Schedule of Proposed Action (SOPA) 04/01/2014 to 06/30/2014 Idaho Panhandle National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact R1 - Northern Region, Occurring in more than one Forest (excluding Regionwide) Upper Lochsa Land Exchange - Land ownership management On Hold N/A N/A EIS Teresa Trulock 208-935-4256 ttrulock@fs.fed.us Description: The Forest Service (FS) is considering a land exchange with Western Pacific Timber. The FS would receive approx. 40,000 acres of WPT land in the upper Lochsa River drainage and WPT would recieve an equal value of Forest Service land in north Idaho. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=26227 Location: UNIT - Sandpoint Ranger District, Palouse Ranger District, North Fork Ranger District, Red River Ranger District, Powell Ranger District , Clearwater Ranger District. STATE - Idaho. COUNTY - Benewah, Bonner, Clearwater, Idaho, Kootenai, Latah. The lands to acquire are in the upper Lochsa River drainage on the border of ID and MT. The federal lands to exchange out of are scattered on the Idaho Panhandle, Clearwater, and Nez Perce NF's. R1 - Northern Region Idaho Panhandle National Forest, Forestwide (excluding Projects occurring in more than one Forest) IPNF Noxious Weed Treatment Project - Vegetation management (other than forest products) EIS In Progress: NOI in Federal Register 10/28/2011 Est. DEIS NOA in Federal Register 09/2014 Expected:04/2015 06/2015 Karl Dekome 208-765-7479 kdekome@fs.fed.us Description: Management of non-native invasive plant species utilizing herbicides, biological control agents, cultural and mechanical methods for weed control. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36183 Location: 04/01/2014 04:42 am MT UNIT - Idaho Panhandle National Forest All Units. STATE - Idaho, Montana, Washington. COUNTY Benewah, Bonner, Boundary, Clearwater, Kootenai, Latah, Shoshone, Lincoln, Sanders, Pend Oreille. LEGAL Not Applicable. Various locations across the forest. Page 1 of 16 Idaho Panhandle National Forest Project Name Project Purpose Planning Status Decision Expected Implementation R1 - Northern Region Idaho Panhandle National Forest, Forestwide (excluding Projects occurring in more than one Forest) Idaho Panhandle and Kootenai National Forest, Forest Plan Revision - Land management planning EIS Description: Forest Plan Revision Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=894 Location: In Progress: Objection Period Legal Notice 09/27/2013 Expected:03/2014 04/2014 Nancy Kertis 208-765-7417 nkertis@fs.fed.us UNIT - Idaho Panhandle National Forest All Units. STATE - Idaho. COUNTY - Benewah, Bonner, Boundary, Clearwater, Kootenai, Latah, Shoshone. LEGAL - Not Applicable. Northern Idaho. R1 - Northern Region Idaho Panhandle National Forest, Occurring in more than one District (excluding Forestwide) Authorization of Frontier Communication's Existing Telephone and Fiber Optic Lines Project Contact - Special use management Developing Proposal Est. Scoping Start 04/2014 Expected:07/2014 08/2014 Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Description: Special use authorization CE Location: Coeur d'Alene Basin Natural Resource Restoration Plan UNIT - Sandpoint Ranger District, Bonners Ferry Ranger District, Priest Lake Ranger District. STATE - Idaho. COUNTY - Bonner, Boundary. LEGAL - Not Applicable. Throughout North Idaho: Bonners Ferry, Priest Lake and Sandpoint Ranger Districts. - Wildlife, Fish, Rare plants - Watershed management EIS In Progress: NOI in Federal Register 06/13/2013 Est. DEIS NOA in Federal Register 07/2014 Expected:12/2014 01/2015 Melissa Christensen 208-783-2115 melissajchristensen@fs. fed.us Description: Restore, rehabilitate, replace, and/or acquire the equivalent of the injured natural resources in the Coeur d'Alene Basin as a result of the release of hazardous mining wastes. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42612 Location: 04/01/2014 04:42 am MT UNIT - Wallace Ranger District, Avery Ranger District. STATE - Idaho. COUNTY - Benewah, Kootenai, Shoshone. LEGAL - Not Applicable. Coeur d'Alene Lake Basin - including the Coeur d'Alene River (North Fork, South Fork, and main stem), the St. Joe River, Lake Coeur d'Alene, and the Upper Spokane River. Page 2 of 16 Idaho Panhandle National Forest Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact R1 - Northern Region Idaho Panhandle National Forest, Occurring in more than one District (excluding Forestwide) Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Northern Lights, Inc. Power Line Special Use Permit Reissuance - Special use management CE Description: Reissuance of existing Special Use Permit for the continued operation and maintenance of a power line across National Forest System lands for an additional 50 year period. *NEW LISTING* Location: Selkirk Mountain Range Winter Travel Plan In Progress: Scoping Start 03/03/2014 Expected:10/2014 11/2014 UNIT - Sandpoint Ranger District, Bonners Ferry Ranger District, Priest Lake Ranger District. STATE - Idaho. COUNTY - Bonner, Boundary. LEGAL - Not Applicable. Various locations throughout Bonner and Boundary Counties. - Recreation management On Hold N/A N/A EIS David Cobb 208-443-6854 dcobb@fs.fed.us Description: Travel management plan for motorized winter recreation use within the Selkirk Mountain Range on the Bonners Ferry, Priest Lake Ranger District and Sandpoint Ranger District. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=15349 Location: Idaho Panhandle National Forest Boulder Creek EA *NEW LISTING* R1 - Northern Region Bonners Ferry Ranger District (excluding Projects occurring in more than one District) - Forest products - Fuels management Developing Proposal Est. Notice of Initiation 05/2014 Expected:10/2015 11/2015 Douglas Nishek 208-267-6765 dnishek@fs.fed.us Description: Ecosystem restoration in various forest types. Project purposes include reducing sediment to Boulder Creek and protecting emergency communication equipment on Black Mountain from wildfire. Location: 04/01/2014 04:42 am MT UNIT - Sandpoint Ranger District, Bonners Ferry Ranger District, Priest Lake Ranger District. STATE - Idaho, Washington. COUNTY - Bonner, Boundary, Pend Oreille. LEGAL - Not Applicable. Priest Lake, Sandpoint, and Bonners Ferry Ranger Districts. UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - Federal lands in all or portions of: T61N, R2E, Sections 1-2, 11-13, 20-36. T61N, R3E, Sections 5-9, 16-22, 27-34. T60N, R2E, Sect. 1-36. T60N, R3E, Sect. 3-9, 16-20, 29-30. T59N, R2E, Sect. 4,BM. The Boulder Creek project is located on federally managed lands in the Boulder Creek Watershed and includes the drainages east of Katka peak. Page 3 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Deer Creek EA *NEW LISTING* Decision Expected Implementation Project Contact R1 - Northern Region Bonners Ferry Ranger District (excluding Projects occurring in more than one District) Albert Helgenberg - Forest products Developing Proposal Expected:11/2015 05/2016 208-265-6643 - Fuels management Est. Notice of Initiation 06/2014 ajhelgenberg@fs.fed.us - Road management Description: The activities associated with this project include timber harvest, timber stand maintenance, fuels treatments, and road maintenance. Location: East-West Access Around Continental Mountain Planning Status UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - Portions of T63N, R2E, Sections 12, 13, 14, 15,16 , 20, 22, 24, 25, 26, 28, 32, 34 and 36; T62N, R2E, Sections 2, 4 and 6; T63N, R3E, Sections 7, 8, 16, 17, 18, 19, 20, 21, 28, 29, 30, 31, 32 and 33;. The Deer Creek project is located north of Moyie Springs in multiple drainages that flow into the Moyie and Kootenai Rivers including Deer Creek, Curley Creek, Skin Creek, Meadow Creek and Fry Creek. - Road management EA In Progress: Notice of Initiation 02/06/2013 Est. Comment Period Public Notice 08/2014 Expected:12/2014 01/2015 Christine Dawe 208-765-7220 cdawe@fs.fed.us Description: Providing safe east-west access across the Selkirk Mtns for U.S. Border Patrol agents by reconstructing portions of the Bog Creek Road (Forest Roads 1013 and 2450). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41296 Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - T65N, R4W, Sections 8, 9, 10, 15, 17, 19 and T65N, R5W, Section 24, B.M. Selkirk Mountains of northern Idaho within 2 miles of the Canadian border. Elk Mountain Farms Water Diversion and Transmission Special Use Permit - Special use management CE Description: Issue a Special Use Permit for maintenance and use of an existing water system. Location: 04/01/2014 04:42 am MT On Hold N/A N/A Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - Section 22, T64N, R1W, B.M. Fisher Creek drainage. Page 4 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Hellroaring EA Idaho Buckhorn Planning Status Decision Expected Implementation R1 - Northern Region Bonners Ferry Ranger District (excluding Projects occurring in more than one District) - Forest products In Progress: - Vegetation management Notice of Initiation 06/07/2013 (other than forest products) Est. Comment Period Public - Fuels management Notice 04/2014 - Watershed management Description: Vegetation management and fuels reduction. Expected:09/2014 Project Contact 02/2015 Douglas Nishek 208-267-6765 dnishek@fs.fed.us Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40785 Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - T64N, R1E, Sections 1, 2, 3, 11, 12, 13; T65N, R1E, Sections 35 and 36; T65N, R2E, Sections 28, 29, 30, 31, 32, 33, 34;T64N, R2E, Sections 3, 4, 5, 6, 7, 8, 9, 16, 17, 18, Boise Meridian. The project encompasses the Hellroaring Creek drainage and is bordered by Round Prairie to the north, Tungsten Mountain to the southwest, and Bussard Mountain to the south. - Fuels management Completed Actual: 02/03/2014 09/2014 CE Jennifer Anderson 208-267-6758 jlanderson02@fs.fed.us Description: Wildlife habitat and big game browse improvement. Also, use prescribed fire to reduce fuels. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40342 Location: 04/01/2014 04:42 am MT UNIT - Bonners Ferry Ranger District. STATE - Idaho, Montana. COUNTY - Bonner, Lincoln. LEGAL - Boise Meridian - T64N, R3E, Sections 15, 16, 20-22, 27-29, 32-34, and T63N, R3E, Sections 3, 4, 9, 10, 15. Principal Meridian - T36N, R34W, Sections 20, 29, 32 and T35N, R34W, Sect. 5, 8, 9, 17. West of Buckhorn Ridge in the Miller, Faro and Keno Creek drainages. The project area is bounded by Deer Creek to the west, Canuck Basin to the north and Buckhorn Ridge to the east. Page 5 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Kreist Creek EA CE Decision Expected Implementation Project Contact R1 - Northern Region Bonners Ferry Ranger District (excluding Projects occurring in more than one District) Shanna Kleinsmith - Forest products In Progress: Expected:08/2014 09/2014 208-267-6729 - Vegetation management Comment Period Public Notice skleinsmith@fs.fed.us (other than forest products) 04/19/2013 - Fuels management Est. Objection Period Legal - Watershed management Notice 05/2014 Description: Vegetation and fuels management to reduce the risk of high-severity wildfires. Maintain and improve aquatic habitat and watershed health. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40768 Location: North Zone TSI Planning Status UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - T64N, R2E, Sections 1, 2, 3, 11, 12, 13, 14, 23, 24, 25, 26, 35, 36. T64N, R3E, Sections 6, 7, 8, 18, 19, 30, 31, 32. T63N, R2E, Sections 1, 2, 11, 12, T64N, R3E, Sections 5, 6, 7. B.M. Bordered by Deer Ridge to the east, the Moyie River to the West, and the Meadow Creek Campground to the South. Encompasses the Feist, Kreist, Snyder and Placer Creek drainages. - Vegetation management (other than forest products) In Progress: Scoping Start 02/11/2014 Expected:04/2014 06/2014 Patrick Behrens 208-267-6743 pbehrens@fs.fed.us Description: Pre-commercial thinning and white pine pruning. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43232 Location: Twenty Mile Creek EA UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Bonner, Boundary. LEGAL - Not Applicable. Various locations throughout the Bonners Ferry, Sandpoint, and Priest Lake ranger districts. - Vegetation management (other than forest products) In Progress: Comment Period Public Notice 04/05/2013 Est. Objection Period Legal Notice 04/2014 Expected:07/2014 09/2014 Douglas Nishek 208-267-6765 dnishek@fs.fed.us Description: Reduce the risk of sediment entering the drinking water through road improvements, road decommissioning, vegetation and fuels management, and to improve grizzly bear habitat. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37730 Location: 04/01/2014 04:42 am MT UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - T61N, R1E, Sections 25, 26, 35, 36. T61N, R2E, Sections 30, 31. T60N, R1E, Sections 1, 2, 12. T60N, R2E, Sections 6, 7, 18. BM. Twenty Mile Creek and Brown Creek drainages. Page 6 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Planning Status Decision Expected Implementation Project Contact R1 - Northern Region Bonners Ferry Ranger District (excluding Projects occurring in more than one District) Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Union Pacific Railroad Communication Site Tower Upgrade - Special use management CE Description: Installation of an 80' self-supporting tower. The existing 60' tower and guyed wooden poles would be removed. In Progress: Scoping Start 03/03/2014 Expected:07/2014 08/2014 *NEW LISTING* Location: Idaho Panhandle National Forest Beaver Creek EIS Coeur d'Alene Ranger District (excluding Projects occurring in more than one District) EA UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T50N R4E, sections 31-35; T49N R3E, sections 1, 12, 13, 24; T49N R4E, sections 1-36; T49N R5E, sections 7, 17-21, 28-32; T48N R5E, section 6; T48N R4E, sections 1-4, 9-11; BM. North to south from Babins Junction to Dago Peak; east to west from White Peak to Fulkerson Peak. Tera Little - Forest products Developing Proposal Expected:10/2014 11/2014 406-329-3662 - Vegetation management Est. Notice of Initiation 10/2013 teralittle@fs.fed.us (other than forest products) - Watershed management Description: The Bottom Canyon project area is located approximately 10 miles north east of the city of Coeur dAlene, ID. The project area is approximately 11,000 acres in size and has high potential for both vegetation and watershed restoration activities Location: 04/01/2014 04:42 am MT R1 - Northern Region Clinton Scott - Forest products In Progress: Expected:05/2014 10/2014 208-769-3030 - Vegetation management Objection Period Legal Notice clscott@fs.fed.us (other than forest products) 02/21/2014 - Fuels management - Watershed management - Road management Description: Proposed watershed improvement, commercial timber harvest, hazardous fuels treatment, fuelbreak construction, reforestation, and associated road management. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40488 Location: Bottom Canyon Project UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - T61N, R2E, Section 30, B.M. Black Mountain Communication Site - Union Pacific Railroad Facility. UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Kootenai. LEGAL - Not Applicable. Kootenai County, ID. T50N R2W sections 7, 8, 17-20 and 30; T50N R2W sections 10-16 and 21-26; T51N R1W sections 6 and 31; T51N R2W sections 1, 2, 35 and 36, Boise Meridian. (Project #4). Page 7 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Double Placer Planning Status Decision Expected Implementation R1 - Northern Region Coeur d'Alene Ranger District (excluding Projects occurring in more than one District) - Minerals and Geology Completed Actual: 02/18/2014 Project Contact 04/2014 CE Timothy Sadler 208-765-7206 tjsadler@fs.fed.us Description: Excavate panel 600' x 30' x 10' and haul pay gravel offsite (private) to process for gold. Gravel returned for reclamation. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39676 Location: Elk Mountain Tungsten UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T49N, R4E, Section 11, B.M. Placer Gulch east of Delta, ID on FR605 in the Trail Creek Drainage. - Minerals and Geology On Hold N/A N/A CE Timothy Sadler 208-765-7206 tjsadler@fs.fed.us Description: Brushing existing trenches and access roads, performing geophysical surveys and geochemical surveys. Location: Fernan Rod & Gun Club Permit Re-Issue UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Kootenai. LEGAL - T49N, R2W, Sections 7, 8, 17, 18, B.M. Beauty Creek drainage, west of Elk Mountain, near Mineral Ridge. - Special use management On Hold N/A N/A EA Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Description: To authorize the continued operation and maintenance of a target range. The target range has operated under the special use permit since 1990. Permit may be issued for up to a 20-year term. Location: Greer Private Road Special Use Permit UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Kootenai. LEGAL - T50 N, R3W, NE1/4, NW1/4 Section 2, B.M. Fernan Hill/Smith Gulch. - Special use management In Progress: Scoping Start 03/25/2014 CE *NEW LISTING* 05/2014 Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Description: Continued use and maintenance of an existing private road across NFS lands for access to private property. The access road is approximately 809 feet in length and 20 feet in width and the only feasible access to the private property. Location: 04/01/2014 04:42 am MT Expected:04/2014 UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Kootenai. LEGAL - T51N, R3W, NW1/4 SE1/4 SE1/4 Section 21, B.M. South Hayden Lake. Page 8 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Harwood Water Transmission Line Reissuance Planning Status Decision Expected Implementation R1 - Northern Region Coeur d'Alene Ranger District (excluding Projects occurring in more than one District) - Special use management Completed Actual: 03/17/2014 Project Contact 03/2014 CE Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Description: Reissuance of a Special Use Permit for continued operation and maintenance of a water transmission line across National Forest System lands to private property for domestic use. Location: Idaho Fish & Game Trail Creek Facility Authorization UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - NW 1/4 Section 1, T52N, R2E, B.M. North of FS Road 422. - Special use management In Progress: Scoping Start 07/01/2010 Expected:04/2014 05/2014 CE Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Description: Occupying facility. Location: Last Rainbow UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T52N, R2E, sec. 19, B.M. Trail Creek drainage, adjacent to Forest Service Road 422. - Minerals and Geology CE *NEW LISTING* Justin Rice 208-765-7356 jwrice@fs.fed.us Developing Proposal Est. NOI in Federal Register 03/2014 Expected:11/2016 06/2017 Jason Kirchner 208-765-7211 jdkirchner@fs.fed.us Description: Proposal by Lookout Pass Ski and Recreation Area to expand its special use permit to upgrade and develop new lifts, ski terrain, parking, access roads, and guest service facilities. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43757 Location: 04/01/2014 04:42 am MT 06/2015 UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - Not Applicable. Lost Creek Drainage in Shoshone County off of Kings Pass Highway (aka FR605). - Recreation management - Special use management EIS *NEW LISTING* Expected:02/2015 Description: Exploratory Placer Pit, 25 feet by 35 feet located on National Forest Lands up the Lost Creek Drainage. Excavation will be down to bedrock with the top 7 feet being overburden and 12 inches being pay gravel to be processed and returned. Location: Lookout Pass Ski Area Expansion Third-Party EIS Developing Proposal Est. Scoping Start 04/2014 UNIT - Fernan Ranger District. STATE - Idaho, Montana. COUNTY - Shoshone, Mineral. LEGAL - Not Applicable. Lookout Pass Ski and Recreation Area on Montana-Idaho Border, approximately 12 miles east of Wallace, Idaho. Page 9 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Moon Digs Planning Status Decision Expected Implementation R1 - Northern Region Coeur d'Alene Ranger District (excluding Projects occurring in more than one District) - Minerals and Geology On Hold N/A Project Contact N/A CE Timothy Sadler 208-765-7206 tjsadler@fs.fed.us Description: Underground mineral exploration involving hand drilling, sampling, and mapping existing adits. Location: Pasold Access Road Reissuance UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T49N, R3E, Section 26, B.M. W. F. Moon Gulch north of Osburn, ID on County Road #930. - Special use management Completed Actual: 03/18/2014 03/2014 CE Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Description: Reissuance of a Special Use Permit for the continued use and maintenance of a private road across National Forest System lands to access private property. Location: Progress Camp Drill Core Exploration UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - SE 1/4 Section 26, T50N, R4E, B.M. Heads north/northwest from Eagle Creek Road. - Minerals and Geology On Hold N/A N/A CE Timothy Sadler 208-765-7206 tjsadler@fs.fed.us Description: Lode mineral exploration consisting of drill holes in five different sites. Location: Prospecting Duke UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T50N, R5E, Section 19 and T50N, R4E, Section 10, BM. Map #7 - E. Fk. of Eagle Creek near Oregon Gulch and N. Fk. of the Coeur d'Alene River just upriver from the Shoshone Work Center. - Minerals and Geology CE Developing Proposal Est. Scoping Start 07/2014 Expected:10/2014 05/2015 Timothy Sadler 208-765-7206 tjsadler@fs.fed.us Description: Trenching 250" x 30' with 200' temporary access road, gravel will be hauled offsite (private) to process for gold and reeturned for reclamation. Location: Idaho Panhandle National Forest 04/01/2014 04:42 am MT UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T49N, R4W, Section 4, B.M. Prospect Gulch south of Babins Junction on the Coeur d'Alene river Ranger District. Priest Lake Ranger District (excluding Projects occurring in more than one District) Page 10 of 16 R1 - Northern Region Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Ashwood Waterline Permit Reissuance Planning Status Decision Expected Implementation R1 - Northern Region Priest Lake Ranger District (excluding Projects occurring in more than one District) - Special use management Completed Actual: 01/13/2014 Project Contact 02/2014 CE Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Description: Reissuance of a Special Use Permit for the continued operation and maintenance of a water transmission line across National Forest System lands to private property for domestic use. Location: Elkins Resort Permit Renewal UNIT - Priest Lake Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - Section 1, T57N, R5W, B.M. Northeast of Quartz Creek. - Special use management CE Developing Proposal Est. Scoping Start 04/2014 Expected:07/2014 08/2014 Debbie Butler (208) 443-6822 dabutler@fs.fed.us Description: Permit renewal Location: Odenberg Waterline Permit Reissuance UNIT - Priest Lake Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - T61N, R4W, Section 19, B.M. Reeder Bay of Priest Lake. - Special use management Completed Actual: 01/13/2014 02/2014 CE Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Description: Reissuance of a Special Use Permit for the continued operation and maintenance of a buried water transmission line across National Forest System lands to private property for domestic use. Location: UNIT - Priest Lake Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - S 1/2 Section 1, T57N, R5W, B.M. Adjacent to Ole Creek. Luke Hixson 208-443-6809 lhixson@fs.fed.us Priest River Experimental Forest Continuing Education Project - Forest products CE Description: A series of commercial thinnings to demonstrate logging practices. Thinning would focus on removing trees with low crown ratios, weak boles, and poor form. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40523 Location: 04/01/2014 04:42 am MT Completed Actual: 02/13/2014 05/2014 UNIT - Priest Lake Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - T58N, R4W, Sections 27 and 28, B.M. Priest River Experimental Forest. Page 11 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Solo Quartz Crystal Management Area Planning Status Decision Expected Implementation R1 - Northern Region Priest Lake Ranger District (excluding Projects occurring in more than one District) - Minerals and Geology On Hold N/A Project Contact N/A CE Timothy Sadler 208-765-7206 tjsadler@fs.fed.us Description: Setting up management parameters for removing crystal material from the site Location: UNIT - Priest Lake Ranger District. STATE - Washington. COUNTY - Pend Oreille. LEGAL - T34N R45E Section 1, Willamette Meridian. Solo Creek drainage approximately one mile up Road #659. Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Thompson Road Association Access Road Permit Reissuance - Special use management CE Description: Reissuance of a Special Use Permit for the continued use and maintenance of a private road across National Forest System lands to access private property. Location: Idaho Panhandle National Forest Avista Lakeview 343 Cedar Creek Distribution Line Burial Completed Actual: 01/13/2014 02/2014 UNIT - Priest Lake Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - Sections 5 and 8, T58N, R4W, B.M. South/Southeast of Priest River. R1 - Northern Region Sandpoint Ranger District (excluding Projects occurring in more than one District) - Special use management In Progress: Scoping Start 03/03/2014 Expected:07/2014 08/2014 CE *NEW LISTING* Description: Burial of approximately 1.2 miles of Avista's existing overhead distribution line from Whiskey Rock campground to Cedar Creek. Location: Clewett Access Road Permit Reissuance Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us UNIT - Sandpoint Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - T54N, R1W, Sections 10 and 15, B.M. East of Lake Pend Oreille. - Special use management Completed CE Actual: 01/13/2014 02/2014 Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Description: Reissuance of a Special Use Permit for the continued use and maintenance of a private road across National Forest System lands to access private property. Location: 04/01/2014 04:42 am MT UNIT - Sandpoint Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - NE 1/4 NW 1/4 Section 32, T56N, R5W, B.M. Access road heads east off of junction of FS Roads 2284 and 2237. Page 12 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Falling Drill Planning Status Decision Expected Implementation R1 - Northern Region Sandpoint Ranger District (excluding Projects occurring in more than one District) - Minerals and Geology On Hold N/A Project Contact N/A CE Timothy Sadler 208-765-7206 tjsadler@fs.fed.us Description: Drill core mineral exploration. One drill site is proposed (up to nine holes drilled from one location). Location: Neumann Water Association Waterline Permit Reissuance UNIT - Sandpoint Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - T.54N., R.1W., Section 1, B.M. Falls Creek. Forest Road 1088 to Falls Creek mine site. - Special use management Completed Actual: 01/13/2014 02/2014 CE Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us Description: Reissuance of a Special Use Permit for the continued operation and maintenance of a water transmission line across National Forest System lands to private property for domestic use. Location: UNIT - Sandpoint Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - Section 3, T54N, R3E, B.M. Approximately 3/4 mile west of Idaho/Montana border. Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us New Cingular Wireless Communication Site Modifications - Special use management CE Description: Addition of a 50kw generator and 1,000 gallon propane tank at New Cingular Wireless's facility on Little Blacktail Mountain in order to upgrade cellular service in the surrounding area. *NEW LISTING* Location: Treasured Landscapes Recreation Projects Expected:07/2014 08/2014 UNIT - Sandpoint Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - T55N, R2W, Section 22, B.M. Fenced facility on Little Blacktail Mountain. - Recreation management EA In Progress: Scoping Start 03/03/2014 In Progress: Notice of Initiation 01/17/2014 Est. Comment Period Public Notice 07/2014 Expected:03/2015 05/2015 Erick Walker 775-884-8120 ewalker02@fs.fed.us Description: Several projects encompassing trail reroute and reconstruction, ATV trail bridge construction, snowmobile warming hut construction, and mountain lake boardwalks. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42843 Location: 04/01/2014 04:42 am MT UNIT - Sandpoint Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - Not Applicable. Projects are located throughout the Lightning Creek drainage north of Clark Fork, ID. Page 13 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Wylie Creek Bridge Repair Planning Status - Road management In Progress: Scoping Start 02/25/2014 Expected:06/2014 Idaho Panhandle National Forest R1 - Northern Region 07/2014 R1 - Northern Region St. Joe Ranger DistricT (excluding Projects occurring in more than one District) - Land ownership management Developing Proposal Est. Scoping Start 04/2014 Expected:07/2014 09/2014 Leann Maupin 208-765-7275 lmaupin@fs.fed.us Description: Conveyance of a Forest Service facility. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44063 Location: Marble Creek Splash Dam Fish Passage Project Sean Stash 208-265-6654 sstash@fs.fed.us UNIT - Sandpoint Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - T59N, R1E, Section 15, B.M. Forest Service Road 280 at Wylie Creek, mile post 4.3. CE *NEW LISTING* Project Contact Description: Replace the existing treated timber bridge with a new, longer spill-through design, pre-fabricated bridge. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43858 Location: Avery White House Conveyance Expected Implementation Sandpoint Ranger District (excluding Projects occurring in more than one District) CE *NEW LISTING* Decision UNIT - Avery Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T45N., R5E., Section 15, BM. Lot 6. St. Joe River in Avery, Idaho. - Wildlife, Fish, Rare plants Completed CE Actual: 02/24/2014 08/2014 Lisa Hawdon 208-245-6045 lhawdon@fs.fed.us Description: The St. Joe Ranger District is partnering with the USFWS, Idaho DEQ, Idaho Dept. of Fish & Game, and Avista Corp to breach two historic splash dams on Marble Creek to increase amount of habitat available for bull trout. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39210 Location: 04/01/2014 04:42 am MT UNIT - St. Maries Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - Section 1, T43N, R3E, BM. Several miles upstream of the creek's confluence with the St. Joe River within the U.S. Forest Service's Grandmother Mountain Roadless Area. Page 14 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest Monitor Project Planning Status Decision Expected Implementation R1 - Northern Region St. Joe Ranger DistricT (excluding Projects occurring in more than one District) - Minerals and Geology CE In Progress: Scoping Start 02/27/2014 Expected:07/2014 Project Contact 08/2014 Timothy Sadler 208-765-7206 tjsadler@fs.fed.us Description: Mineral exploration at seven drill sites Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42329 Location: Simmons CE Ryan Shannahan - Wildlife, Fish, Rare plants In Progress: Expected:05/2014 08/2014 208-245-6210 - Vegetation management Scoping Start 07/13/2012 rmshannahan@fs.fed.u (other than forest products) s - Fuels management Description: Rx burning w/ some planting on 8500 acres to facilitate fire mgmt; reduce natural fuels; provide protection to values at risk; enhance conditions for regeneration of whitebark pine, WP & WL; enhance fire resiliency; increase forage for big game. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39859 Location: St. Joe 2014 Timber Stand Improvement Project UNIT - Avery Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T46N, R7E, Sections 4 - 9, B.M. Between the Manhattan and Mineral Creesk and southwest of Silver Lake. UNIT - Avery Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - Multiple sections in T42N, R9E; T43N, R9E; T44N, R9E; T44N, R10E; T44N, R11E,B.M. Project #4 - Upper St. Joe River Drainage in Simmons, Washout, Goat, Wampus, Indian, Bonehead, Red Ives, Bedrock, Color, and Game Creeks. - Vegetation management (other than forest products) Completed CE Actual: 02/18/2014 06/2014 Lynette Myhre 208-245-2531 lmyhre@fs.fed.us Description: Approximately 1,600 acres of timber stand improvement work inlcuding precommercial thinning and white pine pruning in previously harvested areas. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42169 Location: 04/01/2014 04:42 am MT UNIT - Avery Ranger District. STATE - Idaho. COUNTY - Benewah, Latah, Shoshone. LEGAL - Not Applicable. 1,600 acres across the St. Joe Ranger District. Page 15 of 16 Idaho Panhandle National Forest Project Name Project Purpose Idaho Panhandle National Forest St. Joe Travel Management Plan Planning Status Decision Expected Implementation R1 - Northern Region St. Joe Ranger DistricT (excluding Projects occurring in more than one District) - Recreation management - Road management EA In Progress: Comment Period Public Notice 09/11/2009 Est. Objection Period Legal Notice 05/2014 Expected:07/2014 Project Contact 09/2014 Mary Price 208-245-6022 mprice@fs.fed.us Description: Designating roads and trails for public motorized vehicle use on the St. Joe Ranger District. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=26188 Location: Wooden Spur Resource Management Project EA UNIT - St. Maries Ranger District, Avery Ranger District. STATE - Idaho. COUNTY - Benewah, Clearwater, Latah, Shoshone. LEGAL - Not Applicable. St. Joe Ranger District including Avery RD & St. Maries RD. Timothy Price - Forest products In Progress: Expected:06/2014 07/2014 208-245-6049 - Vegetation management Objection Period Legal Notice tprice@fs.fed.us (other than forest products) 03/25/2014 - Fuels management - Watershed management Description: Vegetation management and water quality improvement in the Cat Spur Drainage on the St. Joe Ranger District Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39858 Location: UNIT - St. Maries Ranger District. STATE - Idaho. COUNTY - Clearwater, Shoshone. LEGAL - T41N, R2E, Sections 5 & 6; T42N, R2E, Sections 19-22, 27-30, 31-33, B.M. Cat Spur Drainage in the West Fork St. Maries River Drainage on the St. Joe Ranger District. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. 04/01/2014 04:42 am MT Page 16 of 16 Idaho Panhandle National Forest