APPENDIX A CROSS-REFERENCE OF REPORT TO STATUTORY REQUIREMENTS This appendix cross-references the pages of this Report to the reporting requirements under the Emergency Supplemental Appropriations Act for Defense and for the Reconstruction of Iraq and Afghanistan, 2004 (P.L. 108-106) Sec. 3001, as amended by P.L. 108-375, Sec 1203, P.L. 109-102, Sec. 599, P.L. 109-364, Sec. 1054, P.L. 109-440, Sec. 2, P.L. 110-28, Sec. 3801, and P.L. 110-181, Sec. 1221 (Table A.1). Table A.1 Cross-Reference to Reporting Requirements under P.L. 108-106 Section 3001, as Amended Section Statute (SIGIR Public Law) SIGIR Action Page # Report to the Secretary of State and the Secretary of Defense. All Supervision Section 3001(e)(1) The Inspector General shall report directly to, and be under the general supervision of, the Secretary of State and the Secretary of Defense. Section 3001(f)(1) It shall be the duty of the Inspector General to conduct, supervise, and coordinate audits and investigations of the treatment, handling, and expenditure of amounts appropriated or otherwise made available for the reconstruction of Iraq and of the programs, operations, and contracts carried out utilizing such funds, including— Review appropriated funds. Programs, operations, contracts using appropriated funds. Sect. 2 Section 3001(f) (1)(A) The oversight and accounting of the obligation and expenditure of such funds; Obligations and expenditures of appropriated funds. Sect. 2 Section 3001(f) (1)(B) The monitoring and review of reconstruction activities funded by such funds; Review reconstruction activities funded by appropriations. 1-106 Section 3001(f) (1)(C) The monitoring and review of contracts funded by such funds; Review contracts using appropriated funds. See note Section 3001(f) (1)(D) The monitoring and review of the transfer of such funds and associated information between and among departments, agencies, and entities of the United States, and private and nongovernmental entities; Review internal and external transfers of appropriated funds. 24-25 Section 3001(f) (1)(E) The maintenance of records on the use of such funds to facilitate future audits and investigations of the use of such funds. Maintain audit records. 107-138 Section 3001(f)(2) The Inspector General shall establish, maintain, and oversee such systems, procedures, and controls as the Inspector General considers appropriate to discharge the duty. Establish, maintain, and oversee systems, procedures, and controls. 107-138 Section 3001(f)(3) In addition, the Inspector General shall also have the duties and responsibilities of inspectors general under the Inspector General Act of 1978. Duties as specified in IG Act. All Section 3001(f)(4) (A)(B)&(C) The Inspector General shall coordinate with, and receive the cooperation of, each of the following: The Inspector General of the Department of State, The Inspector General of the Department of Defense, and The Inspector General of the United States Agency for International Development. Coordination with IGs of State, DoD, & USAID. 139-146 App. G App. H Section 3001(h) (4)(A) Upon request of the Inspector General for information or assistance from any department, agency, or other entity of the Federal Government, the head of such entity shall, insofar as is practicable and not in contravention of any existing law, furnish such information or assistance to the Inspector General, or an authorized designee. Expect support as requested. All Duties Personnel, Facilities, and Other Resources Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I A-1 CROSS-REFERENCE OF REPORT TO STATUTORY REQUIREMENTS Table A.1 Cross-Reference to Reporting Requirements under P.L. 108-106 Section 3001, as Amended Section Statute (SIGIR Public Law) SIGIR Action Page # Section 3001(i)(1) Not later than 30 days after the end of each fiscal-year quarter, the Inspector General shall submit to the appropriate committees of Congress a report summarizing for the period of that quarter and, to the extent possible, the period from the end of such quarter to the time of the submission of the report, the activities of the Inspector General and the activities under programs and operations funded with amounts appropriated or otherwise made available to the Iraq Relief and Reconstruction Fund. Each report shall include, for the period covered by such report, a detailed statement of all obligations, expenditures, and revenues associated with reconstruction and rehabilitation activities in Iraq, including the following – Report – 30 days after the end of each calendar quarter. Summarize activities of IG. Detailed statement of all obligations, expenditures, and revenues. All Section 3001(i) (1)(A) Obligations and expenditures of appropriated funds. Obligations and expenditures of appropriated funds. 22-40 Section 3001(i) (1)(B) A project-by-project and program-by-program accounting of the costs incurred to date for the reconstruction of Iraq, together with the estimate of the Department of Defense, the Department of State, and the United States Agency for International Development, as applicable, of the costs to complete each project and each program. Project-by-project and program-byprogram accounting of costs. List unexpended funds for each project or program. Sect. 2 Section 3001(i)(1)(C) Revenues attributable to or consisting of funds provided by foreign nations or international organizations, and any obligations or expenditures of such revenues. Revenues, obligations, and expenditures of donor funds. 19-22 App. D Section 3001(i)(1)(D) Revenues attributable to or consisting of foreign assets seized or frozen, and any obligations or expenditures of such revenues. Previous SIGIR reports have addressed these matters. N/A Section 3001(i)(1)(E) Operating expenses of agencies or entities receiving amounts appropriated or otherwise made available for the reconstruction of Iraq. SIGIR has limited access to operating expense data of agencies and entities receiving appropriated funds. 24-25 Section 3001(i)(1)(F) In the case of any contract described in paragraph (2): A contract described in this paragraph is any major contract or other agreement that is entered into by any department or agency of the United States Government that involves the use of amounts appropriated or otherwise made available for the reconstruction of Iraq with any public or private sector entity for any of the following purposes: To build or rebuild physical infrastructure of Iraq. To establish or reestablish a political or societal institution of Iraq. To provide products or services to the people of Iraq. Describes a contract. See note Section 3001(i)(1) (F)(i) The amount of the contract or other agreement; Amount of each contract or other agreement. See note Section 3001(i)(1) (F)(ii) A brief discussion of the scope of the contract or other agreement; Brief discussion of each contract scope. See note Section 3001(i)(1) (F)(iii) A discussion of how the contracting department or agency identified, and solicited offers from, potential contractors to perform the contract, together with a list of the potential contractors that were issued solicitations for the offers. Discussion of how potential contractors were identified, how offers were solicited, and a list of contractors that were issued solicitations. See note Section 3001(i)(1) (F)(iv) The justification and approval documents on which was based the determination to use procedures other than procedures that provide for full and open competition. Justification and approval documents for contracts that were not full and open competitions. See note Section 3001(i)(3) The Inspector General shall submit to the appropriate committees of Congress semiannual reports meeting the requirements of Section 5 of the Inspector General Act of 1978. The first such report for a year, covering the first six months of the year, shall be submitted not later than July 31 of that year, and the second such report, covering the second six months of the year, shall be submitted not later than January 31 of the following year. SIGIR’s January and July reports each year meet this requirement. Each January and July Report Reports Continued on next page A-2 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX A Table A.1 Cross-Reference to Reporting Requirements under P.L. 108-106 Section 3001, as Amended Section Statute (SIGIR Public Law) SIGIR Action Page # Section 3001(i)(4) The Inspector General shall publish each report under this subsection in both English and Arabic on the Internet website of the Secretary of State and the Secretary of Defense. SIGIR will take final written report in electronic format, translate and post to website; DoD and DoS websites link to SIGIR website. www.sigir. mil Section 3001(i)(5) Each report under this subsection may include a classified annex if the Inspector General considers it necessary. If necessary, develop a classified annex. N/A Submit report to Secretary of State and Secretary of Defense. Done 7/30/2010 Report Coordination Section 3001(j) The Inspector General shall also submit each report under subsection (i) to the Secretary of State and the Secretary of Defense. Note: This information is not included in this quarterly report. The list of contracts is available at www.sigir.mil. JULY 30, 2010 I REPORT TO CONGRESS I A-3 APPENDIX B CROSS-REFERENCE OF SIGIR BUDGET TERMS The Special Inspector General for Iraq Reconstruction (SIGIR) presents funding data from various sources. For a cross-reference between SIGIR budget terms and budget terms from funding sources, see the table below. Fund Sources CERP IRMS, USF-I CERP Category Report, 7/2/2010; OSD, response to SIGIR data call, 7/13/2010. Appropriation Allocation Obligation Disbursement ESF NEA-I, responses to SIGIR data calls, 4/2/2010, 4/12/2010, 4/14/2010, 6/30/2010, and 7/8/2010; U.S. Embassy-Baghdad, response to SIGIR data call, 7/14/2010; USACE, response to SIGIR data call, 7/12/2010; USAID, response to SIGIR data call, 7/13/2010. Appropriation Allocation Obligation Expenditure DoS, response to SIGIR data call, 4/5/2007; NEA-I, response to SIGIR data call, 7/6/2010; OSD, response to SIGIR data call, 4/10/2009; U.S. Treasury, response to SIGIR data call, 4/2/2009; USAID, response to SIGIR data call, 7/8/2010; USTDA, response to SIGIR data call, 4/2/2009. Appropriation Apportionment Obligation Expenditure ISFF OSD, response to SIGIR data call, 7/13/2010. Appropriation Available Obligation Disbursement INCLE DoS, INL, response to SIGIR data call, 7/2/2010. Appropriation Appropriation Obligation Liquidations International (Non-U.S.) NEA-I, response to SIGIR data call, 7/13/2010. N/A N/A Commitment Disbursement SIGIR Terminology Appropriation Allocation Obligation Expenditure IRRF Source Terminology July 30, 2010 I REPORT TO CONGRESS I B-1 SECTOR CROSS-REFERENCE SECTOR CROSS-REFERENCE This appendix provides a cross-reference of how sectors funded by the Iraq Relief and Reconstruction Fund (IRRF 1 and IRRF 2), the Iraq Security Forces Fund (ISFF), the Economic Support Fund (ESF), and the Commander’s Emergency Response Program (CERP) relate to the SIGIR-defined reconstruction areas and sectors. It also provides the status of the four major funds, by sector and program, as of June 30, 2010. Table C.1 Quarterly Obligations $ Millions Security Infrastructure Governance IRRF -1.7 -3.2 11.8 Economy 0.0 Total 7.0 ISFF 49.9 0.0 0.0 0.0 49.9 ESF -1.8 1.4 111.0 0.0 110.7 CERP 0.9 6.2 13.4 1.7 22.2 Total 47.3 4.4 136.2 1.7 189.7 Infrastructure Governance Table C.2 Quarterly Expenditures $ Millions Security Economy Total IRRF 2.2 36.7 21.3 0.0 60.2 ISFF 419.0 0.0 0.0 0.0 419.0 ESF -0.5 -1.9 187.3 56.2 241.1 CERP 0.0 0.5 0.0 0.2 0.7 Total 420.7 35.3 208.6 56.5 721.1 C-1 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX C Obligations of Major U.S. Reconstruction Funds, as of 6/30/2010 $ Billions IRRF $20.4 ISFF $17.1 ESF $3.9 CERP $3.4 $23.6 $12.1 $7.5 $1.6 Security Infrastructure Governance Economy Note: Data not audited. Numbers affected by rounding. OSD does not report CERP obligation and expenditure data for project categories on a quarterly basis for all fiscal year appropriations. SIGIR pulls CERP project category data from the IRMS, which lags in reporting. Therefore, category totals found in Appendix C may not match category totals in other sections of this Report. Sources: DoS, response to SIGIR data call, 4/5/2007; IRMS, USF-I CERP Category Report, 7/2/2010; NEA-I, responses to SIGIR data calls, 4/12/2010, 4/14/2010, 6/30/2010, 7/6/2010, and 7/8/2010; OSD, responses to SIGIR data calls, 4/10/2009, 4/12/2010, 4/13/2010, and 7/13/2010; U.S. Embassy-Baghdad, responses to SIGIR data calls, 4/2/2009, 4/8/2010, 7/14/2010, and 7/16/2010; USACE, responses to SIGIR data calls, 4/1/2010 and 7/12/2010; USAID, response to SIGIR data call, 4/13/2009, 7/8/2010, and 7/13/2010; USTDA, response to SIGIR data call, 4/2/2009. JULY 30, 2010 I REPORT TO CONGRESS I C-2 SECTOR CROSS-REFERENCE Table C.3 Security: Status of Funds, by Sector and Program $ Millions Status of Funds Sector Fund Program Equipment IRRF 2 Security & Law Enforcement - Equipment IRRF 2 Security & Law Enforcement - IAF Equipment ISFF Equipment and transportation Subtotal Infrastructure Quarterly Change Obligated Expended 88.4 88.3 0.0 (0%) 0.0 (0%) 602.4 602.2 0.0 (0%) 0.0 (0%) 6,375.3 6,065.4 32.0 (1%) 143.7 (2%) 143.7 (2%) 7,066.2 6,755.9 32.0 (0%) Security & Law Enforcement - Facilities 358.4 356.1 -0.1 (0%) 0.0 (0%) IRRF 2 Security & Law Enforcement - IAF Facilities 723.0 719.5 0.0 (0%) 0.0 (0%) ISFF Infrastructure 4,450.4 4,003.0 -17.2 (0%) 132.2 (3%) 5,531.8 5,078.5 -17.3 (0%) 132.2 (3%) Battle Damage 44.1 37.7 0.0 (0%) 0.0 (0%) CERP Condolence Payments 50.8 48.8 0.0 (0%) 0.0 (0%) IRRF 2 Security & Law Enforcement - Iraqi Security Forces Quick Response Program 161.3 159.3 0.0 (0%) 0.0 (0%) IRRF 2 Security & Law Enforcement - Nonproliferation and Export Control & Border Security 7.4 6.9 0.0 (0%) 0.0 (0%) ISFF Related Activities CERP Subtotal Rule of Law Expended IRRF 2 Subtotal Related Activities Obligated CERP Detainee Release Payments 871.5 794.5 -5.2 (-1%) 28.1 (4%) 1,135.1 1,047.2 -5.2 (0%) 28.1 (3%) 1.4 1.3 0.0 (0%) 0.0 (0%) CERP Law & Governance 120.6 110.9 0.4 (0%) 0.0 (0%) CERP Protective Measures 476.8 440.4 0.5 (0%) 0.0 (0%) ESF Regime Crimes Liaison Office 28.5 28.0 -1.6 (-5%) -0.4 (-1%) ESF USAID Program Expenses 0.0 0.0 -0.2 (-100%) -0.1 (-100%) IRRF 1 First Response Network/DIILS 53.3 53.0 0.0 (0%) IRRF 1 Law Enforcement 24.6 21.4 0.0 (0%) 0.0 (0%) IRRF 1 Police/Prison Programs 61.5 56.2 0.0 (0%) 0.0 (0%) IRRF 2 Education, Refugees, Human Rights, Democracy, & Governance - Human Rights 14.4 14.3 0.0 (0%) 0.0 (0%) IRRF 2 Education, Refugees, Human Rights, Democracy, & Governance - Property Claims Tribunal 11.5 11.5 0.0 (0%) 0.0 (0%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society - Facilities Repair 81.8 81.3 -0.2 (0%) 0.1 (0%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society Investigations of Crimes Against Humanity 124.2 120.3 0.0 (0%) 0.3 (0%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society - Judicial Security and Facilities 159.7 158.2 0.0 (0%) 0.1 (0%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society - Other Technical Investigative Methods 36.0 31.4 0.0 (0%) 0.0 (0%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society - Penal Facilities 92.1 84.9 0.0 (0%) 1.6 (2%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society Reconstruction and Modernization of Detention Facilities 182.1 137.4 0.0 (0%) 0.0 (0%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society - Rule of Law in Iraq 71.1 49.6 0.0 (0%) 0.0 (0%) 0.0 (0%) Continued on next page C-3 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX C Security: Status of Funds, by Sector and Program (Continued) $ Millions Status of Funds Sector Fund Program Rule of Law (Continued) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society - U.S. Institute of Peace (USIP) 9.8 IRRF 2 Justice, Public Safety Infrastructure, & Civil Society - Witness Protection Program Subtotal Sustainment ISFF Sustainment Subtotal Training IRRF 2 Quarterly Change Expended Obligated Expended 9.8 0.0 (0%) 0.0 (0%) 1.2 1.2 0.0 (0%) 0.0 (0%) 1,550.7 1,411.1 -1.1 (0%) 1.7 (0%) 2,478.1 2,329.6 4.4 (0%) 74.1 (3%) 2,478.1 2,329.6 4.4 (0%) 74.1 (3%) 421.4 419.1 0.0 (0%) 0.0 (0%) IRRF 2 Security & Law Enforcement - Facilities Protection Service 48.7 48.7 0.0 (0%) 0.0 (0%) IRRF 2 Security & Law Enforcement - Focused Stabilization 30.0 30.0 0.0 (0%) 0.0 (0%) IRRF 2 Security & Law Enforcement - IAF Training and Operations 412.5 412.4 0.1 (0%) 0.0 (0%) IRRF 2 Security & Law Enforcement - Operations and Personnel 211.8 207.2 0.0 (0%) 0.0 (0%) IRRF 2 Security & Law Enforcement - Police Training and Technical Assistance 1,779.1 1,760.1 -1.4 (0%) 0.0 (0%) ISFF Training and Operations Subtotal Total Security & Law Enforcement - Border Enforcement Obligated 2,915.4 2,810.4 35.8 (1%) 40.9 (1%) 5,818.9 5,688.0 34.5 (1%) 41.0 (1%) 23,580.8 22,310.3 47.3 (0%) 420.7 (2%) Note: Data not audited. Numbers affected by rounding. OSD does not report CERP obligation and expenditure data for project categories on a quarterly basis for all fiscal year appropriations. SIGIR pulls CERP project category data from the IRMS, which lags in reporting. Therefore, category totals found in Appendix C may not match category totals in other sections of this Report. Sources: DoS, response to SIGIR data call, 4/5/2007; IRMS, USF-I CERP Category Report, 7/2/2010; NEA-I, responses to SIGIR data calls, 4/2/2010 and 7/6/2010; OSD, responses to SIGIR data calls, 4/10/2009, 4/12/2010, and 7/13/2010; U.S. Embassy-Baghdad, responses to SIGIR data calls, 7/16/2009 and 7/14/2010. JULY 30, 2010 I REPORT TO CONGRESS I C-4 SECTOR CROSS-REFERENCE Table C.4 Infrastructure: Status of Funds, by Sector and Program $ Millions Status of Funds Sector Fund Program Electricity CERP Electricity ESF Infrastructure Security Protection - Electricity ESF O&M Sustainment - Electricity ESF Plant-Level Capacity Development & Technical Training Electrical IRRF 1 IRRF 2 IRRF 2 Expended 330.7 1.3 (0%) 0.5 (0%) 27.0 24.1 4.3 (19%) 1.9 (9%) 219.1 218.6 0.1 (0%) 0.1 (0%) 24.4 24.4 0.0 (0%) 0.0 (0%) Restore Iraq Electricity (RIE) 299.9 299.9 0.0 (0%) 0.0 (0%) Electric Sector - Automated Monitoring and Control System 113.6 113.6 0.0 (0%) 0.0 (0%) Electric Sector - Generation 1,739.0 1,711.9 0.0 (0%) 0.0 (0%) IRRF 2 Electric Sector - Network Infrastructure 1,183.4 1,175.9 -0.2 (0%) 0.1 (0%) IRRF 2 Electric Sector - Security 43.5 43.5 -0.1 (0%) 0.0 (0%) IRRF 2 Electric Sector - Transmission 1,023.1 1,012.6 3.1 (0%) 6.4 (1%) 5,054.5 4,955.4 8.5 (0%) 9.0 (0%) ESF Infrastructure Security Protection - Planning and Design 1.8 1.8 0.0 (0%) 0.0 (0%) ESF O&M Sustainment - Planning and Design 0.6 0.1 0.5 (836%) 0.0 (29%) IRRF 1 Restore Economically Critical Infrastructure 1,112.3 1,112.3 -2.2 (0%) -0.4 (0%) IRRF 2 Roads, Bridges, & Construction - Public Buildings Construction and Repair 122.1 121.8 0.0 (0%) 0.0 (0%) 1,236.8 1,236.0 -1.6 (0%) -0.3 (0%) Subtotal Oil and Gas Quarterly Change Obligated 381.5 Subtotal General Infrastructure Obligated Expended ESF Infrastructure Security Protection - Oil 157.2 156.3 -0.7 (0%) 0.2 (0%) IRRF 1 Restore Iraq Oil (RIO) 165.0 165.0 0.0 (0%) 0.0 (0%) IRRF 2 Oil Infrastructure - Emergency Supplies of Refined Petroleum Products 5.0 5.0 0.0 (0%) 0.0 (0%) IRRF 2 Oil Infrastructure - Infrastructure -0.1 (0%) Subtotal Transportation and CERP Communications CERP Telecommunications Transportation 1,599.2 1,587.5 0.1 (0%) 1,926.5 1,913.8 -0.6 (0%) 0.1 (0%) 32.6 28.3 0.0 (0%) 0.0 (0%) 357.2 303.9 3.1 (1%) 0.0 (0%) ESF O&M Sustainment - Transportation & Communications 6.4 6.4 -5.1 (-44%) -4.4 (-41%) ESF Plant-Level Capacity Development & Technical Training Communication 4.2 2.1 2.2 (104%) 0.1 (7%) ESF Plant-Level Capacity Development & Technical Training Transportation 5.7 5.7 0.0 (0%) 0.0 (0%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society - National Security Communications Network 110.3 109.8 0.0 (0%) 0.0 (0%) IRRF 2 Roads, Bridges, & Construction - Roads & Bridges 157.7 145.3 -0.2 (0%) 0.0 (0%) IRRF 2 Transportation & Telecommunications Projects - Civil Aviation 86.9 86.9 0.0 (0%) 0.0 (0%) IRRF 2 Transportation & Telecommunications Projects - Consolidated Fiber Network 47.8 47.8 0.0 (0%) 0.0 (0%) IRRF 2 Transportation & Telecommunications Projects - Iraqi Communications Operations 19.5 19.4 -0.1 (0%) 0.0 (0%) IRRF 2 Transportation & Telecommunications Projects - Iraqi Communications Systems 52.9 40.0 -0.2 (0%) 2.6 (7%) Continued on next page C-5 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX C Infrastructure: Status of Funds, by Sector and Program (Continued) $ Millions Status of Funds Sector Fund Transportation and IRRF 2 Communications (Continued) IRRF 2 IRRF 2 Program Transportation & Telecommunications Projects - Iraqi Telecom and Postal Corporation Expended 19.9 0.0 (0%) 0.0 (0%) Transportation & Telecommunications Projects - Railroad Rehab and Restoration 196.1 196.1 0.0 (0%) 10.4 (6%) Transportation & Telecommunications Projects - Umm Qasr Port Rehab 43.4 42.7 0.0 (0%) 0.0 (0%) 1,140.8 1,054.3 -0.3 (0%) 8.7 (1%) 690.2 625.7 1.8 (0%) 0.0 (0%) 1.7 1.7 0.0 (0%) 0.0 (0%) CERP Water & Sanitation ESF Infrastructure Security Protection - PW & Water ESF O&M Sustainment - PW & Water 30.5 30.5 0.1 (0%) 0.1 (0%) ESF Plant-Level Capacity Development & Technical Training - PW & Water 13.9 13.9 0.0 (0%) 0.0 (0%) IRRF 2 Water Resources & Sanitation - Dam Repair, Rehab, and New Construction 58.1 56.7 0.0 (0%) 0.0 (0%) IRRF 2 Water Resources & Sanitation - Irrigation and Drainage Systems 0.0 (0%) IRRF 2 Water Resources & Sanitation - Major Irrigation Projects IRRF 2 Water Resources & Sanitation - Potable Water IRRF 2 7.0 6.9 0.0 (0%) 53.2 45.3 0.0 (0%) 0.0 (0%) 1,338.4 1,332.5 -0.8 (0%) 15.3 (1%) Water Resources & Sanitation - Pumping Stations and Generators 176.3 175.8 -0.5 (0%) 0.0 (0%) IRRF 2 Water Resources & Sanitation - Sewerage 268.7 261.8 -1.8 (-1%) 2.3 (1%) IRRF 2 Water Resources & Sanitation - Umm Qasr to Basra Water Pipeline and Treatment Plant 30.8 30.1 0.0 (0%) 0.0 (0%) IRRF 2 Water Resources & Sanitation - Water Conservation 25.6 25.5 -0.2 (-1%) 0.0 (0%) 2,694.2 2,606.5 -1.6 (0%) 17.7 (1%) 12,052.9 11,766.0 4.4 (0%) 35.3 (0%) Subtotal Total Obligated 20.0 Subtotal Water and Sanitation Quarterly Change Obligated Expended Note: Data not audited. Numbers affected by rounding. OSD does not report CERP obligation and expenditure data for project categories on a quarterly basis for all fiscal year appropriations. SIGIR pulls CERP project category data from the IRMS, which lags in reporting. Therefore, category totals found in Appendix C may not match category totals in other sections of this Report. Sources: IRMS, USF-I CERP Category Report, 7/2/2010; NEA-I, response to SIGIR data call, 7/6/2010; OSD, response to SIGIR data call, 4/10/2009; USACE, responses to SIGIR data calls, 4/1/2010 and 7/12/2010; USAID, responses to SIGIR data calls, 4/13/2009 and 7/8/2010. JULY 30, 2010 I REPORT TO CONGRESS I C-6 SECTOR CROSS-REFERENCE Table C.5 Governance: Status of Funds, by Sector and Program $ Millions Status of Funds Sector Fund Program Capacity Development CERP Civic Support Vehicles 24.6 ESF Community Stabilization Program 619.3 ESF Ministerial Capacity Development 41.0 ESF Monitoring and Evaluation ESF National Capacity Development ESF ESF Expended 23.3 0.0 (0%) 0.0 (0%) 619.0 0.0 (0%) 0.0 (0%) 30.0 0.0 (0%) 0.0 (0%) 7.5 3.2 -0.1 (-2%) 2.7 (575%) 250.4 0.0 (0%) -1.2 (0%) PRT Quick Response Fund 266.4 209.6 57.5 (28%) 45.8 (28%) PRT/PRDC Projects 548.5 468.1 40.0 (8%) 32.1 (7%) IRRF 1 Administrative Expenses IRRF 1 Improve Efficiency and Accountability of Government 14.5 14.5 0.0 (0%) 0.0 (0%) 174.7 174.7 0.0 (0%) IRRF 1 0.0 (0%) Office of Transition Initiatives 57.4 57.4 0.0 (0%) 0.0 (0%) IRRF 1 Program Support and Development of Gulf Region 18.0 18.0 0.0 (0%) 0.0 (0%) IRRF 2 Administrative Expenses - Administrative Expenses for U.S. Mission to Iraq 184.5 184.2 0.0 (0%) 0.0 (0%) IRRF 2 Administrative Expenses - USAID 35.0 33.7 0.0 (0%) 0.0 (0%) IRRF 2 Education, Refugees, Human Rights, Democracy, & Governance - Ministerial Capacity Building 51.0 17.2 0.0 (0%) 0.0 (0%) IRRF 2 ISPO Capacity Development 45.4 28.8 2,397.3 2,132.2 94.3 (4%) -3.1 (-6%) 81.7 (4%) 2.2 (8%) ESF Community Action Program 388.9 302.6 6.8 (2%) 34.4 (13%) ESF Democracy and Civil Society 238.0 178.8 3.8 (2%) 23.2 (15%) ESF Elections (IFES) 13.9 13.8 0.0 (0%) 0.4 (3%) ESF Local Governance Program 410.5 344.3 3.0 (1%) 49.8 (17%) IRRF 2 Education, Refugees, Human Rights, Democracy, & Governance - Civic Programs 10.0 10.0 0.0 (0%) 0.0 (0%) IRRF 2 Education, Refugees, Human Rights, Democracy, & Governance - Governance 89.3 68.7 0.0 (0%) 0.0 (0%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society Democracy Building Activities 1,035.4 1,016.6 0.0 (0%) 0.0 (0%) 2,186.0 1,934.9 13.6 (1%) 107.9 (6%) 17.4 16.1 0.6 (3%) 0.0 (0%) 174.0 137.0 8.6 (5%) 0.0 (0%) 0.0 (0%) Subtotal Humanitarian Relief Quarterly Change Obligated 309.4 Subtotal Democracy and Civil Society Obligated Expended CERP Food Production & Distribution CERP Other Humanitarian and Reconstruction Projects ESF Iraqi Refugees (Jordan) 95.0 90.6 0.0 (0%) IRRF 1 Humanitarian Demining 12.3 12.3 0.0 (0%) 0.0 (0%) IRRF 1 Relief Efforts 27.0 26.9 0.0 (0%) 0.0 (0%) IRRF 1 Relief: Office of Foreign Disaster Assistance 43.3 43.1 0.0 (0%) 0.0 (0%) IRRF 1 Support Education, Health, and Social Services 118.2 118.2 0.0 (0%) 0.0 (0%) IRRF 2 Education, Refugees, Human Rights, Democracy, & Governance - Migration & Refugee Assistance 208.8 205.8 0.0 (0%) 0.0 (0%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society Demining 84.5 83.2 0.0 (0%) 0.0 (0%) Continued on next page C-7 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX C Governance: Status of Funds, by Sector and Program (Continued) $ Millions Status of Funds Sector Fund Program Humanitarian Relief (Continued) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society - Marla Ruzicka WVF 29.9 IRRF 2 Security & Law Enforcement - Commanders' Humanitarian Relief & Reconstruction Subtotal Public Services Obligated Expended 29.8 0.0 (0%) 0.0 (0%) 85.1 82.6 0.0 (0%) 0.0 (0%) 895.4 845.6 9.2 (1%) 0.0 (0%) CERP Civic Cleanup Activities 207.5 192.9 0.2 (0%) 0.0 (0%) CERP Civic Infrastructure Repair 104.5 100.0 0.3 (0%) 0.0 (0%) CERP Education 339.9 297.1 3.4 (1%) 0.0 (0%) CERP Healthcare 112.6 104.1 0.3 (0%) 0.0 (0%) ESF O&M Sustainment - Health 11.1 11.1 0.0 (0%) 0.0 (0%) ESF Plant-Level Capacity Development & Technical Training Health 1.8 1.8 0.0 (0%) 0.0 (0%) IRRF 2 Education, Refugees, Human Rights, Democracy, & Governance - Education 100.6 89.8 0.0 (0%) 0.0 (0%) IRRF 2 Health Care - Equipment Procurement and Modernization 275.2 270.5 -1.9 (-1%) 0.3 (0%) IRRF 2 Health Care - Nationwide Hospital and Clinic Improvements 452.6 442.1 16.9 (4%) 17.9 (4%) IRRF 2 Health Care - Pediatric Facility in Basra 45.4 45.4 0.0 (0%) 0.0 (0%) IRRF 2 Health Care - Pediatric Facility in Basra II 43.7 43.5 -0.1 (0%) 0.8 (2%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society - Fire Service 113.9 113.7 0.0 (0%) 0.0 (0%) IRRF 2 Justice, Public Safety Infrastructure, & Civil Society - Public Safety Training and Facilities 181.9 181.9 0.0 (0%) 0.0 (0%) IRRF 2 Water Resources & Sanitation - Other Solid Waste Management 10.0 10.0 0.0 (0%) 0.0 (0%) 2,000.6 1,903.9 19.1 (1%) 19.1 (1%) 7,479.3 6,816.5 136.2 (2%) 208.6 (3%) Subtotal Total Quarterly Change Obligated Expended Note: Data not audited. Numbers affected by rounding. OSD does not report CERP obligation and expenditure data for project categories on a quarterly basis for all fiscal year appropriations. SIGIR pulls CERP project category data from the IRMS, which lags in reporting. Therefore, category totals found in Appendix C may not match category totals in other sections of this Report. Sources:DoS, response to SIGIR data call, 4/5/2007; IRMS, USF-I CERP Category Report, 7/2/2010; NEA-I, responses to SIGIR data calls, 4/2/2010, 4/12/2010, 4/14/2010, 6/30/2010, 7/6/2010, and 7/8/2010; U.S. Embassy-Baghdad, response to SIGIR data call, 4/8/2010; USACE, responses to SIGIR data calls, 4/1/2010 and 7/12/2010; USAID, responses to SIGIR data calls, 4/13/2009 and 7/8/2010. JULY 30, 2010 I REPORT TO CONGRESS I C-8 SECTOR CROSS-REFERENCE Table C.6 Economy: Status of Funds, by Sector and Program $ Millions Status of Funds Fund Program Economic Governance CERP Economic, Financial, and Management Improvements 137.2 114.7 0.3 (0%) 0.2 ESF Economic Governance II, Policy and Regulatory Reforms 85.0 85.0 0.0 (0%) 0.0 (0%) IRRF 1 Technical Assistance 10.7 9.7 0.0 (0%) 0.0 (0%) IRRF 2 Education, Refugees, Human Rights, Democracy, & Governance - Banking System Modernizations 34.0 30.1 0.0 (0%) 0.0 (0%) IRRF 2 Private Sector Development - Institutional Reforms 89.4 86.1 0.0 (0%) 0.0 (0%) IRRF 2 Private Sector Development - Iraq Debt Forgiveness 352.3 352.3 0.0 (0%) 0.0 (0%) IRRF 2 Private Sector Development - Market-Based Reforms 135.0 109.9 0.0 (0%) 0.0 (0%) Subtotal Private Sector Development Obligated Expended Quarterly Change Sector Obligated Expended (0%) 843.6 787.9 0.3 (0%) 0.2 (0%) CERP Agriculture 122.3 109.5 1.5 (1%) 0.0 (0%) ESF Inma Agribusiness Development 124.0 115.3 0.0 (0%) 32.7 (40%) ESF Izdihar 32.8 31.4 0.0 (0%) 0.0 (0%) ESF Provincial Economic Growth 85.8 56.1 0.0 (0%) 18.0 (47%) ESF Targeted Development Program 57.4 36.9 0.0 (0%) 5.5 (18%) IRRF 1 Expand Economic Opportunity IRRF 2 Private Sector Development - Agriculture IRRF 2 Private Sector Development - Business Skills Training IRRF 2 Private Sector Development - Expand Network of Employment Centers IRRF 2 Private Sector Development - Micro-Small-Medium Enterprises IRRF 2 Private Sector Development - Vocational Training Subtotal Total 65.9 65.9 0.0 (0%) 0.0 (0%) 113.0 112.8 0.0 (0%) 0.0 (0%) 40.0 40.0 0.0 (0%) 0.0 (0%) 8.0 8.0 0.0 (0%) 0.0 (0%) 51.4 51.1 0.0 (0%) 0.0 (0%) 70.9 69.9 0.0 (0%) 0.0 (0%) 771.5 696.7 1.5 (0%) 56.2 (9%) 1,615.1 1,484.6 1.7 (0%) 56.5 (4%) Note: Data not audited. Numbers affected by rounding. OSD does not report CERP obligation and expenditure data for project categories on a quarterly basis for all fiscal year appropriations. SIGIR pulls CERP project category data from the IRMS, which lags in reporting. Therefore, category totals found in Appendix C may not match category totals in other sections of this Report. Sources: IRMS, USF-I CERP Category Report, 7/2/2010; NEA-I, response to SIGIR data call, 4/2/2010, 6/30/2010, 7/6/2010, and 7/8/2010; U.S. Treasury, response to SIGIR data call, 4/2/2009; USAID, response to SIGIR data call, 4/13/2009, 7/8/2010, and 7/13/2010; USTDA, response to SIGIR data call, 4/2/2009. C-9 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX D INTERNATIONAL DONOR ASSISTANCE TO THE GOI and $12.84 billion in loans.1 Donor commitments totaled $11.96 billion—$6.15 billion in grants and $5.81 billion in loans.2 For an overview of bilateral and multilateral development assistance, see Figure D.1. Donor assistance to the GOI includes bilateral and multilateral development assistance in loans and grants. As of June 30, 2010, the Department of State (DoS) reported $18.10 billion in total donor pledges, including $5.26 billion in grants Figure D.1 International Grants and Loans, by Type of Assistance, Status, and Donor $ Billions Loans $4 $3 $2 Grants $1 $0 3.28 $0 $1 1.21 Japan 3.50 EU 1.41 0.71 0.24 0.68 0.83 UK 0.30 Italy 0.60 Status, by Donor 0.10 Bilateral Multilateral Total 8.28 3.67 11.96 10.96 7.14 18.10 Committed Pledged Canada Kuwait Status, by Type Committed Pledged Korea Spain Loans Grants Total 5.81 6.15 11.96 12.84 5.26 18.10 0.50 Saudi Arabia UAE 0.40 1.00 $2 0.33 0.24 0.20 0.30 0.14 0.23 0.13 0.50 0.11 0.24 0.09 0.50 0.08 0.22 Iran All Other Bilateral 0.62 0.55 1.85 IRFFI 0.93 IMF 3.64 0.90 World Bank 3.00 0.50 Islamic Development Bank Note: Data not audited. Numbers affected by rounding. Bilateral commitments exclude IRFFI deposits. Amounts may differ from prior quarters due to changes in foreign exchange rates. Source: NEA-I, response to SIGIR data call, 7/13/2010. JULY 30, 2010 I REPORT TO CONGRESS I D-1 INTERNATIONAL DONOR ASSISTANCE TO THE GOI Bilateral Development Assistance As of June 30, 2010, $8.28 billion in bilateral assistance had been committed to Iraq.3 The largest international (non-U.S.) donors include Japan, which has committed $4.49 billion through grants and loans, and the European Commission (EC), which has committed $0.71 billion through grants.4 During the quarter, Japan committed an additional $109.4 million in humanitarian assistance, and Italy doubled its commitments to $300 million.5 Multilateral Development Assistance As of June 30, 2010, $3.67 billion in multilateral assistance has been committed to Iraq. Multilateral development assistance includes loan commitments and pledges from the World Bank, International Monetary Fund (IMF), and Islamic Development Bank (IDB), as well as the International Reconstruction Fund Facility for Iraq (IRFFI) grants funded by donor deposits.6 International Reconstruction Fund Facility for Iraq The IRFFI was launched in 2004 to help donor nations channel their resources and coordinate support for reconstruction and development in Iraq. The facility comprises the World Bank Iraq Trust Fund (WB ITF) and the United Nations Development Group Iraq Trust Fund (UNDG ITF.) New IRFFI projects must start by the end of 2010; project completions and disbursements are to take place no later than December 31, 2013.7 As of June 30, 2010, 25 IRFFI donors, including the United States, had committed $1.86 billion for Iraq reconstruction.8 The largest IRFFI contributors are the European Commission ($774 million in IRFFI deposits), Japan ($492 million), and the United Kingdom ($127 million).9 D-2 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION International Monetary Fund On February 24, 2010, the IMF approved a twoyear Stand-By Arrangement (SBA) for Iraq totaling $3.64 billion. The approval made $455 million immediately available to Iraq.10 The SBA was made available due to lower than anticipated oil revenues. The funds are intended to help improve public financial management, increase transparency and accountability in the oil sector, and help reform the banking sector.11 World Bank The World Bank funds several programs to support the GOI in addressing reconstruction needs: • restoring basic services • supporting private-sector development • enhancing social safety nets • improving public-sector governance This support for Iraq reconstruction is funded primarily through the World Bank Iraq Trust Fund. WB ITF commitments to the IRFFI total $497 million.12 The cutoff date for donor’s contributions for the WB ITF was December 31, 2008, and donors have agreed to terminate the fund on December 31, 2013. By this deadline, all WB ITF funding must be disbursed, and all projects will be completed.13 As of May 31, 2010, the WB ITF has financed 24 projects, four of which have been fully implemented and closed. The remaining 20 projects are currently under implementation.14 The World Bank has provided assistance to Iraq to develop social services through its International Development Association (IDA). Five IDA loans have been approved for Iraq, totaling $508.5 million.15 For the status of these projects, see Table D.1. In May, the World Bank released the second $250 million tranche of its Development Policy Loan for Iraq in support of the World Bank’s reform program, which focuses on public financial management, financial sector reform, and poverty reduction through reforms of social safety-net mechanisms. In April, a team of World Bank specialists launched a capacity-building program APPENDIX D Table D.1 World Bank IDA Loans $ Millions Project Name Third Emergency Education Emergency Road Reconstruction Dokan and Derbandikhan Hydropower Emergency Electricity Emergency Water Supply Project Amount 100.0 135.0 Approval Date Implementing Agency Description Status 11/2005 Ministry of Education Assists the Ministry of Electricity through reducing school overcrowding and strengthening its capacity to improve the quality of teaching and curricula. The Bank’s Board approved project restructuring in June 2009. The project will now support educational infrastructure (school construction), institutional strengthening (teacher training and curricula development), and project management. 6/2006 Ministry of Construction & Housing Assists in the rehabilitation of highways and village access roads in central, northern, and southern Iraq. Three floating bridges will also be replaced with permanent structures. Rehabilitation in the KRG is underway and disbursing. Progress in central and southern Iraq is expected to move forward due to a large contract expected to be tendered soon. The plan aims to upgrade electricity supply in the Kurdistan region and the national grid. The project will directly impact an estimated 490,000 households and benefit industrial consumers. A majority of contracts are finalized and the draft Environmental Preparedness Plan is complete and under review. A supervision and implementation consultant recommended that three rehabilitation projects be considered for additional financing. 40.0 12/2006 KRG Ministry of Electricity 124.0 3/2007 Ministry of Electricity Aims to restore the base-load generating capacity of the Hartha power plant and build capacity at the Ministry of Electricity. A contract to rehabilitate the Hartha power plant was signed in April 2009. The main contract commits the entire IDA credit. An Environmental and Social Impact Assessment has been completed. 6/2008 Ministry of Municipalities and Public Works Intends to improve the quantity and quality of water availability in four high-priority provinces. Assists the GOI on developing a sustainable policy for the water sector. Roughly $74 million has been committed while three more works packages and two consultancy services are yet to be tendered. These additional services would commit another $32 million. 109.5 Source: IRFFI, World Bank Operations in Iraq Data Sheet, 5/2010. for Iraqi officials from the Ministries of Labor and Social Affairs, Education, and Municipalities and Public Works, as well as the National Board of Pensions and Baghdad city government. The program aims to enhance their knowledge and skills for more effective implementation of development projects.16 United Nations UNDG ITF commitments to the IRFFI total $1.36 billion.17 The UNDG ITF has approved 176 joint projects totaling $1.29 billion, leaving $112 million to be committed to new projects.18 The cutoff date for donor contributions for the UNDG ITF was June 30, 2009; any funds that are not committed to a specific project by December 31, 2010, will be returned.19 To meet this requirement, the UN agreed that no new projects would be approved after June 30, 2010.20 Any remaining UN funds will be deposited in the UN’s general Multilateral Donor Trust Fund and will go to support activities overseen by the UN Assistance Mission for Iraq (UNAMI).21 Sources for International Donor Information SIGIR continues to note the challenges in reporting on international contributions to Iraq reconstruction. As Iraq shifts to normalized relations with the international community, the United States is less able to track international funding. Efforts by international donors now focus on helping Iraq sustain its progress. While some donors continue to support Iraq with technical assistance, economic development projects, and project financing, others are focusing on building relationships based on conventional trade and investment.22 The Department of State’s Bureau of Near Eastern Affairs-Iraq (NEA-I) does not expect substantial JULY 30, 2010 I REPORT TO CONGRESS I D-3 INTERNATIONAL DONOR ASSISTANCE TO THE GOI additional increases in donor commitments for Iraq reconstruction.23 Table D.3 Donor Projects by Sector $ Millions Department of State Sector NEA-I provides SIGIR with quarterly updates on international pledge and commitment figures from donor countries and international organizations. Committed Disbursed Agriculture, Food, and Fishing 395.52 189.53 Economic Development 203.07 67.71 Education, Science, and Culture 371.01 280.91 Energy 37.85 29.02 Development Assistance Database Enterprise and Industry 15.00 10.39 The Development Assistance Database (DAD) was established to serve as a reliable and credible source of information on donor contributions for the reconstruction, economic recovery, and socioeconomic development of Iraq.24 However, there is no standard reporting requirement for donors to provide data and no set time frame for updates to the DAD to be completed. Thus, comparing DoS donor pledge figures to data available in the DAD does not provide an accurate or complete picture of the status of donor support. Environment 324.37 227.48 Governance and Democracy Development 608.36 424.39 Health 614.05 493.49 Housing, Labor, and Social Affairs 357.17 256.62 1,077.27 755.92 231.14 190.87 Infrastructure Security Unallocated Unspecified/Unclassified Total 15.60 5.31 116.78 78.94 4,367.20 3,010.58 Note: Data not formally reviewed, audited, or verified. Numbers affected by rounding. Data excludes U.S.funded projects. Source: GOI, Development Assistance Database, www.mop-iraq.org/dad, accessed 7/12/2010. Table D.2 Snapshot of Top Donor-funded Projects $ Millions Donor Project Cost Title Project Implementation Status Sector (Traditional Classification) Sweden, World Bank 150.0 Electricity reconstruction project (Rehabilitation of units 2 & 3 of HARTHA power station) Ongoing Infrastructure Italy 128.8 Soft Loan for the implementation of an Aid Program for Rebuilding Iraq’s Agricultural Sector and Promoting the Related Services Ongoing Agriculture, Food, and Fishing World Bank Iraq Trust Fund 120.0 Irrigation and Drainage Schemes Rehabilitation and Water Resources Management Program Ongoing Agriculture, Food, and Fishing Japan 118.7 Construction of a Diesel Power Station (60 MW) in Al-Samawa Ongoing Infrastructure World Bank Iraq Trust Fund 110.0 Emergency Water, Sanitation, and Urban Reconstruction Project Ongoing Environment; Housing, Labor, and Social Affairs World Bank 100.0 Construction of New School Buildings Not Started Education, Science, and Culture Japan 72.2 Supply and Installation of Units Mobile Substations Completed Infrastructure Japan 68.4 Project for Rehabilitation of Four General Hospitals in the Northern Region of Iraq Completed Health Japan 66.2 Rehabilitation of Taji Gas Turbine Power Station Completed Infrastructure Japan 65.0 Project for Improvement of Trunk Communications Network Completed Infrastructure Note: Data not formally reviewed, audited, or verified. Numbers affected by rounding. Data excludes U.S.-funded projects. Committed and disbursed are the international terms used; this terminology is comparable to the SIGIR terms obligated and expended. Source: GOI, Development Assistance Database, www.mop-iraq.org/dad, accessed 7/12/2010. D-4 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX D Figure D.2 Committed, Pledged, and Disbursed Funds, NEA-I vs. DAD Reporting $ Billions Committed NEA-I DAD Total $11.96 Total $6.03 Japan $4.49 All Others $4.91 UNDG ITF (IRFFI) $1.17 Japan $1.55 WB ITF (IRFFI) $0.61 EC $0.69 EC $0.71 Total $18.10 Pledged All Others $2.00 IRFFI $1.85 Total $9.49 Japan $4.91 All Others $6.54 All Others $2.67 Japan $5.00 EC $0.69 World Bank $3.00 UK $1.14 IMF $3.64 Disbursed Total $3.02 No Data UNDG ITF (IRFFI) $0.76 Japan $1.03 UK $0.26 WB ITF (IRFFI) $0.25 All Others $0.72 Note: Numbers affected by rounding. Amounts may differ from prior quarters due to changes in foreign exchange rates. Sources: NEA-I, response to SIGIR data call, 7/13/2010; GOI, Development Assistance Database, www.mop-iraq.org/dad, accessed 7/12/2010. As of July 12, 2010, the DAD reported total commitments of $6.03 billion and disbursements of $3.02 billion.25 For an overview of Iraqi donor spending reported in the DAD, see Table D.2 and Table D.3. The inconsistent nature of DAD reporting requirements has resulted in significant differences between figures reported by NEA-I and DAD. For a breakdown of these differences, including committed, pledged, and disbursed amounts, see Figure D.2. JULY 30, 2010 I REPORT TO CONGRESS I D-5 INTERNATIONAL DONOR ASSISTANCE TO THE GOI Endnotes 1 NEA-I, response to SIGIR data call, 7/13/2010. 13 IRFFI, “Final Statement of IRFFI Donor Committee Meeting,” Naples, Italy, 2/18/2009. 2 NEA-I, response to SIGIR data call, 7/13/2010. 14 IRFFI, World Bank Operations in Iraq Data Sheet, 5/2010. 3 NEA-I, response to SIGIR data call, 7/13/2010. 15 IRFFI, World Bank Operations in Iraq Data Sheet, 5/2010. 4 NEA-I, response to SIGIR data call, 7/13/2010. 16 NEA-I, response to SIGIR data call, 7/13/2010. 5 NEA-I, response to SIGIR data call, 7/13/2010. 17 IRFFI, “Donor Commitments to the World Bank Iraq Trust 6 NEA-I, response to SIGIR data call, 7/13/2010. Fund and United Nations Development Group Iraq Trust 7 NEA-I, response to SIGIR data call, 4/2/2009. 8 NEA-I, response to SIGIR data call, 7/13/2010; IRFFI, “Donor Commitments to the World Bank Iraq Trust Fund and United Nations Development Group Iraq Trust Fund,” 4/30/2010. 9 NEA-I, response to SIGIR data call, 7/13/2010. 10 IMF, “IMF Executive Board Approves US $3.6 Billion Stand-By Arrangement for Iraq,” 2/24/2010, www.imf.org/ external/np/sec/pr/2010/pr1060.htm, accessed 4/9/2010. 11 IMF, “IMF Provides $3.6 Billion Loan to Iraq,” 3/4/2010, Fund,” 4/30/2010. 18 UN Security Council, Report to the Secretary-General pursuant to Paragraph 6 of Resolution 1883 (2009), 5/14/2010, p. 9. 19 IRFFI, “Final Statement of IRFFI Donor Committee Meeting,” Naples, Italy, 2/18/2009. 20 IRFFI, “Final Statement of IRFFI Donor Committee Meeting,” Baghdad, Iraq, 11/8/2009. 21 NEA-I, response to SIGIR data call, 4/2/2009. www.imf.org/external/pubs/ft/survey/so/2010/car030410a. 22 NEA-I, response to SIGIR data call, 7/2/2009. htm, accessed 4/9/2010. 23 NEA-I, response to SIGIR data call, 7/13/2009. 12 IRFFI, “Donor Commitments to the World Bank Iraq Trust Fund and United Nations Development Group Iraq Trust Fund,” 4/30/2010. 24 GOI, Development Assistance Database, www.mop-iraq. org/dad/, accessed 7/10/2009. 25 GOI, Development Assistance Database, www.mop-iraq. org/dad/, accessed 7/12/2010. D-6 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX E COMPLETED SIGIR INSPECTIONS This appendix contains a list of completed inspections on Iraq reconstruction activities by the Special Inspector General for Iraq Reconstruction (SIGIR), as of April 30, 2010. SIGIR’s Inspections Directorate ceased conducting inspections on April 30, 2010, and will issue a final capping report by the end of 2010. Budgeted Total Cost Project Name Province Humer Kwer Health Center Sulaymaniyah ($ thousands) Executing Agency 547 GRN USACE Region Contractor Local GRN Thi Qar Bee Farm Thi-Qar 255 GRS Local GRS Basrah Modern Slaughterhouse Basrah 5,635 GRS Local GRS Al Hadi Permanent Police Station Basrah 1,274 MNSTC-I Local GRS GRC Al Qaim 33 11kV Electrical Mobile Substation Anbar 6,400 GRC Local Haditha Dam Perimeter Security Anbar 998 GRC Local GRC Renovation of the Tomb of the Unknown Soldier Baghdad 1,741 MNC-I Bennett, Fouch, and Associates GRC Abu Ghraib Dairy Baghdad 3,400 TFBSO Al Balagh Investments GRC Rabeaa Point of Entry Screening Facility Ninewa 3,110 GRN Biltex Construction Company GRN Hammam Al Alil Division Training Center Ninewa 3,574 GRN Local GRN Hammam Al Alil Regional Training Center Ninewa 5,029 GRN Local GRN Secure Document Storage Facility Baghdad Renovate and Expand Chamchamal Correctional Facility Sulaymaniyah Orphanage and Senior Citizen Assisted Living Center in Erbil Erbil 1,916 GRC SIMA International GRC 28,691 GRN Local GRN 3,725 GRN Local GRN Abattoir (Slaughterhouse) in Qaladze Sulaymaniyah 1,100 GRN Local GRN Al Kasik Location Command Ninewa 6,311 GRN Local GRN Basrah Children’s Hospital Basrah 37,682 GRS Bechtel & MID Contracting GRS Roll-on/Roll-off Berth in the Port of Umm Qasr Basrah 2,735 GRS Local GRS 4th Brigade, 10th Infantry Division Iraqi Army HQ Barracks Missan 1,253 GRS Local GRS Missan Surgical Hospital, Phase 1 Missan 5,900 GRS Local GRS Missan Surgical Hospital, Phase 2 Missan 6,800 GRS Local GRS Mujarrah Canal Bridge Anbar 1,262 GRC Local GRC Ammana Market Renovation Baghdad 596 GRC Local GRC Suroor Elementary School Baghdad 246 GRC Local GRC Khandek School Baghdad 296 GRC Local GRC Sagrah School Anbar 399 MNF-West Local GRC Shiqaq Hai Musalla PHC Tameem 305 GRN Parsons/Local GRN Hai Tiseen PHC Tameem 465 GRN Parsons/Local GRN Basrah Courthouse Basrah 10,976 GRS Local GRS Basrah Witness Protection Facility Basrah See above GRS Local GRS Haditha General Hospital Anbar 5,034 GRC Local GRC Heet PHC Anbar 412 GRC Parsons/Local GRC Haditha PHC Anbar 538 GRC Parsons/Local GRC Continued on next page E-1 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX E Budgeted Total Cost Project Name Province Al Shurhabil School Anbar ($ thousands) 200 Executing Agency MNC-I USACE Region Contractor Local GRC Al Iqitadar School Anbar 268 MNC-I Local GRC Anbar Rule of Law Complex Anbar 21,462 GRC ALMCO Limited GRC Ramadi 132-kV Substation Anbar 27,980 GRC Symbion-Ozdil-Al Namarq Joint Venture GRC Plumbing Repairs at the Baghdad Police College Baghdad 3,183 AFCEE & MNSTC-I Laguna Construction GRD Sadr City R3 Water Treatment Plant Baghdad 65,848 GRC Washington International, Inc. / Black and Veatch Falluja Waste Water Treatment Plant (WWTP) Anbar 29,558 GRC FluorAMEC Central Falluja Sewer—Area A Construction and Repair Anbar 2,906 GRC Local Central Falluja Sewer—Pump Station 1&2 Anbar 7,223 GRC Local Central Falluja Sewer—Force Main Anbar 1,804 GRC Local Central Falluja Sewer—Earthwork for the WWTP Anbar 2,769 GRC Local Central Central Central Al Quds High School Baghdad 420 MNC-I Local Al Mualameen High School Baghdad 389 MNC-I Local Central Al Faoo High School Baghdad 441 MNC-I Local Central Al Shofa Water Facility Nassriya 349 GRS Local South Al Kazim Water Supply Nassriya 493 GRS Local South Nassriya 33-kV Power line Nassriya 1,538 GRS Local South Al Ager Water Compact Unit Nassriya 650 GRS Local South Kirkuk to Baiji PEZ Phase 3 Kirkuk 3,838 GRN Local North Kahn Bani-Sa’ad Correctional Facility Diyala 40,497 GRD Parsons Central Project Assessment Review Through April 2008 Various 1,600,000 GRD Various Various Nassriya Water Treatment Plant Thi-Qar 277,000 GRD FluorAMEC Repair of the Al Ghazaliyah G-6 Sewage Lift Station Baghdad 329 GRD Local Central Kurdistan Ministry of Interior Complex Erbil 7,400 GRN Tigris (Turkey) North Sarwaran Primary School Erbil 694 GRN Local North Binaslawa Middle School Erbil 602 GRN Local North Nassriya Prison Expansion Thi-Qar 6,263 GRS Local South Nassriya Prison Follow-up Thi-Qar 15,523 GRS Local South Al Escanddrona School Baghdad 86.6 GRD Local Central Rehabilitation of the Mansour Pump Station Baghdad 123 GRD Local Central Mahalla 824 Sewer Collapse Project Baghdad 629 GRD Local Central Iraqi Army Facilities located in Diyanah and Debecha Erbil 9,300 AFCEE Toltest, Inc. North Erbil Police Academy Erbil 10,000 GRN Tigris Company North South Repair of the Ghazaliyah G-7 Sewage Lift Station Baghdad 329 GRD Local Central Bartilla Booster Pump Station Repair Ninewa 417 GRN Local North Bartilla New Road Paving Ninewa 148 GRN Local North Showairrej to Tak Harb Road Paving Ninewa 1,439 GRN Local North Right Bank Drinking Water Treatment Plant Ninewa 1,714 GRN Local North Continued on next page APRIL 30, 2010 I REPORT TO CONGRESS I E-2 APPENDIX E Budgeted Total Cost Project Name Province Mosul Dam Ninewa Qudas Power Plant Turbine Restoration Project and Qudas Power Plant Expansion Project Baghdad Al Qana’at Raw Water Pump Station Al Rasheed Brigade Set Iraqi C-130 Base ($ thousands) Executing Agency USACE Region Contractor 27,000 GRD Washington International/Black and Veatch North 160,000 GRD URUK Engineering Services and the Baghdad Company for Gas Turbines Ltd.; Joint Venture/ FluorAMEC, L.L.C. Central Baghdad 4,230 GRC Comet Company Central Baghdad 64,010 AFCEE Tetra Tech, Inc. Central Baghdad 30,800 AFCEE Toltest, Inc. Central Central Central Iraqi Ministry of Defense Building Babylon 31,460 MNSTC-I Laguna Construction Company, Inc. Doura Power Station Units 5 and 6 Baghdad 90,800 GRD Bechtel National, Inc. Al Basrah Oil Terminal (ABOT) (5 projects) Basrah 3,045 GRC Parsons South South Military Base, Tallil Thi-Qar 108,590 AFCEE Weston Military Base Upgrades, Tallil Thi-Qar 10,511 AFCEE Weston South Recruiting Center, Hillah Babylon 1,824 AFCEE Weston South Iraqi Civil Defense HQ, Baghdad Baghdad 3,000 GRC Parsons Central Bab Shams Police Station, Mosul Ninewa 353 GRN Local North Gaugli-Ashur Police Station, Mosul Ninewa 881 GRN Local North Maternity and Pediatric Hospital Erbil BIAP 12 Standby 06 Power Baghdad 11,792 6,831 GRN Local North USAID Bechtel National, Inc. Central West BIAP Special Forces Barracks Baghdad 5,205 GRC Local Central Al Alwaiya Maternity Hospital Al Alwaiya Children’s Hospital Baghdad 1,986 GRD Parsons/Local Central Baghdad 1,288 GRD Parsons/Local Dahuk Rehabilitation Center Central Dahuk 5,634 GRD Biltek North Al Kasik Water Storage Tanks Ninewa 4,900 AFCEE AMEC North Al Kasik Waste Water Treatment Plant Ninewa 2,700 AFCEE Shaw North 51st Brigade Iraqi Army Barracks Babylon 999 GRD Local South Al Hillah Police Firing Range Babylon 434 GRD Local South 402nd Battalion Iraqi Army Headquarters Barracks Babylon 737 GRD Local Baghdad Police College, Task Order 06 Baghdad 42,909 GRD Parsons Central Baghdad Police College, Task Order 29 Baghdad 29,345 GRD Parsons Central South Electrical Substation Sustainment-Al Hakamia Basrah 5,677 GRD Perini Corporation South Electrical Substation Sustainment-Hamdan Basrah 5,719 GRD Perini Corporation South Electrical Substation Sustainment-Al Kaffat Basrah 5,438 GRD Perini Corporation South Electrical Substation Sustainment-Al Serajii Basrah 5,718 GRD Perini Corporation South Electrical Substation Sustainment-Shat al Arab Basrah 5,724 GRD Perini Corporation South Courthouse-New Al Karkh-Baghdad Baghdad 2,230 GRD Foreign Central Thi-Qar Village Road Segment 3 Thi-Qar 1,440 GRD Foreign South Ibn Al Bitar Hospital – Critical Care Unit Baghdad 580 GRD Foreign Central Baghdad Municipal Solid Waste Landfill Facility Baghdad 28,800 GRD FluorAMEC Central Continued on next page E-3 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX E Budgeted Total Cost Executing Agency Project Name Province Police Training Academy – Al Kut Wassit 22,900 GRD ECCI ($ thousands) USACE Region Contractor North Ninewa Provincial Police Headquarters Ninewa 1,000 GRD Foreign North 11 kVA Substation Feeder Ninewa 1,220 GRD Foreign North Baghdad Police College (Academy) Baghdad 73,000 GRD Parsons Central Kirkuk to Baiji Pipeline Tameem 3,445 Multiple Multiple North Baghdad Railway Station Rehabilitation Baghdad 6,385 GRD-PCO Foreign Central Military Base – 609th ING Thi-Qar 7,634 GRD Foreign South Muthanna Village Roads Segment 4 Muthanna 2,888 GRD-PCO Foreign South Prison Facility–Nasiriyah Thi-Qar 49,087 GRD-PCO Parsons Global Services South Fire Station–Nasiriyah Thi-Qar 627 GRD-PCO Foreign South Police Station–Safwan - IHP 404 Basrah 2,472 GRD-PCO Foreign South South Basrah International Airport-Air Side Supply Basrah 580.5 GRD-PCO Reyam, Ltd. Basrah International Airport-Terminal and Tower Basrah 5,045 GRD-PCO NANA Pacific South Umm Qasr Water Supply Canal Basrah 15,600 GRD-PCO Washington International South Riyadh Canal Crossing Tameem 635.5 GRD-PCO PIJV North Zegeton Fatah Canal Crossing Tameem 658.1 GRD-PCO PIJV North Hillah SWAT Facility Babylon 2,219 GRD Foreign South Seif Sa’ad Police Station Babylon 153 GRD Foreign South Border Post-As Sul #37 - Bnawasuta-Issawa Sulaymaniyah 272 GRD Parsons Delaware, Inc. North Border Post-As Sul #29 - Kuralau Bnaw-Azmik Sulaymaniyah 275 GRD Parsons Delaware, Inc. North Border Post-As Sul #20 - Marwa Sulaymaniyah 272 GRD Parsons Delaware, Inc. North Border Post-As Sul #23 - Bargurd-Safrah Sulaymaniyah 272 GRD Parsons Delaware, Inc. North Military Base Umm Qasr- Ammo Supply Point Basrah 253 GRD Foreign South Operation Center and Security Basrah 1,175 GRD Foreign South Port of Umm Qasr Security Upgrades Basrah 3,747 GRD Foreign Project Phoenix-Restore Qudas Gas Turbines Baghdad 11,391 PCO FluorAMEC Al Hillah Police Academy-CN-W914NS-04-C-9046 Babylon 9,135 JCC-I/A SBIG Logistics & Technical Services South Kerbala Library Kerbala 1,294 CPA (South Central) Global Business Group South South Central Al Wahda Water Treatment Plant Baghdad 4,712 PCO FluorAMEC Central Al Wathba Water Treatment Plant Baghdad 8,698 PCO FluorAMEC Central Al Nahrwan Water Supply Project Baghdad 348 GRD Foreign Al Sumelat Water Network Baghdad 764 PCO SIMA International Central Al Hakamia Substation Basrah 5,934 PCO Perini Corporation South South South Hamdan Substation Basrah 5,001 PCO Perini Corporation Al Kaffat Substation Basrah 5,934 PCO Perini Corporation South Al Seraji Substation Basrah 5,709 PCO Perini Corporation South Shat al Arab Subtation Basrah 5,298 PCO Perini Corporation South Al Fathah Pipe Crossing Tameem 29,715 PCO PIJV North Kirkuk Canal Crossing Tameem 2,088 PCO PIJV North Continued on next page APRIL 30, 2010 I REPORT TO CONGRESS I E-4 APPENDIX E Budgeted Total Cost Project Name Province Al Fathah River Crossing Tie-ins Tameem ($ thousands) 8,156 Executing Agency PCO Contractor PIJV USACE Region North Al Balda Police Station Babylon 135 GRD Foreign South Al Hillah Maternity and Children’s Hospital Babylon 7,414 PCO Parsons Global Services South Al Imam Primary Care Center Babylon 533 PCO Parsons Delaware, Inc. South Babil Railway Station Babylon 274 PCO Foreign South Mosul Airport – ATC Tower Rehab Ninewa 10,329 GRD Foreign North Ninewa Village Roads Segment 3 Ninewa 920 GRD Foreign North Ainkawa Fire Station Erbil 1,392 GRD Parsons Global Services, Inc. North Erbil City Transformers Erbil 3,372 GRD Washington International, Inc. North Sheile Primary School Dahuk 401 GRD Foreign North Zakho-Military Academy Dahuk 5,591 GRD Foreign North PHC Type A at Shiqaq Hai Musalla Tameem 608 GRD Parsons Delaware, Inc. North PHC Type A at Hai Alhajjaj Tameem 608 GRD Parsons Delaware, Inc. North PHC Type A at Hai Alasra Wa Al Mafqoodeen Tameem 648 GRD Parsons Delaware, Inc. North PHC Type A at Hai Al Wasity Tameem 648 GRD Parsons Delaware, Inc. North PHC Type B at Hai Tis’een Tameem 734 GRD Parsons Delaware, Inc. North North New Second Brigade Base Tameem 114,000 AFCEE Environmental Chemical Corporation Aviation Base Building Tameem 13,200 AFCEE Environmental Chemical Corporation North Al Fatah—Horizontal Directional Drilling Salah Al-Din 75,700 USACE KBR and PJIV (Parsons) North E-5 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX F SUSPENSIONS AND DEBARMENTS This appendix presents a comprehensive list of suspensions and debarments related to Iraq reconstruction contracts or Army support contracts in Iraq and Kuwait. Table F.1 Suspensions and Debarments (Army) Suspension and Debarment Action Taken Reason for Action Powell, Glenn Allen Employee, LOGCAP Contractor Suspended, 9/17/2005; proposed for debarment, 12/13/2005; debarred, 2/16/2006 Bribery of Government Official Awarded contract to KBR subcontractor under LOGCAP III contract in exchange for 20% kickback of contract price. Employer unaware of actions. On 8/19/2005, pled guilty to a two-count criminal information charging him with fraud. Case closed. DXB International LOGCAP Subcontractor Suspended, 7/25/2005; proposed for debarment, 7/25/2005; debarred, 9/29/2005 Allegations of Failure To Perform a Contract Failure to perform a contract for the delivery of ice to Army troops in Iraq. Case closed. Name Withheld Employee, DXB International Suspended, 7/25/2005; proposed for debarment, 7/25/2005 Allegations of Failure To Perform a Contract SDO determined that debarment was not appropriate based on lack of substantiation of allegations. Case closed. Ludwig, Steven Employee, DXB International Suspended, 7/25/2005; proposed for debarment, 7/25/2005; debarred, 9/29/2005 Allegations of Failure To Perform a Contract Failure to perform a contract for the delivery of ice to Army troops in Iraq. Case closed. Jasmine International Trading and Service Company Contractor, Area Support Group Kuwait Proposed for debarment, 2/27/2006; debarred, 6/2/2006; proposed for debarment, 7/23/2008; debarred, 5/14/2009 Bribery of Government Official Provided payments to Army finance office personnel at Camp Arifjan, Kuwait, for expedition of payments due on Army contracts. Kuwaiti Company—no DoJ action. 9-month debarment. Proposed for debarment 7/23/2008. Debarred for a period of 10 years ending on 7/22/2018. Case closed. Salem, Diaa Ahmen Abdul Latif Proposed for debarment, Director, Jasmine 2/27/2006; debarred, International Trading 6/2/2006. Proposed for and Service debarment, 7/23/2008; Company debarred, 5/14/2009 Bribery of Government Official Provided payments to Army finance office personnel at Camp Arifjan, Kuwait, for expedition of payments due on Army contracts. Kuwaiti National—no DoJ action. 9-month debarment. Proposed for debarment 7/23/2008. Debarred for a period of 10 years ending on 7/22/2018. Case closed. Eagle Global Logistics, Inc. Subcontractor, LOGCAP III Suspended, 2/27/2006; Administrative Compliance Agreement signed, 3/2/2006 Allegations of Violation of the False Claims Act; False Statements Claimed surcharges for air-freight forwarding services of transport of U.S. military equipment between Dubai and Baghdad. Administrative compliance agreement signed with Army on 3/2/2006 extending until 3/23/2011. Employee, Eagle Global Logistics, Inc. Suspended, 2/27/2006; proposed for debarment, 9/15/2006; debarred, 11/9/2006 False Claims Act; False Statements Pled guilty to adding an illegal surcharge to government contracts while employed by a shipping company in the Middle East. Sentenced by the U.S. District Court, Central District of Illinois, to 30 months confinement, 2 years supervised release, and a $10,000 fine. Case closed. Contractor – CPA-SC Suspended, 11/28/2005; proposed for debarment, 6/26/2007; debarred, 8/8/2007 Money Laundering; Bribery; Wire Fraud; Interstate Transport of Stolen Property; Conspiracy Contractor based in Romania used by Philip H. Bloom to procure fraudulent contracts. Also doing business as Global Business Group Logistics, GBG Holdings, and GBF Logistics Division. Debarred for approximately 7 years and 4 months, ending on 11/28/2014. Case closed. Name Position Cahill, Christopher Joseph Global Business Group S.R.L. Case Status Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I F-1 SUSPENSIONS AND DEBARMENTS Suspension and Debarment Action Taken Name Position Bloom, Philip H. Suspended, 11/28/2005; Owner, Global proposed for debarment, Business Group S.R.L. 6/26/2007; debarred, 8/8/2007 Merkes, Steven Former Contracting Officer—SOCEUR Stein, Robert J., Jr. CPA-SC Civilian Comptroller and Funding Officer Civil Affairs Team Wheeler, Michael B., Leader, 432nd CA LTC, USAR BN, USA Reason for Action Case Status Money Laundering; Bribery; Wire Fraud; Interstate Transport of Stolen Property; Conspiracy Pled guilty to conspiracy, bribery, and money laundering on 3/10/2006 in U.S. District Court for the District of Columbia. Sentenced 2/16/2007 to 46 months confinement, 24 months supervised release, and (with co-conspirators) forfeiture of $3,600,000. Debarred for a period of approximately 7 years and 4 months, ending on 11/28/2014. Case closed. Suspended, 1/24/2007; proposed for debarment, 8/15/2007; debarred, 9/27/2007 Acceptance of Illegal Gratuities Accepted position with Global Business Group S.R.L. while a U.S. government employee. Agreed to provide GBG with assistance in receiving SOCOM contracts in Eastern Europe and Iraq. Sentenced 6/1/2007 to 12 months of confinement. Suspended, 12/2/2005; proposed for debarment, 7/2/2007; debarred, 8/16/2007 Allegations of Money Laundering; Bribery; Wrongful Conversion; Possession of Machine Gun; Non Registration of Weapon; Wire Fraud; Interstate Transport of Stolen Property; Conspiracy Pled guilty to conspiracy, money laundering, bribery, possession of a machine gun, and aiding/abetting in the U.S. District Court for D.C. Sentenced on 1/29/2007 to 9 years confinement, 36 months supervised release, and (with co-conspirators) forfeiture of $3,600,000. Debarred for a period of approximately 7 years and 4 months, ending on 12/5/2014. Case closed. Suspended, 12/7/2005; proposed for debarment, 3/31/2010 Allegations of Money Laundering; Bribery; Wrongful Conversion; Possession of Machine Gun; Non Registration of Weapon; Wire Fraud; Interstate Transport of Stolen Property; Conspiracy Indicted 2/7/2007 in the U.S. District Court for the District of New Jersey. Sentenced 1/25/2010. Allegations of Money Laundering; Bribery; Wrongful Conversion; Possession of Machine Gun; Non Registration of Weapon; Wire Fraud; Interstate Transport of Stolen Property; Conspiracy Indicted 2/7/2007 in the U.S. District Court for the District of New Jersey. Sentenced 6/4/2009. Debarred until 12/12/2014. Case closed. Harrison, Debra M., LTC, USAR Assistant CPA-SC Comptroller and Funding Officer, 358th CA BDE, USA Suspended, 12/20/2005; proposed for debarment, 6/17/2009; debarred, 8/7/2009 Hopfengardner, Bruce D., LTC, USAR Civil Affairs Advisor, Iraqi Police, Hilla, Iraq Wire Fraud, Money Suspended, 7/19/2006; Laundering, Interstate proposed for debarment, Transport of Stolen 8/8/2007; debarred 9/20/2007 Property, Conspiracy, Wrongful Conversion Zahed, Mohamed Abdel Latif Contractor employee Proposed for debarment, (linguist) Titan Corp, False claims 2/9/2007; debarred 9/10/2009 Camp Victory, Iraq Suspended, 4/13/2006; proposed for debarment, 4/13/2007; debarred, 6/28/2007 Salam, Faheem Mousa Contractor - MNSTC-I Faiq, Alwan Proposed for debarment, Contractor Employee 6/20/2006; debarred, - GRD Baghdad 12/28/2006 Pled guilty to conspiracy to commit money laundering and wire fraud 6/26/2007. Sentenced to 21 months of confinement, 36 months supervised release, $144,500 fine, and (with co-conspirators) forfeiture of $3,600,000. Case closed. Former linguist for MNF-I, Camp victory, Iraq, Submitted false claims for $31,895 in work which was never completed. Debarred until 3/29/2012. Case closed. Attempted Bribery of Government Official Accused of offering cash payments to Iraqi police officials in exchange for contracts to supply the Civilian Police Assistance Training Team, Multi-National Security Transition Command-Iraq, with 1,000 protective vests and other equipment. Sentenced 2/2/2007 to 36 months confinement, 24 months supervised release, 250 hours community service, and $100 special assessment. Case closed. Allegations of Bribery, False Claims Alleged attempted bribery of a USACE-GRD contracting officer in exchange for procurement-sensitive information and favorable treatment on future contracts. Case closed. Continued on next page F-2 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX F Name Position Danube Engineering Contractor - GRD and General Baghdad Contracting Suspension and Debarment Action Taken Reason for Action Proposed for debarment, 6/20/2006; debarred, 12/28/2006 Allegations of Bribery, False Claims Debarred based on unauthorized delegation of contract performance to a subcontractor resulting in attempted bribery of a contracting officer for procurement-sensitive information. Debarred for one year. Case closed. Case Status Qussay, Abdullah Hady President, QAH Mechanical and Electrical Works Proposed for debarment, 3/8/2007; debarred, 6/27/2007 Allegations of Bribery, False Claims Accused of misrepresenting to USACE-GRD that he was a director of Danube Engineering and General Contracting. Case closed. QAH Mechanical and Electrical Works Subcontractor, Baghdad, Iraq Proposed for debarment, 3/8/2007; debarred, 6/27/2007 Allegations of Bribery, False Claims Debarred based on affiliation with Mr. Abdullah H. Qussay. Case closed. Dan Trading and Contracting Contractor, Kuwait Proposed for debarment, 11/1/2005; debarred 1/12/2006 Allegations of Bribery and Illegal Gratuities Debarred based on allegations of providing illegal gratuities to military personnel and overall lack of present responsibility. Case closed. Al Khadra, Amro Manager and Director of Sales, Dan Trading Proposed for debarment, 11/1/2005; debarred 1/12/2006 Allegations of Bribery and Illegal Gratuities Debarred based on allegations of providing illegal gratuities to military personnel and overall lack of present responsibility. Case closed. Wiesemann, Robert CW2, USA Contracting Officer, Camp Arifjan, Kuwait Proposed for debarment, Allegations of Bribery 12/6/2005; debarred 3/6/2006 and Illegal Gratuities Debarred based on allegations of providing illegal gratuities to military personnel and overall lack of present responsibility. Case closed. Name Withheld Mayor, FOB Union III, Proposed for debarment, Iraq, HUB, 2-77 FA 3/30/2007 Allegations of Bribery, Theft, Extortion Allegedly accepted cash payments from contractors at FOB Union III in exchange for cash and personal items. Threatened to have contractors removed from FOB for failure to provide payments demanded. Proposal for debarment terminated. Case closed. Name Withheld Provost, FOB Union Proposed for debarment, III, Iraq, HHB, 2-77 FA 3/30/2007 Allegations of Bribery, Theft, Extortion Allegedly accepted cash payments from contractors at FOB Union III in exchange for cash and personal items. Threatened to have contractors removed from FOB for failure to provide payments demanded. Proposal for debarment terminated. Case closed. Allegations of Money Laundering; Bribery; Wrongful Conversion; Possession of Machine Gun; Non Registration of Weapon; Wire Fraud; Interstate Transport of Stolen Property; Conspiracy Indicted 2/7/2007 in the U.S. District Court for the District of New Jersey. Awaiting final criminal judgment prior to debarment. Bribery of Government Official; Racketeering Allegedly received approximately $28,900 and attempted to receive an additional payment of approximately $19,000 from a Kuwaiti national, for contracts to provide apartments in Kuwait City for Army personnel. Case closed. Chief of Staff and Whiteford, Curtis G., Deputy Regional COL (Retired) USA Advisor, CPA-SC, AlHillah, Iraq Suspended, 3/30/2007 Pappen, Gheevarghese Suspended, 3/30/2006; Contracting Officer - proposed for debarment, ASG Kuwait 5/1/2007; debarred, 6/28/2007 Seamans, Stephen Lowell Employee, LOGCAP III Contractor Suspended, 4/27/2006; proposed for debarment, 1/5/2007; debarred, 7/27/2007 Wire Fraud, Money Laundering Sentenced 12/1/2006 to 12 months and 1 day confinement, 3 years supervised release, $380,130 restitution, $200 special assessment. Case closed. Name Withheld Contractor, Camp Arifjan, Kuwait Proposed for debarment, 12/1/2006; proposed debarment terminated, 5/18/2007 Allegations of False Claims, False Statements SDO determined that debarment was not appropriate based on lack of substantiation of allegations. Case closed. Green Valley Company Contractor, Camp Arifjan, Kuwait Proposed for debarment, 12/1/2006; debarred, 5/18/2007; proposed for debarment, 7/23/2008; debarred, 9/17/2008 Allegations of False Claims, False Statements Fact-based debarment action based on substantiated allegations that contractor willfully caused the submission of false claims related to the removal of black/gray water from Camp Arifjan, Kuwait. Debarment for a period of 10 years ending 12/1/2019. Case closed. Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I F-3 SUSPENSIONS AND DEBARMENTS Name Name Withheld Barnes, Thomas Nelson Lee Dynamics International Suspension and Debarment Action Taken Reason for Action Active Duty Army Officer Suspended, 9/5/2006 Allegations of Offering To Disclose Contractor Bid, Proposal, and Source Arrested 8/18/2006. Died 9/5/2006. Suspension termiSelection Information nated. Case closed. and Soliciting Contractors for Illegal Gratuities Contractor Employee, MNF-I Suspended, 11/4/2005; proposed for debarment, 11/16/2006; debarred, 1/24/2007 Theft Suspended, 7/9/2007; proposed for debarment, 7/1/2008; debarred, 6/17/2009 Fact-based proposal for debarment action based on information received from the International Contract Corruption Task Force and guilty plea of Col. Levonda Allegations of Bribery of Selph, USA. Alleged to have made payments to two Government Official and contracting officers in exchange for the award of Money Laundering warehouse management contracts in support of the Iraqi police and armed forces. Debarred for a period of 10 years ending on 7/8/2017. Case closed. Position MNSTC-I Contractor Subcontractor and Lee Defense Services affiliated company, Corporation Lee Dynamics International Case Status Pled guilty to one count of theft of public property for improperly issuing badges to contractor employees resulting in unauthorized access to the International Zone, Baghdad. Sentenced 5/11/2006 to 30 days home confinement, 1 year supervised probation, and $25 special assessment. Debarred for 4 years. Case closed. Fact-based proposal for debarment action based on information received from the International Contract Suspended, 7/9/2007; Allegations of Bribery of Corruption Task Force, and guilty plea of Col. Levonda proposed for debarment, Government Official and Selph, USA. Suspended as an affiliated company of Lee 7/1/2008; debarred 6/17/2009 Money Laundering Dynamics International and Justin W. Lee. Debarred for a period of 10 years ending 7/8/2017. Case closed. Lee, George H. Owner, Lee Dynamics International; CEO Starcon, Ltd., LLC Fact-based proposal for debarment action based on Suspended, 7/9/2007; Allegations of Bribery of information received from the International Contract proposed for debarment, Government Official and Corruption Task Force and guilty plea of Col. Levonda 7/1/2008; debarred 6/17/2009 Money Laundering Selph, USA. Debarred for a period of 10 years ending 7/8/2017. Case closed. Lee, Justin W. Consultant and Former Marketing Manager, Lee Dynamics International Fact-based proposal for debarment action based on Suspended, 7/9/2007; Allegations of Bribery of information received from the International Contract proposed for debarment, Government Official and Corruption Task Force and guilty plea of Col. Levonda 7/1/2008; debarred 6/17/2009 Money Laundering Selph, USA. Debarred for a period of 10 years ending 7/8/2017. Case closed. Lee, Oai Fact-based proposal for debarment action based on Suspended, 7/9/2007; Allegations of Bribery of information received from the International Contract Agent, Lee Dynamics proposed for debarment , Government Official and Corruption Task Force and guilty plea of Col. Levonda International 7/1/2008; debarred 6/17/2009 Money Laundering Selph, USA. Debarred for a period of 10 years ending 7/8/2017. Case closed. Selph, Levonda J., Colonel, USA (Ret) Former Contracting Officer, MNSTC-I Proposed for debarment, 7/1/2008; debarred, 6/17/2009 Allegedly awarded contracts to Lee Dynamics InternaAllegations of Conspiracy tional for warehouse services in Iraq in exchange for and Bribery monetary payments. Debarred for a period of 9 years ending on 7/1/2017. Case closed. Starcon Ltd., LLC Contractor, Camp Arifjan, Kuwait Proposed for debarment, 7/1/2008; debarred, 6/17/2009 Affiliate of George H. Lee See entry for George H. Lee. Debarred for a period of 9 years ending on 7/1/2017. Case closed. Guyon, Stephen Managing Partner, Starcon, Ltd., LLC Proposed for debarment, 7/1/2008 Affiliate of George H. Lee See entry for George H. Lee. Rivard, John Allen, MAJ, USAR Contracting Officer, LSA Anaconda, Iraq Suspended, 8/10/2007; proposed for debarment, 11/27/2007; debarred, 1/14/2008 Allegations of Conflicts Allegedly awarded $8,000,000 in contracts for housing of Interest, Bribery, Bidtrailers at LSA Anaconda in return for gratuities from rigging, and False Official contractors. Case closed. Statements Continued on next page F-4 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX F Suspension and Debarment Action Taken Name Position Name Withheld Former Finance Manager, Joint ASG, Proposed for debarment, Baghdad, Iraq and 9/10/2007 President, RMI Reason for Action Case Status Allegations of Conflicts of Interest Fact-based proposal for debarment resulting from allegations that post-government employment restrictions for federal employees may have been violated. On 1/31/2008, the Army Suspension and Debarment Official determined that these allegations were unfounded, and the suspension was terminated. Case closed. Allegations of Conflicts of Interest Fact-based proposal for debarment resulting from allegations that contractor received a government contract as a result of a violation of restrictions on post-government employment of federal employees. On 1/31/2008, the Army Suspension and Debarment Official determined that these allegations were unfounded, and the suspension was terminated. Case closed. Allegations of Bribery Allegedly requested a $125,000 payment from a contractor in return for safeguarding the company’s interests and a $50,000 payment from an informant in exchange for a promise of procurement-sensitive information. Taken into custody in New York, NY, and currently awaiting trial. Suspended, 8/15/2007; proposed for debarment, 1/14/2010; debarred, 3/17/2010 Allegations of Bribery, Conspiracy and Money Laundering Indicted in the Western District of Texas on 7/27/2007 on allegations of bribery, money laundering, and wire fraud based on the award of multiple contracts for goods and services while deployed to Kuwait. Entered a plea of guilty to bribery, conspiracy, and money laundering on 1/31/2008. Plea unsealed on 6/24/2008. Sentenced 12/2/2009. Debarred for a period of 27.5 years ending on 2/23/2035. Case closed. Spouse, MAJ John Cockerham Suspended, 8/15/2007; proposed for debarment, 1/14/2010; debarred, 3/17/2010 Indicted in the Western District of Texas on 7/27/2007 on charges of money laundering and wire fraud. Allegedly received and concealed payments from contractors in Kuwait made as a result of the frauduAllegations of Conspiracy lent contracts awarded by MAJ Cockerham. Entered and Money Laundering a plea of guilty to conspiracy, and money laundering on 1/31/2008. Plea unsealed on 6/24/2008. Sentenced 12/2/2009. Debarred for a period of 8.5 years ending on 2/23/2016. Case closed. Blake, Carolyn Sister, MAJ John Cockerham Suspended, 8/15/2007; proposed for debarment, 1/14/2010; debarred, 3/17/2010 Indicted in the Western District of Texas on 7/27/2007 on charges of money laundering and wire fraud. Allegedly received and concealed payments from contracAllegations of Wire Fraud tors in Kuwait made as a result of the fraudulent and Money Laundering contracts awarded by MAJ Cockerham. Sentenced on 12/2/2009. Debarred for a period of 11 years ending on 8/23/2018. Case closed. Name Withheld Contractor Employee, IZ Baghdad Proposed for debarment, 9/14/2007; proposal for debarment terminated, 12/19/2007 Accused of obtaining information in violation of the Procurement Integrity Act to influence the award of Allegations of Violations convoy-security delivery orders. Determined to be of the Procurement presently responsible by Suspension and Debarment Integrity Act Official as a result of materials submitted for consideration in writing and at an oral hearing. Case closed. Name Withheld COR, 10th Mountain Division, Victory Base Suspended, 12/3/2007; Complex Regional suspension terminated, Contracting Center, 1/21/2010 Iraq Name Withheld Contractor, JCC-I/A, Baghdad, Iraq Proposed for debarment, 9/10/2007 COR, 10th Mountain Division, Victory Base Key, Austin, CPT, USA Complex Regional Suspended, 8/27/2007 Contracting Center, Iraq Cockerham, John L., MAJ, USA Cockerham, Melissa Former Contracting Officer, Camp Arifjan, Kuwait Allegations of Larceny and Bribery Allegedly received cash payments in return for escorting contractor fuel tankers into Camp Victory, Iraq, for the purpose of stealing the fuel. Acquitted at trial in U.S. District Court, Eastern District of New York. Case closed. Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I F-5 SUSPENSIONS AND DEBARMENTS Name Position Suspension and Debarment Action Taken Reason for Action Case Status JCC-I/A Prime Contractor and LOGCAP III Subcontractor Proposed for debarment, 11/8/2007; Administrative Compliance Agreement, 2/6/2008 Allegations of False Claims Contractor for construction of a barracks in Taji, Iraq, valued at $19,800,000. After contract was terminated, contractor was accused of submitting numerous claims to the government in the amount of $2,598,941, of which it is alleged that $2,497,440 were false. Proposed for debarment by USAREUR Suspension and Debarment Official. Administrative Compliance Agreement entered on 2/6/2008. Kahn, Mohammad Shabbir Employee - Tamimi Global Logistics, Kuwait Suspended, 4/27/2006; proposed for debarment, 9/15/2006; debarred, 10/10/2007 Allegations of Wire Fraud, Conspiracy, Money Laundering and False Statements Pled guilty to 12 counts of wire fraud, 1 count of conspiracy to launder money, and 1 count of making a false statement. Sentenced to 51 months confinement, 2 years supervised release, ordered to pay an assessment of $1,400, a fine of $10,000, and restitution in the amount of $133,860 payable to U.S. Army Operations Support Command. Case closed. Peleti, Peleti “Pete,” CWO, USA HHC 25th ID, Camp Victory, Iraq Suspended, 1/31/2007; Allegations of Bribery proposed for debarment, and Illegal Gratuities 3/4/2008; debarred 6/15/2008 Lane, Jesse D., Jr. 223rd Finance Detachment, CANG, Camp Victory, Iraq Suspended, 12/29/2007; proposed for debarment 9/30/2008; debarred 1/30/2009 While deployed to Iraq, allegedly used civilian employAllegations of Wire Fraud ment at USPO, California, to use the identities of miliand Money Laundering tary personnel to receive unauthorized payments from and Theft DFAS. Debarred until 12/28/2012. Case closed. Anjakos, Jennifer 223rd Finance Detachment, CANG, Camp Victory, Iraq Suspended, 7/2/2007; proposed for debarment 9/30/2008; debarred 1/30/2009 While deployed to Iraq, allegedly used civilian employAllegations of Wire Fraud ment at USPO, California, to use the identities of miliand Money Laundering tary personnel to receive unauthorized payments from and Theft DFAS. Debarred until 9/10/2012. Case closed. Chavez, Carlos L. 223rd Finance Detachment, CANG, Camp Victory, Iraq Suspended, 7/2/2007; proposed for debarment 9/30/2008; debarred 1/30/2009 While deployed to Iraq, allegedly used civilian employAllegations of Wire Fraud ment at USPO, California, to use the identities of miliand Money Laundering tary personnel to receive unauthorized payments from and Theft DFAS. Debarred until 9/10/2012. Case closed. Hollier, Darryl 223rd Finance Detachment, CANG, Camp Victory, Iraq Suspended, 7/2/2007; proposed for debarment 9/30/2008; debarred 1/30/2009 While deployed to Iraq, allegedly used civilian employAllegations of Wire Fraud ment at USPO, California, to use the identities of miliand Money Laundering tary personnel to receive unauthorized payments from and Theft DFAS. Debarred until 9/10/2012. Case closed. Lopez, Luis A. 223rd Finance Detachment, CANG, Camp Victory, Iraq Suspended, 7/2/2007; proposed for debarment 9/30/2008; debarred 1/30/2009 While deployed to Iraq, allegedly used civilian employAllegations of Wire Fraud ment at USPO, California, to use the identities of miliand Money Laundering tary personnel to receive unauthorized payments from and Theft DFAS. Debarred until 9/10/2012. Case closed. Al Sawari General Trading and Contracting Company Contractor, ASG Kuwait Proposed for debarment, 1/18/2008; debarred, 3/13/2008 Allegations of NonPerformance of Contract Terms and Trafficking in Counterfeit Goods and Services Attempted to deliver 571 counterfeit Nokia cell phones to ASG-KU as part of 3 separate contracts. Phones determined to be counterfeit after DD 250 issues but before issue to units and payment to contractor. Case closed. Martin, Anthony J. Subcontract Manager, KBR, Kuwait Suspended, 7/19/2007; proposed for debarment, 9/29/2009; debarred, 6/3/2009 Allegations of Bribery, Illegal Gratuities, and Receipt of Kickbacks Allegedly awarded a subcontract to a Kuwaiti company after agreeing with its managing partner that he was going to receive $50,240 for the award of the contract. Case closed. Smoot, Kevin Andre Managing Director, Eagle Global Logistics Services Suspended, 8/8/2007; proposed for debarment, 3/10/2008; debarred, 9/30/2008 Allegations of False Statements, False Claims Allegedly falsely stated that $1,141,097 in war risk surcharges billed by Eagle Global Logistics to KBR as part of a subcontract were legitimate. Case closed. Hall, Terry Owner/Manager, Freedom Consulting and Catering, U.S. Eagles Services and Total Government Allegiance Suspended, 3/7/2008 Indicted on 11/20/2007 in the U.S. District Court for the District of Columbia on one count of Bribery, in Allegations of Bribery in violation of 18 U.S.C. § 201 (b)(1)(A), as a result of alObtaining a Government leged participation in a scheme to fraudulently award Contract U.S. government contract to supply bottled water and other supplies and services to the U.S. military in Iraq and Kuwait. Insaat, Yuksel Allegedly received cash payments in exchange for the award of food service supply contracts to a Kuwaitibased company. Case closed. Continued on next page F-6 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX F Suspension and Debarment Action Taken Reason for Action Name Position Freedom Consulting and Catering Company WLL Contractor, ACA, Camp Arifjan, Kuwait Case Status Suspended, 3/7/2008 Affiliate and Imputee of Terry Hall. U.S. Eagles Services Corporation Contractor, ACA, Camp Arifjan, Kuwait Suspended, 3/7/2008 Affiliate and Imputee of Terry Hall. Total Government Allegiance Contractor, ACA, Camp Arifjan, Kuwait Suspended, 3/7/2008 Affiliate and Imputee of Terry Hall. Bluebridge Contractor, ACA, International Trading Camp Arifjan, and Contracting Kuwait Company, WLL Suspended, 3/7/2008 Affiliate and Imputee of Terry Hall, U.S. Eagles Services Corporation, Freedom Consulting and Catering, WLL, and Total Government Allegiance. Suspended, 3/7/2008 Affiliate and Imputee of Terry Hall. Finbar, J. Charles Owner/manager, Freedom Consulting and Catering Company WLL, U.S. Eagles Services Corporation, Total Government Allegiance, Bluebridge International General Trading and Contracting Company, WLL and Trimedpro Project Management Trimedpro Project Management Contractor, ACA, Camp Arifjan, Kuwait Suspended, 3/7/2008 Affiliate of Freedom Consulting and Catering Company WLL, U.S. Eagles Services Corporation, Total Government Allegiance, Bluebridge International General Trading and Contracting Company, WLL, and Trimedpro Project Management. Ellis, Dorothy Contractor Employee, U.S. Eagles Services Suspended, 3/7/2008 Affiliate of U.S. Eagles Services. Bruce, Richard Contractor Employee, Total Government Allegiance Suspended, 3/7/2008 Affiliate of Total Government Allegiance. Charles, Maria Rosario Contractor Employee, U.S. Eagles Services Suspended, 3/7/2008 Affiliate of U.S. Eagles Services. Pressley, Eddie Contractor Employee, U.S. Eagles Services Suspended, 3/7/2008 Affiliate of U.S. Eagles Services. Gayfield, Tina Contractor Employee, Total Government Allegiance Suspended, 3/7/2008 Affiliate of Total Government Allegiance. Naji, Monther “Mike” Majeed Sales Manager, Phoenix Construction, Camp Liberty, Iraq Suspended, 3/13/2008 Allegations of False Statements Allegedly submitted fraudulent applications for Common Access Cards, in violation of 18 U.S.C. § 1001(a)(3), False Statement. Al Jabawi, Harith “Harry” Naji Regional Coordinator, Joshua Construction, Camp Liberty, Iraq Suspended, 3/13/2008 Allegations of False Statements Allegedly submitted fraudulent applications for Common Access Cards, in violation of 18 U.S.C. § 1001(a)(3), False Statement. Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I F-7 SUSPENSIONS AND DEBARMENTS Suspension and Debarment Action Taken Reason for Action Name Position Phoenix Construction Contractor, VBC RCC, Suspended, 3/13/2008 Iraq Case Status Affiliate and Imputee of Naji. Joshua Construction Contractor, VBC RCC, Suspended, 3/13/2008 Iraq Affiliate and Imputee of Naji. Alleged to have fraudulently claimed a payment of $595,000 for work completed by another contractor. Found not guilty at trial. Debarred until 7/15/2014 based on a finding that he made multiple statements to conceal his ownership of Dourat Al-Arab from contracting officers to prevent disclosure of conflicts of interest resulting from his employment as a translator at the Camp Victory Contracting Center, Camp Victory, Iraq. Jabak, Ali N. Former Contractor (Interpreter), Baghdad, Iraq Suspended, 5/23/2008; suspension terminated, 12/11/2008; proposed for debarment, 7/16/2009; debarred, 9/30/2009 Jabak, Liberty A. Spouse of Ali N. Jabak Suspended, 5/23/2008; suspension terminated, 12/11/2008; proposed for debarment, 7/16/2009; debarred, 9/30/2009 Alleged to have fraudulently claimed a payment of $595,000 for work completed by another contractor. Found not guilty at trial. Debarred until 7/15/2014 as an affiliate and imputee of Ali N. Jabak. Liberty’s Construction Company Former contractor, Camp Victory, Iraq Suspended, 5/23/2008; suspension terminated, 12/11/2008; proposed for debarment, 7/16/2009; debarred, 9/30/2009 Alleged to have fraudulently claimed a payment of $595,000 for work completed by another contractor. Found not guilty at trial. Debarred until 7/15/2014 as an affiliate and imputee of Ali N. Jabak. Taresh, Tharwat Employee, Dourat Al-Arab and Dourat Al-Arab, Baghdad, Iraq Proposed for debarment, 7/16/2009; debarred, 9/30/2009 Al-Arab, Babwat Dourat Contractor, JCC-I/A, Baghdad, Iraq Proposed for debarment, 7/16/2009; debarred, 9/30/2009 Debarred until 7/15/2014 as an affiliate and imputee of Ali N. Jabak and Tharwat Taresh. Al-Arab, Dourat Contractor, JCC-I/A, Baghdad, Iraq Proposed for debarment, 7/16/2009; debarred, 9/30/2009 Debarred until 7/15/2014 as an affiliate and imputee of Ali N. Jabak and Tharwat Taresh. Yehia, Hussein Ali Corporate Officer, Dourat Al-Arab, Beruit Lebanon Proposed for debarment, 7/16/2009; debarred, 9/30/2009 Debarred until 7/15/2014 as an affiliate and imputee of Ali N. Jabak. Issa, Amina Ali Corporate Officer, Dourat Al-Arab, Beruit Lebanon Proposed for debarment, 7/16/2009; debarred, 9/30/2009 Debarred until 7/15/2014 as an affiliate and imputee of Ali N. Jabak. Yehia, Adel Ali Corporate Officer, Dourat Al-Arab, Beruit Lebanon Proposed for debarment, 7/16/2009; debarred, 9/30/2009 Debarred until 7/15/2014 as an affiliate and imputee of Ali N. Jabak. Newcon International, Ltd. NVG Supplier, TACOM Contract for Iraqi Army Battalion Equipment Sets Beker, Mendel President, Newcon International Prilik, Arie Vice President, Newcon International False statements and conflicts of interest False statements Made multiple false and misleading statements to Government investigators regarding his relationship with Ali N. Jabak, the ownership of Courat Al-Arab. Debarred until 7/15/2014. Suspended, 6/9/2008 Allegations of Wire Fraud, Conspiracy and Money Laundering Allegedly attempted to obtain a TACOM subcontract for Night Vision Goggles for the Iraqi Armed Forces by making payments to another NVG supplier to halt deliveries, resulting in Newcon becoming the default supplier. Company does business as “Newcon Optik.” Suspended, 6/9/2008 Allegations of Wire Fraud, Conspiracy and Money Laundering Allegedly attempted to obtain a TACOM subcontract for Night Vision Goggles for the Iraqi Armed Forces by making payments to another NVG supplier to halt deliveries, resulting in Newcon becoming the default supplier. Also known as “Mikhail Lvovich” and “Michael Beker.” Suspended, 6/9/2009 Allegations of Wire Fraud, Conspiracy and Money Laundering Allegedly attempted to obtain a TACOM subcontract for Night Vision Goggles for the Iraqi Armed Forced by making payments to another NVG supplier to halt deliveries, resulting in Newcon becoming the default supplier. Continued on next page F-8 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX F Name Position Suspension and Debarment Action Taken Reason for Action Affiliate of Newcon International See entry for Newcon International. See entry for Newcon International. Case Status Name Withheld Employee, Newcon International Suspended, 6/9/2008; suspension terminated, 8/21/2008 Stins Coman International Minority owner, Newcon International, LTD Suspended, 6/9/2008 Affiliate of Newcon International Suspended, 6/14/2008 Allegedly provided between $40,000 and $370,000 in payments and a Harley Davidson motorcycle to an Allegations of Conspiracy Army Contracting Officer in exchange for the award to Commit Bribery of bottled water contracts in Iraq and Kuwait. Indicted 1/23/2008 in the Western District of Oklahoma. Chidiac, Elie Samir Iraq Country Manager, Raman International, Inc. Suspended, 6/14/2008 Allegedly provided between $40,000 and $370,000 in payments and a Harley Davidson motorcycle to an Allegations of Conspiracy Army Contracting Officer in exchange for the award to Commit Bribery of bottled water contracts in Iraq and Kuwait. Indicted 1/23/2008 in the Western District of Oklahoma. Atallah, Mike CEO, Raman International, Inc. Suspended, 6/14/2008 Allegations of Conspiracy Affiliate and Imputee of Raman International and Elie to Commit Bribery Chidiac. (Accessory) Atallah, Marta Treasurer, Raman International, Inc. Suspended, 6/14/2008 Allegations of Conspiracy Affiliate and Imputee of Raman International and Elie to Commit Bribery Chidiac. (Accessory) Atilan, Metin Owner, PMA Services Supply and Construction Suspended, 6/23/2008 Allegedly offered to pay a contracting officer for the Allegations of Conspiracy award of contracts to PMA Services Supply and Conto Commit Contract struction for the supply of residential trailers. Arrested Fraud, Wire Fraud 6/8/2008 in Las Vegas and released on bail. Fugitive as of 6/12/2008. Suspended, 6/23/2008 Allegations of Conspiracy to Commit Contract See entry for Metin Atilan. Fraud, Wire Fraud Kayteks General Services Co. Turkish Subsidiary, PMA Services Supply Suspended, 6/23/2008 and Construction Allegations of Conspiracy to Commit Contract See entry for Metin Atilan. Fraud, Wire Fraud Williams, Theodore Q. Vice President, PMA Services Supply and Construction Suspended, 6/23/2008 Allegations of Conspiracy See entry for Metin Atilan. Allegedly assisted in to Commit Contract delivering payments as part of scheme to fraudulently Fraud, Wire Fraud obtain contracts for residential trailer supply. Kacar, Ozgen Affiliate, Metin Atilan Suspended, 6/23/2008 Allegations of Conspiracy See entry for Metin Atilan. Allegedly assisted in to Commit Contract delivering payments as part of scheme to fraudulently Fraud, Wire Fraud obtain contracts for residential trailer supply. Kacar, Mezin Affiliate, Metin Atilan Suspended, 6/23/2008 Allegations of Conspiracy See entry for Metin Atilan. Allegedly assisted in to Commit Contract delivering payments as part of scheme to fraudulently Fraud, Wire Fraud obtain contracts for residential trailer supply. Atilan, Ayfer Manager and Part-owner, PMA Services Supply and Construction Suspended, 6/23/2008 Allegations of Conspiracy to Commit Contract See entry for Metin Atilan. Fraud, Wire Fraud Momon, James, Jr., Major, USA Former Contracting Officer, Camp Arifjan, Kuwait Suspended, 8/21/2008 Allegedly received payments for the award of conAllegations of Conspiracy tracts from Kuwaiti contractors. Currently awaiting and Bribery trial. Suspended, 8/21/2008 See entry for MAJ James Momon, Jr. Proposed for debarment, 7/23/2008 Proposed for debarment on 7/23/2008 based on alAllegations of bribery in legations of payments made to MAJ John Cockerham obtaining a Government in exchange for bottled water BPA calls. Response to contract. proposed debarment pending. Contractor, Victory Raman International, Base Complex RCC, Inc. Iraq Construction PMA Services Supply Equipment Supplier, and Construction LLC MNF-I Contractor, ACA, Omega Construction Camp Arifjan, and Support Services Kuwait Allied Arms Company, Ltd. Contractor, ACA, Camp Arifjan, Kuwait Company established by MAJ James Momon to facilitate the receipt of kickbacks associated with the award of contracts to Kuwaiti contractors. Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I F-9 SUSPENSIONS AND DEBARMENTS Suspension and Debarment Action Taken Reason for Action Jireh Springs General Contractor, ACA, Trading and Camp Arifjan, Contracting Kuwait Establishment Proposed for debarment, 7/23/2008 Proposed for debarment on 7/23/2008 based on alAllegations of bribery in legations of payments made to MAJ John Cockerham obtaining a Government in exchange for bottled water BPA calls. Response to contract. proposed debarment pending. Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 d/b/a “Zenith for General Trading and Contracting” Allegations of bribery in and “Zenith Enterprises, Ltd.” Debarred for a period obtaining a Government of 10 years based on allegations of payments made to contract. MAJ John Cockerham in exchange for bottled water BPA calls. Case closed. Contractor, ACA, Trans Orient General Camp Arifjan, Trading Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 Allegations of bribery in Debarred for a period of 10 years based on allegaobtaining a Government tions of payments made to MAJ John Cockerham in contract. exchange for bottled water BPA calls. Case closed. Fawzi, Shahir Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008 a.k.a. “Shaher Nabih Fawzi Audah.” Proposed for Allegations of bribery in debarment on 7/23/2008 based on allegations of payobtaining a Government ments made to MAJ John Cockerham in exchange for contract. bottled water BPA calls. Response to proposed debarment pending. Al-Ajmi, Falah Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 Allegations of bribery in Debarred for a period of 10 years based on allegaobtaining a Government tions of payments made to MAJ John Cockerham in contract. exchange for bottled water BPA calls. Case closed. Gopal, K. V. Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 Allegations of bribery in Debarred for a period of 10 years based on allegaobtaining a Government tions of payments made to MAJ John Cockerham in contract. exchange for bottled water BPA calls. Case closed. Nair, Vasantha Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 Allegations of bribery in Debarred based on allegations of payments made to obtaining a Government MAJ John Cockerham in exchange for bottled water contract. BPA calls. Case closed. Defense Consulting and Contracting Group, L.L.C. Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008 Proposed for debarment on 7/23/2008 based on alAllegations of bribery in legations of payments made to MAJ John Cockerham obtaining a Government in exchange for bottled water BPA calls. Response to contract. proposed debarment. Submitted and under review. Allied Arms Company, W.L.L. Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008 Proposed for debarment on 7/23/2008 based on alAllegations of bribery in legations of payments made to MAJ John Cockerham obtaining a Government in exchange for bottled water BPA calls. Response to contract. proposed debarment. Submitted and under review. Jireh Ventures USA Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008 Company established by MAJ Cockerham to facilitate Allegations of bribery in the receipt of kickbacks associated with the award of obtaining a Government contracts to Kuwaiti contractors. Response to proposed contract. debarment. Submitted and under review. D and J Trading Company Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008; debarred, 5/14/2009 Company established by MAJ Cockerham to facilitate Allegations of bribery in the receipt of kickbacks associated with the award of obtaining a Government contracts to Kuwaiti contractors. Debarred for a period contract. of 10 years ending 7/23/2018. Case closed. First AIM Trading and Contracting Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 Debarred for a period of 10 years based on allegaAllegations of bribery in tions of payments made to MAJ John Cockerham in obtaining a Government exchange for bottled water BPA calls. Debarred for a contract. period of 10 years ending 7/22/2018. Case closed. Future AIM United Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 Debarred for a period of 10 years based on allegaAllegations of bribery in tions of payments made to MAJ John Cockerham in obtaining a Government exchange for bottled water BPA calls. Debarred for a contract. period of 10 years ending 7/22/2018. Case closed. Dewa Projects, (Private) Ltd. Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 Debarred for a period of 10 years based on allegaAllegations of bribery in tions of payments made to MAJ John Cockerham in obtaining a Government exchange for bottled water BPA calls. Debarred for a contract. period of 10 years ending 7/22/2018. Case closed. Name Zenith Enterprises, Ltd. Position Case Status Continued on next page F-10 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX F Suspension and Debarment Action Taken Reason for Action Al Ghannom and Contractor, ACA, Nair General Trading Camp Arifjan, Company Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 Debarred for a period of 10 years based on allegaAllegations of bribery in tions of payments made to MAJ John Cockerham in obtaining a Government exchange for bottled water BPA calls. Debarred for a contract. period of 10 years ending 7/22/2018. Case closed. Dewa Trading Establishment Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 Debarred for a period of 10 years based on allegaAllegations of bribery in tions of payments made to MAJ John Cockerham in obtaining a Government exchange for bottled water BPA calls. Debarred for a contract. period of 10 years ending 7/22/2018. Case closed. Dewa Europe Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 Debarred for a period of 10 years based on allegaAllegations of bribery in tions of payments made to MAJ John Cockerham in obtaining a Government exchange for bottled water BPA calls. Debarred for a contract. period of 10 years ending 7/22/2018. Case closed. Triad United Technologies, L.L.C. Contractor, ACA, Camp Arifjan, Kuwait Proposed for debarment, 7/23/2008; debarred, 9/17/2008 Debarred for a period of 10 years based on allegaAllegations of bribery in tions of payments made to MAJ John Cockerham in obtaining a Government exchange for bottled water BPA calls. Debarred for a contract. period of 10 years ending 7/22/2018. Case closed. Lanmon, Cedar J. CPT, USA Former COR, LSA Anaconda, assigned to I Corps and Ft. Lewis, WA Suspended, 6/17/2008; proposed for debarment, Allegations of Bribery 4/9/2009; debarred, 6/3/2009 Dubois, Lee W. Former Contractor, Camp Victory, Baghdad, Iraq Suspended, 9/23/2008 Allegations of False Statement and Theft Alleged to have participated in a scheme to steal jet fuel and diesel fuel from the Camp Victory Bulk Fuel Storage Facility using fraudulent identification cards and authorization letters. Jeffrey, Robert Former Contractor, Camp Victory, Baghdad, Iraq Suspended, 9/23/2008 Allegations of False Statement and Theft Alleged to have participated in a scheme to steal jet fuel and diesel fuel from the Camp Victory Bulk Fuel Storage Facility using fraudulent identification cards and authorization letters. Shrewtha, Bal Ram Former Contractor, Camp Victory, Baghdad, Iraq Suspended, 9/23/2008 Allegations of False Statement and Theft Alleged to have participated in a scheme to steal jet fuel and diesel fuel from the Camp Victory Bulk Fuel Storage Facility using fraudulent identification cards and authorization letters. Maalouf, Elias Former Contractor, Camp Victory, Baghdad, Iraq Suspended, 9/23/2008 Allegations of False Statement and Theft Alleged to have participated in a scheme to steal jet fuel and diesel fuel from the Camp Victory Bulk Fuel Storage Facility using fraudulent identification cards and authorization letters. Young, Robert Former Contractor, Camp Victory, Baghdad, Iraq Suspended, 9/23/2008; proposed for debarment, 1/21/2010; debarred, 3/9/2010 Allegations of False Statement and Theft Alleged to have participated in a scheme to steal jet fuel and diesel fuel from the Camp Victory Bulk Fuel Storage Facility using fraudulent identification cards and authorization letters. Sentenced on 11/11/2009. Debarred for a period of 12 years, ending on 9/22/2021. Case closed. Davis, Kevin Arthis, COL, USA (Ret.) Former Chief, Proposed for debarment, Technical Evaluation 11/25/2008; debarred, Team, CPA Office of 8/20/2009 Security Cooperation Allegations of Bribery and Bid-rigging Provided improper assistance to Lee Dynamics International and other contractors in the award of warehouse contracts by the CPA. Debarred until 11/24/2017. Case closed. Failure to obey a lawful general order and false official statement On multiple occasions between January and October 2008, Krage attempted to use his official position to obtain Government contracts for Alrafidane by making false representations to contracting officers, inserting requirements for Alrafidane products into contract specifications and providing information to Alrafidane to assist in the preparation statements of work for MNF-I projects. Debarred until 3/18/2012. Debarment terminated 12/14/2009. Case closed. Name Position Proposed for debarment, 3/19/2009; debarred, Krage, Gerald Task Force Dragon, 9/4/2009; debarment Thomas, SGM, USAR MNC-I, Camp Victory terminated by the Army, 12/14/2009 Case Status Allegedly facilitated the award of contracts to a contractor in exchange for 10% of contract awards valued at $250,000 during 2 deployments. Also allegedly provided short-term loans to other contractors he was responsible for overseeing. Debarred for a period of 6 years ending 6/16/2014. Case closed. Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I F-11 SUSPENSIONS AND DEBARMENTS Name Position Suspension and Debarment Action Taken Reason for Action Case Status Castro, Andrew John, SSG, USAR President, Alrafidane, LLC Proposed for debarment, 3/19/2009; debarred, 9/4/2009; debarment terminated by the Army, 12/14/2009 Alrafidane, LLC Water purification system manufacturer, Lagrangeville, NY Proposed for debarment, 3/19/2009; debarred, 9/4/2009; debarment terminated by the Army, 12/14/2009 Alama, Nazar Abd Director, San Juan Co. Allegedly solicited a JCC-I/A contracting officer to Proposed for debarment, Allegations of attempted award contracts to San Juan Co., in exchange for a 4/9/2009; debarred, 7/1/2009 bribery $250,000 cash payment. Debarred for a period of 5 years ending on 4/8/2014. Case closed. San Juan Co. Construction materials supplier Proposed for debarment, and general support 4/9/2009; debarred, 7/1/2009 contractor, Baghdad, Iraq Affiliate of Nazar Abd Alama. Debarred for a period of 5 years ending on 4/8/2014. Case closed. Construction Mississippi Company materials supplier Proposed for debarment, for the General and general support 4/9/2009; debarred, 7/1/2009 Contract contractor, Baghdad, Iraq Affiliate of Nazar Abd Alama. Debarred for a period of 5 years ending on 4/8/2014. Case closed. Affiliate and imputee of Gerald Krage. Debarred until 3/18/2012. Debarment terminated 12/14/2009. Case closed. Affiliate and imputee of Gerald Krage. Debarred until 3/18/2012. Debarment terminated 12/14/2009. Case closed. Murray, Christopher H., MAJ, USA (Ret.) Contracting Officer, Camp Arifjan, Kuwait Suspended, 1/19/2009 Allegations of Bribery and Bid-rigging Allegedly received cash payments totaling $225,000 from three contractors providing goods and services to Camp Arifjan. Nguyen, Michael Dung, CPT, USA Civil Affairs Officer, 4th Stryker Brigade Combat Team, 2nd Battalion, 23rd Infantry Suspended, 3/13/2009; proposed for debarment, 6/10/2010 Allegations of Theft Allegedly diverted approximately $690,000 in CERP funds to his personal use during the deployment to Iraq. Awaiting final criminal judgment. Received cash payments and personnel property valued at approximately $370,000 from a contractor on behalf of a deployed family member as part of a scheme to fraudulently award multiple Government contracts. Sentenced on 2/19/2009 to 1 year probation, 180 days home confinement, 104 hours of community service, a $10,000 fine, and $100 special assessment. Family member, JCC-I/A Contracting Officer Proposed for debarment, 4/17/2009; debarred, 8/7/2009 Receipt of Stolen Property Logistics Officer, 413th Military George, Elbert W. III, Transition Team, CPT, USA Forward Operating Base Paliwoda, Iraq Suspended 6/17/2009; proposed for debarment, 9/4/2009; debarred, 1/21/2010 Allegedly sold 1 bus, 8 trucks, 19 generators, 5 trailers, and other miscellaneous items from Joint Base Allegations of Conspiracy Balad DRMO lot to local Iraqis in exchange for cash to Steal Government payments. Entered guilty plea on 3/13/2009 and was Property sentenced to two years probation and joint restitution of $52,288 on 6/22/2009. Debarred for a period of 5 years ending on 6/16/2014. Case closed. Logistics NCOIC, 413th Military Greene, Roy, Jr., SFC, Transition Team, USA Forward Operating Base Paliwoda, Iraq Suspended, 6/17/2009; proposed for debarment, 9/4/2009; debarred, 1/21/2010 Allegedly sold 1 bus, 8 trucks, 19 generators, 5 trailers, and other miscellaneous items from Joint Base Allegations of Conspiracy Balad DRMO lot to local Iraqis in exchange for cash payments. Entered guilty plea on 3/13/2009 and was to Steal Government sentenced to three years probation and joint restituProperty tion of $52,288 on 6/22/2009. Debarred for a period of 5 years ending on 6/16/2014. Case closed. Fankhauser, Jacqueline S. Webb, Ofelia, CSM, USA Allegedly engaged in a scheme to extort kickbacks HHC 94th BSB, Camp Proposed for debarment, Allegations of Extortion, from contractors on FOB Rustamiyah, Iraq. Debarred Rustamiyah, Iraq 8/7/2009; debarred 1/21/2010 Receipt of Kickbacks for a period of 5 years ending on 8/14/2014. Case closed. Continued on next page F-12 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX F Name Position Suspension and Debarment Action Taken Proposed for debarment, Faust, Patrick Arness, B CO 94th BSB, Camp 8/7/2009; debarred, 1SG, USA Rustamiyah, Iraq 1/21/2010 Reason for Action Case Status Allegedly engaged in a scheme to extort kickbacks Allegations of Extortion, from contractors on FOB Rustamiyah, Iraq. Debarred Receipt of Kickbacks for a period of 5 years ending on 8/14/2014. Case closed. Suspended, 8/7/2009; proposed for debarment, 1/14/2020; debarred, 3/17/2010 Allegations of Conspiracy, Money Laundering, and Wire Fraud Allegedly assisted MAJ John L. Cockerham, Jr., in concealing assets following his indictment and arrest on allegations of bribery and fraudulent awards of contracts in Kuwait. Sentenced on 12/2/2009. Debarred for a period of 6 years ending on 8/6/2015. Case closed. Suspended, 7/29/2009 Allegations of Bribery Allegedly solicited a $40,000 payment from a contractor in exchange for the award of a $2,500,000 contract for the construction of parks in Kirkuk, Iraq. Dalvi, Javid Yousef Employee, Area Support Group - Kuwait, U.S. Embassy, Kuwait City, Kuwait Proposed for debarment, 8/7/2009; debarred, 9/25/2009 Acceptance of Illegal Gratuities Accepted payments of between $15,000 and $20,000 from Kuwait freight forwarders in exchange for expedited processing of customs forms related to tax-free shipments of U.S. military goods into Kuwait. Case closed. Williams, Bryant T., CPT, USA 101st ABN Div (AASLT), Baghdad, Iraq Suspended, 9/4/2009 Allegations of Bribery and Extortion Allegedly awarded approximately $500,000 in contracts to two Iraqi contractors in exchange for cash payments and other items of value while deployed to Iraq between September 2005 and September 2006. Driver, William Spouse, LTC Debra Harrison, USAR Suspended, 9/10/2009 Allegations of Money Laundering Allegedly assisted his spouse, LTC Debra Harrison, USAR, in concealing approximately $330,000 in stolen CPA funds. Sublett, Charles Eugene Former Army Contracting Officer, LSA Anaconda, Balad, Iraq Suspended, 1/21/2010 Allegations of Bulk Cash Smuggling and False Statements Allegedly sent $107,900 in sequentially numbered $100 bills and 17,120,000 in Iraqi Dinars (valued at $11,607) from LSA Anaconda to Texas without a Customs declaration. Triple A United General Trading & Contracting Equipment Lessor, Camp Arifjan, Kuwait Proposed for debarment, 1/21/2010 Allegations of Product Substitution and False Claims Allegedly provided a non-conforming 7-ton shuttle lift crane for use at Camp Arifjan, Kuwait. Gamal, Ashraf Mohammad General Manager, Triple A United General Trading & Contracting Proposed for debarment, 1/21/2010 Allegations of Product Substitution and False Claims Allegedly provided a non-conforming 7-ton shuttle lift crane for use at Camp Arifjan, Kuwait. Russell, Theresa Contracting Specialist, Baghdad Regional Contracting Suspended, 2/4/2010 Center, Camp Victory, Iraq Allegations of Bulk Cash Smuggling, False Statements, Money Laundering, Conspiracy, and Bribery Allegedly received the proceeds from a bribery scheme from a second contracting officer for the purpose of smuggling it into the United States through the Postal Service and the purchase of various items. Pettaway, Nyree Family member, U.S. Army Contracting Officer Resident Engineer, Domingo, Joselito B. ACOE-GRD, Kirkuk, Iraq JULY 30, 2010 I REPORT TO CONGRESS I F-13 SUSPENSIONS AND DEBARMENTS Table F.2 Suspensions and Debarments (Air Force and Navy) Name Position Action Taken Custer Battles Custer Battles, LLC Debarred, 3/17/2006 Dayekh, Ahmed Hassan Al Riyadh Laboratories and Electricity Company Debarred, 9/26/2006–9/28/2009 AIR FORCE Al Riyadh Laboratories and Electricity Company Debarred, 1/26/2007 Grove, Robert, COL, USA (Ret) Contractor Mahmoud, Samir Western Solutions Remington, Sherrie Lynn, CPT Debarred, 10/30/2007 Debarred, 11/29/2007 Proposed for debarment, 1/25/2008 Ramirez, David Ricardo Contractor Suspended, 3/27/2009 Grove, Robert Jr., Al-Sishra Group Contractor Proposed for debarment, 4/14/2009; proposed debarment terminated, 4/30/2009 Thompson, Jeff Field Supervisor, Environmental Chemical Corp. Suspended, 8/31/2009; proposed for debarment, 2/25/2010; debarred, 3/29/2010 Walton, Terrance O. MSGT, USMC Suspended, 7/15/2009 Webb, Rodney SGT, USMC Proposed for debarment, 6/29/2010 Fuller, Mark R. MAJ, USMC Suspended, 6/29/2010 NAVY Medina, Gloria Proposed for debarment, 4/11/2008 F-14 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX G DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT This appendix provides summaries of the audits listed in Section 4. All information provided is current, as of June 30, 2010. Defense Contract Audit Agency The services of the Defense Contract Audit Agency (DCAA) include professional advice to acquisition officials on accounting and financial matters to assist them in the negotiation, award, administration, and settlement of contracts. In addition to DCAA’s involvement in the negotiation and award of contracts, significant resources are also dedicated to overseeing the allowability, allocability, and reasonableness of incurred and billed costs. Procedures that govern the costs incurred in-country are also tested through reviews of contractor timekeeping, subcontract management, and cash management/disbursement. Finally, to ensure that adequate internal controls are in place regarding the contractor’s policies and procedures, DCAA performs audits associated with critical internal control systems, with an emphasis on estimating, subcontract management, and billing systems. DCAA plans and performs work on a fiscal year basis. Table G.1 shows both the Iraq-related audits closed during FY 2009 and the audits closed and still open in FY 2010 (as of June 30, 2010). Table G.1 DCAA Audits Related to Iraq for FY 2009 and FY 2010 FY 2009 Description of Audit Area Price Proposals (1) Closed FY 2010 Closed Open 119 72 15 33 32 60 Incurred Cost (3) 25 40 217 Labor Timekeeping (4) 67 23 43 Internal Controls (5) 29 26 70 Other Special Requested Audits (2) Pre-award Accounting Survey (6) 5 7 5 Purchase Existence and Consumption (7) 28 5 18 Cost Accounting Standards (8) 22 31 121 30 21 106 358 257 655 Other (9) Total Note: 1. Price Proposals—Audits of price proposals submitted by contractors in connection with the award, modification, or repricing of government contracts or subcontracts 2. Other Special Requested Audits—Audit assistance provided in response to special requests from the contracting community based on identified risks 3. Incurred Cost—Audits of costs charged to government contracts to determine whether they are allowable, allocable, and reasonable 4. Labor Timekeeping—Audits to determine if the contractor consistently complies with established timekeeping system policies and procedures for recording labor costs 5. Internal Controls—Audits of contractor internal control systems relating to the accounting and billing of costs under government contracts 6. Preaward Accounting Survey—Preaward audits to determine whether a contractor’s accounting system is acceptable for segregating and accumulating costs under government contracts 7. Purchase Existence and Consumption—The physical observation of purchased materials and services and related inquiries regarding their documentation and verification of contract charges 8. Cost Accounting Standards—Audits of Contractor Disclosure Statements and compliance with Cost Accounting Standards 9. Other—Significant types of other audit activities including compliance with Truth in Negotiations Act, audits of provisional billing rates, and audits of claims and termination settlement proposals JULY 30, 2010 I REPORT TO CONGRESS I G-1 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT Table G.2 DCIS Investigations Investigative Status Procurement Fraud Public Corruption Open 10 Closed 4 Totals 14 Defense Criminal Investigative Service DCIS continues to conduct criminal investigations in support of DoD GWOT efforts through investigative resources in Southwest Asia; Wiesbaden, Germany; and continental U.S. task force investigations focusing on public corruption and fraud in the Southwest Asia theater. In conjunction with DoD OIG’s renewed emphasis on oversight of spending related to Iraqi development, DCIS has continued to deploy special agents to Iraq, Kuwait, and Afghanistan to conduct criminal investigations in support of DoD operations. Six-month rotational details to Iraq and Kuwait commenced in September 2006. Six-month rotations to Afghanistan commenced in 2008. As of June 2010, DCIS has deployed 5 special agents and one administrative staff member to Iraq, 1 special agent to Kuwait, and 7 special agents to Afghanistan. Open Cases DCIS currently has 42 open investigations being worked jointly with SIGIR, including four projects. No cases were closed during this period. Table G.2 shows the DCIS open and closed investigations, as of June 30, 2010. Department of Defense Office of Inspector General DoD continues to face many challenges in executing its Overseas Contingency Operations (OCO). The Department of Defense Office of Inspector General (DoD OIG) has identified priorities G-2 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION Theft/Tech Protect/Other Total 25 7 42 3 1 7 28 8 50 based on those challenges and high-risks and has responded by expanding coverage of OCO operations and its presence in Southwest Asia. As the Department continues its OCO, such as Operations Iraqi Freedom and Enduring Freedom, DoD OIG plans to stay focused on issues important to accomplish the mission and ensure that the Department makes efficient use of its resources to support the warfighter. The DoD OIG-led Southwest Asia Joint Planning Group coordinates and deconflicts federal and DoD OCO-related oversight activities. The Group held its thirteenth meeting in May 2010. During the May 2010 Southwest Asia Joint Planning Group, the Army Materiel Command briefed its Southwest Asia efforts, including supporting the shifting of forces in Southwest Asia. Through the Group, the members continue to coordinate, collaborate, and deconflict their respective and joint oversight efforts including working with the Commission on Wartime Contracting and its respective mission. Completed Audits/Reviews Central Issue Facility at Fort Benning and Related Army Policies (D-2010-069, ISSUED JUNE 21, 2010) The Army generally provided DoD civilians and contractor employees deploying to Iraq and Afghanistan with proper clothing and equipment. The value of recoverable clothing and equipment that was not returned by civilians was unavailable. However, DoD OIG determined that, of 940 contractor employees who deployed during FYs 2006 APPENDIX G and 2007 and returned, 749 (about 80 percent) did not return recoverable clothing and equipment, valued at about $2.5 million, issued to them. Items were not recovered because the Army lacked adequate internal controls for recovering clothing and equipment issued to civilians and contractors. If adequate controls had been in place, the Army could have put at least $2.5 million to better use. Additionally, inadequate controls could allow sensitive items such as body armor to end up in the wrong hands. Government Oversight of Field Service Representative and Instructor Services in Support of the Mine Resistant Ambush Protected Vehicle Program (D-2010-068, ISSUED JUNE 17, 2010) Marine Corps Systems Command contracting officials did not provide adequate Government oversight of Field Service Representative and New Equipment Training Instructors as required by Government regulations. This occurred because contracting officials used the Mine Resistant Ambush Protected (MRAP) vehicle production contracts, which did not contain the necessary controls for providing Government oversight when acquiring these services. As a result, Joint Program Office MRAP officials ordered $815.4 million in Field Service Representative and New Equipment Training Instructor services without a written quality assurance process to ensure that the services provided were performed in accordance with contract requirements. Instead, the Joint Program Office MRAP officials relied on the contractors to monitor themselves. Drawdown and Reset of Equipment in Iraq— Operation Clean Sweep (D-2010-060, ISSUED JUNE 11, 2010) According to documents provided by the 13th Sustainment Command (Expeditionary) (ESC), the Mobile Redistribution Teams (MRT) processed and re-established accountability for about $768 million of excess equipment from October 2009 to April 10, 2010. DoD OIG commends the 13th ESC and the MRTs for those results. However, not all units supported the MRT mission, limiting the effectiveness of Operation Clean Sweep. During DoD OIG site visits to four Forward Operating Bases, DoD OIG identified units that denied the MRTs access to their excess equipment, did not comply with FRAGO requirements to sort their excess equipment before the MRT’s arrival, and did not provide adequate logistical support to the MRTs. This occurred because FRAGO 1022 did not require mandatory participation in Operation Clean Sweep and the MRT’s mission and goals were not communicated to all units and commanders. During DoD OIG’s audit, U.S. Forces-Iraq and 13th ESC issued two FRAGOs which addressed DoD OIG’s communication concerns; however, neither required mandatory participation in Operation Clean Sweep. Mandatory participation is key to Operation Clean Sweep effectiveness. When units pack and ship excess equipment without MRT assistance, the risk of injury to personnel at the receiving activity is increased and the accountability and visibility of the equipment is delayed. DoD OIG identified containers at Camp Arifjan, Kuwait, that were not packed and shipped by the MRTs, which were poorly packed and contained items such as weapons and hazardous material. In addition, those items were not brought to record until reaching Camp Arifjan, delaying the accountability and visibility of equipment that might be needed elsewhere, including Afghanistan. Public-Private Partnerships at Air Force Maintenance Depots (D-2010-067, ISSUED JUNE 10, 2010) The Air Force did not adequately document its public-private partnership decisions for enhancing overall product support and the type of partnership arrangement selected; and did not adequately monitor the partnerships once they were established. Specifically, 35 of the 40 partnerships and 49 of 61 implementation agreements reviewed were not supported by business case analyses. In addition, 51 JULY 30, 2010 I REPORT TO CONGRESS I G-3 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT of 61 implementation agreements reviewed had not established baselines and 40 of 61 had not established metrics. Also Air Force Materiel Command did not adequately monitor revenues and expenses on partnership work performed, and the private industry partner owes $3.1 million to Warner Robins Air Logistics Center. As a result, there is not sufficient assurance that the Air Force’s use of partnerships is obtaining best value for its maintenance support decisions and recovering all its expenses. This situation stemmed from prior conflicting Air Force guidance, insufficient Air Force Materiel Command oversight, and partnership decisions made above the Air Logistics Center level for bringing depot maintenance workload back to the depots to satisfy public laws on core capability and 50/50 compliance. Oversight of the U.S. Air Forces Central War Reserve Materiel Contract (D-2010-066, ISSUED MAY 28, 2010) Acquisition Management and Integration Center (AMIC) officials properly awarded the $419 million WRM contract and improved management of the new WRM contract. However, AMIC and AFCENT needed a formal structure to address the following problems. Specifically, AMIC and AFCENT did not have a formal agreement that clearly defined the roles, responsibilities, and accountability of AMIC and AFCENT personnel regarding the WRM program because AMIC and AFCENT personnel could not agree on language describing program management and functional area roles, responsibilities, and accountability. In addition, AMIC and AFCENT did not develop written standard operating procedures for the WRM program’s internal control processes. AFCENT officials lacked defined processes while ineffectively managing the former WRM contract and had no formal processes for the new contract. This occurred because AMIC officials did not foresee the need to formalize the processes to ensure continuity. These problems could later result in delayed WRM requirements ex- G-4 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION ecution, ineffective quality assurance surveillance, and failure in other internal control processes. During the base year of the WRM contract, the total estimated contract value increased by approximately $24 million (6 percent) because of fluctuations in WRM requirements. Troop withdrawals in Iraq and troop surges in Afghanistan could cause the estimated contract value to exceed the scope of the original competition, requiring AMIC to recompete the contract. Controls Over Funds Appropriated for Assistance to Afghanistan and Iraq Processed Through the Foreign Military Sales Network (D-2010-062, ISSUED MAY 24, 2010) DSCA ensured that funds appropriated for assistance to Afghanistan and Iraq placed under its oversight were used for their intended purpose and were properly reported in the DoD Cost of War Report. However, improvements are necessary to ensure effective management of these appropriated funds. Specifically, $6 million was not returned to DoD or the Military Departments before the funds’ cancellation date and were not properly accounted for. In addition, $31.6 million were not returned to Multi-National Security Transition CommandIraq (MNSTC-I) before the funds expired. Also, DSCA needs to fully review and determine the proper disposition of at least an additional $25.7 million of expired unobligated funds held in the FMS Trust Fund. These management exceptions occurred because DSCA did not have existing procedures on managing canceled funds and did not comply with existing procedures on monitoring and notifying funds holders of excess amounts on a timely basis. As a result, some appropriated funds were not available for other use. APPENDIX G Army Vessels Maintenance Contracts in Southwest Asia (D-2010-064, ISSUED MAY 21, 2010) The Mission and Installation Contracting Command-Fort Eustis (MICC-EU) adhered to the surveillance and acceptance requirements for contracts reviewed. However, MICC-EU contracts did not have adequate contract competition, price reasonableness determinations, and funding. Specifically, MICC-EU contracting officers: did not adhere to competition requirements for all 15 contracts because they relied on an incorrect legal opinion from Naval Regional Contracting Command Naples, Detachment Bahrain (NRCC); as a result, they may not have obtained the best price for approximately $51.8 million in contracting actions; did not ensure price reasonableness determinations were performed because they did not follow the Federal Acquisition Regulation; as a result, they may not have obtained the lowest price for more than $29.9 million in sole-source contracting actions; and incorrectly funded one contract because the contracting officer used $2.9 million in FY 2006 funds instead of FY 2007 funds; as a result, they violated the bona fide needs rule and may have violated the Antideficiency Act. Counter Radio-Controlled Improvised Explosive Device Electronic Warfare (CREW) Program (D-2010-061, ISSUED MAY 21, 2010) This report is classified. Contingency Contracting: A Framework for Reform (D-2010-059, ISSUED MAY 14, 2010) DoD OIG reviewed 34 reports DoD OIG issued from October 1, 2007, through April 1, 2010, that involve high-risk areas of contract management and found 10 systemic issues related to contracting deficiencies with the top five issue areas being: Requirements, Contract Pricing, Oversight and Surveillance, Property Accountability, and Financial Management. Additionally, DoD OIG reviewed 19 fraud investigations and determined that the criminal offenses occurred during the award and contract administration phases. The “Key Aspects of the Contracting Process” flowchart on page iii and the “Fraud Indicators and Poor Practices in Relation to the Contracting Process” flowchart on page iv are useful resources to DoD field commanders and contract managers. These flowcharts provide: a useful snapshot of key contract issues and fraud indicators related to contingency operations, and a visual tool for Commanders and contracting officers to assess the strengths and weaknesses in their contracting approaches and real-time awareness of areas that might be susceptible to fraud and contributors to waste and abuse. Review of the Joint Task Force Guantanamo Inclusion of Detainee Mental Health Information in Intelligence Information Reports (10-INTEL-04, ISSUED MAY 4, 2010) This project was developed as a result of information obtained during the Investigation of Allegations of the Use of Mind Altering Drugs to Facilitate Interrogations (09-INTEL-13, issued September 23, 2009). Present regulatory guidance authorizes health-care providers to share detainee medical information with interrogators, but does not provide specific guidance on how to do so. As a result execution of these policies at Guantanamo has been inconsistent, resulting in confusion for both health-care providers and interrogation elements. The Vice Director, Joint Staff concurred with DoD OIG’s recommendation and proposed that corrective measures should be expanded by updating JCS policy and doctrine to effect training modifications for the more efficient conduct of incorporating essential medical information into interrogation operations. JULY 30, 2010 I REPORT TO CONGRESS I G-5 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT Medical/Surgical Prime Vendor Contract Supporting Coalition Forces in Iraq and Afghanistan will progressively improve and enhance intratheater transportation capabilities. (D-2010-055, ISSUED APRIL 29, 2010) Terms and conditions for the Medical/Surgical Prime Vendor contract were adequately developed to meet users’ needs. DoD OIG reviewed selected aspects of the contract based on concerns raised by the primary customers and stakeholders. DoD OIG found the terms and conditions did not need improvement. In addition, Defense Supply Center Philadelphia solicits input from primary customers and stakeholders within the DoD logistics support community to ensure key requirements are incorporated into the contract. Controls over monitoring the performance of the prime vendor contractor for the Global North Region were generally adequate. However, procedures to monitor credits to ensure DoD obtains the benefit of credits need improvement. The prime vendor did not apply FY 2008 overcharge credits resulting from price verification analyses performed by Defense Supply Center Philadelphia. As a result, the primary ordering facility for medical/ surgical supplies used in Iraq and Afghanistan did not obtain the benefit of an estimated $65,000 of overcharge credits for FY 2008. In addition, other ordering organizations in the Global North Region and the other regions may not be obtaining due overcharge credits. Efforts to Prevent Sexual Assault/ Harassment Involving DoD Contractors During Contingency Operations Assessment of Intra-Theater Transportation Planning, Capabilities and Execution for the Drawdown from Iraq (SPO-2010-002, ISSUED APRIL 20, 2010) DoD OIG determined that U.S. Central Command and its subordinate and supporting organizations’ intra-theater logistical planning and selected capabilities appeared to be sufficient to effectively manage and support the movement of materiel being withdrawn from Iraq. Additionally, DoD OIG observed that the logisticians in these organizations were continuing to gain efficiencies in their planning processes, which DoD OIG anticipates G-6 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION (D-2010-052, ISSUED APRIL 16, 2010) Of the 10 DoD contractors reviewed, 8 did not have policies or training requirements for sexual assault prevention and response. This condition occurred because contractual requirements were not established to ensure that contractors were aware of DoD’s definition of sexual assault or that contractors should report sexual assault complaints to Military law enforcement during contingency operations. In addition, sexual assault prevention and response policy was not applied to contractors and contractors were not required to complete such training as part of theater-specific individual requirements training. The Army Deputy Chief of Staff, G-3/5/7, and Air Force contracting officers did not provide adequate oversight of contractor deployment training for sexual assault prevention and response. This condition occurred because the Kellogg, Brown, and Root Services, Inc. Continental United States Replacement Center (CRC) and Fluor Corporation CRC operations were inappropriately approved, despite the contractors’ sexual assault awareness and reporting training not meeting the minimum training requirements. Further, contractor employees were processed through predeployment sites without ensuring that sexual assault prevention and response training was completed. Defense Contract Management Agency Acquisition Workforce for Southwest Asia (D-2010-051, ISSUED APRIL 8, 2010) DCMA could not determine its resource requirements for contractor oversight and contract administration in SWA because DCMA is reactive rather than proactive in assuming its role to provide contractor oversight and contract administration; DCMA did not define its acquisition APPENDIX G workforce requirements to support contracting operations in SWA; AT&L does not require Defense agencies to document acquisition workforce requirements; and, DCMA must be delegated contractor oversight and contract administration responsibility for work in SWA. DCMA Southwest Asia personnel did not have the proper training and certification for contingency contracting positions in SWA. Specifically, of the 221 DCMA personnel training records reviewed from a universe of 1,170 from FY 2004 through FY 2009: 103 DCMA personnel were not fully qualified for the position occupied, and 57 quality assurance representatives did not have or could not produce proof of Defense Acquisition Workforce Improvement Act certification. In addition, of the 75 position descriptions DCMA provided, 30 position descriptions were either incorrect or did not have a requirement for certification. Standard Procurement System Synchronization Utility (D-2010-050, ISSUED APRIL 2, 2010) This report is classified. U.S. Army Corps of Engineers’ Use of Award Fees on Contracts in Iraq and Afghanistan (D-2010-049, ISSUED APRIL 1, 2010) The U.S. Army Corps of Engineers Transatlantic Programs Center (TAC) contracting and award fee officials did not properly manage and oversee the award fee process for the 15 CPAF task orders reviewed, valued at $116.4 million. Specifically, officials did not: develop adequate award fee plans for incentivizing and evaluating contractor performance; adequately conduct oversight and evaluation responsibilities; or adequately document and support award fee ratings. This occurred because USACE did not have policies and procedures for administering award fees consistently and in accordance with Federal Acquisition Regulation (FAR) requirements. In addition, USACE did not adopt Army best practices documented in the Army Contracting Agency (ACA) Award Fee Contracts Handbook. As a result, TAC contracting officers and award fee personnel awarded fees, totaling approximately $20.6 million, without sufficient support, justification, or assurance that contractors were paid award fees commensurate with their level of performance. Material Purchases Made Through Partnership Agreements at Corpus Christi Army Depot (MEMORANDUM, ISSUED MARCH 25, 2010) DoD OIG identified issues that led us to question whether partnership agreements were effective in minimizing the cost of direct materials to Corpus Christi Army Depot. DoD OIG’s review of the Boeing contract led us to ask Aviation and Missile Life Cycle Management Command personnel about the potential, unreasonable unit prices for material and about the process for returning deficient material. DoD OIG also questioned whether procedures for performing, documenting, and monitoring Original Equipment Manufacturer physical inventories were specific enough to ensure adequate inventory management. Finally, DoD OIG determined that Aviation and Missile Life Cycle Management Command needed a standardized, well-defined process for considering and adjusting material requirements on follow-on contracts for GovernmentFurnished Material and the same material available through other DoD sources of supply. The latter is to be the subject of two announced audits: Material Purchases Made Through the Partnership Agreement with Sikorsky Aircraft Corporation at Corpus Christi Army Depot (D2010-D000CH-0077.001, initiated November 18, 2009) and Material Purchases Made Through the Partnership Agreement with the Boeing Company at Corpus Christi Army Depot (D2010-D000CH-0077.000, initiated November 17, 2009). JULY 30, 2010 I REPORT TO CONGRESS I G-7 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT Ongoing Audits Evaluation of the DoD Combating Trafficking in Persons (CTIP) Program (PROJECT NO. D2009-DIP0E3-0260.000, INITIATED AUGUST 5, 2010) DoD OIG plans to review Department of Defense compliance with CTIP statutes, executive direction, and department policy. Specifically, DoD OIG plans to: 1) review a sample of Department of Defense contracts for compliance with the “Trafficking Victims Protection Act of 2000,” (Title 22, U.S. Code, Chapter 78), as amended, 2) summarize Department of Defense CTIP investigative efforts, and 3) evaluate Department of Defense component compliance with and performance to DoDI 2200.01. Drawdown and Reset of Equipment in Iraq— Supply Support Activity and Central Receiving and Shipping Point Operations in Iraq (PROJECT NO. D2010-D000JB-0219.000, INITIATED MAY 7, 2010). DoD OIG is conducting this audit in response to a U.S. Central Command request to focus oversight on asset accountability to ensure that U.S. funded assets are properly accounted for and that there is a process for the proper transfer, reset, or disposal of assets. The overall objective is to determine whether DoD is effectively managing operations at the Supply Support Activities and Central Receiving and Shipping Points in Iraq. Specifically, DoD OIG plans to evaluate the process for the disposition of equipment leaving Iraq and whether that process ensures timely accountability, visibility, and redistribution of the equipment to efficiently and effectively meet DoD needs. DoD OIG plans to also determine whether adequate security procedures are in place to ensure that equipment shipped from Iraq is received at its intended destination. G-8 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION Realignment of Contractor Support in Response to the Drawdown of U.S. Forces from Iraq (PROJECT NO. D2010-D000JB-0211.000, INITIATED MAY 6, 2010) DoD OIG is reviewing the planning and management of actions taken to adjust contractor support in response to the drawdown of U.S. forces from Iraq. Specifically, DoD OIG plans to evaluate the process and methodology used to determine descoping actions associated with the LOGCAP contract. Material Purchases Made Through Partnership Agreements at Anniston Army Depot (PROJECT NO. D2010-D000CE-0190.000, INITIATED MARCH 23, 2010) DoD OIG is evaluating material purchases made at Anniston Army Depot through partnership agreements with private-sector firms. Specifically, DoD OIG plans to determine whether the partnership agreements with original equipment manufacturers are effective in minimizing the cost of direct materials to the depot. Contracting for U.S. Facilities in Iraq (PROJECT NO. D2010-D000JB-0158.000, INITIATED FEBRUARY 17, 2010) DoD OIG is determining whether ongoing and planned contracts to build or refurbish U.S. facilities in Iraq are based on valid requirements and in consideration of the drawdown of the U.S. forces from Iraq. DoD Countermine and Improvised Explosive Device Defeat Systems Interrogation Arm (PROJECT NO. D2010-D000AE-0139.000, INITIATED JANUARY 29, 2010) This audit is the continuation of the audit initiated under D2009-D000AE-0102.000, “DoD Countermine and Improvised Explosive Device Defeat Systems Contracts,” announced on December 9, 2008. The overall audit objective is to determine whether DoD procurement efforts for countermine APPENDIX G and improvised explosive device defeat systems used in Iraq and Afghanistan were developed, awarded, and managed in accordance with Federal and Defense acquisition regulations. Specifically, DoD OIG plans to determine whether the Joint Improvised Explosive Device Defeat Organization and Army procurement efforts for the interrogation arm used on Husky and RG-31 vehicles in Iraq and Afghanistan were developed, contracted, and managed in accordance with Federal and Defense acquisition regulations. Update to the Summary Report on Challenges, Recommendations, and Initiatives Impacting OEF/OIF As Reported by Federal and Defense Oversight Organizations for FY 2003-FY 2009 (PROJECT NO. D2010-D000IG-0073.000, INITIATED DECEMBER 7, 2009) DoD OIG is updating the summaries of issues and actions taken or planned on recommendations identified in audit reports and testimonies on Operations Iraqi Freedom and Enduring Freedom by major oversight organizations that are members of the Southwest Asia Joint Planning Group. DoD OIG plans to also update the report on the program management initiatives and corrective actions taken and still pending by the respective organizations and agencies. Additionally, DoD OIG plans to gather information on oversight initiatives planned or underway by the oversight community. This effort reannounces and expands the scope of DoD OIG summary project D2008D000JC-0274.000 to include the Special Inspector General for Afghanistan Reconstruction, Department of State, and U.S. Agency for International Development at the request of the Commission on Wartime Contracting. This effort updates the first summary report, D-2008-086, which focused on Operations Iraqi Freedom and Enduring Freedomrelated reports and testimonies issued from FY 2003 through FY 2007. Material Purchases Made Through the Partnership Agreement with Sikorsky Aircraft Corporation at Corpus Christi Army Depot (PROJECT NO. D2010-D000CH-0077.001, INITIATED NOVEMBER 18, 2009) DoD OIG is evaluating material purchases made at Corpus Christi Army Depot through partnership agreements with private-sector firms. Specifically, DoD OIG plans to determine whether the partnership agreements in place with original equipment manufacturers are effective in minimizing the cost of direct materials to the depot. Material Purchases Made Through the Partnership Agreement with the Boeing Company at Corpus Christi Army Depot (PROJECT NO. D2010-D000CH-0077.000, INITIATED NOVEMBER 17, 2009) DoD OIG is evaluating material purchases made at Corpus Christi Army Depot through partnership agreements with private-sector firms. Specifically, DoD OIG plans to determine whether the partnership agreements in place with original equipment manufacturers are effective in minimizing the cost of direct materials to the depot. Management of Operations in the Theater Retrograde, Camp Arifjan, Kuwait (PROJECT NO. D2010-D000JA-0055.000, INITIATED OCTOBER 27, 2009) DoD OIG is conducting this audit in response to a U.S. Central Command request to focus oversight on U.S.-funded assets to ensure that they are properly accounted for and that there is a process for their proper transfer, reset, or disposal. DoD OIG is determining whether DoD is effectively managing operations in the Theater Retrograde, Camp Arifjan, Kuwait. Specifically, DoD OIG is determining whether adequate policies and procedures are in place at the Retro Sort, General Supply Warehouse, and Theater Redistribution Center for proper reutilization and disposition of equipment. DoD OIG is also determining whether adequate resources are available to effectively process the current and JULY 30, 2010 I REPORT TO CONGRESS I G-9 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT anticipated volume of equipment at the Theater Retrograde during the drawdown of U.S. forces from Iraq. Controls Over the Disposition of Equipment at the Defense Reutilization and Marketing Office at Camp Arifjan, Kuwait (PROJECT NO. D2010-D000JA-0054.000, INITIATED OCTOBER 27, 2009) DoD OIG is conducting this audit in response to a U.S. Central Command request to focus oversight on U.S.-funded assets to ensure that they are properly accounted for and that there is a process for their proper transfer, reset, or disposal. DoD OIG is evaluating whether adequate policies and procedures are in place to ensure the proper disposition of equipment at the Defense Reutilization and Marketing Office at Camp Arifjan, Kuwait. Specifically, DoD OIG is evaluating whether adequate controls exist to ensure the proper receipt, inspection, coding, and disposition of equipment in accordance with applicable guidance. Logistics Civil Augmentation Program IV Support Contract (PROJECT NO. D2010-D000AS-0031.000, INITIATED OCTOBER 27, 2009) DoD OIG is determining whether the Logistics Civil Augmentation Program IV support contract was managed and administered in accordance with federal and DoD guidance. Commercial Vendor Services Compliance With Federal Tax Reporting Requirements for Contractors Supporting Operations in Southwest Asia (PROJECT NO. D2009-D000FH-0292.000, INITIATED SEPTEMBER 23, 2009) DoD OIG is determining whether the Commercial Vendor Services in Iraq complied with federal tax reporting requirements for payments to contractors in support of operations in Southwest Asia for calendar years 2006 through 2008. G-10 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION Ministerial Capacity Development of the Iraqi Ministries of Defense and Interior Inspectors General (PROJECT NO. NOT REPORTED, DATE INITIATED NOT REPORTED) DoD OIG has embedded a senior level liaison with the Multi-National Security Transition CommandIraq to: 1) develop and strengthen the Iraqi Ministry of Interior and Ministry of Defense IG oversight capabilities, 2) provide support to the U.S. Mission’s Interagency Anti-Corruption Program, and 3) institutionalize MOI IG Weapons Accountability Inspections Program. Controls Over the Accountability and Disposition of Government Furnished Property in Iraq (PROJECT NO. D2009-D000JB-0307.000, INITIATED SEPTEMBER 16, 2009) DoD OIG is conducting this audit in response to a U.S. Central Command request to focus oversight on asset accountability to ensure that U.S.-funded assets are properly accounted for and that there is a process for the proper transfer, reset, or disposal of assets. The objective is to determine whether DoD has adequate controls over government-furnished property as it prepares to drawdown forces from Iraq. Specifically, DoD OIG plans to determine whether DoD properly accounted for government-furnished property, whether policies and procedures exist for the proper transfer, reset, or disposal of government-furnished property, and whether those policies and procedures are being executed adequately. Review of Army Response to Sodium Dichromate Exposure at Qarmat Ali Iraq (PROJECT NO. D2009-DIPOE3-0306.000, INITIATED SEPTEMBER 11, 2009) The project plans to review the U.S. Army’s actions regarding the exposure of personnel to sodium dichromate at the Qarmat Ali water injection facility in 2003. The review is being conducted in response to a request from seven members of the United States Senate questioning efforts of the U.S. Army APPENDIX G and contractors to protect the safety and health of government and contractor personnel at this site. Assessment of Intra-Theater Transportation Planning, Capabilities, and Execution for the Drawdown from Iraq (PROJECT NO. D2009-D00SPO-0310.000, INITIATED SEPTEMBER 10, 2009) DoD OIG is conducting this assessment to determine whether U.S. Central Command and its subordinate and supporting organizations’ intratheater logistical planning, selected capabilities, and execution are adequate to support and manage the movement of cargo and equipment being drawndown from Iraq. Assessment of U.S. Government Efforts to Transition the Security Assistance Mission Supporting the Government of Iraq from Department of Defense Authority to Department of State Authority (PROJECT NO. D2009-DOOSPO-0287.000, DATE INITIATED NOT REPORTED) DoD OIG plans to determine whether: 1) U.S. government goals, objectives, plans, and guidance are issued and operative for the transition of the Iraqi Security Assistance Mission from Department of Defense authority to an office of security cooperation under Department of State authority, and 2) ongoing U.S. efforts to provide security assistance to the Government of Iraq are adversely impacted by the drawdown plans of U.S. Forces-Iraq and the implementation of those plans. Assessment of U.S. Government Efforts to Develop the Logistics Sustainment Capability of the Iraq Security Forces (PROJECT NO. D2009-D00SPO-0286.000, INITIATED AUGUST 11, 2009; AMENDED FEBRUARY 19, 2010) DoD OIG plans to assess determine whether: 1) the planning and operational implementation of efforts by U.S. forces to train, advise and assist in the development of an enduring logistics sustainability capability for ISF are effective, and 2) the plans, training, preparations, and designated missions of the U.S. Forces-Iraq A&T, the U.S. advisory and assistance brigades, and sustainment brigades to train, advise, and assist in the development of an enduring logistics sustainability capability for Iraqi Security Forces are synchronized with in-country plans, operational assumptions and needs. Contracts Supporting Base Operation in Kuwait (PROJECT NO. D2009-D000AS-0266.000, INITIATED JULY 31, 2009) DoD OIG plans to determine whether DoD properly managed and administered contracts supporting base operations in Kuwait. Specifically, DoD OIG plans to determine whether the contract management and administration complied with federal and DoD policies. Contracts Supporting the Broad Area Maritime Surveillance Program (PROJECT NO. D2009-D000AS-0247.000, INITIATED JULY 10, 2009) DoD OIG plans to determine whether DoD officials properly managed and administered the contracts supporting the Broad Area Maritime Surveillance Program. Specifically, DoD OIG plans to determine whether the contract management and administration complied with federal and DoD policies. International Oil Trading Company Contracts to Supply Fuel to U.S. Troops in Iraq (PROJECT NO. D2009-D000CH-0244.000, INITIATED JULY 7, 2009) DoD OIG initiated this audit in response to a request from Congress. DoD OIG is reviewing the Defense Energy Support Center’s decision to award the International Oil Trading Company a series of contracts for the delivery of fuel through Jordan to U.S. troops in Iraq. Specifically, DoD OIG is determining whether prices paid were fair and reasonable, whether an exclusive supply JULY 30, 2010 I REPORT TO CONGRESS I G-11 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT arrangement had an impact on prices, and whether the fuel needs to be supplied through Jordan. Air Cargo Transportation Contracts in Support of Operation Iraqi Freedom and Operation Enduring Freedom (PROJECT NO. D2009-D000LC-0237.000, INITIATED JUNE 11, 2009) DoD OIG plans to determine whether air cargo transportation contracts in support of Operation Iraqi Freedom and Operation Enduring Freedom are administered in accordance with applicable federal and DoD regulations. Specifically, DoD OIG plans to determine whether the decision to use air transportation was justified, whether delivery orders were awarded in accordance with vendor selection criteria, and whether the cargo transported by air was delivered within required time frames. Department of Veterans Affairs. In addition, the project is assessing whether service members were evaluated for combat-related mental health conditions before being separated. Marine Corps Fulfillment of Urgent Universal Need Statements for Laser Dazzlers (PROJECT NO. D2009-D000AE-0210.000, INITIATED APRIL 28, 2009) DoD OIG initiated this audit in response to the Assistant Commandant of the Marine Corps request for addressing allegations of mismanagement in fulfilling Urgent Universal Need Statements for laser dazzlers. DoD OIG is determining whether acquisition managers in the U.S. Marine Corps effectively responded to the urgent needs of deployed Marines in acquiring a nonlethal laser dazzler capability in accordance with federal and Defense acquisition regulations. Assessment of the Defense Hotline Allegations Concerning Traumatic Brain Injury Research Integrity in Iraq Allowances and Differentials Paid to DoD Civilian Employees Supporting the Global War on Terror (PROJECT NO. D2009-D00SPO-0242.00, INITIATED JUNE 11, 2009) DoD OIG is conducting an inquiry of Research Integrity Misconduct in Iraq at the request of the DoD Hotline to determine if clinical research using an unapproved medication was conducted on U.S. service members with Traumatic Brain Injury in Iraq. (PROJECT NO. D2009-D000FC-0199.000, INITIATED APRIL 17, 2009) DoD OIG is determining whether civilian pay disbursed in support of the Global War on Terror is paid in accordance with established laws and regulations. Specifically, DoD OIG is determining whether eligible DoD civilian employees properly received authorized allowances and differentials. Assessment Research on Enlisted Administrative Separations FY 2008 Marine Corps Global War on Terror-Related Costs Processed Through the Standard Accounting, Budgeting and Reporting System (PROJECT NO. D2009-D000IGD00SPO.0226.000, INITIATED MAY 15, 2009) DoD OIG is conducting a research focused on Enlisted Administrative Separations for service members who served in Iraq or Afghanistan. This project resulted from concern expressed by a member of Congress that U.S. Marines with multiple combat tours in Iraq were being administratively separated under Other than Honorable Conditions, making them ineligible for benefits from the G-12 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION (PROJECT NO. D2009-D000FG-0183.000, INITIATED APRIL 7, 2009) DoD OIG plans to determine whether the Marine Corps accurately reported FY 2008 costs related to the Global War on Terror. DoD OIG plans to review whether Marine Corps documentation substantiates operation and maintenance obliga- APPENDIX G tions processed through the Standard Accounting, Budgeting and Reporting System. Deployment of the Standard Procurement System in the Joint Contracting Command Iraq/Afghanistan Controls Over Unliquidated Obligations for Department of the Army Contracts Supporting the Global War on Terror (PROJECT NO. D2009-D000FB-0112.000, INITIATED JANUARY 5, 2009) DoD OIG is determining whether the deployment of the Standard Procurement System (to include the Standard Procurement System-Contingency configuration) in the Joint Contracting Command Iraq/Afghanistan, was properly planned and executed. A series of reports is planned. DoD OIG issued Report No. D-2010-050, a classified report, on May 21, 2010, regarding the Standard Procurement System Synchronization Utility. (PROJECT NO. D2009-D000FC-0176.000, INITIATED MARCH 19, 2009) DoD OIG is determining whether the Department of the Army has established adequate controls over unliquidated obligations on Department of the Army contracts supporting the Global War on Terror. Specifically, DoD OIG plans to determine whether unliquidated obligations are being properly accounted for and deobligated in a timely manner. Army and Navy Small Boats Maintenance Contracts (PROJECT NO. D2009-D000AS-0163.000, INITIATED MARCH 2, 2009) DoD OIG is determining whether contracts providing ship repair and maintenance to the U.S. Army operations in Bahrain and Navy operations in Bahrain, Qatar, and United Arab Emirates were properly managed and administered. Specifically, DoD OIG is reviewing competition, contract type, and contract oversight. A series of reports is planned. DoD OIG issued Report No. D-2010-064, issued May 21, 2010, regarding Army Vessels Maintenance Contracts in Southwest Asia. In addition, DoD OIG issued Report No. D-2010-005, issued November 3, 2009, regarding internal controls weaknesses with securing classified information. DoD OIG plans to issue additional reports for this project. Controls Over the Common Access Card in Non-Department of Defense Agencies (PROJECT NO. D2009-D000JA-0136.000, INITIATED JANUARY 30, 2009) DoD OIG is determining whether controls over common access cards provided to civilians and contractors working for non-Department of Defense agencies were in place and worked as intended. Maintenance and Support of the Mine Resistant Ambush Protected Vehicle (PROJECT NO. D2009-D000CK-0100.000, INITIATED DECEMBER 9, 2008) DoD OIG is determining whether mine resistant ambush protected vehicle program and contracting officials are adequately supporting mine resistant ambush protected vehicle maintenance requirements and appropriately awarding and administering maintenance contracts. A series of reports is planned. DoD OIG issued Report No. D-2010-050, a classified report, on May 21, 2010, regarding the government oversight of field service representative and instructor services in support of the Mine Resistant Ambush Protected Vehicle Program. DoD’s Use of Time and Materials Contracts (PROJECT NO. D2009-D000CF-0095.000, INITIATED DECEMBER 1, 2008) DoD OIG is determining whether time and material contracts for Southwest Asia were awarded and administered in accordance with the Federal Acquisition Regulation. JULY 30, 2010 I REPORT TO CONGRESS I G-13 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT Implementation of Predator/Sky Warrior Acquisition Decision Memorandum Dated May 19, 2008 (PROJECT NO. D2009-D000CD-0071.000, INITIATED NOVEMBER 12, 2008) DoD OIG is determining the implementation status of the Acquisition Decision Memorandum. Specifically, DoD OIG is evaluating whether implementation by the Air Force and the Army complies with the Acquisition Decision Memorandum, and whether alternatives were considered, such as the Reaper program. Army Acquisition Actions in Response to the Threat to Light Tactical Wheeled Vehicles (PROJECT NO. D2009-D0000AE-0007.000, INITIATED SEPTEMBER 29, 2008) DoD OIG is determining whether the Army effectively managed efforts to develop, test, and acquire armor solutions for light tactical wheeled vehicles. These solutions are needed in response to the threat to High Mobility Multi-Purpose Wheeled Vehicle variants and use in developing the next-generation vehicle for Global War on Terror. In addition, DoD OIG is determining whether DoD exercised adequate operational test and live-fire test oversight of the Army’s High Mobility Multi-Purpose Wheeled Vehicle (HMMWV) program. DoD OIG issued Report D-2010-039 on January 29, 2010. DoD OIG plans on issuing a follow-on report to this project. DoD Body Armor Contracts (PROJECT No. D2008-D000CD-0256.000, INITIATED AUGUST 7, 2008) DoD OIG is examining the contracts and contracting process for body armor and related test facilities. Specific objectives include evaluating the background and qualifications of the contractors, the criteria for awarding the contracts, the quality assurance process, and any relationships that may exist between the contractors and government officials. DoD OIG’s review of the quality assurance process plans to include reviewing the results of First Article Testing and Lot acceptance Testing G-14 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION for the body armor contracts. DoD OIG issued Report No. D-2010-029 on December 21, 2009, discussing the contract award of DoD body armor contracts. DoD OIG plans to issue additional reports related to this project. Department of the Air Force Military Pay in Support of the Global War on Terror (PROJECT NO. D2008-D000FP-0252.000, INITIATED AUGUST 1, 2008) DoD OIG is determining whether the Department of the Air Force military payroll disbursed in support of the Global War on Terror is paid in accordance with established laws and regulations. Specifically, DoD OIG plans to review DoD military pay disbursements to determine whether U.S. Air Force military personnel on Active Duty status are paid accurately and timely. Internal Controls and Data Reliability in the Deployable Disbursing System (PROJECT NO. D2007-D000FL-0252.000, INITIATED AUGUST 31, 2007) The overall objective is to determine whether the internal controls over transactions processed through the Deployable Disbursing System are adequate to ensure the reliability of the data processed. The audit series plans to include financial information processed by disbursing stations supporting the Global War on Terror and plans to also follow up on “Internal Controls Over Out-of-Country Payments,” (Project No. D2006D000FL-0208.000). The first report, D-2009-054, addresses U.S. Marine Corps (USMC) processed disbursement transactions that contain classified information into unclassified DoD systems. APPENDIX G Department of State Office of Inspector General Completed Audits The Department of State Office of Inspector General (DoS OIG) completed one audit related to Iraq for the quarter ending June 30, 2010. Property Inventory and Accountability for Embassy Baghdad (MERO-A-10-07, ISSUED MAY 4, 2010) The objectives were to evaluate the Department of State’s controls for inventorying, recording, and safeguarding U.S. government equipment and property in Iraq. Ongoing Audits Audit of Embassy Baghdad Overtime Procedures and Costs (PROJECT NO. 10AUD3004, INITIATED OCTOBER 2009) The objectives are to determine whether Embassy supervisory personnel properly authorized and approved for Embassy Baghdad employees and whether Embassy supervisory personnel and employees complied with Department regulations and standards concerning overtime. This review is in the final report stage. De-mining Programs in Iraq (PROJECT NO. 10-ISP-3013, INITIATED SEPTEMBER 2009) The objectives are to evaluate the implementation and effectiveness of de-mining programs in Iraq. This review is in the final report stage. LOGCAP Task Order for Embassy Baghdad (PROJECT NO. 09MERO3016, INITIATED JUNE 2009) The objectives are to evaluate and assess the contractor’s compliance with contract terms and conditions, task order terms and conditions, and applicable laws and regulations. This review is in the final report stage. Government Accountability Office Completed Reports Warfighter Support: Improvements to DoD’s Urgent Needs Processes Would Enhance Oversight and Expedite Efforts to Meet Critical Warfighter Needs (GAO-10-460, ISSUED APRIL 30, 2010) This report discusses the extent to which DoD has a means to assess the effectiveness of its urgent needs processes, and o what challenges, if any, have affected the overall responsiveness of DoD’s urgent needs processes. Principally, this report found that DoD is unable to manage the urgent needs process and cannot assess how well the process addresses critical deficiencies in the field. Also in this report, GAO made several recommendations to DoD to improve guidance, procedures, and oversight mechanisms for the urgent needs process. Operation Iraqi Freedom: Actions Needed to Facilitate the Efficient Drawdown of U.S. Forces and Equipment from Iraq (GAO-10-376, ISSUED APRIL 19, 2010) In this report, GAO examined (1) the extent to which DoD has planned for the drawdown from Iraq in accordance with set timelines, and (2) factors that may impact the efficient execution of the drawdown. Principally, this report found that DoD has not (1) fully included contracted support in its operational planning for the drawdown, (2) allowed sufficient time in its guidance to ensure that all contracted services can be put on contract in a responsible manner, or (3) clearly defined the roles and responsibilities of various contract validation review boards. Also in this report, GAO made several recommendations to the DoD, such as ensuring that joint doctrine regarding operational planning JULY 30, 2010 I REPORT TO CONGRESS I G-15 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT for contract support is followed, clarifying the roles and responsibilities of the various contract review boards in the CENTCOM theater, and developing plans for mitigating risks during contractor transitions as the Iraq drawdown continues. Military Training: Actions Needed to Further Improve the Consistency of Combat Skills Training Provided to Army and Marine Corps Support Forces (GAO-10-465, ISSUED APRIL 16, 2010) Per the House report to the National Defense Authorization Act for fiscal year 2010, GAO assessed the extent to which (1) Army and Marine Corps support forces are completing required combat skills training; (2) the services and CENTCOM have information to validate completion of required training; and (3) the services have used lessons learned to adjust combat skills training for support forces. Principally this report found that additional actions could help clarify CENTCOM’s training requirements, ensure the services fully incorporate those requirements into their training requirements, and improve the consistency of training. Also in this report, GAO made several recommendations to DoD to clarify training requirements, standards, and the training tracking system. Human Capital: Status of Actions Needed to Improve the Timely and Accurate Delivery of Compensation and Medical Benefits to Deployed Civilians (GAO-10-615T, ISSUED APRIL 14, 2010) GAO testified regarding the status of improvements being made to the delivery of compensation and medical benefits to deployed civilians. Principally, GAO found that while policies concerning compensation for deployed civilians are generally comparable among agencies, there are some issues that can lead to differences in the amount of compensation and the accuracy, timeliness, and completeness of this compensation. GAO made ten recommendations for agencies to take actions such as reviewing G-16 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION compensation laws and policies, establishing medical screening requirements, and creating mechanisms to assist and track deployed civilians. Contingency Contracting: Improvements Needed in Management of Contractors Supporting Contract and Grant Administration in Iraq and Afghanistan (GAO-10-357, ISSUED APRIL 12, 2010) As mandated in the National Defense Authorization Act for Fiscal Year 2008, GAO reviewed (1) the extent to which DoD, State, and USAID rely on contractors to perform such contractors and whether the decisions are guided by strategic workforce planning; and (3) whether agencies considered and mitigated related risks. Principally, this report found DoD, State, and USAID’s use of contractors to help administer contracts and grants was substantial, although the agencies did not know the full extent of their use of such contractors and that the agencies had obligated nearly $1 billion through March 2009 on 223 contracts and task orders active during fiscal year 2008 or the first half of fiscal year 2009 that included the performance of administration functions for contracts and grants in Iraq and Afghanistan. Also in this report, GAO made several recommendations to State and USAID to improve contractor management, such as developing guidance and clarifying policies related to the use of contractors. Ongoing Audits Not reported (PROJECT NO. 320752, INITIATED JUNE 2010) Since 2003, Congress has appropriated more than $23 billion to support the training and equipping of Iraq’s military and police, most of which has been provided through the Iraq Security Forces Fund. As part of its FY 2010 supplemental budget proposal and FY 2011 budget request, the Administration is seeking an additional $3 billion to provide equipment, training, and other services to the Iraq’s security forces. In light of a forthcoming GAO report which APPENDIX G assesses Iraq’s financial resources and examines the extent to which Iraq has spent these resources on security costs, this engagement plans to review the Administration’s justification for requesting additional funding for the Iraq Security Forces Fund and identify possible reductions or modifications. DoD Iraq Drawdown Planning (PROJECT NO. 351476, INITIATED APRIL 2010) This review focuses on four key questions: • To what extent have DoD’s retrograde processes and IT systems ensured the accountability, visibility, and timely disposition of equipment? • To what extent has DoD planned for and begun to execute the tasks necessary to draw down the remaining U.S. military personnel and equipment from Iraq between September 1, 2010, and December 31, 2011? • To what extent has DoD met its goal of increasing the proportion of local national contractors performing work in Iraq and ensured adequate oversight? • What other factors may impact DoD’s ability to effectively and efficiently complete the withdrawal of forces and equipment, and what contingency plans does the department have in place? U.S. Military Withdrawal from Iraq (PROJECT NO. 351475, INITIATED APRIL 2010) This review focuses on two key questions: • To what extent is DoD able to efficiently drawdown materiel from Iraq and close bases in Iraq in accordance with established goals and timelines? • To what extent plans to factors (i.e., the build-up in Afghanistan, resetting the U.S. force, Iraqi domestic politics, etc.) impact the efficient drawdown of U.S. forces in accordance with established timelines and goals, and the department’s ability to effectively transition to the final phase of the drawdown which is scheduled to begin on September 1, 2010? U.S Strategy and Joint Campaign Plan for Iraq (PROJECT NO. 320734, INITIATED NOVEMBER 2009) GAO’s key questions are: • To what extent does the 2010 Joint Campaign Plan for Iraq include key planning elements called for by military doctrine for campaign planning as defined by Joint Publication? • What are the current conditions and projected needs for the security situation in Iraq and the capability of the Iraqi Security Forces? • To what extent have the Departments of Defense and State developed plans to address risks to the campaign? Annual Mandated Review of Contracting in Iraq and Afghanistan (PROJECT NO. 120874, INITIATED NOVEMBER 2009) This review plans to focus on four key questions: • What is the number and value of contracts, grants, or cooperative agreements issued by, or for, DoD, State, and USAID with performance in Iraq or Afghanistan during FY 2009 and the first half of FY 2010, and to what extent were they competitively awarded? • How many contractor/grantee/agreement personnel, including those performing security functions, worked on these contracts/grants/ agreements? • How many contract/grant/agreement personnel were killed or injured? • What is the status of the agencies’ efforts to implement the July 2008 MOU on contracting in Iraq and Afghanistan? Availability of Trained and Ready Forces to Support Military Operations in Iraq and Afghanistan (PROJECT NO. 351388, INITIATED OCTOBER 2009) This review plans to focus on the extent to which DoD has identified requirements for supporting ongoing operations, developed an approach to manage deployment of forces to meet requirements, and DoD’s ability to meet other commitments. JULY 30, 2010 I REPORT TO CONGRESS I G-17 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT Iraq Cost Sharing Arrangements (PROJECT NO. 320638, INITIATED OCTOBER 2009) This review focuses on three main questions: • What mechanisms is the United States using to share or transfer security costs to the Iraqi government and what results have these mechanisms produced? • How do other foreign governments support the presence of U.S. forces in their counties and to what extent could features of these arrangements be applied to Iraq? • What financial resources does Iraq have to pay for its reconstruction and security, to what extent has it expended these resources, and what is Iraq’s budget surplus/deficit? Readiness of Air Force Combat and Expeditionary Combat Forces (PROJECT NO. 351376, INITIATED SEPTEMBER 2009) GAO’s key questions are: • How do the services determine the appropriate level of training to provide to their non-combat compared to combat forces? • What, if any, unique factors have the services considered when determining the appropriate level of training to provide to non-combat arms forces deploying to Iraq and Afghanistan? • To what extent is the current training of support forces consistent with identified service-specific and theater-specific training requirements for an asymmetric combat environment? • To what, if any, extent have the services collected information about the effectiveness of pre- and post-deployment training from non-combat arms forces that have deployed to Iraq or Afghanistan? • To what extent have the services adjusted the training of their non-combat arms forces based on lessons learned from ongoing combat operations in Iraq and Afghanistan? G-18 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION U.S Military Burns of Solid Waste in Open Pits at Some Locations in Iraq and Afghanistan (PROJECT NO. 361123, INITIATED AUGUST 2009) This review focuses on three key questions: • To what extent is open pit burning taking place at U.S. military installations in Iraq and Afghanistan? • What pollutants are emitted during open pit burning? What monitoring does the U.S. government conduct of open pit emissions? How extensive is the air pollution caused by open pit burning and what is the exposure level to U.S personnel? • What are the alternatives to open pit burning? To what extent has the U.S. government pursued these alternatives? DoD Medical Wartime Personnel Requirements (PROJECT NO. 351393, INITIATED AUGUST 2009) DoD’s military health care professionals are needed to support combat contingency operations to treat injured military personnel and save lives. For current contingency combat operations, the key questions are: • To what extent have DoD and the services identified their wartime health care personnel requirements? • What challenges, if any, are DoD and the services encountering in meeting their wartime health care personnel requirements? • To what extent do DoD and the services have or use the tools they need to meet their wartime health care personnel requirements? Army and Marine Corps Training Capacity (PROJECT NO. 351387, INITIATED JULY 2009) This review plans to focus on the extent to which the DoD, the Army, and the Marine Corps have identified differences in ground force training requirements for Iraq and Afghanistan, and developed plans to adjust training capacities to meet requirements for changing forces levels in Iraq and Afghanistan. APPENDIX G Civilian Agency Plans for Programs, Security, and Logistics during/after the U.S. Drawdown from Iraq (PROJECT NO. 320691, INITIATED JULY 2009) This review focuses on three key questions: • How have U.S. civilian agencies planned for the U.S. military drawdown, including prioritizing post-drawdown missions and programs, right-sizing civilian staff for these missions; and planning for their future security and logistical needs? • How effectively have civilian agencies planned for continuing programs previously funded by DoD? • What are the estimated additional costs to maintain a civilian presence in Iraq as U.S. forces drawdown? U.S., Iraqi, and International Efforts to Address Challenges in Reintegrating Displaced Iraqis (PROJECT NO. 320654, INITIATED MARCH 2009) The UN reports that over 4.8 million Iraqis have been displaced, including about 2.8 million within Iraq. In April 2009, GAO issued a report on assistance to Iraqi refugees in Jordan and Syria. In anticipation of a growing number of returns from within and outside Iraq, the international community has encouraged Iraq to develop plans to reintegrate displaced Iraqis. This engagement plans to focus on challenges in reintegrating Iraqis returning from other countries and those displaced within Iraq. This report plans to address the following: • What challenges do the United States, Iraq, and the international community face in reintegrating displaced Iraqis? • What actions have they taken to address these challenges? • What gaps remain, and what more needs to be done to address these challenges? Joint IED Defeat Organization (JIEDDO) Strategic Management (PROJECT NO. 351230, INITIATED JUNE 2008) DoD Joint IED Defeat Organization’s (JIEDDO) mission is to improve the U.S. military’s capability for defending against improvised explosive device (IED) attacks. GAO reviews have continued to raise concerns regarding JIEDDO’s ability to strategically manage and to achieve its objectives. The key questions are: • To what extent has JIEDDO made progress in developing a strategic plan? • To what extent has JIEDDO developed a process to identify, evaluate, select, and develop counterIED initiatives? • To what extent has the Office of the Secretary of Defense provided direction and oversight for JIEDDO operations and activities? U.S. Army Audit Agency As of June 30, 2010, USAAA had 19 auditors deployed to Southwest Asia: 9 in Iraq, 5 in Afghanistan, and 5 in Kuwait. Completed Audits Retrograde Operations in Southwest Asia, Donation and Transfer of Excess Materiel and Supplies (A-2010-0098-ALL, ISSUED MAY 7, 2010) The Army’s Deputy Chief of Staff, G-4 requested this multi-phased audit. USAAA reported the Army didn’t effectively utilize donation and transfer programs in Iraq to reduce excess Army Working Capital Funded (AWCF) supplies and materiel as part of the retrograde process. Between September and November 2007 auditors identified an average of $22 million of serviceable AWCF items on hand at the Forward Redistribution Point. During this same time period, an average of $105 million of serviceable materiel was projected to be received from retrograde. Though the Army had donation and JULY 30, 2010 I REPORT TO CONGRESS I G-19 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT transfer programs in place, they were limited at the time of the audit because (1) HQDA policy only permitted the donation and transfer of such items as part of forward operating base closures, (2) AWCF business rules prevented donation and transfer of items that were on Army stock records, and (3) the Defense Utilization and Marketing Office in Iraq accepted only unserviceable items. Instead of fully utilizing donation and transfer programs, the Army transported serviceable items out of Iraq to Kuwait using limited transportation assets. Command took actions in response to recommendations made by the auditors that should assist in resolving the backlog in the retrograde pipeline. Controls Over Vendor Payments—Southwest Asia (Phase II)—U.S. Army Contingency Operations (A-2010-0096-ALL, ISSUED MAY 7, 2010) This report is protectively marked For Official Use Only (FOUO). In June 2008, the Defense Finance and Accounting Service (DFAS) identified and reported the spillage of classified contingency vendor payment information in two unclassified payment repositories. DoD and Army commands took several actions between June 2008 and April 2009 to prevent additional spillage of classified information through unclassified vendor pay operations. These actions significantly decreased spillage incidents associated with contingency payments by about 71 percent. However, in spite of actions taken, auditors found finance and contracting activities continued to process classified information through unclassified vendor pay processes. This occurred because finance and contracting activities included classified information in payment and invoice packages submitted to DFAS Rome for storage and payment. As a result, the Army was at an increased risk for unauthorized access to classified information that could compromise Soldier safety and foreign relations. G-20 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION Commander’s Emergency Response Program (CERP), Multi-National Force—Iraq, Summary Report (A-2010-0097-ALL, ISSUED MAY 4, 2010) This report is protectively marked For Official Use Only (FOUO). The Commander, Multi-National Force-Iraq requested this audit. USAAA reported, based on reviews of 310 projects valued at valued at $68.2 million, that internal controls were in place to ensure commanders in Iraq implemented the program properly, to include CERP guidance contained in the Multi-National Corps-Iraq CJ8 Money As A Weapon System set of standard operating procedures. However, issues existed with the application of CERP guidance to include some instances of incomplete project files, approved projects that may have fallen outside CERP criteria, and insufficient statements of work. These issues occurred primarily because of shortfalls in the training and experience level of personnel performing the fund’s management, oversight, and execution actions. The Office of the Deputy Chief of Staff, G-3/5/7 and the Commander, Multi-National Force-Iraq stated action had been or would be taken to address the recommendations in the report. Foreign Military Sales Process for Iraq and Afghanistan (A-2010-0094-ALA, ISSUED MAY 3, 2010) USAAA reported that the Foreign Military Sales (FMS) process was generally adequate to acquire equipment and services for Afghanistan security forces. However, equipment for Iraqi forces was primarily acquired outside the FMS process. The peacetime FMS process was perceived as too slow and cumbersome for contingency operations. The Iraq Transition Command asked for and received “direct procurement authority” and used the authority to bypass the FMS process. The Army has taken steps to improve the peacetime process and estimates that about 95 percent of the equipment delivered to Iraq and Afghanistan was Army-managed equipment. Also, Army Security Assistance material and services programs didn’t APPENDIX G have visibility over equipment procured and transferred to Iraq forces outside the FMS system. The Army has an opportunity to further influence the process by working with the DoD Task Force and a Presidential Blue Ribbon interagency task force established to study and recommend improvements to Security Assistance processes. Agreed-Upon Procedures Attestation to Evaluate Bulk Fuel Requests for Forward Operating Base Shank, Afghanistan (A-2010-0088-ALL, ISSUED APRIL 14, 2010) This report is protectively marked For Official Use Only (FOUO) Law Enforcement Sensitive. The International Contract Corruption Task Force, Bagram Airfield, Afghanistan requested this attestation review. Auditors reconciled initial bulk fuel requests with delivery records kept at the Forward Operating Base (FOB) Shank bulk fuel farm for the period December 1, 2009 through February 18, 2010. These reconciliations were made to determine the number of potential fraudulent bulk fuel requests and the respective amount of fuel losses. Multi-National Security Transition Command Iraq (MNSTC-I), Iraqi Security Forces Fund (ISFF) (A-2010-0082-ALL, ISSUED APRIL 12, 2010) This report is protectively marked For Official Use Only (FOUO). The Commander, Multi-National Security Transition Command-Iraq (MNSTC-I) requested this audit. Overall, auditors found command’s process for planning, budgeting, and reviewing the ISFF to be working efficiently based on established procedures, funding guidance, and automated tools used by command. However, auditors identified the need for improvements in internal controls related to program validation and reporting that included (1) attaching documentation of commander approval for funded projects, (2) maintaining proper separation of duties for approving project purchases and (3) properly tracking all uses of the ISFF. Auditors also identified that the reporting method used by MNSTC-I did not meet the intent of congressional reporting requirements dealing with the uses of the ISFF on a project-byproject basis. Followup Audit on Sensitive Items Accountability and Control at Abu Ghraib (A-2010-0087-ALL, ISSUED APRIL 12, 2010) The Army’s Deputy Chief of Staff, G4 requested this follow-up audit. The initial audit showed that command needed to improve how it monitored and documented contractor performance in accordance with the established Quality Assurance Surveillance Plans (QASP) for contracts associated with the Abu Ghraib Warehouse (AGW) mission. During the follow-up audit auditors found that, instead of closing as planned, the AGW site transitioned from the Commercial Logistics Distribution Agency (CLDA) to the Multi-National Security Transition Command-Iraq (MNSTC-I) on July 1, 2009. Auditors found evidence that MNF-I implemented and documented the QASP for only one month between the end of the original audit in February 2009 and the time the warehouse was handed over to MNSTC-I in July 2009. However, in July 2009, MNSTC-I positioned a contracting officer’s representative onsite at AGW to monitor contractor performance. Upon review of the contracting files, it appeared that MNF-I was implementing the QASP and had done so since the command assumed responsibility for the AGW site. In addition, auditors found that command allocated sensitive items stored at the warehouse to end users before the disbandment of CLDA. Because of MNF-I’s actions, recommendations from the initial audit were closed. This report contains no additional recommendations. Ongoing Audits Managing Equipment Reset—U.S. Army Pacific (PROJECT NO. A-2010-FFP-0188.000, INITIATED 3Q/FY 2010) This audit is being performed in Hawaii and Alaska. It plans to determine if Army activities in the Pacific have effective processes (accountability/storage, JULY 30, 2010 I REPORT TO CONGRESS I G-21 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT inspections, replacement/acquisition, and distribution) to manage Left Behind and Reset equipment. Agreed-Upon Procedures Attestation for USFOR-A LOGCAP Course of Action— Afghanistan (PROJECT NO. A-2010-ALL-0480.000, INITIATED 3Q/FY 2010) This attestation is being performed in Afghanistan. It plans to determine if the corrective actions presented in the USFOR-A LOGCAP course of action decision brief were implemented and provide assurance that requirements were processed through the appropriate review board. corrective actions were effective and (2) evaluate the Army’s capabilities and capacities to effectively reset equipment and material from Iraq as part of the Responsible Drawdown. Follow-up Audit of Automatic Reset Induction (PROJECT NO. A-2010-ALM-0394.000, INITIATED 3Q/FY 2010) This audit is being performed in the continental United States (CONUS). It plans to evaluate whether the Army fully implemented recommendations addressed in the two quick reaction reports (A-2009-0071-ALM and A-2009-0077-ALM) and whether those recommendations corrected the reported problems. Return of Assets from SWA—CONUS (PROJECT NO. A-2010-ALL-0086.000, INITIATED 3Q/FY 2010) This audit is being performed in the continental United States (CONUS). It plans to determine if management controls over assets returned from Southwest Asia were adequate to ensure units only retained authorized quantities and properly reported excess materiel for redistribution. Deployment Support Systems (PROJECT NO. A-2010-FFS-0180.000, INITIATED 3Q/FY 2010) This audit is being performed in the continental United States (CONUS). It plans to determine if (1) procedures and controls for data entry, processing and output adequate to ensure the integrity and reliability of unit movement data for deployment planning and reporting and (2) if the Army’s plans for future use of deployment support systems reasonable. Retrograde Operations in Southwest Asia— Multi Class Supplies (PROJECT NO. A-2010-ALL-0260.000, INITIATED 3Q/FY 2010) This audit is being performed in Iraq. It plans to (1) determine if the Army implemented the recommendations from the prior audit and if the G-22 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION Audit of Retrograde Operations—Class VII Equipment in Iraq (PROJECT NO. A-2010-ALL-0258.000, INITIATED 3Q/FY 2010) This audit is being performed in Iraq. It plans to (1) determine if the Army implemented the recommendations from the prior audit and if corrective actions were effective and (2) evaluate the Army’s capabilities and capacities to effectively reset equipment and materiel from Iraq as part of the Responsible Drawdown. Improvised Explosive Device Defeat (IED-D) Home Station Training (PROJECT NO. A-2010-FFF-0372.000, INITIATED 2Q/FY 2010) This audit is being performed in the continental United States (CONUS). It plans to determine whether (1) home station training is effectively providing Soldiers proficiency in IED-D tasks in a counter insurgency environment and (2) home station training facilities including training aids, devices and simulators are adequate to conduct effective IED-D individual and unit training. APPENDIX G Excalibur Accountability Gap (PROJECT NO. A-2010-ALL-0364.000, INITIATED 2Q/FY 2010) This audit is being performed in Iraq. It plans to determine if there are adequate processes and procedures for establishing accountability over Excalibur ammunition rounds. Redistribution Property Assistance Teams (PROJECT NO. A-2010-ALL-0338.000, INITIATED 2Q/FY 2010) This audit is being performed in Iraq. It plans to determine if agreed-upon Redistribution Property Assistance Teams-related recommendations in USAAA Report A-2009-0085-ALL were implemented and corrective actions fixed the problems. U.S. Equipment Transferred to Iraq (PROJECT NO. A-2010-ALL-0312.000, INITIATED 2Q/FY 2010) This audit is being performed in Iraq. It plans to evaluate whether the theater’s process for transferring specific property to the government of Iraq, as part of responsible drawdown, conforms to DoD policies and Title X authority. Disposal of Army Equipment and Materials Into Dump Sites in Iraq (PROJECT NO. A-2010-ALL-0311.001, INITIATED 2Q/FY 2010) This audit is being performed in Iraq. It plans to determine if: (1) Army units are complying with guidance on the disposal of Army equipment and materials into dump sites in Iraq, and (2) Army units’ use of dump sites is enhancing the drawdown mission in Iraq. Disposal of Army Equipment and Material in Iraq (PROJECT NO. A-2010-ALL-0311.000, INITIATED 2Q/FY 2010) This audit is being performed in Iraq. It plans to determine if Army units are complying with DA guidance on disposal of property to Defense Reutilization and Marketing Services and other sites. Follow-up Audit—Body Armor (PROJECT NO. A-2010-ALA-0294.000, INITIATED 2Q/FY 2010) This audit is being performed in the continental United States (CONUS). It plans to: (1) follow-up on recommendations in USAAA Report A-20090086-ALA (issued March 30, 2009), as well as recent DoD OIG and GAO reports on body armor to determine if adequate actions were taken to implement key recommendations, and (2) review body armor requirements to determine if requirements clearly define the force protection needs of the soldier against future threats. Controls Over Vendor Payments Phase II— Afghanistan (PROJECT NO. A-2010-ALL-0103.000, INITIATED 2Q/FY 2010) This audit is being performed in Afghanistan. It plans to determine if the Army has effective controls to ensure the accuracy of vendor payments for contingency operations in Southwest Asia (Afghanistan). Forward Operating Base Closures—Property Transfers to Government of Iraq (PROJECT NO. A-2010-ALL-0232.000, INITIATED 1Q/FY 2010) This audit is being performed in Iraq. It plans to evaluate the process for creating forward operating base closure transfer packages and determine if the process can be streamlined. Contracting Activities in Iraq During and After Force Drawdown (PROJECT NO. A-2010-ALC-0122.000, INITIATED 1Q/FY 2010) This audit is being performed in the continental United States (CONUS). It plans to determine if the Army has a workable plan for continuing JULY 30, 2010 I REPORT TO CONGRESS I G-23 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT contracting activities in Iraq during and after the force drawdown. identified, and (3) controls over shipping container condition and sea worthiness were effective. Follow-up Audit on Forward Operating Base Closures—Iraq Camp Buehring Fuel Farm Operations— Kuwait (PROJECT NO. A-2010-ALL-0105.000, INITIATED 1Q/FY 2010) This follow-up audit is being performed in Iraq. It plans to determine if the recommendations from the prior audit were implemented and, if so, if the recommendations fixed the problem. (PROJECT NO. A-2009-ALL-0590.000, INITIATED 4Q/FY 2009) This audit is being performed in Kuwait. It plans to determine whether controls over fuel farm operations at Camp Buehring were adequate to ensure proper accountability and limit access at fuel points. Life Support Contracts for U.S. Forces at Basra—Iraq (PROJECT NO. A-2010-ALL-0087.000, INITIATED 1Q/FY 2010) This audit is being performed in Iraq. It plans to determine if: (1) the transition of the LOGCAP contract to sustainment contracting was costeffective and (2) the requirements determination process led to contracts that supported the requesting unit’s needs. Contracting for Maintenance Support—Life Cycle Management Commands (PROJECT NO. A-2010-ALM-0008.000, INITIATED 1Q/FY 2010) This audit is being performed in the continental United States (CONUS). It plans to determine if contracts for maintenance services required equipment to be repaired in a timely, technically sound, and cost-effective manner. It plans to also evaluate contract administration controls to determine if appropriate value is received for costs incurred. Contract for Recycling and Disposing of Waste Material at Camp Steeler, Iraq (PROJECT NO. A-2009-ALL-0571.000, INITIATED 4Q/FY 2009) This audit is being performed in Iraq. It plans to determine if the contractor performed according to the terms, specifications, and conditions of the contract. The sub-objectives are to evaluate the adequacy of controls over (1) payments to the contractor, (2) delivery of material for recycling and costs associated with recycling, and (3) delivery and use of fuel. Commander’s Emergency Response Program—Afghanistan (PROJECT NO. A-2009-ALL-0531.000, INITIATED 4Q/FY 2009) This audit is being performed in Afghanistan. It plans to determine if the program in Afghanistan had adequate internal controls in place to ensure commanders and unit personnel implemented the program properly. Controls over Shipping Container Accountability and Visibility—Iraq Force Protection—Security Badging in Kuwait (PROJECT NO. A-2009-ALL-0593.000, INITIATED 4Q/FY 2009) This audit is being performed in Iraq. It plans to determine if: (1) controls over shipping container accountability and visibility were effective, (2) Command implemented recommendations in the prior report and, if so, did the corrective actions fix the conditions (PROJECT NO. A-2009-ALL-0133.000, INITIATED 2Q/FY 2009) This audit is being performed in Kuwait. It plans to evaluate the effectiveness of internal controls at the Area Support Group-Kuwait. Specifically, it plans to determine (1) if procedures were adequate for issuing, accounting for, and using security badges; G-24 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX G and (2) the adequacy of procedures for safeguarding personal information contained in automated systems used in the security badging process. Controls over Vendor Payments—Southwest Asia (Phase II) (PROJECT NO. A-2009-ALL-0118.000, INITIATED 2Q/FY 2009) This audit is being performed at various locations in Southwest Asia. It plans to determine if the Army has effective controls to ensure the accuracy of vendor payments for contingency operations in Southwest Asia. Contracting Operations at the Joint Contracting Command-Iraq/Afghanistan— Jalalabad (Afghanistan) (PROJECT NO. A-2009-ALL-0106.000, INITIATED 2Q/FY 2009) This audit is being performed in Afghanistan. It plans to determine if goods and services acquired under contract were properly justified, awarded, and administered. Reserve Component Post Mobilization Training (PROJECT NO. A-2009-FFS-0075.000, INITIATED 2Q/FY 2009) This audit is being performed in the continental United States (CONUS). It plans to determine if post-mobilization training requirements were adequately identified and executed by the Army Reserve and National Guard. It plans to also determine if necessary unit and individual training requirements were identified and completed prior to deployment; and if post-mobilization training requirements unnecessarily duplicated pre-mobilization training. Non-Standard Equipment Sustainment (PROJECT NO. A-2009-ALM-0059.000, INITIATED 2Q/FY 2009) This audit is being performed in the continental United States (CONUS). It plans to determine if the Army has adequate visibility over non-standard equipment items, and if it has an effective sustainment plan to ensure that repair sources and repair parts are available to sustain non-standard equipment. Logistics Civil Augmentation Program (LOGCAP) III, Contract Close-out (PROJECT NO. A-2009-ALC-0093.000, INITIATED 1Q/FY 2009) This audit is being performed in the continental United States (CONUS) and various locations in Southwest Asia. It plans to determine if the Army has procedures and controls in place to effectively close out the LOGCAP III contract to ensure proper payment of its legitimate liabilities and deobligations of unused funds. Contracting Operations at the Joint Contracting Command-Iraq/Afghanistan— Kandahar and Salerno (Afghanistan) (PROJECT NO. A-2008-ALL-0401.000, INITIATED 4Q/FY 2008) This audit is being performed in Afghanistan. It plans to determine if goods and services acquired under the contract were properly justified, awarded, and administered. Controls over Logistics Civil Augmentation Program (LOGCAP)—White Property (PROJECT NO. A-2008-ALL-0398.000, INITIATED 4Q/FY 2008) This audit is being performed in Iraq. It plans to determine if the Logistics Civil Augmentation Program contractor properly managed and accounted for government acquired property. U.S. Army Corps of Engineers (USACE) Pilot Defense Base Act (DBA) Insurance Program (PROJECT NO. A-2008-ALL-0633.000, INITIATED 3Q/FY 2008) This audit is being performed in the continental United States (CONUS). It plans to determine if Defense Base Act insurance, as acquired under the U.S. Army Corps of Engineers pilot program, JULY 30, 2010 I REPORT TO CONGRESS I G-25 DETAILED SUMMARY OF OTHER AGENCY OVERSIGHT is a cost- effective solution for satisfying overseas workers compensation insurance requirements for the Army. Follow-up Audit of Contracting Operations, U.S. Army Contracting Command (USACC), SWA-Kuwait (Phase I) (PROJECT NO. A-2008-ALL-0625.000, INITIATED 3Q/FY 2008) This audit is being performed in Kuwait. It evaluates the effectiveness of actions taken to improve Army contracting operations in Kuwait. Management of the Prepositioned Fleet at Combat Training Centers (PROJECT NO. A-2008-FFF-0044.000, INITIATED 2Q/FY 2008) This audit is being performed in the continental United States (CONUS). It plans to determine if the pre-positioned fleets are adequately configured. It plans to also determine if rotational units are effectively using the pre-positioned fleets and if the maintenance costs for the pre-positioned fleets were reasonable. U.S. Agency for International Development Office of Inspector General Completed Audits This quarter, the USAID Office of Inspector General (USAID OIG) issued no performance audits related to Iraq reconstruction. In addition, USAID OIG issued one financial audit covering $22.8 million in costs incurred under a USAID grant, which was performed for USAID OIG by DCAA. This audit included questioned costs of $65,294. Fifteen financial audits are in process. G-26 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION Ongoing Audits Audit of Audit of USAID/Iraq’s Microfinance Activities Under its Provincial Economic Growth Program (INITIATED 3Q/FY 2010) The objective is to evaluate if USAID/Iraq’s microfinance activities are achieving their main goal of increasing access to inclusive and sustainable financial services in Iraq. Audit of USAID/Iraq’s Nonexpendable Property (INITIATED 3Q/FY 2010) The objective is to determine if USAID/Iraq has managed its nonexpendable property in accordance with USAID guidance. Audit of USAID/Iraq’s Payroll Payments to Foreign Service Nationals, Third Country Nationals, and U.S. Personal Services Contractors (INITIATED 2Q/FY 2010) The objective is to evaluate if USAID/Iraq properly calculated and disbursed payroll payments to its foreign service national, third country national, and U.S. personal services contractor workforce in accordance with established regulations, policies, and procedures. Audit of USAID/Iraq’s Community Action Program III Activities (INITIATED 1Q/FY 2010) The objective is to evaluate if USAID/Iraq’s Community Action Program III is achieving its main goals. Audit of USAID/Iraq’s Agriculture Private Sector Development—Agribusiness Program (INITIATED 1Q/FY 2010) The objective is to evaluate if USAID/Iraq’s agribusiness program is achieving its main goals. APPENDIX G Audit of USAID/Iraq’s Implementation of the Iraq Financial Management Information System (INITIATED 4Q/FY 2009) The objective is to evaluate if the Iraq Financial Management Information System (IFMIS) has been implemented and its main goals achieved. Survey of Incidents Reported by Private Security Contractors of USAID/Iraq’s Contractors and Grantees (INITIATED 4Q/FY 2009) The objectives are to determine the number of serious security incidents that occurred during the two-year period ending June 30, 2009, and to determine if USAID/Iraq has effectively implemented recommendations made in a prior OIG audit report on private security contractors (“Audit of USAID/ Iraq’s Oversight of Private Security Contractors in Iraq,” E-267-09-002-P, dated March 4, 2009). U.S. Department of the Treasury During this period, the Department of Treasury did not conduct any work related to, in support of, or in Iraq. Additionally, as of September 30, 2009, the Department of Treasury has no plans to conduct any work in the future and will no longer be reported on in this section. Department of Commerce During this period, the Department of Commerce did not conduct any work related to, in support of, or in Iraq. Additionally, as of September 30, 2009, the Department of Commerce has no plans to conduct any work in the future and will no longer be reported on in this section. ◆ JULY 30, 2010 I REPORT TO CONGRESS I G-27 APPENDIX H SUMMARY OF U.S. OVERSIGHT IN IRAQ This appendix contains a list of completed audits, reports, and testimonies on Iraq reconstruction activities released by the Special Inspector General for Iraq Reconstruction (SIGIR), as of July 31, 2010, and the following agencies, as of June 30, 2010: • Department of Defense Office of Inspector General (DoD OIG) • Department of State Office of Inspector General (DoS OIG) • Government Accountability Office (GAO) • U.S. Army Audit Agency (USAAA) • U.S. Agency for International Development Office of Inspector General (USAID OIG) For a complete list of this work, see Table H.1. JULY 30, 2010 I REPORT TO CONGRESS I H-1 SUMMARY OF U.S. OVERSIGHT IN IRAQ Table H.1 DoD OIG Completed Audits, as of June 30, 2010 Agency Report Number Date Report Title DoD OIG D-2010-069 6/21/2010 Central Issue Facility at Fort Benning and Related Army Policies DoD OIG D-2010-068 6/17/2010 Government Oversight of Field Service Representative and Instructor Services in Support of the Mine Resistant Ambush Protected Vehicle Program DoD OIG D-2010-060 6/11/2010 Drawdown and Reset of Equipment in Iraq – Operation Clean Sweep DoD OIG D-2010-067 6/10/2010 Public-Private Partnerships at Air Force Maintenance Depots DoD OIG D-2010-066 5/28/2010 Oversight of the U.S. Air Forces Central War Reserve Materiel Contract DoD OIG D-2010-062 5/24/2010 Controls Over Funds Appropriated for Assistance to Afghanistan and Iraq Processed Through the Foreign Military Sales Network DoD OIG D-2010-064 5/21/2010 Army Vessels Maintenance Contracts in Southwest Asia DoD OIG D-2010-061 5/21/2010 Counter Radio-Controlled Improvised Explosive Device Electronic Warfare (CREW) Program DoD OIG D-2010-059 5/14/2010 Contingency Contracting: A Framework for Reform DoD OIG 10-INTEL-04 5/4/2010 Review of the Joint Task Force Guantanamo Inclusion of Detainee Mental Health Information in Intelligence Information Reports DoD OIG D-2010-055 4/29/2010 Medical/Surgical Prime Vendor Contract Supporting Coalition Forces in Iraq and Afghanistan DoD OIG SPO-2010-002 4/20/2010 Assessment of Intra-Theater Transportation Planning, Capabilities, and Execution for the Drawdown from Iraq DoD OIG D-2010-052 4/16/2010 Efforts to Prevent Sexual Assault/Harassment Involving DoD Contractors During Contingency Operations DoD OIG D-2010-051 4/8/2010 Defense Contract Management Agency Acquisition Workforce for Southwest Asia DoD OIG D-2010-050 4/2/2010 Standard Procurement System Synchronization Utility DoD OIG D-2010-049 4/1/2010 U.S. Army Corps of Engineers’ Use of Award Fees on Contracts in Iraq and Afghanistan DoD OIG Memorandum 3/25/2010 Material Purchases Made Through Partnership Agreements at Corpus Christi Army Depot DoD OIG D-2010-047 3/26/2010 Repair and Maintenance Contracts for Aircraft Supporting Coalition Forces in Afghanistan, Iraq, and Kuwait DoD OIG D-2010-046 3/3/2010 Contracting for Tactical Vehicle Field Maintenance at Joint Base Balad, Iraq DoD OIG D-2010-044 3/2/2010 Information Assurance Controls Over the Outside the Continental of the United States Navy Enterprise Network as Related to the Operations in Southwest Asia DoD OIG D-2010-043 3/2/2010 Deferred Maintenance and Carryover on the Army Abrams Tank DoD OIG D-2010-6-001 2/16/2010 Review of Army Decision Not to Withhold Funds on the Logistics Civil Augmentation Program (LOGCAP) III Contract DoD OIG IP02010E001 2/1/2010 Evaluation of DoD Sexual Assault Response in Operations Enduring and Iraqi Freedom Areas of Operation DoD OIG D-2010-039 1/29/2010 Recapitalization and Acquisition of Light Tactical Wheeled Vehicles DoD OIG D-2010-038 1/25/2010 Identification of Classified Information in an Unclassified DoD System and an Unsecured DoD Facility DoD OIG D-2010-037 1/25/2010 Internal Controls Over United States Marine Corps Commercial and Miscellaneous Payments Processed Through the Deployable Disbursing System DoD OIG D-2010-036 1/22/2010 Controls Over Navy Military Payroll Disbursed in Support of Operations at Southwest Asia at San DiegoArea Disbursing Center DoD OIG D-2010-033 1/21/2010 Information Operations in Iraq DoD OIG D-2010-035 1/11/2010 Defense Logistics Agency Contracts for M2 Machine Gun Spare Parts in Support of Operations in Southwest Asia DoD OIG D-2010-034 1/8/2010 Internal Controls Over the Army, General Fund Cash and Other Monetary Assets Held in Southwest Asia DoD OIG D-2010-032 12/31/2009 DoD Countermine and Improvised Explosive Device Defeat Systems Contracts – Husky Mounted Detection System DoD OIG D-2010-029 12/21/2009 DoD Contractor Qualifications and Selection Criteria for Body Armor Contracts DoD OIG D-2010-028 12/15/2009 Rapid Acquisition and Fielding of Materiel Solutions by the Navy DoD OIG D-2010-025 12/11/2009 Transportation for DoD Personnel and Cargo Relocation From the Iraq Drawdown DoD OIG D-2010-027 12/8/2009 Army’s Management of the Operations and Support Phase of the Acquisition Process for Body Armor Continued on next page H-2 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H Agency Report Number Date Report Title DoD OIG D-2010-021 11/23/2009 Using System Threat Assessments in the Acquisition of Tactical Wheeled Vehicles DoD OIG D-2010-022 11/20/2009 Management of Nontactical Vehicles in Support of Operation Iraqi Freedom DoD OIG Memorandum 11/16/2009 Department of the Army Deferred Maintenance on the Bradley Fighting Vehicle DoD OIG D-2010-005 11/3/2009 Information Security at the Fleet and Industrial Supply Center, Sigonella, Detachment Bahrain DoD OIG D-2009-113 9/30/2009 Medical Equipment Used to Support Operations in Southwest Asia DoD OIG D-2009-118 9/29/2009 Internal Controls Over Naval Special Warfare Command Comptroller Operations in Support of Contingency Operations DoD OIG D-2009-117 9/29/2009 Controls Over Air Combat Command and Pacific Air Forces Unliquidated Obligations from Department of the Air Force Contracts Supporting Contingency Operations DoD OIG D-2009-115 9/29/2009 Summary of Information Operations Contracts in Iraq DoD OIG D-2009-114 9/25/2009 Transition Planning for the Logistics Civil Augmentation Program IV Contract DoD OIG D-2009-112 9/25/2009 Deferred Maintenance on the Air Force C-130 Aircraft DoD OIG D-2009-109 9/25/2009 Contracts Supporting the DoD Counter Narcoterrorism Technology Program Office DoD OIG D-2009-108 9/23/2009 U.S. Air Forces Central War Reserve Materiel Contract DoD OIG 09-INTEL-13 9/23/2009 Investigation of Allegations of the Use of Mind-Altering Drugs to Facilitate Interrogations of Detainees DoD OIG D-2009-102 9/18/2009 Price Reasonableness Determinations for Contracts Awarded by the U.S. Special Operations Command DoD OIG D-2009-091 7/31/2009 Information Operations Contracts in Iraq DoD OIG D-2009-098 7/30/2009 Status of the Defense Emergency Response Fund in Support of the Global War on Terror DoD OIG D-2009-095 7/29/2009 Contracting for Transportation Services for U.S. Army Corps of Engineers, Gulf Region Division DoD OIG D-2009-096 7/28/2009 Contracts for the U.S. Army’s Heavy-Lift VI Program in Kuwait DoD OIG IPO-2009-E001 7/27/2009 Review of Electrocution Deaths in Iraq: Part II - Seventeen Incidents Apart from Staff Sergeant Ryan D. Maseth, U.S. Army DoD OIG IE-2009-006 7/24/2009 Review of Electrocution Deaths in Iraq: Part I - Electrocution of Staff Sergeant Ryan D. Maseth, U.S. Army DoD OIG D-2009-093 7/15/2009 Ship Utilization in Support of the Global War on Terror DoD OIG D-2009-083 5/29/2009 Logistics Support Contracting for the United States Special Operations Command DoD OIG D-2009-079 5/7/2009 Controls Over the Department of the Navy Military Payroll Disbursed in Support of the Global War on Terror DoD OIG D-2009-078 5/4/2009 Health Care Provided by Military Treatment Facilities to Contractors in Southwest Asia DoD OIG D-2009-6-004 4/8/2009 Defense Contract Management Agency (DCMA) Actions on Audits of Cost Accounting Standards and Internal Control Systems at DoD Contractors Involved in Iraq Reconstruction Activities DoD OIG D-2009-073 4/8/2009 DoD Components’ Use of Global War on Terror Supplemental Funding Provided for Procurement and Research, Development, Test, and Evaluation DoD OIG D-2009-067 4/3/2009 Controls Over Air Force Materiel Command Unliquidated Obligations on Department of the Air Force Contracts Supporting the Global War on Terror DoD OIG D-2009-066 4/1/2009 Marine Corps’ Management of the Recovery and Reset Programs DoD OIG 09-INTEL-05 3/24/2009 Audit of the Management of Signals Intelligence Counterterrorism Enterprise Analysts DoD OIG D-2009-063 3/24/2009 Funds Appropriated for Afghanistan and Iraq Processed Through the Foreign Military Trust Fund DoD OIG SPO-2009-003 3/17/2009 Assessment of the Accountability of Night Vision Devices Provided to the Security Forces of Iraq DoD OIG D-2009-061 3/12/2009 Controls Over the Reporting of Transportation Costs in Support of the Global War on Terror DoD OIG D-2009-058 2/27/2009 DoD Cost of War Reporting of Supplemental Funds Provided for Procurement and Research, Development, Test, and Evaluation DoD OIG D-2009-054 2/17/2009 Identification of Classified Information in Unclassified DoD Systems During the Audit of Internal Controls and Data Reliability in the Deployable Disbursing System DoD OIG D-2009-052 2/13/2009 Controls Over Excess Defense Articles Provided to Foreign Governments DoD OIG 09 INTEL-03 2/13/2009 Review of Intelligence Resources at the Joint Intelligence Task Force Combating Terrorism and Special Operations Command in Support of Operation Enduring Freedom and Operation Iraqi Freedom Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I H-3 SUMMARY OF U.S. OVERSIGHT IN IRAQ Agency Report Number Date Report Title DoD OIG D-2009-047 1/29/2009 DoD Testing Requirements for Body Armor DoD OIG D-2009-046 1/29/2009 Procurement and Delivery of Joint Service Armor Protected Vehicles DoD OIG D-2009-042 1/16/2009 Hiring Practices Used To Staff the Iraqi Provisional Authorities DoD OIG D-2009-041 1/14/2009 Expeditionary Fire Support System and Internally Transportable Vehicle Programs DoD OIG D2008DODOIG-0141.000 12/19/2008 Report on the Assessment of Arms, Ammunition, and Explosives Accountability and Control; Security Assistance; and Logistics Sustainment for the Iraq Security Forces DoD OIG D-2009-030 12/8/2008 Marine Corps Implementation of the Urgent Universal Need Statement Process for Mine Resistant Ambush Protected Vehicles DoD OIG D-2009-027 12/8/2008 Air Force Combat Search and Rescue Helicopter DoD OIG D-2009-006 10/20/2008 Small Arms Ammunition Fund Management in Support of the Global War on Terror DoD OIG D-2009-005 10/10/2008 Controls Over the Contractor Common Access Card Life Cycle DoD OIG D-2009-003 10/9/2008 Internal Controls Over Army General Fund, Cash and Other Monetary Assets Held Outside of the Continental United States DoD OIG D-2008-135 9/29/2008 Requiring Radio Frequency Identification in Contracts for Supplies DoD OIG D-2008-132 9/26/2008 Payments for Transportation Using PowerTrack® DoD OIG D-2008-133 9/25/2008 Joint Follow-On Evaluation of the Equipment Status of Operation Iraqi Freedom Forces DoD OIG D-2008-131 9/16/2008 Security Over Radio Frequency Identification DoD OIG D-2008-115 8/6/2008 Status of Training Vehicles for U.S. Ground Forces Deploying in Support of Operation Iraqi Freedom DoD OIG D-2008-086 7/18/2008 Summary of Issues Impacting Operations Iraqi Freedom and Enduring Freedom Reported by Major Oversight Organizations Beginning FY 2003 through FY 2007 DoD OIG D-2008-107 7/3/2008 Defense Hotline Allegations Concerning Contracts Issued by U.S. Army TACOM Life Cycle Management Command to BAE Systems Land and Armaments, Ground Systems Division DoD OIG D2007D000IG-0239.000 7/3/2008 Accountability of Munitions Provided to the Security Forces of Iraq DoD OIG IE-2008-010 7/31/2008 Information Report on the Assessment of DoD Support to the Iraqi Security Forces Inspectors General DoD OIG D-2008-098 5/22/2008 Internal Controls Over Out-of-Country Payments DoD OIG D-2008-089 5/9/2008 Planning Armor Requirements for the Family of Medium Tactical Vehicles DoD OIG D-2008-078 4/9/2008 Training Requirements for U.S. Ground Forces Deploying in Support of Operation Iraqi Freedom DoD OIG D2006-DIP0E2-0137 Not reported DoD/Department of Veterans Affairs (VA) Inspectors General Interagency Care Transition Project DoD OIG 2008E001 6/4/2008 Review of Matters Related to the August 28, 2005, Shooting of Reuters Journalists in Iraq DoD OIG 08-INTEL-06 6/12/2008 Review of the U.S. Government’s Relationship with the Iraqi National Congress: Phase Two- and the Relationship of the Iraqi National Congress with the Department of Defense DoD OIG D-2008-067 3/31/2008 DoD Procurement Policy for Body Armor DoD OIG D-2008-064 3/18/2008 Defense Hotline Allegations Concerning the Biometric Identification System for Access Omnibus Contract DoD OIG D-2008-060 3/7/2008 Potable and Non Potable Water Treatment in Iraq DoD OIG D-2008-059 3/6/2008 Supplemental Funds Used for Medical Support for the Global War on Terror DoD OIG D-2008-024 1/18/2008 Inspection Process of the Army Reset Program for Equipment for Units Returning from Operation Iraqi Freedom DoD OIG IE-2008-001 1/4/2008 Review of Investigative Documentation Associated with the Fatality of a U.S. Army Corporal during Convoy Operations in Iraq DoD OIG D-2008-033 12/28/2007 Training for U.S. Ground Forces at Army Maneuver Combat Training Centers DoD OIG D-2008-038 12/21/2007 Army’s Procurement and Conditional Acceptance of Medium Tactical Vehicles DoD OIG D-2008-029 12/5/2007 Request for and Use of Emergency Supplemental Funds for the Rapid Fielding Initiative DoD OIG D-2008-026 11/30/2007 Management of the Iraq Security Forces Fund in Southwest Asia - Phase III Continued on next page H-4 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H Agency Report Number Date Report Title DoD OIG D-2008-027 11/21/2007 Air Force Use of Global War on Terrorism Supplemental Funding Provided for Procurement and Research, Development, Test, and Evaluation DoD OIG D-2007-0107 6/27/2007 Audit of Procurement Policy for Armored Vehicles DoD OIG D-2007-105 6/21/2007 U.S. Transportation Command (USTRANSCOM) Compliance with DoD Policy on the Use of Commercial Transport DoD OIG D-2007-090 5/3/2007 Management of Prepositioned Munitions DoD OIG Not reported 4/2/2007 Antideficiency Act Investigation of the Operation and Maintenance Appropriation Account 2142020 and 2152020 DoD OIG D-2007-060 2/12/2007 Audit of the Management of the Iraq Security Forces Fund—Phase II DoD OIG D-2007-049 1/25/2007 Audit of the Equipment Status of Deployed Forces within U.S. Central Command DoD OIG D-2007-030 12/8/2006 Management of the Iraq Security Forces Fund in Southwest Asia—Phase I DoD OIG D-2007-010 11/2/2006 The Army Small Arms Program That Relates to Availability, Maintainability, and Reliability of the Small Arms to Support the Warfighter DoD OIG D-2007-001 10/6/2006 Information Operations Activities in Southwest Asia DoD OIG 06-INTEL-10 8/25/2006 Review of DoD-directed Investigations of Detainee Abuse DoD OIG IPO2004-C005 8/25/2006 Review of Criminal Investigations of Alleged Detainee Abuse DoD OIG IE-2005-002 7/15/2006 Follow-up to Department of State/Department of Defense Interagency Assessment of Iraq Police Training DoD OIG D-2007-30 2/10/2006 Management of the Iraq Security Forces Fund in Southwest Asia DoD OIG D-2006-010 10/28/2005 Contract Surveillance for Service Contracts DoD OIG D-2005-045 5/9/2005 FY 2004 Emergency Supplemental Appropriation Allocated to the Defense Logistics Agency DoD OIG D-2005-053 4/29/2005 FY 2004 Emergency Supplemental Appropriation Allocated to the Defense Information Systems Agency DoD OIG D-2004-057 3/18/2004 Contracts Awarded for Coalition Provisional Authority by Defense Contracting Command—Washington Total DoD OIG Reports = 124 JULY 30, 2010 I REPORT TO CONGRESS I H-5 SUMMARY OF U.S. OVERSIGHT IN IRAQ DoS OIG Completed Audits, as of June 30, 2010 Agency Report Number Date Report Title DoS OIG MERO-A-10-07 5/4/2010 Property Inventory and Accountability at Embassy Baghdad DoS OIG MERO-A-10-05 3/22/2010 Baghdad Embassy Security Force (BESF) DoS OIG AUD/IQO-09-25 10/21/2009 Audit of Contract Administration, Commissioning and Accreditation of the NEC Baghdad DoS OIG MERO-IQO-09-09 8/25/2009 Review of the Roles, Staffing, and Effectiveness of Regional Embassy Offices in Iraq DoS OIG MERO-A-09-10 8/25/2009 Performance Audit of Embassy Baghdad’s Transition Planning for a Reduced United States Military Presence in Iraq DoS OIG 09-ISP-3020 7/1/2009 Inspection of Embassy Baghdad DoS OIG MERO-IQO-09-06 6/12/2009 Review of the Activities of DynCorp International under the State Department’s Worldwide Personal Protective Service Contracts (WPPS) in Iraq DoS OIG AUD/IQO-09-16 6/5/2009 Joint Review with SIGIR of the Blackwater Contract for Worldwide Personal Protective Services DoS OIG MERO-IQO-09-03 5/5/2009 Review of the Activities of Triple Canopy under the State Department’s Worldwide Personal Protective Service Contracts (WPPS) in Iraq DoS OIG 09-ISP-3014 3/30/2009 Review of US Policy regarding Oil Contracts in Iraq (Program Evaluation) DoS OIG 08MERO3003 1/7/2009 Review on the Role, Staffing, and Effectiveness of Diplomatic Security in the Management of Personal Protective Services (PPS) in Iraq DoS OIG 08MERO3004 12/13/2008 Review on the Implementation of Recommendations from the Report of the Secretary of State’s Panel on Personal Protective Services in Iraq (commonly known as the Kennedy Report) on Personal Protective Service (WPPS) in Iraq DoS OIG 07AUD3034 12/1/2008 Review of Procurement Competition: New Embassy Compound Baghdad DoS OIG MERO-IQO-08-01 7/1/2008 Status of Iraqi Special Immigrant Visa Programs DoS OIG MERO-IQO-08-02 7/1/2008 Status of U.S. Refugee Resettlement Processing for Iraqi Nationals DoS OIG 08MER03001 6/30/2008 U.S. Refugee Admissions Program (USRAP) for Iraq DoS OIG AUD/CG-07-33 9/1/2007 Audit of the National Endowment for Democracy for Fiscal Years 2003-05 DoS OIG AUD/FM-07-41 8/1/2007 Independent Auditor’s Report on the Application of Agreed-upon Procedures Related to Selected DynCorp Invoices DoS OIG AUD/IQO-07-20 1/30/2007 INL Iraq Police Contract (Adnan Palace) DoS OIG AUD/CG-07-02 12/18/2006 Agreed-upon Procedures on Indirect Cost Rates Proposed by National Endowment for Democracy DoS OIG AUD/CG-07-05 12/18/2006 Agreed-upon Procedures on Indirect Cost Rates Proposed by National Democratic Institute for International Affairs DoS OIG AUD/CG-07-03 9/30/2006 Agreed-upon Procedures on Indirect Cost Rates Proposed by International Republican Institute DoS OIG AUD/CG-07-04 9/30/2006 Agreed-upon Procedures on Indirect Cost Rates Proposed by the Center for International Private Enterprise, Inc. DoS OIG AUD/CG-06-20 3/31/2006 Independent Accountant’s Report on the Application of Agreed-upon Procedures on Indirect Cost Rates Proposed by Scholastic, Inc. DoS OIG AUD/IQO-06-16 3/31/2006 Application of Agreed-upon Procedures of Department of State Procurement Competitions To Support Armored Vehicles in Iraq DoS OIG AUD/IQO-06-17 3/31/2006 Application of Agreed-upon Procedures Relating to DECO, Inc., Task Order No. SALMEC-04-F-0996 DoS OIG ISP-IQO-06-01 10/1/2005 Review of the Staffing of Embassy Baghdad DoS OIG 041412005B17900005 8/1/2005 Billed Costs Under Task Orders Submitted By RONCO (Demining) DoS OIG IT-IQO-05-06 8/1/2005 Embassy Baghdad Communications Security Evaluation DoS OIG 33112005K17900015 7/22/2005 Application of Agreed-upon Procedures To Calculate Daily Life Support Rates Under LOGCAP TO100 DoS OIG IE-2005-002/ISPIQO-05-72 7/15/2005 DoS/DoD Interagency Evaluation of Iraqi Police Training DoS OIG ISP-IQO-05-60 7/1/2005 Review of the Staffing of Embassy Baghdad DoS OIG ISP-IQO-05-61 7/1/2005 Review of the Staffing of Embassy Baghdad Continued on next page H-6 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H Agency Report Number Date Report Title DoS OIG 03311-2005D1790009 5/1/2005 Audit of Cost-Plus Contract for Police Training DoS OIG IT-IQO-05-04 5/1/2005 Survey of Iraq IT Waivers DoS OIG AUD/IQO-05-24 3/28/2005 Agreed-upon Procedures Review of Indirect Rates and Equipment Delivery Charge Proposed by [a Department Contractor] and Review of Accounting System DoS OIG AUD/IQO-05-16 3/1/2005 Review of Agreed-upon Procedures for the Verification of Excessive Fuel Charges in Support of JIPTC DoS OIG ISP-IQO-05-57 3/1/2005 Review of the Staffing of Embassy Baghdad DoS OIG AUD/CG-05-18 2/15/2005 Survey of Department of State’s Funding for Iraq DoS OIG AUD/IQO-05-13 1/1/2005 Agreed-upon Procedures of Daily Direct Labor, Aerial Support Equipment and Indirect Expense Rates Proposed by Blackwater Security Consultants, Contractor’s Accounting System and Timekeeping Procedures DoS OIG ISP-IQO-05-53 12/1/2004 Review of the Staffing of Embassy Baghdad DoS OIG IBO/IQO-A-05-02 10/1/2004 Review of Radio Sawa Support To Transition in Post-Saddam Iraq DoS OIG AUD/IQO-04-47 9/1/2004 Review of Department of State Procurement Competitions To Support the Iraqi Police Training Program DoS OIG AUD/IQO-04-48 9/1/2004 Review of Cashiering Operations at Embassy Baghdad DoS OIG AUD/CG-04-41 7/1/2004 Fact Sheet on Iraqi National Congress Support Foundation Total DoS OIG Audits = 45 JULY 30, 2010 I REPORT TO CONGRESS I H-7 SUMMARY OF U.S. OVERSIGHT IN IRAQ GAO Completed Audits, as of June 30, 2010 Agency Report Number Date Report Title Web Link www.gao.gov/new.items/ d10460.pdf GAO GAO-10-460 4/30/2010 Warfighter Support: Improvements to DoD’s Urgent Needs Processes Would Enhance Oversight and Expedite Efforts to Meet Critical Warfighter Needs GAO GAO-10-376 4/19/2010 Operation Iraqi Freedom: Actions Needed to Facilitate the Efficient Drawdown of U.S. Forces and Equipment from Iraq www.gao.gov/new.items/ d10376.pdf GAO GAO-10-465 4/16/2010 Military Training: Actions Needed to Further Improve the Consistency of Combat Skills Training Provided to Army and Marine Corps Support Forces www.gao.gov/new.items/ d10465.pdf GAO GAO-10-615T 4/14/2010 Human Capital: Status of Actions Needed to Improve the Timely and Accurate Delivery of Compensation and Medical Benefits to Deployed Civilians www.gao.gov/new.items/ d10615t.pdf GAO GAO-10-357 4/12/2010 Contingency Contracting: Improvements Needed in Management of Contractors Supporting Contract and Grant Administration in Iraq and Afghanistan www.gao.gov/new.items/ d10357.pdf GAO GAO-10-472 3/30/2010 Warfighter Support: DoD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations www.gao.gov/new.items/ d10472.pdf GAO GAO-10-331 3/26/2010 Unmanned Aircraft Systems: Comprehensive Planning and a Results-Oriented Training Strategy Are Needed to Support Growing Inventories www.gao.gov/new.items/ d10331.pdf GAO GAO-10-509T 3/23/2010 Iraq and Afghanistan: Agencies Face Challenges in Tracking Contracts, Grants, Cooperative Agreements, and Associated Personnel www.gao.gov/new.items/ d10509t.pdf GAO GAO-10-551T 3/17/2010 Warfighter Support: Continued Actions Needed by DoD to Improve and Institutionalize Contractor Support in Contingency Operations www.gao.gov/new.items/ d10551t.pdf GAO GAO-10-274 3/9/2010 Iraq: Iraqi Refugees and Special Immigrant Visa Holders Face Challenges Resettling in the United States and Obtaining U.S. Government Employment www.gao.gov/new.items/ d10274.pdf GAO GAO-10-266R 3/4/2010 Warfighter Support: A Cost Comparison of Using State Department Employees versus Contractors for Security Services in Iraq www.gao.gov/new.items/ d10266r.pdf GAO GAO-10-288R 12/18/2009 Overseas Contingency Operations: Funding and Cost Reporting for the Department of Defense www.gao.gov/new.items/ d10288r.pdf GAO GAO-10-156 11/12/2009 State Department: Diplomatic Security’s Recent Growth Warrants Strategic Review www.gao.gov/new.items/ d10156.pdf GAO GAO-10-187 11/2/2009 Contingency Contracting: Further Improvements Needed in Agency Tracking of Contractor Personnel and Contracts in Iraq and Afghanistan www.gao.gov/new.items/ d10187.pdf GAO GAO-10-179 11/2/2009 Operation Iraqi Freedom: Preliminary Observations on DoD Planning for the Drawdown of U.S. Forces from Iraq www.gao.gov/new.items/ d10179.pdf GAO GAO-10-95 10/29/2009 Warfighter Support: Actions Needed to Improve Visibility and Coordination of DoD’s Counter-Improvised Explosive Device Efforts www.gao.gov/new.items/ d1095.pdf GAO GAO-10-119 10/16/2009 Warfighter Support: Independent Expert Assessment of Army Body Armor Test Results and Procedures Needed Before Fielding www.gao.gov/new.items/ d10119.pdf GAO GAO-10-01 10/1/2009 Contingency Contracting: DoD, State, and USAID Continue to Face Challenges in Tracking Contractor Personnel and Contracts in Iraq and Afghanistan www.gao.gov/new.items/ d101.pdf GAO GAO-09-1022R 9/25/2009 Overseas Contingency Operations: Reported Obligations for the Department of Defense www.gao.gov/new.items/ d091022r.pdf GAO GAO-09-874 9/17/2009 Department of State: Additonal Steps Needed to Address Continuing Staffing and Experience Gaps at Hardship Posts www.gao.gov/new.items/ d09874.pdf GAO GAO-09-1019T 9/16/2009 Human Capital: Improved Tracking and Additional Actions Needed to Ensure the Timely and Accurate Delivery of Compensation and Medical Benefits to Deployed Civilians www.gao.gov/new.items/ d091019t.pdf GAO GAO-09-351 7/31/2009 Contingency Contract Management: DoD Needs to Develop and Finalize Background Screening and Other Standards for Private Security Contractors www.gao.gov/new.items/ d09351.pdf GAO GAO-09-791R 7/10/2009 Overseas Contingency Operations: Reported Obligations for the Department of Defense www.gao.gov/new.items/ d09791r.pdf GAO GAO-09-562 6/26/2009 Human Capital: Actions Needed to Better Track and Provide Timely and Accurate Compensation and Medical Benefits to Deployed Federal Civilians www.gao.gov/new.items/ d09562.pdf GAO GAO-09-692T 6/23/2009 V-22 Osprey Aircraft: Assessments Needed to Address Operational and Cost Concerns to Define Future Investments www.gao.gov/new.items/ d09692t.pdf Continued on next page H-8 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H Agency Report Number Date Report Title Web Link www.gao.gov/new.items/ d09526.pdf GAO GAO-09-526 6/3/2009 Rebuilding Iraq: Improved Management Controls and Iraqi Commitment Needed for Key State and USAID Capacity-Building Programs GAO GAO-09-120 4/21/2009 Iraqi Refugee Assistance: Improvements Needed in Measuring Progress, Assessing Needs, Tracking Funds, and Developing an International Strategic Plan www.gao.gov/new.items/ d09120.pdf GAO GAO-09-538T 4/1/2009 Contingency Contracting: DOD, State, and USAID Are Taking Actions to Track Contracts and Contractor Personnel in Iraq and Afghanistan www.gao.gov/new.items/ d09538t.pdf GAO GAO-09-449R 3/30/2009 Global War on Terrorism: Reported Obligations for the Department of Defense www.gao.gov/new.items/ d09449r.pdf GAO GAO-09-476T 3/25/2009 Iraq and Afghanistan: Security, Economic, and Governance Challenges to Rebuilding Efforts Should Be Addressed in U.S. Strategies www.gao.gov/new.items/ d09476t.pdf GAO GAO-09-294SP 3/24/2009 Iraq: Key Issues for Congressional Oversight www.gao.gov/new.items/ d09294sp.pdf GAO GAO-09-302 3/17/2009 Global War on Terrorism: DOD Needs to More Accurately Capture and Report the Costs of Operation Iraqi Freedom and Operation Enduring Freedom www.gao.gov/new.items/ d09302.pdf GAO GAO-09-280 3/9/2009 Afghanistan Security: U.S. Programs to Further Reform Ministry of Interior and National Police Challenged by Lack of Military Personnel and Afghan Cooperation www.gao.gov/new.items/ d09280.pdf GAO GAO-09-388T 3/3/2009 Defense Management: Increased Attention on Fuel Demand Management at DOD’s Forward-Deployed Locations Could Reduce Operational Risks and Costs www.gao.gov/new.items/ d09388t.pdf GAO GAO-09-263SP 2/23/2009 Securing, Stabilizing, and Developing Pakistan’s Boarder Area with Afghanistan: Key Issues for Congressional Oversight www.gao.gov/new.items/ d09263sp.pdf GAO GAO-09-300 2/20/2009 Defense Management: DOD Needs to Increase Attention on Fuel Demand Management at Forward-Deployed Locations www.gao.gov/new.items/ d09300.pdf GAO GAO-09-380T 2/12/2009 Iraq and Afghanistan: Availability of Forces, Equipment, and Infrastructure Should Be Considered in Developing U.S. Strategy Plans www.gao.gov/new.items/ d09380t.pdf GAO GAO-09-366T 2/12/2009 Afghanistan Security: Corrective Actions Are Needed to Address Serious Accountability Concerns about Weapons Provided to Afghan National Security Forces www.gao.gov/new.items/ d09366t.pdf GAO GAO-09-267 1/30/2009 Afghanistan Security: Lack of Systematic Tracking Raises Significant Accountability Concerns about Weapons Provided to Afghan National Security Forces www.gao.gov/new.items/ d09267.pdf GAO GAO-09-114R 11/20/2008 Contract Management: DoD Developed Draft Guidance for Operational Contract Support but Has Not Met All Legislative Requirements www.gao.gov/new.items/ d09114r.pdf GAO GAO-09-175 11/14/2008 Unmanned Aircraft Systems: Additional Actions Needed to Improve Management and Integration of DOD Efforts to Support Warfighter Needs www.gao.gov/new.items/ d09175.pdf GAO GAO-09-19 10/1/2008 Contingency Contracting: DOD, State, and USAID Contracts and Contractor Personnel in Iraq and Afghanistan www.gao.gov/new.items/ d0919.pdf GAO GAO-09-86R 10/1/2008 Provincial Reconstruction Teams in Iraq and Afghanistan www.gao.gov/new.items/ d0986r.pdf GAO GAO-08-1144T 9/16/2008 Stabilizing and Rebuilding Iraq: Iraqi Revenues, Expenditures, and Surplus www.gao.gov/new.items/ d081144t.pdf GAO GAO-08-1031 8/5/2008 Stabilizing and Rebuilding Iraq: Iraqi Revenues, Expenditures, and Surplus www.gao.gov/new.items/ d081031.pdf GAO GAO-08-1128R 9/15/2008 Global War on Terrorism: Reported Obligations for the Department of Defense www.gao.gov/new.items/ d081128r.pdf GAO GAO-08-930 9/10/2008 Operation Iraqi Freedom: Actions Needed to Enhance DOD Planning for Reposturing of U.S. Forces from Iraq www.gao.gov/new.items/ d08930.pdf GAO GAO-08-966 7/31/2008 Rebuilding Iraq: DOD and State Department Have Improved Oversight and Coordination of Private Security Contractors in Iraq, but Further Actions Are Needed to Sustain Improvements www.gao.gov/new.items/ d08966.pdf GAO GAO-08-1021T 7/23/2008 Securing, Stabilizing, and Rebuilding Iraq: Progress Report: Some Gains Made, Updated Strategy Needed www.gao.gov/new.items/ d081021t.pdf Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I H-9 SUMMARY OF U.S. OVERSIGHT IN IRAQ Agency Report Number Date Report Title Web Link www.gao.gov/new.items/ d08736r.pdf GAO GAO-08-736R 6/23/2008 Military Operations: Actions Needed To Better Guide Project Selection for Commander’s Emergency Response Program and Improve Oversight in Iraq GAO GAO-08-837 6/23/2008 Securing, Stabilizing, and Rebuilding Iraq: Progress Report: Gains Made, Updated Strategy Needed www.gao.gov/new.items/ d08837.pdf GAO GAO-08-578 5/8/2008 Interagency Contracting: Need for Improved Information and Policy Implementation at the Department of State www.gao.gov/new.items/ d08578.pdf GAO GAO-08-568T 3/11/2008 Stabilizing and Rebuilding Iraq: Actions Needed To Address Inadequate Accountability Over U.S. Efforts and Investments www.gao.gov/new.items/ d08568t.pdf GAO GAO-08-423R 1/30/2008 Global War on Terrorism: Reported Obligations for the Department of Defense www.gao.gov/new.items/ d08423r.pdf GAO GAO-08-316R 1/22/2008 Defense Logistics: The Army Needs To Implement an Effective Management and Oversight Plan for the Equipment Maintenance Contract in Kuwait www.gao.gov/new.items/ d08316r.pdf GAO GAO-08-153 1/18/2008 Iraq Reconstruction: Better Data Needed To Assess Iraq’s Budget Execution www.gao.gov/new.items/ d08153.pdf GAO GAO-08-143R 11/30/2007 Operation Iraqi Freedom: DoD Assessment of Iraqi Security Forces’ Units as Independent Not Clear Because ISF Support Capabilities Are Not Fully Developed www.gao.gov/new.items/ d08143r.pdf GAO GAO-08-68 11/6/2007 Global War on Terrorism: DoD Needs To Take Action To Encourage Fiscal Discipline and Optimize Use of Tools Intended To Improve GWOT Cost Reporting www.gao.gov/new.items/ d0868.pdf GAO GAO-08-231T 10/30/2007 Securing, Stabilizing, and Rebuilding Iraq: GAO Audits and Key Oversight Issues www.gao.gov/new.items/ d08231t.pdf GAO GAO-07-903 10/4/2007 Stabilizing and Rebuilding Iraq: U.S. Ministry Capacity Development Efforts Need an Overall Integrated Strategy To Guide Efforts and Manage Risk www.gao.gov/new.items/ d07903.pdf GAO GAO-08-124T 10/4/2007 Stabilizing and Rebuilding Iraq: Serious Challenges Confront U.S. Efforts To Build the Capacity of Iraqi Ministries www.gao.gov/new.items/ d08124t.pdf GAO GAO-07-814 9/19/2007 Defense Logistics: Army and Marine Corps Cannot Be Assured That Equipment Reset Strategies Will Sustain Equipment Availability While Meeting Ongoing Operational Requirements www.gao.gov/new.items/ d07814.pdf GAO GAO-09-1230T 9/7/2007 Securing, Stabilizing, and Rebuilding Iraq: Iraqi Government Has Not Met Most Legislative, Security, and Economic Benchmarks www.gao.gov/new.items/ d071230t.pdf GAO GAO-09-1221T 9/5/2007 Securing, Stabilizing, and Rebuilding Iraq: Iraqi Government Has Not Met Most Legislative, Security, and Economic Benchmarks www.gao.gov/new.items/ d071221t.pdf GAO GAO-09-1222T 9/5/2007 Securing, Stabilizing, and Rebuilding Iraq: Iraqi Government Has Not Met Most Legislative, Security, and Economic Benchmarks www.gao.gov/new.items/ d071222t.pdf GAO GAO-07-1195 9/4/2007 Securing, Stabilizing, and Rebuilding Iraq: Iraqi Government Has Not Met Most Legislative, Security, and Economic Benchmarks www.gao.gov/new.items/ d071195.pdf GAO GAO-07-1220T 9/4/2007 Securing, Stabilizing, and Rebuilding Iraq: Iraqi Government Has Not Met Most Legislative, Security, and Economic Benchmarks www.gao.gov/new.items/ d071120t.pdf GAO GAO-07-839 7/31/2007 Defense Contract Management: DoD’s Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk www.gao.gov/new.items/ d07839.pdf GAO GAO-07-863 7/11/2007 Unmanned Aircraft Systems: Advance Coordination and Increased Visibility Needed To Optimize Capabilities www.gao.gov/new.items/ d07836.pdf GAO GAO-07-759 6/8/2007 Defense Acquisitions: Analysis of Processes Used To Evaluate Active Protection Systems www.gao.gov/new.items/ d07759.pdf GAO GAO-07-906R 5/25/2007 GAO Findings and Recommendations Regarding DoD and VA Disability Systems www.gao.gov/new.items/ d07906r.pdf GAO GAO-07-699 5/23/2007 Military Operations: The Department of Defense’s Use of Solatia and Condolence Payments in Iraq and Afghanistan www.gao.gov/new.items/ d07699.pdf GAO GAO-07-783T 5/18/2007 Global War on Terrorism: Reported Obligations for the Department of Defense www.gao.gov/new.items/ d07783t.pdf GAO GAO-07-677 5/15/2007 Rebuilding Iraq: Integrated Strategic Plan Needed To Help Restore Iraq’s Oil and Electricity Sectors www.gao.gov/new.items/ d07677.pdf Continued on next page H-10 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H Agency Report Number Date Report Title Web Link www.gao.gov/new.items/ d07832t.pdf GAO GAO-07-832T 5/10/2007 Defense Acquisitions: Improved Management and Oversight Needed To Better Control DoD’s Acquisition of Services GAO GAO-07-827T 5/9/2007 Stabilizing and Rebuilding Iraq: Coalition Support and International Donor Commitments www.gao.gov/new.items/ d07827t.pdf GAO GAO-07-749 5/1/2007 Military Operations: Actions Needed To Improve DoD’s Stability Operations Approach and Enhance Interagency Planning www.gao.gov/new.items/ d07749.pdf GAO GAO-07-662R 4/27/2007 Defense Logistics: Army and Marine Corps’s Individual Body Armor System Issues www.gao.gov/new.items/ d07662r.pdf GAO GAO-07-525T 4/23/2007 Stabilizing and Rebuilding Iraq: Conditions in Iraq Are Conducive to Fraud, Waste, and Abuse www.gao.gov/new.items/ d07525t.pdf GAO GAO-07-503R 3/28/2007 Operation Iraqi Freedom: Preliminary Observations on Iraqi Security Forces’ Logistics and Command and Control Capabilities www.gao.gov/new.items/ d07503r.pdf GAO GAO-07-444 3/22/2007 Operation Iraqi Freedom: DoD Should Apply Lessons Learned Concerning the Need for Security Over Conventional Munitions Storage Sites to Future Operations Planning www.gao.gov/new.items/ d07444.pdf GAO GAO-07-637T 3/22/2007 Stabilizing Iraq: Preliminary Observations on Budget and Management Challenges of Iraq’s Security Ministries www.gao.gov/new.items/ d07637t.pdf GAO GAO-07-612T 3/13/2007 Stabilizing Iraq: Factors Impeding the Development of Capable Iraqi Security Forces www.gao.gov/new.items/ d07612t.pdf GAO GAO-07-582T 3/9/2007 Operation Iraqi Freedom: Preliminary Observations on Iraqi Security Forces’ Logistical Capabilities www.gao.gov/new.items/ d07582t.pdf GAO GAO-07-144 2/15/2007 Defense Logistics: Improved Oversight and Increased Coordination Needed To Ensure Viability of the Army’s Prepositioning Strategy www.gao.gov/new.items/ d07144.pdf GAO GAO-07-426T 2/15/2007 Rebuilding Iraq: Reconstruction Progress Hindered by Contracting, Security, and Capacity Challenges www.gao.gov/new.items/ d07426t.pdf GAO GAO-07-439T 1/31/2007 Defense Logistics: Preliminary Observations on the Army’s Implementation of Its Equipment Reset www.gao.gov/new.items/ d07439t.pdf GAO GAO-07-385T 1/18/2007 Securing, Stabilizing, and Rebuilding Iraq: GAO Audit Approach and Findings www.gao.gov/new.items/ d07385t.pdf GAO GAO-07-308SP 1/9/2007 Securing, Stabilizing, and Rebuilding Iraq: Key Issues for Congressional Oversight www.gao.gov/new.items/ d07308sp.pdf GAO GAO-07-30R 12/15/2006 Rebuilding Iraq: Status of DoD’s Reconstruction Program www.gao.gov/new.items/ d0730r.pdf GAO GAO-07-76 11/13/2006 Global War on Terrorism: Fiscal Year 2006 Obligation Rates Are Within Funding Levels and Significant Multiyear Procurement Funds Will Likely Remain Available for Use in Fiscal Year 2007 www.gao.gov/new.items/ d0776.pdf GAO GAO-07-40 10/6/2006 Rebuilding Iraq: Status of Competition for Iraq Reconstruction Contracts www.gao.gov/new.items/ d0740.pdf GAO GAO-06-1085 9/29/2006 DoD Civilian Personnel: Greater Oversight and Quality Assurance Needed To Ensure Force Health Protection and Surveillance for Those Deployed www.gao.gov/new.items/ d061085.pdf GAO GAO-06-1130T 9/28/2006 Rebuilding Iraq: Continued Progress Requires Overcoming Contract Management Challenges www.gao.gov/new.items/ d061130t.pdf GAO GAO-06-1094T (GAO-06-673C) 9/11/2006 Stabilizing Iraq: An Assessment of the Security Situation www.gao.gov/new.items/ d061094t.pdf GAO GAO-06-928R 9/5/2006 Defense Logistics: Changes to Stryker Vehicle Maintenance Support Should Identify Strategies for Addressing Implementation Challenges www.gao.gov/new.items/ d06928r.pdf GAO GAO-06-1132 9/1/2006 Iraq Contract Costs: DoD Consideration of Defense Contract Audit Agency’s Findings www.gao.gov/new.items/ d061132.pdf GAO GAO-06-885T 7/18/2006 Global War on Terrorism: Observations on Funding, Costs, and Future Commitments www.gao.gov/new.items/ d06885t.pdf GAO GAO-06-953T 7/11/2006 Rebuilding Iraq: More Comprehensive National Strategy Needed To Help Achieve U.S. Goals and Overcome Challenges www.gao.gov/new.items/ d06953t.pdf Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I H-11 SUMMARY OF U.S. OVERSIGHT IN IRAQ Agency Report Number Date Report Title Web Link www.gao.gov/new.items/ d06788.pdf GAO GAO-06-788 7/1/2006 Rebuilding Iraq: More Comprehensive National Strategy Needed To Help Achieve U.S. Goals GAO GAO-06-865T 6/13/2006 Actions Still Needed To Improve the Use of Private Security Providers www.gao.gov/new.items/ d06865t.pdf GAO GAO-06-274 6/1/2006 Lack of a Synchronized Approach Between the Marine Corps and Army Affected the Timely Production and Installation of Marine Corps Truck Armor www.gao.gov/new.items/ d06274.pdf GAO GAO-06-711T 5/2/2006 Oil for Food Program Provides Lessons for Future Sanctions and Ongoing Reform www.gao.gov/new.items/ d06711t.pdf GAO GAO-06-697T 4/25/2006 Rebuilding Iraq: Governance, Security, Reconstruction, and Financing Challenges www.gao.gov/new.items/ d06697t.pdf GAO GAO-06-330 4/1/2006 Lessons Learned from Oil for Food Program Indicate the Need To Strengthen UN Internal Controls and Oversight Activities www.gao.gov/new.items/ d06330.pdf GAO GAO-06-428T 2/8/2006 Rebuilding Iraq: Stabilization, Reconstruction, and Financing Challenges www.gao.gov/new.items/ d06428t.pdf GAO GAO-07-145 12/18/2005 Military Operations: High-level DoD Action Needed To Address LongStanding Problems with Management and Oversight of Contractors Supporting Deployed Forces www.gao.gov/new.items/ d07145.pdf GAO GAO-06-179T 10/18/2005 Rebuilding Iraq: Enhancing Security, Measuring Program Results, and Maintaining Infrastructure Are Necessary to Make Significant and Sustainable Progress www.gao.gov/new.items/ d06179t.pdf GAO GAO-05-882 9/21/2005 Global War on Terrorism: DOD Needs To Improve the Reliability of Cost Data and Provide Additional Guidance To Control Costs www.gao.gov/new.items/ d05882.pdf GAO GAO-05-872 9/7/2005 Rebuilding Iraq: U.S. Water and Sanitation Efforts Need Improved Measures for Assessing Impact and Sustained Resources for Maintaining Facilities www.gao.gov/new.items/ d05872.pdf GAO GAO-05-932R 9/7/2005 Rebuilding Iraq: U.S. Assistance for the January 2005 Elections www.gao.gov/new.items/ d05932r.pdf GAO GAO-05-775 8/11/2005 Defense Logistics: DoD Has Begun To Improve Supply Distribution Operations, but Further Actions Are Needed To Sustain These Efforts www.gao.gov/new.items/ d05775.pdf GAO GAO-05-737 7/28/2005 Rebuilding Iraq: Actions Needed To Improve Use of Private Security Providers www.gao.gov/new.items/ d05737.pdf GAO GAO-05-876 7/28/2005 Rebuilding Iraq: Status of Funding and Reconstruction www.gao.gov/new.items/ d05876.pdf GAO GAO-05-680R 6/27/2005 Opportunities Exist To Improve Future Comprehensive Master Plans for Changing U.S. Defense Infrastructure Overseas www.gao.gov/new.items/ d05680r.pdf GAO GAO-05-293 5/1/2005 Defense Management: Processes To Estimate and Track Equipment Reconstitution Costs Can Be Improved www.gao.gov/new.items/ d05293.pdf GAO GAO-05-280R 4/29/2005 Defense Base Act Insurance: Review Needed of Cost and Implementation Issues www.gao.gov/new.items/ d05280r.pdf GAO GAO-05-201 4/1/2005 Interagency Contracting: Problems with DoD’s and Interior’s Orders To Support Military Operations www.gao.gov/new.items/ d05201.pdf GAO GAO-05-275 4/1/2005 Defense Logistics: Actions Needed To Improve the Availability of Critical Items during Current and Future Operations www.gao.gov/new.items/ d05275.pdf GAO GAO-05-328 3/17/2005 Defense Logistics - High Level DoD Coordination Is Needed To Further Improve the Management of the Army’s LOGCAP Contract www.gao.gov/new.items/ d05328.pdf GAO GAO-05-431T 3/14/2005 Rebuilding Iraq: Preliminary Observations on Challenges in Transferring Security Responsibilities to Iraqi Military and Police www.gao.gov/new.items/ d05431t.pdf GAO GAO-05-392T 3/2/2005 United Nations: Sustained Oversight Is Needed for Reforms To Achieve Lasting Results www.gao.gov/new.items/ d05392t.pdf GAO GAO-05-346T 2/15/2005 United Nations: Oil for Food Program Audits www.gao.gov/new.items/ d05346t.pdf GAO GAO-05-125 2/1/2005 Military Pay: Gaps in Pay and Benefits Create Financial Hardships for Injured Army National Guard and Reserve Soldiers www.gao.gov/new.items/ d05125.pdf Continued on next page H-12 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H Agency Report Number Date Report Title Web Link GAO GAO-05-233 2/1/2005 Progress in Implementing the Services Acquisition Reform Act (SARA) www.gao.gov/new.items/ d05233.pdf GAO GAO-05-79 1/1/2005 Army National Guard: Inefficient, Error-Prone Process Results in Travel Reimbursement Problems for Mobilized Soldiers www.gao.gov/new.items/ d0579.pdf GAO GAO-05-120 11/1/2004 Defense Health Care: Force Health Protection and Surveillance Policy Compliance Was Mixed, but Appears Better for Recent Deployments www.gao.gov/new.items/ d05120.pdf GAO GAO-04-1006 9/14/2004 Foreign Regimes’ Assets: The U.S. Faces Challenges in Recovering Assets, But Has Mechanisms That Could Guide Future Assets www.gao.gov/new.items/ d041006.pdf GAO GAO-04-1031 9/1/2004 Military Personnel: DoD Needs To Address Long-term Reserve Force Availability and Related Mobilization and Demobilization Issues www.gao.gov/new.items/ d041031.pdf GAO GAO-04-953T 7/8/2004 United Nations: Observations on the Oil for Food Program and Areas for Further Investigation www.gao.gov/new.items/ d04953t.pdf GAO GAO-04-854 7/1/2004 Military Operations: DoD’s Extensive Use of Logistics Support Contracts Requires Strengthened Oversight www.gao.gov/new.items/ d04854.pdf GAO GAO-04-915 7/1/2004 Military Operations: Fiscal Year 2004 Costs for the Global War on Terrorism Will Exceed Supplemental, Requiring DoD To Shift Funds from Other Uses www.gao.gov/new.items/ d04915.pdf GAO GAO-04-880T 6/16/2004 United Nations: Observations on the Oil for Food Program and Iraq’s Food Security www.gao.gov/new.items/ d04880t.pdf GAO GAO-04-869T 6/15/2004 Contract Management: Contracting for Iraq Reconstruction and Global Logistics Support (Testimony) www.gao.gov/new.items/ d04869t.pdf GAO GAO-04-605 6/1/2004 Rebuilding Iraq—Fiscal Year 2003 Contract Award Procedures and Management Challenges www.gao.gov/new.items/ d004605.pdf GAO GAO-04-902R 6/1/2004 Rebuilding Iraq—Resource, Security, Governance, Essential Services, and Oversight Issues www.gao.gov/new.items/ d04902r.pdf GAO GAO-04-831R 5/27/2004 Financial Services: Post-hearing Questions Regarding Recovering Foreign Regimes’ Assets www.gao.gov/new.items/ d04831r.pdf GAO GAO-04-746R 5/25/2004 Report on Iraq Transitional Law www.gao.gov/new.items/ d04746r.pdf GAO GAO-04-668 5/1/2004 Military Operations: DoD’s Fiscal Year 2003 Funding and Reported Obligations in Support of the Global War on Terrorism www.gao.gov/new.items/ d04668.pdf GAO GAO-04-730T 4/28/2004 United Nations: Observations on the Management and Oversight of the Oil for Food Program www.gao.gov/new.items/ d04730t.pdf GAO GAO-04-651T 4/7/2004 United Nations: Observations on the Oil for Food Program www.gao.gov/new.items/ d04651t.pdf GAO GAO-04-484 4/1/2004 Operation Iraqi Freedom: Long-standing Problems Hampering Mail Delivery Need To Be Resolved www.gao.gov/new.items/ d04484.pdf GAO GAO-04-559 4/1/2004 State Department Issues Affecting Iraq National Congress Support Foundation www.gao.gov/new.items/ d04559.pdf GAO GAO-04-562T 3/24/2004 Military Prepositioning: Observations on Army and Marine Corps Programs During Operation Iraqi Freedom and Beyond www.gao.gov/new.items/ d04562t.pdf GAO GAO-04-579T 3/18/2004 Recovering Iraq’s Assets: Preliminary Observations on U.S. Efforts and Challenges www.gao.gov/new.items/ d04579t.pdf GAO GAO-04-305R 12/18/2003 Defense Logistics: Preliminary Observations on the Effectiveness of Logistics Activities during Operation Iraqi Freedom (Briefing) www.gao.gov/new.items/ d04305r.pdf GAO GAO-03-1088 9/1/2003 Military Operations: Fiscal Year 2003 Obligations Are Substantial, But May Result in Less Obligations Than Expected www.gao.gov/new.items/ d031088.pdf GAO GAO-03-792R 5/15/2003 Rebuilding Iraq www.gao.gov/new.items/ d03792r.pdf Total GAO Audits = 148 JULY 30, 2010 I REPORT TO CONGRESS I H-13 SUMMARY OF U.S. OVERSIGHT IN IRAQ SIGIR Completed Audits, as of July 31, 2010 Agency Report Number Date Report Title SIGIR 10-022 Jul-2010 Improved Oversight Needed for State Department Grant to the International Republican Institute SIGIR 10-021 Jul-2010 Plans to Preserve Iraq Reconstruction Program and Contract Records Need to be Improved SIGIR 10-020 Jul-2010 Development Fund for Iraq: Department of Defense Needs to Improve Financial and Management Controls SIGIR 10-019 Jul-2010 Iraq Reconstruction Funds: Forensic Audits Identifying Fraud, Waste, and Abuse—Interim Report #4 SIGIR 10-018 Jul-2010 Most Iraq Economic Support Fund Appropriations Have Been Obligated and Liquidated SIGIR 10-017 Apr-2010 Iraq Reconstruction Funds: Forensic Audits Identifying Fraud, Waste, and Abuse—Interim Report #3 SIGIR 10-016 Apr-2010 Most Iraq Security Forces Fund Appropriations Have Been Obligated SIGIR 10-015 Apr-2010 Health Center Sustainment Contract Resulted in Some Repairs, but Iraqi Maintenance Capability Was Not Achieved SIGIR 10-014 Apr-2010 Process for Continuing Invoice Payment for the Development Fund for Iraq Needs Attention SIGIR 10-013 Apr-2010 Commander’s Emergency Response Program: Projects at Baghdad Airport Provided Some Benefits but Waste and Management Problems Occurred SIGIR 10-009 Mar-2010 Interim Report on Projects to Develop the Iraqi Special Operations Forces SIGIR 10-012 Jan-2010 Department of State Grant Management: Limited Oversight of Costs and Impact of International Republican Institute and National Democratic Institute Democracy Grants SIGIR 10-011 Jan-2010 Iraq Reconstruction Funds: Forensic Audits Identifying Fraud, Waste, and Abuse—Interim Report #2 SIGIR 10-010 Jan-2010 Department of State Contract To Study the Iraq Reconstruction Management System SIGIR 10-008 Jan-2010 Long-standing Weaknesses in Department of State’s Oversight of DynCorp Contract for Support of the Iraqi Police Training Program SIGIR 10-007 Jan-2010 Wamar International Successfully Completed Contracts, but Unanticipated Problems Affected Costs and Schedules SIGIR 10-006 Oct-2009 Development Fund for Iraq: Policy Guidance Needed to Enhance Accountability of USACE-managed Funds SIGIR 10-005 Oct-2009 Iraq Security Forces Fund: Weak Contract Oversight Allowed Potential Overcharges by AECOM to Go Undetected SIGIR 10-004 Oct-2009 Iraq Reconstruction Funds: Forensic Audits Identifying Fraud, Waste, and Abuse—Interim Report #1 SIGIR 10-003 Oct-2009 Iraq-Commander’s Emergency Response Program Generally Managed Well, but Project Documentation and Oversight Can Be Improved SIGIR 10-002 Oct-2009 Data Provided to the Government of Iraq on U.S. Reconstruction Projects Lacked Clarity SIGIR 10-001 Oct-2009 Iraqi Security Forces Facilities: Environmental Chemical Corporation Projects Achieved Results, but with Significant Cost and Schedule Increases SIGIR 09-027 Jul-2009 Developing Iraqi Military Depot Maintenance Capability at Taji Hampered by Numerous Problems SIGIR 09-026 Jul-2009 Commander’s Emergency Response Program: Hotel Construction Successfully Completed, but Project Management Issues Remain Unresolved SIGIR 09-025 Jul-2009 Commander’s Emergency Response Program: Muhalla 312 Electrical Distribution Project Largely Successful SIGIR 09-024 Jul-2009 Tikrit Location Command Project Achieving Contract Goals by Using Sound Management Practices SIGIR 09-023 Jul-2009 Investigation and Remediation Records Concerning Incidents of Weapons Discharges by Private Security Contractors Can Be Improved SIGIR 09-022 Jul-2009 Field Commanders See Improvements in Controlling and Coordinating Private Security Contractor Missions in Iraq SIGIR 09-021 and AUD/ IQO-09-16 Jun-2009 Joint Audit of Blackwater Contract and Task Orders for Worldwide Personal Protective Services in Iraq (with DoS OIG) SIGIR 09-020 Apr-2009 Provincial Reconstruction Teams: Developing a Cost-tracking System Will Enhance Decision-making SIGIR 09-019 Apr-2009 Opportunities To Improve Processes for Reporting, Investigating, and Remediating Serious Incidents Involving Private Security Contractors in Iraq SIGIR 09-018 Apr-2009 Information on Government of Iraq Contributions to Reconstruction Costs SIGIR 09-017 Apr-2009 Need To Enhance Oversight of Theater-Wide Internal Security Services Contracts Continued on next page H-14 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H Agency Report Number Date Report Title SIGIR 09-016 Apr-2009 Asset-transfer Process for Iraq Reconstruction Projects Lacks Unity and Accountability SIGIR 09-015 Apr-2009 Construction of Primary Healthcare Centers Reported Essentially Complete, but Operational Issues Remain SIGIR 09-014 Apr-2009 Security Forces Logistics Contract Experienced Certain Cost, Outcome, and Oversight Problems SIGIR 09-013 Jan-2009 Provincial Reconstruction Teams’ Performance Measurement Process Has Improved SIGIR 09-012 Jan-2009 The U.S. Has Reduced Its Funding for the Iraqi Security Forces, but Continued Support Will Likely Be Necessary SIGIR 09-011 Jan-2009 Opportunities to Improve Management of the Quick Response Fund SIGIR 09-010 Jan-2009 Oversight of Aegis’s Performance on Security Services Contracts in Iraq with the Department of Defense SIGIR 09-009 Jan-2009 Full Impact of Department of Defense Program To Restart State-owned Enterprises Difficult To Estimate SIGIR 09-008 Jan-2009 Cost, Outcome, and Oversight of Iraq Oil Reconstruction Contract with Kellogg Brown & Root Services, Inc. SIGIR 09-007 Oct-2008 Improvements Needed in Reporting Status of Reconstruction Projects to Chief of Mission SIGIR 09-006 Oct-2008 Status of Department of State Economic Support Fund Interagency Agreements With The U.S. Army Corps of Engineers in Iraq SIGIR 09-005 Oct-2008 Agencies Need Improved Financial Data Reporting for Private Security Contractors SIGIR 09-004 Oct-2008 Iraq Reconstruction Project Terminations Represent a Range of Actions SIGIR 09-003 Oct-2008 Cost, Outcome, and Oversight of Local Governance Program Contracts With Research Triangle Institute SIGIR 09-002 Oct-2008 Challenges in Obtaining Reliable and Useful Data on Iraqi Security Forces Continue SIGIR 09-001 Oct-2008 Opportunity to Enhance U.S. Democracy Building Strategy for Iraq SIGIR 08-024 Jul-2008 Information on Special Department of Defense Program to Foster Economic Recovery in Iraq SIGIR 08-023 Jul-2008 Anticorruption Efforts in Iraq: U.S. and Iraq Take Actions but Much Remains To Be Done SIGIR 08-022 Jul-2008 Government of Iraq Increasingly Funding Iraq Security Force Infrastructure Development, but Substantial U.S. Support Remains SIGIR 08-021 Jul-2008 Comprehensive Plan Needed To Guide the Future of the Iraq Reconstruction Management System SIGIR 08-020 Jul-2008 Key Recurring Management Issues Identified in Audits of Iraq Reconstruction Efforts SIGIR 08-019 Jul-2008 Outcome, Cost, and Oversight of the Security and Justice Contract with Parsons Delaware, Inc. SIGIR 08-018 Jul-2008 Outcome, Cost, and Oversight of Water Sector Reconstruction Contract with FluorAMEC, LLC SIGIR 08-017 Apr-2008 Transferring Reconstruction Projects to the Government of Iraq: Some Progress Made but Further Improvements Needed To Avoid Waste SIGIR 08-016 Apr-2008 U.S. Anticorruption Efforts in Iraq: Progress Made in Implementing Revised Management Plan SIGIR 08-015 Apr-2008 Interim Analysis of Iraqi Security Force Information Provided by the Department of Defense Report, Measuring Stability and Security in Iraq SIGIR 08-014 Apr-2008 Progress on Recommended Improvements to Contract Administration for the Iraqi Police Training Program SIGIR 08-013 Apr-2008 Interim Report on Iraq Reconstruction Contract Terminations SIGIR 08-011 Apr-2008 Outcome, Cost, and Oversight of Electricity-sector Reconstruction Contract with Perini Corporation SIGIR 08-012 Mar-2008 Attestation to Development Fund for Iraq Cash in the Possession of the Joint Area Support Group-Central SIGIR 08-010 Jan-2008 Outcome, Costs, and Management Oversight of Iraq Reconstruction Contract W914NS-04-D-0006 SIGIR 08-009 Jan-2008 Appropriate Award Fee Conversion Scales Can Enhance Incentive for Contractor Performance SIGIR 08-008 Jan-2008 U.S. Anticorruption Efforts in Iraq: Sustained Management Commitment Is a Key to Success SIGIR 08-007 Jan-2008 Efforts To Implement a Financial-Management Information System in Iraq SIGIR 08-006 Jan-2008 Commander’s Emergency Response Program in Iraq Funds Many Large-Scale Projects SIGIR 08-005 Jan-2008 Differences in Services and Fees for Management and Administration of Iraq Reconstruction Contracts SIGIR 08-004 Jan-2008 Outcome, Cost, and Oversight of Reconstruction of Taji Military Base and Baghdad Recruiting Center SIGIR 08-003 Oct-2007 Review of the Use of Contractors in Managing Iraq Relief and Reconstruction Projects Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I H-15 SUMMARY OF U.S. OVERSIGHT IN IRAQ Agency Report Number Date Report Title SIGIR 08-002 Oct-2007 Logistics Civil Augmentation Program Task Orders 130 and 151: Program Management, Reimbursement, and Transition SIGIR 08-001 Oct-2007 Interim Report on Efforts and Further Actions Needed To Implement a Financial Management Information System in Iraq SIGIR 07-016 Oct-2007 Interim Review of DynCorp International, LLC, Spending Under Its Contract for the Iraqi Police Training Program SIGIR 07-015 Oct-2007 Review of the Effectiveness of the Provincial Reconstruction Team Program In Iraq SIGIR 07-011 Oct-2007 Controls Over Unliquidated Obligations in the Iraq Relief and Reconstruction Fund SIGIR 07-010 Oct-2007 Agency Management of the Closeout Process for Iraq Relief and Reconstruction Fund Contracts SIGIR 07-014 Jul-2007 Status of the Provisional Reconstruction Team Program Expansion in Iraq SIGIR 07-009 Jul-2007 Review of Bechtel’s Spending Under Its Phase II Iraq Reconstruction Contract SIGIR 07-008 Jul-2007 Fact Sheet: U.S. Government Organizations’ Role and Responsibilities for Iraq Relief and Reconstruction Activities SIGIR 07-007 Jul-2007 Status of U.S. Government Anticorruption Efforts in Iraq SIGIR 07-005 Jul-2007 Fact Sheet on Sources and Uses of U.S. Funding Provided in Fiscal Year 2006 for Iraq Relief and Reconstruction SIGIR 07-004 Jul-2007 Transferring Iraq Relief and Reconstruction Fund Capital Projects to the Government of Iraq SIGIR 07-003 Jul-2007 Review of Financial Reporting and Cost-to-complete Estimates for Iraq Relief and Reconstruction U.S.funded Programs and Projects SIGIR 07-001 Jun-2007 Logistics Civil Augmentation Program Task Order 130: Requirements Validation, Government Oversight, and Contractor Performance SIGIR 07-013 Apr-2007 Sustainment of the Advanced First Responder Network (Restricted) SIGIR 07-012 Apr-2007 Review of Iraq Relief and Reconstruction Fund Unmatched Disbursements at the Department of State SIGIR 07-006 Apr-2007 Management of the Commander’s Emergency Response Program in Iraq for Fiscal Year 2006 SIGIR 07-002 Apr-2007 Status of the Advanced First Responder Network SIGIR 06-045 Jan-2007 Status of Ministerial Capacity Development in Iraq SIGIR 06-044 Jan-2007 Fact Sheet on Major U.S. Contractors’ Security Costs Related to Iraq Relief and Reconstruction Fund Contracting Activities SIGIR 06-043 Jan-2007 Review of Iraq Relief and Reconstruction Fund Unmatched Disbursements SIGIR 06-042 Jan-2007 Fact Sheet on Major U.S. Contractors‘ Security Costs Related to IRRF Fund Contracting Activities (Restricted-Limited Distribution) SIGIR 06-040 Jan-2007 Improper Obligations Using the Iraq Relief and Reconstruction Fund (IRRF 2) SIGIR 06-039 Jan-2007 Review of USAID/Bechtel National, Inc., Property Management Controls for Contract SPU-C-00-04-00001-00 SIGIR 06-036 Jan-2007 Follow-up on SIGIR Recommendations Concerning the Development Fund for Iraq (DFI) SIGIR 06-030 Jan-2007 Status of Medical Equipment and Other Non-Construction Items Purchased for Primary Healthcare Centers SIGIR 06-029 Jan-2007 Review of DynCorp International, LLC, Contract Number S-LMAQM-04-C-0030, Task Order 0338, for the Iraqi Police Training Program Support SIGIR 06-035 Oct-2006 Interim Audit Report on Inappropriate Use of Proprietary Data Markings By the Logistics Civil Augmentation Program (LOGCAP) Contractor SIGIR 06-034 Oct-2006 Status of the Provincial Reconstruction Team Program in Iraq SIGIR 06-033 Oct-2006 U.S. Department of Defense Using the Iraq Relief and Reconstruction Fund SIGIR 06-032 Oct-2006 Iraqi Security Forces: Review of Plans To Implement Logistics Capabilities SIGIR 06-031 Oct-2006 Management of the Iraqi Interim Government Fund SIGIR 06-028 Oct-2006 Review of Administrative Task Orders for Iraq Reconstruction Contracts SIGIR 06-038 Sep-2006 Unclassified Summary of SIGIR’s Review of Efforts To Increase Iraq’s Capability To Protect Its Energy Infrastructure Continued on next page H-16 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H Agency Report Number Date Report Title SIGIR 06-037 Sep-2006 Interim Audit Report on Improper Obligations Using the Iraq Relief and Reconstruction Fund (IRRF 2) SIGIR 06-026 Jul-2006 Review of the U.S. Agency for International Development’s Management of the Basrah Children’s Hospital Project SIGIR 06-025 Jul-2006 Review of the Medical Equipment Purchased for the Primary Healthcare Centers Associated with Parsons Global Services, Inc., Contract Number W914NS-04-D-0006 SIGIR 06-024 Jul-2006 Joint Cash Count—Iraq National Weapons Card Program SIGIR 06-023 Jul-2006 Changes in Iraq Relief and Reconstruction Fund Program Activities, January Through March 2006 SIGIR 06-021 Jul-2006 Joint Survey of the U.S. Embassy-Iraq’s Anticorruption Program SIGIR 06-020 Jul-2006 Review of the Advanced First Responder Network SIGIR 06-019 Jul-2006 Review of the Use of Definitization Requirements for Contracts Supporting Reconstruction in Iraq SIGIR 06-018 Jul-2006 Survey of the Status of Funding for Iraq Programs Allocated to the Department of State’s Bureau of International Narcotics and Law Enforcement Affairs as of December 31, 2005 SIGIR 06-017 Jul-2006 Transition of Iraqi Relief and Reconstruction Fund Projects to the Iraqi Government SIGIR 06-014 Jul-2006 Review of Efforts To Increase Iraq’s Capability To Protect Its Energy Infrastructure (Classified) SIGIR 06-016 Apr-2006 Interim Audit Report on the Review of the Equipment Purchased for Primary Healthcare Centers Associated with Parsons Global Services, Contract Number W914NS-04-D-0006 SIGIR 06-015 Apr-2006 Iraqi Armed Forces Seized Assets Fund: Review of Contracts and Financial Documents SIGIR 06-013 Apr-2006 Briefing to the International Advisory and Monitoring Board for Iraq: Management Controls Over the Development Fund for Iraq SIGIR 06-012 Apr-2006 Development Fund for Iraq Cash Accountability Review: Joint Area Support Group-Central/Fallujah SIGIR 06-011 Apr-2006 Management of the Primary Healthcare Centers Construction Projects SIGIR 06-010 Apr-2006 Review of the Multi-National Security Transition Command-Iraq Reconciliation of the Iraqi Armed Forces Seized Assets Fund SIGIR 06-009 Apr-2006 Review of Task Force Shield Programs SIGIR 06-008 Apr-2006 Development Fund for Iraq—Cash Accountability Review: Joint Area Support Group-Central SIGIR 06-007 Apr-2006 U.S. Agency for International Development: Management of the Transfer of Iraq Relief and Reconstruction Fund Projects to the Iraqi Government SIGIR 06-006 Apr-2006 Multi-National Security Transition Command-Iraq Management of the Transfer of Iraq Relief and Reconstruction Fund Projects to the Iraqi Government SIGIR 06-005 Apr-2006 Follow-up on Recommendations Made in SIGIR Audit Reports Related to Management and Control of the Development Fund for Iraq SIGIR 06-004 Apr-2006 Changes in Iraq Relief and Reconstruction Fund Program Activities, October through December 2005 SIGIR 06-003 Apr-2006 Review of Data Entry and General Controls in the Collecting and Reporting of the Iraq Relief and Reconstruction Fund SIGIR 06-001 Apr-2006 Management of Iraq Relief and Reconstruction Fund Program: The Evolution of the Iraq Reconstruction Management System SIGIR 06-002 Feb-2006 Prompt Payment Act: Analysis of Expenditures Made from the Iraq Relief and Reconstruction Fund SIGIR 05-029 Jan-2006 Challenges Faced In Carrying Out Iraq Relief and Reconstruction Fund Activities SIGIR 05-028 Jan-2006 GRD-PCO Management of the Transfer of IRRF-Funded Assets to the Iraqi Government SIGIR 05-027 Jan-2006 Methodologies for Reporting Cost-To-Complete Estimates SIGIR 05-026 Jan-2006 Fact Sheet on the Use of the $50 Million Appropriation To Support the Management and Reporting of the Iraq Relief and Reconstruction Fund SIGIR 05-025 Jan-2006 Management of the Commander’s Emergency Response Program for Fiscal Year 2005 SIGIR 05-024 Jan-2006 Management of the Mansuria Electrical Reconstruction Project SIGIR 05-023 Jan-2006 Management of Rapid Regional Response Program Contracts in South-Central Iraq SIGIR 05-022 Oct-2005 Managing Sustainment for Iraq Relief and Reconstruction Fund Programs SIGIR 05-021 Oct-2005 Management of Iraq Relief and Reconstruction Fund Programs: Cost-to-Complete Estimate Reporting Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I H-17 SUMMARY OF U.S. OVERSIGHT IN IRAQ Agency Report Number Date Report Title SIGIR 05-020 Oct-2005 Management of the Contracts, Grant, and Micropurchases Used To Rehabilitate the Kerbala Library SIGIR 05-018 Oct-2005 Management of Iraq Relief and Reconstruction Fund Program: Acquisition of Armored Vehicles Purchased Through Contract W914NS-05-M-1189 SIGIR 05-017 Oct-2005 Award Fee Process for Contractors Involved In Iraq Reconstruction SIGIR 05-016 Oct-2005 Management of the Contracts and Grants Used To Construct and Operate the Babylon Police Academy SIGIR 05-015 Oct-2005 Management of Rapid Regional Response Program Grants in South-Central Iraq SIGIR 05-014 Oct-2005 Management of Commander’s Emergency Response Program for Fiscal Year 2004 SIGIR 05-019 Sep-2005 Attestation Engagement Report Concerning the Award of Non-Competitive Contract DACA63-03-D-0005 to Kellogg, Brown and Root Services, Inc. SIGIR 05-013 Sep-2005 Controls over Equipment Acquired by Security Contractors SIGIR 05-012 Jul-2005 Policies and Procedures Used for Iraq Relief and Reconstruction Fund Project Management—Construction Quality Assurance SIGIR 05-011 Jul-2005 Cost-to-Complete Estimates and Financial Reporting for the Management of the Iraq Relief and Reconstruction Fund SIGIR 05-010 Jul-2005 Interim Briefing to the Project and Contracting Office-Iraq and the Joint Contracting Command-Iraq on the Audit of the Award Fee Process SIGIR 05-009 Jul-2005 Reconciliation of Reporting Differences of the Source of Funds Used on Contracts After June 28, 2004 SIGIR 05-008 Apr-2005 Administration of Contracts Funded by the Development Fund for Iraq SIGIR 05-007 Apr-2005 Administration of Iraq Relief and Reconstruction Fund Contract Files SIGIR 05-006 Apr-2005 Control of Cash Provided to South-Central Iraq SIGIR 05-005 Apr-2005 Compliance with Contract No. W911S0-04-C-0003 Awarded to Aegis Defence Services Limited SIGIR 05-004 Jan-2005 Oversight of Funds Provided to Iraqi Ministries through the National Budget Process SIGIR 05-003 Nov-2004 Task Order 0044 of the Logistics Civilian Augmentation Program III Contract SIGIR 05-002 Oct-2004 Accountability and Control of Materiel Assets of the Coalition Provisional Authority in Kuwait SIGIR 05-001 Oct-2004 Coalition Provisional Authority Control of Appropriated Funds SIGIR 04-013 Jul-2004 Coalition Provisional Authority’s Contracting Processes Leading Up To and Including Contract Award SIGIR 04-011 Jul-2004 Audit of the Accountability and Control of Materiel Assets of the Coalition Provisional Authority in Baghdad SIGIR 04-009 Jul-2004 Coalition Provisional Authority Comptroller Cash Management Controls Over the Development Fund for Iraq SIGIR 04-008 Jul-2004 Coalition Provisional Authority Control Over Seized and Vested Assets SIGIR 04-007 Jul-2004 Oil For Food Cash Controls for the Office of Project Coordination in Erbil, Iraq SIGIR 04-006 Jul-2004 Corporate Governance for Contractors Performing Iraq Reconstruction Efforts SIGIR 04-005 Jul-2004 Award of Sector Design-Build Construction Contracts SIGIR 04-004 Jul-2004 Task Orders Awarded by the Air Force Center for Environmental Excellence in Support of the Coalition Provisional Authority SIGIR 04-003 Jun-2004 Federal Deployment Center Forward Operations at the Kuwait Hilton SIGIR 04-002 Jun-2004 Management of Personnel Assigned to the Coalition Provisional Authority in Baghdad, Iraq SIGIR 04-001 Jun-2004 Coalition Provisional Authority Coordination of Donated Funds Total SIGIR Reports = 171 H-18 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H USAAA Completed Audits, as of June 30, 2010 Agency Report Number Date Report Title Web Link USAAA A-2010-0098-ALL 5/7/2010 Retrograde Operations in Southwest Asia, Donation and Transfer of Excess Materiel and Supplies www.aaa.army.mil/AAA/AuditReports--Adobe/10%20REPORTS/ A-2010-0098-ALL%20Retrograde%20Operations%20in%20 Southwest%20Asia,%20Donation%20and%20Transfer%20 of%20Excess%20Materiel%20and%20Supplies.pdf USAAA A-2010-0096-ALL 5/7/2010 Controls Over Vendor Payments – Southwest Asia (Phase II) – U.S. Army Contingency Operations Not Available USAAA A-2010-0097-ALL 5/4/2010 Commander’s Emergency Response Program (CERP), Multi-National Force – Iraq, Summary Report Not Available USAAA A-2010-0094-ALA 5/3/2010 Foreign Military Sales Process for Iraq and Afghanistan www.aaa.army.mil/AAA/AuditReports--Adobe/10%20REPORTS/ A-2010-0094-ALA%20Foreign%20Military%20Sales%20 Process%20for%20Iraq%20and%20Afghanistan,%20U.S.pdf USAAA A-2010-0088-ALL 4/14/2010 Agreed-Upon Procedures Attestation to Evaluate Bulk Fuel Requests for Forward Operating Base Shank, Afghanistan Not Available USAAA A-2010-0082-ALL 4/12/2010 Multi-National Security Transition Command – Iraq (MNSTC-I), Iraqi Security Forces Fund (ISFF) Not Available USAAA A-2010-0087-ALL 4/12/2010 Followup Audit on Sensitive Items Accountability and Control at Abu Ghraib www.aaa.army.mil/AAA/AuditReports--Adobe/10%20 REPORTS/A-2010-0087-ALL%20Followup%20Audit%20of%20 Sensitive%20Items%20Accountability%20and%20Control,%20 Abu%20Ghraib%20Warehouse,%20Iraq.pdf USAAA A-2010-0077-ALC 3/25/2010 Agreed-Upon Procedure Attestation of the Joint Contracting Command-Iraq/ Afghanistan Contract Closeout Task Force Not Available www.aaa.army.mil/AAA/AuditReports--Adobe/10%20 REPORTS/A-2010-0075-ALL%20Defense%20Base%20Act%20 Insurance,%20Audit%20of%20Contracting%20Operations,%20 U.S.%20Army%20Contracting%20Command%20SW%20 Asia%20-%20Kuwait.pdf USAAA A-2010-0075-ALL 3/23/2010 Defense Base Act Insurance, Audit of Contracting Operations, U.S. Army Contracting Command Southwest AsiaKuwait USAAA A-2010-0062-ALL 3/16/2010 Controls Over Vendor Payments Southwest Asia (Phase II) www.aaa.army.mil/AAA/AuditReports--Adobe/10%20REPORTS/ A-2010-0062-ALL%20Controls%20Over%20Vendor%20 Payments%20-%20Southwest%20Asia%20(Phase%20II).pdf 3/3/2010 Pricing and Funding Security Assistance to Iraq and Afghanistan, U.S. Army Security Assistance Command www.aaa.army.mil/AAA/AuditReports--Adobe/10%20 REPORTS/A-2010-0060-ALA%20Pricing%20and%20 Funding%20Security%20Assistance%20to%20Iraq%20and%20 Afghanistan,%20U.S.%20Army%20Security%20Assistance%20 Command.pdf Not Available USAAA A-2010-0060-ALA USAAA A-2010-0054-ALL 2/24/2010 Agreed-Upon Procedures Attestation to Determine the Total Amount of Requisitions Under DODAAC W91JKW Processed by Soldiers From the 18th Fires Brigade, Fort Bragg, North Carolina While Deployed to Iraq USAAA A-2010-0057-ALL 2/24/2010 Controls Over Vendor Payments Southwest Asia (Phase II) www.aaa.army.mil/AAA/AuditReports--Adobe/10%20REPORTS/ A-2010-0057-ALL%20Controls%20Over%20Vendor%20 Payments%20-%20Southwest%20Asia.pdf USAAA A-2010-0048-FFF 2/8/2010 Improvised Explosive Device Defeat Unit Training Not Available USAAA A-2010-0044-ALL 1/26/2010 Forward Operating Base Closures in Iraq Not Available 1/16/2010 Contracting Operations, Joint Contracting Command-Iraq/Afghanistan, Regional Contracting Center-Victory, Camp Victory, Iraq www.aaa.army.mil/AAA/AuditReports--Adobe/10%20REPORTS/ A-2010-0031-ALL%20Contracting%20Operations,%20Joint%20 Contracting%20Command%20-%20Iraq-Afghanistan,%20 Regional%20Contracting%20Center%20-%20Victory.pdf USAAA A-2010-0031-ALL Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I H-19 SUMMARY OF U.S. OVERSIGHT IN IRAQ Agency Report Number Date Report Title Web Link USAAA A-2010-0010-ALL 1/15/2010 Housing Management Area Support Group-Kuwait www.aaa.army.mil/AAA/AuditReports--Adobe/10%20REPORTS/ A-2010-0010-ALL%20Housing%20Management,%20Area%20 Support%20Group%20-%20Kuwait,%20Camp%20Arifjan,%20 Kuwait.pdf USAAA A-2010-0026-ALC 1/7/2010 Award Fee for Task Order 139 – LOGCAP III Contract, U.S. Army Contracting Command www.aaa.army.mil/AAA/AuditReports--Adobe/10%20REPORTS/ A-2010-0026-ALC%20Award%20Fee%20Determinations%20 for%20Task%20Order%20139--LOGCAP%20III%20Contract.pdf USAAA A-2010-0012-ALL 1/5/2010 Controls Over Vendor Payments Southwest Asia www.aaa.army.mil/AAA/AuditReports--Adobe/10%20REPORTS/ A-2010-0012-ALL%20Controls%20Over%20Vendor%20 Payments%20-%20Southwest%20Asia%20(Phase%20II).pdf USAAA A-2010-0018-ALL 12/17/2009 Management and Visibility of Government Property Provided to the Contractor Performing Bulk Fuel Operations in Kuwait www.aaa.army.mil/AAA/AuditReports--Adobe/10%20REPORTS/ A-2010-0018-ALL%20Management%20and%20Visibility%20 of%20Government%20Property%20Provided%20to%20 the%20Contractor%20Performing%20Bulk%20Fuel.pdf www.aaa.army.mil/AAA/AuditReports--Adobe/10%20REPORTS/ A-2010-0030-ALL%20Contracting%20Operations,%20Joint%20 Contracting%20Command%20-%20Iraq-Afghanistan,%20 Baghdad%20Regional%20Contracting.pdf USAAA A-2010-0030-ALL 12/14/2009 Contracting Operations, Joint Contracting Command – Iraq/Afghanistan, Baghdad Regional Contracting Center and TheaterWide Requirements Division, International Zone, Baghdad, Iraq USAAA A-2010-0019-ALM 12/8/2009 Time-Sensitive Issue – Nonstandard Equipment Sustainment of Terminated Systems www.aaa.army.mil/AAA/AuditReports--Adobe/10%20 REPORTS/A-2010-0019-ALM%20Time-Sensitive%20Issue%20 -%20Nonstandard%20Equipment%20Sustainment%20of%20 Terminated%20Systems.pdf USAAA A-2010-0021-ALL 12/8/2009 Retrograde Operations in Southwest Asia – Kuwait, Class IX Aviation Warehouse, Camp Arifjan, Kuwait www.aaa.army.mil/AAA/AuditReports--Adobe/10%20 REPORTS/A-2010-0021-ALL%20Retrograde%20Operations%20 in%20Southwest%20Asia%20-%20Kuwait,%20Class%20IX%20 Aviation%20Warehouse,%20Camp%20Arifjan,%20Kuwait.pdf USAAA A-2010-0022-ALL 12/7/2009 Retrograde Operations in Southwest Asia, Multi-Class Retrograde, Camp Arifjan, Kuwait www.aaa.army.mil/AAA/AuditReports--Adobe/10%20 REPORTS/A-2010-0022-ALL%20Retrograde%20Operations%20 Southwest%20Asia,%20Multi-Class%20Retrograde,%20 Camp%20Arifjan,%20Kuwait.pdf USAAA A-2010-0013-ALM 11/16/2009 Automatic Reset Induction Retrograde and Depot Operations Not Available www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0245-ALL%20Logistics%20Civil%20Augmentation%20 Program%20Operations%20in%20Support%20of%20 Operation%20Iraqi%20Freedom%20-%20Power%20 Generators.pdf USAAA A-2009-0245-ALL 9/30/2009 Logistics Civil Augmentation Program (LOGCAP) Operations in Support of Operation Iraqi Freedom - Power Generators USAAA A-2009-0244-ALL 9/30/2009 U.S. Army Corps of Engineers Contract Functions in Iraq, Gulf Region Division, Baghdad, Iraq www.aaa.army.mil/AAA/AuditReports--Adobe/09%20 REPORTS/A-2009-0244-ALL%20U.S.%20Army%20Corps%20 of%20Engineers%20Contract%20Functions%20in%20Iraq,%20 Gulf%20Region%20Division,%20Baghdad,%20Iraq.pdf USAAA A-2009-0242-ALR 9/30/2009 Property Book Unit Supply Enhanced, I Corps and Fort Lewis www.aaa.army.mil/AAA/AuditReports--Adobe/09%20 REPORTS/A-2009-0242-ALR%20Property%20Book%20Unit%20 Supply%20Enhanced,%20I%20Corps%20and%20Fort%20 Lewis.pdf USAAA A-2009-0228-ALL 9/30/2009 Retrograde Operations in Southwest Asia - Management of Automatic Return and Critical Items Not Available USAAA A-2009-0132-ALL 9/29/2009 Contracting Operations, U.S. Army Contracting Command Southwest Asia Kuwait Not Available USAAA A-2009-0235-ALL 9/28/2009 Commander’s Emergency Response Program - Iraq Not Available Continued on next page H-20 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H Agency Report Number Date Report Title Web Link USAAA A-2009-0233-ALA 9/25/2009 Army Acquisition Objective Process www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0233-ALA%20Army%20Acquisition%20Objective%20 Process,%20Office%20of%20the%20Deputy%20Chief%20 of%20Staff,%20G-3,%205,%207.pdf USAAA A-2009-0221-ALA 9/21/2009 Effect of Mine Resistant Ambush Protected Vehicle (MRAP) Upon Tactical Vehicle System Requirements, Office of the Deputy Chief of Staff, G-3/5/7 Not Available USAAA A-2009-0219-ALL 9/21/2009 Sensitive Items Accountability and Control, Abu Ghraib Warehouse, Iraq Not Available USAAA A-2009-0212-FFS 9/17/2009 Requirements for Mobilized Soldiers www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0212-FFS%20Requirements%20for%20Mobilized%20 Soldiers.pdf USAAA A-2009-0188-FFM 9/1/2009 Assessing Future Base Budget Requirements Not Available USAAA A-2009-0164-FFS 9/1/2009 Assessing Future Base Budget Requirements Not Available USAAA A-2009-0202-FFF 8/28/2009 Use of Role-players for Training - Exclusive of Combat Training Centers www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0202-FFF%20Use%20of%20Role-players%20for%20 Training%20-%20Exclusive%20of%20Combat%20Training%20 Centers.pdf USAAA A-2009-0196-ALO 8/27/2009 Assessing Future Base Budget Requirements Not Available USAAA A-2009-0192-FFF 8/25/2009 Assessing Future Base Budget Requirements Not Available USAAA A-2009-0182-ALL 8/18/2009 Commander’s Emergency Response Program - Iraq Not Available USAAA A-2009-0181-ALR 8/18/2009 Property Accountability, 3rd Infantry Division, Rear Detachment, Fort Stewart, Georgia www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0181-ALR%20Property%20Accountability,%203rd%20 Infantry%20Division,%20Rear%20Detachment,%20Fort%20 Stewart,%20Georgia.pdf USAAA A-2009-0173-ALL 7/29/2009 Controls Over Vendor Payments Kuwait (Phase I - U.S. Army Contracting Command, Southwest Asia, Camp Arifjan, Kuwait) www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0173-ALL%20Controls%20Over%20Vendor%20 Payments-Kuwait%20(Phase%20I%20U.S.%20Army%20 Contracting%20Command.pdf USAAA A-2009-0169-ALL 7/28/2009 Commander’s Emergency Response Program - Iraq Not Available USAAA A-2009-0159-ALM 7/27/2009 Assessing Future Base Budget Requirements Not Available USAAA A-2009-0144-ZBI 7/23/2009 Army Foreign Language Program Contracting Not Available USAAA A-2009-0165-ALL 7/16/2009 Followup Audit of Management Controls Over Offline Purchases www.aaa.army.mil/AAA/AuditReports--Adobe/09%20 REPORTS/A-2009-0165-ALL%20Followup%20Audit%20 of%20Management%20Controls%20Over%20Offline%20 Purchases,%20Office%20of%20the%20Deputy.pdf USAAA A-2009-0156-ALM 7/9/2009 Field Level Maintenance Operations, U.S. Army Sustainment Command and U.S. Army Garrison, Fort Hood, Texas www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0156-ALM%20Field%20Level%20Maintenance%20 Operations,%20U.S.%20Army%20Sustainment%20Command. pdf USAAA A-2009-0146-ALM 6/22/2009 Sustaining Left-Behind Equipment, U.S. Army Sustainment Command www.aaa.army.mil/AAA/AuditReports--Adobe/09%20 REPORTS/A-2009-0146-ALM%20Sustaining%20Left-Behind%20 Equipment,%20U.S.%20Army%20Sustainment%20Command. pdf USAAA A-2009-0120-FFD 6/17/2009 Improvised Explosive Device Training for Explosive Ordnance Disposal Soldiers, Deputy Chief of Staff G-3/5/7 and Training and Doctrine Command Not Available Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I H-21 SUMMARY OF U.S. OVERSIGHT IN IRAQ Agency Report Number Date Report Title Web Link USAAA A-2009-0130-FFD 6/8/2009 Body Armor Requirements, Office of the Deputy Chief of Staff, G-3/5/7 www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0130-FFD%20Body%20Armor%20Requirements,%20 Office%20of%20the%20Deputy%20Chief%20of%20Staff,%20 G-3,%205,%207.pdf USAAA A-2009-0119-ALL 6/8/2009 Commander’s Emergency Response Program – Multi-National Division – Baghdad Not Available USAAA A-2009-0076-ALM 3/31/2009 Reset Fly Away Team – Inter-depot Transfer Request Process Not Available USAAA A-2009-0080-ALL 3/31/2009 Retrograde Operations in Southwest Asia, Multi-class Retrograde – Camp Victory, Iraq Not Available USAAA A-2009-0082-ALM 3/31/2009 Field Level Reset Requirements – Army National Guard www.aaa.army.mil/AAA/AuditReports--Adobe/09%20 REPORTS/A-2009-0082-ALM%20Field%20Level%20Reset%20 Requirements,%20U.S.%20Army%20National%20Guard.pdf USAAA A-2009-0086-ALA 3/30/2009 Body Armor Testing, Program Executive Office, Soldier www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0086-ALA%20Body%20Armor%20Testing,%20 Program%20Executive%20Office,%20Soldier.pdf USAAA A-2009-0066-ALR 3/30/2009 Property Book Unit Supply Enhanced System – Property Accountability and Management, 10th Mountain Division Not Available USAAA A-2009-0073-ALA 3/26/2009 Assessing Future Base Budget Requirements, Equipping Program Evaluation Group Not Available USAAA A-2009-0085-ALL 3/26/2009 Retrograde Operations in Southwest Asia, Class VII Theater Provided Equipment, Camp Victory, Iraq Not Available USAAA A-2009-0035-ALR 3/25/2009 Customer Billing Rates – Liner Business Shipments, United States Transportation Command Not Available USAAA A-2009-0071-ALM 3/23/2009 Time Sensitive Issue – Automatic Reset Induction Criteria Not Available USAAA A-2009-0077-ALM 3/23/2009 Time-Sensitive Memorandum: M88A1 Recovery Vehicle FY09 Reset Maintenance Requirements Not Available USAAA A-2009-0074-ALM 3/23/2009 Time-Sensitive Memorandum: Automatic Reset Induction Transportation from Southwest Asia Not Available USAAA A-2009-0069-ALL 3/19/2009 Management of Shipping Containers in Southwest Asia, Kuwait, Iraq, Afghanistan, and CONUS – Summary Report Not Available USAAA A-2009-0062-FFM 3/3/2009 Assessing Future Base Budget Requirements, Manning Program Evaluation Group Not Available USAAA A-2009-0049-FFS 2/20/2009 US Army Reserve Pre-Mobilization Training Requirements www.aaa.army.mil/AAA/AuditReports--Adobe/09%20 REPORTS/A-2009-0049-FFS%20US%20Army%20Reserve%20 Pre-Mobilization%20Training%20Requirements.pdf USAAA A-2009-0057-FFS 2/19/2009 Army National Guard Pre-Mobilization Training Requirements www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0057-FFS%20Army%20National%20Guard%20PreMobilization%20Training%20Requirememts.pdf USAAA A-2009-0042-ALM 1/27/2009 Contracts for Field Level Reset, US Army Sustainment Command www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0042-ALM%20Contracts%20for%20Field%20Level%20 Reset,%20U.S.%20Army%20Sustainment%20Command.pdf Continued on next page H-22 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H Agency Report Number Date Report Title Web Link USAAA A-2009-0033-ALL 1/22/2009 Management of Shipping Containers in Southwest Asia - Afghanistan www.aaa.army.mil/AAA/AuditReports--Adobe/09%20REPORTS/ A-2009-0033-ALL%20Management%20of%20Shipping%20 Containers%20Southwest%20Asia-Afghanistan.pdf USAAA A-2009-0026-ALR 1/15/2009 Container Detention Billing for the Global War on Terrorism, Military Surface Deployment and Distribution Command Not Available USAAA A-2009-0023-ALM 12/16/2008 Time Sensitive Issue--Excess TheaterProvided Equipment Disposition Request Process Not Available USAAA A-2008-0286-ALL 9/30/2008 Management of Shipping Containers in Southwest Asia--Kuwait www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0286-ALL%20Management%20of%20Shipping%20 Containers%20in%20Southwest%20Asia-Kuwait.pdf USAAA A-2008-0287-ALL 9/30/2008 Followup Audit of Asset Visibility and Container Management--Operation Iraqi Freedom, U.S Central Command www.aaa.army.mil/AAA/AuditReports--Adobe/08%20 REPORTS/A-2008-0287-ALL%20Followup%20Audit%20of%20 Asset%20Visibility%20and%20Container%20ManagementOperation%20Iraqi.pdf USAAA A-2008-0255-FFS 9/30/2008 Accountability of Contractors on the Battlefield www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0255-FFS%20Accountability%20of%20Contractors%20 on%20the%20Battlefield.pdf USAAA A-2008-0179-FFI 9/25/2008 Operational Purchases of Information Technology Equipment, Purchases, and Services-Iraq and Kuwait Not Available USAAA A-2008-0256-ALM 9/17/2008 Overseeing Contracts for Field-Level Reset, U.S. Army Sustainment Command www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0256-ALM%20Overseeing%20Contracts%20for%20 Field-Level%20Reset,%20U.S.%20Army%20Sustainment%20 Command.pdf USAAA A-2008-0213-ALA 9/5/2008 Rapid Fielding Initiative--Program Executive Office Soldier, Fort Belvoir, Virginia www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0213-ALA%20Rapid%20Fielding%20Initiative,%20 Program%20Executive%20Office%20Soldier,%20Fort%20 Belvoir,%20Virginia.pdf USAAA A-2008-0234-FFF 9/2/2008 Use of Role-Players for Training at Combat Training Centers www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0234-FFF%20Use%20of%20Role-Players%20for%20 Training%20at%20Combat%20Training%20Centers.pdf USAAA A-2008-0190-ALM 7/22/2008 Reset Metrics-Sustainment Maintenance www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0190-ALM%20Reset%20Metrics—Sustainment%20 Maintenance.pdf USAAA A-2008-0182-FFS 7/15/2008 Temporary Change of Station Orders and Housing for Mobilized Soldiers www.aaa.army.mil/AAA/AuditReports--Adobe/08%20 REPORTS/A-2008-0182-FFS%20Temporary%20Change%20 of%20Station%20Orders%20and%20Housing%20for%20 Mobilized%20Soldiers.pdf USAAA A-2008-0178-FFI 7/1/2008 Operational Purchases of Information Technology Equipment, Purchases, and Services-U.S. Army Forces Command www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0178-FFI%20Operational%20Purchases%20of%20IT%20 Equipment,%20Systems,%20and%20Services,%20FORSCOM.pdf USAAA A-2008-0145-ALL 6/25/2008 Management of Shipping Containers in Southwest Asia, Continental United States www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0145-ALL%20Management%20of%20Shipping%20 Containers%20in%20Southwest%20Asia,%20Continental%20 United%20States.pdf USAAA A-2008-0098-ALL 4/3/2008 Audit of Management of Shipping Containers in Southwest Asia - Iraq www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0098-ALL%20Management%20of%20Shipping%20 Containers%20in%20Southwest%20Asia%20-%20Iraq.pdf USAAA A-2008-0091-ALL 3/31/2008 Internal Controls Over Contracted Dining Facility Operations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom Not Available USAAA A-2008-0090-ALL 3/20/2008 Audit of Supply Activities (H-Sites), Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0090-ALL%20Supply%20Activities%20(H-Sites),%20 Audit%20of%20Logistics%20Civil%20Augmentation%20 Program%20Operations.pdf Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I H-23 SUMMARY OF U.S. OVERSIGHT IN IRAQ Agency USAAA Report Number A-2008-0077-ALL Date Report Title Web Link 3/20/2008 Contract Administration Over Contracted Dining Facility Operations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom Not Available www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0085-ALL%20Class%20III%20(Bulk%20and%20 Retail)%20Fuel%20Operations%20in%20the%20Iraq%20 Area%20of%20Operations.pdf USAAA A-2008-0085-ALL 3/18/2008 Audit of Class III (Bulk and Retail) Fuel Operations in the Iraq Area of Operations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom USAAA A-2008-0075-ALL 3/12/2008 Audit of Contractor-Acquired Property, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0075-ALL%20Contractor-Acquired%20Property,%20 Audit%20of%20Logistics%20Civil%20Augmentation%20 Program.pdf USAAA A-2008-0021-FFS 11/28/2007 Army Operational Plans for Contractor Support on the Battlefield www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0021-FFS%20Army%20Operational%20Plans%20 for%20Contractor%20Support%20on%20the%20Battlefield. pdf USAAA A-2008-0010-ALL 11/2/2007 Followup Audit of Internal Controls over Cargo Container Payments, Military Surface Deployment and Distribution Command www.aaa.army.mil/AAA/AuditReports--Adobe/08%20REPORTS/ A-2008-0010-ALL%20Followup%20Audit%20of%20Internal%20 Controls%20Over%20Cargo%20Container%20Payments%20 Military%20Surface.pdf For Official Use Only USAAA A-2007-0204-ALL 9/28/2007 Defense Base Act Insurance for the Logistics Civil Augmentation Program, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom USAAA A-2007-0149-ALL 7/23/2007 Audit of the Army’s Theater Linguist Program in Afghanistan, Operation Enduring Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/07%20 REPORTS/A-2007-0149-ALL%20Army%20Theater%20 Linguist%20Program%20in%20Afghanistan,%20Operation%20 Enduring%20Freedom.pdf 3/23/2007 Summary Audit Report on the CostEffectiveness of Transitioning Work Under the Logistics Civil Augmentation Program Contingency Contract to Sustainment Contracting, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/07%20 REPORTS/A-2007-0104-ALL%20Cost-Effectiveness%20of%20 Transitioning%20Work%20Under%20the%20Logistics%20 Civil%20Augmentation%20Program.pdf www.aaa.army.mil/AAA/AuditReports--Adobe/07%20 REPORTS/A-2007-0093-ALL%20Cost-Effectiveness%20of%20 Transitioning%20Selected%20Functions%20Performed%20 at%20the%20Theater.pdf USAAA A-2007-0104-ALL USAAA A-2007-0093-ALL 3/9/2007 Audit of the Cost-Effectiveness of Transitioning Selected Functions Performed at the Theater Distribution Center (Task Order 87) From Contingency to Sustainment Contracting, Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom USAAA A-2007-0040-ALL 1/16/2007 Audit of Procedures for Managing the Overaged Reparable Items List at the Tactical Wheeled Vehicle Refurbishment Center www.aaa.army.mil/AAA/AuditReports--Adobe/07%20REPORTS/ A-2007-0040-ALL%20Procedures%20for%20Managing%20 the%20Overaged%20Reparable%20Items%20List%20at%20 the%20Tactical%20Wheeled.pdf USAAA A-2007-0019-ALL 11/21/2006 Audit of Distribution Functions, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/07%20REPORTS/ A-2007-0019-ALL%20Distribution%20Functions,%20Audit%20 of%20Logistics%20Civil%20Augmentation%20Program%20 Operations.pdf USAAA A-2007-0011-ALL 11/16/2006 Audit of Nontactical Vehicle Usage in the Iraq Area of Operations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/07%20REPORTS/ A-2007-0011-ALL%20Nontactical%20Vehicle%20Usage%20 in%20the%20Iraq%20Area%20of%20Operations,%20 Audit%20of%20Logistics%20Civil.pdf Continued on next page H-24 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H Agency USAAA Report Number A-2006-0254-ALL Date Report Title Web Link 9/29/2006 Audit of the Procedures for Transferring Property During the Base Closure Process in Support of Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/06%20REPORTS/ A-2006-0254-ALL%20Procedures%20for%20Transferring%20 Property%20During%20the%20Base%20Closure%20Process. pdf Not Available USAAA A-2006-0253-ALL 9/28/2006 Audit of the Cost-Effectiveness of Transitioning the General Support Supply Support Activity (Task Order 87) From Contingency to Sustainment Contracting, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom USAAA A-2006-0233-ALL 9/22/2006 Clothing Issue Facilities, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/06%20REPORTS/ A-2006-0233-ALL%20Clothing%20Issue%20Facilities,%20 Audit%20of%20Logistics%20Civil%20Augmentation%20 Program%20Operations.pdf USAAA A-2006-0168-ALL 8/4/2006 Report on the Subsistence Prime Vendor Contract, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/06%20 REPORTS/A-2006-0168-ALL%20Subsistence%20Prime%20 Vendor%20Contract,%20Audit%20of%20Logistics%20Civil%20 Augmentation%20Program.pdf www.aaa.army.mil/AAA/AuditReports--Adobe/06%20 REPORTS/A-2006-0158-ALL%20Class%20IX%20(Aviation)%20 Warehouse%20Staffing,%20Camp%20Anaconda,%20Audit%20 of%20Logistics%20Civil.pdf USAAA A-2006-0158-ALL 7/11/2006 Report on Class IX (Aviation) Warehouse Staffing, Camp Anaconda, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom USAAA A-2006-0099-ALL 4/25/2006 Audit of Program Management in the Iraq Area of Operations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/06%20REPORTS/ A-2006-0099-ALL%20Program%20Management%20in%20 the%20Iraq%20Area%20of%20Operations,%20Audit%20 of%20Logistics%20Civil%20Augmentation%20Program%20.pdf www.aaa.army.mil/AAA/AuditReports--Adobe/06%20 REPORTS/A-2006-0091-ALL%20Management%20of%20the%20 Theater%20Transportation%20Mission%20(Task%20Order%20 88).pdf USAAA A-2006-0091-ALL 4/4/2006 Audit of Management of the Theater Transportation Mission (Task Order 88), Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom USAAA A-2006-0090-ALE 3/31/2006 Follow-up Audit II of the Commanders Emergency Response Program and Quick Response Fund www.aaa.army.mil/AAA/AuditReports--Adobe/06%20REPORTS/ A-2006-0090-ALE%20Followup%20II%20Commanders%20 Emergency%20Response%20Program%20and%20Quick%20 Response%20Fund.pdf USAAA A-2006-0083-ALL 3/21/2006 Audit of Retrograde Operations (Task Order 87), Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/06%20REPORTS/ A-2006-0083-ALL%20Retrograde%20Operations%20(Task%20 Order%2087),%20Audit%20of%20Logistics%20Civil%20 Augmentation%20Program.pdf USAAA A-2006-0081-ALL 3/17/2006 Audit of Unliquidated Obligations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/06%20REPORTS/ A-2006-0081-ALL%20Unliquidated%20Obligations,%20 Audit%20of%20Logistics%20Civil%20Augmentation%20 Program.pdf USAAA A-2006-0046-ALA 1/31/2006 Fund Accountability for Fiscal Year 2004 Iraq Relief and Reconstruction Funds www.aaa.army.mil/AAA/AuditReports--Adobe/06%20 REPORTS/A-2006-0046-ALA%20Fund%20Accountability%20 for%20Fiscal%20Year%202004%20Iraq%20Relief%20and%20 Reconstruction%20Funds.pdf USAAA A-2006-0047-ALL 1/11/2006 Base Closure Process in the Iraq Area of Operations www.aaa.army.mil/AAA/AuditReports--Adobe/06%20REPORTS/ A-2006-0047-ALL%20Base%20Closure%20Process%20in%20 the%20Iraq%20Area%20of%20Operations.pdf USAAA A-2005-0332-ALE 9/30/2005 Followup Audit of the Commanders’ Emergency Response Program and Quick Response Fund www.aaa.army.mil/AAA/AuditReports--Adobe/05%20 REPORTS/A-2005-0332-ALE%20Followup%20Commanders%20 Emergency%20Response%20Program%20and%20Quick%20 Response%20Fund%20Rev.pdf USAAA A-2005-0194-ALA 5/26/2005 Project Management in Support of Iraq Reconstruction www.aaa.army.mil/AAA/AuditReports--Adobe/05%20REPORTS/ A-2005-0194-ALA%20Program%20Management%20in%20 Support%20of%20Iraq%20Reconstruction.pdf Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I H-25 SUMMARY OF U.S. OVERSIGHT IN IRAQ Agency Report Number Date Report Title Web Link USAAA A-2005-0173-ALE 5/2/2005 Commanders’ Emergency Response Program and Quick Response Fund www.aaa.army.mil/AAA/AuditReports--Adobe/05%20REPORTS/ A-2005-0173-ALE%20Commanders%20Emergency%20 Response%20Program%20and%20Quick%20Response.pdf USAAA A-2005-0078-FFG 3/2/2005 Coalition Provisional Authority Travel Process www.aaa.army.mil/AAA/AuditReports--Adobe/05%20REPORTS/ A-2005-0078-FFG%20Coalition%20of%20Provisional%20 Authority%20Travel%20Process.pdf USAAA A-2005-0095-FFG 2/16/2005 Vested & Seized Assets, Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/05%20REPORTS/ A-2005-0095-FFG%20Vested%20and%20Seized%20Assets.pdf USAAA A-2005-0043-ALE 11/24/2004 Logistics Civil Augmentation Program in Kuwait www.aaa.army.mil/AAA/AuditReports--Adobe/05%20REPORTS/ A-2005-0043-ALE%20Logistics%20Civil%20Augmentation%20 Program%20in%20Kuwait.pdf USAAA A-2004-0438-AML 8/12/2004 Definitization of Task Orders – Audit of Logistics Civil Augmentation Program www.aaa.army.mil/AAA/AuditReports--Adobe/04%20REPORTS/ A-2004-0438-AML.pdf USAAA A-2004-0305-FFG 5/18/2004 Time Sensitive Report, Audit of Vested and Seized Assets, Operation Iraqi Freedom www.aaa.army.mil/AAA/AuditReports--Adobe/04%20REPORTS/ A-2004-0305-FFG.pdf Total USAAA Audits = 117 H-26 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION APPENDIX H USAID OIG Completed Audits, as of June 30, 2010 Agency Report Number Date Report Title Web Link USAID OIG E-267-10-001-P 3/31/2010 Audit of USAID’s Internally Displaced Persons Activities in Iraq Not Available USAID OIG E-267-09-005-P 8/16/2009 Audit of USAID/Iraq’s Iraq Rapid Assistance Program www.usaid.gov/oig/public/fy09rpts/ e-267-09-005-p.pdf USAID OIG E-267-09-004-P 6/3/2009 Audit of USAID/Iraq’s Economic Governance Program II www.usaid.gov/oig/public/fy09rpts/ e-267-09-004-p.pdf USAID OIG E-267-09-003-P 5/31/2009 Audit of USAID/Iraq’s Local Governance Program II Activities www.usaid.gov/oig/public/fy09rpts/ e-267-09-003-p.pdf USAID OIG No report number 4/30/2009 Audit of USAID/Iraq’s Compliance with the Federal Information Security Management Act of 2002 for Fiscal Year 2009 Not Available USAID OIG E-267-09-002-P 3/4/2009 Audit of USAID/Iraq’s Oversight of Private Security Contractors in Iraq www.usaid.gov/oig/public/fy09rpts/ e-267-09-002-p.pdf USAID OIG E-267-09-001-P 11/25/2008 USAID/Iraq’s National Capacity Development Program www.usaid.gov/oig/public/fy09rpts/ e-267-09-001-p.pdf USAID OIG E-267-08-006-P 9/30/2008 USAID/Iraq’s Agribusiness Program www.usaid.gov/oig/public/fy08rpts/ e-267-08-006-p.pdf USAID OIG E-267-08-005-P 8/5/2008 Audit of USAID/Iraq’s Community Action Program II www.usaid.gov/oig/public/fy08rpts/ e-267-08-005-p.pdf USAID OIG E-267-08-004-P 7/3/2008 Audit of USAID/Iraq’s Monitoring and Evaluation Performance Program www.usaid.gov/oig/public/fy08rpts/ e-267-08-004-p.pdf USAID OIG E-267-08-003-P 6/24/2008 Audit of USAID/Iraq’s Management of Its Official Vehicle Fleet www.usaid.gov/oig/public/fy08rpts/ e-267-08-003-p.pdf USAID OIG E-267-08-002-P 4/3/2008 Audit of USAID/Iraq’s Marla Ruzicka War Victims Assistance Fund www.usaid.gov/oig/public/fy08rpts/ e-267-08-002-p.pdf USAID OIG E-267-08-001-P 3/18/2008 Audit of USAID/Iraq’s Community Stabilization Program www.usaid.gov/oig/public/fy08rpts/ e-267-08-001-p.pdf USAID OIG E-267-07-008-P 9/27/2007 Audit of USAID/Iraq’s Participation in Provincial Reconstruction Teams in Iraq www.usaid.gov/oig/public/fy07rpts/ e-267-07-008-p.pdf USAID OIG E-267-07-007-P 7/31/2007 Audit of USAID/Iraq’s Local Governance Activities www.usaid.gov/oig/public/fy07rpts/ e-267-07-007-p.pdf USAID OIG E-267-07-006-P 7/11/2007 Audit of the Office of Foreign Disaster Assistance Program in Iraq www.usaid.gov/oig/public/fy07rpts/ e-267-07-006-p.pdf USAID OIG E-267-07-005-P 6/6/2007 Audit of USAID/Iraq’s Activity Planning and Its Reporting Process Under Section 2207 of Public Law 108-106 www.usaid.gov/oig/public/fy07rpts/ e-267-07-005-p.pdf USAID OIG E-267-07-004-P 5/3/2007 Audit of USAID/Iraq Telecommunications Activities www.usaid.gov/oig/public/fy07rpts/ e-267-07-004-p.pdf USAID OIG E-267-07-003-P 2/4/2007 Follow-up Audit of USAID/Iraq’s Education Activities www.usaid.gov/oig/public/fy07rpts/ e-267-07-003-p.pdf USAID OIG E-267-07-002-P 1/22/2007 Audit of USAID/Iraq’s Agriculture Reconstruction and Development www.usaid.gov/oig/public/fy07rpts/ Program e-267-07-002-p.pdf USAID OIG E-267-07-001-P 11/5/2006 Audit of USAID’s/Iraq’s Civil Society Activities www.usaid.gov/oig/public/fy07rpts/ e-267-07-001-p.pdf USAID OIG E-267-06-004-P 8/16/2006 Audit of USAID’S Transition Initiatives in Iraq www.usaid.gov/oig/public/fy06rpts/ e-267-06-004-p.pdf USAID OIG E-267-06-003-P 7/10/2006 Audit of USAID/Iraq’s Local Governance Activities www.usaid.gov/oig/public/fy06rpts/ e-267-06-003-p.pdf USAID OIG E-267-06-002-P 2/16/2006 Audit of USAID/Iraq’s Non-Expendable Property www.usaid.gov/oig/public/fy06rpts/ e-267-06-002-p.pdf USAID OIG E-267-06-001-P 12/20/2005 Audit of USAID/Iraq’s Basic Education Activities www.usaid.gov/oig/public/fy06rpts/ e-267-06-001-p.pdf USAID OIG 9-267-06-001-P 10/6/2005 Audit of the Accuracy of Biographical Datasheets Provided by International Resources Group to USAID for Contracts in Iraq www.usaid.gov/oig/public/ fy06rpts/9-267-06-001-p.pdf Continued on next page JULY 30, 2010 I REPORT TO CONGRESS I H-27 SUMMARY OF U.S. OVERSIGHT IN IRAQ Agency Report Number Date Report Title Web Link USAID OIG E-267-05-005-P 9/27/2005 USAID/Iraq’s Cash Control Procedures www.usaid.gov/oig/public/fy05rpts/ e-267-05-005-p.pdf USAID OIG E-267-05-004-P 6/30/2005 Audit of USAID/Iraq’s Water and Sanitation Activities www.usaid.gov/oig/public/fy05rpts/ e-267-05-004-p.pdf USAID OIG E-267-05-003-P 6/29/2005 Audit of USAID/Iraq’s Electrical Generation Activities www.usaid.gov/oig/public/fy05rpts/ e-267-05-003-p.pdf USAID OIG E-267-05-002-P 2/28/2005 Audit of USAID/Iraq’s Health System Strengthening Contract Activities www.usaid.gov/oig/public/fy05rpts/ e-267-05-002-p.pdf USAID OIG E-267-05-001-P 1/31/2005 Audit of USAID/Iraq’s Community Action Program www.usaid.gov/oig/public/fy05rpts/ e-267-05-001-p.pdf USAID OIG A-267-05-005-P 1/6/2005 Audit of USAID’s Compliance with Federal Regulations in Awarding www.usaid.gov/oig/public/fy05rpts/ the Contract to Kroll Security Services Inc. a-267-05-005-p.pdf USAID OIG A-000-04-004-P 9/23/2004 Audit of USAID’s Compliance with Federal Regulations in Awarding www.usaid.gov/oig/public/fy04rpts/ Iraq Basic Education Phase II Contract a-000-04-004-p.pdf USAID OIG E-266-04-004-P 9/20/2004 Audit of USAID/Iraq’s Economic Reform Program USAID OIG E-266-04-003-P 8/6/2004 Audit of USAID’s Compliance with Federal Regulations in Awarding www.usaid.gov/oig/public/fy04rpts/ the Iraq Phase II Reconstruction and Rehabilitation, Program e-266-04-003-p.pdf Advisors and Oversight Contract USAID OIG E-266-04-001-F 6/9/2004 Audit of USAID/Iraq’s Cash Control Procedures Not Available www.usaid.gov/oig/public/fy04rpts/ e-266-04-002-p.pdf www.usaid.gov/oig/public/fy04rpts/ e-266-04-004-p.pdf USAID OIG E-266-04-002-P 6/3/2004 Audit of USAID/Iraq’s Infrastructure Reconstruction and Rehabilitation Program USAID OIG A-000-04-003-P 5/19/2004 Capping Report on Audit of USAID’s Compliance with Federal Regulations in Awarding the Iraq Phase I Contracts www.usaid.gov/oig/public/fy04rpts/ a-000-04-003-p.pdf USAID OIG AIG/A Memo 04-006 4/20/2004 USAID’s Compliance with Federal Regulations in Awarding the Iraq Infrastructure Reconstruction Program Phase II Contract www.usaid.gov/oig/iraq_doc/ memo04_006.pdf USAID OIG AIG/A Memo 04-005 3/22/2004 USAID’s Compliance with Federal Regulations in Awarding the Contract for Economic Recovery, Reform and Sustained Growth in Iraq www.usaid.gov/oig/iraq_doc/ memorandum_04_0051.pdf USAID OIG E-266-04-001-P 3/19/2004 Audit of USAID’s Results Data for Its Education Activities in Iraq www.usaid.gov/oig/public/fy04rpts/ e-266-04-001-p.pdf USAID OIG AIG/A Memo 04-004 1/27/2004 USAID’s Compliance with Federal Regulations in Awarding the Iraq Seaport Assessment and Operation Contract www.usaid.gov/oig/iraq_doc/ memorandum_04_004.pdf USAID OIG AIG/A Memo 04-003 1/27/2004 USAID’s Compliance with Federal Regulations in Awarding the Iraq Airport Administration Contract www.usaid.gov/oig/iraq_doc/ memorandum_04_003.pdf USAID OIG AIG/A Memo 04-002 1/14/2004 USAID’s Compliance with Federal Regulations in Awarding the Agriculture Reconstruction and Development Program for Iraq Contract www.usaid.gov/oig/iraq_doc/ memo_04_002.pdf USAID OIG AIG/A Memo 04-001 1/14/2004 USAID’s Compliance with Federal Regulations in Awarding the Iraq Monitoring and Evaluation Program Performance Task Order www.usaid.gov/oig/iraq_doc/ memorandum_04_001_1_14_04.pdf USAID OIG AIG/A Memo 03-005 10/17/2003 USAID’s Compliance with Federal Regulations in Awarding the Health System Strengthening in Post-Conflict Iraq Contract www.usaid.gov/oig/iraq_doc/ memorandum_03_005.pdf USAID OIG AIG/I Memo 03-004 9/9/2003 USAID’s Compliance with Federal Regulations in Awarding the Iraq Sub-National Governance and Civic Institution Support Contract www.usaid.gov/oig/iraq_doc/ memo_03-004.pdf USAID OIG AIG/A Memo 03-003 7/23/2003 USAID’s Compliance with Federal Regulations in Awarding the Iraq Infrastructure Reconstruction Contract www.usaid.gov/oig/iraq_doc/ memo_03-003.pdf USAID OIG AIG/A Memo 03-002 6/20/2003 USAID’s Compliance with Federal Regulations in Awarding the Iraq Personnel Support Services Contract www.usaid.gov/oig/iraq_doc/ memorandum_03-002_06-20-03. pdf. USAID OIG AIG/A Memo 03-001 6/6/2003 USAID’s Compliance with Federal Regulations in Awarding the Iraq Education Sector Contract www.usaid.gov/oig/iraq_doc/ memorandum_03-001_6-06-03.pdf USAID OIG No report number 4/25/2003 Iraq Seaport Administration and Airports Administration Contracts www.usaid.gov/oig/2028318_ beans2.pdf Total USAID OIG Audits = 51 H-28 I SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION