PROJECT GUIDE 2011 For Designers, Contractors and Users

advertisement
PROJECT GUIDE
For Designers, Contractors and Users
SFU Burnaby Campus
2011
Project Guide v. 2.0 12/1/2011
Facilities Services Technical Standards Committee
FACILITIES SERVICES
PROJECT GUIDE |
3
Contents
ABOUT THIS GUIDE
8
WELCOME8
AUDIENCE8
ACKNOWLEDGMENTS9
PART A : GETTING A PROJECT STARTED
11
SETTING THE CAMPUS CONTEXT 11
REGULATORY BODIES (DEVELOPMENT AND BUILDING PERMITS)
13
PROJECT DEVELOPMENT AND MANAGEMENT
15
GETTING BASE DRAWINGS AND INFORMATION 17
PART B: DOING CONSTRUCTION WORK ON CAMPUS
21
SCHEDULING OF WORK
21
SITE OFFICE AND ADMINISTRATION
22
TRAFFIC AND LOADING ACCESS
23
ENVIRONMENTAL REQUIREMENTS
24
JOB SITE SAFETY
25
SECURITY OF THE JOB SITE
25
WORK OUTSIDE OF THE CONSTRUCTION SITE
26
PROTECTING EXISTING 26
OTHER RULES AND REGULATIONS
28
PART C: DESIGNING FOR BURNABY CAMPUS SUSTAINABILITY AND GREEN BUILDING STANDARDS
29
29
4
| PROJECT GUIDE
NAMING SYSTEMS ON CAMPUS
30
DESIGNING FOR UNIVERSAL ACCESS
31
DESIGNING PUBLIC AREAS & SPECIFIC FUNCTIONAL SPACES
32
SPECIFYING ARCHITECTURAL SYSTEMS
34
SPECIFYING HEATING AND VENTILATION SYSTEMS
39
DESIGNING WATER, SANITARY AND STORM SYSTEMS 41
SPECIFYING FIRE PROTECTION SYSTEMS
42
SPECIFYING ELECTRICAL SYSTEMS (FIRE ALARM, POWER AND LIGHTING)
42
SPECIFYING DATA AND TELECOMMUNICATION SYSTEMS
46
PART D: PROJECT DOCUMENTATION AND EXECUTION 47
OWNER’S (SFU) ROLE AND CONSULTANT TEAM
47
SOURCES OF INFORMATION
47
DESIGN INTERFACE WITH BASE BUILDING (for Renovation Projects) 47
PUBLIC REGULATORY REQUIREMENTS
48
COMMENCEMENT OF RENOVATION WORK
48
DOCUMENTING THE PROJECT: DRAWING AND SPECIFICATIONS 48
DOCUMENTING MECHANICAL PLANS AND CONTROLS
50
OPERATIONS & MAINTENANCE MANUALS
51
SYSTEM CONFIGURATION DOCUMENT
53
PREPARING CONTRACT DOCUMENTATION 54
COMMISSIONING55
SUBMITTING FINAL RECORD DOCUMENTATION
57
APPENDICES61
PROJECT GUIDE |
5
A-1. Burnaby Campus Map
61
A-2. Building List, Names, Official Acronyms and Building Numbers
62
A-3. SFU Legal Map (2011)
66
A-4. Consultant Disbursements Form
67
A-5. Project Initiating Form
69
A-6. Minor Project Checklist
70
A-7. Major Project Checklist 72
B-1. Contractor Integral Work under General Requirements
77
B-2. SFU Burnaby Campus Construction Map
79
B-3. Storm Water Management Standards
81
B-4a. EH&S Safety Procedures-Construction Safety Handout
82
B-4b. EH&S Safety Procedures-Contractor Asbestos Information
84
B-4c. EH&S Safety Procedures-Prime Contractor Handout
85
C-1. Burnaby Campus Climate Data (2011)
87
C-2. BC Building Code Seismic Slope Regulation & Technical Guidance
88
C-3. Energy Standards
90
C-4. Reference Levels by Building Floors
95
C-5. SFU Space Guidelines
99
C-6. SFU Room ID Standards
100
C-7. Door Numbering and Labeling Requirements
103
C-8. Green Standard - Common Area
104
C-9. Green Standard - Offices
107
C-10. Green Standard - Wet Labs
110
6
| PROJECT GUIDE
C-11. Green Standard - Washrooms
114
C-12. Burnaby Recycling Bin Location Map
117
C-13. SFU Mechanical Systems Design Checklist
119
C-14. 2011 Energy Efficiency Act 133
C-15. SFU Standard Pipe and Duct Labeling Requirements
151
C-16. Burnaby Campus Mechanical Standards
152
C-17. Interior & Exterior Lighting Fixture Standard Products
202
D-1a. SFU Labeling and Identification System - Equipment Type List
203
D-1b. SFU Labeling and Identification System - Electrical Equipment ID Forms
206
D-1c. SFU Labeling and Identification System - Mechanical Equipment ID Forms
209
D-2. Printing Request Form 220
D-3. Record Submittal Checklist
221
PROJECT GUIDE |
Revisions & Updates
Date
Description
06/30/2010
Final Draft released to Committee for final comments
08/09/2010 Project Guide v.1.0
12/01/2011 Project Guide v.2.0
Revision (Page
and Section #)
0
Disclaimer
Simon Fraser University Facilities Services provides these standards and guidelines which
are to be applied as required in your project but in no way is intended to override or
remove responsibility of the Consultant or the Contractor to provide best practice and
advise on the proper system design or application for a specific project.
Notwithstanding the requirements of these Standards, the Contract and the specific
requirements of the contractual Agreement takes precedence over these standards.
Refer also to www.sfu.ca/fs for most up-to-date standards.
7
Download