Schedule of Proposed Action (SOPA) 10/01/2015 to 12/31/2015 Plumas National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact Projects Occurring in more than one Region (excluding Nationwide) Sierra Nevada Forest Plan Amendment (SNFPA) - Land management planning On Hold N/A EIS N/A Donald Yasuda 916-640-1168 dyasuda@fs.fed.us Description: Prepare a narrowly focused analysis to comply with two orders issued by the Eastern District Court of California on November 4, 2009. Correct the 2004 SNFPA Final SEIS to address range of alternatives and analytical consistency issues. Web Link: http://www.fs.fed.us/r5/snfpa/2010seis Location: UNIT - Eldorado National Forest All Units, Lassen National Forest All Units, Modoc National Forest All Units, Sequoia National Forest All Units, Tahoe National Forest All Units, Lake Tahoe Basin Mgt Unit, Carson Ranger District, Bridgeport Ranger District, Plumas National Forest All Units, Sierra National Forest All Units, Stanislaus National Forest All Units, Inyo National Forest All Units. STATE - California, Nevada. COUNTY - Alpine, Amador, Butte, Calaveras, El Dorado, Fresno, Inyo, Kern, Lassen, Madera, Mariposa, Modoc, Mono, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Tulare, Tuolumne, Yuba, Douglas, Esmeralda, Mineral. LEGAL - Along the Sierra Nevada Range, from the Oregon/California border south to Lake Isabella as well as lands in western Nevada. Sierra Nevada National Forests. R5 - Pacific Southwest Region, Occurring in more than one Forest (excluding Regionwide) Liberty Utilities 619 Power Line Maintenance Project EA *UPDATED* Matthew Jedra - Vegetation management Completed Actual: 09/17/2015 11/2015 530-836-7192 (other than forest products) mjedra@fs.fed.us - Special use management Description: Repair and replace power line poles, manage vegetation within the right-of-way and repair existing access route. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46674 Location: UNIT - Sierraville Ranger District, Beckwourth Ranger District. STATE - California. COUNTY - Plumas, Sierra. LEGAL - Sections 4, 5, 6 and 9, Township 22 North, Range 14 East (T22N, R14E) and Section 31, T23N, R14E, Section 1, T22N, R13E. The project is located on the north and northeast side of Beckwourth Peak and east of the city of Portola, in Plumas County, California. Plumas National Forest, Forestwide (excluding Projects occurring in more than one Forest) 10/01/2015 04:24 am MT Page 1 of 20 R5 - Pacific Southwest Region Plumas National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact R5 - Pacific Southwest Region Plumas National Forest, Forestwide (excluding Projects occurring in more than one Forest) Deb Schoenberg 530-532-7460 dschoenberg@fs.fed.us California Department of Water Resources - new permit for existing water monitoring sites - Special use management CE Description: Continued use and maintenance of 20 existing facilities and accessory structures needed to gather data on rainfall and snow depth forest wide, with dedicated winter use helispots. Current permit terminates 12/31/2010. Location: Plumas National Forest OverSnow Vehicle (OSV) Use Designation On Hold N/A N/A UNIT - Plumas National Forest All Units. STATE - California. COUNTY - Butte, Plumas, Sierra. 20 locations Forest Wide. - Recreation management EIS *UPDATED* In Progress: NOI in Federal Register 09/29/2015 Est. DEIS NOA in Federal Register 02/2017 Expected:12/2017 02/2018 David Wood 530-283-7772 dcwood@fs.fed.us Description: Designate over-snow vehicle (OSV) use on National Forest System roads and trails and areas on National Forest System lands as allowed, restricted, or prohibited. Identify trails for snow grooming for OSV use would be conducted. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47124 Location: UNIT - Plumas National Forest All Units. STATE - California. COUNTY - Butte, Lassen, Plumas, Sierra, Yuba. LEGAL - Not Applicable. National Forest System lands administer by the Plumas National Forest (forest-wide). R5 - Pacific Southwest Region Plumas National Forest, Occurring in more than one District (excluding Forestwide) Moonlight Fire Invasive Plant Treatment Project - Vegetation management (other than forest products) EA *UPDATED* In Progress: Scoping Start 08/19/2015 Est. Comment Period Public Notice 12/2015 Expected:06/2016 06/2016 John Slown 406-329-3749 jslown@fs.fed.us Description: Integrated pest management of up to 500 acres of invasive plant infested areas per year, using herbicides on up to 250 acres per year. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46877 Location: 10/01/2015 04:24 am MT UNIT - Mt. Hough Ranger District, Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T26NR10E; T26NR11E; T26NR12E T27NR10E; T27NR11E:; T27NR12E; T27NR13E T28NR10E;T28NR11E;T28NR12E; T28NR13E; Many Sections, Mount Diablo Base Meridian . The project area encompasses watersheds affected by the 2007 Moonlight Fire and ranges approximately 15 to 27 air miles northeast of Quincy, Plumas County, California. Page 2 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Beckwourth-Genesee Dam Project - Special use management In Progress: Scoping Start 07/11/2012 Expected:10/2015 Expected Implementation R5 - Pacific Southwest Region 08/2016 CE *UPDATED* Antonio Duenas 530-836-7156 tduenas@fs.fed.us Description: Remove a cabin, pond, solar panels, natural gas storage tank and septic system from National Forest System lands. A well would be capped and abandoned. Location: Barry Creek A Project Contact UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R14E, Sec29. Off of Beckwourth-Genesee Road (County Road 111). - Fuels management On Hold N/A N/A CE Don Fregulia 530-836-2575 dfregulia@fs.fed.us Description: Fuels reduction treatments on private land using Steven's Funds. Location: Barry Creek B UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N R13E sec13 and sec 14. Off Highway 89 near Calpine Summit down Whitehawk Ranch. - Fuels management On Hold N/A N/A CE Don Fregulia 530-836-2575 dfregulia@fs.fed.us Description: Fuels reduction treatments on private land using Steven's Funds Location: Barry Creek C UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N R13E sec13 and sec 14. Off Highway 89 near Calpine Summit down to Whitehawk Ranch. - Fuels management On Hold N/A CE N/A Don Fregulia 530-836-2575 dfregulia@fs.fed.us Description: Fuels reduction treatments on private land using Steven's Funds Location: 10/01/2015 04:24 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N R13E sec13 and sec 14. Off Highway 89 near Calpine Summit down to Whitehawk Ranch. Page 3 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Beckwourth-Crocker MultiPurpose Trails Project - Recreation management On Hold N/A Expected Implementation Project Contact R5 - Pacific Southwest Region N/A EA Lisa Sedlacek 530-836-7126 lsedlacek@fs.fed.us Description: Develop a multi-purpose (hiking, biking, OHVs, equestrian) trail connecting the Crocker Campground with Red Clover Valley. Establish a staging area at the intersection of Forest Highway 177 and Forest Road 24N23. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41454 Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T 23 and 24N, R14E, Sections 33, 28, 29, 20, 21,16,17. Crocker Campground to road 29N49Y, connecting to quarry road 24N64X to the BG intersection, Crocker Mountain #33. Antonio Duenas 530-836-7156 tduenas@fs.fed.us Cow and Freeman Creeks Stream Improvement Project (Prop50) - Watershed management CE Description: In stream-channel work would include check-dam and grade control structures, laying back banks, and installation of rock structures within the stream to improve fish habitat. *UPDATED* Location: Discovery Placer Exploration Project Cancelled - Minerals and Geology Completed Actual: 09/10/2015 10/2015 Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Claimant proposes to sample the sub-surface material along the remnant stream terrace of Eureka Creek to assess mineral content. Up to 20 test trenches would be excavated with a backhoe. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40981 Location: 10/01/2015 04:24 am MT N/A UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Cow Creek: T23N R13E Section 6 and T24N R13E Section 31. Freeman Creek: T24N R12E Section36. The vicinity of the proposed project is located in the Big Grizzly Creek HUC6 watershed, about 6 miles north of Portola and on the west side of Lake Davis. EA *UPDATED* N/A UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R11E, NE 1/4 of Section 1, MDBM. The Discovery claim is located along NFS Road 23N37 at Eureka Creek, north of Johnsville, CA. Page 4 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Eastside Underburn Project EA *UPDATED* - Vegetation management (other than forest products) - Fuels management In Progress: Scoping Start 10/15/2014 Est. Comment Period Public Notice 10/2015 Expected:02/2016 Expected Implementation Project Contact R5 - Pacific Southwest Region 04/2016 Sara Billings 530-836-7136 sbillings@fs.fed.us Description: This project proposes to enhance resource protection from wildfire, improve forest health, and maintain and continue restoring fire adapted ecosystems on the eastside of the Beckwourth District through underburning. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45650 Location: Elwell Lakes Lodge Permit Reissue UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Lassen, Plumas. LEGAL - Not Applicable. North of highway 70, south and west of highway 395 and east of Antelope Lake. - Special use management In Progress: Scoping Start 04/01/2015 Expected:10/2015 01/2016 CE *UPDATED* Debra Fryberger-Eby 530-836-7120 dfrybergereby@fs.fed.u s Description: Re-issue a 20 year special use permit for Elwell Lakes Lodge. Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Section 7 and 8, T. 21 N., R. 12 E., Mt. Diablo Meridian. Elwell Lakes Lodge is located in the Lakes Basin Recreation Area near the community of Graeagle, California. Feather River Inn Water System - Special use management CE In Progress: Scoping Start 04/01/2015 Expected:10/2015 10/2015 Robert Hawkins 916-849-8037 rhhawkins@fs.fed.us Description: Re-Issue a 30 year special use authorization to Schomac, Inc. for the Feather River Inn water system. The water system includes two diversion structures, a storage tank, waterlines and road and trail access. Location: 10/01/2015 04:24 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Section 3, T. 22 N., R. 12 E., Mt Diablo Meridian. The water system is located along Bonta Creek just north of the National Forest boundary and the Feather River Inn. Page 5 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Frazier Creek Placer Exploration Project - Minerals and Geology EA *UPDATED* In Progress: Scoping Start 06/10/2014 Est. Comment Period Public Notice 10/2015 Expected:12/2015 Expected Implementation Project Contact R5 - Pacific Southwest Region 04/2016 Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Exploration for minerals using hand tools to excavate material. Material processed through a highbanker. Water pumped from Frazier Creek and returned to settling pit. Plan will authorize replacement of gate and use of gate and spur road. Location: Happy Valley Aspen and Meadow Restoration Project CE *UPDATED* Matthew Jedra - Wildlife, Fish, Rare plants Completed Actual: 08/27/2015 12/2015 530-836-7192 - Vegetation management mjedra@fs.fed.us (other than forest products) Description: Restore and release aspen from conifer competition, as well as to restore the original meadow and potential areas to their historic state surrounding the aspen stand. Location: Ingalls Underburn CE *NEW LISTING* UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T23N, R12E, S2, 3 and 10. 8 miles NE of the town of Cromberg, CA, on Highway 89/70, off of Mt. Tomba Rd to Forest Road 23N11, in the Happy Valley Area. - Wildlife, Fish, Rare plants Completed Actual: 06/22/2015 - Vegetation management (other than forest products) - Fuels management Description: Underburn units to reduce fuel loadings within the project area. Location: 10/01/2015 04:24 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R12E, Section 27. Frazier Creek just south of Gold Lake Highway and south of the town of Graeagle. 09/2015 Kyla Sabo 530-836-7157 kylasabo@fs.fed.us UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R12E, Sec 1116, T24N, R13E, Sec 8, 9, 16, 17. North and northwest of Lake Davis. Page 6 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Lakes Basin Project EIS *UPDATED* Project Contact R5 - Pacific Southwest Region Kyla Sabo - Recreation management Developing Proposal Expected:05/2017 10/2017 530-836-7157 - Forest products Est. NOI in Federal Register kylasabo@fs.fed.us - Vegetation management 10/2015 (other than forest products) - Fuels management Description: Improve forest health and reduce hazards around recreation sites. Activities include mechanical thinning, grapple piling, mastication, hand thinning and underburning. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40964 Location: Last Chance Creek Phase II Restoration Project Expected Implementation UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas, Sierra. LEGAL - Not Applicable. Lakes Basin recreation area. - Watershed management On Hold N/A N/A EIS Antonio Duenas 530-836-7156 tduenas@fs.fed.us Description: Restore the hydrologic function of approximately 7.8 miles of Last Chance Creek and 402 acres of degraded meadow system. Location: Long Lake Boat Storage Special Use Permit UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - The project area is in Sections 9, 10, 11, 14, and 15 of T26N, R13E and Sections 15, 16, and 17 of T26N, R14E. Last Chance HUC 5 watershed. - Special use management In Progress: Scoping Start 07/29/2015 Expected:10/2015 11/2015 CE *NEW LISTING* Description: The Long Lake Boat Assoc. has requested a permit to store personal watercraft at Long Lake. The proposal includes building a boat house and installing a removable dock. Several types of watercraft are proposed; gas, electric and non-motorized. Location: Mills Placer Exploration Project UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T 21 N, R 12 E, Sec 7. Long Lake in the Lakes Basin Recreation Area. - Minerals and Geology Completed CE *UPDATED* Actual: 07/30/2015 08/2015 Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Excavation of test pits with a tracked excavator. Material will be removed, scanned with a metal detector and then returned to the hole. Some brush and logging slash will be moved to access the test areas. Location: 10/01/2015 04:24 am MT Debra Fryberger-Eby 530-836-7120 dfrybergereby@fs.fed.u s UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N, R12E, Sections 9 & 10, MDBM. The claim is located south of Mills Peak Lookout and south of the community of Graeagle. Page 7 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Ramelli and Hall Allotments - Grazing management On Hold N/A Expected Implementation Project Contact R5 - Pacific Southwest Region N/A EA Scott Lusk 530-836-7165 salusk@fs.fed.us Description: The Ramelli and Hall range allotments are currently vacant. The project proposes to allow them to be utilized as a swing allotment. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=21898 Location: Rush Skeleton Weed Project EA *UPDATED* - Vegetation management (other than forest products) In Progress: Expected:11/2015 05/2016 Michael Friend 530-836-7167 mjfriend@fs.fed.us Description: Rush skeleton weed would be sprayed with aminocyclopyrachlor chlorsulfuron (e.g. Perspective)or aminopyralid triclopyr (e.g. Capstone or Milestone Plus) or a combination of these herbicides with A surfactant (e.g. methylated seed oil) and dye. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43804 Location: Two Rivers Soccer Camp Permit Re-issue UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Lassen, Plumas. LEGAL - portions of sections 25-31, 1-11, 16-34. Beckwourth Ranger District. UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R11E, Sec. 1, SE 1/4 of NE 1/4. Eureka Creek at Discovery Mine and adjacent to National Forest System road 23N37, approximately 3 air miles northwest of the Beckwourth Ranger Station. T22N, R11E, Sec. 1, SE 1/4 of NE 1/4. - Special use management In Progress: Scoping Start 05/01/2015 Expected:09/2015 CE 09/2015 Debra Fryberger-Eby 530-836-7120 dfrybergereby@fs.fed.u s Description: Re-issue a 20 year permit to Two Rivers Soccer Camp for the following uses: bridge, road, parking area, portion of a soccer field, water transmission lines, storage tank and spring boxes. Location: Plumas National Forest 10/01/2015 04:24 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Sections 30, 31, 32, T. 22 N., R. 12E., Mt. Diablo Meridian. Two Rivers Soccer Camp is located near Blairsden, California. Feather River Ranger District (excluding Projects occurring in more than one District) Page 8 of 20 R5 - Pacific Southwest Region Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Feather River RD Abandoned Mine Closures 2015 - Minerals and Geology In Progress: Scoping Start 08/13/2015 Expected:10/2015 Expected Implementation R5 - Pacific Southwest Region 10/2015 CE *NEW LISTING* UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte, Plumas, Sierra. LEGAL - Not Applicable. T21N, R9E, Sec 17; T21N, R10E, Sec 8, 24 & 18; T22N, R10E, Sec 29; T23N, R6E, Sec26;. - Minerals and Geology Cancelled N/A N/A CE *NEW LISTING* Donna Duncan 530-532-7461 dmduncan@fs.fed.us Description: Use of backhoe/frontloader to dig sample holes up to 10 ft deep. Total of 25 cy or less. Materail to be sluiced in Nelson creek. Occupancy on claim in campers, with toilets/porta-potties. Location: California Department of Water Resources - Amend permit to install a streamgauge at 2nd location Donna Duncan 530-532-7461 dmduncan@fs.fed.us Description: Closure of abandoned mine openings at 6 sites, for public safety. Use of bat friendly gates in openings with bat habitat. Use of foam plugs in other openings. Closure of non-system access routes. Location: 7N7 Mining Plan of Operations Project Contact UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R11E, Sec30. West branch of Nelson Creek, Aprrox 6 miles west of Johnsville, CA. - Special use management On Hold N/A N/A Deb Schoenberg 530-532-7460 dschoenberg@fs.fed.us Description: CA DWR proposes to install a streamgauge station at the PG&E Miocene Dam near Magalia. CE Location: Challenge Substation Salvage CE UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - SE 1/4 of SW 1/4 of Section 30, T23N, R4E. Miocene Dam near Magalia, California. - Forest products - Special use management Completed Actual: 07/01/2015 07/2015 Eric Murphy 530-532-8922 ejmurphy@fs.fed.us Description: Salvage 5 large ponderosa pines cut at Pacific Gas and Electric Company substation for line protection. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47247 Location: 10/01/2015 04:24 am MT UNIT - Feather River Ranger District. STATE - California. COUNTY - Yuba. LEGAL - T19N R7E SW1/4 Section 20. Immediately east of, and along side of, intersection of LaPorte and Old LaPorte roads. Page 9 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Feather River Ranger District - Minerals and Geology Abandoned Mine Closures 2015 In Progress: Scoping Start 08/14/2015 Expected:10/2015 Expected Implementation R5 - Pacific Southwest Region 10/2015 CE *NEW LISTING* Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: The proposed action includes closing the abandoned mine openings and removal of trash on the sites. Items identified as historical will not be disturbed. Non-system access routes not required for other forest uses will be closed and reclaimed. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47565 Location: Forbestown - Community Protection Fuel Reduction (CPFR) Project Contact UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N, R9E, sec 17; T21N, R10E, Sec 18, 24; T22N, R10E, Sec 8, 29; T23N, R6E, Sec 26. Famous 49er AML site, Pacific AML site, Wahoo Air Shaft AML site, Ophir Mine AML site, Sawmill Ridge AML site, Little North Fork AML site. - Forest products - Fuels management EA In Progress: Scoping Start 07/20/2015 Est. Comment Period Public Notice 12/2015 Expected:02/2016 02/2016 Jason Vermillion 530-532-7434 jvermillion@fs.fed.us Description: This wildland urban interface (WUI) project is designed to reduce the risks of wildfire around the community of Forbestown, enhance firefighter safety and remove hazardous trees along roads. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47250 Location: HDH/Millet Mining Plan Of Operations UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte, Yuba. LEGAL - T19N R6E Sections 2, 3, 4, 5, 8, 9, 11, 14, 15 and 16. Roadside corridors and accessible Forest lands around the community of Forbestown, CA. - Minerals and Geology EA *UPDATED* In Progress: Scoping Start 08/17/2011 Est. Comment Period Public Notice 11/2015 Expected:02/2016 05/2016 Donna Duncan 760-379-5646 dmduncan@fs.fed.us Description: Placer mining. Panning, sluicing, dredging. Use of non-system road. Location: 10/01/2015 04:24 am MT UNIT - Feather River Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T20N, R9E, Sec 10, 15, 16. Feather River Ranger District, Plumas national Forest, along Canyon Creek. Page 10 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Expected Implementation Project Contact R5 - Pacific Southwest Region Cindy Roberts 530-532-7467 ckroberts@fs.fed.us Hughes Pond California RedLegged Frog (CRLF) Critical Habitat Restoration Project - Wildlife, Fish, Rare plants CE Description: Critical habitat for the California Red-Legged Frog, a federally listed threatened species, has been designated within the French Creek watershed. The primary goal is to protect and improve breeding habitat by controlling water levels. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47613 *NEW LISTING* Location: Last Chance Mining Plan of Operations In Progress: Scoping Start 08/21/2015 Expected:09/2015 10/2015 UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - Mount Diablo Meridian, California, T. 22 N., R. 5 E., Section 34. Hughes Pond is located approximately 3 miles northwest of Brush Creek Work Station. - Minerals and Geology EA *UPDATED* In Progress: Scoping Start 08/17/2011 Est. Comment Period Public Notice 11/2015 Expected:03/2016 05/2016 Donna Duncan 530-532-7461 dmduncan@fs.fed.us Description: Placer mining along Slate Creek. Dredging, panning and sluicing. Use of non-system road and gated access. Location: Pearson Mine Plan of Operations UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas, Sierra. LEGAL - T21N, R9E, Sec 11. Feather River Ranger District, slate creek. - Minerals and Geology EA *UPDATED* In Progress: Scoping Start 06/17/2013 Est. Comment Period Public Notice 11/2015 Expected:02/2016 05/2016 Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: Underground exploration in existing mines, using explosives (with proper permit) and rock drills underground, and a skip loader outside the portals as well as to maintain the old access road. No processing on site. Camp trailer for overnight stays. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44952 Location: 10/01/2015 04:24 am MT UNIT - Feather River Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T22N, R10E, Sec 32. one mile North of Howland Flat. Page 11 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Expected Implementation Project Contact R5 - Pacific Southwest Region Cindy Roberts Peavine Creek, Coon Creek and - Wildlife, Fish, Rare plants Completed Actual: 05/23/2014 05/2014 Buckhorn Creek Aquatic 530-532-7467 - Watershed management Organism Passage ckroberts@fs.fed.us - Road management Improvements Description: The Peavine Creek, Coon Creek and Buckhorn Creek Aquatic Organism Passage (AOP) Improvement Project CE would upgrade road stream crossing drainage infrastructures to restore upstream and downstream passage to *NEW LISTING* high quality aquatic habitats. Location: Pendola Silviculture Project CE Errol Solomon - Wildlife, Fish, Rare plants Completed Actual: 06/06/2011 08/2011 530-532-7413 - Vegetation management esolomon@fs.fed.us (other than forest products) - Fuels management Description: The Feather River Ranger District (PNF) is proposing to treat a minimum of 160 acres of plantation ground within the Pendola boundary. Treatments will include: mastication, hand cutting and piling, pile burning, under burning, reforesting and release Location: Provost, Rod - renew permit for existing access road. UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - T22N R6E section 21; T23N R7E section 20. The Peavine Creek, Coon Creek and Buckhorn Creek AOP Improvements Project is located along Forest Service (FS) Road #22N12X and #22N18 in Butte County, California. UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T18N R7E S2,11,12, 14, 15, and 26. Located near Bullards Reservoir and adjacent to the Challenge community. - Special use management On Hold N/A N/A CE Deb Schoenberg 530-532-7460 dschoenberg@fs.fed.us Description: Continued use and maintenance of an existing access road, approximately 150' on National Forest System lands, to private property. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34303 Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R9E, Section 34. Near Little Grass Valley Reservoir, north of La Porte, California. Mary Sullivan 530-532-7460 mcsullivan@fs.fed.us Reissue Special Use Permit for Paradise Lake Picnic Area and Access Road - Special use management CE Description: Reissue two Special Use Permits to Paradise Irrigation District (P.I.D.) for the Paradise Lake Picnic Area; and access road operation and maintenance. Location: 10/01/2015 04:24 am MT In Progress: Scoping Start 02/10/2015 Expected:09/2015 11/2015 UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - T23N R3E, Sections 12 & 18. Paradise Lake, Magalia, CA. Page 12 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Sugarloaf Hazardous Fuels Reduction EIS *UPDATED* Project Contact R5 - Pacific Southwest Region Carol Spinos - Special area management Completed Actual: 09/19/2014 11/2014 530-534-6500 - Wildlife, Fish, Rare plants 09/18/2014 cspinos@fs.fed.us - Forest products 09/18/2014 - Vegetation management (other than forest products) - Fuels management - Watershed management Description: Reduce hazardous fuels around the communities of La Porte and American House and reintroduce fire to the landscape. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36549 Location: Taber Mine Plan of Operations Expected Implementation UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - T22N, R10E, S19, 20, 29-32, T22N, R9E, S24, 25, 35, 36. T21N, R10E, S5-8, T21N, R9E, S1-3, 5-12, 14-22, 27-32, T21N, R8E, S24-26, 35, 36, T20N, R8E, S1, 2, 22, 27, 28, 33, 34. Adjacent to the communities of American House and La Porte within the southeast portion of the Feather River Ranger District. - Minerals and Geology EA *UPDATED* In Progress: Scoping Start 07/17/2012 Est. Comment Period Public Notice 11/2015 Expected:02/2016 05/2016 Donna Duncan 530-532-7461 dmduncan@fs.fed.us Description: Continued Maintenance and clearing of the existing adit. Repair and maintenance of the access road. Use of backhoe to transport material from the adit to the wash plant. Use and maintenance of the settling pond. Use of the historic cabin. Location: Plumas National Forest UNIT - Feather River Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T22N, R9E, Sec 30. Just off the La Porte road, about 7 miles NE of La Porte, CA. Mt. Hough Ranger District (excluding Projects occurring in more than one District) Shenandoah Abandoned Mine Closure - Minerals and Geology In Progress: Scoping Start 06/01/2011 CE *UPDATED* 04/2016 Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Closure of 5 mine adits at the Shenandoah Mine. Mine closure will provide for public safety. Bat gates and culverts will be installed as needed. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36352 Location: 10/01/2015 04:24 am MT Expected:11/2015 R5 - Pacific Southwest Region UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R7E, NE 1/4 of Section 28. Shenandoah Mine is located within the Bucks Lake Wilderness above the town of Rich Bar. Page 13 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Mt. Hough Ranger District (excluding Projects occurring in more than one District) Antelope Lake Fuels Reduction - Fuels management CE *UPDATED* Butterfly Twain Fuels Reduction and Landscape Restoration Project EA *NEW LISTING* R5 - Pacific Southwest Region 06/2016 Maurice Huynh 530-836-2575 mlhuynh@fs.fed.us UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Township 27N, Range 12E, Sections 13, 14, 15, 23, and 24, MDBM, Plumas County, California. The total project area is approximately 388 acres and is located north of Antelope Lake and within the Antelope Lake Recreation Area along National Forest System Roads 27N41 and 27N47. UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. Approximately 4 miles northwest of Quincy, California, between the communities of Butterfly Valley and Twain in Plumas County, California. - Minerals and Geology Completed CE Actual: 07/31/2015 07/2015 Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: Cal Trans removal of 150 cubic yards of material from the Chips Creek disposal site, for landscaping in the Quincy Maint. yard and along Hwy 70 for roadside landscaping. Material to be screened & washed on site. Reclamation to include recontouring. Location: 10/01/2015 04:24 am MT Expected:10/2015 Project Contact David Kinateder - Wildlife, Fish, Rare plants Developing Proposal Expected:10/2016 10/2016 530-283-7673 - Forest products Est. Scoping Start 09/2015 djkinateder@fs.fed.us - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management Description: Reduce hazardous fuels; improve forest health; restore plant and wildlife habitat; improve transportation system and soil and water quality; and reduce invasive plants. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47559 Location: Cal Trans Chips Creek Mineral Materials Permit In Progress: Scoping Start 06/22/2015 Expected Implementation Description: This is a project designed to reduce hazardous fuels in and around the Antelope Lake Recreation Area. Proposed activities include hand thinning and piling, grapple piling, prescribed burning and/or pile burning. Location: *UPDATED* Decision UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R6E, Sec 23 SE. Along Hwy 70 in the Feather River canyon, Mile marker 13.58, adjacent to Chips Creek. Page 14 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Caribou #2 Pole Replacement - Special use management On Hold N/A Expected Implementation Project Contact R5 - Pacific Southwest Region N/A CE Erika Brenzovich 530-283-7622 ebrenzovich@fs.fed.us Description: PGE proposes to replace 2 transmission/power line poles nea Snake lake and Keddie along highway 89 and 70 (PG&E Project #30876102) Location: Claremont Watershed Improvement Project CE *NEW LISTING* Kelby Gardiner 10/2015 - Wildlife, Fish, Rare plants Developing Proposal Expected:10/2015 530-283-7686 - Vegetation management Est. Scoping Start 09/2015 kgardiner@fs.fed.us (other than forest products) - Fuels management - Watershed management Description: Remove encroaching conifers from aspen and meadow habitats (hand pile and burn material), unclassified road obliteration, and non-motorized trail construction/reconstruction. Location: Grays Flat Quincy-Caribou PGE Pole Replacement UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Southwest quater of T25N, R9E, sections 26 and Northwest quarter of T25N, R9E,section 32. Project is located west of highway 89 and 70 and est of Snake Lake and South of Keddie along highway 89 and 70. UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. Meadow Valley area southeast to the Claremont area. Sec 4,9,10,13 of T23NR8E; sec 1,6,11,12,17,18 of T23NR9E; sec 6,7,8 of T23NR10E; sec 12,24,25 of T24NR8E; sec 30 of T24R9E; sec 31 of T25NR9E MDBM. - Special use management On Hold N/A N/A CE Erika Brenzovich 530-283-7622 ebrenzovich@fs.fed.us Description: PGE is proposing replacing 16 wood utility poles in two areas on NFS Lands. These two areas are along the Grays Flat-Quincy Caribou #2 Line (PG&E Project #30783963). Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R7E, section 14, 15, 16, 21, 22, and 23. The proposed treatment area is the power line between Grays Flat adn Quincy Caribou #2 Line. Elizabeth Sousa 530-283-7622 esousa@fs.fed.us Greenhorn Creek Guest Ranch Outfitting and Guiding Permit reissue - Recreation management CE Description: Reissue a 10 year O&G Permit for horseback rides and an assigned campsite on Nat Forest Sys land. This is the same operation as the past 10 years, with approximately 39 miles of trail and the majority of the rides with 8 miles of the Ranch *UPDATED* Location: 10/01/2015 04:24 am MT In Progress: Scoping Start 12/26/2012 Expected:12/2015 01/2016 UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24 R10,R11 R11 T24 R12. Mt. Hough Ranger District and Little Summit Lake on Beckwourth Ranger District. Page 15 of 20 T23R10 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Herby's Mining Plan of Operations - Minerals and Geology EA *NEW LISTING* In Progress: Scoping Start 08/13/2015 Est. Comment Period Public Notice 11/2015 Expected:05/2016 Expected Implementation Project Contact R5 - Pacific Southwest Region 05/2016 Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: Locatable minerals exploration. Use of small rubber tired tractor for road maintenance and removing overburden and waste rock. Occupancy in camp trailer. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47642 Location: Jackass Creek Bridge Replacement Project UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T26N, R12E, Sec 4, MDBM. Southwest of Antelope Lake. - Watershed management - Road management Developing Proposal Est. Scoping Start 09/2015 Expected:04/2016 06/2016 EA *NEW LISTING* Description: This project proposes to replace the Jackass Creek Bridge on National Forest System Trail 6M40 to meet Forest Service bridge design standards. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47659 Location: Lorenzen - Haskins Creek Water Association Amendment UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Township 24N, Range 6E, Section 16, Mount Diablo Meridian, California. West of Quincy, CA by way of State Highway 70 near the Tobin Quarry on NFS Trail 6M40. - Special use management Completed Actual: 08/12/2015 08/2015 CE *UPDATED* Elizabeth Sousa 530-283-7622 esousa@fs.fed.us Description: Cabin owner in Haskins Valley is proposing to dig a trench for a waterline and also be added to a water association special use permit. Location: Mt Hough Abandoned Mine Closures-2015 Lisa Whitcomb 414-332-0871 lwhitcomb@fs.fed.us UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. T23N R7E section 12. - Minerals and Geology In Progress: Scoping Start 06/25/2015 CE Expected:09/2015 10/2015 Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: Safety closures for 3 abandoned mines, using bat friendly gates or filling in (possibly using PUF). Removal of non-historic trash. Location: 10/01/2015 04:24 am MT UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T27N, R9E, Sec 16 NE; T26N, R8E, Sec 18 NE; T26N, R9E, Sec 23 NE. West of Greenville, CA, Mt Hough Ranger District. Page 16 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Mt. Hough Range Allotment Project - Grazing management Developing Proposal Est. Scoping Start 01/2016 Expected:12/2016 Expected Implementation R5 - Pacific Southwest Region 01/2017 EA *UPDATED* UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - portions of sections in T27N R12E. Mt Hough Ranger District. PG&E Big Meadows Pole - Special use management Replacement & Reconductoring In Progress: Scoping Start 08/10/2015 Expected:10/2015 10/2015 CE Erika Brenzovich 530-283-7620 ebrenzovich@fs.fed.us Description: The project would involve the reconductoring of approximately 5,249 feet of overhead conductor, 4 pole replacements, 1 pole installation, 2 pole removals, 6 anchor replacements and/or installations, and various other overhead work. Location: Pioneer/Caribou Mining Project Kyla Sabo 530-836-7157 kylasabo@fs.fed.us Description: Mount Hough Range Allotments in and around Lone Rock Creek, Lights Creek, and Antelope Lake. Six allotments are included: Lone Rock, Lights Creek, Antelope, and Antelope Lake. Location: *NEW LISTING* Project Contact UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Township 27N, Range 8E, Sections 20 and 28 MDM. The project is located about 0.13 mile south of State Highway 89 (CA 89) (0.4 mile west of the intersection of Highways 147 and 89) located near Canyon Dam and Lake Almanor. - Minerals and Geology EA *UPDATED* In Progress: Scoping Start 05/28/2015 Est. Comment Period Public Notice 11/2015 Expected:01/2016 03/2016 Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Excavation of underground river channel deposits with hand tools. Material to be loaded into ore cart for extraction. Material is processed through a trommel. Finer material is amalgamated. Location: Rich Fire Restoration: National Forest System (NFS) Road 25N20 Improvement Project CE *UPDATED* Kurt Sable 10/2015 - Wildlife, Fish, Rare plants In Progress: Expected:10/2015 530-258-5176 - Watershed management Scoping Start 04/30/2015 ksable@fs.fed.us - Road management Description: The project would improve drainage on NFS Road 25N20 by outsloping, installing drainage dips and armoring road surface and drainage outlets. A short Non-system spur would be blocked. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46878 Location: 10/01/2015 04:24 am MT UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T26N, R7E, Sections 27 and 34, MDBM. Approximately 6 miles northeast of Belden, CA. UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - The entire project is located within Township 25N, Range 8E, and sections 18, 20-23, and 26-28. (MDBM). NFS road 25N20 begins near Virgilia, California, off of State Highway 70, and climbs the south side of the Feather River Canyon. A short non-system spur to be closed parallels 25N20 for 0.2 mile. Page 17 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) South Alma Salvage CE *UPDATED* - Forest products - Fuels management Expected:09/2015 Project Contact R5 - Pacific Southwest Region 09/2015 Frank Hanson 530-283-7647 fhanson@fs.fed.us Description: The project includes salvage of commercial timber blown down within 25 acres of the Chip's Fire salvage area. Proposed activities include bucking-trimming, log skidding operation, landing operations, log haul, and slash treatment. Location: Spanish Creek Campground Mineral Withdrawal In Progress: Scoping Start 05/11/2015 Expected Implementation UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T27N, R8E, Sec. 28, 29, 32, & 33, Mt Diablo Base & Meridian. This project is located within the footprint of the 2012 Chips Fire immediately south of Lake Almanor, CA, southwest of the unincorporated town of Canyon Dam, CA. - Recreation management EA *UPDATED* In Progress: Scoping Start 12/18/2014 Est. Comment Period Public Notice 11/2015 Expected:01/2016 02/2016 Erika Brenzovich 530-283-7622 ebrenzovich@fs.fed.us Description: Project proposal is to withdraw 82.5 acres encompassing the Spanish Creek Campground from mineral location, entry, and patenting. Location: Storrie Fire Restoration Upper North Fork Road Improvement (HYDS72) CE *NEW LISTING* Kurt Sable - Wildlife, Fish, Rare plants Completed Actual: 09/24/2015 09/2015 530-258-5176 - Watershed management ksable@fs.fed.us - Road management Description: Improve drainage on NFS roads 26N23, 27N98, and Plumas County Road 306. Culverts and rolling dips will be installed or maintained. Sections of road will be armored with rock. The Owl Creek stream crossing will be replaced at Logan Tunnel. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47688 Location: 10/01/2015 04:24 am MT UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. Spanish Creek Campground, approximately 6 miles northwest of Quincy, CA. Legal location T25N, R9E, Section 15, MDBM. UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Township 25N, Range 7E, sections 1 and 2. Township 26N, Range 7E, section 13. Township 26N, Range 8E, sections 4, 6, 7, 8, 9, 10, 14, 16, 17, 18, 20, , Township 27N, Range 8E, sections 28 and 33. (MDBM), Plumas County, California). These roads are in watersheds affected by the Storrie Fire within the Chips Fire perimeter in the Upper North Fork Feather Watershed. They are located between Caribou and Butt Valley Dam. Page 18 of 20 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Storrie and Rich Fire Areas Invasive Plant Treatment Project EA *UPDATED* Project Contact R5 - Pacific Southwest Region Gretchen Jehle - Wildlife, Fish, Rare plants In Progress: Expected:10/2015 03/2016 530-283-7619 - Vegetation management Scoping Start 09/08/2015 gjehle@fs.fed.us (other than forest products) Description: Treat up to 200 acres annually of priority invasive plant infestations using a combination of manual, mechanical, cultural, and chemical methods on NFS lands in watersheds affected by the Storrie and Rich Fires. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38602 Location: Whitlock Ravine Staging Area Development Expected Implementation UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T23N R5E; T23N R6E; T24N R5E; T24N R5E; T24N R6E; T24N R7E; T25N R6E; T25N R7E; T25N R8E; T26N R6E; T26N R7E; T26N R8E. Watersheds affected by the Storrie and Rich fires, approximately 20 miles northwest of Quincy, California; nearest town is Belden. - Recreation management On Hold EA N/A N/A Elizabeth Sousa 530-283-7622 esousa@fs.fed.us Description: Create gravel parking and install barriers for an Off Highway Vehicle and Snowmobile Staging Area. Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N R8E Section 12. Whitlock Ravine off County Road 435. Maurice Huynh Wildcat Fuels Reduction and - Wildlife, Fish, Rare plants In Progress: Expected:01/2016 01/2016 Vegetation Management Project - Vegetation management 530-283-7653 Comment Period Public Notice (Wildcat Project) mlhuynh@fs.fed.us (other than forest products) 04/22/2015 - Fuels management EA - Watershed management *UPDATED* - Road management Description: The Wildcat Project proposes to reduce fuels, improve forest health, reduce invasives and improve water quality. The activities include decommissioning non-system and system roads,use of herbicides for invasives and wood product. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43435 Location: 10/01/2015 04:24 am MT UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T27N R12E Sections 13, 10-12, 14 and 15; T27N R13E Section 6; T28N R12E Sections 13-16, 21-24, 25, 28, 34-36; and T28N R13E Sections 30 and 31; Mount Diablo Base Meridian (MDBM). The Wildcat Project is on the Mt. Hough Ranger District of the Plumas National Forest; approximately 3 miles southeast of Janesville and south of Susanville, California. Page 19 of 20 Plumas National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 10/01/2015 04:24 am MT Page 20 of 20 Plumas National Forest