Schedule of Proposed Action (SOPA) 04/01/2016 to 06/30/2016 Plumas National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact Projects Occurring in more than one Region (excluding Nationwide) Sierra Nevada Forest Plan Amendment (SNFPA) - Land management planning On Hold N/A N/A EIS Donald Yasuda 916-640-1168 dyasuda@fs.fed.us Description: Prepare a narrowly focused analysis to comply with two orders issued by the Eastern District Court of California on November 4, 2009. Correct the 2004 SNFPA Final SEIS to address range of alternatives and analytical consistency issues. Web Link: http://www.fs.fed.us/r5/snfpa/2010seis Location: UNIT - Eldorado National Forest All Units, Lassen National Forest All Units, Modoc National Forest All Units, Sequoia National Forest All Units, Tahoe National Forest All Units, Lake Tahoe Basin Mgt Unit, Carson Ranger District, Bridgeport Ranger District, Plumas National Forest All Units, Sierra National Forest All Units, Stanislaus National Forest All Units, Inyo National Forest All Units. STATE - California, Nevada. COUNTY - Alpine, Amador, Butte, Calaveras, El Dorado, Fresno, Inyo, Kern, Lassen, Madera, Mariposa, Modoc, Mono, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Tulare, Tuolumne, Yuba, Douglas, Esmeralda, Mineral. LEGAL - Along the Sierra Nevada Range, from the Oregon/California border south to Lake Isabella as well as lands in western Nevada. Sierra Nevada National Forests. R5 - Pacific Southwest Region Plumas National Forest, Forestwide (excluding Projects occurring in more than one Forest) Deb Schoenberg 530-532-7460 dschoenberg@fs.fed.us California Department of Water Resources - new permit for existing water monitoring sites - Special use management CE Description: Continued use and maintenance of 20 existing facilities and accessory structures needed to gather data on rainfall and snow depth forest wide, with dedicated winter use helispots. Current permit terminates 12/31/2010. *UPDATED* Location: 04/01/2016 04:08 am MT Cancelled N/A N/A UNIT - Plumas National Forest All Units. STATE - California. COUNTY - Butte, Plumas, Sierra. 20 locations Forest Wide. Page 1 of 21 Plumas National Forest Project Name Project Purpose Planning Status Decision - Recreation management EIS In Progress: NOI in Federal Register 09/29/2015 Est. DEIS NOA in Federal Register 02/2017 Project Contact R5 - Pacific Southwest Region Plumas National Forest, Forestwide (excluding Projects occurring in more than one Forest) Plumas National Forest OverSnow Vehicle (OSV) Use Designation Expected Implementation Expected:12/2017 02/2018 David Wood 530-283-7772 dcwood@fs.fed.us Description: Designate over-snow vehicle (OSV) use on National Forest System roads and trails and areas on National Forest System lands as allowed, restricted, or prohibited. Identify trails for snow grooming for OSV use would be conducted. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47124 Location: UNIT - Plumas National Forest All Units. STATE - California. COUNTY - Butte, Lassen, Plumas, Sierra, Yuba. LEGAL - Not Applicable. National Forest System lands administer by the Plumas National Forest (forest-wide). R5 - Pacific Southwest Region Plumas National Forest, Occurring in more than one District (excluding Forestwide) Lisa Whitcomb 414-332-0871 lwhitcomb@fs.fed.us Hungry Creek Watershed Road Maintenance and Stony Quarry Development Project - Watershed management - Road management CE Description: General maintenance and road improvement activities on approximately 40 miles of national forest system roads. Decommissioning of non-system roads. Development of the Stony Quarry gravel pit. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48324 *UPDATED* Location: 04/01/2016 04:08 am MT In Progress: Scoping Start 02/08/2016 Expected:03/2016 06/2016 UNIT - Mt. Hough Ranger District, Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. The road maintenance activities are located within the Hungry Creek watershed, which is approximately 15 miles northeast of Quincy, CA. The Stony Quarry is located 10 miles further east. Page 2 of 21 Plumas National Forest Project Name Project Purpose Planning Status Decision - Vegetation management (other than forest products) EA *UPDATED* In Progress: Scoping Start 08/19/2015 Est. Comment Period Public Notice 07/2016 Project Contact R5 - Pacific Southwest Region Plumas National Forest, Occurring in more than one District (excluding Forestwide) Moonlight Fire Invasive Plant Treatment Project Expected Implementation Expected:12/2016 12/2016 John Slown 406-329-3749 jslown@fs.fed.us Description: Integrated pest management of up to 500 acres of invasive plant infested areas per year, using herbicides on up to 250 acres per year. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46877 Location: Plumas National Forest UNIT - Mt. Hough Ranger District, Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T26NR10E; T26NR11E; T26NR12E T27NR10E; T27NR11E:; T27NR12E; T27NR13E T28NR10E;T28NR11E;T28NR12E; T28NR13E; Many Sections, Mount Diablo Base Meridian . The project area encompasses watersheds affected by the 2007 Moonlight Fire and ranges approximately 15 to 27 air miles northeast of Quincy, Plumas County, California. Beckwourth Ranger District (excluding Projects occurring in more than one District) Beckwourth-Genesee Dam Project - Special use management Completed Actual: 11/19/2015 R5 - Pacific Southwest Region 08/2016 CE *UPDATED* Description: Remove a cabin, pond, solar panels, natural gas storage tank and septic system from National Forest System lands. A well would be capped and abandoned. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39303 Location: Barry Creek A Antonio Duenas 530-836-7156 tduenas@fs.fed.us UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R14E, Sec29. Off of Beckwourth-Genesee Road (County Road 111). - Fuels management On Hold N/A CE N/A Don Fregulia 530-836-2575 dfregulia@fs.fed.us Description: Fuels reduction treatments on private land using Steven's Funds. Location: 04/01/2016 04:08 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N R13E sec13 and sec 14. Off Highway 89 near Calpine Summit down Whitehawk Ranch. Page 3 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Barry Creek B - Fuels management Cancelled N/A Expected Implementation R5 - Pacific Southwest Region N/A CE *UPDATED* UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N R13E sec13 and sec 14. Off Highway 89 near Calpine Summit down to Whitehawk Ranch. - Fuels management Cancelled N/A N/A CE *UPDATED* UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N R13E sec13 and sec 14. Off Highway 89 near Calpine Summit down to Whitehawk Ranch. - Recreation management Cancelled N/A N/A EA *UPDATED* Lisa Sedlacek 530-836-7126 lsedlacek@fs.fed.us Description: Develop a multi-purpose (hiking, biking, OHVs, equestrian) trail connecting the Crocker Campground with Red Clover Valley. Establish a staging area at the intersection of Forest Highway 177 and Forest Road 24N23. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41454 Location: Cal Trans Radio Repeater Permit Don Fregulia 530-836-2575 dfregulia@fs.fed.us Description: This project has been combined with Barry Creek A Location: Beckwourth-Crocker MultiPurpose Trails Project Don Fregulia 530-836-2575 dfregulia@fs.fed.us Description: This project has been combined with Barry Creek A Location: Barry Creek C Project Contact UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T 23 and 24N, R14E, Sections 33, 28, 29, 20, 21,16,17. Crocker Campground to road 29N49Y, connecting to quarry road 24N64X to the BG intersection, Crocker Mountain #33. - Special use management In Progress: Scoping Start 12/10/2015 Expected:03/2016 04/2016 CE Debra Fryberger-Eby 530-836-7120 dfrybergereby@fs.fed.u s Description: Install a radio repeater at Frenchman Lake for use by Cal Trans Road Maintenance crews. Location: 04/01/2016 04:08 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R16E, Section 33 MDM. T24N, R16E, Section 33 MDM. Page 4 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Cradle Valley Aspen and Meadow Restoration CE *NEW LISTING* Project Contact R5 - Pacific Southwest Region Mary Kliejunas - Wildlife, Fish, Rare plants Developing Proposal Expected:08/2016 12/2016 530-836-7159 - Vegetation management Est. Scoping Start 02/2016 mkliejunas@fs.fed.us (other than forest products) Description: Wildlife habitat and timber stand improvements activities which includes aspen stand restoration and meadow enhancement to release and improve the growing conditions. Location: DWR Stream Monitoring Stations Permit Expected Implementation UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Lassen, Plumas. LEGAL - T27N, R13E, many sections and T28N, R13E, Sections 33 & 34 off of the Janesville Grade to Forest Road 28N01 in the Cradle Valley area. This project is located on the far northeastern edge of the Beckwourth Ranger District. - Special use management In Progress: Scoping Start 12/11/2015 Expected:04/2016 05/2016 CE Debra Fryberger-Eby 530-836-7120 dfrybergereby@fs.fed.u s Description: Existing DWR stream monitoring and weather stations consolidated under a special use permit. Location: Eastside Underburn Project EA *UPDATED* UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. Beckwourth Ranger District East of Lake Davis. Sara Billings - Vegetation management Completed Actual: 03/15/2016 04/2016 530-836-7136 (other than forest products) sbillings@fs.fed.us - Fuels management Description: This project proposes to enhance resource protection from wildfire, improve forest health, and maintain and continue restoring fire adapted ecosystems on the eastside of the Beckwourth District through underburning. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45650 Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Lassen, Plumas. LEGAL - Not Applicable. North of highway 70, south and west of highway 395 and east of Antelope Lake. Feather River Inn Water System - Special use management CE In Progress: Scoping Start 04/01/2015 Expected:04/2016 05/2016 Robert Hawkins 916-849-8037 rhhawkins@fs.fed.us Description: Re-Issue a 30 year special use authorization to Schomac, Inc. for the Feather River Inn water system. The water system includes two diversion structures, a storage tank, waterlines and road and trail access. Location: 04/01/2016 04:08 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Section 3, T. 22 N., R. 12 E., Mt Diablo Meridian. The water system is located along Bonta Creek just north of the National Forest boundary and the Feather River Inn. Page 5 of 21 Plumas National Forest Project Name Plumas National Forest Frazier Creek Mining Exploration Project Project Purpose Planning Status Decision Expected Implementation Beckwourth Ranger District (excluding Projects occurring in more than one District) - Minerals and Geology Completed Actual: 03/04/2016 R5 - Pacific Southwest Region 05/2016 EA *UPDATED* EA *UPDATED* UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R12E, Section 27. Frazier Creek just south of Gold Lake Highway and south of the town of Graeagle. Kyla Sabo - Recreation management In Progress: Expected:04/2017 02/2018 530-836-7157 - Forest products Scoping Start 12/16/2015 kylasabo@fs.fed.us - Vegetation management Est. Comment Period Public (other than forest products) Notice 07/2016 - Fuels management Description: Improve forest health and reduce hazards around recreation sites. Activities include mechanical thinning, grapple piling, mastication, hand thinning and underburning. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40964 Location: Lakes Basin Trails Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Exploration for minerals using hand tools to excavate material. Material processed through a highbanker. Water pumped from Frazier Creek and returned to settling pit. Plan will authorize replacement of gate and use of gate and spur road. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45490 Location: Lakes Basin Project Project Contact UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas, Sierra. LEGAL - Not Applicable. Lakes Basin recreation area. - Recreation management CE Developing Proposal Est. Scoping Start 01/2016 Expected:06/2016 *NEW LISTING* 07/2016 Debra Fryberger-Eby 530-836-7120 dfrybergereby@fs.fed.u s Description: This project will add trails to the system within the Lakes Basin Recreation Area. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48410 Location: 04/01/2016 04:08 am MT UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R12E, Sections 33-34, T 21N, R12E, Sections 8-10, 15-16,. Mills Peak area in the Lakes Basin Recreation Area. Page 6 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Last Chance Creek Phase II Restoration Project - Watershed management Cancelled N/A Expected Implementation R5 - Pacific Southwest Region N/A EIS *UPDATED* UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - The project area is in Sections 9, 10, 11, 14, and 15 of T26N, R13E and Sections 15, 16, and 17 of T26N, R14E. Last Chance HUC 5 watershed. - Special use management Completed Actual: 03/10/2016 04/2016 CE *UPDATED* UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T 21 N, R 12 E, Sec 7. Long Lake in the Lakes Basin Recreation Area. - Special use management CE *NEW LISTING* Developing Proposal Est. Scoping Start 04/2016 - Grazing management Laura Gray 530-839-7122 lgray@fs.fed.us Cancelled N/A N/A Scott Lusk 530-836-7165 salusk@fs.fed.us Description: The Ramelli and Hall range allotments are currently vacant. The project proposes to allow them to be utilized as a swing allotment. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=21898 Location: 04/01/2016 04:08 am MT 05/2016 UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. various existing powerlines. EA *UPDATED* Expected:05/2016 Description: To consolidate 6 expired special use permits authorizing operation and maintenance of power lines and a substation under one 30-year master special use permit (MSU). No increase in scope or intensity of operation proposed. Location: Ramelli and Hall Allotments Debra Fryberger-Eby 530-836-7120 dfrybergereby@fs.fed.u s Description: The Long Lake Boat Assoc. has requested a permit to store personal watercraft at Long Lake. The proposal includes building a boat house and installing a removable dock. Several types of watercraft are proposed; gas, electric and non-motorized. Location: PSREC MSUP Antonio Duenas 530-836-7156 tduenas@fs.fed.us Description: Restore the hydrologic function of approximately 7.8 miles of Last Chance Creek and 402 acres of degraded meadow system. Location: Long Lake Boat Storage Special Use Permit Project Contact UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Lassen, Plumas. LEGAL - portions of sections 25-31, 1-11, 16-34. Beckwourth Ranger District. Page 7 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Beckwourth Ranger District (excluding Projects occurring in more than one District) Rush Skeleton Weed Project EA *UPDATED* - Vegetation management (other than forest products) In Progress: Expected:05/2016 Expected Implementation Project Contact R5 - Pacific Southwest Region 06/2016 Michael Friend 530-836-7167 mjfriend@fs.fed.us Description: Rush skeleton weed would be sprayed with aminocyclopyrachlor chlorsulfuron (e.g. Perspective)or aminopyralid triclopyr (e.g. Capstone or Milestone Plus) or a combination of these herbicides with A surfactant (e.g. methylated seed oil) and dye. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43804 Location: Two Rivers Soccer Camp Permit Re-issue UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R11E, Sec. 1, SE 1/4 of NE 1/4. Eureka Creek at Discovery Mine and adjacent to National Forest System road 23N37, approximately 3 air miles northwest of the Beckwourth Ranger Station. T22N, R11E, Sec. 1, SE 1/4 of NE 1/4. - Special use management In Progress: Scoping Start 05/01/2015 Expected:04/2016 05/2016 CE Debra Fryberger-Eby 530-836-7120 dfrybergereby@fs.fed.u s Description: Re-issue a 20 year permit to Two Rivers Soccer Camp for the following uses: bridge, road, parking area, portion of a soccer field, water transmission lines, storage tank and spring boxes. Location: Plumas National Forest UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Sections 30, 31, 32, T. 22 N., R. 12E., Mt. Diablo Meridian. Two Rivers Soccer Camp is located near Blairsden, California. Feather River Ranger District (excluding Projects occurring in more than one District) California Department of Water Resources - Amend permit to install a streamgauge at 2nd location - Special use management Cancelled N/A R5 - Pacific Southwest Region N/A Deb Schoenberg 530-532-7460 dschoenberg@fs.fed.us Description: CA DWR proposes to install a streamgauge station at the PG&E Miocene Dam near Magalia. CE *UPDATED* 04/01/2016 04:08 am MT Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - SE 1/4 of SW 1/4 of Section 30, T23N, R4E. Miocene Dam near Magalia, California. Page 8 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Challenge-Woodleaf Bug Kill Salvage Project - 2016 - Forest products - Fuels management In Progress: Scoping Start 03/11/2016 Expected:03/2016 Expected Implementation R5 - Pacific Southwest Region 04/2016 CE *NEW LISTING* Eric Murphy 530-532-8922 ejmurphy@fs.fed.us Description: Tree mortality has occurred in the Challenge, Woodleaf, and Forbestown areas. These dead, dying, and structurally damaged live trees present an imminent safety hazard and risk to forest visitors, employees, and facilities. Whole tree logging hazards. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48935 Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte, Yuba. LEGAL - Mount Diablo Meridian, California, Township 19 N., Range 7 E., sections 16, 18-21, 29, 32, and 33 and Township 19 N., Range 6 E., section 11 and Township 20 N., Range 6 E., sections 25 and 36. Near Challenge, Woodleaf, and Forbestown within Butte and Yuba Counties, California. Feather River Ranger District - Minerals and Geology Abandoned Mine Closures 2015 Completed Actual: 02/01/2016 04/2016 CE *UPDATED* Project Contact Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: The proposed action includes closing the abandoned mine openings and removal of trash on the sites. Items identified as historical will not be disturbed. Non-system access routes not required for other forest uses will be closed and reclaimed. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47565 Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N, R9E, sec 17; T21N, R10E, Sec 18, 24; T22N, R10E, Sec 8, 29; T23N, R6E, Sec 26. Famous 49er AML site, Pacific AML site, Wahoo Air Shaft AML site, Ophir Mine AML site, Sawmill Ridge AML site, Little North Fork AML site. Jason Vermillion 530-532-7434 jvermillion@fs.fed.us Forbestown - Community Protection Fuel Reduction (CPFR) - Forest products - Fuels management EA Description: This wildland urban interface (WUI) project is designed to reduce the risks of wildfire around the community of Forbestown, enhance firefighter safety and remove hazardous trees along roads. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47250 *UPDATED* Location: 04/01/2016 04:08 am MT In Progress: Comment Period Public Notice 01/09/2016 Expected:05/2016 05/2016 UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte, Yuba. LEGAL - T19N R6E Sections 2, 3, 4, 5, 8, 9, 11, 14, 15 and 16. Roadside corridors and accessible Forest lands around the community of Forbestown, CA. Page 9 of 21 Plumas National Forest Project Name Plumas National Forest Gibsonville Healthy Forest Restoration Project EA *UPDATED* Project Purpose Decision Feather River Ranger District (excluding Projects occurring in more than one District) Expected Implementation Project Contact R5 - Pacific Southwest Region Clay Davis - Heritage resource In Progress: Expected:08/2016 08/2016 530 532-8940 management Scoping Start 11/03/2015 clayrdavis@fs.fed.us - Forest products Est. Comment Period Public - Fuels management Notice 05/2016 Description: Using a variety of vegetation treatments including sale of merchantable timber and biomass to reduce risk of catastrophic wildfire, release aspen, restore meadows and other wetlands, and to restore and protect the historic Gibsonville townsite. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47960 Location: HDH/Millet Mining Plan Of Operations Planning Status UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas, Sierra. LEGAL - Not Applicable. In and around the historic Gibsonville, California townsite. - Minerals and Geology EA *UPDATED* In Progress: Scoping Start 08/17/2011 Est. Comment Period Public Notice 04/2016 Expected:07/2016 07/2016 Donna Duncan 760-379-5646 dmduncan@fs.fed.us Description: Placer mining. Panning, sluicing, dredging. Use of non-system road. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36938 Location: Jackson Ranch Cemetery Fence CE *NEW LISTING* Jamie Moore - Heritage resource Completed Actual: 02/01/2016 02/2016 530-532-7463 management jjmoore@fs.fed.us - Grazing management - Special use management Description: The District proposes to authorize through the issuance of a special use permit to construct a "T" post and barbed wire fence. The fence will be five feet tall and encompass 17.4 acres. It is to keep cattle out of the cemetery. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48574 Location: 04/01/2016 04:08 am MT UNIT - Feather River Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T20N, R9E, Sec 10, 15, 16. Feather River Ranger District, Plumas national Forest, along Canyon Creek. UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - Mount Diablo Meridian, California, Township 21 N., Range 6 e., section 25. Frye Cemetery nearby Jackson Ranch. Page 10 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Last Chance Mining Plan of Operations - Minerals and Geology EA *UPDATED* In Progress: Scoping Start 08/17/2011 Est. Comment Period Public Notice 06/2016 Expected:08/2016 Expected Implementation Project Contact R5 - Pacific Southwest Region 08/2016 Donna Duncan 530-532-7461 dmduncan@fs.fed.us Description: Placer mining along Slate Creek. Dredging, panning and sluicing. Use of non-system road and gated access. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36937 Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas, Sierra. LEGAL - T21N, R9E, Sec 11. Feather River Ranger District, slate creek. Mary Sullivan 530-532-7460 mcsullivan@fs.fed.us PG&E Sawmill Peak Communication Use Lease Amendment - Special use management CE Description: Amendment of existing PG&E communication use lease at Sawmill Peak Communication Site to authorize installation of "smart bridge" tower, approximately 23 feet in height, to enhance effective signal. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48070 *UPDATED* Location: Pearson Mine Plan of Operations *UPDATED* Expected:05/2016 05/2016 UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - Mount Diablo Meridian, T. 23 N., R. 4E., section 32. Sawmill Peak Communication Site. - Minerals and Geology EA In Progress: Scoping Start 03/08/2016 In Progress: Scoping Start 06/17/2013 Est. Comment Period Public Notice 03/2016 Expected:05/2016 05/2016 Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: Underground exploration in existing mines, using explosives (with proper permit) and rock drills underground, and a skip loader outside the portals as well as to maintain the old access road. No processing on site. Camp trailer for overnight stays. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44952 Location: 04/01/2016 04:08 am MT UNIT - Feather River Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T22N, R10E, Sec 32. one mile North of Howland Flat. Page 11 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Pendola Fire RestorationCalifornia Red-Legged Frog (CRLF) Critical Habitat (CH) Restoration Project CE *NEW LISTING* R5 - Pacific Southwest Region UNIT - Feather River Ranger District. STATE - California. COUNTY - Yuba. LEGAL - Mount Diablo Meridian, California, T. 18 N., R. 7 E., sections 10, 11, 14 & 15. South of Challenge, north of Dobbins, and west of New Bullards Bar Reservoir in California. - Special use management Cancelled N/A N/A CE *UPDATED* UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R9E, Section 34. Near Little Grass Valley Reservoir, north of La Porte, California. - Fuels management Completed CE *NEW LISTING* Actual: 03/24/2016 04/2016 Jason Vermillion 530-532-7434 jvermillion@fs.fed.us Description: There is a significant buildup of hazardous fuel on NFS lands nearby three residences. We propose to do some hand-thinning and piling of trees and brush around the residences. The intent is to give more fire clearance and make the area look better. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48575 Location: 04/01/2016 04:08 am MT Deb Schoenberg 530-532-7460 dschoenberg@fs.fed.us Description: Continued use and maintenance of an existing access road, approximately 150' on National Forest System lands, to private property. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34303 Location: Stephens Ridge Hand-Cut/Pile Project Project Contact Cindy Roberts - Wildlife, Fish, Rare plants In Progress: Expected:05/2016 07/2016 530-532-7467 - Fuels management Scoping Start 09/24/2015 ckroberts@fs.fed.us - Watershed management Description: To restore and preserve wildlife habitats for the California red-legged frog, a federally listed threatened species; and California spotted owl, foothill yellow-legged frog, western pond turtle and fringed myotis, all Forest Service sensitive species Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48616 Location: Provost, Rod - renew permit for existing access road. Expected Implementation UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - Mount Diablo Meridian, California, Township 21 n., Range 5 e., SE1/4 section 14. 120 acre parcel south of Stephens Ridge. The NFS land bounds 3 private residences on their south and eastern property lines and they are bounded west to north by Oroville Quincy Highway. Page 12 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Feather River Ranger District (excluding Projects occurring in more than one District) Taber Mine Plan of Operations - Minerals and Geology In Progress: Expected:06/2016 Expected Implementation R5 - Pacific Southwest Region 06/2016 EA *UPDATED* Donna Duncan 530-532-7461 dmduncan@fs.fed.us Description: Continued Maintenance and clearing of the existing adit. Repair and maintenance of the access road. Use of backhoe to transport material from the adit to the wash plant. Use and maintenance of the settling pond. Use of the historic cabin. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40263 Location: Plumas National Forest Project Contact UNIT - Feather River Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T22N, R9E, Sec 30. Just off the La Porte road, about 7 miles NE of La Porte, CA. Mt. Hough Ranger District (excluding Projects occurring in more than one District) Shenandoah Abandoned Mine Closure - Minerals and Geology In Progress: Scoping Start 06/01/2011 Expected:03/2016 R5 - Pacific Southwest Region 04/2016 CE Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Closure of 5 mine adits at the Shenandoah Mine. Mine closure will provide for public safety. Bat gates and culverts will be installed as needed. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36352 Location: Bucks Lake Cabin Remodels UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R7E, NE 1/4 of Section 28. Shenandoah Mine is located within the Bucks Lake Wilderness above the town of Rich Bar. - Recreation management Completed CE *NEW LISTING* 05/2016 Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: The project would involve remodels of seven cabins in the Buck's Lake recreational residence tract. Construction would meet Forest Service specifications for size, visual quality and historic character. Location: 04/01/2016 04:08 am MT Actual: 03/14/2016 UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. Buck's Lake, Plumas County, California. 15 air miles west of Quincy, California. Page 13 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Butterfly Twain Fuels Reduction and Landscape Restoration Project EA *UPDATED* R5 - Pacific Southwest Region UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. Approximately 4 miles northwest of Quincy, California, between the communities of Butterfly Valley and Twain in Plumas County, California. - Special use management Completed Actual: 03/07/2014 11/2014 CE *UPDATED* Developing Proposal Est. Scoping Start 05/2016 Expected:05/2016 05/2016 Kurt Sable 530-283-7641 ksable@fs.fed.us Description: Repairing trail degradation resulting in negative impacts to watershed. Web Link: http://www.fs.fed.us/biology/watershed/condition_framework.html Location: 04/01/2016 04:08 am MT UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Southwest quater of T25N, R9E, sections 26 and Northwest quarter of T25N, R9E,section 32. Project is located west of highway 89 and 70 and est of Snake Lake and South of Keddie along highway 89 and 70. - Watershed management CE *NEW LISTING* Erika Brenzovich 530-283-7622 ebrenzovich@fs.fed.us Description: PGE proposes to replace 2 transmission/power line poles nea Snake lake and Keddie along highway 89 and 70 (PG&E Project #30876102) Location: Cascade Trail Realignment Project Contact David Kinateder - Wildlife, Fish, Rare plants In Progress: Expected:12/2016 03/2017 530-283-7673 - Forest products Scoping Start 09/16/2015 djkinateder@fs.fed.us - Vegetation management Est. Comment Period Public (other than forest products) Notice 07/2016 - Fuels management - Watershed management - Road management Description: Reduce hazardous fuels; improve forest health; restore plant and wildlife habitat; improve transportation system and soil and water quality; and reduce invasive plants. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47559 Location: Caribou #2 Pole Replacement Expected Implementation UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Township 25 North, Range 9 East, Section 36. This project is located approximately 4 miles north of Quincy CA in the newly designated South Park Trail System. Page 14 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Claremont Watershed Improvement Project CE R5 - Pacific Southwest Region UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. Meadow Valley area southeast to the Claremont area. Sec 4,9,10,13 of T23NR8E; sec 1,6,11,12,17,18 of T23NR9E; sec 6,7,8 of T23NR10E; sec 12,24,25 of T24NR8E; sec 30 of T24R9E; sec 31 of T25NR9E MDBM. - Watershed management - Road management In Progress: Scoping Start 02/08/2016 Expected:03/2016 06/2016 CE *UPDATED* UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Sections 7 and 18 of T26N, R8E, MDBM. Clear Creek is southeast of Butt Valley Reservoir between Seneca and Caribou. The project area is upstream of the intersection of Clear Creek with Seneca Road (Plumas County Route 306). - Recreation management Developing Proposal Est. Scoping Start 04/2016 CE *NEW LISTING* Expected:05/2016 05/2016 Dani Swantic 530-836-7142 dswantic@fs.fed.us Description: Rehabilitate the Four Corners OHV Play Area Location: 04/01/2016 04:08 am MT Lisa Whitcomb 414-332-0871 lwhitcomb@fs.fed.us Description: Partial dam removal, reshaping and restoration of a natural creek channel, decommissioning of unclassified roads (including culvert removal), and road reconstruction to improve watershed condition. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47984 Location: Four Corners OHV Play Area Rehab Project Project Contact Kelby Gardiner - Wildlife, Fish, Rare plants On Hold N/A N/A 530-283-7686 - Vegetation management kgardiner@fs.fed.us (other than forest products) - Fuels management - Watershed management Description: Remove encroaching conifers from aspen and meadow habitats (hand pile and burn material), unclassified road obliteration, and non-motorized trail construction/reconstruction. Location: Clear Creek Watershed Restoration Project Expected Implementation UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T 24N, R 10 E, Section 4. Four Corners OHV Play Area is located approximately 5 miles from Quincy off of County Rd. 403, also known as Mt. Hough Rd. Page 15 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Grays Flat Quincy-Caribou PGE Pole Replacement - Special use management Cancelled N/A Expected Implementation R5 - Pacific Southwest Region N/A CE *UPDATED* Project Contact Erika Brenzovich 530-283-7622 ebrenzovich@fs.fed.us Description: PGE is proposing replacing 16 wood utility poles in two areas on NFS Lands. These two areas are along the Grays Flat-Quincy Caribou #2 Line (PG&E Project #30783963). Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R7E, section 14, 15, 16, 21, 22, and 23. The proposed treatment area is the power line between Grays Flat adn Quincy Caribou #2 Line. Elizabeth Sousa 530-283-7622 esousa@fs.fed.us Greenhorn Creek Guest Ranch Outfitting and Guiding Permit reissue - Recreation management CE Description: Reissue a 10 year O&G Permit for horseback rides and an assigned campsite on Nat Forest Sys land. This is the same operation as the past 10 years, with approximately 39 miles of trail and the majority of the rides with 8 miles of the Ranch *UPDATED* Location: Herby's Mining Plan of Operations *UPDATED* 06/2016 In Progress: Comment Period Public Notice 02/10/2016 Expected:05/2016 05/2016 T23R10 Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: Locatable minerals exploration. Use of small rubber tired tractor for road maintenance and removing overburden and waste rock. Occupancy in camp trailer. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47642 Location: 04/01/2016 04:08 am MT Expected:05/2016 UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24 R10,R11 R11 T24 R12. Mt. Hough Ranger District and Little Summit Lake on Beckwourth Ranger District. - Minerals and Geology EA In Progress: Scoping Start 12/26/2012 UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T26N, R12E, Sec 4, MDBM. Southwest of Antelope Lake. Page 16 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Jackass Creek Bridge Replacement Project - Watershed management - Road management EA *UPDATED* In Progress: Scoping Start 09/23/2015 Est. Comment Period Public Notice 04/2016 Expected:08/2016 Expected Implementation Project Contact R5 - Pacific Southwest Region 08/2016 Lisa Whitcomb 414-332-0871 lwhitcomb@fs.fed.us Description: This project proposes to replace the Jackass Creek Bridge on National Forest System Trail 6M40 to meet Forest Service bridge design standards. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47659 Location: Moonlight Off-Channel Water Sources UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Township 24N, Range 6E, Section 16, Mount Diablo Meridian, California. West of Quincy, CA by way of State Highway 70 near the Tobin Quarry on NFS Trail 6M40. - Watershed management - Road management In Progress: Scoping Start 02/08/2016 Expected:03/2016 06/2016 CE *UPDATED* Description: Installation of up to eight off-channel water sources to reduce impacts to stream channels while providing water for road maintenance and fire suppression activities Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47995 Location: Mt. Hough Range Allotment Project UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. Within the Moonlight Fire area in the northwest corner of the Mt. Hough District on Forest Roads 27N09, 27N51, 27N10, 27N45, 29N43, 27N30, and 28N03. - Grazing management Developing Proposal Est. Scoping Start 04/2016 EA *UPDATED* Expected:12/2016 01/2017 Kyla Sabo 530-836-7157 kylasabo@fs.fed.us Description: Mount Hough Range Allotments in and around Lone Rock Creek, Lights Creek, and Antelope Lake. Six allotments are included: Lone Rock, Lights Creek, Antelope, and Antelope Lake. Location: 04/01/2016 04:08 am MT Lisa Whitcomb 414-332-0871 lwhitcomb@fs.fed.us UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - portions of sections in T27N R12E. Mt Hough Ranger District. Page 17 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) PG&E Big Meadows Pole - Special use management Replacement & Reconductoring Completed Actual: 11/09/2015 Expected Implementation R5 - Pacific Southwest Region 12/2016 CE *UPDATED* UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Township 27N, Range 8E, Sections 20 and 28 MDM. The project is located about 0.13 mile south of State Highway 89 (CA 89) (0.4 mile west of the intersection of Highways 147 and 89) located near Canyon Dam and Lake Almanor. - Minerals and Geology In Progress: Scoping Start 10/20/2015 Expected:04/2016 05/2016 CE *UPDATED* Donna Duncan 530-283-7614 dmduncan@fs.fed.us Description: Use of metal detector and hand tools to extract minerals. Collection of loose rock from rock outcropping. Processing of material through rock crusher and shake table using re-circulating water system. Concrete slab to stabilize shake table. Location: Pioneer/Caribou Mining Project Erika Brenzovich 530-283-7620 ebrenzovich@fs.fed.us Description: The project would involve the reconductoring of approximately 5,249 feet of overhead conductor, 4 pole replacements, 1 pole installation, 2 pole removals, 6 anchor replacements and/or installations, and various other overhead work. Location: Patriot Placer Exploration Project Project Contact UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R8E, Section 26 & 27, MDBM. Hambly Ravine, along NFS system road 25N20, south of Twain, California and approximately 9 air miles northwest of Quincy, California. - Minerals and Geology EA In Progress: Scoping Start 05/28/2015 Est. Comment Period Public Notice 03/2016 Expected:06/2016 06/2016 Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Excavation of underground river channel deposits with hand tools. Material to be loaded into ore cart for extraction. Material is processed through a trommel. Finer material is amalgamated. Location: Plumas Imperial Mine Exploration Project UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T26N, R7E, Sections 27 and 34, MDBM. Approximately 6 miles northeast of Belden, CA. - Minerals and Geology In Progress: Scoping Start 12/03/2015 CE Expected:03/2016 04/2016 Beth Ann Waterston 530-283-7768 bwaterston@fs.fed.us Description: Excavation of approximately 500 cubic yards of material with a backhoe, construction of holding and settling ponds, processing of material through trommel, clearing of .57 miles of non-system road for access. Location: 04/01/2016 04:08 am MT UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R9E, Section 18, MDBM. Slate Creek, off of NFS Road 24N28, approximately 5 miles west of Quincy, California. Page 18 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Sierra Pacific Industry and Plumas National Forest Supplement 10 Road Right-ofWay Use Agreement CE *NEW LISTING* Spanish Creek Campground Mineral Withdrawal - Road management Completed Actual: 02/17/2016 Expected Implementation Project Contact R5 - Pacific Southwest Region 02/2016 Matthew Jedra 530-836-7192 mjedra@fs.fed.us Description: Supplement existing agreement to add three existing non-system roads to the cost share agreement. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48767 Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. The three roads are all located on Mt Hough RD. - Recreation management EA *UPDATED* In Progress: Scoping Start 12/18/2014 Est. Comment Period Public Notice 03/2016 Expected:06/2016 07/2016 Leslie Edlund 530-283-7650 ledlund@fs.fed.us Description: Project proposal is to withdraw 82.5 acres encompassing the Spanish Creek Campground from mineral location, entry, and patenting. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46055 Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Not Applicable. Spanish Creek Campground, approximately 6 miles northwest of Quincy, CA. Legal location T25N, R9E, Section 15, MDBM. Gretchen Jehle 530-283-7616 gjehle@fs.fed.us Storrie Fire Area Fuel Reduction in Spotted Owl and Goshawk Habitat Project - Wildlife, Fish, Rare plants - Fuels management CE Description: Hand thinning of small trees, hand piling, burning of piles, and underburning to reduce hazardous fuels in wildlife habitat; obliteration of non-system roads to reduce detrimental impacts in wildlife habitat. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48562 *NEW LISTING* Location: 04/01/2016 04:08 am MT Developing Proposal Est. Scoping Start 04/2016 Expected:09/2016 09/2016 UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - All or portions of Township 25N, Range 8E, sections 31, 32, and 35; Township 24N, Range 8E, sections 2-6, 8-11, 15-17, 20-22, Mount Diablo Base Meridian. The project area is approximately 5 to 10 air miles west of Quincy. The proposed units are east of the Bucks Lake Wilderness and north and west of Meadow Valley, California. Page 19 of 21 Plumas National Forest Project Name Plumas National Forest Project Purpose Planning Status Decision Mt. Hough Ranger District (excluding Projects occurring in more than one District) Expected Implementation Project Contact R5 - Pacific Southwest Region Kurt Sable Storrie Fire Restoration: Storrie - Vegetation management In Progress: Expected:05/2016 06/2016 Fire Access Improvement 530-283-7641 (other than forest products) Scoping Start 02/12/2016 Project (HYDS72) ksable@fs.fed.us - Watershed management Road management CE Description: Remove hazard trees along 5.8 miles of NFS 26N26 and the first 1.2 miles of26N26A, conduct general road *NEW LISTING* maintenance, replace culverts and construct an off site water source along Mosquito Creek. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48770 Location: Whitlock Ravine Staging Area Development UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Township 25N, Range 7E, sections 6,7, 8, 17, 18, 19, Township 26N Range 7E, section 31 and for water site Township 26N Range 7E, section 15 (MDBM). Township 26N Range 8E, sections 5 and 6, and Townshi. Hazard tree removal and road work would occur on the entire 26N26 system (9.6 miles). The water drafting site is located where NFS 26N33D crosses the Middle Branch of Mosquito Creek. - Recreation management Cancelled EA *UPDATED* N/A N/A Elizabeth Sousa 530-283-7622 esousa@fs.fed.us Description: Create gravel parking and install barriers for an Off Highway Vehicle and Snowmobile Staging Area. Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N R8E Section 12. Whitlock Ravine off County Road 435. Maurice Huynh Wildcat Fuels Reduction and - Wildlife, Fish, Rare plants In Progress: Expected:05/2016 07/2016 Vegetation Management Project - Vegetation management 530-283-7653 (Wildcat Project) mlhuynh@fs.fed.us (other than forest products) - Fuels management EA - Watershed management *UPDATED* - Road management Description: The Wildcat Project proposes to reduce fuels, improve forest health, reduce invasives and improve water quality. The activities include decommissioning non-system and system roads,use of herbicides for invasives and wood product. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43435 Location: 04/01/2016 04:08 am MT UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T27N R12E Sections 13, 10-12, 14 and 15; T27N R13E Section 6; T28N R12E Sections 13-16, 21-24, 25, 28, 34-36; and T28N R13E Sections 30 and 31; Mount Diablo Base Meridian (MDBM). The Wildcat Project is on the Mt. Hough Ranger District of the Plumas National Forest; approximately 3 miles southeast of Janesville and south of Susanville, California. Page 20 of 21 Plumas National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 04/01/2016 04:08 am MT Page 21 of 21 Plumas National Forest