Schedule of Proposed Action (SOPA) 07/01/2015 to 09/30/2015 Uinta-Wasatch-Cache National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide) Energy Gateway South 500 kV Powerline (EGS) - Special use management EIS In Progress: DEIS NOA in Federal Register 04/01/2011 Est. FEIS NOA in Federal Register 08/2014 Expected:03/2015 01/2020 Charles Call 435-865-3730 ckcall@fs.fed.us Description: This proposed 500 kV transmission line is designed to deliver power to Rocky Mountain Power utility costumers in Utah and the intermountain west. Generation sources are located in central Wyoming. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42534 Location: Greater Sage-grouse Management Direction - Utah UNIT - Duchesne Ranger District, Pine Valley Ranger District, Richfield Ranger District, Price Ranger District, Fillmore Ranger District, Heber-Kamas Ranger District, Spanish Fork Ranger District. STATE - Utah. COUNTY - Beaver, Duchesne, Emery, Garfield, Iron, Juab, Millard, Piute, Sevier, Uintah, Wasatch, Weber. LEGAL - Not Applicable. The project initiates in central Wyoming and crosses public, private, and state lands in Wyoming, Colorado, and Utah. Project terminates at the Mona substation in central Utah. - Land management planning - Wildlife, Fish, Rare plants EIS In Progress: DEIS NOA in Federal Register 11/01/2013 Est. FEIS NOA in Federal Register 05/2014 Expected:11/2014 11/2014 Glen Stein 801-625-5281 gstein@fs.fed.us Description: The purpose of this project is to prepare environmental impact statements (EISs) and supplemental environmental impact statements to incorporate greater sage-grouse conservation measures into Bureau of Land Management land use plans and Forest Plans. Web Link: http://www.blm.gov/wo/st/en/prog/more/sagegrouse/western.html Location: 07/01/2015 04:32 am MT UNIT - Ashley National Forest All Units, Dixie National Forest All Units, Fishlake National Forest All Units, MantiLasal National Forest All Units, Uinta-Wasatch-Cache All Units. STATE - Utah. COUNTY - Beaver, Box Elder, Cache, Carbon, Daggett, Davis, Duchesne, Emery, Garfield, Grand, Iron, Juab, Kane, Millard, Morgan, Piute, Rich, Salt Lake, San Juan, Sanpete, Sevier, Summit, Tooele, Uintah, Utah, Wasatch, Washington, Wayne, Weber. LEGAL - Not Applicable. All National Forests in Utah. Page 1 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide) High Uintas Wilderness Domestic Sheep Analysis Project (Ashley NF) - Grazing management EIS In Progress: NOI in Federal Register 04/25/2013 Est. DEIS NOA in Federal Register 04/2016 Expected:03/2017 04/2017 Paul Cowley 801-999-2177 pcowley@fs.fed.us Description: This project will evaluate the effects of continued domestic sheep grazing in the High Uintas Wilderness (HUW). There are 10 sheep allotments located on the north and south slopes of HUW and are located in both the Ashley and Uinta-Wasatch-Cache NFs. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44503 Location: Transwest Express 600 kV Direct Current Powerline (TWE) UNIT - Roosevelt Ranger District, Duchesne Ranger District, Evanston-Mountain View RD. STATE - Utah. COUNTY - Duchesne, Summit. LEGAL - Not Applicable. The project is located in the High Uintas Wilderness in both Duchesne and Summit counties. The project is located northeast of Duchesne, UT and southwest of Manila, UT. - Special use management EIS In Progress: DEIS NOA in Federal Register 02/18/2011 Est. FEIS NOA in Federal Register 07/2013 Expected:12/2014 03/2018 Charles Call 435-865-3730 ckcall@fs.fed.us Description: This proposed 600 kV direct current transmission line is designed to carry renewable energy (primarily wind power) from generation sources in central Wyoming to markets in in the pacific southwest. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42526 Location: UNIT - Roosevelt Ranger District, Pine Valley Ranger District, Richfield Ranger District, Fillmore Ranger District, Ferron Ranger District, Heber-Kamas Ranger District, Spanish Fork Ranger District. STATE - Utah. COUNTY Beaver, Duchesne, Emery, Garfield, Iron, Juab, Millard, Piute, Sevier, Uintah, Wasatch, Weber. LEGAL - Not Applicable. This project initiates in central Wyoming and crosses public, private, and state lands in Wyoming, Colorado, Utah, and Nevada. Uinta-Wasatch-Cache National Forest, Forestwide (excluding Projects occurring in more than one Forest) 07/01/2015 04:32 am MT Page 2 of 18 R4 - Intermountain Region Uinta-Wasatch-Cache National Forest Project Name Project Purpose Planning Status Decision Expected Implementation R4 - Intermountain Region Uinta-Wasatch-Cache National Forest, Forestwide (excluding Projects occurring in more than one Forest) Uinta-Wasatch-Cache N.F. Forest Plan Monitoring Realignment CE Charlie Condrat - Regulations, Directives, Developing Proposal Expected:10/2015 01/2016 801-236-3439 Orders Est. Colloboration Start 02/2015 ccondrat@fs.fed.us - Land management planning Description: The UWCNF has begun a process to realign its forest plans with the 2012 Final Planning Rule (see: 36 Code of Federal Regulations 219). In particular, the UWCNF will address the purpose of the monitoring plan program set forth in 36 CFR 219.12(a)(1). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46267 Location: UNIT - Uinta-Wasatch-Cache All Units. STATE - Utah, Wyoming. COUNTY - Box Elder, Cache, Davis, Morgan, Rich, Salt Lake, Summit, Tooele, Utah, Wasatch, Weber, Uinta. LEGAL - Not Applicable. UintaWasatch-Cache National Forest. R4 - Intermountain Region Uinta-Wasatch-Cache National Forest, Occurring in more than one District (excluding Forestwide) Uinta Express Pipeline Project EIS Project Contact - Minerals and Geology - Special use management Cancelled N/A N/A Steve Scheid 801-733-2689 sscheid@fs.fed.us Description: The proposed action includes a 12-inch buried carbon steel pipeline approximately 135 miles long and ancillary facilities. Approximately 14 miles of the pipeline would be on the Uinta-Wasatch-Cache National Forest. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43620 Location: Uinta-Wasatch-Cache National Forest District) 07/01/2015 04:32 am MT UNIT - Salt Lake Ranger District, Heber-Kamas Ranger District. STATE - Utah. COUNTY - Davis, Duchesne, Morgan, Salt Lake, Summit. LEGAL - Not Applicable. The proposed pipeline would cross the UWCNF in the Wolf Creek/Upper South Fork Provo River area of the Heber-Kamas Ranger District, and in the Bountiful Peak area of the Salt Lake Ranger District. Evanston-Mountain View RD (excluding Projects occurring in more than one Page 3 of 18 R4 - Intermountain Region Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest District) High Uintas Wilderness Domestic Sheep Analysis Project Planning Status Decision Expected Implementation R4 - Intermountain Region Evanston-Mountain View RD (excluding Projects occurring in more than one - Grazing management EIS In Progress: NOI in Federal Register 04/25/2014 Est. DEIS NOA in Federal Register 04/2016 Expected:03/2017 Project Contact 04/2017 Paul Cowley 801-999-2177 pcowley@fs.fed.us Description: This project will evaluate the effects of continued domestic sheep grazing in the High Uintas Wilderness (HUW). There are 10 sheep allotments located on the north and south slopes of HUW and are located in both the Ashley and Uinta-Wasatch-Cache NFs. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44452 Location: UNIT - Evanston-Mountain View RD. STATE - Utah. COUNTY - Duchesne, Summit. LEGAL - Not Applicable. The project is located in the High Uintas Wilderness in both Duchesne and Summit counties. The project is located northeast of Duchesne, UT and southwest of Manila, UT. Platte Petroleum Environmental - Minerals and Geology Assessment - Road management EA In Progress: Notice of Initiation 09/26/2014 Est. Comment Period Public Notice 12/2014 Expected:04/2015 05/2015 Roger Kesterson 307-782-6555 rkesterson@fs.fed.us Description: Burnett Oil Company has submitted an application for permit to drill a test well. The Forest Service will analyze impacts on surface resources. The Bureau of Land Management will be a cooperating agency and will analyze subsurface impacts. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45108 Location: 07/01/2015 04:32 am MT UNIT - Evanston-Mountain View RD. STATE - Utah. COUNTY - Summit. LEGAL - Southeast quarter of the southwest quarter of Section 3, Township 2 North, Range 13 East, Salt Lake Meridian. The proposed action is located within northern Utah near the Wyoming border. The nearest town is Mountain View, Wyoming which is approximately 24 air miles northeast of the project area. Page 4 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest District) Roughneck Vegetation Restoration Project Planning Status Decision Expected Implementation R4 - Intermountain Region Evanston-Mountain View RD (excluding Projects occurring in more than one - Forest products - Fuels management EA In Progress: Notice of Initiation 01/29/2014 Est. Comment Period Public Notice 08/2014 Expected:01/2015 Project Contact 06/2015 Timothy Gill 307-783-3966 tgill@fs.fed.us Description: The UWCNF proposes: 3,369 acres of stand clearcut with leave trees; 2,770 acres of two-aged stand clearcut with reserves; 0.75 miles of new specified road construction; 46.7 miles of temporary road construction; and 15.2 miles of temporary road use. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43599 Location: Wildlife and livestock pond development UNIT - Evanston-Mountain View RD. STATE - Utah, Wyoming. COUNTY - Summit, Uinta. LEGAL - Not Applicable. The proposed project is located approximately 15 miles south of Mountain View, Wyoming. The project area lies within Uinta County, Wyoming, and Summit County, Utah. - Wildlife, Fish, Rare plants - Grazing management In Progress: Scoping Start 12/07/2012 Expected:04/2013 04/2013 CE Aimee Cameron 307-782-6555 aimeecameron@fs.fed. us Description: The Forest Service proposes to develop four ponds that would benefit both wildlife and livestock. Two new ponds would be created, and a ditch and water bars along a closed logging road would be modified o catch water. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40881 Location: Uinta-Wasatch-Cache National Forest District) Allwest Communications Fiber Optic Line Upgrade UNIT - Evanston-Mountain View RD. STATE - Utah. COUNTY - Summit. West Fork Smiths Fork watershed. R4 - Intermountain Region Heber-Kamas Ranger District (excluding Projects occurring in more than one - Special use management Developing Proposal Est. Scoping Start 04/2015 CE Expected:04/2015 04/2015 Virginia Daniel 435-783-4338 vdaniel@fs.fed.us Description: The Forest Service proposes to authorize Allwest Communications to upgrade an existing 525-foot section of copper line with 96-strand fiber optic line. The upgraded line would be installed along the existing copper line, which runs along Highway 150. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46639 Location: 07/01/2015 04:32 am MT UNIT - Heber-Kamas Ranger District. STATE - Utah. COUNTY - Summit. LEGAL - Township 2 South, Range 6 East, Section 25. Approximately 0.5 mile northwest of Samak along Highway 150. Page 5 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest District) Beef Pasture Pipeline Planning Status Decision Expected Implementation R4 - Intermountain Region Heber-Kamas Ranger District (excluding Projects occurring in more than one - Grazing management CE Developing Proposal Est. Scoping Start 10/2014 Expected:12/2014 Project Contact 07/2015 Jim Percy 435-654-0470 jpercy@fs.fed.us Description: Installing a new pipeline and trough to improve livestock distribution. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45647 Location: Butterfly Lake: Notch Connection Trail UNIT - Heber-Kamas Ranger District. STATE - Utah. COUNTY - Wasatch. LEGAL - Not Applicable. Upper Strawberry River. - Recreation management - Watershed management Developing Proposal Est. Scoping Start 02/2015 Expected:07/2015 11/2015 CE Evan Glenn 435-654-7215 evanrglenn@fs.fed.us Description: The Heber-Kamas Ranger District proposes to create a Class 4 trail around Butterfly Lake. A portion of the proposed trail would be built on existing user-created trails, while a portion would involve new trail construction. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46251 Location: Indian Creek Exploratory Well Surface Use Plan of Operations UNIT - Heber-Kamas Ranger District. STATE - Utah. COUNTY - Summit. LEGAL - Township 1 East, Range 8 West, Section 25. In the Lakes Country area of the Heber-Kamas Ranger District. - Minerals and Geology On Hold N/A N/A CE Jim Percy 435-654-7211 jpercy@fs.fed.us Description: Approval of Surface Use Plan of Operations for one exploratory oil/gas well on an old, existing well pad. Location: Lagoon Pipeline UNIT - Heber-Kamas Ranger District. STATE - Utah. COUNTY - Wasatch. LEGAL - T4S, R12W, Section 26. Crooked Creek area off Indian Creek Road. - Grazing management CE Developing Proposal Est. Scoping Start 10/2014 Expected:12/2014 07/2015 Jim Percy 435-654-0470 jpercy@fs.fed.us Description: Add a trough outside of an exclosure. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45648 Location: 07/01/2015 04:32 am MT UNIT - Heber-Kamas Ranger District. STATE - Utah. COUNTY - Wasatch. LEGAL - Not Applicable. Upper Strawberry River. Page 6 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest District) Mud Creek Pipeline Planning Status Decision Expected Implementation R4 - Intermountain Region Heber-Kamas Ranger District (excluding Projects occurring in more than one - Grazing management Developing Proposal Est. Scoping Start 10/2014 CE Expected:12/2014 Project Contact 07/2015 Jim Percy 435-654-0470 jpercy@fs.fed.us Description: A headbox, pipeline and 3 troughs would be installed to lessen the impact on boreal toads. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45649 Location: North Heber Salvage Project EA UNIT - Heber-Kamas Ranger District. STATE - Utah. COUNTY - Wasatch. LEGAL - Not Applicable. Mud Creek Drainage. - Forest products - Road management Completed Actual: 06/05/2015 07/2015 Jim Gibson 435-783-4338 jgibson@fs.fed.us Description: The proposal would remove bark beetle killed timber, supplement existing regeneration of spruce-fir to meet forest plan stocking rates, and obliterate the old road prisms, temporary roads, and skid trails. No new system roads are propoposed. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45097 Location: Soapstone Summer Home #19 CE UNIT - Heber-Kamas Ranger District. STATE - Utah. COUNTY - Wasatch. LEGAL - Not Applicable. HeberKamas Ranger District. - Recreation management - Land ownership management Developing Proposal Est. Scoping Start 10/2014 Expected:12/2014 07/2015 Evan Glenn 435-654-7215 evanrglenn@fs.fed.us Description: Install a septic system and add an addition to the cabin. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45652 Location: South Streeper Corral Pipeline UNIT - Heber-Kamas Ranger District. STATE - Utah. COUNTY - Wasatch. LEGAL - Not Applicable. Soapstone Basin. - Grazing management CE Developing Proposal Est. Scoping Start 10/2014 Expected:12/2014 07/2015 Jim Percy 435-654-0470 jpercy@fs.fed.us Description: Install a pipeline and trough. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45651 Location: 07/01/2015 04:32 am MT UNIT - Heber-Kamas Ranger District. STATE - Utah. COUNTY - Wasatch. LEGAL - Not Applicable. Indian Creek Road. Page 7 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest District) Upper Provo Watershed Restoration Project. EA Decision Expected Implementation Project Contact R4 - Intermountain Region Heber-Kamas Ranger District (excluding Projects occurring in more than one Jim Gibson 06/2015 - Forest products Completed Actual: 05/29/2015 435-783-4338 - Vegetation management jgibson@fs.fed.us (other than forest products) - Fuels management - Watershed management Description: The project proposes primarily non-commercial thinning, prescribed burning, mechanical vegetation treatments (mowing, mastication), and planting over a period of up to 10 years. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41548 Location: Uinta-Wasatch-Cache National Forest Bear River Project GeoExplore Planning Status UNIT - Heber-Kamas Ranger District. STATE - Utah. COUNTY - Summit, Wasatch. LEGAL - The legal description includes all or some of the following: Township 2 North, Range 7, 8; Township 3 North Range 7, 8, 9 SLBM. The Upper Provo Watershed Restoration Project is located in Summit and Wasatch Counties, Utah. R4 - Intermountain Region Logan Ranger District (excluding Projects occurring in more than one District) - Special use management Completed CE Actual: 05/01/2015 05/2015 Ronald Vance 435-755-3620 rvance@fs.fed.us Description: State of Utah, Division of Water Resources proposes to drill 2 exploratory test holes with piezometer on Temple Fork Road to gather geotechnical information related to a potential dam site. Holes will be sealed after 1 year of data collection. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45627 Location: Camp Lomia Waterline/Streambank Repair CE Kelli Taylor 10/2013 - Recreation management In Progress: Expected:09/2013 435-755-3626 - Wildlife, Fish, Rare plants Scoping Start 07/23/2013 ktaylor02@fs.fed.us - Watershed management - Special use management Description: 1. Relocate existing culinary water lines under the stream channel and stabilize 190 feet of streambank. 2. Install two water storage tanks and water metering system in an existing structure located within the permit area. 3. Relocate shutoff valve. Location: 07/01/2015 04:32 am MT UNIT - Logan Ranger District. STATE - Utah. COUNTY - Cache. LEGAL - T13N, R3E, Section 26 SW1/4, Salt Lake Base and Meridian. Approximately 20 miles east of Logan, UT. UNIT - Logan Ranger District. STATE - Utah. COUNTY - Cache. LEGAL - T113 N R3 E Section 17. Righthand Fork of the Logan River. Camp Lomia special use authorization. Page 8 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest Logan Peak Trail Planning Status Decision Expected Implementation R4 - Intermountain Region Logan Ranger District (excluding Projects occurring in more than one District) - Recreation management CE Developing Proposal Est. Scoping Start 10/2014 Expected:06/2015 Project Contact 07/2015 Ronald Vance 435-755-3620 rvance@fs.fed.us Description: A proponent has requested adding approx. 1.6mi of system trail from Logan Dry Canyon Trail to Logan Peak. Trail was likely constructed by CCC and previously a system trail that was removed. Approximately 50% of the trail would need repairs. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45626 Location: Precipitation Study USU UNIT - Logan Ranger District. STATE - Utah. COUNTY - Cache. LEGAL - T11N, R2E, S1/2 Section 4 and T11N, R2E, NW1/4 Section 9 Salt Lake Base and Meridian. East of Logan, Utah within the Bear River Range. Proposed trail would extend west from Logan Peak. - Special use management CE Developing Proposal Est. Scoping Start 10/2014 Expected:10/2014 11/2014 Ronald Vance 435-755-3620 rvance@fs.fed.us Description: Utah State University is requesting to conduct research aimed at better understanding the vegetative response to climate change. The proposal involves installation of twelve (12m x12m) "precipitation manipulation shelters" at forest edge sites. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45622 Location: Spawn Creek Trailhead UNIT - Logan Ranger District. STATE - Utah. COUNTY - Box Elder, Cache, Rich. LEGAL - Not Applicable. To Be Determined. - Recreation management CE In Progress: Scoping Start 06/19/2014 Expected:11/2014 11/2014 Kyler McCarrel 775-964-2671 kmccarrel02@fs.fed.us Description: Project would reroute the Worm Trail out of Spawn Creek exclosure and up the hill to the west. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45635 Location: 07/01/2015 04:32 am MT UNIT - Logan Ranger District. STATE - Utah. COUNTY - Cache. LEGAL - T13N, R3E, Section 26 Salt Lake Base and Meridian. Approximately 11 miles northeast of Logan, Utah in the Bear River Range. Page 9 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest Staker Relocation Environmental Assessment Planning Status Decision Expected Implementation R4 - Intermountain Region Logan Ranger District (excluding Projects occurring in more than one District) - Special use management Developing Proposal Est. Notice of Initiation 08/2014 03/2015 Expected:12/2014 Project Contact EA Pete Gomben 801-999-2103 pgomben@fs.fed.us Description: The Forest Service proposes to authorize Pacificorp to relocate a 0.5-mile segment of an existing transmission line onto National Forest System lands to avoid excavation activites on private land. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45059 Location: White Rock, Millville, and Providence Allotments UNIT - Logan Ranger District. STATE - Utah. COUNTY - Box Elder. LEGAL - Not Applicable. Section 20, Township 9 North, Range 1 West, east of Brigham City, Utah. - Grazing management On Hold N/A N/A EA Pete Gomben 801-999-2103 pgomben@fs.fed.us Description: Proposal is to authorize the continuance of grazing on the White Rock, Millville, and Providence Allotments. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38463 Location: Uinta-Wasatch-Cache National Forest UNIT - Logan Ranger District. STATE - Utah. COUNTY - Cache. LEGAL - Not Applicable. Allotments are located southeast of Logan, Utah. R4 - Intermountain Region Ogden Ranger District (excluding Projects occurring in more than one District) Rick Vallejos 801-625-5112 rvallejos@fs.fed.us Ogden Ranger District Travel Plan Revision Supplemental EIS - Road management EIS Description: The Ogden Ranger District is preparing a supplemental EIS in response to a March 7, 2012 court order instructing the Forest Service to address deficiencies in the previous EIS and record of decision for the Ogden Travel Plan. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45226 Location: 07/01/2015 04:32 am MT In Progress: FEIS NOA in Federal Register 03/30/2015 Expected:05/2015 06/2015 UNIT - Ogden Ranger District. STATE - Utah. COUNTY - Box Elder, Cache, Morgan, Rich, Weber. LEGAL Not Applicable. Ogden Ranger District. Page 10 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest Pelican Beach Parking Expansion Planning Status Decision Expected Implementation R4 - Intermountain Region Ogden Ranger District (excluding Projects occurring in more than one District) - Recreation management Developing Proposal Est. Scoping Start 07/2014 Expected:08/2014 Project Contact 08/2014 CE Rick Vallejos 801-625-5112 rvallejos@fs.fed.us Description: The Ogden Ranger District proposes to expand the parking area at Pelican Beach on the east side of Pineview Reservoir. The proposed expansion is in response to an increase in recreation demand for the Pelican Beach area. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44950 Location: Three Creeks Allotment Consolidation UNIT - Ogden Ranger District. STATE - Utah. COUNTY - Weber. LEGAL - Not Applicable. On the east side of Pineview Reservoir. - Grazing management EA In Progress: Notice of Initiation 08/15/2011 Est. Comment Period Public Notice 01/2015 Expected:10/2015 11/2015 Pete Gomben 801-999-2182 pgomben@fs.fed.us Description: The proposal is to consolidate 10 grazing allotments (5 BLM and 5 FS) into 1 management unit with 20 pastures on BLM and 8 pastures on FS lands.Management would focus on time, timing, frequency, and intensity of livestock grazing on about 143,000 ac. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36707 Location: Uinta Highlands Reservoir - Special use management CE *NEW LISTING* In Progress: Scoping Start 05/07/2015 Expected:05/2015 05/2015 Anne Hansen 801-999-2158 annehansen@fs.fed.us Description: The Uinta Highlands Improvement District proposes to rebuild its culinary water reservoir #3. The reservoir is located on private land owned by the improvement district. Portions of the pipeline and access road are on NFS land. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46909 Location: Uinta-Wasatch-Cache National Forest District) 07/01/2015 04:32 am MT UNIT - Ogden Ranger District. STATE - Utah. COUNTY - Rich. LEGAL - Not Applicable. West of Randolph, Utah. UNIT - Ogden Ranger District. STATE - Utah. COUNTY - Weber. LEGAL - Not Applicable. East bench of the Uinta Highlands southeast of Ogden, Utah. Pleasant Grove Ranger District (excluding Projects occurring in more than one Page 11 of 18 R4 - Intermountain Region Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest District) American Fork River armoring project Planning Status Decision Expected Implementation R4 - Intermountain Region Pleasant Grove Ranger District (excluding Projects occurring in more than one - Watershed management Developing Proposal Est. Scoping Start 05/2015 Expected:06/2015 08/2015 CE *NEW LISTING* Gary Gray 801-796-4892 gcgray@fs.fed.us Description: The Pleasant Grove Ranger District proposes to armor the banks of the American Fork River to minimize the risks of erosion. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46960 Location: Kimball Land Exchange Project Contact UNIT - Pleasant Grove Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - Not Applicable. Along the American Fork River. - Land ownership management CE In Progress: Scoping Start 10/11/2013 Expected:02/2015 06/2015 Jon Stansfield 530-233-8829 jstansfield@fs.fed.us Description: Exchange of National Forest System lands (19.62) for Private Lands (25.11)to consolidate the ownership. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45602 Location: Snowbird Mineral Basin Howitzer mount UNIT - Pleasant Grove Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - T3S R3E Sections 29 & 30 SLBM. Major Evans Gulch, American Fork Canyon Management Area. - Special use management Developing Proposal Est. Scoping Start 04/2015 CE Expected:05/2015 07/2015 Steve Scheid 801-733-2689 sscheid@fs.fed.us Description: Snowbird Ski Resort proposes installation of a Howitzer in Mineral Basin for avalanche control on both Forest Service and private lands. Snowbird currently conducts avalanche reduction in Mineral Basin using hand charges and Avalaunchers. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46707 Location: 07/01/2015 04:32 am MT UNIT - Pleasant Grove Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - Township 3 South, Range 3 East, Section 17. Mineral Basin area. Page 12 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest District) Snowbird Path to Paradise ski run modification Planning Status Decision Expected Implementation R4 - Intermountain Region Pleasant Grove Ranger District (excluding Projects occurring in more than one - Recreation management - Special use management Developing Proposal Est. Scoping Start 04/2015 07/2015 Expected:05/2015 Project Contact CE Steve Scheid 801-733-2689 sscheid@fs.fed.us Description: Snowbird Ski Resort proposes an extension of the Path to Paradise ski run. Approximately 480 feet of Forest Service land through the Twin Peaks inventoried roadless area would be graded, resulting in a continuous 12foot-wide track. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46704 Location: Tibble Fork Communications UNIT - Pleasant Grove Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - Township 3 South, Range 3 East, Section 18. On the Pleasant Grove Ranger District. - Recreation management CE In Progress: Scoping Start 02/17/2015 03/2015 Expected:03/2015 Anne Hansen 801-999-2158 annehansen@fs.fed.us Description: Installing an emergency phone at the Tibble Fork Parking Lot for public safety. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45645 Location: Tibble Fork Dam UNIT - Pleasant Grove Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - Not Applicable. Tibble Fork Reservoir Parking Lot and Timpooneke Road. - Special use management EA In Progress: Objection Period Legal Notice 12/31/2012 Expected:08/2014 10/2014 Anne Hansen 801-999-2158 annehansen@fs.fed.us Description: The Natural Resources Conservation Service (NRCS) is proposing to fund rehabilitation of the Tibble Fork Dam in the American Fork Canyon of northern Utah County, Utah. It is located 10 miles north east of the city of Alpine, UT. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41710 Location: 07/01/2015 04:32 am MT UNIT - Pleasant Grove Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - Not Applicable. Tibble Fork Dam is in the American Fork Canyon of northern Utah County, Utah. It is located 10 miles north east of the city of Alpine, UT. Page 13 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest District) Welch Land Exchange Planning Status Decision Expected Implementation R4 - Intermountain Region Pleasant Grove Ranger District (excluding Projects occurring in more than one - Land ownership management CE In Progress: Scoping Start 10/15/2013 Expected:02/2015 Project Contact 06/2015 Jon Stansfield 530-233-8829 jstansfield@fs.fed.us Description: Exchange of land between private land owner and Uinta-Wasatch-Cache National Forest. Parcels of equal size will be exchanged to consolidate land ownership which will benefit both the Forest Service and the private land owner. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46141 Location: Uinta-Wasatch-Cache National Forest Alta 2015 Summer Projects UNIT - Pleasant Grove Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - Township 4 South; Range 2 East; Section 8. Located in Dry Creek Canyon near the Horsetail Falls trailhead (northeast of Alpine, UT). R4 - Intermountain Region Salt Lake Ranger District (excluding Projects occurring in more than one District) - Recreation management CE Developing Proposal Est. Scoping Start 03/2015 Expected:06/2015 06/2015 Steve Scheid 801-733-2689 sscheid@fs.fed.us Description: Alta ski Area is proposing to implement a number of small projects from their accepted MDP including minor modifications to existing lodges, constructing solar panels on buildings, and constructing an additional small culinary buried tank. Location: Bountiful Lions Gun Range permit renewal UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - T2S, R3E, Sec. 5. Within Alta Ski Area permitted boundary in Collins Gulch in upper Little cottonwood Canyon, Salt Lake County, UT. - Special use management On Hold CE N/A N/A Pollyanna Popola 801-733-2686 ppopola@fs.fed.us Description: The Bountiful Lions Gun Range is operated by the Bountiful Lions Club of Bountiful, and operates under a special use permit, originally issued in 1959, that will expire at the end of 2013. The Gun Club has submitted an application to renew the permit Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43105 Location: 07/01/2015 04:32 am MT UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Davis. LEGAL - T2N, R1w, Sec. 17. Bottom of Ward Canyon, Davis County, Utah. Page 14 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest Climbing Areas Stabilization projects Planning Status Decision Expected Implementation R4 - Intermountain Region Salt Lake Ranger District (excluding Projects occurring in more than one District) - Recreation management - Watershed management On Hold N/A Project Contact N/A CE Matthew Zumstein 801-733-2670 mzumstein@fs.fed.us Description: the SLRD is proposing to construct belay platforms that are anchored by barrier rock and/or gabion baskets and to improve the access trails that lead to two climbing areas in Big Cottonwood Canyon - Dogwood and the Pile. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43615 Location: Farmington City Water Storage Tank Special Use Permit UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Dogwood Picnic Area & "S" Curve area in Big Cottonwood Canyon, Salt Lake County. - Special use management On Hold N/A N/A CE Pollyanna Popola 801-733-2687 ppopola@fs.fed.us Description: Farmington City is proposing to construct a water storage tank to include within their current special use permit Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35721 Location: Mill Creek Dam Removal and Restoration Project EA Paul Cowley - Recreation management In Progress: Expected:08/2015 09/2015 801-999-2177 - Wildlife, Fish, Rare plants Comment Period Public Notice pcowley@fs.fed.us - Watershed management 08/12/2013 Description: The purpose of this project is to restore watershed function and aquatic ecosystem to more closely match historic conditions in Mill Creek Canyon. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41873 Location: NEON Domain 15 Project in Utah UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Davis. LEGAL - T3N, R1E, Sec 29,. Proposed lacation in Lower Davis Creek area, Farmington City, Davis County, UT. UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - The project is located in the southwest corner of Township 2 South, Range 2 East Section 27. The dam is located just upstream of Porter Fork in the Mill Creek Drainage. - Special use management - Research and Development EA In Progress: Comment Period Public Notice 11/23/2014 Expected:11/2015 03/2016 Steve Scheid 801-733-2689 sscheid@fs.fed.us Description: The NEON research sites include the construction, maintenance, and operation of ecological observation and experiment stations within w/in Red Butte RNA and Vernon site to study land use, invasive species, and urban effects for 10-15 years. Location: 07/01/2015 04:32 am MT UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake, Tooele. LEGAL - Not Applicable. Red Butte Canyon, Salt Lake County; and Vernon site. Tooele County. Page 15 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest Patch Springs Fire Rehabilitation CE Decision Expected Implementation Salt Lake Ranger District (excluding Projects occurring in more than one District) Project Contact R4 - Intermountain Region Michael Duncan - Wildlife, Fish, Rare plants On Hold N/A N/A 801-236-3415 - Vegetation management mduncan@fs.fed.us (other than forest products) - Watershed management Description: In August 2013 the Patch Springs wildfire burned 31,010 acres on the Southwest Side of the Stansbury Mountain Range in Tooele County Utah.The State DWR proposes to treat approx. 2,100 acres of NFS land by aerially seeding and chaining. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43618 Location: Rankin Water Development Permit Reissue Planning Status UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Tooele. LEGAL - Not Applicable. Southwest side of Stansbury Mountains in Tooele County. - Special use management Developing Proposal Est. Scoping Start 03/2015 Expected:05/2015 07/2015 CE Charles Rosier 801-999-2159 crosier@fs.fed.us Description: Permit Holders Ron and Carol Rankin are applying to have their current permit for spring development, water storage tank and transmission line reissued for an additional 20 year term. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46502 Location: Silver Lake Boardwalk replacement UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Davis. LEGAL - Not Applicable. Township 4 North, Range 1 West, Section 12, northwest quarter. Salt Lake Meridian. - Recreation management Completed Actual: 04/13/2015 CE 06/2015 Matthew Zumstein 801-733-2670 mzumstein@fs.fed.us Description: Proposal to replace the boardwalk, located in BCC. All existing boardwalk, bridges, and fishing piers will be replaced in current location and the boardwalk will be widened from 6 to 8%u2019 to better accommodate visitors with disabilities Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43106 Location: Uinta-Wasatch-Cache National Forest District) 07/01/2015 04:32 am MT UNIT - Salt Lake Ranger District. STATE - Utah. COUNTY - Salt Lake. LEGAL - Not Applicable. Silver Lake, Big Cottonwood Canyon, Salt Lake County, UT. Spanish Fork Ranger District (excluding Projects occurring in more than one Page 16 of 18 R4 - Intermountain Region Uinta-Wasatch-Cache National Forest Project Name Project Purpose Uinta-Wasatch-Cache National Forest District) Loop Springs Trough Relocation Planning Status Decision Expected Implementation R4 - Intermountain Region Spanish Fork Ranger District (excluding Projects occurring in more than one - Grazing management In Progress: Scoping Start 10/02/2014 Expected:12/2014 Project Contact 07/2015 CE Renae Bragonje 801-342-5267 rbragonje@fs.fed.us Description: The existing trough would be moved from the dispersed camping site which has grown bigger over the years. The new trough location is approximately 260 feet from the current location. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45545 Location: Nebo Creek Corral UNIT - Spanish Fork Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - T10S R2E Sections 35 & 36 SLM. Just off the Nebo Loop Road near the Holman Exclosure. - Grazing management CE In Progress: Scoping Start 10/02/2014 Expected:12/2014 06/2015 Renae Bragonje 801-342-5267 rbragonje@fs.fed.us Description: Construct cattle corrals that are approximately 30 by 30 feet of steel panels. The purpose of the corral is to hold cattle at the site until they can be trailered off the Forest. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45547 Location: Nephi/Payson Allotment Fence UNIT - Spanish Fork Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - T11S R3E Section 16 SLM. Up the Nebo Creek road at the junction with and old closed road. - Grazing management CE In Progress: Scoping Start 10/02/2014 Expected:12/2014 07/2015 Renae Bragonje 801-342-5267 rbragonje@fs.fed.us Description: Reconstruct approximately ¼ mile of fence between the Nephi and Payson Allotments. A portion of the fence will be relocated out of trees and snow areas to better maintain after reconstruction. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45548 Location: Santaquin WUI UNIT - Spanish Fork Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - T11S R2E Section 15 SLM. Off the Nebo Loop Road. - Fuels management Completed CE Actual: 05/01/2015 07/2015 Lanson Stavast 801-794-6777 lstavast@fs.fed.us Description: The USFS and the UDWR are proposing to improve undesirable fuel conditions within the Santaquin canyon area. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43897 Location: 07/01/2015 04:32 am MT UNIT - Spanish Fork Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - T10S R1E sections 12, 13, & 24 (USFS) 12, 13, 14, 15, & 23 (UDWR); T10S R2E sections 7, 18, &19 (USFS). The project is located in the Spanish Fork Ranger District within the Santaquin canyon area. Page 17 of 18 Uinta-Wasatch-Cache National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 07/01/2015 04:32 am MT Page 18 of 18 Uinta-Wasatch-Cache National Forest