Schedule of Proposed Action (SOPA) 10/01/2014 to 12/31/2014 Sierra National Forest

advertisement
Schedule of Proposed Action (SOPA)
10/01/2014 to 12/31/2014
Sierra National Forest
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
Project Name
Project Purpose
Planning Status
Decision
Expected
Implementation
Project Contact
Projects Occurring in more than one Region (excluding Nationwide)
Sierra Nevada Forest Plan
Amendment (SNFPA)
- Land management planning
On Hold
N/A
N/A
EIS
Donald Yasuda
916-640-1168
dyasuda@fs.fed.us
Description: Prepare a narrowly focused analysis to comply with two orders issued by the Eastern District Court of California on
November 4, 2009. Correct the 2004 SNFPA Final SEIS to address range of alternatives and analytical
consistency issues.
Web Link: http://www.fs.fed.us/r5/snfpa/2010seis
Location:
UNIT - Eldorado National Forest All Units, Lassen National Forest All Units, Modoc National Forest All Units,
Sequoia National Forest All Units, Tahoe National Forest All Units, Lake Tahoe Basin Mgt Unit, Carson Ranger
District, Bridgeport Ranger District, Plumas National Forest All Units, Sierra National Forest All Units, Stanislaus
National Forest All Units, Inyo National Forest All Units. STATE - California, Nevada. COUNTY - Alpine,
Amador, Butte, Calaveras, El Dorado, Fresno, Inyo, Kern, Lassen, Madera, Mariposa, Modoc, Mono, Nevada,
Placer, Plumas, Shasta, Sierra, Siskiyou, Tulare, Tuolumne, Yuba, Douglas, Esmeralda, Mineral. LEGAL - Along
the Sierra Nevada Range, from the Oregon/California border south to Lake Isabella as well as lands in western
Nevada. Sierra Nevada National Forests.
R5 - Pacific Southwest Region, Occurring in more than one Forest (excluding Regionwide)
Inyo, Sierra, and Sequoia
National Forests Land
Management Plans Revision
- Land management planning
EIS
In Progress:
NOI in Federal Register
08/29/2014
Est. DEIS NOA in Federal
Register 04/2015
Expected:09/2016
09/2016
Michael Dietl
707-562-9121
michaeldietl@fs.fed.us
Description: The Sequoia, Sierra, and Inyo National Forests propose to revise their land management plans as guided by the
2012 Planning Rule.
Web Link: http://tinyurl.com/r5earlyadopters
Location:
10/01/2014 08:51 am MT
UNIT - Sequoia National Forest All Units, Sierra National Forest All Units, Inyo National Forest All Units. STATE
- California, Nevada. COUNTY - Fresno, Inyo, Kern, Kings, Mono, Tulare, Esmeralda, Mineral. LEGAL - Not
Applicable. Entire Sierra National Forest, entire Inyo National Forest, and the Sequoia National Forest outside of
the Giant Sequoia National Monument.
Page
1 of 18
Sierra National Forest
Project Name
Project Purpose
Planning Status
Decision
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region, Occurring in more than one Forest (excluding Regionwide)
Issue Easement for ExcheckerYosemite 70Kv Transmission
Line and Indian Flat Substation
- Special use management
On Hold
N/A
N/A
EA
Doug McKay
559-297-0706 ext
4891
dcmckay@fs.fed.us
Description: Issue an Easement for approximately 10.4 miles of the Exchecker-Yosemite 70Kv Transmission Line located on
the Sierra and Stanislaus National Forests, and the Indian Flat Substation located in the Merced River Canyon in
Mariposa County, California.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36182
Location:
UNIT - Bass Lake Ranger District, Groveland Ranger District. STATE - California. COUNTY - Mariposa.
LEGAL - T 3SR 19E. Merced River Canyon.
R5 - Pacific Southwest Region
Sierra National Forest, Forestwide (excluding Projects occurring in more than one Forest)
Concessionaire Permit
Extension
- Recreation management
- Facility management
On Hold
N/A
CE
N/A
Susan Burkindine
559-297-0706 x 4921
sburkindine@fs.fed.us
Description: Amend existing permit to extend two years for concessionaire permit.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43127
Location:
UNIT - Sierra National Forest All Units. STATE - California. COUNTY - Fresno, Madera, Mariposa. LEGAL Not Applicable. 86 Campground and Picnic Sites Forest-wide.
Annette Lambert
Pacific Gas and Electric
- Special use management
On Hold
N/A
N/A
Company Electric Line Facilites
559-855-5355 x3338
Permit Reissue (aka Holdover)
alambert@fs.fed.us
Description: Reissue expired or soon to be expired permits to various (33) PGE electric line and associated access roads.
CE
10/01/2014 08:51 am MT
Web Link:
http://www.fs.fed.us/nepa/nepa_project_exp.php?project=19615
Location:
UNIT - Sierra National Forest All Units. STATE - California. COUNTY - Fresno, Madera, Mariposa. LEGAL maps available at the District Offices. Various locations on the Bass Lake and High Sierra Ranger Districts.
Page
2 of 18
Sierra National Forest
Project Name
Project Purpose
Planning Status
Decision
- Special use management
On Hold
Project Contact
R5 - Pacific Southwest Region
Sierra National Forest, Forestwide (excluding Projects occurring in more than one Forest)
SCE Permit Renewal for
Existing Distribution Lines
Expected
Implementation
N/A
N/A
CE
Annette Lambert
(559) 855-5355 x3338
alambert@fs.fed.us
Description: Renew a special use permit forest-wide for existing distribution lines 33 kilovolts and under on the Sierra National
Forest
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33583
Location:
Sierra National Forest
UNIT - Sierra National Forest All Units. STATE - California. COUNTY - Fresno, Madera. LEGAL - Various
locations on Bass Lake (BLRD) and High Sierra Ranger Districts (HSRD), maps available at HSRD. Sierra
National Forest - Huntington, Shaver, Mammoth Pool, Auberry, North Fork.
Bass Lake Ranger District (excluding Projects occurring in more than one District)
"007" Motorized Trail Project
- Recreation management
On Hold
N/A
R5 - Pacific Southwest Region
N/A
EA
Leak Pen
559-877-2218
lpen02@fs.fed.us
Description: The project will develop needed social, economic and natural resource impacts and information to determine the
purpose and need for the popular user defined "007" route to establish it's designation as a trail.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35501
Location:
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - TS7S, R22E, Sec 25
SE1/4, NE1/4, Sec 24 SE1/4, NE1/4, Sec19 NW1/4, Sec 13 SW1/4, Sec18 SW1/4, NW1/4, NE1/4, Sec7 SW1/4, SE
1/4, NE1/4. The "007' route is located approximately 4.5 miles north of North Fork, CA.
Leak Pen
559-877-2218
lpen02@fs.fed.us
Bass Lake Toilets (Granite
Creek and Nelder Grove
Campgrounds)
- Facility management
CE
Description: Decommission (remove) existing toilets, install new accessible toilet. Granite Creek Campground will remove one
'single' toilet and replace with one 'single' toilet. Nelder Grove Campground will remove two 'double' toilets and
replace with one 'do
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38786
Location:
10/01/2014 08:51 am MT
In Progress:
Scoping Start 04/01/2012
Expected:09/2015
09/2015
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - Granite Creek: Lat:
37.53820799, Long: -119.26455680; Nelder Grove: Lat: 37.43118561, Long: -119.58214220. Granite Creek and
Nelder Grove areas.
Page
3 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
Bass Lake Ranger District (excluding Projects occurring in more than one District)
Bass Lake Water Company
Water Treatment Plant Project
- Special use management
EA
In Progress:
Notice of Initiation 06/03/2013
Est. Comment Period Public
Notice 01/2015
Expected:04/2015
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region
05/2015
Jody Nickerson
(559)297-0706 ext
4943
jnickerson@fs.fed.us
Description: Issue a new special use permit to the Bass Lake Water Company, construct a new water treatment plant and
decommission (remove) the existing water treatment plant that is no longer functioning.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42151
Location:
Doublegate/Lone
Sequoia/Timberloft Prescribed
Burns - NEPA Review
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - Township 7 South,
Range 22 East, Section 9, MDBM. Bass Lake, California.
- Vegetation management
(other than forest products)
- Fuels management
On Hold
N/A
N/A
CE
Gloria Smith
559-877-2218 ext.
3103
gsmith07@fs.fed.us
Description: Improve forest health and wildlife forage though reduction of existing fuels, suppressed conifers and brush. A
NEPA consistancy review is needed so that prescribed buurning may continue and achieve a "maintenance burn"
level through multiple entries.
Location:
Ferguson Slide Talus Removal
Project
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - T6S, R21E, Sec 2-4,916. See #15.
- Road management
Completed
CE
Actual: 09/11/2014
10/2014
Doug McKay
559-297-0706 ext
4891
dcmckay@fs.fed.us
Description: This Project will consist of stabilization of the rock talus and debris slide via installation of a cable net drapery
system, and removal of rock talus and debris from below the origination point of the slide.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44893
Location:
10/01/2014 08:51 am MT
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Mariposa. LEGAL - Township 3 South,
Range 19 East, Section 19. Located on the Merced River along Highway 140 at Post Mile 42.0 to 42.7, eight miles
east of the community of Briceburg and 7.6 miles west of the community of El Portal in Mariposa County,
California.
Page
4 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
Bass Lake Ranger District (excluding Projects occurring in more than one District)
Horizon Tower Permit Issuance
- Special use management
CE
In Progress:
Scoping Start 04/08/2013
Expected:11/2014
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region
11/2014
Sharon Dooley
559-877-2218 3126
sdooley@fs.fed.us
Description: To issue a special use permit (lease) to Horizon Tower for the existing Miami Mountain communications site
previously owned and operated by California Sierra Tower Company. Work is administrative only. No ground
disturbance will occur.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41894
Location:
Jackass Meadow Conifer
Removal
CE
Keith Stone
- Grazing management
In Progress:
Expected:10/2014
10/2014
559-877-2218
- Vegetation management
Scoping Start 05/13/2014
kstone@fs.fed.us
(other than forest products)
- Fuels management
- Watershed management
Description: Removal (by hand) of approximately 15 acres of small (<10" dbh) encroaching lodgepole conifers in the arm of
Jackass Meadow.
Location:
Kamook Motorized Recreation
Staging Area
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Mariposa. LEGAL - Township 6 South,
Range 20 East, Section 11. Miami Mountain Communications Site.
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - Not Applicable. Conifer
removal would occur on the eastern arm of Jackass Meadow.
- Recreation management
EA
In Progress:
215 Comment Period Legal
Notice 06/17/2010
Expected:09/2015
09/2016
Linda McPhail
559-877-2218 -3200
lmcphail01@fs.fed.us
Description: Reconstruction of a 2.1 acre site to develop parking/off loading, replace deterioating toilet, reduce maintenance
costs and impacts to natural and cultural resources including soils and water quality.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=32822
Location:
10/01/2014 08:51 am MT
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - Township: 5S, Range:
21E, Section: 14, 1/4 Sec: NE1/4. Project is within the County of Madera, California and is approximately 8 miles
north of the town of Oakhurst, California.
Page
5 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
Bass Lake Ranger District (excluding Projects occurring in more than one District)
Mile High Roadside Hazard
Salvage Project
CE
*NEW LISTING*
Project Contact
R5 - Pacific Southwest Region
Katharine Napier
- Regulations, Directives,
In Progress:
Expected:10/2014
10/2014
559-877-2218
Orders
Scoping Start 09/16/2014
knapier@fs.fed.us
- Recreation management
- Forest products
- Fuels management
- Road management
Description: The project is the salvage of dead and dying trees. The project reduces the hazard potential of dead, and dying,
trees by removing hazardous trees within striking distance of the road and recreation sites.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45294
Location:
Mollie Clayton Cabin Removal
Project
Expected
Implementation
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - Not Applicable. 250
acres along the Scenic Byway within and adjacent to the French Fire burn area.
- Land management planning
- Recreation management
On Hold
N/A
N/A
EA
Leak Pen
559-877-2218
lpen02@fs.fed.us
Description: Demolition and removal of existing cabin located on FS land.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43012
Location:
Ponderosa Telephone
Company Master Permit
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - Not Applicable. Located
off of Road 222. Lot is surrounded by large mature trees. Area heavily used for recreational purpose during peak
season.
- Special use management
- Facility management
Cancelled
EA
*NEW LISTING*
N/A
Doug McKay
559-297-0706 ext
4891
dcmckay@fs.fed.us
Description: This project is cancelled because the NEPA was previously completed and listed on the SOPA. This listing was
entered as a mistake, to remove it, the project must be "cancelled". Again, this project was previously completed.
Location:
10/01/2014 08:51 am MT
N/A
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Fresno, Madera. LEGAL - Sec13 T5S
R24E., Sec16 T6S R24E., Sec17 T6S R24E, Sec17 T8S R24E, Sec2 T8S R22E, Sec 13 T8S R22E, Sec 25 T8S
R22E, Sec 26 8S R22E, Sec 28 T8S R22E, Sec36 T8S R22E, Sec 28 T7S R22E, Sec 33 T7S R22E. Various
locations on the Bass Lake Ranger District.
Page
6 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
Bass Lake Ranger District (excluding Projects occurring in more than one District)
Ponderosa Telephone
Company San Joaquin
Experimental Range Project
- Special use management
Developing Proposal
Est. Notice of Initiation 11/2014
Expected:08/2015
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region
08/2015
EA
Doug McKay
559-297-0706 ext
4891
dcmckay@fs.fed.us
Description: Install approximately 7424'of buried telephone cable inside a conduit to serve the San Joaquin Experimental
Range. Related facilities would include pedestals and above ground warning markers.
Location:
Sweetwater Mine Restoration
Project
CE
Alan Gallegos
- Heritage resource
Completed
Actual: 08/19/2014
09/2014
559-297-0706 x 4862
management
ajgallegos@fs.fed.us
- Wildlife, Fish, Rare plants
- Vegetation management
(other than forest products)
- Watershed management
- Minerals and Geology
- Road management
Description: The project includes improving public safety & watershed condition by removing structures and abandoned mining
property, eradicating noxious weeds by using mechanical methods & stabilizing sections of an open trench, and
road decommissioning.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=21752
Location:
Try Me Placer Mining Project
EIS
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - Township 10 South,
Range 21 East, Sections 1, 6, MDBM. U.S. Forest Service Pacific Southwest Station San Joaquin Experimental
Range.
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Mariposa. LEGAL - Range 19 East,
Township 4 South,Sections 17 and 20; MDB&M (protracted). The Sweetwater Mine is located approximately
3 miles northwest of the Jerseydale Fire Station off Forest Road 5S24.
- Regulations, Directives,
Orders
Developing Proposal
Est. NOI in Federal Register
10/2014
Expected:07/2015
08/2015
Alan Gallegos
559-297-0706 x 4862
ajgallegos@fs.fed.us
Description: The proposal includes mining gold bearing gravels along 1500 feet of channel, setting up a camp and storage
area, diversion of water around the mining operation, constructing a sediment pond and small earthen dam to pond
water and reclamation.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41898
Location:
10/01/2014 08:51 am MT
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - T. 6 S.; R. 24E, 23E;
Sections 13, 18, & 19. Small channel off of West Fork Chiquito Creek, north of Soda Springs.
Page
7 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
Bass Lake Ranger District (excluding Projects occurring in more than one District)
West Chiquito Ecological
Restoration Project
EIS
- Recreation management
On Hold
- Forest products
- Vegetation management
(other than forest products)
- Fuels management
- Road management
Description: This project is ON HOLD due to a recent fire.
Location:
Willow Creek Watershed
Restoration Planning Project
N/A
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region
N/A
Greg Schroer
559-297-0706 x 4933
gschroer@fs.fed.us
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - Not Applicable. On hold
due to Frenchfire. Project is in Madera County, CA. The outer project boundary encompasses 19,810 acres,
primarily within the Lower Chiquito Creek Watershed in the Bass Lake Ranger District.
- Watershed management
Developing Proposal
Est. Notice of Initiation 07/2015
Expected:12/2015
06/2016
EA
Keith Stone
559-877-2218
kstone@fs.fed.us
Description: This project will complete the planning and NEPA analysis necessary to successfully repair several high priority
meadows and streams within the Willow Creek watershed.
Location:
Yosemite Forks Estates Mutual
Water Company Special Use
Permit Renewal
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera, Mariposa. LEGAL - Not
Applicable. Surveys, planning and NEPA analysis will occur for meadows and streams throughout the 80,000 acre
5th-Field (HUC10) Willow Creek watershed.
- Special use management
On Hold
CE
N/A
N/A
Doug McKay
559-297-0706 ext
4891
dcmckay@fs.fed.us
Description: Reissue a Special Use Permit for a residential water supply line (12" or less pipeline), forless than 1 mile across
Natioanl Forest System lands on the Bass Lake Ranger District of the Sierra National Forest
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35375
Location:
10/01/2014 08:51 am MT
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - T 6 S, R 21 E Section 24
MDM. Bass Lake Ranger District, near Cedar Valley private land.
Page
8 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
Bass Lake Ranger District (excluding Projects occurring in more than one District)
Yosemite Sugar Pine Railroad
Permit Reissue
- Recreation management
- Special use management
In Progress:
Scoping Start 10/15/2009
Expected:04/2015
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region
04/2015
CE
Leak Pen
559-877-2218
lpen02@fs.fed.us
Description: Reissue 20 yr term permit to Yosemite Sugar Pine Railroad Resort
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=19616
Location:
Sierra National Forest
6 Water System Permit
Renewals
UNIT - Bass Lake Ranger District. STATE - California. COUNTY - Madera. LEGAL - Section 35 T5S R21E.
Near Fish Camp, CA.
High Sierra Ranger District (excluding Projects occurring in more than one District)
- Special use management
Cancelled
CE
N/A
R5 - Pacific Southwest Region
N/A
Annette Lambert
(559) 855-5355 x3338
alambert@fs.fed.us
Description: There are six water system special use permits that will terminate on 12/31/2013. The only action is to renew each
permit for a 20 year term. All systems are existing and no new activities are being proposed.
Location:
Bald Mountain Project
EA
Keith Ballard
- Wildlife, Fish, Rare plants
In Progress:
Expected:10/2014
11/2014
(559) 855-5355
- Forest products
Objection Period Legal Notice
keballard@fs.fed.us
- Vegetation management
06/27/2014
(other than forest products)
- Fuels management
- Road management
Description: Implement restoration treatments collaboratively to reduce hazardous fuels, retain and promote large tree and
denning/nesting structures, promote stand/landscape heterogeneity, and provide for natural regeneration of shade
intolerant tree species.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39344
Location:
10/01/2014 08:51 am MT
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - T8S, R25E, Sections 11,
12, 14, 23; T10S, R23E, Section 13; T10S, R26E, Section 8. Huckleberry Tract, Dinkey Bluffs Tract, Dinkey Creek
Tract, Huntington Manor (private), 168 Four Lane (private), jose Basin (private).
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Legal description is T9S,
R25E; T9S, R26E; T10S, R24E; T10S, R25E; and T10S, R26E; Mt. Diablo Base Meridian. Project is located in
Fresno County, south and east of Shaver lake, CA. The project area is approximately 15,000 acres.
Page
9 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
Expected
Implementation
R5 - Pacific Southwest Region
High Sierra Ranger District (excluding Projects occurring in more than one District)
Big Creek community Fuel
Break
- Fuels management
In Progress:
Scoping Start 08/01/2014
Expected:10/2014
10/2014
CE
*NEW LISTING*
Ramiro Rojas
559-855-5355
rrojas@fs.fed.us
Description: Hand cutting (23 acres)of live trees less than 12 inches DBH and hand pile (15 acres) and tractro pile (5 acres)
within 1000 ft of the community of Big Creek.
Location:
Camp Fresno Well
Project Contact
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. T 8 S,
R25 E, Sec. 28 located below the community of Big Creek California.
- Special use management
Completed
Actual: 09/16/2014
10/2014
CE
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: Camp Fresno needs another source for water and is proposing to drill a new well.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43559
Location:
Dinkey Creek Inn Permit
Renewal
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - T10S, R26E, Section 17.
Near Camp Fresno.
- Special use management
In Progress:
Scoping Start 06/12/2014
Expected:11/2014
12/2014
CE
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: New owners have submitted application for a permit to continue current resort acitivities authorized for the Dinkey
Creek Inn.
Location:
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. High
Sierra Ranger District.
Dinkey Creek Lot 28 New Phone - Special use management
Service
Completed
CE
*NEW LISTING*
09/2014
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: The cabin owner has applied to Ponderosa Telephone Company to add phone service to his cabin. A special use
permit is required.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45063
Location:
10/01/2014 08:51 am MT
Actual: 08/28/2014
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - T10S, R26E, Section 8.
Dineky Creek Recreation Residence Tract.
Page
10 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
High Sierra Ranger District (excluding Projects occurring in more than one District)
Dinkey Creek Tract New Well
- Special use management
Completed
Actual: 08/28/2014
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region
10/2014
CE
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: Dinkey Creek Recreation Rsidence Tract currently has a spring fed domestic water system and would like to
develop a more reliable water source.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43821
Location:
Duff Creek Aquatic Organism
Passage (AOP) Project
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. Dinkey
Creek Tract.
- Wildlife, Fish, Rare plants
In Progress:
Scoping Start 06/15/2014
Expected:12/2014
06/2015
CE
Elwood Raley
559-297-0706
elwoodcraley@fs.fed.us
Description: Replacement of two culverts one on Road 10S02 and the other culvert on Road 10S17 to allow safe passage for
the western pond turtle, and provide additional habitat for trout.
Location:
Ely, Balsam, and Bolsillo Creek
Diversions Infrastructure
Improvement Project
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - SW ¼ of the NW ¼ of
Section 26, T10S/R25E, MDB&M for area 1 and SE ¼ of the NE ¼ of Section 34, T10S/R25E, MDB&M for area 2
. Duff Creek crossing on Road 10S17 approx. 1 mile east of Bretz Mill Campground for area 1 and Duff Creek
crossing on Road 10S02 approximately 1.5 miles SE of Bretz Mill CG at Duff Creek CG for area 2.
- Facility management
In Progress:
215 Comment Period Legal
Notice 08/21/2012
EA
Expected:01/2015
05/2015
Doug McKay
559-297-0706 ext
4891
dcmckay@fs.fed.us
Description: Evaluate the effect of the implementation of the Southern California Edison Company's (SCE's) Ely, Balsam, and
Bolsillo Creek Diversions Infrastructure Improvement Project on federally listed threatened, endangered,
candidate, and proposed species.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38911
Location:
10/01/2014 08:51 am MT
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno, Madera. LEGAL - Not Applicable.
Located in the upper San Joaquin River (SJR) watershed in Madera and Fresno counties, California.
Page
11 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
High Sierra Ranger District (excluding Projects occurring in more than one District)
Ershim Meadow Bridge
- Recreation management
EA
In Progress:
Notice of Initiation 07/30/2013
Est. Comment Period Public
Notice 12/2014
Expected:02/2015
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region
08/2016
Anthony Benedetti
559-855-5355 x3302
abenedetti@fs.fed.us
Description: To protect meadow resources by building a bridge over a perennial water crossing on a congressionally
designated OHV Route (Dusy Ershim).
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35058
Location:
Fence Meadow
Communications Site
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. Ershim
meadow located one mile North of Ershim Lake.
- Special use management
Completed
Actual: 08/29/2014
09/2014
CE
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: PGE and Ponderosa Telephone are proposing changes to the established communications site. The tower will be
replaced, with the additions of a new building and solar panels. The purpose is for enhanced internal
communications for PGE.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43869
Location:
Gold Arrow Camp Leach Field
Expansion
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - T11S, R26E, Section 19.
Fence Meadow Lookout and Communications Site.
- Special use management
In Progress:
Scoping Start 09/26/2014
Expected:10/2014
11/2014
CE
*NEW LISTING*
Description: Camp Gold Arrow has requested to expand their leach field capacity due to increased usage.
Location:
Gold Arrow Camp permit
renewal.
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. Gold
Arrow Camp is located at the south east end of Huntington Lake.
- Special use management
Cancelled
CE
N/A
N/A
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: Gold Arrow Camp has submitted application for renewal of their Special Use Permit to operate a private camp on
Huntington Lake. The application includes adding Camp Mirimichi to their existing use area.
Location:
10/01/2014 08:51 am MT
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable.
Huntington Lake, High Sierra Ranger District.
Page
12 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
High Sierra Ranger District (excluding Projects occurring in more than one District)
Haslett Conservancy Project
CE
- Vegetation management
(other than forest products)
- Fuels management
Developing Proposal
Est. Scoping Start 10/2014
Expected:01/2015
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region
01/2015
John Cielnicky
559-855-5355
johnwcielnicky@fs.fed.u
s
Description: This prescribed fire project is bordered by the 10S03 to the South and the 10S60 to the West, North and East.
Location:
Huckleberry Tract New Well
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - T11S R 25E S23, 24, 13,
14. Road 10S03 to the South and the 10S60 road to the West, North and East.
- Special use management
Completed
Actual: 08/28/2014
10/2014
CE
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: The Huckleberry Recreation Residence Tract wants to drill a new well to supplement their current domestic water
supply.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43851
Location:
Huntington Basin Project
EA
Judith Tapia
- Vegetation management
On Hold
N/A
N/A
559-297-0706
(other than forest products)
jetapia@fs.fed.us
- Fuels management
Description: The purpose of this project is to minimize the risk of uncontrolled fire on the landscape and improve tree vigor and
health in the Huntington Basin while maintaining a visually appealing and undeveloped appearing landscape.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40173
Location:
Huntington Lake Resort Permit
Reissue to New Owners
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable.
Huckleberry Tract at Huntington Lake area.
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - T8S R25E Sections 1, 2,
11, 12, 13, 15, 16, and 21, and T8S R26E Sections 4, 5, 6, 7, 8, 9, 17, 18, 19, 20, and 21 (Mt Diablo Base
Meridian). Fresno County, areas outside of the Kaiser Wilderness to the west, north, east, and southeast of
Huntington Lake, including the China Peak Resort.
- Special use management
In Progress:
Scoping Start 09/18/2014
CE
*NEW LISTING*
12/2014
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: Huntington Lake Resort has been sold and there are new owners. A new permit needs to be issued to the new
owners as permits are not transferable.
Location:
10/01/2014 08:51 am MT
Expected:11/2014
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable.
Huntington Lake Resort, Huntington Lake Recreation Area, High Sierra Ranger District.
Page
13 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
Expected
Implementation
R5 - Pacific Southwest Region
High Sierra Ranger District (excluding Projects occurring in more than one District)
Lakeview Tract New Well
- Special use management
Completed
Actual: 09/03/2014
10/2014
CE
*NEW LISTING*
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: Lakeview has applied to drill a new well, install pipe line, and install a storage tank.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45160
Location:
NEON Flux Tower at Lower
Teakettle
Project Contact
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. Behind
the Lakeview Cottages.
- Special use management
- Research and Development
In Progress:
Scoping Start 01/20/2012
Expected:12/2014
01/2015
CE
Annette Lambert
(559) 855-5355 x3338
alambert@fs.fed.us
Description: The National Ecological Observatory Network proposes to establish scientific infrastructure needed for research to
address critical questions about land use and climate change on ecological systems and to evaluate the impacts to
the environment.
Web Link: http://www.neoninc.org
Location:
NEON Flux Tower at Soaproot
Saddle
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - T11S, R27E, Sections 2,
3. Lower Teakettle, Wishon area.
- Special use management
- Research and Development
In Progress:
Scoping Start 01/20/2012
CE
Expected:12/2014
01/2015
Annette Lambert
(559) 855-5355 x3338
alambert@fs.fed.us
Description: The National Ecological Observatory Network proposes to establish scientific infrastructure needed for research to
address critical questions about land use and climate change on ecological systems and to evaluate the impacts to
the environment.
Web Link: http://www.neoninc.org
Location:
10/01/2014 08:51 am MT
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - T10S, R25E, Section 29.
Soaproot Saddle.
Page
14 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
High Sierra Ranger District (excluding Projects occurring in more than one District)
NEON Research Activities at
Providence Creek
- Special use management
- Research and Development
Cancelled
N/A
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region
N/A
CE
Annette Lambert
(559) 855-5355 x3338
alambert@fs.fed.us
Description: The National Ecological Observatory Network proposes to establish scientific infrastructure needed for research to
address critical questions about land use and climate change on ecological systems and to evaluate the impacts to
the environment.
Web Link: http://www.neoninc.org
Location:
OHV Parking Areas-White Bark
Vista and Red Mountain
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - T10S, R25E, Sections
13, 14. Providence Creek.
- Recreation management
EA
In Progress:
Notice of Initiation 05/08/2013
Est. Comment Period Public
Notice 12/2014
Expected:02/2015
08/2016
Anthony Benedetti
559-855-5355 x3302
abenedetti@fs.fed.us
Description: Develop Off Highway Vehicle (OHV) staging and parking areas at White Bark Vista and Red Mountain.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41554
Location:
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. White
Bark Vista above Huntington Lake and road junction at 8S10 and 8S42 serving Red Mountain.
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Ponderosa Telephone - High
Sierra Ranger Station New
Service
- Special use management
- Facility management
CE
Description: The Ponderosa Telephone Co. received an application from the Forest Service to provide phone service at the
High Sierra Ranger Station.
*NEW LISTING*
Location:
Ponderosa Telephone - Verizon
Service at Huntington Condos
In Progress:
Scoping Start 09/16/2014
- Special use management
In Progress:
Scoping Start 09/16/2014
Expected:02/2015
06/2015
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: The Ponderosa Telephone Co. is proposing to reinforce their existing facilities in Lower Deer Creek Tract and
provide for a new fiber optic cable to the cell site operated by Verizon on private land.
Location:
10/01/2014 08:51 am MT
06/2015
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. High
Sierra Ranger Station.
CE
*NEW LISTING*
Expected:03/2015
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. Lower
Deer Creek Tract at Huntington Lake.
Page
15 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
High Sierra Ranger District (excluding Projects occurring in more than one District)
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Ponderosa Telephone Fence
Meadow Comm Site New
Generator
- Special use management
CE
Description: The Ponderosa Telephone Co. is proposing to install a new outdoor generator and shelter at their existing Fence
Meadow Comm Site.
*NEW LISTING*
Location:
Ponderosa Telephone New
Service to Camp Sierra Lot 41
Cancelled
N/A
N/A
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. Fence
Meadow Lookout and Communications Site.
- Special use management
In Progress:
Scoping Start 09/19/2014
Expected:10/2014
11/2014
CE
*NEW LISTING*
Description: The cabin owners at lot 41 in the Camp Sierra Recreation Residence Tract have applied to The Ponderosa
Telephone Co. for new phone service.
Location:
SCE 45 Deteriorated Pole
Replacements
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. Camp
Sierra Tract, High Sierra Ranger District.
- Special use management
In Progress:
Scoping Start 09/16/2014
Expected:12/2014
01/2015
CE
*NEW LISTING*
In Progress:
Scoping Start 09/16/2014
Expected:11/2014
04/2015
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: SCE proposes to upgrade and alter the configuration of several overhead
and underground facilities along the China Peak 12kV circuit at the China Peak Mountain Resort. Crews will
access poles scoped for removal on
foot.
Location:
10/01/2014 08:51 am MT
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. Various
locations on the High Sierra Ranger District.
- Special use management
CE
*NEW LISTING*
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: SCE has identified 45 deteriorated poles on the High Sierra Ranger District that need to be replaced before they
fall over or break, which could result in fires and/or resource damages.
Location:
SCE China Peak 12kV Project
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. Work to
take place within the China Peak Mountain Resort's permitted area.
Page
16 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Decision
High Sierra Ranger District (excluding Projects occurring in more than one District)
SCE Dinkey Pole Replacements - Special use management
CE
*NEW LISTING*
Planning Status
In Progress:
Scoping Start 09/16/2014
Expected:01/2015
Expected
Implementation
Project Contact
R5 - Pacific Southwest Region
05/2015
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: SCE as 4 deteriorated poles within the Dinkey Fisherman's Picnic area that need to be replaced.
Location:
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. Within
the Dinkey Creek Fisherman's Picnic area.
Annette Lambert
SCE Integrated Vegetation
N/A
- Special use management
On Hold
N/A
Management, Big Creek-Rector
559-855-5355 x3338
220 kV Transmission Line
alambert@fs.fed.us
Right-of-Way
Description: SCE has chosen a 1 mile corridor as a test area to explore a long-term approach to vegetation management
EA
within their authorized transmission corridor. Methods include both mechanical and chemical. Their goal is to avoid
interruptions and wildfire.
Location:
SCE Power Pole Project
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - T10S, R24E, Sections
20 and 29. Shaver Springs area.
- Special use management
Cancelled
N/A
N/A
CE
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: SCE needs to replace a power pole and upgrade an overhead switch.
Location:
Term Extensions District
Ranger Authority
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - T10S, R26E, Section 17.
In the old Pine Logging Camp area, Dinkey Creek.
- Special use management
In Progress:
Scoping Start 09/16/2014
CE
*NEW LISTING*
10/2014
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: Authorizes 1 year extensions for 8 special use authorizations for those permits which would otherwise expire on
12/31/14, and will continue the authorizations through 12/31/15 or until an assessment is conducted to continue the
use or not.
Location:
10/01/2014 08:51 am MT
Expected:10/2014
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. High
Sierra Ranger District.
Page
17 of 18
Sierra National Forest
Project Name
Sierra National Forest
Project Purpose
Planning Status
Decision
High Sierra Ranger District (excluding Projects occurring in more than one District)
Term Extensions Forest
Supervisor Authority
- Special use management
In Progress:
Scoping Start 09/16/2014
Expected:10/2014
Expected
Implementation
R5 - Pacific Southwest Region
10/2014
CE
*NEW LISTING*
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. High
Sierra Ranger District.
- Special use management
CE
*NEW LISTING*
In Progress:
Scoping Start 09/16/2014
Expected:12/2014
04/2015
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: UC Merced has submitted a proposal to install a cellular wireless network repeater that would support an existing
wireless sensor network off of 10S17, off Dinkey Creek Road.
Location:
Upper Billy Creek Campground
Rehabilitation Project
Annette Lambert
559-855-5355 x3338
alambert@fs.fed.us
Description: Authorizes 1 year extensions for 19 special use authorizations for those permits which would otherwise expire on
12/31/14, and will continue the authorizations through 12/31/15 or until an assessment is conducted to continue the
use or not.
Location:
UC Merced New Repeater
Project Contact
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Not Applicable. In the
Providence Creek area, south of Dinkey Creek Road, north of Forest Road 10S17.
- Recreation management
EA
In Progress:
Notice of Initiation 10/15/2012
Est. Comment Period Public
Notice 01/2015
Expected:02/2015
05/2015
Judith Tapia
559-297-0706
jetapia@fs.fed.us
Description: The project would rehabilitate and replace existing campsites, ancillary amenities, and associated roads and
parking spurs at the Upper Billy Creek Campground.
Location:
UNIT - High Sierra Ranger District. STATE - California. COUNTY - Fresno. LEGAL - Township 9 South,
Range 25 East, Section 15. The Upper Billy Creek Campground is located on the northwestern shore of
Huntington Lake.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial
status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited
bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at
(202) 720-2600 (voice and TDD).
To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA
is an equal opportunity provider and employer.
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
10/01/2014 08:51 am MT
Page
18 of 18
Sierra National Forest