Freedom of Information: Records released as a result of Freedom of Information (FOI) requests June 2008 This table lists the individual records opened in June 2008 as a result of FOI requests. Subject Catalogue reference Date of record Description Records of the Ceremonial Branch Nationality and Naturalisation T 333/230 1986 Jan 011992 Dec 31 Badge of Honour: Montserrat, British Virgin Islands, Anguilla HO 144/4997 1925 Nationality and Naturalisation HO 405/898 1940 Jan 01 1948 Dec 31 NATIONALITY AND NATURALISATION: Schornikoff, Stephen (or Stephen Schornikow), from Russia. Resident in London. Certificate 12456 issued 29 September 1925. ASSENHEIM. J Date of Birth: 05.06.1879 CAB 128/30/1 CAB 128/30/3 Metropolitan Police Service Firearms MEPO 2/9868 1945-1964 Nationality and Naturalisation Nationality and Naturalisation HO 405/2768 1936 Jan 01 1938 Dec 31 HO 144/7123 1927 Nationality and Naturalisation Succession Duty and Estate Duty records Nationality and Naturalisation HO 405/9757 IR 62/1376 1935 Jan 011936 Dec 31 1932 HO 144/22135 1935-1945 Succession Duty and Estate Duty records Nationality and Naturalisation Nationality and Naturalisation Nationality and Naturalisation IR 62/1429 1933 Bequest to the Victoria and Albert Museum: E A Belford HO 405/9593 1937 Jan 011966 Dec 31 1948 Jan 01 1949 Dec 31 1931 DIAMANSTEIN, B aka DIEMENSTEIN Date of Birth: 22.09.1882 BESKINE, A M Date of Birth: 16.08.1896 NATIONALITY AND NATURALISATION: Zinn, Bettina, from Latvia. Resident in London. Certificate AZ764 issued 4 December 1931. HO 405/4309 HO 144/14295 Home Office guidelines regarding the grant and renewal of firearms certificates for the purposes of protection BLUSTEIN, H aka BLUESTONE, H aka BLOSTONE Date of Birth: 07.10.1901 NATIONALITY AND NATURALISATION: Cohen, Hugo Oscar. No Nationality. Resident in Bradford. Certificate 15412 issued 25 November 1927. DUC, T M C aka DUC Date of Birth: 13.07.1891 Bequest to the National Portrait Gallery and the Yorkshire Museum respectively: E Sumner NATIONALITY AND NATURALISATION: Registration of naturalised British subjects. WAR: Registration of neutralised British subjects. Nationality and Naturalisation HO 144/7959 1927 Nationality and Naturalisation HO 144/14713 1931 Nationality and Naturalisation HO 144/8824 1928 Nationality and Naturalisation HO 144/6008 1926 National Coal Board: Minute Series National Coal Board: Minute Series National Coal Board: Minute Series National Coal Board: Minute Series National Coal Board: Minute Series Nationality and Naturalisation Nationality and Naturalisation Nationality and Naturalisation Nationality and Naturalisation Nationality and Naturalisation COAL 77/8329 1976-1987 COAL 89/63 1951 Apr-1989 July COAL 77/8326 1978-1988 COAL 89/276 1968 May- 1989 Aug COAL 89/103 1969 Nov-1983 Aug Cardowan Colliery Scottish North HO 405/36367 1949 Jan 01 1949 Dec 31 1948 Jan 01 1949 Dec 31 1947 Jan 01 1949 Dec 31 01/01/1943 31/12/1965 MANSI, M L O; MANSI, G Dates of birth 04/01/1892; 29/02/1888 MERFELD, A D A K Date of birth 27/07/1879 MEYER, O Date of birth 30/03/1885 HO 405/35805 HO 405/35830 HO 405/4323 HO 144/16619 1932 Prime Minister's Office Law Officers' Department PREM 13/1036 1965-1966 LO 2/406 1966 Law Officers' Department LO 2/409 1966 Law Officers' Department LO 2/411 1966-1967 Law Officers' Department LO 2/420 1967 NATIONALITY AND NATURALISATION: Berntzwiller, Charles Gourt (or Charles Gourt Bryan), from the United States of America. Resident in Tonypandy, Glam. Certificate 15164 issued 19 September 1927. Re-admission. NATIONALITY AND NATURALISATION: Cuker, Calman (known as Calman Sugar), from Russia. Resident in Hull. Certificate A19500 issued 3 March 1931. NATIONALITY AND NATURALISATION: Sugar, Louis, from Russia. Resident in Kingston-upon-Hull. Certificate 16093 issued 11 June 1928. NATIONALITY AND NATURALISATION: Zinn, Willy Vladimir, from Russia. Resident in London. Certificate 13745 issued 31 August 1926. Special Colliery Consultative Committee Minutes Formation: Seafield Colliery Bilston Glen Colliery Scottish South Area Special Colliery Consultative Committee Minutes Formation: Bilston Glen Colliery Monktonhall Colliery Scottish South Area BAUER, H Date of Birth: 09.02.1913 NATIONALITY AND NATURALISATION: Petersen, Axel Anders, from Denmark. Resident in Liverpool. Certificate AZ1544 issued 8 June 1932. NATIONALISATION. Future of Brigade of Gurkhas Applications for the attorney-general's fiat under the Race Relations Act 1965: Corney, J, Bean J: no consent. Applications for the attorney-general's fiat under the Race Relations Act 1965:"Britain Awake": no consent. Applications for the attorney-general's fiat under the Race Relations Act 1965: Jordan, C, Pollard, P: consent. Applications for the attorney-general's fiat under the Race Relations Act 1965: Jordan, C: no consent. Law Officers' Department LO 2/426 1967 Law Officers' Department LO 2/427 1967 Law Officers' Department LO 2/432 1967 Law Officers' Department LO 2/433 1967 Law Officers' Department LO 2/437 1967 Law Officers' Department LO 2/443 1967 Law Officers' Department LO 2/451 1967 Law Officers' Department LO 2/470 1968 Law Officers' Department LO 2/485 1968 Home Office: Registered Papers HO 144/20969 1916 Feb 3 1918 Dec 18 Nationality and Naturalisation Nationality and Naturalisation Home Office: Registered Papers HO 405/6539 1947 Jan 01 1948 Dec 31 1934 Jan 01 1935 Dec 31 1920-1921 Nationality and Naturalisation HO 405/5935 HO 405/2229 HO 144/1684/400430 1948 Jan 01 1948 Dec 31 Applications for the attorney-general's fiat under the Race Relations Act 1965: National Front: no consent. Applications for the attorney-general's fiat under the Race Relations Act 1965: Kinsman Book Club: no consent. Applications for the attorney-general's fiat under the Race Relations Act 1965:"The British Independent": no consent. Applications for the attorney-general's fiat under the Race Relations Act 1965:"Southern News": no consent. Applications for the attorney-general's fiat under the Race Relations Act 1965:"The British Independent": no consent. Applications for the attorney-general's fiat under the Race Relations Act 1965:"Southern News": no consent. Applications for the attorney-general's fiat under the Race Relations Act 1965: Nicholson, Rev G: no consent. Applications for the attorney-general's fiat under the Race Relations Act 1965: Nationalist Centre, Birkbeck Hill, London, SE21 no consent. Applications for the attorney-general's fiat under the Race Relations Act 1965: Anti-Semitic propaganda in Arabic: no consent. CRIMINAL CASES: LINCOLN, Ignatius Timothy Trebitsch Convicted at Central Criminal Court (CCC) on 27 June 1916 for forgery and sentenced to 3 years penal servitude EXTRADITION: Extradition from the United States of America of Trebitsch Lincoln on a charge of forgery. NATIONALITY AND NATURALIZATION: Naturalisation (with subsequent revocation) of Ignatius Timothy Trebitsch Lincoln, a former MP who became a German spy. BEETZ, W G Date of Birth: 31.12.1898 BRONSTEIN, I Date of Birth: 15.11.1888 SEDITION; WARRANTS: Warrants authorising the production of letters and telegrams to and from Russia for inspection. BAUM, D Date of Birth: 02.10.1907 Nationality and Naturalisation HO 144/5770 1926 Nationality and Naturalisation HO 144/8877 1928 Nationality and Naturalisation HO 144/10175 1929 Nationality and Naturalisation HO 144/11955 1930 Nationality and Naturalisation HO 144/12195 1930 Nationality and Naturalisation Selected Death Duty Accounts Home Office: Registered Papers Nationality and Naturalisation Nationality and Naturalisation Nationality and Naturalisation Home Office: Dangerous Drugs (DDA Symbol Series) and Drugs Record Cases HO 405/16228 IR 59/711 1938 Jan 01 1944 Dec 31 1929-1940 HO 144/19776 1909-1935 HO 405/14390 1948 Jan 01 1949 Dec 31 1939 Jan 01 1957 Dec 31 1949 Jan 01 1951 Dec 31 1977 Jun 13 1980 Jan 07 Piper Alpha Public Inquiry EG 5/79 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/80 1990 Jan 01 1990 Dec 31 HO 405/14455 HO 405/19341 HO 319/237 NATIONALITY AND NATURALISATION: Jacobson, Israel, from Russia. Resident in Preston Lancs. Certificate 13460 issued 14 June 1926. NATIONALITY AND NATURALISATION: Krafchik, Benjamin, from Russia. Resident in Preston. Certificate 16072 issued 1 June 1928. NATIONALITY AND NATURALISATION: Kuch, Georg Friedrich (or George Frederick Cook). No Nationality. Resident in Sunderland. Certificate B.928 issued 8 February 1929. Kuch, Elise (or Elise Cook). Child of Georg Friedrich Kuch. Certificate B.928. NATIONALITY AND NATURALISATION: Kostchuk, Jankel (or Jacob (or Jack) Kostick), from Russia. Resident in London. Certificate 18898 issued 3 November 1930. NATIONALITY AND NATURALISATION: Cohen, Shemel (or Samuel Cohen), from Russia. Resident in Liverpool. Certificate 18882 issued 28 October 1930. GERSON, K A; GERSON, R M Dates of birth 13.12.1880; 27.06.1903 WEATHERLY, Frederick Edward ROYAL - TITLE ROYAL AND ROYAL ARMS: Title Royal: Royal Tunbridge Wells FEINGOLD, E Date of birth 17.11.1904 FEINGOLD, J; FEINGOLD, M A Dates of birth 17.03.1908; 25.07.1907 GRYCMAN, B aka BERNARD Date of birth 01.04.1891 Advisory Council on the Misuse of Drugs: Working Group on Treatment and Rehabilitation; paper on treatment and rehabilitation facilities in prisons. Investigation into the treatment of drug addicts in prison, which culminated in the publication in December 1979 of the report 'Study of Treatment of Drug Dependents Within the Prison System in England and Wales'. This report recommended rehabilitation arrangements after release for those treated in prison, to reduce relapse once out of custody. Includes statistics showing a marked increase in drug offences for both men and women serving sentences of two years and over. Piper Alpha platform: diagrams; photographs of a 1:33 scale model showing indicated areas Piper Alpha platform: photographs of a 1:100 scale model of entire platform Piper Alpha Public Inquiry EG 5/95 1988 Mar 23 1988 Jul 06 Piper Alpha Public Inquiry EG 5/133 1989 Jan 01 1989 Jan 31 Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/198 1990 Jan 01 1990 Dec 31 1990 Jan 01 1990 Dec 31 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/211 Piper Alpha Public Inquiry EG 5/242 EG 5/199 EG 5/208 EG 5/240 1990 Jan 01 1990 Dec 31 1990 Jan 01 1990 Dec 31 1986 Feb 01 1986 Feb 28 Methanol injection on the Piper Alpha platform: schematic; Production equipment to be shutdown for maintenance work: list; Gas Conservation Module (GCM) shutdown: proposed list of work dated July 1988; Replacement cooler: memorandum of 6 July 1988 by Occidental; Pressure Safety Valve (PSV) recertification on the Piper Alpha platform: list of work dated 20 May 1988; Piper Alpha platform: diagrams of various sections of the platform in relation to maintenance activities; Daily reports on the maintenance of apparatus on the Piper Alpha platform: collection of memoranda by Occidental dated 3-5 July 1988; Removal of prover on the Piper Alpha platform: memorandum of 24 June 1988 by Occidental; Phase 1 operation - methanol injection: memorandum of 23 March 1988; Monthly maintenance reports for May and June 1988 on work carried out on the Piper Alpha platform Reproductions of photographs and drawings which were presented on photographic slides during evidence given by Mr Konrad R Wottge, Facilities Engineering Manager of Occidental Petroleum (Caledonia) Limited: the reproductions illustrate the ownership and development of the Piper Field and adjacent fields, the design and layout of the Piper Alpha platform, and organisation of operations on the platform Diagram of the Control Room layout on the Piper Alpha platform Photograph of the Control Room on the Piper Alpha platform Sixty-eight foot level deck support frame on the Piper Alpha platform: diagram of layout; Module C of the Piper Alpha platform: diagram of layout Photographs of liferafts on the Piper Alpha platform Pressure rating of Condensate Injection Pump Relief Valves on the Piper Alpha platform; Condensate injection pump: diagram by Bechtel International Ltd; Modifications to the Piper Alpha platform: data sheets and diagrams by Bechtel International Limited 68 foot level deck support frame layout on the Piper Alpha platform: diagram; Fire and gas detection apparatus on the 68 foot level deck support frame: diagram of February 1986; Fire and gas detection Piper Alpha Public Inquiry EG 5/263 1989 Apr 13 Piper Alpha Public Inquiry EG 5/318 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/326 1985 May 02 1986 Apr 24 Piper Alpha Public Inquiry EG 5/327 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/341 1979 Jun 01 1979 Jun 30 Piper Alpha Public Inquiry EG 5/350 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/351 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/352 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/353 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/354 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/355 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/356 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/357 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/377 1989 Jun 08 Piper Alpha Public Inquiry EG 5/389 1988 Jan 12 1988 May 12 Piper Alpha Public Inquiry EG 5/395 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/396 1990 Jan 01 1990 Dec 31 Piper Alpha EG 5/535 1990 Jan 01 - apparatus in the Speem module: diagram of February 1986; Module C: diagram MSV Tharos: diagram by Occidental Petroleum (Caledonia) Limited showing gangway extended and landed on the Piper Alpha platform Fire resisting screen between Module B and Module C on the Piper Alpha platform: diagram by Durasteel Ltd Shutdown of condensate injection pumps on the Piper Alpha platform: scope of work and drawings Shutdown of condensate booster pump and suction valve on the Piper Alpha platform: scope of work and drawing Classification of hazardous areas on the Piper Alpha platform: diagrams by Occidental of Britain Inc Modifications to the Piper Alpha platform: diagram by Bechtel International Limited Modifications to the Piper Alpha platform: diagram by Bechtel International Limited Modifications to the Piper Alpha platform: diagram by Bechtel International Limited Modifications to the Piper Alpha platform: diagram by Bechtel International Limited Modifications to the Piper Alpha platform: diagram by Bechtel International Limited Modifications to the Piper Alpha platform: diagram by Bechtel International Limited Modifications to the Piper Alpha platform: diagram by Bechtel International Limited of condensate injection piping and instrumentation Modifications to the Piper Alpha platform: diagram by Bechtel International Limited of condensate injection piping and instrumentation Extent of damage caused by initial explosion on the Piper Alpha platform and probable effects on critical systems: report by Technica, Consulting Scientists and Engineers, for Messrs Paull and Williamson Condensate Injection Pump 'A' on the Piper Alpha platform: job details report Photograph of Pressure Safety Valve (PSV) of Condensate Pump 'A' on the Piper Alpha platform Photograph of Pressure Safety Valve (PSV) of Condensate Pump 'B' on the Piper Alpha platform Diagram of Firewall and Escape Public Inquiry 1990 Dec 31 Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/567 Piper Alpha Public Inquiry EG 5/797 1985 Aug 01 1985 Aug 31 Piper Alpha Public Inquiry EG 5/809 1985 Oct 01 1985 Oct 31 Piper Alpha Public Inquiry EG 5/810 1985 Jul 01 1985 Jul 31 Piper Alpha Public Inquiry EG 5/811 1985 Jul 01 1985 Jul 31 Piper Alpha Public Inquiry EG 5/812 1987 Oct 01 1987 Oct 31 Piper Alpha Public Inquiry EG 5/813 1985 Jul 01 1985 Jul 31 Piper Alpha Public Inquiry EG 5/814 1987 Jun 01 1987 Jun 30 Piper Alpha Public Inquiry EG 5/815 1987 May 01 1987 May 31 Piper Alpha Public Inquiry EG 5/816 1985 Oct 01 1985 Oct 31 Piper Alpha Public Inquiry EG 5/817 1986 Oct 01 1986 Oct 31 Piper Alpha Public Inquiry EG 5/818 1985 Sep 01 1985 Sep 30 Piper Alpha Public Inquiry EG 5/819 1985 Oct 01 1985 Oct 31 Piper Alpha Public Inquiry EG 5/820 1986 Oct 01 1986 Oct 31 Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/821 1982 Dec 01 1982 Dec 31 1987 Nov 01 1987 Nov 30 1985 Feb 01 1985 Feb 28 1990 Jan 01 1990 Dec 31 1984 Sep 01 1984 Sep 30 1978 Feb 01 1978 Feb 28 Piper Alpha EG 5/828 EG 5/796 EG 5/822 EG 5/823 EG 5/825 EG 5/826 EG 5/827 1990 Jan 01 1990 Dec 31 1986 Dec 01 1986 Dec 31 1980 Mar 01 - Routes in Module 'D' of the Piper Alpha platform Condensate Injection Pump on the Piper Alpha platform: schematic Final Gas Dehydration Facilities on the Piper Alpha platform: Piping and Instrumentation Diagram Condensate Injection Piping and Instrument Diagram (Piper Alpha platform) Gas Compression Facilities on the Piper Alpha platform: Piping and Instrumentation Diagram Gas Compression Facilities on the Piper Alpha platform: Piping and Instrumentation Diagram Gas Compression Facilities on the Piper Alpha platform: Piping and Instrumentation Diagram Gas Compression Facilities on the Piper Alpha platform: Piping and Instrumentation Diagram Firewater and Utility Water Pumps on the Piper Alpha platform: Piping and Instrument Diagram Gravity Drains (Open) to Sump Pile on the Piper Alpha platform: Piping and Instrument Diagram Pressure Drains (Closed) and Gravity Drains (Open) to Sump Pile on the Piper Alpha platform: Piping and Instrument Diagram Fuel Gas System on the Piper Alpha platform: Process and Instrument Diagram Diesel Fuel System on the Piper Alpha platform: Piping and Instrument Diagram (Sheet 1) Diesel Fuel System on the Piper Alpha platform: Piping and Instrument Diagram (Sheet 2) Instrument and Utility Air System on the Piper Alpha platform: Piping and Instrument Diagram Instrument and Utility Air Systems on the Piper Alpha platform: Piping and Instrument Diagram Firewater Deluge System in Module 'C' Production Deck of Module 'B' of the Piper Alpha platform: plot plan Production Deck of Module 'C' of the Piper Alpha platform: plot plan Firewall and Escape Route layout on the Piper Alpha platform Gasline Scraper Launcher facilities: Piping layout Condensate Injection and Gas Transmission Facilities at Production Deck Level on the Piper Alpha platform: Piping layout Condensate Injection Facility at Deck Public Inquiry 1980 Mar 31 Piper Alpha Public Inquiry EG 5/829 1980 Mar 01 1980 Mar 31 Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/830 1985 Oct 01 1985 Oct 31 1990 Jan 01 1990 Dec 31 1987 Oct 01 1987 Oct 31 Piper Alpha Public Inquiry EG 5/854 1982 Nov 29 Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/855 1990 Jan 01 1990 Dec 31 1990 Jan 01 1990 Dec 31 1990 Jan 01 1990 Dec 31 1990 Jan 01 1990 Dec 31 1979 Nov 01 1979 Nov 30 1982 Apr 01 1982 Apr 30 Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/861 Piper Alpha Public Inquiry EG 5/863 1982 Nov 01 1982 Nov 30 Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/864 1979 Jul 01 1979 Jul 31 1985 Nov 01 1985 Nov 30 1986 Jan 01 1986 Jan 31 1986 Jan 01 1986 Jan 31 1986 Jan 01 1986 Jan 31 1986 Jan 01 1986 Jan 31 1986 Jan 01 1986 Jan 31 1987 Jan 01 1987 Jan 31 1987 Jan 01 1987 Jan 31 1987 Jan 01 1987 Jan 31 1987 Jan 01 1987 Jan 31 1990 Jan 01 1990 Dec 31 EG 5/831 EG 5/832 EG 5/856 EG 5/857 EG 5/858 EG 5/859 EG 5/860 EG 5/862 EG 5/865 EG 5/878 EG 5/879 EG 5/880 EG 5/881 EG 5/882 EG 5/883 EG 5/884 EG 5/885 EG 5/886 EG 5/784 1984 Aug 01 1984 Aug 31 1982 Nov 01 1982 Nov 30 Support Frame level of the Piper Alpha platform: Piping layout Condensate Injection Facilities at Deck Support Frame level of the Piper Alpha platform: Piping plan Piper Gas Conservation Project: Gas Line to the MCP-01 platform Deck Support Frame: Equipment and Walkway Location plan Condensate Injection on the Piper Alpha platform: Piping and Instrument Diagram Isometric of Eighteen Inch Piper/Tartan Gas Riser at the Piper Alpha platform Cause and Effect Diagram: Fire/Gas Panels on Deck Support Frame Cause and Effect Diagram: Fire/Gas Panels on Deck Support Frame Cause and Effect Diagram: Fire Gas Mimic Panel on the Piper Alpha Cause and Effect Diagram: Fire Gas Mimic Panel on the Piper Alpha Condensate System on the Piper Alpha platform: Pneumatic Schematic Reciprocal Compressor Control Panels on the Piper Alpha platform: Pneumatic Schematic Control Room on the Piper Alpha platform: Layout Fire and Gas System on the Piper Alpha platform: Functional Logic Diagrams for Fire Zones C1 and C2 Fire and Gas System on the Piper Alpha platform: Functional Logic Diagrams for Fire Zones C3, C4 and C5 Process and Utility Flow Diagram for the Piper Alpha platform Overall Single Line Diagram (Piper Alpha platform) Piper Alpha platform: Overall plan view Piper Alpha platform: plan on EL +107 feet -61/4 inches Piper Alpha platform: plan on EL +83 feet -61/4 inches Piper Alpha platform: plan on EL +68 feet -0 inches Piper Alpha platform: plan on EL +20 feet -0 inches Piper Alpha platform: East Elevation Piper Alpha platform: West Elevation Piper Alpha platform: North Elevation Piper Alpha platform: South Elevation Overall Equipment and Module Location plan for the Deck Support Frame level of the Piper Alpha platform Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/785 Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/793 Piper Alpha Public Inquiry EG 5/802 1987 May 01 1987 May 31 Piper Alpha Public Inquiry EG 5/803 1986 Oct 01 1986 Oct 31 Piper Alpha Public Inquiry EG 5/804 1986 Oct 01 1986 Oct 31 Piper Alpha Public Inquiry EG 5/805 1986 Oct 01 1986 Oct 31 Piper Alpha Public Inquiry EG 5/806 1986 Oct 01 1986 Oct 31 Piper Alpha Public Inquiry EG 5/807 1985 Oct 01 1985 Oct 31 Piper Alpha Public Inquiry EG 5/824 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/833 1988 Oct 12 EG 5/834 1988 Oct 11 Piper Alpha Public Inquiry EG 5/852 1988 Mar 01 1988 Mar 31 EG 5/786 EG 5/787 EG 5/788 EG 5/789 EG 5/790 EG 5/791 EG 5/792 EG 5/794 EG 5/798 EG 5/799 EG 5/800 EG 5/801 1987 Oct 01 1987 Oct 31 1986 Sep 01 1986 Sep 30 1986 May 01 1986 May 31 1990 Jan 01 1990 Dec 31 1990 Jan 01 1990 Dec 31 1987 Dec 01 1987 Dec 31 1981 Dec 01 1981 Dec 31 1986 Mar 01 1986 Mar 31 1990 Jan 01 1990 Dec 31 1987 Feb 01 1987 Feb 28 1987 May 01 1987 May 31 1986 Oct 01 1986 Oct 31 1985 Nov 01 1985 Nov 30 1987 Jun 01 1987 Jun 30 Foam Compound Production Deck Firefighting and Detection, Gas and Utility Modules Firefighting and Detection, Deck Support Frame Flare System, Phase One and Two Operation: Process Flow Diagram Flare System, Phase One and Two Operation: Process Flow Diagram Fuel Gas System: Process Flow Diagram Firewater: Process Flow Diagram Firefighting Water and Foam Deluge System, Gas Conservation Module (GCM) and Deck Support Frame Methanol Injection System: Process Flow Diagram Platform Flare System: Piping and Instrument Diagram Piper Gas Sales Project, Phase One: Piping and Instrument Diagram Hydrate Inhibitor Injection: Piping and Instrument Diagram Gas line from Tartan platform to Piper Firewater and Utility Water Distribution on the Piper Alpha platform: Piping and Instrument Diagram Crude Production and Pumping Facilities on the Piper Alpha platform: Piping and Instrumentation Diagram Crude Production and Pumping Facilities on the Piper Alpha platform: Piping and Instrumentation Diagram Crude Production and Pumping Facilities on the Piper Alpha platform: Piping and Instrumentation Diagram Crude Production and Pumping Facilities on the Piper Alpha platform: Piping and Instrumentation Diagram Gas Compression Facilities on the Piper Alpha platform: Piping and Instrument Diagram Gas Compression Facilities on the Piper Alpha platform: Piping and Instrumentation Diagram Fire Fighting equipment on the Production Deck of the Piper Alpha platform Gas Compression on the Piper Alpha platform: System Isometric (Sheet 1) Gas Compression Phase One on the Piper Alpha platform: System Isometric (Sheet 2) Isometric of Sixteen Inch Gas Riser from Pig Launcher to Sea-bed Hydrocouples on the Piper Alpha platform Piper Alpha Public Inquiry EG 5/853 1978 Oct 10 Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/866 1979 Mar 01 1979 Mar 31 1990 Jan 01 1990 Dec 31 1990 Jan 01 1990 Dec 31 1990 Jan 01 1990 Dec 31 1979 Jan 01 1979 Jan 31 1990 Jan 01 1990 Dec 31 Piper Alpha Public Inquiry EG 5/872 1979 Feb 01 1979 Feb 28 Piper Alpha Public Inquiry EG 5/873 1979 Feb 01 1979 Feb 28 Piper Alpha Public Inquiry EG 5/874 1986 Oct 01 1986 Oct 31 Piper Alpha Public Inquiry EG 5/875 1986 Oct 01 1986 Oct 31 Piper Alpha Public Inquiry EG 5/876 1985 Oct 01 1985 Oct 31 Piper Alpha Public Inquiry EG 5/877 1985 Oct 01 1985 Oct 31 Piper Alpha Public Inquiry EG 5/887 1987 Oct 01 1987 Oct 31 Piper Alpha Public Inquiry EG 5/888 1987 Jul 01 1987 Jul 31 Piper Alpha Public Inquiry EG 5/889 1987 Jul 01 1987 Jul 31 Piper Alpha Public Inquiry EG 5/890 1988 Jan 01 1988 Jan 31 Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry Piper Alpha Public Inquiry EG 5/891 1987 Jul 01 1987 Jul 31 1987 Jan 01 1987 Jan 31 1982 Nov 01 1982 Nov 30 1982 Nov 01 1982 Nov 30 Piper Alpha Public Inquiry EG 5/895 EG 5/867 EG 5/868 EG 5/869 EG 5/870 EG 5/871 EG 5/892 EG 5/893 EG 5/894 1988 May 01 1988 May 31 Isometric for Connection between Pig Trap and Sealine Connection at the Piper Alpha platform Fire Water Main Firewater Deluge System Isometric, Gas Conservation Module Firewater Piping Isometric for Condensate Injection Pumps Firewater Piping Isometric for Plant number 9 Scraper Traps Firewater Deluge System Isometric: Scraper Launcher Platform Production Deck Piping Arrangement: Module 'C' West on the Piper Alpha platform Production Deck Piping Arrangement: Module 'C' West on the Piper Alpha platform Production Deck Piping Arrangement: Module 'C' East on the Piper Alpha platform Firewater System Replacement in Module 'B' (West Side) of the Piper Alpha platform: System Isometric Firewater System Replacement in Module 'B' (East Side) of the Piper Alpha platform: System Isometric Gravity Drains (Open) on the Piper Alpha platform to Overboard Dump: Piping and Instrument Diagram Gravity Drains (Open) on the Piper Alpha platform to Overboard Dump: Piping and Instrument Diagram Wellhead production system on the Piper Alpha platform (Wellheads numbers P13, P1 and P10): Piping and Instrument Diagram Firewater Deluge Replacement in Module 'A' East of the Piper Alpha platform: System Isometric Firewater Deluge Replacement in Module 'A' West of the Piper Alpha platform: System Isometric 'As Built' Composite Arrangement of Gas Lift Supply Headers on the Piper Alpha platform Fire and Gas Equipment in Module 'A' of the Piper Alpha platform: layout Fire and Gas Equipment in Module 'B' of the Piper Alpha platform: layout Fire and Gas Equipment in Module 'C' Fire and Gas Equipment in the Utilities and Sub-Utilities Modules of the Piper Alpha platform: layout Fire and Gas Equipment in the Scraper Launcher and the Produced Water Disposal System of the Piper Alpha platform: layout Piper Alpha Public Inquiry EG 5/896 1983 Mar 08 Piper Alpha Public Inquiry EG 5/897 1988 May 01 1988 May 31 Piper Alpha Public Inquiry EG 5/898 1987 Jul 01 1987 Jul 31 Piper Alpha Public Inquiry EG 5/899 1987 Jul 01 1987 Jul 31 Piper Alpha Public Inquiry EG 5/900 1987 Jul 01 1987 Jul 31 Piper Alpha Public Inquiry EG 5/901 1987 May 01 1987 May 31 Piper Alpha Public Inquiry EG 5/902 1982 Oct 01 1982 Oct 31 Nationality and Naturalisation HO 144/8508 1898;1928 Nationality and Naturalisation HO 144/8131 1927 Nationality and Naturalisation: Aliens HO 144/1715/143162 1906-1921 Nationality and Naturalisation HO 144/8679 1928 Prison Commission and Home Office Prison Commission and Home Office Prison Commission and Home Office PCOM 9/934 1942 PCOM 9/997 1943 PCOM 9/724 1943-1949 HO 405/4323 01/01/1943 31/12/1965 1971 Jan 01 1979 Dec 31 BAUER, H Date of Birth: 09.02.1913 1986 Jan 01 1986 Dec 31 Member of railway staff killed on line at Elsenham, Suffolk on 14 October 1985. With plans Nationality and Naturalisation Records of the Employment Policy Divisions British Transport Commission LAB 109/20 AN 183/656 Fire and Gas Equipment on the Condensate Pump platform of the Piper Alpha platform: layout Fire and Gas Equipment in the Pig Launcher area of the Piper Alpha platform: layout Fire and Gas Equipment on the Drill Floor and Lower Mezzanine of the Piper Alpha platform: layout Fire and Gas Equipment in the Mud Module and Shaker of the Piper Alpha platform Fire and Gas Equipment in the Cement Pod Module and Sack Storage Module: layout Fire and Gas Equipment on the Production Deck of Module 'D' of the Piper Alpha platform: layout Fire and Gas Equipment in the Electrical Workshop, Control Room, Uninterrupted Power Supply Room and Battery Room on the Piper Alpha platform: layout NATIONALITY AND NATURALISATION: Cohen, Julius, from Germany. Resident in Manchester. Certificate A10469 issued 12 September 1898. Revoked by Secretary of State Order 18 October 1928. NATIONALITY AND NATURALISATION: Kellinovich, Dora (or Dora Kellie), from Russia. Resident in Liverpool. Certificate 14518 issued 19 March 1927. ALIENS (see also Nationality and Naturalisation): Identification of expelled aliens who attempt to return to the United Kingdom. Origin of suspect index NATIONALITY AND NATURALISATION: Ohler, Eugene Theodore, from France. Resident in Guildford. Certificate 16558 issued 24 October 1928 MERRY Harold Oswald: convicted at Birmingham Assizes 18 July of murder and sentenced to death. QUAYLE William: convicted at Birmingham Assizes 12 July of murder and sentenced to death FARRELL James: convicted of murder at Warwick 10 March 1949 and sentenced to death Commonwealth citizens on working holidays Metropolitan Police Service MEPO 2/10052 1959-1960 Assassination of Mr Solomon BANDARANAIKA, Prime Minister of Ceylon, in Colombo on 25 September 1959 by Talduwe SOMARAMA: two CID officers sent to Colombo by request of Ceylon Government to assist investigation