Freedom of Information: Records released as a result of Freedom... (FOI) requests June 2008

advertisement
Freedom of Information: Records released as a result of Freedom of Information
(FOI) requests
June 2008
This table lists the individual records opened in June 2008 as a result of FOI
requests.
Subject
Catalogue reference
Date of record
Description
Records of the
Ceremonial
Branch
Nationality and
Naturalisation
T 333/230
1986 Jan 011992 Dec 31
Badge of Honour: Montserrat, British
Virgin Islands, Anguilla
HO 144/4997
1925
Nationality and
Naturalisation
HO 405/898
1940 Jan 01 1948 Dec 31
NATIONALITY AND
NATURALISATION: Schornikoff,
Stephen (or Stephen Schornikow), from
Russia. Resident in London. Certificate
12456 issued 29 September 1925.
ASSENHEIM. J Date of Birth:
05.06.1879
CAB 128/30/1
CAB 128/30/3
Metropolitan
Police Service Firearms
MEPO 2/9868
1945-1964
Nationality and
Naturalisation
Nationality and
Naturalisation
HO 405/2768
1936 Jan 01 1938 Dec 31
HO 144/7123
1927
Nationality and
Naturalisation
Succession Duty
and Estate Duty
records
Nationality and
Naturalisation
HO 405/9757
IR 62/1376
1935 Jan 011936 Dec 31
1932
HO 144/22135
1935-1945
Succession Duty
and Estate Duty
records
Nationality and
Naturalisation
Nationality and
Naturalisation
Nationality and
Naturalisation
IR 62/1429
1933
Bequest to the Victoria and Albert
Museum: E A Belford
HO 405/9593
1937 Jan 011966 Dec 31
1948 Jan 01 1949 Dec 31
1931
DIAMANSTEIN, B aka DIEMENSTEIN
Date of Birth: 22.09.1882
BESKINE, A M Date of Birth:
16.08.1896
NATIONALITY AND
NATURALISATION: Zinn, Bettina, from
Latvia. Resident in London. Certificate
AZ764 issued 4 December 1931.
HO 405/4309
HO 144/14295
Home Office guidelines regarding the
grant and renewal of firearms
certificates for the purposes of
protection
BLUSTEIN, H aka BLUESTONE, H aka
BLOSTONE Date of Birth: 07.10.1901
NATIONALITY AND
NATURALISATION: Cohen, Hugo
Oscar. No Nationality. Resident in
Bradford. Certificate 15412 issued 25
November 1927.
DUC, T M C aka DUC Date of Birth:
13.07.1891
Bequest to the National Portrait Gallery
and the Yorkshire Museum respectively:
E Sumner
NATIONALITY AND
NATURALISATION: Registration of
naturalised British subjects.
WAR: Registration of neutralised
British subjects.
Nationality and
Naturalisation
HO 144/7959
1927
Nationality and
Naturalisation
HO 144/14713
1931
Nationality and
Naturalisation
HO 144/8824
1928
Nationality and
Naturalisation
HO 144/6008
1926
National Coal
Board: Minute
Series
National Coal
Board: Minute
Series
National Coal
Board: Minute
Series
National Coal
Board: Minute
Series
National Coal
Board: Minute
Series
Nationality and
Naturalisation
Nationality and
Naturalisation
Nationality and
Naturalisation
Nationality and
Naturalisation
Nationality and
Naturalisation
COAL 77/8329
1976-1987
COAL 89/63
1951 Apr-1989
July
COAL 77/8326
1978-1988
COAL 89/276
1968 May- 1989
Aug
COAL 89/103
1969 Nov-1983
Aug
Cardowan Colliery Scottish North
HO 405/36367
1949 Jan 01 1949 Dec 31
1948 Jan 01 1949 Dec 31
1947 Jan 01 1949 Dec 31
01/01/1943 31/12/1965
MANSI, M L O; MANSI, G Dates of birth
04/01/1892; 29/02/1888
MERFELD, A D A K Date of birth
27/07/1879
MEYER, O Date of birth 30/03/1885
HO 405/35805
HO 405/35830
HO 405/4323
HO 144/16619
1932
Prime Minister's
Office
Law Officers'
Department
PREM 13/1036
1965-1966
LO 2/406
1966
Law Officers'
Department
LO 2/409
1966
Law Officers'
Department
LO 2/411
1966-1967
Law Officers'
Department
LO 2/420
1967
NATIONALITY AND
NATURALISATION: Berntzwiller,
Charles Gourt (or Charles Gourt Bryan),
from the United States of America.
Resident in Tonypandy, Glam.
Certificate 15164 issued 19 September
1927. Re-admission.
NATIONALITY AND
NATURALISATION: Cuker, Calman
(known as Calman Sugar), from Russia.
Resident in Hull. Certificate A19500
issued 3 March 1931.
NATIONALITY AND
NATURALISATION: Sugar, Louis, from
Russia. Resident in Kingston-upon-Hull.
Certificate 16093 issued 11 June 1928.
NATIONALITY AND
NATURALISATION: Zinn, Willy
Vladimir, from Russia. Resident in
London. Certificate 13745 issued 31
August 1926.
Special Colliery Consultative
Committee Minutes Formation:
Seafield Colliery
Bilston Glen Colliery Scottish South
Area
Special Colliery Consultative
Committee Minutes Formation:
Bilston Glen Colliery
Monktonhall Colliery Scottish South
Area
BAUER, H Date of Birth: 09.02.1913
NATIONALITY AND
NATURALISATION: Petersen, Axel
Anders, from Denmark. Resident in
Liverpool. Certificate AZ1544 issued 8
June 1932.
NATIONALISATION. Future of Brigade
of Gurkhas
Applications for the attorney-general's
fiat under the Race Relations Act
1965: Corney, J, Bean J: no consent.
Applications for the attorney-general's
fiat under the Race Relations Act
1965:"Britain Awake": no consent.
Applications for the attorney-general's
fiat under the Race Relations Act
1965: Jordan, C, Pollard, P: consent.
Applications for the attorney-general's
fiat under the Race Relations Act
1965: Jordan, C: no consent.
Law Officers'
Department
LO 2/426
1967
Law Officers'
Department
LO 2/427
1967
Law Officers'
Department
LO 2/432
1967
Law Officers'
Department
LO 2/433
1967
Law Officers'
Department
LO 2/437
1967
Law Officers'
Department
LO 2/443
1967
Law Officers'
Department
LO 2/451
1967
Law Officers'
Department
LO 2/470
1968
Law Officers'
Department
LO 2/485
1968
Home Office:
Registered
Papers
HO 144/20969
1916 Feb 3 1918 Dec 18
Nationality and
Naturalisation
Nationality and
Naturalisation
Home Office:
Registered
Papers
HO 405/6539
1947 Jan 01 1948 Dec 31
1934 Jan 01 1935 Dec 31
1920-1921
Nationality and
Naturalisation
HO 405/5935
HO 405/2229
HO 144/1684/400430
1948 Jan 01 1948 Dec 31
Applications for the attorney-general's
fiat under the Race Relations Act
1965: National Front: no consent.
Applications for the attorney-general's
fiat under the Race Relations Act
1965: Kinsman Book Club: no
consent.
Applications for the attorney-general's
fiat under the Race Relations Act
1965:"The British Independent": no
consent.
Applications for the attorney-general's
fiat under the Race Relations Act
1965:"Southern News": no consent.
Applications for the attorney-general's
fiat under the Race Relations Act
1965:"The British Independent": no
consent.
Applications for the attorney-general's
fiat under the Race Relations Act
1965:"Southern News": no consent.
Applications for the attorney-general's
fiat under the Race Relations Act
1965: Nicholson, Rev G: no consent.
Applications for the attorney-general's
fiat under the Race Relations Act
1965: Nationalist Centre, Birkbeck
Hill, London, SE21 no consent.
Applications for the attorney-general's
fiat under the Race Relations Act
1965: Anti-Semitic propaganda in
Arabic: no consent.
CRIMINAL CASES: LINCOLN,
Ignatius Timothy Trebitsch Convicted
at Central Criminal Court (CCC) on 27
June 1916 for forgery and sentenced
to 3 years penal servitude
EXTRADITION: Extradition from the
United States of America of Trebitsch
Lincoln on a charge of forgery.
NATIONALITY AND
NATURALIZATION: Naturalisation
(with subsequent revocation) of
Ignatius Timothy Trebitsch Lincoln, a
former MP who became a German
spy.
BEETZ, W G Date of Birth: 31.12.1898
BRONSTEIN, I Date of Birth:
15.11.1888
SEDITION; WARRANTS: Warrants
authorising the production of letters and
telegrams to and from Russia for
inspection.
BAUM, D Date of Birth: 02.10.1907
Nationality and
Naturalisation
HO 144/5770
1926
Nationality and
Naturalisation
HO 144/8877
1928
Nationality and
Naturalisation
HO 144/10175
1929
Nationality and
Naturalisation
HO 144/11955
1930
Nationality and
Naturalisation
HO 144/12195
1930
Nationality and
Naturalisation
Selected Death
Duty Accounts
Home Office:
Registered
Papers
Nationality and
Naturalisation
Nationality and
Naturalisation
Nationality and
Naturalisation
Home Office:
Dangerous Drugs
(DDA Symbol
Series) and
Drugs Record
Cases
HO 405/16228
IR 59/711
1938 Jan 01 1944 Dec 31
1929-1940
HO 144/19776
1909-1935
HO 405/14390
1948 Jan 01 1949 Dec 31
1939 Jan 01 1957 Dec 31
1949 Jan 01 1951 Dec 31
1977 Jun 13 1980 Jan 07
Piper Alpha
Public Inquiry
EG 5/79
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/80
1990 Jan 01 1990 Dec 31
HO 405/14455
HO 405/19341
HO 319/237
NATIONALITY AND
NATURALISATION: Jacobson, Israel,
from Russia. Resident in Preston
Lancs. Certificate 13460 issued 14 June
1926.
NATIONALITY AND
NATURALISATION: Krafchik,
Benjamin, from Russia. Resident in
Preston. Certificate 16072 issued 1
June 1928.
NATIONALITY AND
NATURALISATION: Kuch, Georg
Friedrich (or George Frederick Cook).
No Nationality. Resident in Sunderland.
Certificate B.928 issued 8 February
1929. Kuch, Elise (or Elise Cook). Child
of Georg Friedrich Kuch. Certificate
B.928.
NATIONALITY AND
NATURALISATION: Kostchuk, Jankel
(or Jacob (or Jack) Kostick), from
Russia. Resident in London. Certificate
18898 issued 3 November 1930.
NATIONALITY AND
NATURALISATION: Cohen, Shemel (or
Samuel Cohen), from Russia. Resident
in Liverpool. Certificate 18882 issued 28
October 1930.
GERSON, K A; GERSON, R M Dates of
birth 13.12.1880; 27.06.1903
WEATHERLY, Frederick Edward
ROYAL - TITLE ROYAL AND ROYAL
ARMS: Title Royal: Royal Tunbridge
Wells
FEINGOLD, E Date of birth 17.11.1904
FEINGOLD, J; FEINGOLD, M A Dates
of birth 17.03.1908; 25.07.1907
GRYCMAN, B aka BERNARD Date of
birth 01.04.1891
Advisory Council on the Misuse of
Drugs: Working Group on Treatment
and Rehabilitation; paper on treatment
and rehabilitation facilities in prisons.
Investigation into the treatment of drug
addicts in prison, which culminated in
the publication in December 1979 of the
report 'Study of Treatment of Drug
Dependents Within the Prison System
in England and Wales'. This report
recommended rehabilitation
arrangements after release for those
treated in prison, to reduce relapse
once out of custody.
Includes statistics showing a marked
increase in drug offences for both men
and women serving sentences of two
years and over.
Piper Alpha platform: diagrams;
photographs of a 1:33 scale model
showing indicated areas
Piper Alpha platform: photographs of
a 1:100 scale model of entire platform
Piper Alpha
Public Inquiry
EG 5/95
1988 Mar 23 1988 Jul 06
Piper Alpha
Public Inquiry
EG 5/133
1989 Jan 01 1989 Jan 31
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/198
1990 Jan 01 1990 Dec 31
1990 Jan 01 1990 Dec 31
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/211
Piper Alpha
Public Inquiry
EG 5/242
EG 5/199
EG 5/208
EG 5/240
1990 Jan 01 1990 Dec 31
1990 Jan 01 1990 Dec 31
1986 Feb 01 1986 Feb 28
Methanol injection on the Piper Alpha
platform: schematic; Production
equipment to be shutdown for
maintenance work: list; Gas
Conservation Module (GCM)
shutdown: proposed list of work dated
July 1988; Replacement cooler:
memorandum of 6 July 1988 by
Occidental; Pressure Safety Valve
(PSV) recertification on the Piper
Alpha platform: list of work dated 20
May 1988; Piper Alpha platform:
diagrams of various sections of the
platform in relation to maintenance
activities; Daily reports on the
maintenance of apparatus on the
Piper Alpha platform: collection of
memoranda by Occidental dated 3-5
July 1988; Removal of prover on the
Piper Alpha platform: memorandum of
24 June 1988 by Occidental; Phase 1
operation - methanol injection:
memorandum of 23 March 1988;
Monthly maintenance reports for May
and June 1988 on work carried out on
the Piper Alpha platform
Reproductions of photographs and
drawings which were presented on
photographic slides during evidence
given by Mr Konrad R Wottge,
Facilities Engineering Manager of
Occidental Petroleum (Caledonia)
Limited: the reproductions illustrate
the ownership and development of
the Piper Field and adjacent fields,
the design and layout of the Piper
Alpha platform, and organisation of
operations on the platform
Diagram of the Control Room layout
on the Piper Alpha platform
Photograph of the Control Room on
the Piper Alpha platform
Sixty-eight foot level deck support
frame on the Piper Alpha platform:
diagram of layout; Module C of the
Piper Alpha platform: diagram of
layout
Photographs of liferafts on the Piper
Alpha platform
Pressure rating of Condensate
Injection Pump Relief Valves on the
Piper Alpha platform; Condensate
injection pump: diagram by Bechtel
International Ltd; Modifications to the
Piper Alpha platform: data sheets and
diagrams by Bechtel International
Limited
68 foot level deck support frame
layout on the Piper Alpha platform:
diagram; Fire and gas detection
apparatus on the 68 foot level deck
support frame: diagram of February
1986; Fire and gas detection
Piper Alpha
Public Inquiry
EG 5/263
1989 Apr 13
Piper Alpha
Public Inquiry
EG 5/318
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/326
1985 May 02 1986 Apr 24
Piper Alpha
Public Inquiry
EG 5/327
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/341
1979 Jun 01 1979 Jun 30
Piper Alpha
Public Inquiry
EG 5/350
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/351
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/352
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/353
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/354
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/355
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/356
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/357
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/377
1989 Jun 08
Piper Alpha
Public Inquiry
EG 5/389
1988 Jan 12 1988 May 12
Piper Alpha
Public Inquiry
EG 5/395
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/396
1990 Jan 01 1990 Dec 31
Piper Alpha
EG 5/535
1990 Jan 01 -
apparatus in the Speem module:
diagram of February 1986; Module C:
diagram
MSV Tharos: diagram by Occidental
Petroleum (Caledonia) Limited
showing gangway extended and
landed on the Piper Alpha platform
Fire resisting screen between Module
B and Module C on the Piper Alpha
platform: diagram by Durasteel Ltd
Shutdown of condensate injection
pumps on the Piper Alpha platform:
scope of work and drawings
Shutdown of condensate booster
pump and suction valve on the Piper
Alpha platform: scope of work and
drawing
Classification of hazardous areas on
the Piper Alpha platform: diagrams by
Occidental of Britain Inc
Modifications to the Piper Alpha
platform: diagram by Bechtel
International Limited
Modifications to the Piper Alpha
platform: diagram by Bechtel
International Limited
Modifications to the Piper Alpha
platform: diagram by Bechtel
International Limited
Modifications to the Piper Alpha
platform: diagram by Bechtel
International Limited
Modifications to the Piper Alpha
platform: diagram by Bechtel
International Limited
Modifications to the Piper Alpha
platform: diagram by Bechtel
International Limited
Modifications to the Piper Alpha
platform: diagram by Bechtel
International Limited of condensate
injection piping and instrumentation
Modifications to the Piper Alpha
platform: diagram by Bechtel
International Limited of condensate
injection piping and instrumentation
Extent of damage caused by initial
explosion on the Piper Alpha platform
and probable effects on critical
systems: report by Technica,
Consulting Scientists and Engineers,
for Messrs Paull and Williamson
Condensate Injection Pump 'A' on the
Piper Alpha platform: job details
report
Photograph of Pressure Safety Valve
(PSV) of Condensate Pump 'A' on the
Piper Alpha platform
Photograph of Pressure Safety Valve
(PSV) of Condensate Pump 'B' on the
Piper Alpha platform
Diagram of Firewall and Escape
Public Inquiry
1990 Dec 31
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/567
Piper Alpha
Public Inquiry
EG 5/797
1985 Aug 01 1985 Aug 31
Piper Alpha
Public Inquiry
EG 5/809
1985 Oct 01 1985 Oct 31
Piper Alpha
Public Inquiry
EG 5/810
1985 Jul 01 1985 Jul 31
Piper Alpha
Public Inquiry
EG 5/811
1985 Jul 01 1985 Jul 31
Piper Alpha
Public Inquiry
EG 5/812
1987 Oct 01 1987 Oct 31
Piper Alpha
Public Inquiry
EG 5/813
1985 Jul 01 1985 Jul 31
Piper Alpha
Public Inquiry
EG 5/814
1987 Jun 01 1987 Jun 30
Piper Alpha
Public Inquiry
EG 5/815
1987 May 01 1987 May 31
Piper Alpha
Public Inquiry
EG 5/816
1985 Oct 01 1985 Oct 31
Piper Alpha
Public Inquiry
EG 5/817
1986 Oct 01 1986 Oct 31
Piper Alpha
Public Inquiry
EG 5/818
1985 Sep 01 1985 Sep 30
Piper Alpha
Public Inquiry
EG 5/819
1985 Oct 01 1985 Oct 31
Piper Alpha
Public Inquiry
EG 5/820
1986 Oct 01 1986 Oct 31
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/821
1982 Dec 01 1982 Dec 31
1987 Nov 01 1987 Nov 30
1985 Feb 01 1985 Feb 28
1990 Jan 01 1990 Dec 31
1984 Sep 01 1984 Sep 30
1978 Feb 01 1978 Feb 28
Piper Alpha
EG 5/828
EG 5/796
EG 5/822
EG 5/823
EG 5/825
EG 5/826
EG 5/827
1990 Jan 01 1990 Dec 31
1986 Dec 01 1986 Dec 31
1980 Mar 01 -
Routes in Module 'D' of the Piper
Alpha platform
Condensate Injection Pump on the
Piper Alpha platform: schematic
Final Gas Dehydration Facilities on
the Piper Alpha platform: Piping and
Instrumentation Diagram
Condensate Injection Piping and
Instrument Diagram (Piper Alpha
platform)
Gas Compression Facilities on the
Piper Alpha platform: Piping and
Instrumentation Diagram
Gas Compression Facilities on the
Piper Alpha platform: Piping and
Instrumentation Diagram
Gas Compression Facilities on the
Piper Alpha platform: Piping and
Instrumentation Diagram
Gas Compression Facilities on the
Piper Alpha platform: Piping and
Instrumentation Diagram
Firewater and Utility Water Pumps on
the Piper Alpha platform: Piping and
Instrument Diagram
Gravity Drains (Open) to Sump Pile
on the Piper Alpha platform: Piping
and Instrument Diagram
Pressure Drains (Closed) and Gravity
Drains (Open) to Sump Pile on the
Piper Alpha platform: Piping and
Instrument Diagram
Fuel Gas System on the Piper Alpha
platform: Process and Instrument
Diagram
Diesel Fuel System on the Piper
Alpha platform: Piping and Instrument
Diagram (Sheet 1)
Diesel Fuel System on the Piper
Alpha platform: Piping and Instrument
Diagram (Sheet 2)
Instrument and Utility Air System on
the Piper Alpha platform: Piping and
Instrument Diagram
Instrument and Utility Air Systems on
the Piper Alpha platform: Piping and
Instrument Diagram
Firewater Deluge System in Module
'C'
Production Deck of Module 'B' of the
Piper Alpha platform: plot plan
Production Deck of Module 'C' of the
Piper Alpha platform: plot plan
Firewall and Escape Route layout on
the Piper Alpha platform
Gasline Scraper Launcher facilities:
Piping layout
Condensate Injection and Gas
Transmission Facilities at Production
Deck Level on the Piper Alpha
platform: Piping layout
Condensate Injection Facility at Deck
Public Inquiry
1980 Mar 31
Piper Alpha
Public Inquiry
EG 5/829
1980 Mar 01 1980 Mar 31
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/830
1985 Oct 01 1985 Oct 31
1990 Jan 01 1990 Dec 31
1987 Oct 01 1987 Oct 31
Piper Alpha
Public Inquiry
EG 5/854
1982 Nov 29
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/855
1990 Jan 01 1990 Dec 31
1990 Jan 01 1990 Dec 31
1990 Jan 01 1990 Dec 31
1990 Jan 01 1990 Dec 31
1979 Nov 01 1979 Nov 30
1982 Apr 01 1982 Apr 30
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/861
Piper Alpha
Public Inquiry
EG 5/863
1982 Nov 01 1982 Nov 30
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/864
1979 Jul 01 1979 Jul 31
1985 Nov 01 1985 Nov 30
1986 Jan 01 1986 Jan 31
1986 Jan 01 1986 Jan 31
1986 Jan 01 1986 Jan 31
1986 Jan 01 1986 Jan 31
1986 Jan 01 1986 Jan 31
1987 Jan 01 1987 Jan 31
1987 Jan 01 1987 Jan 31
1987 Jan 01 1987 Jan 31
1987 Jan 01 1987 Jan 31
1990 Jan 01 1990 Dec 31
EG 5/831
EG 5/832
EG 5/856
EG 5/857
EG 5/858
EG 5/859
EG 5/860
EG 5/862
EG 5/865
EG 5/878
EG 5/879
EG 5/880
EG 5/881
EG 5/882
EG 5/883
EG 5/884
EG 5/885
EG 5/886
EG 5/784
1984 Aug 01 1984 Aug 31
1982 Nov 01 1982 Nov 30
Support Frame level of the Piper
Alpha platform: Piping layout
Condensate Injection Facilities at
Deck Support Frame level of the
Piper Alpha platform: Piping plan
Piper Gas Conservation Project: Gas
Line to the MCP-01 platform
Deck Support Frame: Equipment and
Walkway Location plan
Condensate Injection on the Piper
Alpha platform: Piping and Instrument
Diagram
Isometric of Eighteen Inch
Piper/Tartan Gas Riser at the Piper
Alpha platform
Cause and Effect Diagram: Fire/Gas
Panels on Deck Support Frame
Cause and Effect Diagram: Fire/Gas
Panels on Deck Support Frame
Cause and Effect Diagram: Fire Gas
Mimic Panel on the Piper Alpha
Cause and Effect Diagram: Fire Gas
Mimic Panel on the Piper Alpha
Condensate System on the Piper
Alpha platform: Pneumatic Schematic
Reciprocal Compressor Control
Panels on the Piper Alpha platform:
Pneumatic Schematic
Control Room on the Piper Alpha
platform: Layout
Fire and Gas System on the Piper
Alpha platform: Functional Logic
Diagrams for Fire Zones C1 and C2
Fire and Gas System on the Piper
Alpha platform: Functional Logic
Diagrams for Fire Zones C3, C4 and
C5
Process and Utility Flow Diagram for
the Piper Alpha platform
Overall Single Line Diagram (Piper
Alpha platform)
Piper Alpha platform: Overall plan
view
Piper Alpha platform: plan on EL
+107 feet -61/4 inches
Piper Alpha platform: plan on EL +83
feet -61/4 inches
Piper Alpha platform: plan on EL +68
feet -0 inches
Piper Alpha platform: plan on EL +20
feet -0 inches
Piper Alpha platform: East Elevation
Piper Alpha platform: West Elevation
Piper Alpha platform: North Elevation
Piper Alpha platform: South Elevation
Overall Equipment and Module
Location plan for the Deck Support
Frame level of the Piper Alpha
platform
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/785
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/793
Piper Alpha
Public Inquiry
EG 5/802
1987 May 01 1987 May 31
Piper Alpha
Public Inquiry
EG 5/803
1986 Oct 01 1986 Oct 31
Piper Alpha
Public Inquiry
EG 5/804
1986 Oct 01 1986 Oct 31
Piper Alpha
Public Inquiry
EG 5/805
1986 Oct 01 1986 Oct 31
Piper Alpha
Public Inquiry
EG 5/806
1986 Oct 01 1986 Oct 31
Piper Alpha
Public Inquiry
EG 5/807
1985 Oct 01 1985 Oct 31
Piper Alpha
Public Inquiry
EG 5/824
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/833
1988 Oct 12
EG 5/834
1988 Oct 11
Piper Alpha
Public Inquiry
EG 5/852
1988 Mar 01 1988 Mar 31
EG 5/786
EG 5/787
EG 5/788
EG 5/789
EG 5/790
EG 5/791
EG 5/792
EG 5/794
EG 5/798
EG 5/799
EG 5/800
EG 5/801
1987 Oct 01 1987 Oct 31
1986 Sep 01 1986 Sep 30
1986 May 01 1986 May 31
1990 Jan 01 1990 Dec 31
1990 Jan 01 1990 Dec 31
1987 Dec 01 1987 Dec 31
1981 Dec 01 1981 Dec 31
1986 Mar 01 1986 Mar 31
1990 Jan 01 1990 Dec 31
1987 Feb 01 1987 Feb 28
1987 May 01 1987 May 31
1986 Oct 01 1986 Oct 31
1985 Nov 01 1985 Nov 30
1987 Jun 01 1987 Jun 30
Foam Compound Production Deck
Firefighting and Detection, Gas and
Utility Modules
Firefighting and Detection, Deck
Support Frame
Flare System, Phase One and Two
Operation: Process Flow Diagram
Flare System, Phase One and Two
Operation: Process Flow Diagram
Fuel Gas System: Process Flow
Diagram
Firewater: Process Flow Diagram
Firefighting Water and Foam Deluge
System, Gas Conservation Module
(GCM) and Deck Support Frame
Methanol Injection System: Process
Flow Diagram
Platform Flare System: Piping and
Instrument Diagram
Piper Gas Sales Project, Phase One:
Piping and Instrument Diagram
Hydrate Inhibitor Injection: Piping and
Instrument Diagram
Gas line from Tartan platform to Piper
Firewater and Utility Water
Distribution on the Piper Alpha
platform: Piping and Instrument
Diagram
Crude Production and Pumping
Facilities on the Piper Alpha platform:
Piping and Instrumentation Diagram
Crude Production and Pumping
Facilities on the Piper Alpha platform:
Piping and Instrumentation Diagram
Crude Production and Pumping
Facilities on the Piper Alpha platform:
Piping and Instrumentation Diagram
Crude Production and Pumping
Facilities on the Piper Alpha platform:
Piping and Instrumentation Diagram
Gas Compression Facilities on the
Piper Alpha platform: Piping and
Instrument Diagram
Gas Compression Facilities on the
Piper Alpha platform: Piping and
Instrumentation Diagram
Fire Fighting equipment on the
Production Deck of the Piper Alpha
platform
Gas Compression on the Piper Alpha
platform: System Isometric (Sheet 1)
Gas Compression Phase One on the
Piper Alpha platform: System
Isometric (Sheet 2)
Isometric of Sixteen Inch Gas Riser
from Pig Launcher to Sea-bed
Hydrocouples on the Piper Alpha
platform
Piper Alpha
Public Inquiry
EG 5/853
1978 Oct 10
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/866
1979 Mar 01 1979 Mar 31
1990 Jan 01 1990 Dec 31
1990 Jan 01 1990 Dec 31
1990 Jan 01 1990 Dec 31
1979 Jan 01 1979 Jan 31
1990 Jan 01 1990 Dec 31
Piper Alpha
Public Inquiry
EG 5/872
1979 Feb 01 1979 Feb 28
Piper Alpha
Public Inquiry
EG 5/873
1979 Feb 01 1979 Feb 28
Piper Alpha
Public Inquiry
EG 5/874
1986 Oct 01 1986 Oct 31
Piper Alpha
Public Inquiry
EG 5/875
1986 Oct 01 1986 Oct 31
Piper Alpha
Public Inquiry
EG 5/876
1985 Oct 01 1985 Oct 31
Piper Alpha
Public Inquiry
EG 5/877
1985 Oct 01 1985 Oct 31
Piper Alpha
Public Inquiry
EG 5/887
1987 Oct 01 1987 Oct 31
Piper Alpha
Public Inquiry
EG 5/888
1987 Jul 01 1987 Jul 31
Piper Alpha
Public Inquiry
EG 5/889
1987 Jul 01 1987 Jul 31
Piper Alpha
Public Inquiry
EG 5/890
1988 Jan 01 1988 Jan 31
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
Piper Alpha
Public Inquiry
EG 5/891
1987 Jul 01 1987 Jul 31
1987 Jan 01 1987 Jan 31
1982 Nov 01 1982 Nov 30
1982 Nov 01 1982 Nov 30
Piper Alpha
Public Inquiry
EG 5/895
EG 5/867
EG 5/868
EG 5/869
EG 5/870
EG 5/871
EG 5/892
EG 5/893
EG 5/894
1988 May 01 1988 May 31
Isometric for Connection between Pig
Trap and Sealine Connection at the
Piper Alpha platform
Fire Water Main
Firewater Deluge System Isometric,
Gas Conservation Module
Firewater Piping Isometric for
Condensate Injection Pumps
Firewater Piping Isometric for Plant
number 9 Scraper Traps
Firewater Deluge System Isometric:
Scraper Launcher Platform
Production Deck Piping Arrangement:
Module 'C' West on the Piper Alpha
platform
Production Deck Piping Arrangement:
Module 'C' West on the Piper Alpha
platform
Production Deck Piping Arrangement:
Module 'C' East on the Piper Alpha
platform
Firewater System Replacement in
Module 'B' (West Side) of the Piper
Alpha platform: System Isometric
Firewater System Replacement in
Module 'B' (East Side) of the Piper
Alpha platform: System Isometric
Gravity Drains (Open) on the Piper
Alpha platform to Overboard Dump:
Piping and Instrument Diagram
Gravity Drains (Open) on the Piper
Alpha platform to Overboard Dump:
Piping and Instrument Diagram
Wellhead production system on the
Piper Alpha platform (Wellheads
numbers P13, P1 and P10): Piping
and Instrument Diagram
Firewater Deluge Replacement in
Module 'A' East of the Piper Alpha
platform: System Isometric
Firewater Deluge Replacement in
Module 'A' West of the Piper Alpha
platform: System Isometric
'As Built' Composite Arrangement of
Gas Lift Supply Headers on the Piper
Alpha platform
Fire and Gas Equipment in Module 'A'
of the Piper Alpha platform: layout
Fire and Gas Equipment in Module 'B'
of the Piper Alpha platform: layout
Fire and Gas Equipment in Module 'C'
Fire and Gas Equipment in the
Utilities and Sub-Utilities Modules of
the Piper Alpha platform: layout
Fire and Gas Equipment in the
Scraper Launcher and the Produced
Water Disposal System of the Piper
Alpha platform: layout
Piper Alpha
Public Inquiry
EG 5/896
1983 Mar 08
Piper Alpha
Public Inquiry
EG 5/897
1988 May 01 1988 May 31
Piper Alpha
Public Inquiry
EG 5/898
1987 Jul 01 1987 Jul 31
Piper Alpha
Public Inquiry
EG 5/899
1987 Jul 01 1987 Jul 31
Piper Alpha
Public Inquiry
EG 5/900
1987 Jul 01 1987 Jul 31
Piper Alpha
Public Inquiry
EG 5/901
1987 May 01 1987 May 31
Piper Alpha
Public Inquiry
EG 5/902
1982 Oct 01 1982 Oct 31
Nationality and
Naturalisation
HO 144/8508
1898;1928
Nationality and
Naturalisation
HO 144/8131
1927
Nationality and
Naturalisation:
Aliens
HO 144/1715/143162
1906-1921
Nationality and
Naturalisation
HO 144/8679
1928
Prison
Commission and
Home Office
Prison
Commission and
Home Office
Prison
Commission and
Home Office
PCOM 9/934
1942
PCOM 9/997
1943
PCOM 9/724
1943-1949
HO 405/4323
01/01/1943 31/12/1965
1971 Jan 01 1979 Dec 31
BAUER, H Date of Birth: 09.02.1913
1986 Jan 01 1986 Dec 31
Member of railway staff killed on line at
Elsenham, Suffolk on 14 October 1985.
With plans
Nationality and
Naturalisation
Records of the
Employment
Policy Divisions
British Transport
Commission
LAB 109/20
AN 183/656
Fire and Gas Equipment on the
Condensate Pump platform of the
Piper Alpha platform: layout
Fire and Gas Equipment in the Pig
Launcher area of the Piper Alpha
platform: layout
Fire and Gas Equipment on the Drill
Floor and Lower Mezzanine of the
Piper Alpha platform: layout
Fire and Gas Equipment in the Mud
Module and Shaker of the Piper Alpha
platform
Fire and Gas Equipment in the
Cement Pod Module and Sack
Storage Module: layout
Fire and Gas Equipment on the
Production Deck of Module 'D' of the
Piper Alpha platform: layout
Fire and Gas Equipment in the
Electrical Workshop, Control Room,
Uninterrupted Power Supply Room
and Battery Room on the Piper Alpha
platform: layout
NATIONALITY AND
NATURALISATION: Cohen, Julius,
from Germany. Resident in Manchester.
Certificate A10469 issued 12
September 1898. Revoked by Secretary
of State Order 18 October 1928.
NATIONALITY AND
NATURALISATION: Kellinovich, Dora
(or Dora Kellie), from Russia. Resident
in Liverpool. Certificate 14518 issued 19
March 1927.
ALIENS (see also Nationality and
Naturalisation): Identification of expelled
aliens who attempt to return to the
United Kingdom. Origin of suspect
index
NATIONALITY AND
NATURALISATION: Ohler, Eugene
Theodore, from France. Resident in
Guildford. Certificate 16558 issued 24
October 1928
MERRY Harold Oswald: convicted at
Birmingham Assizes 18 July of
murder and sentenced to death.
QUAYLE William: convicted at
Birmingham Assizes 12 July of murder
and sentenced to death
FARRELL James: convicted of murder
at Warwick 10 March 1949 and
sentenced to death
Commonwealth citizens on working
holidays
Metropolitan
Police Service
MEPO 2/10052
1959-1960
Assassination of Mr Solomon
BANDARANAIKA, Prime Minister of
Ceylon, in Colombo on 25 September
1959 by Talduwe SOMARAMA: two
CID officers sent to Colombo by request
of Ceylon Government to assist
investigation
Download