CLAY County Technology Plan 2004-2007

advertisement
CLAY County Technology Plan
2004-2007
OPTIMAL
Online Planning - Technology Integration Measures for Achievement and Learning
Last revised on February 18, 2005
Page 1 of 64
County Technology Plan
West Virginia has placed an emphasis on equitably providing technology for schools in order to
enhance student learning, improve student achievement, and prepare students for post-secondary
education and the world of work. Many stakeholders are involved in this process including students,
teachers, administrators, parents, community members, legislators, board of education members and
others.
Collectively, the county technology planning team members have assisted in creating, refining,
implementing and utilizing educational technology to meet the current standards, develop local
programs, build partners and capacity, make data-driven decisions, and to evaluate the use of
technology for administrative and instructional tasks.
The county technology plan is a component of the UCIP and is based on the state OPTimal online
format (http://wv.ontargetus.com/). This plan will serve several functions. Not only does the plan
complement and support the county's instructional goals as delineated in the UCIP, it is also intended to
help meet the technology objectives/requirements of the school, county/state policies, state/federal
programs, and competitive grants. Examples of these include the following:
Policy 2320: A Process for Improving Education Performance Based Accreditation System
Policy 2450: Virtual Distance Learning
Policy 2460: Use of the Internet by Students and Educators
Policy 2470: Use of Technology by Students and Educators
Policy 2510: Assuring Quality of Education
Policy 2520: Content Standards and Objectives
Federal Communications Commission (FCC) in order to receive Universal Service Fund Program
E-rate Funds
The No Child Left Behind Act of 2001 which establishes the Enhancing Education Through
Technology (Ed Tech) Program
West Virginia House Bill 4319
Basic Skills/Computer Education (BS/CE)
WV SUCCESS
WVDE Reinventing Education
However, the most important function of the plan is to ensure that the effective use of educational
technology supports achievement and lifelong learning.
Page 2 of 64
Technology Team Contact Information
Name: Kenneth Tanner
Title: Technology Coordinator
Email: ktanner@access.k12.wv.us
Phone: 304-587-4266
Name: Andy Haynes
Title: Computer Technician/Instructor
Email: andyhay@charter.net
Phone: 304-587-4266
Name: Randy Cantrell
Title: Clay County High School Lab Coordinator
Email: rcantrel@access.k12.wv.us
Phone: 304-587-4226
Name: Steve Stanley
Title: Clay County Middle School Lab Coordinator
Email: ststanle@access.k1.wv.us
Phone: 304-587-2343
Name: J. B. Butcher
Title: Clay Elementary School Lab Coordinator
Email: jbbutche@access.k12.wv.us
Phone: 304-587-4126
Name: Lavern Taylor
Title: H. E. White Elementary School Principal
Email: lutaylor@access.k12.wv.us
Phone: 304-548-7101
Name: Teresa Morris
Title: Lizemore Elementary School Prinicipal
Email: tmorris@access.k12.wv.us
Phone: 304-587-4823
Name: Mike Mullins
Title: Ivydale Elementary School Principal
Email: mwmullin@access.k12.wv.us
Phone: 304-286-4861
Page 3 of 64
Name: Garland Tenney
Title: Valley Fork Elementary School Instructor
Email: grtenney@access.k12.wv.us
Phone: 304-587-2140
Page 4 of 64
County Mission and Vision Statements
County Vision:
Caring plus commitment equals success.
County Mission:
To achieve caring, commitment, and competence in the professional and service personnel work force
through effective staff development, constructive supervision, evaluation of work skills, and trust in the
ability of our employees.
To achieve caring, commitment, and competence in students through skilled instruction, innovative
school programs, provision of opportunities to demonstrate talents and abilities, purposeful
management of student behavior, diverse student support services, and development of work
readiness skills.
To achieve caring, commitment, and competence among staff and students through a shared vision of
success for the Clay County School System and a belief that the school system can and will meet the
instructional, social, emotional, and technological needs of students.
To achieve caring and commitment of the community through parent and citizen involvement, shared
decision making, and effective communication.
And finally, through emphasis on caring, competence and commitment, to achieve success as
measured by grade level or better performance by all students, distinguished performance by students
in competitive events, and student conduct consistent with good citizenship.
Page 5 of 64
Needs Assessment
Analysis of Assessment Data
1. There is a need for strengthening K-5 instructional programs in the areas of Mathematics and
Reading, with a special focus on students from low SES homes and with disabilities. (Source –Westest
and Unified School Improvement Plans)
The following is a summary of the student subgroups at each level and the percentage of students
meeting proficiency.
Elementary - All - In Math – 68.5% of students met mastery; In Reading – 74.9% of students met
mastery.
Elementary - Low SES - In Math – 63.8% of students met mastery; In Reading – 70.7% of students met
mastery.
Elementary - Sp. Ed. - In Math – 35.0% of students met mastery; In Reading – 30.0% of students met
mastery.
2. There is a need for strengthening middle level instructional programs in the areas of Mathematics
and Reading, with a special focus on students from low SES homes and with disabilities (Source –
Westest)
Middle - All - In Math – 65.5% of students met mastery; In Reading – 79.1% of students met mastery.
Middle - Low SES - In Math – 61.4% of students met mastery; In Reading – 74.5% of students met
mastery.
Middle - Sp. Ed. - In Math – 22.3% of students met mastery; In Reading – 34.7% of students met
mastery.
3. There is a need for strengthening high school level instructional programs in the areas of
Mathematics and Reading, with a special focus on students from low SES homes and with disabilities
(Source – Westest)
High - All - In Math – 65.5% of students met mastery; In Reading – 79.1% of students met mastery.
High - Low SES - In Math – 63.2% of students met mastery; In Reading – 68.4% of students met
mastery.
High - Sp. Ed. - In Math – 26.9% of students met mastery; In Reading – 26.9% of students met mastery.
Technology will be used to address these needs through software that enhances student learning in
reading and mathematics. We are adding additional software for our special education population to
address the achievement gap indicated by the data.
Analysis of UCIP
4. There is a need to provide extra time and extra help across the curriculum in the form of reduced
class size in key grades and subjects, and through “after-school” and extended day programs for
students at all grade levels who are scoring below proficiency levels in Reading and Mathematics as
measured by the Westest. (Source – Westest) and other appropriate assessment measures.
5. There is a need to provide transportation services for students to be able to participate in after-school
and extended day programs in order to maximize participation. (Source – local percentage of students
that depend on bus transportation as a sole means of getting to and from school is 90%.
Page 6 of 64
6. There is a need to provide all staff with professional development opportunities that promote quality
leadership and instruction, including the use of technology as a productivity tool and teaching resource.
(Source – Technology Plans)
7. There is a need to pursue the expansion of internet and intranet availability for students and teachers
and to increase the speed of internet access. The addition of T1 connectivity at all district schools is
needed to permit full access of available resources. (Source – Technology Plans)
8. There is a need for increased opportunities for parent involvement. (Source – Unified School
Improvement Plans)
9. There is a need for upgrades of current student workstations to Pentium/CD Rom technology and to
other newer wireless and handheld technologies. There is also a need to expand library services to
include more up-to-date technologies and digital-based materials, including video-conferencing
capabilities. (Source – Technology Plans)
10. There is a need for programs that promote the capacity of children to begin school ready to learn.
(Source – Educational Research, Best Practices, Surveys, WV Kids Count)
11. There is a need to implement the key practices of the Middle Schools That Work and High Schools
That Work initiative. (Source – Best Practices)
12. There is a need to provide classroom teachers with opportunities to strengthen teaching skills
through quality graduate education programs. (Source – Educational Research, Surveys)
13. There is a need to provide high quality educational offerings to adult learners. (Source – Dropout
Data, Unified School Improvement Plans, Steering Committee Recommendations)
14. There is a need to train and assist teachers and administrators in developing quality Web sites for
the school district and the schools. (Source – County Plan Technology )
15. There is a need to provide students with expanded opportunities for writing and reading across the
curriculum. There is also a need to expand existing library resources for all children in the school
district. (Source – Writing Assessment, Unified School Improvement Plans)
16. There is a need to provide support services to the families and students whose absences from
school are detrimental to academic progress. (Source – Attendance Data)
17. There is a need to implement programs that lead to an increased college going rate. (Source –
Educational Research, College Going Rates.)
18. There is a need to expand the high school/middle school curriculum through virtual school sources,
and to expand educational opportunities at all grade levels through the use of virtual/distance learning
technology. (Source – LSIC Recommendations, Board of Education Minutes)
19. There is a need to provide a climate conducive to learning through improvements in school facilities
and grounds. (Source – Local School Improvement Councils)
20. There is a need to continue implementation of the Saxon Phonics comprehensive reading program
that effectively delivers skills and concepts to meet West Virginia Content Standards and Objectives
and to supplement the adopted reading program with a strong, systematic phonics program. (Source –
SAT 9)
Page 7 of 64
21. There is a need to expand foreign language services to students at all grade levels K-12 in order to
improve overall language skills for students (Source – Educational Research, Best Practices, Surveys,
WV Kids Count)
22. There is a need to train and assist teachers in implementing student assessment procedures at all
grade levels in order to meet new state and federal requirements.
23. There is a need to train and assist teachers in understanding and implementing policies and
procedures relating to the “No Child Left Behind” Federal Legislation. This includes training in effective
schools correlates, effective instructional strategies, learner engagement levels, Bloom’s Taxonomy,
and pillars of school improvement.
In the needs described above, up-to-date technology is required in order to provide teacher and
students with the best tools possible for learning. Only through the wise use and integration of
technology can all subgroups of learners achieve the required proficiency levels set forth by NCLB.
Technology Infrastructure
Assessment results show that 77% of Clay County Schools classrooms have 3 or more W98 (or higher)
computers, compared to 35% Statewide. 100% of classrooms are wired compared to 91% statewide.
Based on individual school results, Clay Elementary School has the greatest need in terms of updating
computer equipment. Wiring infrastructure throughout the county is excellent.
School Satisfaction Survey
Satisfactions surveys show that parents are generally pleased with the availability of technology in
schools. Our surveys show that parents are most concerned about fairness in discipline and school
safety. We are adding surveilance technology in our schools to help address these concerns.
OEPA Reports
6 of our 7 schools are meeting AYP. Clay County Middle School is not meeting AYP due to the special
education subgroup. OEPA completed a vist at this school a few days ago and the report is pending.
Based on the exit interview, the school is complying with all regulations, policies and procedures.
Supplemental services are being provided to students to assist the school in making AYP. Computer
technology is being used as part of the supplemental services and after-school tutoring.
Facilities Assessment
We have 7 schools. Our 3 larger schools, Clay High, Clay Middle and Clay Elem. are in excellent
condition. Our 4 remaining schools are very small, housing about 100-130 students each. These
schools are clean and well-maintained, yet they are very old and replaced. We are constructing a new
school over the next two years to replace Valley Fork and Ivydale schools. Our CEFP calls for a similar
plan to replace Lizemore and H.E. White schools in the future. The technology infrastructure at all
schools is very good.
Digital Divide Survey
Generally the digital divide survey results show Clay County to be above the state average in
computer-to-student ratios, wired classrooms, up-to-date computers, and administrative usage of
technology. We hope to continue with a progressive agenda in the integration and usage of technology.
This will help to level the playing field in a county that has the 2nd highest poverty rate among the 55
counties in West Virginia.
Page 8 of 64
Page 9 of 64
Instructional Goal #1
Goal #1 is to provide not less than 3 to 5 up-to-date computer workstations in all K-12 classrooms in the
school district. (WV Education Goal #5; Clay County Improvement Objective #2, 8, 17, & 18)
Instructional Goal #1, Technology Improvement Objective #1
Identify funding through multiple sources and purchase 60 new computer workstations annually in order
to achieve the goal of 240 up-to-date computer workstations in 50 K-5 elementary classrooms
throughout the school district.
Indicators of Achievement:
Year 1:
Identification of sources and purchase of 60 new computer workstations for K-5 elementary
(2002-03) school classrooms.
Year 2:
Identification of sources and purchase of 60 new computer workstations for K-5 elementary
(2003-04) school classrooms.
Year 3:
Identification of sources and purchase of 60 new computer workstations for K-5 elementary
(2004-05) school classrooms.
Year 4:
Identification of sources and purchase of 60 new computer workstations for K-5 elementary
(2005-06) school classrooms.
Year 5:
Identification of sources and purchase of 60 new computer workstations for K-5 elementary
(2006-07) school classrooms.
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #1
Purchase 10 computer workstations for Valley Fork Elementary School.
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Pam Mullins
Activity Type
Access
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Desktop Access
Grants
10000
Total:
10000.00
Page 10 of 64
Technology Activity: #2, Instructional Goal #1, Technology Improvement Objective #1
Purchase 10 computers for Ivydale Elementary School
Persons Responsible
Kenneth Tanner
Mike Mullins
Jerry Linkinoggor
Activity Type
Access
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Desktop Access
Grants
10000
Total:
10000.00
Technology Activity: #3, Instructional Goal #1, Technology Improvement Objective #1
Purchase 10 computer workstations for classroom use for Lizemore Elementary School.
Persons Responsible
Larry Gillespie
Kenneth Tanner
Teresa Morris
Activity Type
Access
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Desktop Access
Grants
10000
Total:
10000.00
Technology Activity: #4, Instructional Goal #1, Technology Improvement Objective #1
Purchase 10 computer workstations for H. E. White Elementary School
Persons Responsible
Kenneth Tanner
Lavern Taylor
Jerry Linkinoggor
Activity Type
Page 11 of 64
Access
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Desktop Access
Grants
10000
Total:
10000.00
Technology Activity: #5, Instructional Goal #1, Technology Improvement Objective #1
Seek and identify funding for the purchase of 20 computer workstations at Clay Elementary School
Persons Responsible
Kenneth Tanner
Danny Brown
Jerry Linkinoggor
Activity Type
Access
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Desktop Access
Grants
24000
Total:
24000.00
Page 12 of 64
Instructional Goal #1, Technology Improvement Objective #2
Identify funding through multiple sources and purchase 60 new computer workstations annually in order
to achieve the goal of 5 up-to-date computer workstations per classroom in grade 6-12 classrooms
throughout the school district.
Indicators of Achievement:
Year 1:
Identify funding through multiple sources and purchase 60 computer workstations annually
(2002-03) in grades 6-12 to maintain goal of 5 up-to-date computer workstations per classroom.
Year 2:
Identify funding through multiple sources and purchase 60 computer workstations annually
(2003-04) in grades 6-12 to maintain goal of 5 up-to-date computer workstations per classroom.
Year 3:
Identify funding through multiple sources and purchase 60 computer workstations annually
(2004-05) in grades 6-12 to maintain goal of 5 up-to-date computer workstations per classroom.
Year 4:
Identify funding through multiple sources and purchase 60 computer workstations annually
(2005-06) in grades 6-12 to maintain goal of 5 up-to-date computer workstations per classroom.
Year 5:
Identify funding through multiple sources and purchase 60 computer workstations annually
(2006-07) in grades 6-12 to maintain goal of 5 up-to-date computer workstations per classroom.
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #2
Identify funding and purchase 30 computer workstations for Clay County High School to achieve goal of
5 up-to-date computers per classroom.
Persons Responsible
Kenneth Tanner
Philip Dobbins
Jerry Linkinoggor
Activity Type
Access
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Desktop Access
Grants
34000
Total:
34000.00
Technology Activity: #2, Instructional Goal #1, Technology Improvement Objective #2
Identify funding and purchase 30 computer workstations for Clay County Middle School to achieve goal
Page 13 of 64
of 5 up-to-date computers per classroom.
Persons Responsible
Kenneth Tanner
Steve Stanley
Jerry Linkinoggor
Activity Type
Access
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Desktop Access
SUCCESS
6000
Grants
26000
Total:
32000.00
Page 14 of 64
Instructional Goal #2
Provide modern computer labs in all Clay County Schools for group instruction of up to 25 students.
WV Education Goal #5; Clay County Improvement Objective #2, 8, 17, & 18)
Instructional Goal #2, Technology Improvement Objective #1
Provide modern computer labs in each of the schools in the school district.
Indicators of Achievement:
Year 1:
H.E. White, Lizemore, Valley Fork, and Ivydale Elementary schools will have modern labs
(2002-03) with 25 computers.
Valley Fork and Ivydale Elementary Schools will have a modern lab with 25 computers.
Year 2:
Clay County High School, Clay County Middle School, and Clay Elementary School will
(2003-04)
receive new labs.
Year 3:
Clay Elementary School and Clay County High School will have updated computer labs
(2004-05) with new/updated computers hardware.
Year 4:
Clay County Middle School and Clay County High School will have updated computer labs
(2005-06) with new/updated computers hardware.
Year 5:
The New School "Valley Dale" at Big Otter WV will have a new, modern computer lab with
(2006-07) 25 computers.
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #1
Provide a 25 station updated computer lab at Clay Elementary School
Persons Responsible
Kenneth Tanner
Larry Gillespie
Danny Brown
Activity Type
Access
No. Budget Item
1
Activity Type Funding Source
Hardware - Desktop Access
BS/CE
Est $
18000
Telecommunications 12000
Total:
30000.00
Page 15 of 64
Technology Activity: #2, Instructional Goal #2, Technology Improvement Objective #1
Provide a 25 station updated computer lab for Clay County High School
Persons Responsible
Kenneth Tanner
Larry Gillespie
Philip Dobbins
Activity Type
Access
No. Budget Item
1
Activity Type Funding Source
Hardware - Desktop
SUCCESS
Est $
18000
Telecommunications 12000
Total:
30000.00
Technology Activity: #3, Instructional Goal #2, Technology Improvement Objective #1
Provide a 25 station mobile computer lab for Valley Fork Elementary School
Persons Responsible
Kenneth Tanner
Pam Mullins
Larry Gillespie
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Hardware - Notebook Content/Tech Integration Grants
Total:
30000
30000.00
Technology Activity: #4, Instructional Goal #2, Technology Improvement Objective #1
Provide a 25 station mobile computer lab for Ivydale Elementary School
Persons Responsible
Kenneth Tanner
Mike Mullins
Page 16 of 64
Larry Gillespie
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Notebook Access
Grants
30000
Total:
30000.00
Technology Activity: #5, Instructional Goal #2, Technology Improvement Objective #1
Provide a 25 station mobile computer lab for Clay Elementary School
Persons Responsible
Kenneth Tanner
Danny Brown
Jerry Linkinoggor
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Notebook Access
Grants
30000
Total:
30000.00
Technology Activity: #6, Instructional Goal #2, Technology Improvement Objective #1
Provide a 25 station mobile computer lab for Clay County Middle School and Clay County High School
Persons Responsible
Kenneth Tanner
Philip Dobbins
Joan Haynie
Activity Type
Access
Content/Tech Integration
Page 17 of 64
No. Budget Item
1
2
Activity Type Funding Source Est $
Hardware - Notebook Access
Hardware - Notebook Access
Grants
30000
Total:
30000.00
Grants
30000
Total:
30000.00
Technology Activity: #7, Instructional Goal #2, Technology Improvement Objective #1
Purchase a 25-Station Mobile Laptop Lab for Lizemore Elementary School to increase technology
availability and usage.
Persons Responsible
Kenneth Tanner
Teresa Morris
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Notebook Access
Grants
30000
Total:
30000.00
Technology Activity: #8, Instructional Goal #2, Technology Improvement Objective #1
Purchase a 25-Station Mobile Laptop Lab for H.E. White Elementary School to increase technology
availability and usage.
Persons Responsible
Kenneth Tanner
Lavern Taylor
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Notebook Access
Grants
30000
Total:
30000.00
Page 18 of 64
Instructional Goal #2, Technology Improvement Objective #2
Provide renovated computer labs in each of the three larger Clay County Schools (Clay Elementary,
Clay Middle, and Clay High).
Indicators of Achievement:
Year 1:
Renovate a computer lab with 25 stations at Clay Elementary School
(2002-03)
Year 2:
Renovate a computer lab with 25 stations at Clay Elementary School
(2003-04)
Year 3:
Renovate a computer lab with 25 stations at Clay High School
(2004-05)
Year 4:
Renovate a computer lab with 25 stations at Clay Middle School
(2005-06)
Year 5:
Renovate the computer labs at Valley Fork and Ivydale El. (moved to a new school at Big
(2006-07) Otter, WV)
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #2
Purchase Computer Equipment to complete renovation of 25 station lab at Clay Elementary School;
Persons Responsible
Kenneth Tanner
Danny Brown
Larry Gillespie
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Desktop Access
Grants
15000
Total:
15000.00
Technology Activity: #2, Instructional Goal #2, Technology Improvement Objective #2
Purchase Computer Equipment to complete renovation of 25 station lab at Clay County High School;
Page 19 of 64
Persons Responsible
Kenneth Tanner
Cindy Willis
Philip Dobbins
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Desktop Access
Grants
15000
Total:
15000.00
Technology Activity: #3, Instructional Goal #2, Technology Improvement Objective #2
Complete the renovation of a 25 station computer lab at Clay County Middle School
Persons Responsible
Kenneth Tanner
Joan Haynie
Cindy Willis
Activity Type
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Desktop Access
Grants
15000
Total:
15000.00
Page 20 of 64
Instructional Goal #3
Provide the appropriate software for all classroom and lab computers in Clay County Schools in order
for students and teachers to meet or exceed all WV Technology Goals, all WV Classroom Standards
and Objectives, and all National Technology Standards for teachers and students. WV Education Goal
#2, 3, 4, & 6; Clay County Improvement Objective #3, 4, 8, 12, 16, & 17)
Instructional Goal #3, Technology Improvement Objective #1
Provide anti-virus and security software to prevent hacking on all computers.
Indicators of Achievement:
Year 1:
Installation of Nortions on all computers; and Deep Freeze on all middle & high school
(2002-03) computers
Year 2:
Installation of Nortions on all computers; and Deep Freeze on all middle computers
(2003-04)
Year 3:
Installation of Nortions on all computers; and Deep Freeze on all middle school computers
(2004-05)
Year 4:
Installation of Nortons on all computers; and deep freeze on all middle school computers
(2005-06)
Year 5:
Installation of Nortons on all computers; and deep freeze on all middle school computers
(2006-07)
Technology Activity: #1, Instructional Goal #3, Technology Improvement Objective #1
Purchase Nortons Anti-Virus for all computers in all schools
Persons Responsible
Kenneth Tanner
Activity Type
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Application Admin/Support Procedures General Funds
Total:
Page 21 of 64
2000
2000.00
Technology Activity: #2, Instructional Goal #3, Technology Improvement Objective #1
Continue providing Deep Freeze Software for all middle school computers.
Persons Responsible
Kenneth Tanner
Steve Stanley
Randy Cantrell
Activity Type
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 22 of 64
Instructional Goal #3, Technology Improvement Objective #2
A comprehensive, distance/technology learning portal will be established for all Clay County Schools to
include quality video/audio conferencing, distance learning capabilities in all district schools, a managed
website with tutorial functionality for students, interactive functionality parents, instructional and
administrative functionality for teachers and administrators. This solution is being established to more
fully comply with local, state, and national technology standards for teachers and students. The solution
must include the software, hardware, and communication infrastructure to bring quality video/audio, live
and recorded to every up-to-date multimedia computer in the school district.
Indicators of Achievement:
We will seek funding for a distance learning solution in order to provide enhanced
Year 1:
technology integration opportunities for students in rural schools, homebound students,
(2002-03) student in alternative schools, and students in in-school suspension. The funding will also
provide additional integration opportunities for all teachers in all classes.
Year 2:
A distance learning vendor(s) will be selected to implement a custom solution for Clay
(2003-04) County Schools; The solution will be installed
Teachers in all schools will utilize a distance/technology learning portal to enhance
Year 3:
instructional opportunities for students, increase parent involvement opportunities for
(2004-05)
parents, and increase community involvement for the public at large.
Teachers in all schools will utilize a distance/technology learning portal to enhance
Year 4:
instructional opportunities for students, increase parent involvement opportunities for
(2005-06)
parents, and increase community involvement for the public at large.
Teachers in all schools will utilize a distance/technology learning portal to enhance
Year 5:
instructional opportunities for students, increase parent involvement opportunities for
(2006-07)
parents, and increase community involvement for the public at large.
Technology Activity: #1, Instructional Goal #3, Technology Improvement Objective #2
Technology Committee and local administrators plan implementation of a distance/technology solution
to more fully implement state and national technology standards
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
R. B. Legg
Activity Type
Stakeholder Involvement
Admin/Support Procedures
Page 23 of 64
No. Budget Item Activity Type
1
Stipends
Funding Source Est $
Stakeholder Involvement Grants
3000
Total:
3000.00
Technology Activity: #2, Instructional Goal #3, Technology Improvement Objective #2
A distance/technology software solution will be implemented to enhance technology learning
opportunities for students, enhance technology utilization for teachers, enhance administrative
capabilities for teachers and administrators, and enhance parent and community involvment for parents
and community members.
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Cindy Willis
Activity Type
No. Budget Item
Activity Type
1
Content/Tech Integration Grants
2
3
4
Software - Web Design
Software - Application
Technical Support - Installation
Innovative Strategies
Innovative Strategies
Technical Support - SW maintenance Innovative Strategies
Funding Source Est $
17000
Total:
17000.00
Grants
30000
Total:
30000.00
Grants
11500
Total:
11500.00
Grants
15000
Total:
15000.00
Technology Activity: #3, Instructional Goal #3, Technology Improvement Objective #2
A distance learning equipment package will be purchased and installed to complement the
distance/technology solution selected by the school district. The equipment package must provide high
quality video/audio, both in live and on-demand recorded mode, from multiple input sites to any
up-to-date multimedia computer in the school district.
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Larry Gillespie
Activity Type
Access
Professional Development
Page 24 of 64
Content/Tech Integration
Stakeholder Involvement
Innovative Strategies
Admin/Support Procedures
No. Budget Item
1
2
3
4
5
Activity Type
Funding Source Est $
Hardware - Projection Device Innovative Strategies
Hardware - Server
Hardware - Other
Hardware - Peripherals
Hardware - Other
Access
Innovative Strategies
Grants
10000
Total:
10000.00
General Funds
18000
Total:
20000.00
General Funds
20000
Grants
5000
Total:
25000.00
Content/Tech Integration General Funds
Innovative Strategies
20000
Grants
57000
Total:
77000.00
Grants
38500
Total:
38500.00
Technology Activity: #4, Instructional Goal #3, Technology Improvement Objective #2
To complement the distance/technology solution, the necessary communication infrastructure will be
completed; this includes high-speed access points (T1, T3/DS#, and/or VDSL as is available.
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Larry Gillespie
Activity Type
No. Budget Item
1
Activity Type
Funding Source Est $
Network Infrastructure - Electronics Innovative Strategies Grants
Total:
2
3
Network Infrastructure - Wireless
Network Infrastructure - Cabling
Innovative Strategies Grants
Access
20000
20000.00
20000
Total:
20000.00
General Funds
8000
Grants
2000
Total:
10000.00
Page 25 of 64
Technology Activity: #5, Instructional Goal #3, Technology Improvement Objective #2
To complement the distance/technology solution, the necessary staff development will be conducted in
order to assist teachers in maximizing existing technology tools. This will be done by means of an
on-going technology academy.
Persons Responsible
Kenneth Tanner
Cindy Willis
Jerry Linkinoggor
Activity Type
Professional Development
Content/Tech Integration
No. Budget Item
1
Professional Development
Activity Type Funding Source
Grants
Est $
5000
Rural School Initiative 5000
2
Stipends
Title II
5000
Total:
15000.00
Rural School Initiative 5000
Grants
5000
Title II
10000
Total:
20000.00
Page 26 of 64
Instructional Goal #3, Technology Improvement Objective #3
Provide Bridges CX-Online Career Software and School Kit Software for all middle and high computers.
Indicators of Achievement:
Year 1:
All existing computers will be equipped with Bridges CX-Online
(2002-03)
Year 2:
All existing computers will be equipped with Bridges CX-Online and School Kit Software
(2003-04)
Year 3:
All existing computers will be equipped with Bridges CX-Online and School Kit Software
(2004-05)
Year 4:
All existing computers will be equipped with CBridges X-Online and School Kit Software
(2005-06)
Year 5:
All existing computers will be equipped with CBridges X-Online and School Kit Software
(2006-07)
Technology Activity: #1, Instructional Goal #3, Technology Improvement Objective #3
gontinue providine Bridges for Clay County High School and Clay Middle School
Persons Responsible
Kenneth Tanner
Randy Cantrell
Steve Stanley
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration SUCCESS
Total:
2200
2200.00
Technology Activity: #2, Instructional Goal #3, Technology Improvement Objective #3
Provide School Kit Software for Clay County High School and Clay County Middle School.
Persons Responsible
Kenneth Tanner
Page 27 of 64
Joan Haynie
Philip Dobbins
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration SUCCESS
Total:
Page 28 of 64
1000
1000.00
Instructional Goal #3, Technology Improvement Objective #4
Provide the complete Compass Learning Software Package on all computers for each of 4 smaller
rural, elementary schools (HE White, Ivydale, Lizemore, and Valley Fork). All computers at Clay
Elementary School will have Orchard Sotware installed.
Indicators of Achievement:
Year 1:
All existing computers will have Compass Learning System or Orchard Software
(2002-03)
Year 2:
All existing computers will have Compass Learning System or Orchard Software
(2003-04)
Year 3:
All existing computers will have Compass Learning System or Orchard Software
(2004-05)
Year 4:
All existing computers will have Compass Learning System or Orchard Software
(2005-06)
Year 5:
All existing computers will have Compass Learning System or Orchard Software
(2006-07)
Technology Activity: #1, Instructional Goal #3, Technology Improvement Objective #4
Provide Compass Learning System on all existing computers at the elementary level
Persons Responsible
Kenneth Tanner
Larry Gillespie
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration BS/CE
Total:
5000
5000.00
Technology Activity: #2, Instructional Goal #3, Technology Improvement Objective #4
Provide Orchard Software on all Clay Elementary School computers
Persons Responsible
Page 29 of 64
Kenneth Tanner
J. B. Butcher
Danny Brown
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration Grants
Total:
Page 30 of 64
5000
5000.00
Instructional Goal #3, Technology Improvement Objective #5
Identify , obtain, and implement effective core content curriculum software designed to increase student
performance in fulfillment of state and national performance standards
Indicators of Achievement:
Year 1:
Identification of appropriate curriculum integration software
(2002-03)
Year 2:
Obtain needed curriculum integration software, train teachers and implement software
(2003-04)
Year 3:
Identify appropriate hand-held sofware applications, train teachers, and implement software
(2004-05) use in classrooms.
Year 4:
Identify additional technology tools that are effective in helping students meet content
(2005-06) standards and objectives; train teachers in usage and implement tools in classrooms.
Year 5:
Identify additional technology tools that are effective in helping students meet content
(2006-07) standards and objectives; train teachers in usage and implement tools in classrooms.
Technology Activity: #1, Instructional Goal #3, Technology Improvement Objective #5
Conduct appropriate curriculum committee meetings with input from technology team members and
LSIC members to determine curriculum integration hand-held software to best meet needs of schools;
purchase hand-helds and software
Persons Responsible
Cindy Willis
Joan Haynie
Kenneth Tanner
Larry Gillespie
Activity Type
Access
Professional Development
Content/Tech Integration
Stakeholder Involvement
Innovative Strategies
Admin/Support Procedures
Page 31 of 64
No. Budget Item
1
Activity Type
Funding Source
Hardware - PDA
Ed Tech Formula - Round 3 5000
Total:
2
Est $
5000.00
Professional Development Professional Development Grants
5000
Total:
5000.00
Technology Activity: #2, Instructional Goal #3, Technology Improvement Objective #5
Provide staff development to teachers in each district school to enable them to effectively use
hand-helds during as instructional tools during hands-on activities.
Persons Responsible
Cindy Willis
Joan Haynie
Kenneth Tanner
Larry Gillespie
Activity Type
No. Budget Item Activity Type
1
Stipends
Funding Source
Est $
Professional Development Rural School Initiative 5000
Grants
5000
Title II
5000
Total:
15000.00
Technology Activity: #3, Instructional Goal #3, Technology Improvement Objective #5
Evaluate effectiveness of software usage based on student performance data
Persons Responsible
Kenneth Tanner
Cindy Willis
Joan Haynie
Larry Gillespie
Activity Type
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 32 of 64
Instructional Goal #4
During the 2005, 2006, and 2007 school years the school district will offer a staff development
Technology Academy in order to adequately prepare all teachers to utilize current technology in
accordance with Technology Standards for West Virginia Teachers and consistent with the new
evaluation policy for teachers. WV Education Goal #3; Clay County Improvement Objective #3, 5, 16, &
17)
Instructional Goal #4, Technology Improvement Objective #1
Effectively assess all teachers with regard to current technology knowledge, usage, and perceived
needs.
Indicators of Achievement:
Year 1:
Successful assessment of all teachers, scoring of results, and identification of training
(2002-03) needs
Year 2:
Successful assessment of all teachers, scoring of results, and identification of training
(2003-04) needs
Year 3:
Successful assessment of all teachers, scoring of results, and identification of training
(2004-05) needs
Year 4:
Successful assessment of all teachers, scoring of results, and identification of training
(2005-06) needs
Year 5:
Successful assessment of all teachers, scoring of results, and identification of training
(2006-07) needs
Technology Activity: #1, Instructional Goal #4, Technology Improvement Objective #1
Distribute assessment instrument to all teachers (provided by Integrated Services) Systems.
Persons Responsible
Kenneth Tanner
Activity Type
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 33 of 64
Technology Activity: #2, Instructional Goal #4, Technology Improvement Objective #1
Collect completed assessment documents and deliver to Integrated Services for scoring
Persons Responsible
Kenneth Tanner
Activity Type
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 34 of 64
Instructional Goal #4, Technology Improvement Objective #2
The Professional Development Council and the Technology Council will meet to plan the Technology
Academy based on the technology assessment results.
Indicators of Achievement:
Year 1:
Successful meeting and planning of Technology Academy
(2002-03)
Year 2:
Successful meeting and planning of Technology Academy
(2003-04)
Year 3:
Successful meeting and planning of Technology Academy
(2004-05)
Year 4:
Successful meeting and planning of Technology Academy
(2005-06)
Year 5:
Successful meeting and planning of Technology Academy
(2006-07)
Technology Activity: #1, Instructional Goal #4, Technology Improvement Objective #2
Technology Team and Professional Development Council meet to Plan Technology Academy.
Persons Responsible
Kenneth Tanner
Larry Gillespie
Jerry Linkinoggor
Activity Type
Professional Development
Stakeholder Involvement
Admin/Support Procedures
No. Budget Item Activity Type
1
Stipends
Funding Source Est $
Stakeholder Involvement Grants
Total:
2000
2000.00
Technology Activity: #2, Instructional Goal #4, Technology Improvement Objective #2
Schedule Trainers, Publicize Academy, Sign up participants
Page 35 of 64
Persons Responsible
Kenneth Tanner
Larry Gillespie
Jerry Linkinoggor
Activity Type
Professional Development
No. Budget Item Activity Type
1
Salary
Funding Source Est $
Professional Development Grants
Total:
2
Supplies
Professional Development Grants
2000
2000.00
1000
Grants
Total:
1000.00
Page 36 of 64
Instructional Goal #4, Technology Improvement Objective #3
Implement the Technology Academy as planned.
Indicators of Achievement:
Year 1:
Successful implementation of Technology Academy with full participation of teachers
(2002-03)
Year 2:
Successful implementation of Technology Academy with full participation of teachers
(2003-04)
Year 3:
Successful implementation of Technology Academy with full participation of teachers; Full
(2004-05) is defined as participating teachers from 100% of district schools.
Year 4:
Successful implementation of Technology Academy with full participation of teachers; Full
(2005-06) is defined as participating teachers from 100% of district schools.
Year 5:
Successful implementation of Technology Academy with full participation of teachers; Full
(2006-07) is defined as participating teachers from 100% of district schools.
Technology Activity: #1, Instructional Goal #4, Technology Improvement Objective #3
Conduct the Technology Academy according to the scheduled plan.
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Larry Gillespie
Activity Type
Professional Development
No. Budget Item
1
2
3
Activity Type
Funding Source
Est $
Professional Development Professional Development Ed Tech Formula - Round 3 15000
Salary
Supplies
Grants
15000
Total:
30000.00
Professional Development Ed Tech Formula - Round 3 5000
Grants
5000
Total:
10000.00
Ed Tech Formula - Round 3 5000
Grants
5000
Total:
10000.00
Page 37 of 64
Technology Activity: #2, Instructional Goal #4, Technology Improvement Objective #3
Conduct post workshop evaluation
Persons Responsible
Kenneth Tanner
Activity Type
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 38 of 64
Instructional Goal #5
The Clay County School District will provide extra time and extra help opportunities for students that
make available current technology for help in meeting performance goals. WV Education Goal #2, 5, &
6; Clay County Improvement Objective #1, 2, 4, 7, & 9)
Instructional Goal #5, Technology Improvement Objective #1
Provide after school tutoring and instruction for students in all schools needing assistance to master
content standards and objectives
Indicators of Achievement:
Year 1:
Successful implementation of after school in all Clay County Schools
(2002-03)
Year 2:
Successful implementation of after school in all Clay County Schools
(2003-04)
Year 3:
Successful implementation of after school in all Clay County Schools
(2004-05)
Year 4:
Successful implementation of after school in all Clay County Schools
(2005-06)
Year 5:
Successful implementation of after school in all Clay County Schools
(2006-07)
Technology Activity: #1, Instructional Goal #5, Technology Improvement Objective #1
Provide Computers and appropriate basic skills software for students after school in each of 7 Clay
County Schools
Persons Responsible
Principal of Each School
Activity Type
Access
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
Page 39 of 64
No. Budget Item Activity Type
1
2
Salary
Funding Source Est $
Innovative Strategies Grants
Supplies
20000
Total:
20000.00
Grants
5000
Total:
5000.00
Technology Activity: #2, Instructional Goal #5, Technology Improvement Objective #1
Provide transportation to students participating in after school
Persons Responsible
Larry Legg
Activity Type
Access
Innovative Strategies
No. Budget Item Activity Type
1
Funding Source Est $
Innovative Strategies Local Levy/Bond 40000
Grants
20000
Total:
60000.00
Technology Activity: #3, Instructional Goal #5, Technology Improvement Objective #1
Provide summer school activities at the three larger schools, with student access to technology and
basic skills software as a form of extra time and extra help.
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Larry Gillespie
Activity Type
Access
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
Page 40 of 64
No. Budget Item Activity Type
Funding Source Est $
1
Grants
15000
Total:
15000.00
2
Salary
Supplies
Innovative Strategies
Content/Tech Integration Grants
Total:
10000
10000.00
Page 41 of 64
Instructional Goal #6
Provide opportunities for adults to participate educational opportunities within all Clay County Schools,
and utilize existing technology to enhance the quality of life. (WV Education Goal #6; Clay County
Improvement Objective #13, & 14)
Instructional Goal #6, Technology Improvement Objective #1
Provide opportunities for adults, particularly parents to participate in activities involving technology
during after school hours.
Indicators of Achievement:
Year 1:
Participation by parents and other adult learners in technology activities after school.
(2002-03)
Year 2:
Participation by parents and other adult learners in technology activities after school.
(2003-04)
Year 3:
Participation by parents and other adult learners in technology activities after school.
(2004-05)
Year 4:
Participation by parents and other adult learners in technology activities after school.
(2005-06)
Year 5:
Participation by parents and other adult learners in technology activities after school.
(2006-07)
Technology Activity: #1, Instructional Goal #6, Technology Improvement Objective #1
Offer after school tutoring and instruction with parental involvement
Persons Responsible
School Principals
Activity Type
Content/Tech Integration
Stakeholder Involvement
Innovative Strategies
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 42 of 64
Technology Activity: #2, Instructional Goal #6, Technology Improvement Objective #1
Offer adult education courses with and without college credit, and using distance learning technology.
Persons Responsible
Cindy Willis
Connie Schoonover
Kenneth Tanner
Activity Type
Access
Stakeholder Involvement
Innovative Strategies
Admin/Support Procedures
No. Budget Item Activity Type
1
Tuition
Funding Source Est $
Stakeholder Involvement Grants
5000
Total:
5000.00
Technology Activity: #3, Instructional Goal #6, Technology Improvement Objective #1
Expand the school district's capacity to maintain and utilize a website to increase parent involvement
Persons Responsible
Kenneth Tanner
Cindy Willis
Jerry Linkinoggor
Activity Type
Access
Content/Tech Integration
Stakeholder Involvement
Innovative Strategies
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Web Design Innovative Strategies Grants
Total:
Page 43 of 64
10000
10000.00
Instructional Goal #7
All Clay County Schools will become TMS (Technology Model Schools within a period of three years,
with continued support through employment of two technology integration specialists. WV Education
Goal #2, & 5; Clay County Improvement Objective #3, 16, & 17, 18)
Instructional Goal #7, Technology Improvement Objective #1
Seek and obtain Competitive Ed Tech Funds to combine with other existing funding in order to make all
Clay County Schools TMS Schools within three years.
Indicators of Achievement:
Year 1:
The 4 smaller, rural elementary schools will become TMS schools
(2002-03)
Year 2:
Clay Elementary School, Clay County Middle School, and Clay County High School will
(2003-04) apply for funding to become TMS schools
Year 3:
Clay Elementary School, Clay County Middle and Clay County High School will become
(2004-05) TMS schools.
Year 4:
We will seek EETT funding to provide on-going support support for TMS schools through
(2005-06) our Technology Integration Specialists.
Year 5:
We will seek continued EETT funding to provide on-going support support for TMS schools
(2006-07) through our Technology Integration Specialists.
Technology Activity: #1, Instructional Goal #7, Technology Improvement Objective #1
The Technology Team will prepare a coordinated Ed Tech application for each of the next 3 years that
will combine competitive and formula funding, and other funding sources in order to make all schools
TMS schools
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Larry Gillespie
Activity Type
Access
Professional Development
Content/Tech Integration
Stakeholder Involvement
Innovative Strategies
Admin/Support Procedures
Page 44 of 64
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #2, Instructional Goal #7, Technology Improvement Objective #1
Implement the Ed Tech Grant as proposed
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Larry Gillespie
Activity Type
Professional Development
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
No. Budget Item
1
Substitutes
Activity Type Funding Source
Ed Tech Formula - Round 3 62400
Total:
2
Travel
62400.00
Ed Tech Formula - Round 3 5400
Total:
3
Hardware - Desktop
Est $
5400.00
Ed Tech Formula - Round 3 18000
Total:
18000.00
Page 45 of 64
Instructional Goal #8
To realize the full potential of E-rate funding in order to assist in providing the best possible technology
opportunities for students in the school district. WV Education Goal #5; Clay County Improvement
Objective #17 & 18)
Instructional Goal #8, Technology Improvement Objective #1
Contract with Alph Telecommunications with the assistance of RESA III to aid and assist the school
district in maximizing E-rate opportunities
Indicators of Achievement:
Year 1:
Execute Fulfil Contract with Alpha Telecommunications
(2002-03)
Year 2:
Execute Fulfil Contract with Alpha Telecommunications
(2003-04)
Year 3:
Execute Fulfil Contract with Alpha Telecommunications
(2004-05)
Year 4:
Execute Fulfil Contract with Alpha Telecommunications
(2005-06)
Year 5:
Execute Fulfil Contract with Alpha Telecommunications
(2006-07)
Technology Activity: #1, Instructional Goal #8, Technology Improvement Objective #1
Complete local E-Rate applications relating to Success and Basic Skills implementation
Persons Responsible
Kenneth Tanner
Activity Type
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #2, Instructional Goal #8, Technology Improvement Objective #1
Page 46 of 64
Submit all necessary information to Alpha Telecommunications regarding E-Rate.
Persons Responsible
Kenneth Tanner
Loretta Gray
Activity Type
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #3, Instructional Goal #8, Technology Improvement Objective #1
To provide voice, long distance, data lines and CSU/DSU, Cellular, and Internal Connections in order
for the school district to carry out effeciently the process of meeting all instructional objectives as
defined by local, state, and federal policies. (Year 7)
Persons Responsible
Kenneth Tanner, Tech Coord.
Loretta Gray, Erate Coord.
Alpha Communications
Jerry Linkinoggor, Superintendent
Activity Type
Access
No. Budget Item
Activity Type Funding Source Est $
1
Access
2
3
4
5
E-rate - Cellular
E-rate - Data Lines
Access
E-rate - Internal Connections Access
E-rate - Long Distance
E-rate - Voice
E-Rate Year 7
1774.80
General Funds
265.20
Total:
2040.00
E-Rate Year 7
66368
General Funds
9652
Total:
76020.00
E-Rate Year 7
79124.85
General Funds
9941
Total:
89065.85
E-Rate Year 7
6369
General Funds
952
Total:
7321.00
E-Rate Year 7
21325
General Funds
3172
Page 47 of 64
Total:
24497.00
Technology Activity: #4, Instructional Goal #8, Technology Improvement Objective #1
To provide voice, long distance, data lines and CSU/DSU, Cellular, and Internal Connections in order
for the school district to carry out effeciently the process of meeting all instructional objectives as
defined by local, state, and federal policies. (Year 6)
Persons Responsible
Kenneth Tanner, Tech Coord.
Loretta Gray, Erate Coord.
Jerry Linkinoggor, Superintendent
Activity Type
Access
No. Budget Item
1
2
3
4
5
E-rate - Voice
E-rate - Long Distance
E-rate - Data Lines
E-rate - Cellular
E-rate - Internal Connections
Activity Type Funding Source Est $
E-Rate Year 6
18526
General Funds
2738
Total:
21264.00
E-Rate Year 6
6264
General Funds
936
Total:
7200.00
E-Rate Year 6
22646
General Funds
3324
Total:
25970.00
E-Rate Year 6
1775
General Funds
265
Total:
2040.00
E-Rate Year 6
122088
General Funds
14959
Total:
137047.00
Technology Activity: #5, Instructional Goal #8, Technology Improvement Objective #1
To provide voice, long distance, data lines and CSU/DSU, Cellular, and Internal Connections in order
for the school district to carry out effeciently the process of meeting all instructional objectives as
defined by local, state, and federal policies. (Year 8)
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Page 48 of 64
Alpha Communications
Loretta Gray
Activity Type
Access
No. Budget Item
Activity Type Funding Source Est $
1
Access
2
3
4
5
E-rate - Cellular
E-rate - Data Lines
Access
E-rate - Internal Connections Access
E-rate - Long Distance
E-rate - Voice
Access
E-Rate Year 8
2400
General Funds
500
Total:
2900.00
E-Rate Year 8
70000
General Funds
10000
Total:
80000.00
E-Rate Year 8
80000
General Funds
10000
Total:
90000.00
E-Rate Year 8
6400
General Funds
1000
Total:
7400.00
Total:
25000.00
Access
Technology Activity: #6, Instructional Goal #8, Technology Improvement Objective #1
To provide web hosting in Clay County for improved communication with students, staff, parents and
community (Year 7)
Persons Responsible
County e-rate coordinator
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
E-rate - Web Hosting Content/Tech Integration E-Rate Year 7
54810
General Funds
8190
Total:
63000.00
Technology Activity: #7, Instructional Goal #8, Technology Improvement Objective #1
Page 49 of 64
To provide web hosting in Clay County for improved communication with students, staff, parents and
community (Year 8)
Persons Responsible
Kenneth Tanner
Loretta Gray
Jerry Linkinoggor
Activity Type
Access
No. Budget Item
1
E-rate - Web Hosting
Activity Type Funding Source Est $
E-Rate Year 8
12000
General Funds
3000
Total:
15000.00
Page 50 of 64
Instructional Goal #8, Technology Improvement Objective #2
The Clay County School district will effectively utilize e-rate funding assistance, in coordination with the
West Virginia SUCCESS and BASIC SKILLS Programs to fully meet local, state, and national
technology standards for students and teachers.
Indicators of Achievement:
Year 1:
A 90%+ utilization of e-rate funding eligibility
(2002-03)
Year 2:
A 90%+ utilization of e-rate funding eligibility
(2003-04)
Year 3:
A 90%+ utilization of e-rate funding eligibility
(2004-05)
Year 4:
A 90%+ utilization of e-rate funding eligibility
(2005-06)
Year 5:
A 90%+ utilization of e-rate funding eligibility
(2006-07)
Technology Activity: #1, Instructional Goal #8, Technology Improvement Objective #2
Install necessary servers, switches, wiring drops, routers to build and maintain needed infrastructure at
Clay County High School and Clay County Middle School in order to fully implement the WV Success
Program as well as a new distance learning solution and to enhance learning and improve student
achievement through the integration of technology. (Year 6)
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Andy Haines
Activity Type
Access
Content/Tech Integration
Page 51 of 64
No. Budget Item
1
2
3
Activity Type Funding Source Est $
E-rate - SUCCESS E-rate App. Access
E-rate - SUCCESS E-rate App. Access
Hardware - Server
Access
E-Rate Year 6
23348
SUCCESS
5837
Total:
29185.00
E-Rate Year 6
26266
SUCCESS
2919
Total:
29185.00
Grants
22000
Total:
22000.00
Technology Activity: #2, Instructional Goal #8, Technology Improvement Objective #2
Install necessary servers, switches, wiring drops, routers to build and maintain needed infrastructure at
Clay Elementary, Ivydale Elementary, Valley Fork Elementary, Lizemore Elementary, and H.E. White
Elementary in order to fully implement the WV Success Program as well as a new distance learning
solution and to enhance learning and improve student achievement through the integration of
technology. (Year 8)
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Andy Haines
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
2
3
4
5
Activity Type
Funding Source Est $
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 8
BS/CE
2000
Total:
18000.00
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 8
E-rate - BSCE E-rate App.
E-rate - BSCE E-rate App.
E-rate - BSCE E-rate App.
16000
8000
BS/CE
900
Total:
8900.00
E-Rate Year 8
8000
BS/CE
900
Total:
8900.00
E-Rate Year 8
8000
BS/CE
900
Total:
8900.00
E-Rate Year 8
8000
Page 52 of 64
BS/CE
900
Total:
8900.00
Technology Activity: #3, Instructional Goal #8, Technology Improvement Objective #2
Install necessary servers, switches, wiring drops, routers to build and maintain needed infrastructure at
Clay Elementary School, Valley Fork Elementary School, Ivydale Elementary School, Lizemore
Elementary School, and H.E. White Elementary School in order to fully implement the WV BS/CE
Program as well as a new distance learning solution and to enhance learning and improve student
achievement through the integration of technology. (Year 6)
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Andy Haines
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
2
3
4
5
Activity Type
Funding Source Est $
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 6
14265
BS/CE
1585
Total:
15850.00
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 6
6501
BS/CE
722
Total:
7223.00
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 6
6501
BS/CE
722
Total:
7223.00
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 6
5778
BS/CE
1445
Total:
7223.00
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 6
6501
BS/CE
722
Total:
7223.00
Technology Activity: #4, Instructional Goal #8, Technology Improvement Objective #2
Install necessary servers, switches, wiring drops, routers to build and maintain needed infrastructure at
Clay County High School and Clay County Middle School in order to fully implement the WV Success
Page 53 of 64
Program as well as a new distance learning solution and to enhance learning and improve student
achievement through the integration of technology. (Year 7)
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Andy Haines
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
2
3
4
5
Activity Type
Funding Source Est $
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 7
15408
BS/CE
1712
Total:
17120.00
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 7
7605
BS/CE
845
Total:
8450.00
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 7
7605
BS/CE
845
Total:
8450.00
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 7
7605
BS/CE
845
Total:
8450.00
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 7
7605
BS/CE
845
Total:
8450.00
Technology Activity: #5, Instructional Goal #8, Technology Improvement Objective #2
Install necessary servers, switches, wiring drops, routers to build and maintain needed infrastructure at
Clay County High School and Clay County Middle School in order to fully implement the WV Success
Program as well as a new distance learning solution and to enhance learning and improve student
achievement through the integration of technology. (Year 7)
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Andy Haines
Activity Type
Access
Content/Tech Integration
Page 54 of 64
No. Budget Item
1
2
Activity Type
Funding Source Est $
E-rate - SUCCESS E-rate App. Content/Tech Integration E-Rate Year 7
23348
SUCCESS
5837
Total:
29185.00
E-rate - SUCCESS E-rate App. Content/Tech Integration E-Rate Year 7
26266
SUCCESS
2918.50
Total:
29184.50
Technology Activity: #6, Instructional Goal #8, Technology Improvement Objective #2
Install necessary servers, switches, wiring drops, routers to build and maintain needed infrastructure at
Clay County High School and Clay County Middle School in order to fully implement the WV Success
Program as well as a new distance learning solution and to enhance learning and improve student
achievement through the integration of technology. (Year 8)
Persons Responsible
Kenneth Tanner
Jerry Linkinoggor
Andy Haines
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
2
Activity Type
Funding Source Est $
E-rate - SUCCESS E-rate App. Content/Tech Integration E-Rate Year 8
25000
SUCCESS
6000
Total:
31000.00
E-rate - SUCCESS E-rate App. Content/Tech Integration E-Rate Year 8
28000
SUCCESS
4000
Total:
32000.00
Technology Activity: #7, Instructional Goal #8, Technology Improvement Objective #2
Expand Data Lines and CSU/DSU capabilities to accomodate distance learning project. Also Expand
wireless infrastructure to achieve optimal utilization of distance learning solution.
Persons Responsible
Kenneth Tanner
Andy Haines
Page 55 of 64
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
E-rate - CSU/DSU
Activity Type Funding Source Est $
E-Rate Year 7
18000
General Funds
2000
Total:
20000.00
Page 56 of 64
Instructional Goal #9
To improve the student academic achievement of Clay County students and enable lifelong learning
through the use of technology in schools and classrooms. WV Education Goal #2, 4, & 5; Clay County
Improvement Objective #3, 5, 16, 17, & 18)
Instructional Goal #9, Technology Improvement Objective #1
Clay County Schools will continue the West Virginia Virtual School and other distance learning
opportunities for students who have difficulty obtaining access to appropriate courses.
Indicators of Achievement:
Year 1:
Number of students enrolled in distance learning courses, and/or who participate in
(2002-03) distance and virtual learning activities.
Year 2:
Number of students enrolled in distance learning courses, and/or who participate in
(2003-04) distance and virtual learning activities.
Year 3:
Number of students enrolled in distance learning courses, and/or who participate in
(2004-05) distance and virtual learning activities.
Year 4:
Number of students enrolled in distance learning courses, and/or who participate in
(2005-06) distance and virtual learning activities.
Year 5:
Number of students enrolled in distance learning courses, and/or who participate in
(2006-07) distance and virtual learning activities.
Technology Activity: #1, Instructional Goal #9, Technology Improvement Objective #1
Survey students to determine course offerings that are needed and desired.
Persons Responsible
Clay County High School Principal
Activity Type
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #2, Instructional Goal #9, Technology Improvement Objective #1
Page 57 of 64
Provide Distance Learning and Virtual Learning in low service areas including Foreign Language,
Alternative School Instruction, Homebound, higher mathematics and science, and other needed areas.
Persons Responsible
Clay County High School Principal
Clay County Middle School Principal
Clay County Elementary School Principals
Kenneth Tanner
Activity Type
Access
Content/Tech Integration
No. Budget Item
1
Virtual School Tuition
Activity Type Funding Source
WV Virtual School
Est $
5000
Ed Tech Formula - Round 3 5000
General Funds
5000
Total:
15000.00
Page 58 of 64
Instructional Goal #10
The Clay County School District will seek to maintain and upgrade classroom technology, while
expanding availability of technology resources. Goals 3, 4, 11, and 14; Improvement Objective XVII
Instructional Goal #10, Technology Improvement Objective #1
The school district will provide the necessary maintenance support to keep existing hardware and
infrastructure in good working order as determined by onsite inspections by the WV Dept. of Ed.
Technology Represtatives, Local Technology Coordinator, and School Administrators. 100% of
modern-up-to-date equipment will be maintained.
Indicators of Achievement:
Year 1:
All modern usable equipment will be in good working order.
(2002-03)
Year 2:
All modern usable equipment will be in good working order.
(2003-04)
Year 3:
All modern usable equipment will be in good working order.
(2004-05)
Year 4:
All modern usable equipment will be in good working order.
(2005-06)
Year 5:
All modern usable equipment will be in good working order.
(2006-07)
Technology Activity: #1, Instructional Goal #10, Technology Improvement Objective #1
The school district will employ 2 computer technicians to maintain technology throughout the county.
Persons Responsible
Jerry Linkinoggor
Kenneth Tanner
Activity Type
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Technical Support - HW maintenance Admin/Support Procedures General Funds
Total:
Page 59 of 64
90000
90000.00
Technology Activity: #2, Instructional Goal #10, Technology Improvement Objective #1
The school district will purchase technology repair services from RESA III on an individual item repair
basis.
Persons Responsible
Jerry Linkinoggor
Kenneth Tanner
Activity Type
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Technical Support - HW maintenance Admin/Support Procedures General Funds
Total:
Page 60 of 64
10000
10000.00
Compliance Checklist
Ed Tech Compliance Checklist
1. Does the county plan include the county's specific goals for using advanced technology to improve
student achievement?
yes
This is addressed under Goal 7 Objective 1 and Activity 1
2. Does the plan include strategies that address how Ed Tech Funds will improve academic
achievement of all students in all schools in the county? (Emphasis should be given to high-need and
high-poverty schools)
yes
This is addressed under Goal 7 Objective 1 and Activity 1
3. Does the county plan include strategies that address how to ensure that all students and teachers will
have increased access to technology?
yes
This is addressed under Goal 1 Objective 1 and Activity 1
4. Does the county plan include plans to provide ongoing professional development for teachers,
principals and administrators to further the effective use of technology?
yes
This is addressed under Goal 4 Objective 1 and Activity 1
5. Does the county plan include a budget (description of type and costs of technology to be acquired
with Ed Tech formula and /or competitive funds)?
yes
This is addressed under Goal 7 Objective 1 and Activity 1
6. Does the county plan include strategies that address how to encourage the development and use of
innovative strategies for the delivery of specialized or rigorous courses (e.g., distance learning)?
yes
This is addressed under Goal 3 Objective 2 and Activity 1
7. Does the county plan include strategies that address how to use technology to promote parental
involvement to increase communication with parents?
yes
This is addressed under Goal 3 Objective 2 and Activity 1
Page 61 of 64
8. Does the county plan include strategies that address how the technology programs will be developed
in collaboration with adult literacy providers?
yes
This is addressed under Goal 6 Objective 1 and Activity 2
9. Does the county plan include strategies that address how the county will evaluate the extent to which
activities funded in formula and competitive funds are effective in integrating technology?
yes
This is addressed under Goal 6 Objective 3 and Activity 2
E-rate Compliance Checklist
1. Does the county plan include the E-rate requirements for clear goals and a realistic strategy for using
telecommunications?
yes
This is addressed under Goal 8 Objective 1 and Activity 1
2. Does the county plan include strategies that address the computer equipment currently available or
budgeted for purchase?
yes
This is addressed under Goal 1 Objective 1 and Activity 1
3. Does the county plan include strategies that address the internal connections that the county has in
place or budgeted to install in the current, next or future academic years?
yes
This is addressed under Goal 8 Objective 1 and Activity 3
4. Does the county plan include strategies that address the computer software necessary to
communicate with other computers over an internal network?
yes
This is addressed under Goal 8 Objective 1 and Activity 3
5. Does the county plan include the professional development plan for professionals using the
equipment connected to the telecommunications network?
yes
This is addressed under Goal 4 Objective 1 and Activity 1
6. Does the county plan include the existing or budgeted maintenance contracts to maintain computers?
yes
This is addressed under Goal 10 Objective 1 and Activity 1
7. Does the county plan include specific plans for using telecommunications technologies and how they
Page 62 of 64
integrate the use of these technologies into the curriculum?
yes
This is addressed under Goal 3 Objective 4 and Activity 1
8. Does someone else other than your county personnel submit your local E-rate application?
yes
This is addressed under Goal Objective and Activity
9. E-rate requires that we report the number of schools in each county that have the following Internet
Connections:
Number of schools in the county with Dial up modem connections to the Internet?
0
Number of schools in the county with 56 K frame relay connection to the Internet?
4
Number of schools in the county that have T-1 frame relay connections to the Internet? 3
Number of schools in the county that have ATM T-1 Internet connections?
0
Number of schools in the county that have cable modem connections to the Internet? 0
Page 63 of 64
Policies and Procedures
Do you have an Acceptable Use Policy?
yes
If yes, what is the last date of adoption/revision?
02/04/02
When was the public meeting held for CIPA Compliance?
06/18/2001
Provide the URL to your acceptable use policy.
claycountyschools.org
Page 64 of 64
Download