GEO 480: Field Work in Geography, Spring Semester 2013, Fridays 11-4 Schedule Points Day Date Part. Work Fri. (L) 1/18/13 Watershed basics, watershed delineation, team assignments, 3 Writing in geography, fieldnotes, resumes, hypotheses Choice 1/25/13 Team reconnaissance, independent work, no class 4 Fieldnotes, pictures, and hypotheses Fri. (L) 2/1/13 Walk in the watershed, Feb 8 = last day to apply for summer graduation 4 Vans Exposed film or digital pictures on CD & MARKED route map or GPS track Fri. (M) 2/8/13 Photo identification and webpage critique instructions 3 Draft resumes (2 pts.) and 2 hypotheses/person (4 pts.) due 6 Fri. (M) 2/15/13 Webpage critiques due, proposal writing instructions 3 8 Fri. (L) 2/22/13 Alabama Water Watch Certification : 9:00-3:00 4 Fri. (M) 3/1/13 Draft proposals due, annotated bibliography instructions Peer review proposals in class, establish fieldwork needs Fri. (M) 3/8/13 Abstract instructions, data presentation in figures and tables Final resumes due (4), Annotated Bibliography due (8) Fri. (M) 3/15/13 Spring Break…no class 3 Fri. (M) 3/22/13 Trip to C.C.Williams sewage treatment plant (Meet there at 11:00) Final proposals due Fri. (M) 3/29/13 How to do a poster presentation Abstract due Fri (L) 4/5/13 Boat trip on Dog River, meet at Luscher (Navco) Park or Sat Last day to drop - April 5 Fri. (M) 4/12/13 Writing your final report Draft poster due, Peer review posters in class Fri. (M) 4/19/13 Draft report due Peer review reports in class Fri. (M) 4/26/13 Poster session, Lunch at the Shed, 3 Fri. (M) 5/3/13 Guidelines for Final report, fieldnotes, Individual appts. Mon 5/6/12 Final written report due on Monday before 5 PM Turn in fieldnotes, turn in report on CD and as hardcopy 12 3 12 16 3 8 3 3 3 4 16 3 16 3 48 Total Participation Draft work Other written work Final written report Poster presentation Fieldnotes 25% 18% 25% 17% 8% 6% 100% 32 12 142 190