Schedule of Proposed Action (SOPA) 10/01/2015 to 12/31/2015 White River National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact Projects Occurring in more than one Region (excluding Nationwide) Western Area Power Administration Right-of-Way Maintenance and Reauthorization Project - Special use management EIS In Progress: DEIS NOA in Federal Register 09/27/2013 Est. FEIS NOA in Federal Register 01/2015 Expected:03/2015 05/2015 Christopher Wehrli 303-275-5107 clwehrli@fs.fed.us Description: Update vegetation management activities along 278 miles of transmission lines located on NFS lands in Colorado, Nebraska, and Utah. These activities are intended to protect the transmission lines by managing for stable, low growth vegetation. Location: UNIT - Ashley National Forest All Units, Grand Valley Ranger District, Norwood Ranger District, Yampa Ranger District, Hahns Peak/Bears Ears Ranger District, Pine Ridge Ranger District, Sulphur Ranger District, East Zone/Dillon Ranger District, Paonia Ranger District, Boulder Ranger District, West Zone/Sopris Ranger District, Canyon Lakes Ranger District, Salida Ranger District, Gunnison Ranger District, Mancos/Dolores Ranger District. STATE - Colorado, Nebraska, Utah. COUNTY - Chaffee, Delta, Dolores, Eagle, Grand, Gunnison, Jackson, Lake, La Plata, Larimer, Mesa, Montrose, Routt, Saguache, San Juan, Dawes, Daggett, Uintah. LEGAL - Not Applicable. Linear transmission lines located in Colorado, Utah, and Nebraska. R2 - Rocky Mountain Region, Occurring in more than one Forest (excluding Regionwide) Colorado Mountain School - Special use management CE Developing Proposal Est. Scoping Start 07/2015 Expected:02/2016 03/2016 Jaime Oliva 303-541-2509 joliva@fs.fed.us Description: The Forest Service proposes to issue a ten-year outfitter and guide permit for mountaineering, avalanche education, and ski touring. This will replace a transitional priority use permit. Location: UNIT - Boulder Ranger District, East Zone/Holy Cross Ranger District, Canyon Lakes Ranger District. STATE Colorado. COUNTY - Boulder, Eagle, Larimer. LEGAL - Not Applicable. Indian Peaks Wilderness from May 1st to November 30th, east of the continental divide, and ice climbing within the Canyon Lakes and Holy Cross Ranger District's. White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) 10/01/2015 04:23 am MT Page 1 of 18 R2 - Rocky Mountain Region White River National Forest Project Name Project Purpose Planning Status Decision EIS *UPDATED* In Progress: 215 Comment Period Legal Notice 02/04/2013 Expected:10/2015 - Recreation management - Special use management Developing Proposal Est. Scoping Start 10/2015 EA R2 - Rocky Mountain Region Expected:06/2016 06/2016 Allison Anderson 970-404-3173 allisonanderson@fs.fed. us Description: Ajax Adventure Camp has requested a ten year priority use permit to host a summer camp for children ages 7-14. Activities include rock climbing, fishing, water dipping, bouldering, camping, biking, and outdoor education programming. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47757 Location: 10/01/2015 04:23 am MT Sarah Hankens 970-625-6840 shankens@fs.fed.us UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco, Routt, Summit. LEGAL - Not Applicable. Forest Wide. White River National Forest, Occurring in more than one District (excluding Forestwide) *NEW LISTING* 11/2015 Description: The WRNF Oil & Gas Leasing EIS will revise the existing 1993, Oil & Gas Leasing availability decision for the WRNF. The proposal will make revisions to the availability of certain WRNF lands for lease and to the stipulations on lands available. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=29938 Location: Ajax Adventure Camp Permit Issuance Project Contact R2 - Rocky Mountain Region White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) White River National Forest Oil - Land management planning and Gas Leasing Environmental - Minerals and Geology Impact Statement Expected Implementation UNIT - West Zone/Aspen Ranger District, West Zone/Sopris Ranger District. STATE - Colorado. COUNTY Pitkin. LEGAL - Not Applicable. Burger Shack (Independence Pass), Lost Man Reservoir, Linkin Lake, Weller Lake, Upper Boulder Field Area (Ind. Pass), Kobey Park, Grottos, Classy Cliff (Ind. Pass), and Ditch Trail (Snowmass). Page 2 of 18 White River National Forest Project Name Project Purpose Planning Status Decision EA *NEW LISTING* Brett Crary - Forest products Developing Proposal Expected:08/2016 10/2016 970-328-5899 - Vegetation management Est. Scoping Start 11/2015 bcrary@fs.fed.us (other than forest products) - Road management Description: Proposed vegetation management activities along the Buford/New Castle Road. Vegetation management activities could include improvement harvests, clearcuts, patch clearcuts, precommercial thinning and other silvicultural activities. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47451 Location: Camp Hale Restoration and Enhancement Project Project Contact R2 - Rocky Mountain Region White River National Forest, Occurring in more than one District (excluding Forestwide) Buford/New Castle Project Expected Implementation UNIT - West Zone/Blanco Ranger District, West Zone/Rifle Ranger District. STATE - Colorado. COUNTY Garfield, Rio Blanco. LEGAL - Portions of sections 15 and 22; Township 2 South, Range 91 West Portions of sections 2-4, 9, 10, 15, 17, 18, 19, 30 and 31; Township 3 South, Range 91 West Portions of sections 24, 25 and 36; Towns. In general, proposed management activities would occur along the Buford New Castle Road (CR 245), where it pass through national forest system lands between the towns of New Castle and Buford, CO. - Watershed management EIS *UPDATED* In Progress: NOI in Federal Register 03/16/2015 Est. DEIS NOA in Federal Register 11/2015 Expected:06/2016 08/2016 Matthew Grove 970-827-5166 magrove@fs.fed.us Description: The purpose of action is to improve aquatic, riparian, and wetland conditions in and along the Eagle River, maintain or improve recreation opportunities and facilities, and conserve historic values in the Camp Hale area. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46121 Location: EagleGarfield AML Safety Closures UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY Eagle. LEGAL - Township 7S, Range 80W, Sect. 3, 4, 9, 10, 14, 15, 16, 22, 23, 24, 25, 26, 27. The project area is located in the Camp Hale area, south of Red Cliff, and north of Tennessee Pass. - Minerals and Geology Completed CE Actual: 07/02/2015 07/2016 Olivia Garcia 970-945-3220 ogarcia@fs.fed.us Description: Reclaim and or close open mine features to prevent entry and thereby protect the public from unsafe mines.Mine features are located along Gypsum Creek, on New York Mtn, along E. and W. Elk Creeks, and Carbonate. Location: 10/01/2015 04:23 am MT UNIT - West Zone/Rifle Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle, Garfield. LEGAL - Multiple mines on the Forest in Eagle and Garfield Counties. Various. Page 3 of 18 White River National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact R2 - Rocky Mountain Region White River National Forest, Occurring in more than one District (excluding Forestwide) Carole Huey 970-945-3219 clhuey@fs.fed.us Public Service Company of Colorado (PSCo) - Reissuance of Transmission Lines - Special use management CE Description: Reissuance of transmission line permits to PSCo that have expired: Hopkins/Leadville Line, Wolcott-Avon-Vail line, and the Wolcott to Beaver Creek line. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40993 Location: On Hold N/A N/A UNIT - West Zone/Rifle Ranger District, East Zone/Holy Cross Ranger District, West Zone/Sopris Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle, Garfield, Lake, Pitkin. LEGAL - Not Applicable. Various locations on the White River. James Kirschvink 970-963-2266 x 3118 jkirschvink@fs.fed.us Washington Claim Summer Construction and Winter Access - Special use management CE Description: The proposed action is 1) to obtain an authorization for permanent motorized winter access to a patented mining claim (private land) utilizing an existing route; and 2) to obtain approval to access during non-snow covered months for construction. *NEW LISTING* Location: Cancelled N/A N/A UNIT - West Zone/Aspen Ranger District, West Zone/Sopris Ranger District. STATE - Colorado. COUNTY Pitkin. LEGAL - N/E 1/4, Sec.31, T.10S. R.84W. 6th P.M. Pitkin County, CO. National Forest System Land directly adjacent to the %u201CWashington Claim, USMS #5964%u201D. Scott Kaden 970-404-3159 scottakaden@fs.fed.us Western Adventures, Inc. (WAI) Priority Special Use Permit Environmental Assessment - Recreation management - Special use management EA Description: WAI's priority special use permit expired on May 31, 2015. WAI proposes changes to their long-standing operations and changes the intensity of use. This project analysis is required to issue a new recreation special uses authorization. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47743 *NEW LISTING* Location: 10/01/2015 04:23 am MT Developing Proposal Est. Scoping Start 10/2015 Expected:06/2016 06/2016 UNIT - West Zone/Aspen Ranger District, West Zone/Sopris Ranger District. STATE - Colorado. COUNTY Pitkin. LEGAL - Not Applicable. Guided snowmobile tours would occur in the areas of Larkspur Mountain, Red Canyon, and Kobey Park. Permittee would utilize National Forest System Road 103.2 to access these areas. Page 4 of 18 White River National Forest Project Name Project Purpose Planning Status Decision Expected Implementation R2 - Rocky Mountain Region White River National Forest, Occurring in more than one District (excluding Forestwide) White River National Forest Permit Re-issuances 2015 - Special use management In Progress: Scoping Start 08/13/2015 Expected:10/2015 10/2015 CE *UPDATED* Access to the Tailor Lode Marcia Rose-Ritchie 404-549-9533 mroseritchie@fs.fed.us Description: Re-issuance of nine lands special uses authorizations Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47337 Location: White River National Forest Project Contact UNIT - West Zone/Aspen Ranger District, East Zone/Holy Cross Ranger District, West Zone/Sopris Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle, Gunnison, Pitkin. LEGAL - Not Applicable. The nine authorizations in this project range across the forest on the Eagle-Holy Cross and AspenSopris Ranger Districts. See the attached table for specific location descriptions for each case. R2 - Rocky Mountain Region East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) - Land ownership management CE Developing Proposal Est. Scoping Start 04/2015 Expected:05/2015 06/2015 Paul Semmer 970-262-3448 psemmer@fs.fed.us Description: Analysis to provide access to a private inholding between Peaks 6 and Peaks 7. Project would entail construction of 1,500 feet of new road from the top of the Zendo lift (BSR) to the private inholding. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45279 Location: American Tower- A-Basin Communications Site UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - NW1/4 Sec 35 and NE1/4 Sec 34, T. 6 S., R. 78 W., 6th P.M. Summit County. Tailor Lode (south of the top of the Zendo Lift at the Breckenridge Ski Resort). - Special use management On Hold EA N/A N/A Paul Semmer 970-262-3448 psemmer@fs.fed.us Description: New authorization for construction of cellular phone comm site along US Highway 6 between Loveland Pass and Keystone (A-Basin). The facility will be multi-carrier facility consisting of one prefabricated equipment shelter and two towers. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41658 Location: 10/01/2015 04:23 am MT UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Section 2, T. 5 S., R. 76 W., 6th P.M. Adjacent to US Highway 6 right-of-way immediately south and east of A-Basin Ski Area. Page 5 of 18 White River National Forest Project Name White River National Forest American Tower- East Dillon Communications Site Project Purpose Planning Status Decision Expected Implementation R2 - Rocky Mountain Region East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) - Special use management On Hold N/A Project Contact N/A CE Paul Semmer 970-262-3448 psemmer@fs.fed.us Description: New authorization for construction of a cellular phone comm site along I-70 between the Eisenhower Tunnel & East Dillon. The facility will be a multi-carrier facility consisting of one prefab equip shelter and 2 towers. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41657 Location: Arapahoe Basin - Beavers Lift, Trail Development, and Summer Use Improvements UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Section 25, T. 4 S., R. 77 W., 6th P.M. 5 miles east of Silverthorne on I-70 at mile marker 211 on the south side of the highway. Site is within the highway right-of-way. - Special use management EIS *UPDATED* In Progress: NOI in Federal Register 11/21/2013 Est. DEIS NOA in Federal Register 01/2016 Expected:01/2017 06/2017 Shelly Grail 970-262-3484 sgrail@fs.fed.us Description: Projects include the development on the Beavers area, installation of a surface lift at the top of Zuma Bowl and summer uses. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41664 Location: Breckenridge Multi-Season Recreation Projects - Special use management EIS *UPDATED* In Progress: NOI in Federal Register 11/21/2013 Expected:10/2015 06/2016 Shelly Grail 970-262-3484 sgrail@fs.fed.us Description: Proposal includes ziplines, mountain bike trails, and challenge courses on Peaks 8 and 7 Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43291 Location: 10/01/2015 04:23 am MT UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. Arapahoe Basin Ski Area. UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Breckenridge Ski Resort. Page 6 of 18 White River National Forest Project Name White River National Forest Breckenridge Ski Resort Construction Projects CE Project Purpose Planning Status Decision Expected Implementation East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) - Special use management Developing Proposal Est. Scoping Start 11/2015 Expected:03/2016 R2 - Rocky Mountain Region 05/2016 CE *NEW LISTING* UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Breckenridge Ski Resort, Summit County, Colorado. - Special use management Developing Proposal Est. Scoping Start 11/2015 Expected:03/2017 05/2017 EA *NEW LISTING* Shelly Grail 970-262-3484 sgrail@fs.fed.us Description: An analysis of various project at BSR- installation of an electrical line from the T-Bar hut to the top of the Imperial Lift; ancillary facilities associated with a new Peak 7 restaurant (approved in the 1998 EA). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47714 Location: Copper Mountain Improvements EA Project Contact Shelly Grail 970-262-3484 sgrail@fs.fed.us Description: An analysis of a new mountain coaster at the base of the American Flyer; a new mountain bike trail; snowmaking on Collage and an associated drainage system. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47716 Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Copper Mountain Resort, Summit County, Colorado. Ken Waugh 970-262-3446 kwaugh@fs.fed.us Dillon Ranger District Recreation Events 5-year permits - Recreation management - Special use management CE Description: The proposal is to reclassify nine annual re-occurring Recreation Event Special Use Permits and re-issue on a five-year term permit. These permits are not for new activities and have been authorized on the Dillon District for more than ten years. Location: 10/01/2015 04:23 am MT Developing Proposal Est. Scoping Start 08/2015 Expected:10/2015 10/2015 UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Roads: Pennsylvania Gulch, Boreas Pass, Humbug Hill, Sally Barber, Prospect Hill, Trails: Peaks, Mt. Pride Mine, Little French Gulch, Spruce Creek, Wheeler, Miners Creek, Bakers Tank, Mount Royal,. Page 7 of 18 White River National Forest Project Name White River National Forest Dillon-Malta 230 kV Electric Transmission Line Project Purpose Planning Status Decision Expected Implementation R2 - Rocky Mountain Region East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) - Land ownership management - Special use management In Progress: Scoping Start 02/25/2009 Expected:06/2015 Project Contact 06/2015 CE Paul Semmer 970-262-3448 psemmer@fs.fed.us Description: Reissuance of special use permit to Xcel Energy for the existing 230kV electric transmission line from Dillon Substation, to the Malta Substation. The permit was originally issued in 1978, reissued in 1983, and expired in 2008. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27743 Location: Keystone Forest Health and Fuels Project UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - NF lands on the WR and Pike/San Isabel National Forests in Townships 5, 6, 7, 8, 9 & 10 South, all in Range 77 West of the 6th PM and in Township 10 South Range 78 West of the 6th PM., CO. The project includes approximately 20 miles of an existing 230kV overhead electric transmission line from the Dillon Substation (near the Summit County Landfill), to the Malta Substation. - Fuels management On Hold N/A N/A EA Shelby Limberis 970-827-5161 slimberis@fs.fed.us Description: Proposal to implement approx. 1250 acres of fuels reduction and vegetation management activities. Potential treatment activities include clearcuts, precommercial thinning and pile burning. Potential locations have been identified with stakeholders. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46192 Location: Keystone Ski Resort Construction Projects CE UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Portions of sections 7, 18, 21, 22, 30 and 31; Township 5 South, Range 76 West Portions of sections 13-16, 23-26, 29-32 and 36; Township 5 South, Range 77 West Portions of sections 6-10, 16 and 17;. In Summit County, Colorado, near the town of Keystone. In the Frey Gulch area, in Keystone Gulch, along the Montezuma road, and on Tenderfoot Mountain and along Swan Mountain Road. - Special use management Developing Proposal Est. Scoping Start 11/2015 CE *NEW LISTING* 05/2016 Shelly Grail 970-262-3484 sgrail@fs.fed.us Description: An analysis of minor trail improvements- widening on Alamo, construction of a skier bypass at the base of the Outback Express Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47713 Location: 10/01/2015 04:23 am MT Expected:03/2016 UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Keystone Ski Resort, Summit County, Colorado. Page 8 of 18 White River National Forest Project Name White River National Forest Project Purpose Planning Status Decision Expected Implementation East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) Lancaster Mine CERCLA Removal Action - Minerals and Geology In Progress: Scoping Start 01/31/2014 Expected:05/2016 Project Contact R2 - Rocky Mountain Region 06/2016 CE Olivia Garcia 970-945-3220 ogarcia@fs.fed.us Description: The FS & the CO DOR, Mining, & Safety will be conducting final restoration work on the Lancaster Mine. Prior work has confirmed the presence of elevated lead & arsenic in the mine waste and zinc & lead in surface water below the mine. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43594 Location: Shadow Creek Ranch - Smith Ditch No. 2 UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - T5S, R76W, Sections 25 & 26. Less than 1/2 mile due north from the Town of Montezuma. - Special use management In Progress: Scoping Start 12/31/2013 Expected:06/2015 06/2015 CE Paul Semmer 970-262-3448 psemmer@fs.fed.us Description: New authorization for operating and maintaining an existing irrigation ditch (Smith Ditch No. 2) that was previously authorized and expired in 1980. the ditch diverts water from Deep Creek to the Shadow Creek Ranch. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43306 Location: Summer Construction projects at Keystone UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Sections 7 & 18, T2S, R80W and Sections 13 & 24, T2S, R81W, 6th P.M. immediately west and adjacent to Shadow Creek Ranch. - Special use management Completed CE Actual: 08/11/2015 08/2015 Shelly Grail 970-262-3484 sgrail@fs.fed.us Description: Specific projects are to be determined but may include misc. tree removal along existing trails and utility installations. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46737 Location: 10/01/2015 04:23 am MT UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Keystone Ski Resort. Page 9 of 18 White River National Forest Project Name White River National Forest Project Purpose Planning Status Decision Expected Implementation R2 - Rocky Mountain Region East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) Summit Public Radio - Buried Powerline Reconstruction - Special use management In Progress: Scoping Start 12/31/2013 Expected:05/2015 Project Contact 06/2015 CE Paul Semmer 970-262-3448 psemmer@fs.fed.us Description: Reconstruction/replacement of the buried powerline (8,100' x 20')on Bald Mtn. The line provides power to an electronics communications facility on private land. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43307 Location: Tucker Lift at Copper Mountain UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Sections 9 & 10, T7S, R77W, 6th P.M. Bald Mtn. - Special use management Cancelled N/A Shelly Grail 970-262-3484 sgrail@fs.fed.us N/A CE *NEW LISTING* Description: Installation of the Tucker Lift was approved for construction in the 2006 Copper Mtn. Trail and Facilities EIS; however, the alignment has changed. This analysis is for the new lift alignment. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47438 Location: Tucker Lift realignment at Copper Mountain UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Copper Mountain Ski Resort. - Special use management In Progress: Scoping Start 01/05/2015 Expected:04/2016 CE *NEW LISTING* 10/01/2015 04:23 am MT Shelly Grail 970-262-3484 sgrail@fs.fed.us Description: Installation of the Tucker Lift was approved for construction in the 2006 Copper Mtn. Trail and Facilities EIS. This project analyzes the changed alignment. Tucker Lift was scoped with mountain bike trail, but removed from that analysis. Location: White River National Forest 04/2016 UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Copper Mountain Resort. East Zone/Eagle Ranger District (excluding Projects occurring in more than one District) Page 10 of 18 R2 - Rocky Mountain Region White River National Forest Project Name White River National Forest WRNF Wild and Scenic River Suitability Study Project Purpose Planning Status Decision Expected Implementation R2 - Rocky Mountain Region East Zone/Eagle Ranger District (excluding Projects occurring in more than one District) - Land management planning Completed Actual: 06/11/2015 Project Contact 07/2015 EIS Kay Hopkins 970-876-9040 kchopkins@fs.fed.us Description: Interagency Wild and Scenic Suitability Study on the Colorado River and Deep Creek. USFS Draft ROD will be posted after the legal notice is posted in the Glenwood Post Independent. The entire EIS can be found: www.blm.gov/co/st/en/fo/crvfo.html Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43846 Location: UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Not Applicable. All of Deep Creek flowing through NFS lands and the Colorado River in Glenwood Canyon on NFS lands. Carole Huey 970-945-3219 clhuey@fs.fed.us Competitive or Direct Sale of Four Administrative Parcels in Eagle - Land ownership management CE Description: To offer for competitive sale to the public or direct sale to Eagle County 4 administrative use parcels totalling 8.48 acres and associated improvements located in Eagle, CO under the authority of the FS Facilities Realignment and Enhancement Act Location: Gypsum Creek C&H Allotment Grazing Analysis *UPDATED* N/A In Progress: Comment Period Public Notice 02/16/2011 Expected:01/2016 01/2016 Jessica Crawford 970-328-5869 jessicacrawford@fs.fed. us Description: Proposal to continue grazing authorization for 592 cattle between June 16 and October 16 annually (3,204 AUMs), construct several range improvements to improve livestock distribution and management. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=30687 Location: 10/01/2015 04:23 am MT N/A UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Sec. 5 of T5S, R84W of the 6th P.M., warranty deed recorded Feb. 9, 1950 in Bk 135 on Pg 85 (Parent Parcel); Bk 0114, Pg 0506; Bk 135, Pg 85 (Parent Parcel); recorded Jan. 6, 1967 in Bk 0203, Pg 0047. Within the Township of Eagle. - Grazing management EA On Hold UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. The allotment is located just south of Eagle, CO. The main access points onto the allotment are via the Valley road in Gypsum, the Hardscrabble road (#413), and the Brush/Gypsum road (#414). Page 11 of 18 White River National Forest Project Name White River National Forest Project Purpose AT&T Tigiwon Cell Site Expected Implementation Project Contact R2 - Rocky Mountain Region Shelby Limberis - Forest products In Progress: Expected:10/2015 11/2015 970-827-5161 - Vegetation management Scoping Start 03/02/2015 slimberis@fs.fed.us (other than forest products) - Fuels management Description: The Eagle/Holy Cross Ranger District is proposing to implement a variety of vegetation enhancement projects to reduce the risk or extent of, or increase the resilience to, current and potential insect or disease infestations. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41673 Location: White River National Forest Decision East Zone/Eagle Ranger District (excluding Projects occurring in more than one District) South Eagle Vegetation Project CE Planning Status UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. Two geographic locations have been identified south of Eagle; Hardscrabble Mtn and adjacent to the town of Fulford. Additional treatments could be developed in the Hat Creek landscape. East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) - Special use management On Hold N/A N/A CE R2 - Rocky Mountain Region David Neely 970-328-5860 (Eagle), 970-827-5150 (Holy Cross) dneely@fs.fed.us Description: New Cingular Wireless PCS, LLC (AT&T) has proposed to install a cellular facility along the Tigiwon Road. Location: New Cingular Deming Mtn Cellular Facility UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Section 14, T.4 S., R. 81 W., 6th P.M. Along the Tigiwon Road. - Special use management On Hold CE N/A N/A David Neely 970-328-5860 (Eagle), 970-827-5150 (Holy Cross) dneely@fs.fed.us Description: New auth for construction of a cell phone comm site along I-70 on the West Side of Vail Pass between the Shrine Pass Comm Site and East Vail comm site. The facility will be multi-carrier facility consisting of 1 prefab equipment shelter & 1 tower Location: 10/01/2015 04:23 am MT UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Section 28, T.5 S., R.89 W., 6th P.M. Adjacent to Interstate 70 on the West side of Vail Pass. Page 12 of 18 White River National Forest Project Name White River National Forest Reissue nine expiring priority use O/G Permits & convert on transitional permit to a priority permit CE *NEW LISTING* Project Purpose EA *UPDATED* - Special use management Expected Implementation Developing Proposal Est. Scoping Start 10/2015 Expected:12/2015 Project Contact R2 - Rocky Mountain Region 01/2016 Robert Rodriguez 970-827-5178 rtrodriguez@fs.fed.us Description: The Eagle Holy Cross District needs to complete CE to reissue nine expiring priority use O/G permits as required by FSH 1909.15, Section 31.2 (15). One transitional permit is proposed for reissuance as priority use as required by FSH 2709.14, 53.1q. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47579 UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle, Garfield. LEGAL - Not Applicable. Vail Pass Winter rec Area, Colorado River, Spraddle Creek area, Black Lakes, Homestake Creek, Eagle River, Fulford Cave, Camp Hale, Red Cliff & Homestake Climbing Areas, system roads/trails, & others. Cary Green - Vegetation management In Progress: Expected:12/2015 02/2016 970-827-5160 (other than forest products) Comment Period Public Notice cgreen@fs.fed.us - Fuels management 06/05/2015 Description: Enhance the wildland urban interface community protection zone through vegetation and fuels reduction treatments adjacent to Vail Intermountain and West Vail. Helicopter yarding to accomplish fuels treatments is proposed. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44884 Location: White River National Forest Decision East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) Location: Vail Intermountain Fuels Project Planning Status UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Portions of Sections 12, 13 and 14 , Township 5 South, Range 81 West, 6th Principal Meridian, Eagle County, Colorado. south side of I-70 and west of Vail Resorts Ski Area. West Zone/Aspen Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region James Kirschvink 970-404-3153 jkirschvink@fs.fed.us Washington Carver LLC and Jason Gregg - Land Access Permits on Richmond Ridge - Road management CE Description: Winter Snowmobile access to the Washington Parcel USMS #5964, and the Iron Silver Placer USMS #5963; Cross-country construction access to the Washington Parcel with no permanent road construction, and summer road access to the Iron Silver Parcel *NEW LISTING* Location: 10/01/2015 04:23 am MT In Progress: Scoping Start 08/11/2015 Expected:09/2015 10/2015 UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - N1/2 Sec. 30, NE1/4 Sec. 31, T.10S, R.84W, 6th PM, Pitkin County, CO. These Parcels are 1/4 mile south of the top of the Aspen Mountain Gondola on Richmond Ridge. Page 13 of 18 White River National Forest Project Name White River National Forest Project Purpose Decision Expected Implementation In Progress: Comment Period Public Notice 01/22/2015 Expected:12/2015 Project Contact R2 - Rocky Mountain Region West Zone/Blanco Ranger District (excluding Projects occurring in more than one District) Morapos Creek, Wilson Mesa - Grazing management and Deer Creek Sheep and Goat Grazing Allotments EA Planning Status 01/2016 Mary Gillespie 970-878-6015 mlgillespie@fs.fed.us Description: The proposal is to re-authorize sheep grazing on the Morapos Creek, Wilson Mesa and Deer Creek allotments and identify resource management opportunities. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44050 Location: White River National Forest Heede Pasture Water Improvement Project UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Moffat, Rio Blanco. LEGAL Township 3 North, Range 90 West, Sections 7-10, 15-22, and 29-32 Township 2 North, Range 90 West, Sections 5-8 and 18 Township 2 North, Range 91 West, Sections 1, 2, 11 and 12. The allotments are located on the extreme north side of the Blanco Ranger District, accessed by State Highway 13 to Moffat County Road 41 that turns into Rio Blanco County Road 58. R2 - Rocky Mountain Region West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) - Grazing management Completed Actual: 07/22/2015 07/2015 CE *NEW LISTING* Lydia LaBelle de Rios 970-625-2371 llabellederios@fs.fed.us Description: The proposed action is to install a gravity fed water pipeline from the range improvement pond to the Hoot Owl Cow Camp corral for approximately 2,000 feet. The pipe will be a High Density Polyethylene commonly used for this purpose. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47426 Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Not Applicable. FSR 816, South of Silt, Along Alkali Creek. Lava Boulder Creek Exploratory - Minerals and Geology Well On Hold EA N/A N/A Jason Gross 970-876-9046 jrgross@fs.fed.us Description: Antero Resources is requesting to construct one well pad and to drill up to four wells on Federal lease #COC66708. On Hold awaiting BLM leasing decision. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=28966 Location: 10/01/2015 04:23 am MT UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Mesa. LEGAL - T8S, R90W, Section 17. East Divide Creek, approximately 20 miles southeast of Silt, CO. Page 14 of 18 White River National Forest Project Name White River National Forest Rifle Creek Grazing Allotment Analysis Project Purpose Planning Status Decision Expected Implementation R2 - Rocky Mountain Region West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) - Grazing management EA *NEW LISTING* In Progress: Scoping Start 08/04/2015 Est. Comment Period Public Notice 11/2015 Expected:02/2016 Project Contact 06/2016 Lydia LaBelle de Rios 970-625-2371 llabellederios@fs.fed.us Description: This analysis is to determine whether to continue permitting livestock grazing on all, none, or some portion of the Rifle Creek Grazing Allotment. If authorized, grazing would be managed in a manner that maintains or moves towards desired conditions. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47452 Location: Sheep Salvage Timber Sale UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - T 3 S, R 94 W, and R 93 W. The Rifle grazing allotment is N of the Rifle Ranger District and the Rifle gap State park, off of Buford New Castle Road, going W toward Coulter Mesa. - Forest products Completed Actual: 07/23/2015 08/2015 CE *NEW LISTING* Description: Commercial timber harvest of blowdown Engelmann spruce and subalpine fir trees on 21 acres. The estimated cut volume is 20 to 25 mbf, with spruce comprising 90% of the volume. Ground based logging machinery would be used. Location: Travel Mgmt Plan Rev BNC Corridor Cliff/Meadow Lake, Mansfield/Clark Point and Clinetop Cow Camp EA *UPDATED* UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Not Applicable. It is located in Garfield County, roughly 15 miles due north of New Castle, Colorado in sections 3 and 10 of T. 3S., R. 91W., 6th P.M. - Recreation management - Road management On Hold N/A N/A Kyle Grambley 970-625-6852 kgrambley@fs.fed.us Description: Provide access from campsites to the BNC motorized trail system. Provide access to Clark Ridge by allowing mixed motorized use on a sect. of BNC road. Correct designations and mapping errors providing motorized and non-motorized trail opportunities Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40525 Location: 10/01/2015 04:23 am MT Sarah Hankens 970-625-6840 shankens@fs.fed.us UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - NFSR 860 Section 19, T3S, R91W and Sections 24, 25 and 36, T3S, R92W; NFSR 822 - Sections 10, 15, 22, T3S, R91W; NFSR 245 ¿ Sections 3 and 10, T3S, R91W: NFSR 819 ¿ Sections 5 and 6, T4S, R91W. Buford New Castle Road Corridor, Clark Ridge, Lake Park, Homestead, Cliff/Meadow Lake, Mansfield/Clark Point and Clinetop Cow Camp areas located approximately 12 to 17 miles north and NW of New Castle. Page 15 of 18 White River National Forest Project Name White River National Forest Bowles Ditch and Pipeline Authorization Project Purpose Planning Status Decision Expected Implementation R2 - Rocky Mountain Region West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) - Special use management On Hold N/A Project Contact N/A CE Carrie Surber 970-263-5830 csurber@fs.fed.us Description: Reissuance of expired SU Permit for a spring development and pipeline approx. 1300 feet long. Also for a ditch for supplying water to fish ponds on private lands that is approx. 200 feet long. The permit will continuee to have a 10 foot wide use area Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=32474 Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Sections 20 & 21, T8S, R83W,6PM. Fryingpan road. James Kirschvink 970-945-3313 jkirschvink@fs.fed.us CDOT Highway 133 Debris Dump Site and Placita Roadside Landscaping - Special use management EA Description: CDOT is proposing to permanently store natural road debris inside the bottom switchback east of McClure Pass on Hwy 133. Project will fill in a 16.1-acre depression from original road construction. Includes revegetation of the old Placita fill site. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=24022 Location: Capitol Creek and East Sopris C&H Grazing Allotments EA In Progress: FEIS NOA in Federal Register 08/14/2015 - Grazing management Developing Proposal Est. Scoping Start 10/2015 Expected:04/2016 06/2016 Samantha Dinar 970-404-3169 samanthabdinar@fs.fed .us Description: Proposal to analyze cattle grazing for a total of 913 AUMs between July and October between Capitol Creek and East Sopris Allotments. If authorized, grazing would be managed in a manner that maintains or moves towards desired conditions. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47519 Location: 10/01/2015 04:23 am MT 10/2015 UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Gunnison. LEGAL - NW 1/4 of Section 18, T11S, R88W, 6th P.M. The switchback is located approximately 5 1/2 miles south of Redstone, CO on Hwy 133. The fill will be inside the switchback. EA *NEW LISTING* Expected:10/2015 UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - T 9 S, R 87 W, Sec 2, 10-11, 14-16, 20-22, 26-30 and 32-36 T 9 S, R 86 W, Sec 31-33 T 10 S, R 86 W, Sec 4-6 T 10 S, R 87 W, Sec 1-5, 8-16 and 22-23. The allotments are located on the western side of the Aspen/Sopris Ranger District, accessed by State Hwy 82 to Pitkin County Rd. 11 (Snowmass Creek Rd.) to Pitkin County Rd 9 (Capitol Creek Road). Page 16 of 18 White River National Forest Project Name White River National Forest Project Purpose Planning Status Decision Expected Implementation Project Contact R2 - Rocky Mountain Region West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) Carole Huey 970-945-3219 clhuey@fs.fed.us Competitive or Direct Sale of El Jebel "Tree Farm" Administrative Property - Land ownership management CE Description: Offer for competitive sale to the public or direct sale to a governmental organization 20 acres of land with four houses. This action will be carried out under the authority of the FS FRE Act of 2005 (P.L. 109-54). Location: On Hold N/A N/A UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - N1/2 of Sec. 3, NE1/4 NE1/4 of Sec. 4, T. 8 S., R. 87 W., 6th P.M. to the west of Crown Mountain Park, to the south of Valley Road, and to the north of the Roaring Fork river in El Jebel. James Kirschvink 970-404-3153 jkirschvink@fs.fed.us Crystal River Broadband LLC Town of Marble Fiber optics Line - Special use management CE Description: Burial of Fiber Optics cable along CSH 133, then the line will be mounted on an overhead line owned by Holy Cross Energy. *NEW LISTING* Location: Seven Castles Road Easement Completed Actual: 09/09/2015 09/2015 UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Gunnison. LEGAL - Portions of the: W1/2 Sec.7; N1/2, SE1/4 Sec 18;SW1/4 Sec 17; N1/2 Sec 20, T11S., R88W, 6th PM, Gunnison County, Colorado. Alongside CSH 133 approximately 22 miles south of Carbondale, just north of Horseshoe Bend Switchback, then following existing powerlines that roughly parallel Gunnison County Road 3 into Marble. - Special use management On Hold N/A N/A CE James Kirschvink 970-945-3313 jkirschvink@fs.fed.us Description: Authorization and permanent use of an emergency road cut across NFS land and State of Colorado lands in the Seven Castles area, up the Fryingpan drainage Location: State of Colorado - 2013 Sunlight Peak Communication Site Tower Rebuild and Lease Renewal CE *NEW LISTING* 10/01/2015 04:23 am MT UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - SW1/4 section 2, T8S, R86W, 6th P.M. Approximately 4 miles East of Basalt, up the Fryingpan road, North side of road. This is the site of a massive mudslide 3 years ago. - Special use management In Progress: Scoping Start 08/12/2015 Expected:08/2015 09/2015 James Kirschvink 970-404-3153 jkirschvink@fs.fed.us Description: Removal of outdated tower and replacement with new free-standing tower and other improvements. This will also result in a new lease to replace SOP101401 that will terminate Dec. 31, 2015 Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - SW1/4 SW1/4 Sec.19., T.7S., R.89W., 6th PM, Garfield County, CO. Sunlight Peak is located off FSR 300 just SW of Glenwood Springs, CO. Page 17 of 18 White River National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 10/01/2015 04:23 am MT Page 18 of 18 White River National Forest