Schedule of Proposed Action (SOPA) 10/01/2014 to 12/31/2014 Plumas National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact Projects Occurring in more than one Region (excluding Nationwide) Sierra Nevada Forest Plan Amendment (SNFPA) - Land management planning On Hold N/A N/A EIS Donald Yasuda 916-640-1168 dyasuda@fs.fed.us Description: Prepare a narrowly focused analysis to comply with two orders issued by the Eastern District Court of California on November 4, 2009. Correct the 2004 SNFPA Final SEIS to address range of alternatives and analytical consistency issues. Web Link: http://www.fs.fed.us/r5/snfpa/2010seis Location: UNIT - Eldorado National Forest All Units, Lassen National Forest All Units, Modoc National Forest All Units, Sequoia National Forest All Units, Tahoe National Forest All Units, Lake Tahoe Basin Mgt Unit, Carson Ranger District, Bridgeport Ranger District, Plumas National Forest All Units, Sierra National Forest All Units, Stanislaus National Forest All Units, Inyo National Forest All Units. STATE - California, Nevada. COUNTY - Alpine, Amador, Butte, Calaveras, El Dorado, Fresno, Inyo, Kern, Lassen, Madera, Mariposa, Modoc, Mono, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Tulare, Tuolumne, Yuba, Douglas, Esmeralda, Mineral. LEGAL - Along the Sierra Nevada Range, from the Oregon/California border south to Lake Isabella as well as lands in western Nevada. Sierra Nevada National Forests. R5 - Pacific Southwest Region Plumas National Forest, Forestwide (excluding Projects occurring in more than one Forest) Deb Schoenberg 530-532-7460 dschoenberg@fs.fed.us California Department of Water Resources - new permit for existing water monitoring sites - Special use management CE Description: Continued use and maintenance of 20 existing facilities and accessory structures needed to gather data on rainfall and snow depth forest wide, with dedicated winter use helispots. Current permit terminates 12/31/2010. Location: On Hold N/A UNIT - Plumas National Forest All Units. STATE - California. COUNTY - Butte, Plumas, Sierra. 20 locations Forest Wide. Plumas National Forest, Occurring in more than one District (excluding Forestwide) 10/01/2014 08:51 am MT N/A Page 1 of 14 R5 - Pacific Southwest Region Plumas National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact R5 - Pacific Southwest Region Plumas National Forest, Occurring in more than one District (excluding Forestwide) Erika Brenzovich 530-283-7622 ebrenzovich@fs.fed.us PG&E Herbicide Vegetation Management Program - Special use management EA Description: PG&E proposes to use herbicides in the right of way of 14 transmission lines in order to reduce the risk of fire and maintain a high standard of reliability. Spraying vegetation along Caribou Road was removed from the analysis. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35104 Location: Plumas National Forest In Progress: Objection Period Legal Notice 06/04/2014 Expected:08/2014 UNIT - Mt. Hough Ranger District, Feather River Ranger District. STATE - California. COUNTY - Butte, Plumas, Yuba. LEGAL - Not Applicable. Located on the Plumas National Forest within 14 different transmission power lines. Beckwourth Ranger District (excluding Projects occurring in more than one District) Beckwourth-Genesee Dam Project 09/2014 - Special use management EA In Progress: Comment Period Public Notice 07/11/2012 Est. Objection Period Legal Notice 12/2014 Expected:02/2015 R5 - Pacific Southwest Region 02/2015 Antonio Duenas 530-836-7156 tduenas@fs.fed.us Description: Remove a cabin, pond, solar panels, natural gas storage tank and septic system from National Forest System lands. A well would be capped and abandoned. Location: Barry Creek A UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R14E, Sec29. Off of Beckwourth-Genesee Road (County Road 111). - Fuels management On Hold N/A CE N/A Don Fregulia 530-836-2575 dfregulia@fs.fed.us Description: Fuels reduction treatments on private land using Steven's Funds. Location: 10/01/2014 08:51 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N R13E sec13 and sec 14. Off Highway 89 near Calpine Summit down Whitehawk Ranch. Page 2 of 14 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Barry Creek B - Fuels management On Hold N/A Expected Implementation Project Contact R5 - Pacific Southwest Region N/A CE Don Fregulia 530-836-2575 dfregulia@fs.fed.us Description: Fuels reduction treatments on private land using Steven's Funds Location: Barry Creek C UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N R13E sec13 and sec 14. Off Highway 89 near Calpine Summit down to Whitehawk Ranch. - Fuels management On Hold N/A N/A CE Don Fregulia 530-836-2575 dfregulia@fs.fed.us Description: Fuels reduction treatments on private land using Steven's Funds Location: Beckwourth-Crocker MultiPurpose Trails Project UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N R13E sec13 and sec 14. Off Highway 89 near Calpine Summit down to Whitehawk Ranch. - Recreation management On Hold N/A N/A EA Lisa Sedlacek 530-836-7126 lsedlacek@fs.fed.us Description: Develop a multi-purpose (hiking, biking, OHVs, equestrian) trail connecting the Crocker Campground with Red Clover Valley. Establish a staging area at the intersection of Forest Highway 177 and Forest Road 24N23. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41454 Location: Big Grizzly Creek Stream Improvement Project UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T 23 and 24N, R14E, Sections 33, 28, 29, 20, 21,16,17. Crocker Campground to road 29N49Y, connecting to quarry road 24N64X to the BG intersection, Crocker Mountain #33. - Watershed management Developing Proposal Est. Scoping Start 09/2014 CE Expected:10/2014 06/2015 Don Kozlowski 530-836-7145 dkozlowski@fs.fed.us Description: In stream-channel work would include check-dam and grade control structures, laying back stream banks, revegetation of banks, and installation of rock structures within the stream to increase fish habitat. Location: 10/01/2014 08:51 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N R12E & R13E Sections 21, 23 and 24. Approximately 6 miles north of Portola and on the west side of Lake Davis, CA, on Big Grizzly Creek. Page 3 of 14 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Discovery Placer Exploration Project - Minerals and Geology In Progress: Scoping Start 12/19/2012 Expected:12/2014 Expected Implementation Project Contact R5 - Pacific Southwest Region 04/2015 CE Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Claimant proposes to sample the sub-surface material along the remnant stream terrace of Eureka Creek to assess mineral content. Up to 20 test trenches would be excavated with a backhoe. Location: Dixie Mountain Refuge Road Closure UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R11E, NE 1/4 of Section 1, MDBM. The Discovery claim is located along NFS Road 23N37 at Eureka Creek, north of Johnsville, CA. - Road management Developing Proposal Est. Scoping Start 07/2014 Expected:08/2014 08/2014 CE Kyla Sabo 530-836-7157 kylasabo@fs.fed.us Description: There are two non-system roads located off the 26N70 road. One road will be obliterated (0.08 miles). The other road will be gated to limit access (0.10 miles). Location: Hayden Project EA UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R14E, Sections 23 and 27. North of (to be renamed) Squaw Valley, in the Dixie Mountain State Game Refuge, off the paved road 26N70. - Forest products - Fuels management In Progress: Notice of Initiation 02/13/2013 Est. Comment Period Public Notice 09/2014 Expected:02/2015 06/2015 Kyla Sabo 530-836-7157 kylasabo@fs.fed.us Description: Reduce fuel loading within the Wildland Urban Interface surrounding the communities of Portola, Delleker, Mabie and Lake David Highlands while promoting a healthy, diverse, fire-resilient forest structure and improve watershed health. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40385 Location: 10/01/2014 08:51 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. North of the communites of Delleker, Mabie, Portola and Lake Davis Highlands. Page 4 of 14 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Lakes Basin Forest Health Project EIS Project Contact R5 - Pacific Southwest Region Kyla Sabo - Recreation management Developing Proposal Expected:08/2015 05/2016 530-836-7157 - Forest products Est. NOI in Federal Register kylasabo@fs.fed.us - Vegetation management 09/2014 (other than forest products) - Fuels management Description: Improve forest health and reduce hazards around recreation sites. Activities include mechanical thinning, grapple piling, mastication, hand thinning and underburning. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40964 Location: Last Chance Creek Phase II Restoration Project Expected Implementation UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas, Sierra. LEGAL - Not Applicable. Lakes Basin recreation area. - Watershed management On Hold EIS N/A N/A Antonio Duenas 530-836-7156 tduenas@fs.fed.us Description: Restore the hydrologic function of approximately 7.8 miles of Last Chance Creek and 402 acres of degraded meadow system. Location: Lava Spring Aspen and Spring Enhancement Project CE Debra Bliss - Wildlife, Fish, Rare plants In Progress: Expected:09/2014 10/2014 530-836-7160 - Vegetation management Scoping Start 04/11/2014 dbliss@fs.fed.us (other than forest products) - Fuels management - Watershed management Description: There are four parts: 1)Remove non-functioning spring developments, 2)Remove conifers (juniper and pine)from aspen stand, 3)Obilitirate non-system road bisecting meadow, and 4)Underburn meadow to open up ground for aspen regenration. Location: 10/01/2014 08:51 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - The project area is in Sections 9, 10, 11, 14, and 15 of T26N, R13E and Sections 15, 16, and 17 of T26N, R14E. Last Chance HUC 5 watershed. UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T. 24 N, R. 14 E, Sec. 10. One mile east of County Road 177 (Red Clover Valley) and six miles west of Dixie Mountain. Page 5 of 14 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Expected Implementation Project Contact R5 - Pacific Southwest Region Lisa Sedlacek Lost Sierra Run, proposed date - Recreation management Completed Actual: 08/11/2014 09/2014 Saturday September 6, 2014. To - Special use management 530-836-7126 issue a 5-year Special Use lsedlacek@fs.fed.us Permit. Description: This proposal is to issue a 5-year recreation Special Use Permit to the Sierra Butte Trail Stewardship for an CE endurance run on Saturday September 6, 2014 in the Lakes Basin Recreation Area. The district has a cap of 500 participants. Location: McKesick Peak and Ferris Fields Allotments Project UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas, Sierra. LEGAL - Lakes Basin Recreation Area: Graeagle, Gray Eagle Creek Tr, Smith Lake Tr, Mt.Elwell Tr, Silver Lake Tr, Mud Lake Tr, Long Lake Connect Tr, Silver Lake Connect Tr, Round Lake Tr,GL HWY, Mill Peak-89. Lakes Basin Recreation Area in Plumas and Sierra Counties. - Grazing management EA In Progress: Objection Period Legal Notice 07/02/2014 Expected:08/2014 08/2014 Kyla Sabo 530-836-7157 kylasabo@fs.fed.us Description: The purpose of this project is to re-authorize continued livestock grazing consistent with Federal laws and regulations in a manner that maintains or improves project area resource conditions. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41939 Location: Ramelli and Hall Allotments UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Lassen, Plumas. LEGAL - The McKesick Peak Allotment is located in T26N, R14E, Sections 13, 14, 22-24, T26N, R15E, Sections 17-23, 26-29, 33-35. The Ferris Fields Allotment is located in T26N, R15E, portions of sections 30-33. North of Frenchman Lake. - Grazing management EA In Progress: Notice of Initiation 08/06/2014 Est. Comment Period Public Notice 11/2014 Expected:02/2015 04/2015 Scott Lusk 530-836-7165 salusk@fs.fed.us Description: The Ramelli and Hall range allotments are currently vacant. The project proposes to allow them to be utilized as a swing allotment. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=21898 Location: 10/01/2014 08:51 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Lassen, Plumas. LEGAL - portions of sections 25-31, 1-11, 16-34. Beckwourth Ranger District. Page 6 of 14 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Rush Skeleton Weed Project EA - Vegetation management (other than forest products) In Progress: Comment Period Public Notice 03/11/2014 Est. Objection Period Legal Notice 09/2014 Expected:11/2014 Expected Implementation Project Contact R5 - Pacific Southwest Region 06/2015 Michael Friend 530-836-7167 mjfriend@fs.fed.us Description: Rush skeleton weed would be sprayed with aminocyclopyrachlor chlorsulfuron (e.g. Perspective)or aminopyralid triclopyr (e.g. Capstone or Milestone Plus) or a combination of these herbicides with A surfactant (e.g. methylated seed oil) and dye. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43804 Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R11E, Sec. 1, SE 1/4 of NE 1/4. Eureka Creek at Discovery Mine and adjacent to National Forest System road 23N37, approximately 3 air miles northwest of the Beckwourth Ranger Station. T22N, R11E, Sec. 1, SE 1/4 of NE 1/4. Squirrel Creek Mine Exploration - Minerals and Geology Project In Progress: Scoping Start 11/19/2013 Expected:08/2014 04/2015 CE Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Excavation of 20-30 test pits to sample the sub-surface material on the claim. Exacavated material would be processed through a trommel. Water would be pumped from Squirrel Creek to the processing area and discharged to a settling pit. Location: Plumas National Forest UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R11E, Sections 2 & 3. Squirrel Creek, along NFS Road 23N08, West of Graeagle, CA. Feather River Ranger District (excluding Projects occurring in more than one District) California Department of Water Resources - Amend permit to install a streamgauge at 2nd location - Special use management On Hold N/A R5 - Pacific Southwest Region N/A Deb Schoenberg 530-532-7460 dschoenberg@fs.fed.us Description: CA DWR proposes to install a streamgauge station at the PG&E Miocene Dam near Magalia. CE Location: 10/01/2014 08:51 am MT UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - SE 1/4 of SW 1/4 of Section 30, T23N, R4E. Miocene Dam near Magalia, California. Page 7 of 14 Plumas National Forest Project Name Plumas National Forest Debbie Lu Mining Plan of Operations Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) - Minerals and Geology In Progress: Scoping Start 03/20/2014 Expected:08/2014 Expected Implementation Project Contact R5 - Pacific Southwest Region 08/2014 CE Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: Lode mining exploration using hand tools and a small garden-type tractor to maintain old access road. No processing on site, no over-night occupancy. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44948 Location: Geraldine Mining Plan of Operations UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - T21N, R6E, Sec 30. Near Berry Creek, CA. - Minerals and Geology EA In Progress: Notice of Initiation 04/18/2012 Est. Comment Period Public Notice 08/2014 Expected:08/2014 09/2014 Donna Duncan 530-532-7461 dmduncan@fs.fed.us Description: Exploratory work in existing mine adit. Travel on non-system road and staging area near adit. Location: HDH/Millet Mining Plan Of Operations UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - T19N, R6E, Sec 3,10. Near Old Forbestown. - Minerals and Geology EA In Progress: Notice of Initiation 08/17/2011 Est. Comment Period Public Notice 04/2014 Expected:07/2014 07/2014 Donna Duncan 760-379-5646 dmduncan@fs.fed.us Description: Placer mining. Panning, sluicing, dredging. Use of non-system road. Location: Hawkeye Tunnel Plan of Operations UNIT - Feather River Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T20N, R9E, Sec 10, 15, 16. Feather River Ranger District, Plumas national Forest, along Canyon Creek. - Minerals and Geology In Progress: Scoping Start 03/13/2014 CE Expected:08/2014 08/2014 Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: Underground exploration in existing mine adit. Long term occupancy in camp trailer. Use of sluice box and existing settling ponds. Location: 10/01/2014 08:51 am MT UNIT - Feather River Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T22N, R10E, Sec 32. Howland Flat area. Page 8 of 14 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Last Chance Mining Plan of Operations - Minerals and Geology EA In Progress: Notice of Initiation 08/17/2011 Est. Comment Period Public Notice 09/2014 Expected:10/2014 Expected Implementation Project Contact R5 - Pacific Southwest Region 05/2015 Donna Duncan 530-532-7461 dmduncan@fs.fed.us Description: Placer mining along Slate Creek. Dredging, panning and sluicing. Use of non-system road and gated access. Location: Oregon Peak Project CE JoAnna Arroyo - Wildlife, Fish, Rare plants Completed Actual: 04/01/2014 08/2014 530-532-7429 - Vegetation management jarroyo@fs.fed.us (other than forest products) Description: The project purpose is to remove vegetation along a section of road and in addition remove vegetation, prescribed burning, and plant seedlings in an owl PAC. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43834 Location: Pearson Mine Plan of Operations UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas, Sierra. LEGAL - T21N, R9E, Sec 11. Feather River Ranger District, slate creek. UNIT - Feather River Ranger District. STATE - California. COUNTY - Yuba. LEGAL - T18N, R7E, S28&34; T19, R7, S29&32. West of Bullard's Bar and west of Oregon Hill Road between Dobbins and Oregon Peak, Yuba County, California. - Minerals and Geology EA In Progress: Notice of Initiation 06/17/2013 Est. Comment Period Public Notice 08/2014 Expected:09/2014 09/2014 Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: Underground exploration in existing mines, using explosives (with propoer permit) and rock drills underground, and a skip loader outside the portals as well as to maintain the old access road. No processing on site. Canp trailer for overnight stays. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44952 Location: 10/01/2014 08:51 am MT UNIT - Feather River Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T22N, R10E, Sec 32. one mile North of Howland Flat. Page 9 of 14 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Pendola Silviculture Project CE Project Contact R5 - Pacific Southwest Region Errol Solomon - Wildlife, Fish, Rare plants On Hold N/A N/A 530-532-7413 - Vegetation management esolomon@fs.fed.us (other than forest products) - Fuels management Description: The Feather River Ranger District (PNF) is proposing to treat a minimum of 160 acres of plantation ground within the Pendola boundary. Treatments will include: mastication, hand cutting and piling, pile burning, under burning, reforesting and release Location: Provost, Rod - renew permit for existing access road. Expected Implementation UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T18N R7E S2,11,12, 14, 15, and 26. Located near Bullards Reservoir and adjacent to the Challenge community. - Special use management On Hold CE N/A N/A Deb Schoenberg 530-532-7460 dschoenberg@fs.fed.us Description: Continued use and maintenance of an existing access road, approximately 150' on National Forest System lands, to private property. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34303 Location: Sugarloaf Hazardous Fuels Reduction EIS Carol Spinos - Special area management In Progress: Expected:08/2014 09/2014 530-534-6500 - Wildlife, Fish, Rare plants Objection Period Legal Notice cspinos@fs.fed.us - Forest products 07/02/2014 - Vegetation management (other than forest products) - Fuels management - Watershed management Description: Reduce hazardous fuels around the communities of La Porte and American House and reintroduce fire to the landscape. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36549 Location: 10/01/2014 08:51 am MT UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R9E, Section 34. Near Little Grass Valley Reservoir, north of La Porte, California. UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - T22N, R10E, S19, 20, 29-32, T22N, R9E, S24, 25, 35, 36. T21N, R10E, S5-8, T21N, R9E, S1-3, 5-12, 14-22, 27-32, T21N, R8E, S24-26, 35, 36, T20N, R8E, S1, 2, 22, 27, 28, 33, 34. Adjacent to the communities of American House and La Porte within the southeast portion of the Feather River Ranger District. Page 10 of 14 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Taber Mine Plan of Operations - Minerals and Geology EA In Progress: Notice of Initiation 10/10/2012 Est. Comment Period Public Notice 10/2014 Expected:12/2014 Expected Implementation Project Contact R5 - Pacific Southwest Region 05/2015 Donna Duncan 530-532-7461 dmduncan@fs.fed.us Description: Continued Maintenance and clearing of the existing adit. Repair and maintenance of the access road. Use of backhoe to transport material from the adit to the wash plant. Use and maintenance of the settling pond. Use of the historic cabin. Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T22N, R9E, Sec 30. Just off the La Porte road, about 7 miles NE of La Porte, CA. Carol Spinos Union Hill Hazardous Fuels and - Wildlife, Fish, Rare plants In Progress: Expected:08/2014 10/2014 Ecological Restoration Project 530-534-6500 - Forest products Notice of Initiation 01/14/2013 cspinos@fs.fed.us Vegetation management Est. Comment Period Public EA (other than forest products) Notice 05/2014 - Fuels management - Watershed management Description: Modify hazardous fuels conditions to protect local communities. Overcrowded forests pose an increased risk to watersheds and forest resources. Implement restoration activities to improve watershed conditions, enhance wildlife/aquatic habitat, meadows Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41053 Location: Plumas National Forest UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T19N,R8E, S2; T20N, R8E, S22, 25, 26, 27, 35; T20N, R9E, S6, 7, 8, 16, 17, 18, 19, 20, 21, 30; T21N, R9E, S31. West and south of the community of LaPorte, California. Mt. Hough Ranger District (excluding Projects occurring in more than one District) Shenandoah Abandoned Mine Closure - Minerals and Geology In Progress: Scoping Start 06/01/2011 CE Expected:01/2015 R5 - Pacific Southwest Region 04/2015 Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Closure of 5 mine adits at the Shenandoah Mine. Mine closure will provide for public safety. Bat gates and culverts will be installed as needed. Location: 10/01/2014 08:51 am MT UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R7E, NE 1/4 of Section 28. Shenandoah Mine is located within the Bucks Lake Wilderness above the town of Rich Bar. Page 11 of 14 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Bila PGE Telephone Pole Replacement Project - Special use management In Progress: Scoping Start 07/22/2013 Expected:05/2014 Expected Implementation Project Contact R5 - Pacific Southwest Region 05/2014 CE Erika Brenzovich 530-283-7622 ebrenzovich@fs.fed.us Description: PG&E proposes to remove and replace approximatey 25 poles along powerline between Indian Falls and Crescent Mills. New poles will be set 5 feet from old poles with minimal ground disturbance (PG&E project #s 30934013 & 30934088). Location: Bud Lee Placer Mineral Exploration Project UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R9E, section 3 and T26N, R9E, sections 34 and 35. Project is located along highway 89 between highway 70 and Cresent Mills. - Minerals and Geology In Progress: Scoping Start 12/31/2013 Expected:09/2014 09/2014 CE Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: The proposal includes excavation of two test trenches to sample the material for mineral potential. Excavated material would be processed through a grizzly and trommel. Water for processing would be pumped from Mill Creek. Location: Burton Gulch Placer Mining Exploration UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R7E, Section 27. The project is located approximately 25 miles from Quincy, California and southwest of the community of Rich Bar. - Minerals and Geology In Progress: Scoping Start 06/09/2014 Expected:08/2014 09/2014 CE Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: The Plan of Operations proposes excavaton of dry gulch bottoms with a mini excavator. Material will be scanned with a metal detector to recover minerals. Location: Caribou #2 Pole Replacement UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R8E, Sections 4, 5 & 9. Burton Gulch, northwest of Meadow Valley. - Special use management CE Developing Proposal Est. Scoping Start 04/2014 Expected:05/2014 05/2014 Erika Brenzovich 530-283-7622 ebrenzovich@fs.fed.us Description: PGE proposes to replace 2 transmission/power line poles nea Snake lake and Keddie along highway 89 and 70 (PG&E Project #30876102) Location: 10/01/2014 08:51 am MT UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Southwest quater of T25N, R9E, sections 26 and Northwest quarter of T25N, R9E,section 32. Project is located west of highway 89 and 70 and est of Snake Lake and South of Keddie along highway 89 and 70. Page 12 of 14 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Grays Flat Quincy-Caribou PGE Pole Replacement - Special use management In Progress: Scoping Start 07/23/2013 Expected:04/2014 Expected Implementation Project Contact R5 - Pacific Southwest Region 04/2014 CE Erika Brenzovich 530-283-7622 ebrenzovich@fs.fed.us Description: PGE is proposing replacing 16 wood utility poles in two areas on NFS Lands. These two areas are along the Grays Flat-Quincy Caribou #2 Line (PG&E Project #30783963). Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R7E, section 14, 15, 16, 21, 22, and 23. The proposed treatment area is the power line between Grays Flat adn Quincy Caribou #2 Line. Elizabeth Sousa 530-283-7622 esousa@fs.fed.us Greenhorn Creek Guest Ranch Outfitting and Guiding Permit reissue - Recreation management CE Description: Reissue a 10 year O&G Permit for horseback rides and an assigned campsite on Nat Forest Sys land. This is the same operation as the past 10 years, with approximately 39 miles of trail and the majority of the rides with 8 miles of the Ranch Location: Mt. Hough Range Allotment Project In Progress: Scoping Start 12/26/2012 Expected:07/2014 08/2014 UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24 R10,R11 R11 T24 R12. Mt. Hough Ranger District and Little Summit Lake on Beckwourth Ranger District. - Grazing management Developing Proposal Est. Notice of Initiation 08/2015 Expected:09/2016 09/2016 EA T23R10 Kyla Sabo 530-836-7157 kylasabo@fs.fed.us Description: Mount Hough Range Allotments in and around Lone Rock Creek, Lights Creek, and Antelope Lake. Six allotments are included: Lone Rock, Lights Creek, Antelope, Antelope Lake, Hungry Creek, and Taylor Lake. Location: Storrie and Rich Fire Areas Invasive Plant Treatment Project UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - portions of sections in T27N R12E. Mt Hough Ranger District. - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) EA In Progress: Comment Period Public Notice 02/05/2014 Est. Objection Period Legal Notice 12/2014 Expected:04/2017 04/2017 Katherine Carpenter 530-283-7619 kacarpenter@fs.fed.us Description: Treat up to 200 acres annually of priority invasive plant infestations using a combination of manual, mechanical, cultural, and chemical methods on NFS lands in watersheds affected by the Storrie and Rich Fires. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38602 Location: 10/01/2014 08:51 am MT UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T23N R5E; T23N R6E; T24N R5E; T24N R5E; T24N R6E; T24N R7E; T25N R6E; T25N R7E; T25N R8E; T26N R6E; T26N R7E; T26N R8E. Watersheds affected by the Storrie and Rich fires; nearest town is Belden. Page 13 of 14 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Whitlock Ravine Staging Area Development - Recreation management EA In Progress: Notice of Initiation 05/30/2012 Est. Comment Period Public Notice 05/2014 Expected:08/2014 Expected Implementation Project Contact R5 - Pacific Southwest Region 09/2014 Elizabeth Sousa 530-283-7622 esousa@fs.fed.us Description: Create gravel parking and install barriers for an Off Highway Vehicle and Snowmobile Staging Area. Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N R8E Section 12. Whitlock Ravine off County Road 435. Maurice Huynh Wildcat Fuels Reduction and - Wildlife, Fish, Rare plants In Progress: Expected:02/2015 05/2015 Vegetation Management Project - Vegetation management 530-283-7653 Notice of Initiation 01/29/2014 (Wildcat Project) mlhuynh@fs.fed.us (other than forest products) Est. Comment Period Public Watershed management Notice 08/2015 EA - Road management Description: The Wildcat Project proposes to reduce fuels, improve forest health, reduce invasives and improve water quality. The activities include decommissioning non-system and system roads,use of herbicides for invasives and wood product. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43435 Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T27N R12E Sections 13, 10-12, 14 and 15; T27N R13E Section 6; T28N R12E Sections 13-16, 21-24, 25, 28, 34-36; and T28N R13E Sections 30 and 31; Mount Diablo Base Meridian (MDBM). The Wildcat Project is on the Mt. Hough Ranger District of the Plumas National Forest; approximately 3 miles southeast of Janesville and south of Susanville, California. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 10/01/2014 08:51 am MT Page 14 of 14 Plumas National Forest