.us Description: Meadow enhancement of the Pigeon Prairie meadow complex, on approximately 41 acres. Activities include removal of encroaching conifers and fuels treatments as appropriate. Location: 04/01/2016 04:09 am MT Brandon Haraughty 503-854-4222 bharaughty@fs.fed.us Description: Reroute a portion of the Pacific Crest Trail to reduce resource damage. Location: Pigeon Prairie Meadow Enhancement Brandon Haraughty 503-854-4222 bharaughty@fs.fed.us Description: Construction of ten new trail sections including brush work, log cutting, tree removal and tread surface construction. Location: Pacific Crest Trail #2000 Three Finger Jack Vicinity Reroute Brandon Haraughty 503-854-4222 bharaughty@fs.fed.us Description: Construction of one new trail section including brush work, log cutting, tree removal and tread surface construction Location: Pacific Crest Trail #2000 Park Ridge Vicinity Reroutes Project Contact UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. Pigeon Prairie Meadow Complex. Page 6 of 24 Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Decision Detroit Ranger District (excluding Projects occurring in more than one District) Relocating Breitenbush lot #2 - Special use management CE *NEW LISTING* Expected:05/2016 R6 - Pacific Northwest Region 06/2016 - Watershed management In Progress: Scoping Start 03/15/2016 Expected:05/2016 11/2016 CE *NEW LISTING* Expected:04/2017 05/2017 Josh Weathers 503-854-3226 jweathers@fs.fed.us UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. Three Pools Day Use Area, T. 8 S., R. 4 E., Section 34, North Santiam Watershed. Darrin Neff 05/2016 - Recreation management In Progress: Expected:04/2016 503-854-4219 - Special area management Scoping Start 03/15/2016 daneff@fs.fed.us - Watershed management Description: Multiple dispersed recreation sites would have their footprint decreased and transitioned from drive into to walk in sites. Location: 04/01/2016 04:09 am MT Developing Proposal Est. Scoping Start 05/2016 Description: Proposal is to ban alcohol use at the Three Pools Day Use Area. Location: Three Pools Respect the River UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. Adjacent to Southshore campground. Detroit Tribs Watershed, T.10S., R.05E., Sec. 15, NE1/4. - Recreation management EA *NEW LISTING* Dave Klug 503-854-4216 dklug@fs.fed.us Description: Planting wetland plants is intended to stabilize sifting lake sediments in a shallow swimming area in an alcove at the Southshore Campground. Location: Three Pools Alcohol Ban Penny Keen 503-854-4202 pkeen@fs.fed.us UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. T. 9S., R. 5 E., Sections 21 , Breitenbush Watershed. CE *NEW LISTING* Project Contact Description: The cabin owners of Breitenbush River Lot #2 are requesting permission to move their cabin to the south and east approximately 50-75 feet because of the eroding river bank. Location: Southshore Alcove Aquatic Planting Developing Proposal Est. Scoping Start 04/2016 Expected Implementation UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Marion. LEGAL - Not Applicable. Opal Creek Scenic Area. Page 7 of 24 Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Decision Detroit Ranger District (excluding Projects occurring in more than one District) Expected Implementation Project Contact R6 - Pacific Northwest Region Lynise Medley 503-854-4228 lmedley@fs.fed.us Whitewater Creek Hydro Core Drill Phase 2 Geo Resource Study - Minerals and Geology CE Description: Whitewater Green Energy is proposing to perform core drills with a backpack drill for geotechnical studies associated with their FERC licensing process in the Whitewater and Russell Creek drainages. *UPDATED* Location: Willamette National Forest 2016 Meadow and Wetland Enhancement Cancelled N/A N/A UNIT - Detroit Ranger District. STATE - Oregon. COUNTY - Linn, Marion. LEGAL - Not Applicable. Whitewater and Russell Creek drainages. T10S, R7E, SECTIONS 22 THRU 24 AND T10S R8E SECTION 19, 20. McKenzie River Ranger District (excluding Projects occurring in more than one District) - Wildlife, Fish, Rare plants Completed Actual: 03/01/2016 R6 - Pacific Northwest Region 07/2016 CE *NEW LISTING* Description: The proposed project would restore and maintain meadows, ponds, pools, and wetlands to improve landscape diversity, wildlife habitat, and ecological functions. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48716 Location: Benson and Obsidian Trail Reroutes UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane, Linn. LEGAL - Not Applicable. Various meadows, ponds, pools, and wetlands across the McKenzie River Ranger District. - Recreation management Developing Proposal Est. Scoping Start 04/2016 CE *UPDATED* Expected:06/2016 07/2016 Edward Cross 541-822-7231 etcross@fs.fed.us Description: The proposed project would reroute approximately 2.2 miles of the Obsidian Trail (FS Trail 3528) and one mile of the Benson Lake Trail (FS Trail 3502). Reroutes would reduce erosion and maintenance. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46849 Location: 04/01/2016 04:09 am MT Penny Harris 541-822-7265 pjharris@fs.fed.us UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. Trails are located to east and west of Highway 242 near McKenzie Pass. The Benson Trail is located in the Mount Washington Wilderness and the Obsidian Trail is located in the Three Sisters Wilderness. Page 8 of 24 Willamette National Forest Project Name Willamette National Forest Blue River Upper Compound Administrative Site Disposal Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) - Facility management Completed Actual: 01/20/2016 Expected Implementation R6 - Pacific Northwest Region 01/2016 CE *UPDATED* CE CE *UPDATED* On Hold N/A N/A Shari Monson 541-225-6424 smonson@fs.fed.us Description: Complete updates needed to upgrade to LTE capacity of existing Cingular/AT&T tower at Mt. Hagen, including the removal of 2 existing antennas, placement of 4 new antennas, and installation of a generator and propane tank. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43946 UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 35, T. 16S., R.3E. Mt. Hagan, McKenzie River District of the Willamette National Forest. Kate Meyer - Wildlife, Fish, Rare plants In Progress: Expected:04/2016 07/2016 541-822-7230 - Vegetation management Scoping Start 11/10/2015 kmmeyer@fs.fed.us (other than forest products) - Watershed management Description: The project will consist of channel reconstruction and floodplain enhancement using wood placement and side channel excavation. Wood sources for the logs will be located within a 5 mile radius of the channel. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47582 Location: 04/01/2016 04:09 am MT UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 21; T16S, R4E; W.M. Lane County. Forest road 2620-130. - Special use management - Facility management Location: Deer Creek Floodplain Enhancement Susan Beall 541-750-7059 sebeall@fs.fed.us Description: The proposed project would authorize sale of a USFS site which consists of six structures, a paved road, gravel driveways and roads, paved and graveled parking and loading areas, a gravel stockpile, and timber/vegetation areas. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38416 Location: Cingular-Mt. Hagan Tower Upgrades & Generator/Propane Tank Installation Project Contact UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. The project area is approximately 42 acres and includes 1.6 miles of Deer Creek. Page 9 of 24 Willamette National Forest Project Name Willamette National Forest Flat Top Thin Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) - Forest products Completed Actual: 01/21/2016 Expected Implementation R6 - Pacific Northwest Region 07/2016 CE *UPDATED* UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R6E, Section 17 & 20. Project area is off Forest road 2643410. - Recreation management On Hold N/A N/A CE *UPDATED* CE Edward Cross 541-822-7231 etcross@fs.fed.us Description: The proposed project would harden the creek crossing at mile 2.1 of the French Pete Creek Trail (FS Trail 3311) to mitigate erosion. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41528 Location: Fresca Thin Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: The project proposes to commercially thin a 60 year old stand that is 70 acres. In addition to the thinning, approximately 10-15% of the stand will have gaps ranging in size from one to three acres. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46282 Location: French Pete Creek Crossing Repair Project Contact UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T18S, R5E, Sec. 3. Mile 2.1 of the French Pete Creek Trail (FS Trail 3311) in the Three Sisters Wilderness. - Forest products - Fuels management On Hold N/A N/A Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: The proposed project would thin two 44 year old managed stands; one is 38 acres the other is 30 acres. In addition to the thinning, approximately eight acres of gaps will be placed between the two stands. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46884 Location: 04/01/2016 04:09 am MT UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T15S, R6E Sections 3 & 10. Forest roads 2655504 & 2655507. Page 10 of 24 Willamette National Forest Project Name Willamette National Forest Goose EIS 2015 EIS *UPDATED* Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) - Wildlife, Fish, Rare plants - Forest products - Fuels management Completed Actual: 02/02/2016 Expected Implementation Project Contact R6 - Pacific Northwest Region 06/2016 Elysia Retzlaff 541-822-7214 elysiamretzlaff@fs.fed.u s Description: The Goose Project proposes to commercially harvest and reduce fuels on approximately 2,452 acres on the Willamette National Forest near the community of McKenzie Bridge, Oregon. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45853 Location: Green Mountain Project EIS UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T 16S R 5E Sec: 1-5, 9-16, 24. T 16S R 6E Sec: 3-11, 13-25. T 16S R 7E 18, 19, 30. The Goose Project area is located on the McKenzie River Ranger District within the Upper McKenzie Watershed (5th field). It is located in the McKenzie Bridge Community. - Forest products - Vegetation management (other than forest products) - Watershed management In Progress: NOI in Federal Register 04/11/2014 Est. DEIS NOA in Federal Register 06/2016 Expected:10/2016 07/2017 James Rudisill 541-822-2703 jamesrudisill@fs.fed.us Description: Proposes to thin ~3,003 acres (3.0% of the Project Area) and regenerate ~324 acres (0.3% of the Project Area) of forests across a sum of approximately 3,327 acres within the Green Mountain Project Area. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40858 Location: King Castle Reroute - Recreation management CE *UPDATED* Developing Proposal Est. Scoping Start 04/2016 Expected:06/2016 07/2016 Edward Cross 541-822-7231 etcross@fs.fed.us Description: The proposed project would reroute approximately 1.25 miles of the King Castle Trail (FS Trail 4326). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43949 Location: 04/01/2016 04:09 am MT UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16SR4E s36; T16SR5E s31-32; T17SR4E s01-13; T17SR5E s05-34; T17SR6E s19,30; T18SR4E s01,12; T18SR5E s01-36; T18SR6E s06-36; T18SR7E s31-35; T19SR5E s01-24; T19SR6E s1-36; T19SR7E s02-31; T20SR6E s01. The Green Mountain Project area is located within the Cougar Reservoir, Augusta Creek, Roaring River, and Elk Creek subwatersheds (6th field) of the South Fork McKenzie River Watershed (5th field). UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S, R5E, Sec. 28 & 21. King's Castle, McKenzie River District, Willamette National Forest. Page 11 of 24 Willamette National Forest Project Name Willamette National Forest LangDam Project EA *UPDATED* Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) - Forest products - Vegetation management (other than forest products) In Progress: Scoping Start 07/07/2014 Est. Comment Period Public Notice 04/2016 Expected:10/2016 Expected Implementation Project Contact R6 - Pacific Northwest Region 07/2017 Elysia Retzlaff 541-822-7214 elysiamretzlaff@fs.fed.u s Description: The proposed project would commercially thin timber stands up to 120 years of age on approximately 733 acres. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41223 Location: Lookout Mountain Meadow Restoration CE *UPDATED* UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Section 22-26, 35, & 36, T16S, R4E; Sections 24, 25, & 36, T16S, R4.5E; Sections 19, 20, 27-35, T16S, R5E; and Sections 4 & 5, T17S, R5E. The project area is located around Forest road 1900,1900408, and 1900411; north of Cougar Reservoir. Ruby Seitz - Wildlife, Fish, Rare plants On Hold N/A N/A 541-822-7256 - Vegetation management ruseitz@fs.fed.us (other than forest products) - Fuels management Description: The purpose of this project is to restore native meadow habitat by cutting and girdling small diameter trees, and subsequently implementing a prescribed fire across an approximately 347-acre project area. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43955 Location: UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T15S, R6E, Sections 31, 32; T16S, R6E, Section 6. Lookout Mountain Meadow. Edward Cross 541-822-7231 etcross@fs.fed.us Lost Creek, Tamolitch Valley and Roaring River Bridge Replacements - Recreation management CE Description: A project to replace three trail bridges that need replacement. Two bridges are located on the McKenzie River National Recreation Trail (MRNRT) (Tr. No. 3507). Another bridge crosses Roaring River on the Roaring River Ridge Trail (Tr. No. 3312). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41530 *UPDATED* Location: 04/01/2016 04:09 am MT On Hold N/A N/A UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T14S,R7E,Sec30 & T16S,R6E,Sec10 & T19S,R5.5E,Sec12. Lost Creek, Tamolitch Valley on the McKenzie River National Recreation Trail and Roaring River crossing of the Roaring River Ridge Trail. Page 12 of 24 Willamette National Forest Project Name Willamette National Forest Project Purpose *UPDATED* - Recreation management Developing Proposal Est. Scoping Start 04/2016 - Forest products 07/2016 Edward Cross 541-822-7231 etcross@fs.fed.us Completed Actual: 02/11/2016 07/2016 Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: The project proposes to commercially thin a 65 year old stand that is 52 acres. In addition to the thinning, approximately 10-15% of the stand will have gaps ranging in size from one to three acres. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46273 Location: 04/01/2016 04:09 am MT Expected:06/2016 UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T15S,R6E,Sec. 14, 13, 24, 26 & T16S,R6E,Sec.11, 10, 9, 17, 18 & T14S,R7E,Sec. 5,8,17,30,31. McKenzie River Trail. CE *UPDATED* R6 - Pacific Northwest Region Description: The proposed project would reroute several sections of the McKenzie River National Recreation Trail (#3507) to prevent trenching and erosion. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43956 Location: Ollie Thin Project Project Contact UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T16S R4E Sections 23,24; T16S R4.5E Sections 24,25; T16S R5E Sections 19,30,31. The project area is approximately 835 acres and includes 4.5 miles of the lower South Fork McKenzie River below Courgar Dam to the McKenzie River mainstem. CE *UPDATED* Expected Implementation Kate Meyer - Wildlife, Fish, Rare plants In Progress: Expected:10/2016 07/2017 541-822-7230 - Vegetation management Scoping Start 11/12/2015 kmmeyer@fs.fed.us (other than forest products) Est. Comment Period Public - Watershed management Notice 05/2016 Description: The project would reconstruct portions of the mainstem and side channels, by adding gravel and over 3000 pieces of wood to the stream and floodplain. Several levees and rip-rap would be removed to improve floodplain access. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43959 Location: McKenzie River Trail Reroute Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) Lower South Fork McKenzie River Floodplain Enhancement EA Planning Status UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T15S, R7E, Sections 7, 8, 17, & 18. Project area is on Forest roads 2657830 & 2657834. Page 13 of 24 Willamette National Forest Project Name Willamette National Forest Project Purpose EA *UPDATED* Prescribed Fire in Wilderness: Scott Mountain In Progress: Comment Period Public Notice 08/17/2015 Expected:04/2016 10/2016 Matt Peterson 541-225-6421 mbpeterson@fs.fed.us UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - The legal description for the project area is T15S, R07E, sections 23, 24, 25, 26, 27, 34, 35, 36; T15S, R07½ E, sections 21, 22, 26, 27, 28, 33, 34; and T16S, R07E, sections 2 and 3. The project area includes the Mt. Washington Wilderness area on the McKenzie River Ranger District. Shadie Nimer - Forest products Completed Actual: 02/11/2016 07/2016 541-822-7271 - Fuels management snimer@fs.fed.us - Road management Description: The proposed project would remove approximately 15 dead and dying hazard trees that have a failure zone of hitting Forest Road 2672655. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46885 Location: 04/01/2016 04:09 am MT R6 - Pacific Northwest Region Description: The project would use prescribed fire in the Mt. Washington Wilderness area to modify vegetation and fuels to sufficiently reduce the threats to values outside of wilderness in order to allow fire to play a more natural role within wilderness. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43527 Location: SR Danger Tree Removal (DTR) Project Contact UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T 15 S R 6 E, SEC 1 & 12. Trailbridge Reservoir. - Fuels management EA *UPDATED* Expected Implementation Shane Kamrath - Wildlife, Fish, Rare plants On Hold N/A N/A 541-822-7233 - Special use management skamrath@fs.fed.us - Road management Description: Realignment of the existing bypass Forest Service Road 2672690 around the Eugene Water and Electric Board's Carmen power house in order to provide safe and adequate access for construction of the fish passage facilities at trailbridge reservoir. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41242 Location: *UPDATED* Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) Power Plant Bypass Road Realignment CE Planning Status UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S, R6E Section 25. Forest road 2672655. Page 14 of 24 Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) Santiam Junction In-Ground Holding Tank - Special use management In Progress: Scoping Start 03/25/2016 Expected:04/2016 Expected Implementation R6 - Pacific Northwest Region 06/2016 CE *NEW LISTING* UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. Oregon Department of Transportation (ODOT) Santiam Junction Maintenance Station Compound located at the junction of Highway 20 and Highway 22. - Special use management Completed Actual: 02/11/2016 02/2016 CE *NEW LISTING* Developing Proposal Est. Scoping Start 04/2016 Expected:06/2016 07/2016 Edward Cross 541-822-7231 etcross@fs.fed.us Description: The proposed project would reroute approximately one mile of the Foley Ridge Trail (FS Trail 3511) to prevent and reduce heavy erosion. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46850 Location: 04/01/2016 04:09 am MT UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. ODOT Santiam Junction Maintenance Station Compound located at the junction of Highway 20/126 and Highway 22. - Recreation management CE *UPDATED* Starr Sullivan 541-822-7217 starrasullivan@fs.fed.us Description: Proposed project would approve Oregon Department of Transportation (ODOT) to construct an extension to an existing truck shop. The extension would be approximately 21x15 feet. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48607 Location: Upper Foley Trail Reroute Starr Sullivan 541-822-7217 starrasullivan@fs.fed.us Description: The proposed project would approve the installment of a 1,000 gallon in-ground holding tank for the Oregon Department of Transportation (ODOT). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=49119 Location: Santiam Junction Maintenance Station Truck Shop Extension Project Contact UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. The section proposed for reroute is approximately eight miles from the nearest trailhead and approximately one mile before the trail intersects with the Pacific Crest Trail in Three Sisters Wilderness. Page 15 of 24 Willamette National Forest Project Name Willamette National Forest Wolf Boughs Project Project Purpose Planning Status Decision McKenzie River Ranger District (excluding Projects occurring in more than one District) - Forest products On Hold N/A Expected Implementation Project Contact R6 - Pacific Northwest Region N/A CE Shadie Nimer 541-822-7271 snimer@fs.fed.us Description: The Wolf Boughs project would remove approximately one hundred thirty-one tons (62,000 pounds) of coniferous boughs over 123 acres, under contracts or permits. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46401 Location: Willamette National Forest American Tower Cell Towers UNIT - McKenzie River Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S, R6E Sections 30, 31, & 36. Forest roads 1500618, 1500735 & 1500734. Middle Fork Ranger District (excluding Projects occurring in more than one District) - Special use management EA *UPDATED* Brian McGinley 541-367-9234 bmcginley@fs.fed.us Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 11/2016 John Poet 541-937-2129 jpoet@fs.fed.us Description: Project would thin stand (68 acres) at a moderate spacing including gaps or openings typical with the adjacent LSR thinning project, Hehe. Sale would also perform road maintenance on approximately 11 miles of road 1817. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47418 Location: 04/01/2016 04:09 am MT 03/2017 UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. Along Highway 58 from Willamette Pass to near the western edge of the Willamette National Forest. - Forest products CE *UPDATED* Expected:01/2017 Description: This project will install 6 commercial cell tower sites along Highway 58 from Willamette Pass to near the western edge of the Willamette National Forest. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47702 Location: Cowhorn Thinning Project Developing Proposal Est. Scoping Start 05/2016 R6 - Pacific Northwest Region UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T.18s, R.2e, Sec. 2,11. Approximately, 9.5 miles NE of Fall Creek Reservoir in the Fall Creek Area. Page 16 of 24 Willamette National Forest Project Name Willamette National Forest Gold Lake Project Project Purpose Planning Status Decision Middle Fork Ranger District (excluding Projects occurring in more than one District) - Recreation management CE Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 Expected Implementation Project Contact R6 - Pacific Northwest Region 06/2017 *NEW LISTING* McKenzie Jensen 503-622-2026 mckenziejensen@fs.fed .us Description: The Forest Service proposes to replace the Gold Lake boat ramp and reroute trails in the area to better accommodate the type of trail use and the number of visitors. Location: Hills Creek - Lookout Point Power Line Re-alignment UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T2S R6E S30, S15 & S9. Approximately, 15 to 20 miles East of Oakridge just off of Hwy. 58 at and near the Gold Lake recreation site. - Special use management EA *UPDATED* In Progress: Scoping Start 08/23/2013 Est. Comment Period Public Notice 04/2016 Expected:08/2016 10/2016 Allen Hambrick 541-782-5217 afhambrick@fs.fed.us Description: Two sections of the BPA power line between Hills Creek and Lookout Point Reservoirs will need a slight adjustment in the right of way. There will also be replacement of poles along the entire project corridor. Line adjustments due to unstable ground. Web Link: http://efw.bpa.gov/environmental_services/Document_Library/HillsCreekLookoutPoint/ Location: Indigo Springs Campground Bridge UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. Power line corridor between Hills Creek Reservoir and Lookout Reservoir, following the Middle Fork of the Willamette through the town of Oakridge. - Recreation management Developing Proposal Est. Scoping Start 04/2016 Expected:09/2016 CE *NEW LISTING* CE *NEW LISTING* UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T24S R5#, section 18, NW. 35 miles south of Oakridge at the Indigo Springs Campground. Molly Juillerat - Vegetation management Developing Proposal Expected:10/2016 11/2016 541-782-5350 (other than forest products) Est. Scoping Start 04/2016 mjuillerat@fs.fed.us - Fuels management Description: The Forest Service proposes to under burn the Jim's Creek area to maintain the open forest component. The approximately 688 acres would be burned in phases and burns could be repeated. Location: 04/01/2016 04:09 am MT Kevin Rowell 541-782-5305 karowell@fs.fed.us Description: Replacement of deck boards and two stringers at a bridge in Indigo Springs. Location: Jim's Creek Prescribed Burn 10/2016 UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T24S, R3E, S11 and S12. Twenty miles south of Oakridge, OR off FS Road 2129. Page 17 of 24 Willamette National Forest Project Name Willamette National Forest Project Purpose *NEW LISTING* - Recreation management In Progress: Scoping Start 09/29/2015 - Wildlife, Fish, Rare plants - Watershed management 06/2017 Kevin Rowell 541-782-5305 karowell@fs.fed.us In Progress: Scoping Start 09/11/2015 Expected:10/2016 11/2016 Joseph Helstab 541-782-5328 jmhelstab@fs.fed.us Description: Stabilization of approx. 200 ft. of eroding stream bank, including large woody debris jam construction. Trees with root wads attached will be gathered and large trees will be hauled to the project area for bank stabilization and log jam construction. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40115 Location: 04/01/2016 04:09 am MT Expected:04/2016 UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T20S, R2E, west half of section 29. Approximately, one mile south of the Hampton boat launch along Highway 58. CE *UPDATED* R6 - Pacific Northwest Region Description: Two disconnected segments of Lawler Trail (3473) exist currently. The proposed segment will connect the currently orphaned trail segments only traveling on spur 5840-535 for 200' This will create a safer and more desirable trail user experience. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47677 Location: Lower Staley Floodplain Restoration Project Contact UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T24S R3E sect. 11, 12 Hills Creek Reservoir Fifth-field Watershed. Twenty miles south of Oakridge, OR off FS Road 2129. CE *UPDATED* Expected Implementation David Haupt - Forest products Developing Proposal Expected:08/2016 09/2016 530-258-5187 - Vegetation management Est. Scoping Start 04/2016 dhaupt@fs.fed.us (other than forest products) - Watershed management Description: ~200 trees blew down in the Jim's Creek Stewardship area this winter. There is a desire to remove as many of these trees as possible to reduce the risk of beetle infestation. Logs will be sold and/or used in watershed restoration work in Staley Creek Location: Lawler Connection Decision Middle Fork Ranger District (excluding Projects occurring in more than one District) Jims Creek Blowdown Salvage CE Planning Status UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T24S, R4E, NW 1/4 of Section 19. The location is at the former Pope and Talbot bridge crossing of Staley Creek on Forest Road 2134244. This is located at approximately the 1.7 mile mark on Forest Road 2134. Page 18 of 24 Willamette National Forest Project Name Willamette National Forest Maple Creek Prescribed Burn CE *NEW LISTING* Project Purpose CE *UPDATED* - Wildlife, Fish, Rare plants - Fuels management Developing Proposal Est. Scoping Start 04/2016 R6 - Pacific Northwest Region 11/2016 Joanne Lowden 541-782-5335 jalowden@fs.fed.us Molly Juillerat - Wildlife, Fish, Rare plants In Progress: Expected:04/2016 10/2016 541-782-5350 - Vegetation management Scoping Start 09/03/2015 mjuillerat@fs.fed.us (other than forest products) Description: The purpose of this project is to cover maintenance burning and whip felling for the next 10 years as needed to stop encroachment and maintain the meadows. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46949 UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. These meadows fall within one of the listed watersheds as follows:Upper Middle Fork Watershed, Hills Creek, Hills Creek Reservoir,Middle Fork Willamette, and the North Fork of the Middle Fork. - Vegetation management (other than forest products) Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 05/2017 Ray Holk 541-782-5354 rholk@fs.fed.us Description: The Forest Service proposes to thin overstocked plantation stands for optimal growth, stand health, late successional reserve characteristics, watershed quality, and to favor desired species such as pine and oak, along with native forbs and grasses Location: 04/01/2016 04:09 am MT Project Contact UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T24S-R03E-S13. Approximately, 20 miles south of Oakridge Oregon just off of FS road 21. CE *NEW LISTING* Expected:10/2016 Expected Implementation Description: We are proposing to conduct a prescribed underburn (without any pre-treatment) in this 38-acre forest unit in order to thin the stand out through fire-induced mortality. Location: Middle Fork Ranger District PCT Pruning Decision Middle Fork Ranger District (excluding Projects occurring in more than one District) Location: Meadow and Forage Restoration Planning Status UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Not Applicable. This project is spread out throughout the Middle Fork Ranger District and can best be describes by viewing the map. Page 19 of 24 Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Decision Middle Fork Ranger District (excluding Projects occurring in more than one District) Outlook Landscape Diversity Project EA *UPDATED* R6 - Pacific Northwest Region UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - Townships 20 and 21 South, Ranges 1 and 2 East, of the Willamette Meridian. Federal portions of the Lookout Point 5th-field watershed near the Lookout Point Reservoir near the cities of Westfir and Lowell, OR. - Recreation management On Hold N/A N/A EA *UPDATED* UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T21S R3E Sec 12, 13, 14, 15 and T21S R4E Sec 4,5, 7, 8. Approximately two to six miles east of Oakridge, OR along Salmon Creek. - Recreation management Completed CE *UPDATED* Actual: 03/21/2016 07/2016 Kevin Rowell 541-782-5305 karowell@fs.fed.us Description: Several sections of the Salmon Creek Trail and the connected Warrior Loops were destroyed by flooding and channel movements. This project is intended to connect the remaining trail segments and to make as much of the trail as sustainable as possible. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47417 Location: 04/01/2016 04:09 am MT Katie Isacksen 541-782-5355 krisacksen@fs.fed.us Description: Activities would include obtain a Day Use Forest Order for the first four miles, obtain a Forest Order that prohibits target shooting at a waste site, closing dispersed campsites, and gate installation. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47674 Location: Salmon/Warrior Trail Reroutes Project Project Contact Allen Hambrick 02/2017 - Special area management In Progress: Expected:01/2017 541-782-5217 - Wildlife, Fish, Rare plants Scoping Start 01/14/2013 afhambrick@fs.fed.us - Forest products Est. 215 Comment Period Legal - Vegetation management Notice 05/2016 (other than forest products) - Fuels management - Watershed management - Road management Description: Commercial thinning and fuels reduction on 4300 ac. of plantations; 110 mi. of road maintenance, closure of 130 mi. of road; special habitat restoration; 260 ac. of early-seral habitat maintenance/creation; snag creation, noxious weed abatement. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40122 Location: Salmon Creek Visitor Use Project Expected Implementation UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T21S, R3E, Secs. 12, 13, 14 T21S, R4E, Sec. 7 . Approximately, one mile east of the town of Oakridge along the Salmon Creek corridor. Page 20 of 24 Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Decision Middle Fork Ranger District (excluding Projects occurring in more than one District) Sawtooth Trail Reroute (FS Trail - Recreation management 3634) Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 Expected Implementation R6 - Pacific Northwest Region 07/2017 CE Location: UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T25S, R5.5E Sections 27, 28. Approximately, 20 to miles south of Oakridge, Oregon near Timpanogas Lake. Katie Isacksen 04/2017 - Forest products In Progress: Expected:03/2017 541-782-5355 - Vegetation management Scoping Start 02/24/2015 krisacksen@fs.fed.us (other than forest products) Est. Comment Period Public - Fuels management Notice 10/2016 - Watershed management - Road management Description: The Middle Fork Ranger District of the Willamette National Forest proposes density management on about 1720 acres of young plantations located in the Little Fall Creek subwatershed.The project would include the reconstruction of existing roads. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43203 Upper Little Fall LSR Density Management Project EA *UPDATED* Location: Wolf Mountain Communication Site Upgrade UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T17S, R1E, Sections 47,9,17,18, T17S, R2E, Sections 1-3,10, and 11 of the Willamette Meridian. This area is in the Little Fall Creek fifth-field watershed located approximately 16 miles northeast of the city of Lowell. - Special use management Developing Proposal Est. Scoping Start 04/2016 Expected:10/2016 CE 04/01/2016 04:09 am MT 11/2016 Brian McGinley 541-367-9234 bmcginley@fs.fed.us Description: To upgrade existing ODOT communications systems on Wolf Mtn to meet the requirements of the State Radio Project (SRP) for emergency communications. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47700 Location: Willamette National Forest Kevin Rowell 541-782-5305 karowell@fs.fed.us Description: Middle Fork Recreation proposes to reroute 1500 feet of the Sawtooth trail in the Oregon Cascades Recreation Area to improve sustainability and to improve the trail user experience. *NEW LISTING* *UPDATED* Project Contact UNIT - Middle Fork Ranger District. STATE - Oregon. COUNTY - Lane. LEGAL - T22S, R5E, Section 33 SW. On top of Wolf Mountain, approximately 14 miles south east of Oakridge Oregon. Sweet Home Ranger District (excluding Projects occurring in more than one District) Page 21 of 24 R6 - Pacific Northwest Region Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Decision Sweet Home Ranger District (excluding Projects occurring in more than one District) Cool Soda Culvert Replacements - Watershed management - Road management In Progress: Scoping Start 02/11/2016 Expected:03/2016 Expected Implementation R6 - Pacific Northwest Region 04/2016 CE *NEW LISTING* Daniel Matthews 541-367-3812 danielwmatthews@fs.fe d.us Description: There are a total of 65 culvert replacements on National Forest Service Roads 2027-000, 2041-000, 2043-000, 2043-320, 2043-328, 2043-330, 2043-333, 2043-410, 2043-411, 2043-360 and 2043-402. Location: Jude Ridge Project Contact UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S, R4E, Sections 1, 1114, 24 and 25 T13S, R4E, Sections 3-10, 14-22, 28-30 Willamette Meridian, Linn Co., Oregon . 30 miles East of Sweet Home, OR. - Forest products EA Developing Proposal Est. Scoping Start 12/2015 Expected:10/2016 06/2017 Suzanne Schindler 541-225-6436 sschindler@fs.fed.us Description: Harvest 3.6 MMBF from 13 stands aged 36-60 years old. Commercially thin 264 acres, leave ~27 acres of gaps (1/2-1 acre in size), leave ~143 acres of unharvested skips, and 27 acres of early seral creation leaving ~35% canopy cover in clumpy pattern. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48187 Location: Menagerie Seasonal Closure Boundary Change for Species Protection CE Amanda Colton N/A - Regulations, Directives, On Hold N/A 541-367-3540 Orders arcolton@fs.fed.us - Recreation management - Wildlife, Fish, Rare plants Description: Proposed change to existing seasonal closure boundary to provide species protection during the critical nesting and fledging period. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38620 Location: 04/01/2016 04:09 am MT UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. Jude Ridge. UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T13S, R4E, Sections. 14, 15, 22 and 23. Menagerie Wilderness. Page 22 of 24 Willamette National Forest Project Name Willamette National Forest Project Purpose Planning Status Decision Expected Implementation R6 - Pacific Northwest Region Sweet Home Ranger District (excluding Projects occurring in more than one District) ODOT Right of Way - Special use management CE *UPDATED* Expected:03/2016 03/2016 Penny Keen 503-854-4202 pkeen@fs.fed.us Description: Granting right-of-way to ODOT for Sheep Creek bridge replacement on highway 20. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46426 Location: Smith Prairie Meadow Maintenance Developing Proposal Est. Scoping Start 01/2016 Project Contact UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. T13S, R5E, Section 28 at milepost 56.64 on Highway 20 where Sheep Creek crosses the highway. - Wildlife, Fish, Rare plants On Hold CE N/A N/A Sonja Weber 541-225-6449 sweber@fs.fed.us Description: Enhance and maintain meadow complex by reducing encroachment of conifers (remove saplings under 4 inches), seed collection, girdling 1-2 trees/acre under 12 inches DBH and falling 1 tree/acre for down wood. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36704 Location: Sweet Home RD Admin/Rec CE CE *NEW LISTING* Nanci Curtis - Recreation management In Progress: Expected:04/2016 06/2016 541-367-3285 - Vegetation management Scoping Start 03/06/2015 ncurtis@fs.fed.us (other than forest products) - Fuels management Description: This project proposes to thin understory brush and trees less than or equal to 7 inches dbh to increase the defensible space around district infrastructure. Location: 04/01/2016 04:09 am MT UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T14S, R6E, section 1; T14S, R7E, section 6, Willamette Meridian. Smith Prairie in the Upper McKenzie watershed. UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - Not Applicable. T 13 S, R 4 E, sec 26, 31, 32, 33, 35. T 12 S, R 4 E Sec 34. T 14 S, R 4 E, sec 5 and 10. Page 23 of 24 Willamette National Forest Project Name Willamette National Forest Trout Creek EA Project Purpose Planning Status Decision Sweet Home Ranger District (excluding Projects occurring in more than one District) Expected Implementation Project Contact R6 - Pacific Northwest Region Suzanne Schindler - Wildlife, Fish, Rare plants On Hold N/A N/A 541-225-6436 - Forest products sschindler@fs.fed.us - Vegetation management (other than forest products) Description: In managed and natural stands: Promote health, vigor, diversity and complexity ~1770 ac. Mimic mixed-severity fire ~720 ac. Improve hardwood habitat ~290 ac. Improve traditional resources. Generate revenue to improve existing roads. Treat fuels. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46279 Location: UNIT - Sweet Home Ranger District. STATE - Oregon. COUNTY - Linn. LEGAL - T12S, R4E, Sec.34; T12S, R5E, Sec. 19,29,30-32; T13S, R3E, Sec.11-15, 22-27, 34-36; T13S, R4E, Sec. 1-12, 14-36; T13S, R5E, Sec.5,6; T14S, R3E, Sec 1-3, 12; T14S, R4E, Sec. 1-15. Trout Creek, Moose Creek and portions of Canyon Creek within the South Santiam watershed. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 04/01/2016 04:09 am MT Page 24 of 24 Willamette National Forest