Schedule of Proposed Action (SOPA) 10/01/2014 to 12/31/2014 Mt Baker-Snoqualmie National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact R6 - Pacific Northwest Region, Regionwide (excluding Projects occurring in more than one Region) Christine Pyle Aquatic Invasive Species order - Wildlife, Fish, Rare plants Developing Proposal Expected:05/2014 05/2014 to prevent the spread or 503-808-2691 Est. Scoping Start 05/2014 introduction of aquatic invasive cdpyle@fs.fed.us species Description: The purpose of this order is to prevent the spread or introduction of aquatic invasive plant or animal species. CE Public involvement is targeted for the Umatilla, Willamette, Mt. Baker-Snoqualmie, Gifford Pinchot, and Colville NFs. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44360 Location: UNIT - R6 - Pacific Northwest Region All Units. STATE - Oregon, Washington. COUNTY - Asotin, Clark, Columbia, Cowlitz, Ferry, Garfield, King, Klickitat, Lewis, Pend Oreille, Pierce, Skagit, Skamania, Snohomish, Stevens, Walla Walla, Whatcom, Baker, Clackamas, Douglas, Grant, Jefferson, Lane, Linn, Marion, Morrow, Umatilla, Union, Wallowa, Wheeler. LEGAL - Not Applicable. Order will apply to all Forests in Region 6, however targeted scoping is with the Umatilla, Gifford Pinchot, Mt. Baker/Snoqualmie, Willamette and Colville NFs tribal and public scoping lists. Mt Baker-Snoqualmie National Forest, Forestwide (excluding Projects occurring in more than one Forest) Invasive Plant Management EIS - Vegetation management (other than forest products) In Progress: NOI in Federal Register 02/28/2012 Est. DEIS NOA in Federal Register 10/2014 Expected:04/2015 R6 - Pacific Northwest Region 05/2015 Phyllis Reed 360-436-2332 plreed@fs.fed.us Description: Treat approximately 4000 acres with herbicide, manual, mechanical, cultural and biological methods. Add aminopyralid. Use boom sprayers. Use Early Detection, Rapid Response for new infestation Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34208 Location: 10/01/2014 08:52 am MT UNIT - Mt Baker-Snoqualmie National Forest All Units. STATE - Washington. COUNTY - King, Pierce, Skagit, Snohomish, Whatcom. LEGAL - (Multiple sites having invasive plants now and in the expected future across the Forest.). Approximately 4000 treatment acres across the entire Forest, including 936 known invasive plant sites, and a total of 43 different invasive plant species. Page 1 of 11 Mt Baker-Snoqualmie National Forest Project Name Project Purpose Planning Status Decision Expected Implementation R6 - Pacific Northwest Region Mt Baker-Snoqualmie National Forest, Forestwide (excluding Projects occurring in more than one Forest) Mt. Baker Geothermal Consent to Lease - Minerals and Geology Developing Proposal Est. Scoping Start 08/2013 Expected:03/2014 Project Contact 06/2014 EA Eric Ozog 360-691-4396 eozog@fs.fed.us Description: The Forest Service (FS) will determine whether to provide consent to BLM to lease nominated lands, or to lease with stipulations, or to deny from further consideration for leasing and subsequent development Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38973 Location: UNIT - Mt Baker-Snoqualmie National Forest All Units. STATE - Washington. COUNTY - Whatcom. LEGAL T37N, R08E, sections 02, 03, 04, 08, and 09; T37R08E, sections 20, 21, 22, 26, 27, 28, and 29. This project is located in Whatcom County in the Baker River watershed within the Skagit River Sub-basin. Nominated lands are located south of the Mt. Baker Wilderness and east of the Mt. Baker NRA. USGS Forest-wide Special Use - Special use management Permit - Stream Gauge Stations In Progress: Scoping Start 03/18/2011 Expected:05/2011 05/2011 CE Sue ShermanBiery 360-856-5700 sshermanbiery@fs.fed. us Description: Install & establish a new stream gauge station on Huckleberry Cr, located adjacent to the bridge on FS Rd 7320. A 20-yr Special Use Authorization would be issued for the proposed site & existing stream gauges authorized through a MOU btwn FS and USGS Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35350 Location: Mt Baker-Snoqualmie National Forest 10/01/2014 08:52 am MT UNIT - Mt Baker-Snoqualmie National Forest All Units. STATE - Washington. COUNTY - Pierce, Skagit, Snohomish, Whatcom. LEGAL - Huckleberry Cr: T19N, R9E, NE 1/4 of Sec. 12, WM; Nooksack River: T40N, R7E, SE 1/4 SW 1/4 of Sec. 36; Bacon Cr: T36N, R11E, SE 1/4 of Sec. 17; Sauk: T31N, R10E, Ne 1/4 NE 1/4 of Sec. 23. New: Huckleberry Cr, on left bank approx. 1.5 mi downstream from White River; Existing: NF Nooksack near Glacier, WA; Bacon Cr below Oakes Cr near Marblemount, WA; Sauk above Whitechuck River. Darrington Ranger District (excluding Projects occurring in more than one District) Page 2 of 11 R6 - Pacific Northwest Region Mt Baker-Snoqualmie National Forest Project Name Project Purpose Mt Baker-Snoqualmie National Forest Boulder River Trailhead and Road Storage Planning Status Decision Expected Implementation Darrington Ranger District (excluding Projects occurring in more than one District) - Recreation management In Progress: Scoping Start 03/08/2011 Expected:06/2015 Project Contact R6 - Pacific Northwest Region 06/2016 CE Carol Gladsjo 360-436-2316 cgladsjo@fs.fed.us Description: Construct new trailhead with toilet, large gravel parking area (20-30 vehicles), picnic area and signs. Place last 0.7 mile of Road 2010 in storage for use as trail until new trail route can be constructed from new parkign area to current trailhead. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35171 Location: UNIT - Darrington Ranger District. STATE - Washington. COUNTY - Snohomish. LEGAL - T32N R08E sections 19 and 20. 10 miles W of Darrington, Snohomish County. Lost Creek Bridge Replacement - Watershed management - Road management CE In Progress: Scoping Start 03/08/2011 Expected:07/2014 09/2014 Peter Wagner 360-856-2621 pswagner@fs.fed.us Description: Replace the Lost Creek Bridge, an undersized and deteriorating timber bridge on Road #49 with a longer steel or concrete bridge. The bridge is located across Lost Creek on Road #49 in the North Fork of the Sauk River drainage. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35195 Location: Skaglund Road 18 Reciprocal Easement Exchange UNIT - Darrington Ranger District. STATE - Washington. COUNTY - Snohomish. LEGAL - T30N R11E Section 13. North Fork of the Sauk River drainage, Snohomish County. - Special use management - Road management In Progress: Scoping Start 05/15/2002 CE Expected:06/2014 06/2014 Eric Ozog 360-691-4396 eozog@fs.fed.us Description: Exchange easements between the Forest Service (FS) and Steve Skaglund on 0.8 miles of Forest Road 18. Mr. Skaglund would be granted easement on the road from milepost 0.0 to 0.5, and the FS easement on the road from milepost 0.5 to 0.8. Location: 10/01/2014 08:52 am MT UNIT - Darrington Ranger District. STATE - Washington. COUNTY - Snohomish. LEGAL - T32N, R8E, Section 1 and T32N, R9E, Section 6. The Skaglund Road 18 begins from the County owned Swede Heaven Road, approximately 1.7 miles north of State Route 530 (at Whitehorse) and approximately 8 miles northwest of Darrington. Page 3 of 11 Mt Baker-Snoqualmie National Forest Project Name Project Purpose Mt Baker-Snoqualmie National Forest Sulphur Creek Campground Restoration CE Decision Expected Implementation Darrington Ranger District (excluding Projects occurring in more than one District) Project Contact R6 - Pacific Northwest Region Phyllis Reed - Recreation management In Progress: Expected:08/2014 10/2014 360-436-2332 - Wildlife, Fish, Rare plants Scoping Start 05/10/2013 plreed@fs.fed.us - Watershed management Description: Provides for the clean-up and reconfiguration of access in Sulphur Cr. Campground after 10 years of no drivable access due to flood damage. The project would restore floodplain processes and conditions along known fish spawning and rearing habitat. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42123 Location: Verizon Communication Permit Amendment Planning Status UNIT - Darrington Ranger District. STATE - Washington. COUNTY - Snohomish. LEGAL - T32N R12E Section 24. The project is located within the Suiattle River drainage at Mile Post 22.8 of USFS Road #26. - Special use management In Progress: Scoping Start 05/10/2013 Expected:06/2014 07/2014 CE Eric Ozog 360-691-4396 eozog@fs.fed.us Description: Verizon Wireless (VW) proposes to add alternative energy source components of solar and wind power for the existing VW communication site located on Seglesen Ridge of the Darrington Ranger District. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42101 Location: Weden Creek Trail Flood Repairs UNIT - Darrington Ranger District. STATE - Washington. COUNTY - Skagit. LEGAL - T33N R09E Section 30. The project is located approximately 6 air miles northwest of Darrington, Washington. - Recreation management In Progress: Scoping Start 09/15/2011 CE Expected:10/2014 06/2015 Carol Gladsjo 360-436-2316 cgladsjo@fs.fed.us Description: Construct 0.5 mile of the Weden trail to replace flood damaged portions of the trail. The trail relocation would begin north of the clay slide on the county road to Monte Cristo, with construction upslope of the county road. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37259 Location: 10/01/2014 08:52 am MT UNIT - Darrington Ranger District. STATE - Washington. COUNTY - Snohomish. LEGAL - T31N R11E, Sec. 7. S.F. of the Sauk River drainage, Weeden Creek. Page 4 of 11 Mt Baker-Snoqualmie National Forest Project Name Project Purpose Mt Baker-Snoqualmie National Forest Planning Status Decision Expected Implementation Darrington Ranger District (excluding Projects occurring in more than one District) White Chuck Bench Trail Repair - Recreation management and Reconstruction In Progress: Scoping Start 03/26/2010 Expected:07/2014 Project Contact R6 - Pacific Northwest Region 08/2014 CE Carol Gladsjo 360-436-2316 cgladsjo@fs.fed.us Description: Repair and reconstruct the White Chuck Bench Trail (#731) that was damaged in both the 2003 and 2007 floods. Repair work includes relocation and reconstruction at multiple locations from several hundred feet to over 1 mile in length. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=31043 Location: White Chuck Trail Flood Repairs UNIT - Darrington Ranger District. STATE - Washington. COUNTY - Snohomish. LEGAL - T31N R11E Sec 15, 16, 17 and 18. Lower White Chuck River valley. - Facility management Developing Proposal Est. Scoping Start 06/2015 Expected:06/2016 06/2016 CE Dawn Erickson 360-436-1155 derickson@fs.fed.us Description: Relocation of 4 miles of the White Chuck Trail using motorized equipment in the wilderness Location: Mt Baker-Snoqualmie National Forest Bayview Campground Redevelopment and Expansion UNIT - Darrington Ranger District. STATE - Washington. COUNTY - Snohomish. LEGAL - T30N, R13E, S 1, 12, 13; T30N, R14E, S 19, 30. Upper White Chuck valley. Mt Baker Ranger District (excluding Projects occurring in more than one District) - Recreation management - Facility management EA In Progress: Notice of Initiation 03/10/2014 Est. Comment Period Public Notice 07/2014 Expected:09/2014 R6 - Pacific Northwest Region 04/2015 Ann Dunphy 360-856-5700 adunphy@fs.fed.us Description: This project would occur in two phases. Phase 1 would rehabilitate and reconstruct the Bayview North Group campsite an the 28 acre Bayview South Campground. Phase 2 would expand Bayview South Campground adding single, host, multiple and group sites. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43948 Location: 10/01/2014 08:52 am MT UNIT - Mt Baker Ranger District. STATE - Washington. COUNTY - Whatcom. LEGAL - Township T37N; Range 9E; Section 19. This project is located on the west side of Baker Lake in Whatcom County WA, approximately 30 miles northeast of Sedro-Woolley, WA and is accessed by Forest Road (FR) 1122 from the Baker Lake Highway. Page 5 of 11 Mt Baker-Snoqualmie National Forest Project Name Project Purpose Mt Baker-Snoqualmie National Forest Planning Status Decision Expected Implementation Mt Baker Ranger District (excluding Projects occurring in more than one District) Depression Lake Improvements - Recreation management EA In Progress: Notice of Initiation 03/14/2014 Est. Comment Period Public Notice 11/2014 Expected:03/2015 Project Contact R6 - Pacific Northwest Region 05/2015 Ann Dunphy 360-856-5700 adunphy@fs.fed.us Description: The proposed action is to replace a wooden toilet that was removed due to disrepair and install an accessible toilet at this site and provide additional resource protection measures as needed. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43954 Location: Glacier House Conveyance UNIT - Mt Baker Ranger District. STATE - Washington. COUNTY - Whatcom. LEGAL - Township 37N; Range 8E; Section 25 WM. This project is located approximately 9 miles north of Concrete, WA and is accessed from East Bank (FR1106) and Depression Lake (FR1106011) roads. - Facility management CE In Progress: Scoping Start 12/16/2013 Expected:09/2014 10/2014 Amelia Anthony 425-783-6095 asanthony@fs.fed.us Description: This project will reduce facilities operations and maintenance costs, the number of unused facilities and administrative site maintenance backlog through the sale of one house, a detached garage and a small cement bunker on 0.51 acre of land. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44264 Location: Glacier Lodge Access UNIT - Mt Baker Ranger District. STATE - Washington. COUNTY - Whatcom. LEGAL - Township 39N; Range 7E; Section 6 WM. This project is located within the town of Glacier in Whatcom County, WA and accessed from SR 542 and Vaughn Avenue. - Road management On Hold N/A CE N/A Forrest Shoemaker 360-856-5700 fshoemaker@fs.fed.us Description: Issue road easement on approximately 150' of Forest Road. Location: 10/01/2014 08:52 am MT UNIT - Mt Baker Ranger District. STATE - Washington. COUNTY - Whatcom. LEGAL - T. 39 N., R. 7 E., NW, NW Section 8. Approximately 1/2 mile east of Glacier, WA on State Route 542. Page 6 of 11 Mt Baker-Snoqualmie National Forest Project Name Project Purpose Mt Baker-Snoqualmie National Forest Little Sandy Creek Fish Barrier Replacement Project Planning Status Decision Expected Implementation Mt Baker Ranger District (excluding Projects occurring in more than one District) - Wildlife, Fish, Rare plants On Hold N/A Project Contact R6 - Pacific Northwest Region N/A CE Jeremy Gilman 360-854-2633 jmgilman@fs.fed.us Description: Replace three culverts in the Baker Lake Basin to provide access to upstream rearing and spawning habitat for known Coho salmon and Coastal Cutthroat Trout populations in the Little Sandy Creek drainage. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43502 Location: Panorama Point Boat Launch Improvements UNIT - Mt Baker Ranger District. STATE - Washington. COUNTY - Whatcom. LEGAL - Township 37N; Range 9E; Section 7 W.M. The project is located approximately 24 miles northeast of Sedro-Woolley, Washington. The sites are near MP 17.4 and 17.9 on Baker Lake Highway, and MP 0.9 on Forest Service Road 1123. - Recreation management - Facility management EA In Progress: Notice of Initiation 03/03/2014 Est. Comment Period Public Notice 01/2015 Expected:04/2015 04/2015 Ann Dunphy 360-856-5700 adunphy@fs.fed.us Description: Improve and maintain boat launching capabilities, provide improved toilet facilities and increase parking capacity to improve visitor safety at the Panorama Point boat launch. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43973 Location: UNIT - Mt Baker Ranger District. STATE - Washington. COUNTY - Whatcom. LEGAL - Township 37N; Range 9E; Section 5 WM. This project is approximately 13 miles north of Concrete, WA and is accessed from the Baker Lake Highway. Proposed Access - Minerals and Geology Improvements, Repairs, and Sampling at the Great Excelsior Mine EA In Progress: Comment Period Public Notice 12/27/2013 Est. Objection Period Legal Notice 04/2014 Expected:06/2014 07/2014 Eric Ozog 360-691-4396 eozog@fs.fed.us Description: Redevelop the Great Excelsior Mine in two phases in preparation for future extraction of gold and silver bearing ore. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43458 Location: 10/01/2014 08:52 am MT UNIT - Mt Baker Ranger District. STATE - Washington. COUNTY - Whatcom. LEGAL - NW ¼ Sec. 5, and NE ¼ Sec. 6, T39N, R8E, W.M. The Great Excelsior Plan of Operation project is located in the North Cascades, approximately seven miles east of Glacier, Whatcom County, Washington, on the south side of Highway 542. Page 7 of 11 Mt Baker-Snoqualmie National Forest Project Name Project Purpose Mt Baker-Snoqualmie National Forest Puget Sound Hydro Easement Planning Status Decision Expected Implementation Mt Baker Ranger District (excluding Projects occurring in more than one District) - Special use management On Hold N/A Project Contact R6 - Pacific Northwest Region N/A CE Sue ShermanBiery 360-854-2660 sshermanbiery@fs.fed. us Description: The proposal is to issue a 20 year Special Use Authorization to grant access on approximately 625 feet of existing Forest Service Road 3045 from the entrance of Excelsior Campground to private property. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39908 Location: South Fork Nooksack Trail Reconstruction UNIT - Mt Baker Ranger District. STATE - Washington. COUNTY - Whatcom. LEGAL - T39N R8E Sec. 31. The project area lies seven miles east of Glacier, WA. - Recreation management On Hold N/A N/A CE Otis Allen 360-856-5700 oallen@fs.fed.us Description: The Forest Service proposes to relocate 1.2 miles of the South Fork Nooksack Trail #602 out of the floodplain and repair an additional two miles of existing trail. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39786 Location: USGS South Cascade Glacier Research Station UNIT - Mt Baker Ranger District. STATE - Washington. COUNTY - Whatcom. LEGAL - T37N, R7E, Secs. 21, 22, 27 and 34. Mt Baker Ranger District, northeast of Sedro-Woolley, WA. - Special use management In Progress: Scoping Start 05/10/2013 Expected:06/2014 CE 06/2014 Sue ShermanBiery 360-856-5700 sshermanbiery@fs.fed. us Description: The USFS proposes to issue a 20 year permit to USGS Ice and Climate Project, to continue the operation and maintenance of the research station at S Cascade Glacier, in the Glacier Peak Wilderness area. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42137 Location: Mt Baker-Snoqualmie National Forest District) 10/01/2014 08:52 am MT UNIT - Mt Baker Ranger District. STATE - Washington. COUNTY - Skagit. LEGAL - T33N, R13E, Sec. 2. South Cascade Glacier in the Glacier Peaks Wilderness. North Bend Ranger District (excluding Projects occurring in more than one Page 8 of 11 R6 - Pacific Northwest Region Mt Baker-Snoqualmie National Forest Project Name Project Purpose Mt Baker-Snoqualmie National Forest District) Hansen Creek Vegetation Project Planning Status Decision Expected Implementation R6 - Pacific Northwest Region North Bend Ranger District (excluding Projects occurring in more than one - Forest products EA In Progress: Notice of Initiation 06/17/2014 Est. Comment Period Public Notice 01/2015 Expected:05/2015 Project Contact 07/2015 Rachel Lipsky 425-888-8750 rslipsky@fs.fed.us Description: Supply sustainable forest products, and support the health and wildlife habitat values of forest stands, while meeting aquatic, recreational, and scenic objectives within the South Fork Snoqualmie watershed Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44548 Location: Mt Baker-Snoqualmie National Forest Baring Communications Site UNIT - North Bend Ranger District. STATE - Washington. COUNTY - King. LEGAL - Township 23 North (T23N), Range 9 East (R9E), Sections 34 and 35; T22N, R10E, Sec. 6-17; and T22N, R9E, Sec. 1, 2, 3 and 12. The project is within the South Fork Snoqualmie watershed, along the Interstate 90 corridor, approximately between mileposts 38 and 48. Skykomish Ranger District (excluding Projects occurring in more than one District) - Special use management CE In Progress: Scoping Start 04/23/2014 Expected:09/2014 R6 - Pacific Northwest Region 05/2015 Eric Ozog 360-691-4396 eozog@fs.fed.us Description: Issue a special use permit to American Tower to construct a new wireless communications site and associated infrastructure along Forest Service Road 6024 Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44390 Location: Communications Use Lease Renewals UNIT - Skykomish Ranger District. STATE - Washington. COUNTY - Snohomish. LEGAL - T27N, R10E, Sec.35, SE ¼ (cell site); and T27N, R10E, Sec.35 and T26N, R10E, Sec. 2, NE ¼ (Forest Service Road 6024). NE of the town of Baring, just off US Highway 2. - Special use management On Hold N/A N/A CE Todd Griffin 360-677-2258 toddgriffin@fs.fed.us Description: Renew communications use lease for existing Maloney Ridge communications sites. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=16036 Location: 10/01/2014 08:52 am MT UNIT - Skykomish Ranger District. STATE - Washington. COUNTY - Snohomish. LEGAL - Sec 36, T26N, R11E. Maloney Ridge, Skykomish RD, southwest of the town of Skykomish WA. Page 9 of 11 Mt Baker-Snoqualmie National Forest Project Name Project Purpose Mt Baker-Snoqualmie National Forest Frog Mountain and Alpine Falls Trail Construction Planning Status Decision Expected Implementation Skykomish Ranger District (excluding Projects occurring in more than one District) - Recreation management In Progress: Scoping Start 09/03/2014 Expected:12/2014 Project Contact R6 - Pacific Northwest Region 08/2015 CE Tom Davis 425-744-3260 tdavis@fs.fed.us Description: Construct about 3.8mi of trail from the gravel pit on Forest Service Road 6550-610 north of Jacks Pass to the summit of Frog Mtn. Construct about 750ft of trail with viewpoints of Alpine Falls, adjacent to Hwy 2, about 6mi east of Skykomish. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44653 Location: Stevens Pass Phase 3 UNIT - Skykomish Ranger District. STATE - Washington. COUNTY - Snohomish. LEGAL - T28N, R12E, portions of Sections 29, 30, and 31. This project is located approximately 13 miles north of State Highway 2 and the Town of Skykomish, WA. - Recreation management EA In Progress: Notice of Initiation 09/10/2013 Est. Comment Period Public Notice 11/2014 Expected:01/2015 06/2015 Barry Collins 360-677-2239 bcollins@fs.fed.us Description: Stevens Pass Mountain Resort wishes to develop additional downhill mountain bike trails and skills parks, replace two chairlifts, add parking on the north side of US Highway 2, and remove a gun mount (formerly used for avalance control). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42769 Location: UNIT - Skykomish Ranger District. STATE - Washington. COUNTY - Chelan, King. LEGAL - Township 26N, Range 14E, Section 14. Stevens Pass Mountain Restort is adjacent to US Highway 2 at the Cascade crest, 65 miles east of Everett, WA. Sultan Roads Improvement and - Watershed management Decomissioning Project - Road management EA In Progress: Comment Period Public Notice 04/02/2014 Est. Objection Period Legal Notice 11/2014 Expected:12/2014 06/2015 Rachel Lipsky 425-888-8750 rslipsky@fs.fed.us Description: Treat and put in storage approximately 0.5 miles of Forest Service Road (FSR) 6122. Decommission approximately 4.1 miles of system and non-system roads including FSRs 6100-050, 6122-115, and 6124-114. Remove a log stringer bridge. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38459 Location: 10/01/2014 08:52 am MT UNIT - Skykomish Ranger District. STATE - Washington. COUNTY - Snohomish. LEGAL - Township 29 North, Range 8 East, Sections 22, 23, and 25-28; and T29N, R9E, Sec. 30, W.M. Sultan Basin, north of the town of Sultan and just east of Spada Lake. Page 10 of 11 Mt Baker-Snoqualmie National Forest Project Name Project Purpose Mt Baker-Snoqualmie National Forest District) Planning Status Decision White River Ranger District (excluding Projects occurring in more than one Expected Implementation Project Contact R6 - Pacific Northwest Region Karen Chang 425-888-8758 kchang@fs.fed.us Twentyeight Mile Creek Steelhead Acclimation Pond Special Use Permit - Special use management CE Description: Permit Puyallup Tribe to construct and maintain a 100-foot-long by 35-foot-wide steelhead acclimation pond using water diverted from Twentyeightmile Creek. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44398 Location: In Progress: Scoping Start 05/23/2014 Expected:09/2014 09/2014 UNIT - White River Ranger District. STATE - Washington. COUNTY - Pierce. LEGAL - T19N R10E Sec 21, NE1/4 of SW1/4. Adjacent to the 118 spur off Forest Service Road 70 just west of the bridge over Twentyeightmile Creek. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 10/01/2014 08:52 am MT Page 11 of 11 Mt Baker-Snoqualmie National Forest