Appendix I List of Contracts As required in P.L. 108-106, Section 3001 (i)(1)(F), as amended, Appendix I lists contracting actions funded by the Iraq Relief and Reconstruction Fund (IRRF) that have been entered into the SIGIR Iraq Reconstruction Information System (SIRIS). Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I-1 Appendix I-2 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 01/31/04 02/03/04 02/06/04 02/06/04 02/06/04 02/06/04 02/06/04 02/06/04 33 34 35 36 37 38 01/16/04 21 32 01/06/04 20 31 01/04/04 19 01/27/04 12/29/03 18 30 10/15/03 17 01/22/04 09/23/03 16 01/22/04 09/10/03 15 29 08/14/03 14 28 08/01/03 13 01/22/04 07/30/03 12 01/22/04 07/18/03 11 27 07/16/03 10 26 07/14/03 9 01/22/04 07/09/03 8 25 07/05/03 7 01/22/04 06/25/03 6 01/22/04 05/24/03 5 24 05/24/03 4 23 04/30/03 3 01/21/04 02/07/03 22 02/07/03 2 Award Date 1 # -$4,093,226 $8,685,868 $12,705,000 $33,078,193 $56,281,864 $89,996,565 $33,064,656 $33,064,656 $28,647 $10,279,724 $26,336,252 $28,691,237 $46,749,910 $46,749,910 $65,449,155 $65,449,199 $12,584 $1,200,000,000 $8,458,350 $1,823,317,492 $10,801,000 $36,973,798 $6,425,391 $75,000,000 $800,000,000 $8,000,000 $6,000,000 $4,500,000 $9,000,000 $2,500,000 $18,890,092 $7,966,069 $20,938,852 $1,918,985 $9,500,000 $6,508,060 $10,265,970 $15,590,578 Total Value -$4,093,226 $8,685,868 $12,705,000 $33,078,193 $56,281,864 $89,996,565 $33,064,656 $33,064,656 $28,647 $10,279,724 $26,336,252 $28,691,237 $46,749,910 $46,749,910 $65,449,155 $65,449,199 $12,584 $500,000 $3,100,000 $18,000,000 $10,801,000 $5,000,000 $6,425,391 $75,000,000 $500,000 $8,000,000 $6,000,000 $4,500,000 $9,000,000 $2,500,000 $18,890,092 $7,966,069 $500,000 $1,918,985 $9,500,000 $2,700,000 $7,086,094 $15,590,578 Obligated Value Fluor Intercontinental, Inc. Fluor Intercontinental, Inc. CH2M Hill/Parsons a Joint Venture Washington Int’l/Black and Veatch Joint Venture Fluor Intercontinental, Inc. Fluor Intercontinental, Inc. Nour USA Nour USA Tyson Enterprise Llc Weston Parsons Shaw Shaw Environmental, Inc. Shaw Environmental, Inc. Earth Tech, Inc. Earth Tech, Inc. Iraqi Contractor - 306 Kellogg Brown Root Berger/URS Bechtel International Resources Group Development Alternatives Inc. Development Alternatives Inc. Air Force Contract Augmentation Program (AFCAP) Parsons Air Force Contract Augmentation Program (AFCAP) International Resources Group Management Systems International Iraqi Contractor - 2813 International Resources Group Iraqi Contractor - 3237 Spacelink International, LLC Management Systems International Stevedoring Services of America (SSA) Stevedoring Services of America (SSA) International Resources Group International Resources Group Motorola Contractor W912ER-04-D-0004/3/01 W912ER-04-D-0004/2/0 W912ER-04-D-0002/1/0 W912ER-04-D-0010/1/0 W912ER-04-D-0004/3/0 W912ER-04-D-0004/1/0 W914NS-04-D-0100/1/0 W914NS-04-D-0100/0001/0 W914NS-05-M-9647/0/0 FA8903-04-D-8681/0008/0 FA8903-04-D-8675/T0001/0 FA8903-04-D-8676/0008/2 FA8903-04-D-8678/T0008/0 FA8903-04-D-8676/0008/0 FA8903-04-D-8671/0001/0 FA8903-04-D-8671/T0001/0 W914NS-05-M-9609/0/0 W9126G-04-D-0001/0/0 W914NS-04-C-0004/0/0 SPU-C-00-04-00001/0/0 EMT-C-00-03-00007/0/12 RAN-C-00-04-0002/0/0 LAG-I-00-99-00017-00/TO0008/02 EEE-R-00-03-00016/0/04 W9126G-04-D-0002/0/0 EEE-R-00-03-00016/0/03 EMT-C-00-03-00007/0/08 AEP-I-00-00-00024/0008/01 DABV01-03-C-0003/0/P0001 EMT-C-00-03-00007/0/07 DABV01-03-C-0002/0/0 DABV01-03-C-0001/0/0 AEP-I-00-00-00024/0008/0 TRN-C-00-03-00054/0/01 TRN-C-00-03-00054/0/02 EMT-C-00-03-00007/0/03 EMT-C-00-03-00007/0/0 DCA100-03-P-4397/0/0 Contract Number Baghdad Generator Rehabilitation Baghdad Generator Rehabilitation Emergency repairs to the Haditha Dam Hydropower facility Rehabilitation of Mosul Gas Turbine Power Plant Baghdad Generator Rehabilitation Baghdad Generator Rehabilitation Weapons And Miscellaneous Supplies Battalion Sets Gps Systems Renovate Um Qasr Naval Base Renovate Tadji Military Base Al Kasik Phases I & II Renovate Al Kasik Army Base Renovate Al Kasik Army base in Iraq An Numaniyah Phase I Part A Renovate An Numaniyah Military Base Tires Restoration of southern oil fields Security and Justice Sector Program Management Office Reconstruction - Phase II Support USAID in the overall planning, monitoring, management, and reporting on reconstruction activities Agriculture Rehabilitation Restoring The Marshlands Theater Logistical Support Restoration of northern oil fields Theater Logistical Support Support USAID in the overall planning, monitoring, management, and reporting on reconstruction activities Monitoring & Evaluation of Technical Assistance Portfolio Generators Support USAID in the overall planning, monitoring, management, and reporting on reconstruction activities Setup, Operate And Maintain The Kirkush Military Base MMICC Communications Systems Monitoring & Evaluation of Technical Assistance Portfolio Seaport Administration Seaport Administration Support USAID in the overall planning, monitoring, management, and reporting on reconstruction activities Support USAID in the overall planning, monitoring, management, and reporting on reconstruction activities Baghdad Police Radios Scope Competitive Competitive Competitive Competitive Competitive Competitive Open Competitive Open Competitive Open Competitive Open Competitive Competitive Open Open Competitive Competitive Competitive Competitive Competitive n/a Competitive Competitive Competitive Competitive n/a Competitive Competitive Open Open Competitive Competitive Competitive Competitive Competitive Sole Source Competition Type USACE USACE USACE USACE USACE USACE CPA CPA PCO AFCEE DCMA AFCEE DCMA AFCEE AFCEE DCMA PCO USACE Pentagon Renovation Office USAID USAID USAID USAID USAID USACE USAID USAID USAID CPA USAID CPA CPA USAID USAID USAID USAID USAID DISA NCR Contracting Office IDIQ IDIQ CPAF-IDIQ CPAF-IDIQ IDIQ IDIQ FFP FFP CPATT CPFF CPFF n/a CPFF CPFF /CPAF/IDIQ n/a CPFF CPATT CPAF-IDIQ Cost+Award Fee CPFF/CPIF CPFF CPFF n/a CPAF CPAF-IDIQ CPAF CPFF CPFF FFP CPFF n/a n/a CPFF CPFF LOE CPFF LOE CPFF CPFF FFP Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I-3 02/15/04 02/15/04 02/18/04 02/27/04 03/02/04 03/02/04 03/04/04 03/04/04 03/10/04 03/10/04 03/10/04 03/10/04 03/10/04 03/10/04 03/11/04 03/11/04 03/11/04 03/12/04 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 03/14/04 02/10/04 46 03/14/04 02/10/04 45 68 02/10/04 44 67 02/10/04 43 03/12/04 02/10/04 42 66 02/10/04 41 03/12/04 02/10/04 65 02/07/04 40 Award Date 39 # $2,141,017 $2,141,017 $706,485 $2,095,954 $3,397,156 $1,342,196 $1,653,264 $41,955,663 $19,000,000 $21,119,249 $26,871,647 $63,582,357 $77,623,017 $114,417,069 $83,708 $18,000,000 $48,271,437 $1,751,076,575 $14,800,000 $26,250,000 -$6,525,205 -$2,104,976 -$808,500 -$631,699 -$500,000 $9,026,380 $10,332,000 Total Value $2,141,017 $2,141,017 $706,485 $2,095,954 $3,397,156 $1,342,196 $1,653,264 $6,800,000 $19,000,000 $3,100,000 $4,000,000 $6,900,000 $8,500,000 $6,300,000 $83,708 $18,000,000 $44,541,371 $14,800,000 $26,250,000 -$6,525,205 -$2,104,976 -$808,500 -$631,699 -$500,000 $9,026,380 $10,332,000 Obligated Value Iraqi Contractor - 2720 Iraqi Contractor - 2720 Perini Corporation Washington International Development Alternatives Inc. Washington Int’l/Black and Veatch Joint Venture FluorAMEC LLC Foster Wheeler ASRG Airfield & Range Services, Inc. Berger/URS Berger/URS ATC Services, Inc CH2M Hill/Parsons a Joint Venture Iraq Power Alliance Joint Venture Information Spectrum, Inc. Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root DynCorp International LLC Kellogg Brown Root Parsons Kellogg Brown Root Fluor Intercontinental, Inc. Washington Int’l/Black and Veatch Joint Venture CH2M Hill/Parsons a Joint Venture Fluor Intercontinental, Inc. Parsons GE Iraqi Contractor - 3209 Contractor W914NS-04-D-0102/2/0 W914NS-04-D-0102/0002/0 W914NS-04-D-0011/1/0 W914NS-04-D-0010/1/0 RAN-C-00-04-0002/0/01 W914NS-04-D-0007/0001/0 W914NS-04-D-0003/1/0 W914NS-04-C-0007/0/0 W911S0-04-C-0002/0/0 W914NS-04-C-0006/0/0 W914NS-04-C-0005/0/0 W914NS-04-C-0001/0/0 W914NS-04-C-0003/0/0 W914NS-04-C-0002/0/0 N00140-98-D-M323/DO0810/0 W9126G-04-D-0001/0005/0 W9126G-04-D-0001/T0003/01 W9126G-04-D-0001/0/02 W912ER-04-D-0005/1/0 SLMAQM-04-C-0030/0/0 W9126G-04-D-0001/0002/0 W9126G-04-D-0002/2/0 W9126G-04-D-0001/0/01 W912ER-04-D-0004/1/01 W912ER-04-D-0010/1/01 W912ER-04-D-0002/1/01 W912ER-04-D-0004/2/01 W9126G-04-D-0002/0/01 DABV01-04-M-2188/0/0 FY5866-04-C-0003/0/0 Contract Number Body Armor Latrines And Showers Base Camp Life Support Southern Region: Restore, Repair, And Develop Power Generation, Transmission, Distribution And Supervisory Control And Data Acquisition Systems Projects To Support The Iraq CPA Mission Northern Region: Restore, Repair, And Develop Power Generation, Transmission, Distribution And Supervisory Control And Data Acquisition Systems Projects To Support The Iraq CPA Mission Agriculture Rehabilitation Restore, Rebuild, And Develop National Water Resources Projects To Support The Iraq CPA Mission Nationwide - Restore, Repair, And Develop New And Existing Power Generation, And Supervisory Control And Data Acquisition Systems To Support The Iraq CPA Mission Oil Sector Program Management Offices Electrical Power Security Services (EPSS) Communication/Transportation Sector Program Manage Buildings/Health Sector Program Management Offices Overall oversight to manage activities Public Works and Water Sector Program Management Office Electrical Services Sector Program Management Office Ils, Technical Analysis And Investigations Of Fms Restoration of southern oil fields Iraq Infrastructure Iraq Infrastructure Emergency assessment and rehabilitation of substation at Al Ameen and interconnections with New Baghdad and Mashtel substations International police training, monitoring, support Restoration of southern oil fields Initial Mobilization Renovation Of Facilities Baghdad Generator Rehabilitation Rehabilitation Of Mosul Gas Turbine Power Plant Emergency Repairs To The Haditha Dam Hydropower Facility Baghdad Generator Rehabilitation Restoration Of Northern Oil Fields Gas Turbine Parts (Al Qudas) Scope Open Competitive Competitive Competitive Competitive Competitive Competitive Competitive Sole Source Competitive Competitive Competitive Competitive Competitive n/a Competitive Open Open Competitive Competitive Competitive Competitive Open Competitive Competitive Competitive Competitive Competitive Competitive Open Competition Type CPA CPA USACE USACE USAID NAVFAC USACE Pentagon Renovation Office ACA Pentagon Renovation Office Pentagon Renovation Office Pentagon Renovation Office Pentagon Renovation Office Pentagon Renovation Office Fleet And Industrial Supply Center Norfolk USACE USACE USACE USACE State Department USACE USACE USACE USACE USACE USACE USACE USACE CPA CPA Contracting Office n/a FFP CPAF-IDIQ CPAF-IDIQ CPFF Cost + Award Fee TO CPAF-IDIQ Cost+Award Fee FFP Services Cost+Award Fee Cost+Award Fee Cost+Award Fee Cost+Award Fee Cost+Award Fee n/a n/a IDIQ CPAF IDIQ CPAF CPAF-IDIQ FFP- IDIQ-CPFF n/a CPAF-IDIQ IDIQ CPAF IDIQ CPAF-IDIQ CPAF-IDIQ IDIQ CPAF-IDIQ FFP FFP Contract Type Appendix I-4 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 04/22/04 04/23/04 04/23/04 04/24/04 04/26/04 04/26/04 04/27/04 04/28/04 99 100 101 102 103 104 105 04/15/04 88 98 04/15/04 87 04/22/04 04/15/04 86 97 04/15/04 85 04/22/04 04/13/04 84 96 04/13/04 83 04/20/04 04/13/04 82 95 04/06/04 81 04/16/04 04/02/04 80 04/15/04 03/30/04 79 94 03/26/04 78 93 03/26/04 77 04/15/04 03/26/04 76 04/15/04 03/26/04 75 92 03/25/04 74 91 03/25/04 73 04/15/04 03/23/04 72 90 03/23/04 71 04/15/04 03/23/04 70 89 03/23/04 Award Date 69 # $34,924,122 $36,314,427 $16,957,621 $16,957,621 $742,450 $4,782,102 $7,879,000 $4,120,000 $34,385,764 $34,385,764 $6,155,119 $19,491,301 $19,491,301 $23,863,560 $23,863,580 $28,691,237 $47,500,528 $47,500,528 $49,808,566 $49,808,566 -$5,822,524 $811,786 $6,087,706 $6,087,706 $41,120,016 $2,640,000 $3,000,000 $19,521,325 $19,521,325 $4,000,000 $55,779,999 $975,060 $1,475,531 $1,528,041 $2,487,603 Total Value $14,275,999 $36,314,427 $16,957,621 $16,957,621 $742,450 $4,782,102 $7,879,000 $4,120,000 $34,385,764 $34,385,764 $6,155,119 $19,491,301 $19,491,301 $23,863,560 $23,863,580 $28,691,237 $47,500,528 $47,500,528 $49,808,566 $49,808,566 $4,038,772 $811,786 $784,889 $6,087,706 $41,120,016 $2,640,000 $3,000,000 $19,521,325 $19,521,325 $4,000,000 $55,779,999 $975,060 $1,475,531 $1,528,041 $2,487,603 Obligated Value International Resources Group Laguna Construction Co., Inc. ECC InternationalL LLC ECC InternationalL LLC Parsons Parsons MCI ECC InternationalL LLC ECC InternationalL LLC ECC InternationalL LLC Parsons ECC InternationalL LLC Shaw Environmental, Inc. Shaw Environmental, Inc. AMEC Earth & Environmental, Inc. AMEC Earth & Environmental, Inc. Shaw Environmental, Inc. ECC InternationalL LLC ECC InternationalL LLC Weston Weston Management Systems International DynCorp International LLC Weston DynCorp International LLC Weston International Resources Group Parsons Parsons Laguna Construction Co., Inc. Laguna Construction Co., Inc. Parsons Parsons Contrack/AICI/OCI/Archirodon Joint Venture FluorAMEC LLC FluorAMEC LLC Lucent Technologies World Services Inc. Contractor EMT-C-00-03-00007/0/13 FA8903-04-D-8690/T0005/0 FA8903-04-D-8672/0006/0 FA8903-04-D-8672 /T0006/0 W914NS-04-D-0009/2/0 FA8903-04-D-8675/0001/02 W91RUS-04-C-0028/0/0 FA8903-04-D-8672/0008/02 FA8903-04-D-8672/0008/0 FA8903-04-D-8672 /T0008/0 W9126G-04-D-0001/0/03 FA8903-04-D-8672/0006/1 FA8903-04-D-8676/T0015/0 FA8903-04-D-8676/0015/0 FA8903-04-D-8669/0006/0 FA8903-04-D-8669/T0006/0 FA8903-04-D-8676/T0008/M0002 FA8903-04-D-8672/0003/0 FA8903-04-D-8672 /T0003/0 FA8903-04-D-8681/T0024/0 FA8903-04-D-8681/T00024/0 AEP-I-00-00-00024/0008/03 SLMAQM-04-C-0030/0/02 FA8903-04-D-8681/0008/02 SLMAQM-04-C-0030/0/01 FA8903-04-D-8681/T0008/M0002 517-C-00-04-00106/0/0 W914NS-04-D-0009/1/0 W914NS-04-D-0009/1/0 FA8903-04-D-8690/T00024/0 FA8903-04-D-8690/T0002/0 W914NS-04-D-0006/1/0 W914NS-04-D-0006/0006/0 W914NS-04-D-0004/1/0 W914NS-04-D-0008/0001/0 W914NS-04-D-0022/0001/0 W914NS-04-D-0005/1/0 Contract Number Support USAID in the overall planning, monitoring, management, and reporting on reconstruction activities Ar Rastamiyah Military Academy Provide utilities at Kirkush Military Training Base (KMTB) Kirkush Military Base Renovate Tadji Military Base, Renovate New Iraqi Army Baghdad Recruiting Station Digital Cellular System/Network An Numaniyah Phase I Part B Renovate and construct permanent utilities at An Numaniyah Military Base Renovate And Construct Permanent Utilities Iraq Infrastructure KMTB Utilities, Water Line New Brigade Kirkuk Military Base (phase III) Renovate Al-Kasik Military Base for Iraqi Armed Forces Phase III Renovate Tadji Army Aviation Base Tadji Army Aviation Base Repair Al Kasik Army Base Renovate and Construct New Brigade Kirkuk Military Base New Brigade Kirkuk Military Base Brigade Facilities Tallil Military Base Brigade Facilities Tallil Military Base Monitoring & Evaluation Of Technical Assistance Portfolio International Police Training, Monitoring, Support, And Policy Renovate Um Qasr Naval Base International Police Training, Monitoring, Support, And Policy Renovate Umm Qasr Naval Base Technical specialists to assist in the monitoring and management of reconstruction and rehabilitation activities in Iraq Civil Defense HQ Restore, rebuild, and develop security and justice projects to support the Iraq CPA mission Ministry Of Defense Headquarters, Baghdad Iraq. Ministry Of Defense Headquarters Building, Housing, and Health Sector Design/Build Services to restore, rebuild, and develop public projects to support the Iraq CPA mission Teaching Hospital Restore, Rebuild, And Develop Transportation Infrastructure Projects To Support The Iraq CPA Mission Northern Region: Restore, Rebuild, And Develop National Water, Wastewater, And Solid Waste Projects To Support The Iraq CPA Mission Southern Region: Restore, Rebuild, And Develop National Water, Wastewater, And Solid Waste Projects To Support The Iraq CPA Mission Restore, rebuild, and develop Communication projects to support the Iraq CPA mission Scope Competitive Open Competitive Open Open Competitive Open Competitive Competitive Open Open Competitive Open Competitive Competitive Open n/a Competitive Open Open Open n/a Competitive Competitive Competitive n/a Competitive Open Competitive Small Disadvantage Open Competitive n/a Competitive Competitive Competitive Competitive Competition Type USAID DCMA AFCEE DCMA CPA AFCEE United States Army Contracting Agency AFCEE AFCEE DCMA USACE AFCEE DCMA AFCEE AFCEE DCMA DCMA AFCEE DCMA DCMA DCMA USAID State Department AFCEE State Department DCMA USAID CPA USACE DCMA DCMA USACE PCO USACE NAVFAC NAVFAC USACE Contracting Office CPFF CPFF CPFF CPFF n/a CPFF FFP n/a CPFF CPFF IDIQ CPAF n/a CPFF CPFF CPFF CPFF CPFF CPFF CPFF CPFF CPFF CPFF FFP- IDIQ-CPFF CPFF FFP- IDIQ-CPFF CPFF CPFF CPAF CPAF-IDIQ CPFF CPFF CPAF-IDIQ n/a CPAF-IDIQ Cost + Award Fee TO Cost + Award Fee TO CPAF-IDIQ Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I-5 05/03/04 05/04/04 05/04/04 05/04/04 05/05/04 05/05/04 05/05/04 05/06/04 05/08/04 05/08/04 05/08/04 05/11/04 05/11/04 05/11/04 05/12/04 05/12/04 05/15/04 05/15/04 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 05/17/04 05/02/04 117 141 05/02/04 116 05/16/04 05/02/04 115 140 05/02/04 114 05/15/04 05/01/04 113 139 05/01/04 112 05/15/04 05/01/04 111 138 05/01/04 110 05/15/04 05/01/04 109 05/15/04 05/01/04 108 137 04/30/04 136 04/30/04 107 Award Date 106 # $955,756 $9,058,791 $599,331 $846,115 $1,057,644 $1,057,644 $1,833,250 $24,100,988 $3,300,000 $5,000,000 $15,000,000 $40,497,030 $48,818,700 $28,203,841 $2,673,137 $590,000 $5,500,000 $9,180,184 $400,000 $2,000,000 $2,000,000 $5,200,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $1,128,154 $1,762,740 $2,157,618 $17,003,397 $17,168,205 $17,168,205 $23,740,323 $27,740,323 Total Value $955,756 $9,058,791 $599,331 $846,115 $1,057,644 $1,057,644 $1,833,250 $24,100,988 $3,300,000 $5,000,000 $15,000,000 $40,497,030 $48,818,700 $28,203,841 $2,673,137 $590,000 $5,500,000 $9,180,184 $400,000 $2,000,000 $2,000,000 $5,200,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $1,128,154 $1,762,740 $2,157,618 $17,003,397 $17,168,205 $17,168,205 $23,740,323 $27,740,323 Obligated Value Development Alternatives Inc. Parsons Parsons Parsons Parsons Parsons Parsons Iraqi Contractor - 2726 Lucent Technologies World Services Inc. Parsons Parsons Parsons Parsons Perini Corporation Perini Corporation Parsons Parsons Parsons Parsons Contrack/AICI/OCI/Archirodon Joint Venture FluorAMEC LLC Kellogg Brown Root Kellogg Brown Root Parsons Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Parsons Parsons Parsons Global Risk Strategies Perini Corporation Perini Corporation FluorAMEC LLC FluorAMEC LLC Contractor RAN-C-00-04-0002/0/02 W914NS-04-D-0009/14/0 W914NS-04-D-0009/9/0 W914NS-04-D-0009/10/0 W914NS-04-D-0009/13/0 W914NS-04-D-0009/12/0 W914NS-04-D-0009/11/0 DABV01-04-C-0104/0/0 W914NS-04-D-0005/2/0 W914NS-04-D-0006/5/0 W914NS-04-D-0006/4/0 W914NS-04-D-0009/7/0 W914NS-04-D-0009/8/0 W914NS-04-D-0011/T0002/01 W914NS-04-D-0011/2/1 W914NS-04-D-0009/6/0 FA8903-04-D-8675/0001/03 W9126G-04-D-0002/5/0 W914NS-04-D-0006/3/0 W914NS-04-D-0004/2/0 W914NS-04-D-0003/2/0 W9126G-04-D-0001/13/0 W9126G-04-D-0001/0013/0 W914NS-04-D-0006/2/0 W9126G-04-D-0001/12/0 W9126G-04-D-0001/11/0 W9126G-04-D-0001/0012/0 W9126G-04-D-0001/0011/0 W914NS-04-D-0009/5/0 W914NS-04-D-0009/4/0 W914NS-04-D-0009/3/0 W914NS-04-D-0105/0/0 W914NS-04-D-0011/2/0 W914NS-04-D-0011/0/0 W914NS-04-D-0008/4/0 W914NS-04-D-0008/PW-007/0 Contract Number Agriculture Rehabilitation Baghdad Public Service Academy Life Support Restore, rebuild, and develop Communication projects to support the Iraq CPA mission Construction Of Buildings, Housing, And Health Sector Building, Housing, and Health Sector Design/Build Services to restore, rebuild, and develop public projects to support the Iraq CPA mission Basrah Distribution Network Correct Appropriation Data Renovate Tadji Military Base, Renovate New Iraqi Army Baghdad Recruiting Station Gas Oil Separation Plants Building, Housing, and Health Sector Design/Build Services to restore, rebuild, and develop public projects to support the Iraq CPA mission Restore, rebuild, and develop transportation infrastructure projects to support the Iraq CPA mission Nationwide - Restore, Repair, And Develop New And Existing Power Generation, And Supervisory Control And Data Acquisition Systems To Support The Iraq CPA Mission Restoring Iraqi Oil Production Restoration Of Southern Oil Fields Building, Housing, and Health Sector Design/Build Services to restore, rebuild, and develop public projects to support the Iraq CPA mission Restore The Gas Oild Separation Plants In Southern Iraq RESTORE NGL AND LPG PLANTS IN SOUTHERN IRAQ TO INCREASED CAPACITY Restoration of southern oil fields Restoration of southern oil fields Green Zone Security Basrah Distribution Network Basrah Distribution Network Balad Rooz Water Supply Balad Rooz Water Supply Project Scope Competitive Open Open Open Open Open Open Open n/a Open n/a Open Open Open n/a Open Competitive Competitive n/a n/a Competitive Open Competitive n/a Open Open Competitive Competitive Open Open Open Open Open Open Open Open Competition Type USAID CPA CPA CPA CPA CPA CPA CPA USACE n/a USACE CPA CPA CPA CPA CPA AFCEE USACE USACE USACE USACE CPA USACE USACE CPA CPA USACE USACE CPA CPA CPA DMCA Iraq CPA CPA CPA CPA Contracting Office n/a CPFF n/a n/a n/a n/a n/a n/a n/a CPAF-IDIQ CPAFTO CPAF-IDIQ n/a n/a IDIQ CPATT n/a n/a CPFF CPAF-IDIQ CPAF-IDIQ CPAF-IDIQ CPAF-IDIQ n/a n/a CPAF-IDIQ n/a n/a n/a n/a n/a n/a n/a FFP CPATT IDIQ CPATT n/a Contract Type Appendix I-6 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 06/04/04 06/06/04 06/07/04 06/07/04 06/07/04 06/07/04 06/07/04 172 173 174 175 176 177 06/02/04 161 171 06/02/04 160 06/04/04 06/02/04 159 06/04/04 06/02/04 158 170 05/28/04 157 169 05/27/04 156 06/04/04 05/26/04 155 168 05/26/04 154 06/04/04 05/26/04 153 167 05/26/04 152 06/04/04 05/25/04 151 166 05/25/04 150 06/03/04 05/24/04 149 165 05/23/04 148 06/03/04 05/23/04 147 06/03/04 05/21/04 146 164 05/19/04 145 163 05/19/04 144 06/02/04 05/19/04 162 05/18/04 143 Award Date 142 # $11,964,401 $11,964,401 $12,000,000 $12,000,000 $65,449,199 $25,383,457 $19,800 $157,517 $157,571 $402,983 $402,983 $3,976,569 -$11,025,250 $435,000 $580,000 $653,000 $796,000 $850,000 $10,083,334 -$250,000 $360,000 $1,100,000 $5,050,000 $7,599,780 $120,125,150 $4,591,000 $2,000,000 $3,000,000 $3,500,000 $5,546,495 $7,000,000 $29,188,920 $5,500 Total Value $11,964,401 $11,964,401 $12,000,000 $12,000,000 $65,449,199 $25,383,457 $19,800 $157,517 $157,571 $402,983 $402,983 $3,976,569 -$11,025,250 $435,000 $580,000 $653,000 $796,000 $850,000 $10,083,334 -$250,000 $360,000 $1,100,000 $5,050,000 $7,599,780 $120,125,150 $4,591,000 $2,000,000 $3,000,000 $3,500,000 $5,546,459 $7,000,000 $29,188,920 $5,500 Obligated Value Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Earth Tech, Inc. Parsons Nour USA Altec Industries Inc. Altec Industries Inc. Altec Industries Inc. Altec Industries Inc. TOLTEST, INC. Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Contrack/AICI/OCI/Archirodon Joint Venture Contrack/AICI/OCI/Archirodon Joint Venture Contrack/AICI/OCI/Archirodon Joint Venture Contrack/AICI/OCI/Archirodon Joint Venture Contrack/AICI/OCI/Archirodon Joint Venture Parsons Lucent Technologies World Services Inc. Contrack/AICI/OCI/Archirodon Joint Venture Parsons Contrack/AICI/OCI/Archirodon Joint Venture Contrack/AICI/OCI/Archirodon Joint Venture Toltest, Inc. Anham Joint Venture Contrack/AICI/OCI/Archirodon Joint Venture Parsons Parsons Lucent Technologies World Services Inc. Tetra lnternational LLC International Resources Group ECC InternationalL LLC Iraqi Contractor - 500 Contractor W9126G-04-D-0001/17/0 W9126G-04-D-0001/0017/0 W9126G-04-D-0001/16/0 W9126G-04-D-0001/0016/0 FA8903-04-D-8671/T0001/M0002 W914NS-04-D-0009/16/0 W914NS-05-M-1328/0/0 W56HZV-04-D-BO58/TO0001/0 W56HZV-04-D-B058/TO0001/0 W56HZV-04-D-BO59/TO0001/0 W56HZV-04-D-B059/TO0001/0 FA8903-04-D-8678/T0047/0 W9126G-04-D-0001/7/2 W9125G-04-D-0001/8/1 W9126G-04-D-0001/0005/01 W914NS-04-D-0004/8/0 W914NS-04-D-0004/10/0 W914NS-04-D-0004/7/0 W914NS-04-D-0004/9/0 W914NS-04-D-0004/6/0 W914NS-04-D-0009/15/0 W914NS-04-D-0005/2/01 W914NS-04-D-0004/T0002/01 W914NS-04-D-0009/1/1 W914NS-04-D-0004/4/0 W914NS-04-D-0004/5/0 FA8903-04-D-8678/0045/0 W56HZV-04-D-0181/0001/0 W914NS-04-D-0004/3/0 W9126G-04-D-0002/7/0 W9126G-04-D-0002/6/0 W914NS-04-D-0005/3/0 FA8903-04-D-8677/T0017/0 517-C-00-04-00106/0/01 FA8903-04-D-8672/0011/0 W914NS-05-M-1284/0/0 Contract Number Metal Wall Lockers Life Support Restoration of southern oil fields Security Restoration of southern oil fields Construction Motorola 360 Vehicle Antennas High Lift Trucks High Lift Truck, Manuals. Aerial Platform Vehicles Aerial Platform Vehicles, Manuals. Kirkush Mtb Logistics Facility Change Accounting And Appropriation Data Change Accounting And Appropriation Data Restoration Of Southern Oil Fields Restore, Rebuild, And Develop Transportation Infrastructure Projects To Support The Iraq CPA Mission Restore, Rebuild, And Develop Transportation Infrastructure Projects To Support The Iraq CPA Mission Restore, Rebuild, And Develop Transportation Infrastructure Projects To Support The Iraq CPA Mission Restore, Rebuild, And Develop Transportation Infrastructure Projects To Support The Iraq CPA Mission Restore, Rebuild, And Develop Transportation Infrastructure Projects To Support The Iraq CPA Mission Restore, Rebuild, And Develop Communication Projects To Support The Iraq CPA Mission Security, Close Protection Team, Project Management Team Increase Contract Value Restore, Rebuild, And Develop Transportation Infrastructure Projects To Support The Iraq CPA Mission Restore, rebuild, and develop transportation infrastructure projects to support the Iraq CPA mission Rehabilitation of Karbala and Mandilee Pump Stations Battalion Sets Restore, rebuild, and develop transportation infrastructure projects to support the Iraq CPA mission Restore Pump Stations In Northern Iraq NOC Pump Stations Restore, rebuild, and develop Communication projects to support the Iraq CPA mission Renovate Ministry Of Trade Headquarters Buildings Technical specialists to assist in the monitoring and management of reconstruction and rehabilitation activities in Iraq Repair schools, governorate of Muthanna, Thi-Qar, Missan, & Wassit, and renovate Ministry of Environment HQ building Scope Open Competitive Open Competitive n/a Open Open n/a Open n/a Open Open n/a n/a Competitive n/a n/a n/a n/a n/a Open n/a Open n/a n/a n/a Competitive Competitive n/a Open Competitive n/a Open Competitive Competitive Open Competition Type CPA USACE CPA USACE DCMA CPA JCCI TACOM Warren DCMA TACOM Warren DCMA DCMA CPA CPA USACE USACE USACE USACE USACE USACE CPA USACE CPA CPA USACE USACE AFCEE TACOM Warren USACE CPA USACE USACE DCMA USAID AFCEE JCCI Contracting Office n/a n/a n/a n/a n/a CPFF n/a FFP FFP FFP FFP FFP CPFF n/a n/a n/a CPAF-IDIQ CPAF-IDIQ CPAF-IDIQ CPAF-IDIQ CPAF-IDIQ n/a CPAF-IDIQ n/a n/a CPAF-IDIQ CPAF-IDIQ CPFF FFP/IDIQ CPAF-IDIQ n/a CPAF-IDIQ CPAF-IDIQ CPFF CPFF CPFF Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I-7 06/07/04 06/07/04 06/07/04 06/07/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/08/04 06/10/04 06/10/04 06/10/04 06/11/04 06/11/04 06/12/04 06/12/04 06/12/04 06/12/04 06/13/04 06/13/04 06/13/04 06/13/04 06/13/04 06/13/04 06/13/04 06/15/04 06/15/04 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 Award Date 178 # $98,900 $8,116,883 $288,200 $2,161,500 $2,593,800 $3,746,600 $5,720,934 $30,000,000 $34,584,000 $2,305,600 $2,305,600 $2,933,812 $3,520,557 $2,773,925 $6,916,800 $123,954 $123,954 $3,000,000 $5,089,036 $5,089,036 $5,981,345 $5,982,020 $6,521,824 $15,336,937 $15,336,937 $19,255,379 $19,255,379 $19,335,472 $19,335,472 $19,335,472 $24,106,402 $24,106,402 $27,548,515 $41,053,323 $41,053,323 $44,595,886 $44,595,886 $6,000,000 $6,000,000 $6,000,000 $6,000,000 Total Value $98,900 $8,116,883 $288,200 $2,161,500 $2,593,800 $3,746,600 $5,720,934 $30,000,000 $34,584,000 $2,305,600 $2,305,600 $2,933,812 $3,520,557 $2,773,925 $6,916,800 $123,954 $123,954 $3,000,000 $5,089,036 $5,089,036 $5,981,345 $5,982,020 $6,521,824 $15,336,937 $15,336,937 $19,255,379 $19,255,379 $19,335,472 $19,335,472 $19,335,472 $24,106,402 $24,106,402 $27,548,515 $41,053,323 $41,053,323 $44,595,886 $44,595,886 $6,000,000 $6,000,000 $6,000,000 $6,000,000 Obligated Value Ingersoll-rand Company Parsons Parsons Parsons Parsons Parsons Parsons Parsons Parsons Parsons Parsons Parsons Parsons Parsons Parsons Komatsu America Intl. Co. Komatsu America Intl. Co. Komatsu America Intl. Co. Parsons Parsons Contrack/AICI/OCI/Archirodon Joint Venture Parsons Parsons Parsons Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Parsons Parsons Parsons Kellogg Brown Root Kellogg Brown Root Parsons Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Contractor W56HZV-04-D-B060/TO0001/0 W914NS-04-D-0016/31/0 W914NS-04-D-0011/26/0 W914NS-04-D-0010/25/0 W914NS-04-D-0012/27/0 W914NS-04-D-0009/23/0 W914NS-04-D-0013/28/0 W914NS-04-D-0014/29/0 W914NS-04-D-0009/24/0 W914NS-04-D-0009/20/0 W914NS-04-D-0009/19/0 W914NS-04-D-0009/22/0 W914NS-04-D-0009/21/0 W914NS-04-D-0009/18/0 W914NS-04-D-0009/17/0 W56HZV-04-D-B085/TO0001/01 W56HZV-04-D-BO85/TO0001/0 W56HZV-04-D-B085/TO0001/0 W9126G-04-D-0002/9/0 W914NS-04-D-0006/5/1 W914NS-04-D-0004/0005/01 W914NS-04-D-0006/0006/0001 W914NS-04-D-0006/2/1 W9126G-04-D-0002/5/01 W9126G-04-D-0001/8/2 W9126G-04-D-0001/0008/02 W9126G-04-D-0001/13/1 W9126G-04-D-0001/0013/01 W9126G-04-D-0002/7/1 W9126G-04-D-0002/7/01 W9126G-04-D-0002/6/1 W9126G-04-D-0001/7/3 W9126G-04-D-0001/0007/03 W9126G-04-D-0002/6/01 W9126G-04-D-0001/11/1 W9126G-04-D-0001/0011/01 W9126G-04-D-0001/12/1 W9126G-04-D-0001/0012/01 W9126G-04-D-0001/15/0 W9126G-04-D-0001/14/0 W9126G-04-D-0001/0015/0 W9126G-04-D-0001/0014/0 Contract Number Manual Compressor, Manuals. Utility Vehicles, Manuals Utility Vehicles Utility Vehicles, Manuals Contract Management And Administration Support Increase Funding And Revise Definitization Schedule Restore, rebuild, and develop transportation infrastructure projects to support the Iraq CPA mission Teaching Hospital Increase Amount By Modifying And Adding Clins Gas Oil Separation Plants Increase Not To Exceed Amount Restoration of southern oil fields Increase The Not To Exceed Amount Restoration of southern oil fields Increase Not To Exceed Amount Downstream Sector Projects Increase NTE Amount Increase Amount Restoration of southern oil fields NOC Pump Stations Increase NTE Amount Restoration of southern oil fields Increase Amount Restoration of southern oil fields MANAGEMENT AND ADMINISTRATION TRANSPORTATION AND MOBILIZATION Restoration of southern oil fields Restoration of southern oil fields Scope Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open n/a Open Open n/a Competitive Competitive n/a Competitive n/a Competitive n/a Competitive n/a Competitive n/a n/a Competitive Competitive n/a Competitive n/a Competitive Open Open Competitive Competitive Competition Type DCMA CPA CPA CPA CPA CPA CPA CPA CPA CPA CPA CPA CPA CPA CPA DCMA TACOM Warren DCMA CPA CPA PCO PCO CPA USACE CPA USACE CPA USACE CPA USACE CPA CPA USACE USACE CPA USACE CPA USACE CPA CPA USACE USACE Contracting Office FFP n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a FFP FFP FFP FFP n/a CPAF-IDIQ IDIQ n/a CPAF-IDIQ n/a n/a n/a n/a n/a CPAF-IDIQ n/a n/a n/a CPAF-IDIQ n/a n/a n/a n/a n/a n/a n/a n/a Contract Type Appendix I-8 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 07/01/04 07/04/04 07/05/04 07/06/04 257 258 259 260 06/24/04 244 07/01/04 06/23/04 243 256 06/23/04 242 07/01/04 06/21/04 241 255 06/21/04 240 06/29/04 06/21/04 239 06/28/04 06/20/04 238 254 06/20/04 237 253 06/19/04 236 06/28/04 06/18/04 235 252 06/18/04 234 06/28/04 06/18/04 233 06/28/04 06/18/04 232 251 06/18/04 231 250 06/17/04 230 06/28/04 06/17/04 229 249 06/17/04 228 06/26/04 06/17/04 227 06/25/04 06/16/04 226 248 06/16/04 225 247 06/16/04 224 06/24/04 06/16/04 223 06/24/04 06/16/04 222 246 06/16/04 245 06/15/04 221 Award Date 220 # $500,000 $23,020 $915,700 $915,700 $56,491,647 $10,100,712 $500,000 $2,500,000 $2,875,000 $6,200,000 $21,516,768 $10,627,691 $6,392,139 -$600 $188,734,226 $901,876 $3,246,753 $3,246,753 $36,525,974 $4,509,381 $7,305,195 $194,403 $194,403 $1,180,813 $1,180,813 $1,700,750 $8,510,480 $3,000,000 $6,000,000 $6,585,748 $12,987,013 $18,170 $18,170 $249,096 $3,070,149 $6,087,662 $98,900 Total Value $500,000 $23,020 $915,700 $915,700 $51,809,000 $10,100,712 $500,000 $2,500,000 $2,875,000 $6,200,000 $21,516,768 $10,627,691 $6,392,139 -$600 $188,734,226 $901,876 $3,246,753 $3,246,753 $36,525,974 $4,509,381 $7,305,195 $194,403 $194,403 $1,180,813 $1,180,813 $1,700,750 $8,510,480 $3,000,000 $6,000,000 $6,585,748 $12,987,013 $18,170 $18,170 $249,096 $3,070,149 $6,087,662 $98,900 Obligated Value ECC InternationalL LLC Parsons Iraqi Contractor - 2722 Komatsu America Intl. Co. Komatsu America Intl. Co. Creative Associates Caterpillar Inc Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root Kellogg Brown Root ECC InternationalL LLC Kellogg Brown Root AMEC Earth & Environmental, Inc. H.K. Mullins and Associates, Inc. Ingersoll-Rand Company DynCorp International LLC Altec Industries Inc. Parsons Parsons Parsons Parsons Parsons Parsons H.K. Mullins and Associates, Inc. H.K. Mullins and Associates, Inc. Caterpillar Inc Caterpillar Inc Caterpillar Inc James Worldwide Sales, Inc. Parsons Parsons Parsons Parsons Iraqi Contractor - 2722 North Shore International Inc. North Shore International Inc. Terex Corporation Iraqi Contractor - 2722 Parsons Ingersoll-rand Company Contractor FA8903-04-D-8672 /T0008/M0001 W914NS-04-D-0006/5/2 W914NS-04-D-0123/T0011/0 W56HZV-04-D-B940/TO0001/0 W56HZV-04-D-B940/TO0001/0 EPP-C-00-04-00004/2/0 W56HZV-04-D-B770/0/01 W9126G-04-D-0001/0025/0 W9126G-04-D-0001/0024/0 W9126G-04-D-0001/0023/0 W9126G-04-D-0001/0022/0 FA8903-04-D-8672 /T0012/0 W9126G-04-D-0001/0021/0 FA8903-04-D-8669/T0014/0 W56HZV-04-D-B061/TO0001/01 W56HZV-04-D-B060/TO0001/01 SLMAQM-04-C-0030/ SAWMPD04F0338/02 W56HZV-04-D-B059/TO0001/01 W914NS-04-D-0024/39/0 W914NS-04-D-0023/38/0 W914NS-04-D-0022/37/0 W914NS-04-D-0021/36/0 W914NS-04-D-0020/35/0 W914NS-04-D-0019/34/0 W56HZV-04-D-BO61/TO0001/0 W56HZV-04-D-B061/TO0001/0 W56HZV-04-D-B770/TO0001/0 W56HZV-04-D-B770/TO0001/0 W56HZV-04-D-B930/TO0001/0 W56HZV-04-D-B010/0/0 W9126G-04-D-0002/8/0 W9126G-04-D-0002/10/0 W9126G-04-D-0002/11/0 W914NS-04-D-0018/33/0 W914NS-04-D-0104/0/01 W56HZV-04-D-BO84/TO0001/0 W56HZV-04-D-B084/TO0001/0 W56HZV-04-D-B870/TO0002/0 W914NS-04-D-0104/0/0 W914NS-04-D-0017/32/0 W56HZV-04-D-BO60/TO0001/0 Contract Number Not To Exceed (nte) Amount Is Increased Field Equipment Tractors Komatsu Tractor, Manuals. Education, Health and Social Services Manuels for Caterpillar Forklifts Refurbish Loading Arms - Abot Pipeline Communications Misc Parts and Equipment-OPC & MRC Misc SRC Projects Utility Upgrade And Renovation At Kirkush Military Training Base SOC Pump Stations Upgrade Electrical Welding Machine, Manuals. Manual Compressor. International police training, monitoring, support, and policy Aerial Platform Vehicles, Manuals. Welding Mach 600 Amp Vehicle Welding Machine, Manuals. Manuels For Caterpillar Forklifts Forklift Vehicles Tractor Vehicle, Manuals. 45 Seat Bus Transportation And Mobilization Security For Operation In Iraq Life Support Flights All Terrain Utility Vehicles Utility Vehicles, Manuals Dumper Fitted With Essential Equipment Flights Air Compressors Scope n/a n/a Open n/a Open Competitive Open n/a n/a n/a n/a SMALL BUSINESS n/a Open Open Open Competitive Open Open Open Open Open Open Open n/a Open Open n/a Open Competitive Open Open Open Open Open n/a Open n/a Open Open n/a Competition Type DCMA n/a PCO TACOM Warren DCMA USAID DCMA CPA CPA CPA CPA DCMA CPA DCMA DCMA DCMA State Department DCMA CPA CPA CPA CPA CPA CPA TACOM Warren DCMA DCMA TACOM Warren DCMA TACOM Warren CPA CPA CPA CPA PCO TACOM Warren DCMA TACOM Warren CPA CPA TACOM Warren Contracting Office n/a CPFF n/a n/a n/a FFP n/a FFP n/a n/a n/a n/a CPFF n/a CPFF FFP FFP FFP- IDIQ-CPFF FFP n/a n/a n/a n/a n/a n/a FFP FFP IDIQ n/a FFP FFP FFP FFP FFP n/a FFP n/a FFP n/a FFP n/a Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I-9 07/07/04 07/07/04 07/07/04 07/07/04 07/07/04 07/07/04 07/08/04 07/09/04 07/09/04 07/09/04 07/09/04 07/09/04 07/09/04 07/09/04 07/12/04 07/12/04 07/12/04 07/14/04 07/14/04 07/14/04 07/14/04 07/14/04 07/14/04 07/15/04 07/15/04 07/15/04 07/15/04 07/15/04 07/16/04 07/16/04 07/16/04 07/16/04 07/16/04 07/18/04 07/21/04 07/22/04 07/22/04 07/23/04 07/23/04 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 Award Date 261 # $21,180,000 $33,986,948 $7,155,977 $35,287,472 $6,221,460 $39,021,180 $249,096 $7,124,544 $7,124,544 $7,124,544 $123,555,478 $237,052 $237,052 $1,158,129 $1,158,129 $6,155,119 $649,860 $649,860 $1,375,440 $1,375,440 $6,049,654 $13,693,178 $309,750 $309,750 $5,238,640 $191,866 $321,200 $321,200 $5,455,674 $5,775,696 $5,775,696 $50,000,000 $191,866 $308,472 $308,472 $1,268,798 $1,834,077 $1,834,077 $12,089,702 Total Value $21,180,000 $33,986,948 $7,155,977 $35,287,472 $6,221,460 $39,021,180 $249,096 $7,124,544 $7,124,544 $115,750,021 $237,052 $237,052 $1,158,129 $1,158,129 $6,155,119 $649,860 $649,860 $1,375,440 $1,375,440 $6,049,654 $13,693,178 $309,750 $309,750 $5,238,640 $191,866 $321,200 $321,200 $5,455,674 $5,775,696 $5,775,696 $23,000,000 $191,866 $308,472 $308,472 $1,268,798 $1,834,077 $1,834,077 $12,089,702 Obligated Value Orenburgsnab XXI Century MAC International FZE Kellogg Brown Root Kellogg Brown Root Caterpillar Inc Washington International Terex Corporation Volvo Construction Equipment North America Inc Volvo Construction Equipment North America Inc Volvo Construction Equipment North America Inc Anham Joint Venture Caterpillar Inc Caterpillar Inc American Material Handling American Material Handling ECC InternationalL LLC Certified Stainless Service Inc Certified Stainless Service Inc Certified Stainless Service Inc Certified Stainless Service Inc Grove ESS S.C. Roman S.A. S.C. Roman S.A. Mafeks International LLC Certified Stainless Service Inc Ingersoll-rand Company Ingersoll-rand Company Caterpillar Inc Navistar Navistar CEPPS II-IRI Certified Stainless Service Inc American Material Handling American Material Handling Anham Joint Venture Volvo Construction Equipment North America Inc Volvo Construction Equipment North America Inc Volunteers in Economic Growth Alliance Contractor W914NS-04-M-0116/0/0 W914NS-04-D-0117/17/0 W9126G-04-D-0001/0028/0 W9126G-04-D-0001/0026/0 W915WE41770290/0/0 W914NS-04-D-0010/9/0 W56HZV-04-D-B870/TO0002/0 W56HZV-04-D-B910/TO0002/0 W56HZV-04-D-B910/TO0002/0 W56HZV-04-D-B910/0/0 W56HZV-04-D-0181/0001/0003 W56HZV-04-D-D790/TO0001/0 W56HZV-04-D-D790/TO0001/0 W56HZV-04-D-B800/TO0002/0 W56HZV-04-D-B800/TO0002/0 FA8903-04-D-8672 /T0006/M0001 W56HZV-04-D-BO70/TO0001/0 W56HZV-04-D-B070/TO0001/0 W56HZV-04-D-BO67/TO0001/0 W56HZV-04-D-B067/TO0001/0 W56HZV-04-D-B013/0/0 W914NS-04-C-9008/0/0 W56HZV-04-D-BO56/TO0001/0 W56HZV-04-D-B056/TO0001/0 W914NS-04-M-0113/0/0 W56HZV-04-D-BO62/TO0001/0 W56HZV-04-D-BO60/TO0002/0 W56HZV-04-D-B060/TO0002/0 W56HZV-04-D-B930/2/0 W56HZV-04-D-B020/2/0 W56HZV-04-D-B020/0/0 AFP-A-00-04-00014/2/0 W56HZV-04-D-B062/TO0001/0 W56HZV-04-D-B800/TO0001/0 W56HZV-04-D-B800/TO0001/0 W56HZV-04-D-0181/0001/0002 W56HZV-04-D-B910/TO0001/0 W56HZV-04-D-B910/TO0001/0 EGA-A-00-04-00002/2/0 Contract Number Railroad Equipment MRC/SRC Consolidated Chemicals Distribution - OPC Northern Region: Restore, repair, and develop power generation, transmission, distribution and Supervisory Control and Data Acquisition Systems projects to support the Iraq CPA mission Dumper, Manuals. Wheel Loaders Volvo model L120E cars, manuals. Battalion Sets Forklift Vehicles Caterpillar Forklifts, Manuals Forklift Vehicles Daewoo Forklifts, Manuals Water, Sewer And Power Plant Fuel Tank Trucks Manuals. Truck With Fuel Tank Trailer Semi Fuel Tank, Manuals. Truck, Mobile Cold Storage Order Mobile Cold Storage Truck, Manuals LPG Container Wagons Trucks Air Compressors Manual Compressor, Manuals. Improved Efficiency & Accountability of Local Governance Truck With Hydrochloric Acid Tank, Manuals Forklift Vehicles Daewoo Forklifts, Manuals Battalion Sets Wheel Loaders Volvo Model L120e Cars, Manuals. Economy, Finance, Agriculture & Rural Economy Scope Competitive Competitive n/a n/a Competitive Competitive Open n/a Open Competitive Competitive n/a Open n/a Open n/a n/a Open n/a Open Competitive Competitive n/a Open Competitive n/a n/a Open Competitive Competitive Competitive Competitive Open n/a Open Competitive n/a Open Competitive Competition Type PCO PCO PCO PCO PCO PCO DCMA TACOM Warren DCMA PCO TACOM Warren TACOM Warren DCMA TACOM Warren DCMA DCMA TACOM Warren DCMA TACOM Warren DCMA PCO PCO TACOM Warren DCMA PCO TACOM Warren TACOM Warren DCMA PCO PCO PCO USAID DCMA TACOM Warren DCMA TACOM Warren TACOM Warren DCMA USAID Contracting Office n/a FFP IDIQ n/a n/a FFP IDIQ FFP n/a FFP n/a FFP/IDIQ n/a FFP n/a FFP CPFF n/a FFP n/a FFP FFP FFP n/a FFP FFP n/a n/a FFP IDIQ IDIQ FFP n/a FFP n/a FFP FFP/IDIQ n/a FFP Contract Type Appendix I - 10 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 09/15/04 09/16/04 09/16/04 09/16/04 09/16/04 09/17/04 336 337 338 339 340 09/01/04 323 335 08/27/04 322 09/15/04 08/20/04 321 334 08/19/04 320 09/15/04 08/18/04 319 09/15/04 08/17/04 318 333 08/13/04 317 332 08/13/04 316 09/13/04 08/13/04 315 331 08/13/04 314 09/10/04 08/06/04 313 330 08/03/04 312 09/10/04 07/30/04 311 09/09/04 07/29/04 310 329 07/29/04 309 328 07/29/04 308 09/07/04 07/28/04 307 327 07/28/04 306 09/04/04 07/28/04 305 09/03/04 07/28/04 304 326 07/27/04 303 325 07/25/04 302 09/03/04 07/25/04 301 324 07/25/04 Award Date 300 # $769,600 $27,564 $27,564 $214,448 $8,000,000 $653,880 $2,701,996 $12,167,385 $26,246,562 $684,600 $523,000 $4,226,482 $4,928,000 $804,585 $331,100 $11,169,276 $184,637,237 $40,000,000 $967,236 $1,144,000 $2,077,180 $21,409,173 $9,961,000 $401,602 $1,054,000 $3,723,886 $5,728,382 $1,409,640 $3,000,000 $17,549,897 $318,962 $1,018,728 $106,999 $106,999 $12,054,399 $13,609,053 $46,928,540 $8,146,270 $16,000,000 $21,016,010 Total Value $769,600 $27,564 $27,564 $207,448 $8,000,000 $653,880 $2,701,996 $12,167,385 $26,246,562 $684,600 $523,000 $4,226,482 $4,928,000 $804,585 $331,100 $11,169,276 $33,500,000 $40,000,000 $967,236 $1,144,000 $2,077,180 $21,409,173 $9,961,000 $401,602 $1,054,000 $3,723,886 $5,728,382 $1,409,640 $3,000,000 $17,549,897 $318,962 $1,018,728 $106,999 $106,999 $12,054,399 $13,609,053 $46,928,540 $8,146,270 $16,000,000 $21,016,010 Obligated Value SallyPort Global Holdings American International Radio American International Radio Certified Stainless Service Inc Parsons Volvo Construction Equipment North America Inc Volvo Construction Equipment North America Inc Parsons American Science and Engineering Inc. S.C. Roman S.A. Isometrics, Inc. Navistar Weston Iraqi Contractor - 3237 Iraqi Contractor - 3222 Bertoll SRL BearingPoint CEPPS IV-IFES Terex Corporation Komatsu America Intl. Co. Grove Washington International Washington International Rosenbauer America LLC Terex Corporation Rosenbauer America LLC Navistar Navistar Parsons FluorAMEC LLC Caterpillar Inc Caterpillar Inc Caterpillar Inc Caterpillar Inc Caterpillar Inc Caterpillar Inc FluorAMEC LLC Kellogg Brown Root Parsons Parsons Washington International Contractor W914NS-04-D-9007/1/0 W914NS-05-M-9166/0/0 W914NS-04-M-9166/0/0 W56HZV-04-D-B076/0001/0 W914NS-04-D-0006/7/0 W56HZV-04-D-B125/0001/0 W56HZV-04-D-B125/0002/0 W9126G-04-D-0002/9/3 W914NS-04-F-9014/0/0 W56HZV-04-D-B041/0002/0 W56HZV-04-D-B069/0001/0 W56HZV-04-B074/0001/0 FA8903-04-D-8681/T0126/0 DABV01-03-C-0002/0/P00003 W914NS-04-M-0161/0/0 W914NS-04-D-0128/5/0 267-C-00-04-00405/2/0 267-A-00-04-00405/1/0 W56HZV-04-D-B036/0001/0 W56HZV-04-D-B880/0001/0 W56HZV-04-D-B016/0001/0 FA8903-04-D-8680/T0002/0 FA8903-04-D-8680/T0003/0 W56HZV-04-D-B104/T0001/0 W56HZV-04-D-B019/0001/0 W56HZV-04-D-B104/0001/0 W56HZV-04-D-B002/0001/0 W56HZV-04-D-B024/0002/0 W9126G-04-D-0002/9/2 W914NS-04-D-0008/10/0 W56HZV-04-D-B970/0/01 W56HZV-04-D-B970/T0001/0 W56HZV-04-D-B970/T0002/01 W56HZV-04-D-B900/TO0001/02 W56HZV-04-D-B900/TO0001/02 W56HZV-04-D-B900/0/01 W914NS-04-D-0008/9/0 W9126G-04-D-0001/0027/0 W9126G-04-D-0002/13/0 W9126G-04-D-0002/12/0 W914NS-04-D-0010/8/0 Contract Number Flight Tasking Order Installation Radio Supplies Water Tank Truck Grader Grader Increase NTE Amount Fire Trucks Fuel Tank Truck Water Tank Truck Tallil Upgrades Setup, Operate And Maintain The Kirkush Military Base Deliver Twin Lift Spreaders To Port Umm Qasser Economy, Finance, Agriculture & Rural Economy Improved Efficiency & Accountability of Local Governance Trucks: 6x4 with Low Bed Trailer, 70 Ton Hydraulic Excavator Crane Truck Repair Schools Repair Schools Fire Truck Mini Pumper Crane, Hydraulic, All Terrain Fire truck mini-pumper Bus, passenger, 32 seats NTE Amount Increased Caterpillar Ps360c Caterpillar Ps360c Caterpillar P360c Change Caterpillar Model To 140h Caterpillar Graders, Manuals CAT Motor Graders, Manuals Restore Compressions Stations In Northern Iraq Work Over Of Wells Northern Region: Restore, repair, and develop power generation, transmission, distribution and Supervisory Control and Data Acquisition Systems projects to support the Iraq CPA mission Scope Open Open Open n/a Competitive n/a n/a n/a Competitive Competitive Competitive n/a Open Open Open Competitive Competitive Competitive Competitive Competitive Competitive Open Open Open Competitive Competitive Competitive Competitive n/a Competitive Open Open Open n/a n/a n/a Competitive Competitive Open Open Competitive Competition Type PCO PCO PCO TACOM Warren PCO TACOM Warren TACOM Warren PCO PCO TACOM Warren TACOM Warren TACOM Warren DCMA CPA PCO PCO USAID USAID TACOM Warren TACOM Warren TACOM Warren DCMA DCMA DCMA TACOM Warren TACOM Warren TACOM Warren TACOM Warren PCO PCO DCMA DCMA DCMA TACOM Warren DCMA DCMA PCO PCO PCO PCO PCO Contracting Office n/a FFP n/a n/a CPAF IDIQ IDIQ n/a FFP n/a IDIQ IDIQ CPFF n/a n/a FFP CPFF n/a IDIQ IDIQ IDIQ CPFF CPFF IDIQ IDIQ IDIQ IDIQ n/a n/a CPFF FFP FFP FFP FFP FFP FFP CPAF CPAF FFP FFP IDIQ Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 11 09/20/04 09/21/04 09/21/04 09/21/04 09/22/04 09/22/04 09/22/04 09/23/04 09/23/04 09/23/04 09/23/04 09/23/04 09/23/04 09/24/04 09/24/04 09/24/04 09/27/04 09/27/04 09/27/04 09/27/04 09/27/04 09/27/04 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 09/28/04 09/20/04 354 09/28/04 09/20/04 353 383 09/20/04 352 382 09/20/04 351 09/28/04 09/20/04 350 381 09/20/04 349 09/28/04 09/20/04 348 380 09/20/04 347 09/28/04 09/20/04 346 09/28/04 09/20/04 345 379 09/20/04 344 378 09/20/04 343 09/28/04 09/19/04 377 09/17/04 342 Award Date 341 # $171,180 $171,180 $186,200 $186,200 $375,350 $1,948,780 $5,818,000 $179,759 $254,200 $254,200 $254,200 $6,293,357 $87,999,873 -$17,528 $13,630 $769,600 $160,699 $160,699 $160,699 $160,699 $401,308 $55,779,999 $732,878 $25,000,000 $25,000,000 $4,617 $102,000 $8,000,000 $4,500 $9,850 $88,250 $88,250 $109,582 $109,582 $138,455 $586,950 $1,169,602 $10,317,895 $21,000,000 $21,000,000 $540,000 Total Value $171,180 $171,180 $186,200 $186,200 $375,350 $1,948,780 $5,818,000 $179,750 $254,200 $254,200 $6,293,357 $27,200,000 -$17,528 $13,630 $769,600 $160,699 $160,699 $160,699 $160,699 $401,308 $55,779,999 $732,878 $25,000,000 $25,000,000 $4,617 $102,000 $8,000,000 $4,500 $9,850 $88,250 $88,250 $109,582 $109,582 $138,455 $586,950 $1,169,602 $10,317,895 $21,000,000 $21,000,000 $540,000 Obligated Value Certified Stainless Service Inc Certified Stainless Service Inc Mifram Projects Ltd Mifram Projects Ltd Iraqi Contractor - 2132 Rosenbauer America LLC Transatlantic Traders, Inc Independent Systems Inc Independent Systems Inc Independent Systems Inc Independent Systems Inc Navistar Louis Berger Group/MOLSA SkyLink Iraqi Contractor - 162 SallyPort Global Holdings Volvo Construction Equipment North America Inc Volvo Construction Equipment North America Inc Volvo Construction Equipment North America Inc Volvo Construction Equipment North America Inc S.C. Roman S.A. Parsons Rosenbauer America LLC Parsons Parsons Iraqi Contractor - 1544 SallyPort Global Holdings Parsons Terex Corporation S.C. Roman S.A. Iraqi Contractor - 1707 Data Entry Error S.C. Roman S.A. P & G Chevrolet, Inc. P & G Chevrolet, Inc. James Worldwide Sales, Inc. Terex Corporation James Worldwide Sales, Inc. Anham Joint Venture Parsons Parsons Iraqi Contractor - 1588 Tri Service Professional Support Services Contractor W56HZV-04-D-BO67/0002/0 W56HZV-04-D-B067/TO0002/0 W56HZV-04-D-BO92/0001/0 W56HZV-04-D-B092/TO0001/0 W914NS-04-M-9222/0/0 W56HZV-04-D-B106/0001/0 W58RGZ-04-C-0332/0/0 W56HZV-04-D-B830/0/0 W56HZV-04-D-B830/TO0001/0 W56HZV-04-D-B830/T0001/0 W56HZV-04-D-B830/0001/0 W56HZV-04-D-B075/0001/0 267-C-00-04-00417/1/0 W914NS-04-M-9023/0/P00001 W914NS-04-M-9202/0/0 W914NS-04-D-9007/0/0 W56HZV-04-D-B860/TO0001/0 W56HZV-04-D-B860/TO0001/0 W56HZV-04-D-B860/T0001/0 W56HZV-04-D-B860/0001/0 W56HZV-04-D-B113/0001/0 W914NS-04-D-0006/T0006/04 W56HZV-04-D-B046/0001/0 W914NS-04-D-0006/10/0 W914NS-04-D-0006/0010/0 W914NS-04-M-9176/0/0 W914NS-04-D-9007/1/0 W914NS-04-D-0006/0009/0 W56HZV-04-D-B022/0/0 W56HZV-04-P-B041/0/0 W914NS-04-M-9178/0/0 W56HZV-04-D-B110/TO0001/0 W56HZV-04-D-B110/0001/0 W56HZV-04-D-B111/TO0001/0 W56HZV-04-D-B111/0001/0 W56HZV-04-R-S126/0/0 W56HZV-04-D-B022/T0001/0 W56HZV-04-R-S126/T0001/0 W56HZV-04-D-0181/0004/0 W914NS-04-D-0006/8/0 W914NS-04-D-0006/0008/0 W914NS-04-M-9042/0/P00001 W914NS-04-D-9006/1/0 Contract Number Truck With Fuel Tank Trailer Semi Fuel Tank, Manuals. Agricultural Tractors Agricultural Tractor, Manuals Camp Fiji Interior Renovation Fire Truck, Medium Rescue Surveillance aircraft, Misc Forklifts Forklifts, Manuals Forklifts Forklift Daewo Model D50c Water Tank Truck Economy, Finance, Agriculture & Rural Economy Decrease Unit Price And Add Line Item Office Supplies Flights Backhoes, Water Tank Trucks, Manuals Backhoes Construction Equipment Backhoe Shipment To Baghdad And Basrah Truck, 30 Ton Trailer Design And Construct Submittals Fire Trucks Pediatric Hospitals Mattresses Add Additional Flight Hospital Renovation Boom Truck Manuals For Fire Trucks Power Connection At Karbala Police Academy Cargo Truck, Manuals Flatbed Trucks Dump Trucks, Manuals. 3 Ton Dump Trucks Buses Boom Truck Buses Cargo Trailer Hospital Modernization Cancel Order In Its Entirety Scope n/a Open n/a Open Open n/a Competitive Open Open Open n/a Competitive Competitive n/a Open Open Open n/a Open n/a Competitive Open n/a Competitive n/a Open n/a n/a Open Open Open Open n/a Open n/a Open Open Open n/a Competitive n/a n/a Open Competition Type TACOM Warren DCMA TACOM Warren DCMA PCO TACOM Warren US Army Aviation and Missile Command DCMA DCMA DCMA TACOM Warren TACOM Warren USAID PCO PCO PCO DCMA TACOM Warren DCMA DCMA TACOM Warren PCO TACOM Warren PCO PCO PCO PCO PCO DCMA TACOM Warren PCO DCMA TACOM Warren DCMA TACOM Warren DCMA DCMA DCMA TACOM Warren PCO PCO PCO PCO Contracting Office n/a FFP FFP FFP n/a IDIQ FFP n/a FFP CPAIQ n/a IDIQ CPFF n/a n/a n/a FFP n/a n/a n/a IDIQ n/a n/a CPAF n/a n/a n/a n/a n/a n/a n/a FFP n/a FFP n/a IDIQ n/a IDIQ n/a CPAF n/a n/a n/a Contract Type Appendix I - 12 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 09/29/04 09/29/04 09/29/04 09/29/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 09/30/04 10/01/04 10/01/04 10/01/04 10/01/04 10/01/04 10/01/04 10/01/04 10/01/04 10/01/04 10/01/04 10/01/04 10/01/04 10/01/04 10/01/04 10/02/04 10/02/04 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 Award Date 384 # $7,875 $34,200 $20,835 $235,000 $292,575 $292,575 $409,900 $1,427,535 $1,427,535 $1,493,965 $3,180,724 $3,180,724 $3,742,392 $3,742,392 $4,914,000 -$614,090 $1,200 $174,788 $187,373 $283,920 $432,000 $432,000 $432,000 $500,000 $761,850 $761,850 $761,850 $1,083,250 $2,299,979 $2,439,990 $2,439,990 $3,311,214 $4,119,999 $119,073,300 $119,073,300 $16,200 $1,379,744 $1,379,744 $87,999,873 Total Value $7,875 $34,200 $20,835 $235,000 $292,575 $292,575 $409,900 $1,427,535 $1,427,535 $1,493,965 $3,180,724 $3,180,724 $3,742,392 $3,742,392 $4,914,000 -$614,090 $1,200 $174,788 $187,373 $283,920 $432,000 $432,000 $432,000 $500,000 $761,850 $761,850 $761,850 $1,083,250 $2,299,979 $2,439,990 $2,439,990 $3,311,214 $4,119,999 $12,636,115 $12,636,115 $16,200 $1,379,744 $1,379,744 $24,950 Obligated Value Saudi Naval Support Company Ltd. Iraqi Contractor - 1919 Xuan Yuan Industrial Development Co, Ltd Supplycore, Inc Advanced Technology Lifeline Shelter Systems, Inc Lifeline Shelter Systems, Inc S.C. Roman S.A. Terex Corporation Terex Corporation Volvo Construction Equipment North America Inc Caterpillar Inc Caterpillar Inc Navistar Navistar Komatsu America Intl. Co. Volvo Construction Equipment North America Inc Iraqi Contractor - 1280 W.S. Darley & Co SkyLink S.C. Roman S.A. S.C. Roman S.A. S.C. Roman S.A. S.C. Roman S.A. Parsons Independent Systems Inc Independent Systems Inc Independent Systems Inc Certified Stainless Service Inc AMEC Earth & Environmental, Inc. Terex Corporation Terex Corporation Caterpillar Inc ECC InternationalL LLC Louis Berger Group Louis Berger Group/PSDII Iraqi Contractor - 2629 Lifeline Shelter Systems, Inc Lifeline Shelter Systems, Inc Louis Berger Group/ MTC-Iraq, LLC. Joint Venture Contractor W914NS-05-M-9031-P00001/0/1 W914NS-05-M-9032/0/0 W914NS-04-M-0114/0/P00001 W914NS-05-M-9026/0/0 W914NS-04-M-9226/0/0 W56HZV-04-D-B103/TO0001/0 W56HZV-04-D-B103/TO0001/0 W56HZV-04-D-B049/TO0001/03 W56HZV-04-D-BO99/0002/0 W56HZV-04-D-B099/TO0002/0 W56HZV-04-D-B890/0002/0 W56HZV-04-D-D820/0002/0 W56HZV-04-D-B820/0002/0 W56HZV-04-D-BO75/0002/0 W56HZV-04-D-B075/TO0002/0 W56HZV-04-D-B880/0002/0 W56HZV-04-D-B125/0002/01 W914NS-04-M-9192/0/0 W914NS-04-M-0174/0/0 W914NS-04-M-0176/0/0 W56HZV-04-D-B125/T0001/0 W56HZV-04-D-B114/TO0001/0 W56HZV-04-D-B114/T0001/0 W56HZV-04-D-B114/0001/0 W914NS-04-D-0006/5/3 W56HZV-04-D-B830/T0002/0 W56HZV-04-D-B830/0002/0 W56HZV-04-D-B30/T0002/0 W56HZV-04-D-B032/0002/0 FA8903-04-D-8669/T0006/M0001 W56HZV-04-D-D022/0002/0 W56HZV-04-D-B022/T0002/0 W56HZV-04-D-D028/0002/0 FA8903-04-D-8672 /T0008/M0002 267-C-00-04-00435-00/0/0 267-C-00-04-00435/0/0 W914NS-05-M-9168/0/0 W56HZV-04-D-B105/T0001/0 W56HZV-04-D-B105/0001/0 267-C-00-04-00417-00/0/0 Contract Number Badges Gas Cans Fix Typos And Change Payment Method Washers And Dryers Internet & Computer Training Labs Bloodmobiles Bloodmobile, Manuals Manuals. Cement Mixer Truck Cement Mixer Truck, Manuals Excavator Forklift, 5 ton Forklift, 5 ton Water Tank Trucks Water Tank Trucks, manuals. Grader Floor Fans Fire Protection Equipment Fire Fighting Supplies Mobile Equipment Manuals. Trucks Flatbed Trucks NTE Amount Is Increased Forklifts Forklift, 5 Ton Forklift Vacuum Haul Truck Renovate Tadji Military Base Boom Truck Boom Truck Side Boom Truck Renovate And Construct Permanent Utilities Develop Private Sector And Generate Employment In Iraq Economy, Finance, Agriculture & Rural Economy Parking Lot Security Fence Refrigerated Blood Transport Truck Blood Transport Truck Rehabilitate, Open And Operate Vocational And Employment Services Scope n/a Open n/a Open Open n/a Open Open n/a Open n/a n/a n/a n/a Open n/a n/a Open Open Open Open Open Open n/a n/a Open n/a Open n/a Open n/a Open n/a n/a n/a Competitive Open Open n/a n/a Competition Type PCO PCO PCO PCO PCO TACOM Warren DCMA DCMA TACOM Warren DCMA TACOM Warren TACOM Warren TACOM Warren TACOM Warren DCMA TACOM Warren TACOM Warren PCO PCO PCO DCMA DCMA DCMA TACOM Warren State Department/PCO DCMA TACOM Warren DCMA TACOM Warren DCMA TACOM Warren DCMA TACOM Warren DCMA Acquisition And Assistance Office USAID PCO DCMA TACOM Warren USAID Contracting Office FFP n/a n/a FFP FFP n/a FFP FFP n/a FFP n/a n/a n/a n/a FFP n/a FFP n/a FFP n/a IDIQ FFP n/a n/a n/a CPAIQ n/a n/a n/a CPFF n/a CPAIQ n/a CPFF CPFF CPFF n/a n/a IDIQ CPFF Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 13 10/03/04 10/03/04 10/03/04 10/03/04 10/03/04 10/03/04 10/03/04 10/03/04 10/04/04 10/04/04 10/04/04 10/04/04 10/04/04 10/04/04 10/04/04 10/04/04 10/04/04 10/05/04 10/05/04 10/05/04 10/06/04 10/06/04 10/06/04 10/06/04 10/07/04 10/07/04 10/07/04 10/07/04 10/07/04 10/08/04 10/08/04 10/08/04 10/08/04 10/08/04 10/08/04 10/08/04 10/08/04 10/09/04 10/10/04 10/11/04 10/11/04 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 Award Date 424 # $69,000 $77,030 $42,288 $4,440,624 -$2,661,449 $126,582 $160,621 $2,868,699 $2,868,699 $2,868,699 $13,199,923 $13,199,923 $7,875 $291,375 $1,282,480 $1,452,550 $2,255,009 -$270 $53,343 $53,343 $11,220 $11,220 $28,883 -$8,589,036 -$8,589,036 $10,949 $11,044 $16,760 $45,915 $585,600 $1,471,400 $1,471,400 $8,447 $12,104 $12,367 $12,840 $84,600 $87,830 $136,240 $12,000,000 Total Value $69,000 $77,030 $42,288 $4,440,624 -$2,661,449 $126,582 $160,621 $2,868,699 $2,868,699 $13,199,923 $13,199,923 $7,875 $291,375 $1,282,480 $1,452,550 $2,255,009 -$270 $53,343 $53,343 $11,220 $11,220 $28,883 -$8,589,036 -$8,589,036 $10,949 $11,044 $16,760 $45,915 $585,600 $1,471,400 $1,471,400 $8,447 $12,104 $12,367 $12,840 $84,600 $87,830 $136,240 $12,000,000 Obligated Value Iraqi Contractor - 2625 Iraqi Contractor - 2691 Xuan Yuan Industrial Development Co, Ltd Data Entry Error Parsons P & G Chevrolet, Inc. DFS Logistics, LLC Navistar Navistar Navistar ECC InternationalL LLC ECC InternationalL LLC Saudi Naval Support Company Ltd. Saudi Naval Support Company Ltd. Data Entry Error Data Entry Error ATC Services, Inc MA-TEX Wire and Rope Co, Inc. Triple Canopy Inc. Avsco Avsco Iraqi Contractor - 162 Iraqi Contractor - 620 Iraqi Contractor - 2615 Parsons Parsons Iraqi Contractor - 162 Iraqi Contractor - 162 Motorola Motorola Isometrics, Inc. Isometrics, Inc. Isometrics, Inc. Iraqi Contractor - 162 Iraqi Contractor - 162 Iraqi Contractor - 162 Iraqi Contractor - 162 Triple Nickel Tactical Supply Iraqi Contractor - 2718 Iraqi Contractor - 2157 Iraqi Contractor - 1715 Contractor W914NS-05-M-9063/0/0 W914NS-05-M-9061/0/0 W914NS-04-M-0114 /0/01 W914NS-05-M-2383/0/0 W914NS-04-D-0006/0002/07 W56HZV-04-D-B122/T0001/0 W914NS-05-M-9053/0/0 W56HZV-04-D-B039/T0001/0 W56HZV-04-D-B039/1/0 W56HZV-04-D-B039/0001/0 FA8903-04-D-8672/0003/2 FA8903-04-D-8672/0003/0002 W914NS-05-M-9031/0/P00001 W914NS-05-M-9031/T0001/0 W914NS-05-M-2381/0/0 W914NS-05-M-2382/0/0 W914NS-04-C-0001/0004/PO0004 W914NS-04-D-0139/0/P00001 W911SO-04-A-0004/0029/01 W914NS-05-M-9048/0/0 W914NS-04-M-9048/0/0 W914NS-05-M-9046/0/0 W914NS-05-F-9046/0/0 W914NS-05-M-9043/0/0 W914NS-04-D-0006/5/4 W914NS-04-D-0006/0005/04 W914NS-05-M-9039/0/0 W914NS-05-M-9040/0/0 W914NS-05-M-9042/0/0 W914NS-05-M-9041/0/0 W56HZV-04-D-B072/0001/0 W56HZV-04-D-BO66/0002/0 W56HZV-04-D-B066/TO0002/0 W914NS-05-M-9036/0/0 W914NS-05-M-9033/0/0 W914NS-05-M-9035/0/0 W914NS-05-M-9038/0/0 W914NS-05-M-9034/0/0 W914NS-05-M-9061/0/M0002 W914NS-05-M-9037/0/0 W914NS-04-C-9051/0/0 Contract Number Office Supplies Electrical Power cables & Components Building, Housing, And Health Sector Design/build Services To Restore, Rebuild, And Develop Public Projects To Support The Iraq CPA Mission Distributor Truck For Asphalt Medical Equipment Recovery Truck Recovery Trucks Recovery Truck Construct Kirkuk IMB Construct Kirkuk IMB Add Dapping To Each Badge Residential Power Distribution System For Mahalla 212 Residential Power Distribution System For Mahalla 218 None. Change Payment Office Decrease Contract Amount Welding Equipment Aluminum Welding Wires, Steel, Electronics, Welder, Blow Torch Office Supplies Fixtures, Furnishings And Equipment Sanitary Building Reduce Statement Of Work Fixtures, Furnishings, Equipment For Al Zuhour Patrol Station Fixtures, Furnishings, Equipment For Al Taji Police Station 160 Unit Search Cards And Spare Batteries Handheld Terminals, Sim. And Scratch Cards Truck, Cesspool Emptier Fuel Tanks Fuel Tank Truck Office Supplies Office Supplies Office Supplies Office Supplies N-vision Optics Supplies Repair Belat Al Shuhadaa Police Station Scope Open Open n/a Limited Competition Competitive Open Open Open Open Competitive Competitive Competitive n/a Open Limited Competition Limited Competition n/a n/a n/a Open Open Open Open Open n/a n/a n/a n/a Open n/a n/a n/a Open Open Open Open Open n/a Open n/a Competitive Competition Type PCO PCO PCO PCO USACE DCMA PCO DCMA DCMA TACOM Warren AFCEE AFCEE PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO TACOM Warren TACOM Warren DCMA PCO PCO PCO PCO PCO PCO PCO PCO Contracting Office FFP FFP n/a FFP n/a n/a n/a CPAIQ n/a IDIQ n/a CPFF n/a n/a FFP FFP n/a n/a n/a n/a FFP FFP n/a FFP n/a n/a n/a n/a n/a n/a n/a n/a FFP FFP FFP FFP FFP n/a n/a n/a FFP Contract Type Appendix I - 14 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 10/11/04 10/12/04 10/12/04 10/12/04 10/12/04 10/12/04 10/12/04 10/12/04 10/12/04 10/12/04 10/13/04 10/13/04 10/13/04 10/13/04 10/13/04 10/13/04 10/13/04 10/13/04 10/13/04 10/15/04 10/15/04 10/15/04 10/16/04 10/16/04 10/16/04 10/16/04 10/16/04 10/16/04 10/16/04 10/16/04 10/17/04 10/18/04 10/19/04 10/19/04 10/19/04 10/19/04 10/19/04 10/19/04 10/19/04 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 Award Date 465 # $115,570 $187,575 $259,200 $430,641 $474,580 $704,620 $704,620 $17,225 $189,500 $4,620 $11,460 $17,920 $42,000 $42,752 $541,503 $629,100 $1,885,827 $90,631 $363,878 $13,199,923 $9,578 $13,020 $23,760 $26,019 $29,898 $131,381 $622,845 $653,891 $709,183 $9,710 $39,561 $48,000 $48,275 $58,497 $92,569 $169,484 $254,680 $376,544 $7,960 Total Value $115,570 $187,575 $259,200 $430,461 $704,620 $704,620 $17,225 $189,500 $4,620 $11,460 $17,920 $42,000 $42,752 $541,503 $629,100 $1,885,827 $90,631 $363,878 $13,199,923 $9,578 $13,020 $23,760 $26,019 $29,898 $131,381 $622,845 $653,891 $709,183 $9,710 $39,561 $48,000 $48,275 $58,497 $92,569 $169,484 $254,680 $376,544 $7,960 Obligated Value Iraqi Contractor - 2721 Motorola Naman & Basil Consulting Group Iraqi Contractor - 2592 Rosenbauer America LLC Rosenbauer America LLC Rosenbauer America LLC HighCom Security Inc. Iraqi Contractor - 744 Iraqi Contractor - 812 Iraqi Contractor - 152 Iraqi Contractor - 1588 Iraqi Contractor - 2644 Iraqi Contractor - 2722 Data Entry Error Iraqi Contractor - 2638 Data Entry Error Iraqi Contractor - 2721 American International Radio ECC InternationalL LLC Supplycore, Inc Iraqi Contractor - 743 Iraqi Contractor - 620 Iraqi Contractor - 2603 Supplycore, Inc Iraqi Contractor - 2603 SallyPort Global Holdings Iraqi Contractor - 3238 Overseas Support Services Iraqi Contractor - 2613 Iraqi Contractor - 2722 Iraqi Contractor - 2600 Iraqi Contractor - 2722 Iraqi Contractor - 2722 Iraqi Contractor - 2722 Iraqi Contractor - 2722 Global Link Distribution LLC Iraqi Contractor - 2722 Iraqi Contractor - 152 Contractor W914NS-05-C-9009/0/0 W914NS-05-M-9092/0/0 W914NS-05-M-9090/0/0 W914NS-05-M-9087/0/0 W56HZV-04-D-B051/0/P00001 W56HZV-04-D-B051/TO0002/0 W56HZV-04-D-B051/T0002/0 W914NS-05-M-9088/0/0 W914NS-05-C-9008/0/0 W914NS-05-M-9083/0/0 W914NS-05-M-9084/0/0 W914NS-05-M-9082/0/0 W914NS-05-M-9085/0/0 W914NS-04-D-0104/T0032/0 W914NS-05-C-0002/0/0 W914NS-05-M-9055/0/0 W914NS-05-C-0001/0/0 W914NS-05-M-9080/0/0 W914NS-05-F-9001/0/0 FA8903-04-D-8672 /T0003/M0002 W914NS-05-D-9001/T0002/0 W914NS-05-M-9070/0/0 W914NS-05-M-9074/0/0 W914NS-05-M-9071/0/0 W914NS-05-D-9001/T0001/0 W914NS-05-M-9069/0/0 W914NS-04-D-9007/0/0 W914NS-04-C-9056/0/0 W914NS-05-C-9003/0/0 W914NS-05-M-9066/0/0 W914NS-04-D-0104/T0026/0 W914NS-05-M-9371/0/0 W914NS-04-D-0104/T0031/0 W914NS-04-D-0104/T0030/0 W914NS-04-D-0104/T0027/0 W914NS-04-D-0104/T0028/0 W914NS-05-M-9067/0/0 W914NS-04-D-0104/T0029/0 W914NS-05-M-9054/0/0 Contract Number Hy Al Amil Police Station Reconstruction Motorola Equipment Boots, Pants, Short Sleeve Shirts Field Equipment Shipment Of Fire Trucks Fire Trucks Fire Truck Gps And Gps Software Force Protection And Renovation Of Mcu Fuel Truck, Gasoline Mini Mag Lights Office Supplies Computer Supplies Phone And Phone Accessories Pave 10.2 Kms Road-diyala Upgrade Armor Pave 39.1 Kms Road-diyala Upgrade Radios New Brigade Kirkuk Military Base Tool Sets Computers, And Computer Supplies Twalls, Jersey Barriers Tools And Shop Supplies Flights Radar Vessel Traffic System Coastal Patrol Boats Repair And Replace Heating A/c And Electrical Printer, Laptop, Computer Supplies Electric Power S Phase Computers, And Computer Supplies Computers, And Computer Supplies Printer, Laptop, Computer Supplies Printer, Laptop, Computer Supplies Karadah-maryam Police Station Refurbishment Printer, Laptop, Computer Supplies Office Supplies And Furniture Scope Open Open Open Open n/a n/a Open Open Open Open Open Open Open Open Full & Open Open Full & Open Open Open n/a Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Competition Type PCO PCO PCO PCO DCMA DCMA DCMA PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO DCMA PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO Contracting Office FFP CPATT CPATT n/a n/a n/a n/a FFP FFP n/a FFP n/a n/a CPATT FFP n/a FFP n/a n/a CPFF IDIQ n/a n/a FFP n/a n/a FFP n/a n/a FFP CPATT FFP CPATT CPATT CPATT CPATT FFP CPATT n/a Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 15 10/22/04 10/24/04 10/25/04 10/27/04 10/28/04 10/28/04 10/28/04 10/28/04 10/28/04 10/28/04 10/28/04 10/28/04 10/28/04 10/28/04 10/28/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/30/04 10/30/04 10/30/04 10/30/04 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 11/01/04 10/22/04 513 544 10/21/04 512 11/01/04 10/20/04 511 543 10/20/04 510 10/31/04 10/20/04 509 10/31/04 10/20/04 508 542 10/19/04 507 541 10/19/04 506 10/31/04 10/19/04 540 10/19/04 505 Award Date 504 # $299,750 $307,000 -$2,400 -$2,400 $10,800 $872 $105,300 $4,918,640 $9,396,762 $6,153 $13,598 $77,357 $9,396,762 $38,241,721 $38,241,721 $43,985,787 $13,787 $13,863 $13,863 $14,140 $101,151 $117,540 $203,160 $290,790 $439,545 $21,017,439 $21,017,439 $8,129,580 $89,992 $12,690 $14,308 $138,900 $4,100 $10,340 $21,000 $123,954 $2,850 $2,850 $7,290 Total Value $299,750 $307,000 -$2,400 -$2,400 $10,800 $872 $105,300 $4,918,640 $9,396,762 $6,153 $13,598 $77,357 $9,396,762 $38,241,721 $38,241,721 $43,985,787 $13,787 $13,863 $13,863 $14,140 $101,151 $117,540 $203,160 $290,790 $439,545 $21,017,439 $21,017,439 $8,129,580 $89,992 $12,690 $14,308 $138,900 $4,100 $10,340 $21,000 $123,954 $2,850 $2,850 $7,290 Obligated Value Data Entry Error Data Entry Error Thuraya Satellite Communications Thuraya Satellite Communications Iraqi Contractor - 2718 Kipper Tool Iraqi Contractor - 2540 Motorola Nour USA Iraqi Contractor - 1246 Iraqi Contractor - 620 Nour USA Nour USA ECC InternationalL LLC ECC InternationalL LLC AMEC Earth & Environmental, Inc. SOHEIL GENERAL TRADING Iraqi Contractor - 620 Iraqi Contractor - 620 Iraqi Contractor - 620 P & G Chevrolet, Inc. Iraqi Contractor - 162 P & G Chevrolet, Inc. Soheil General Trading Tri Service Professional Support Services TOLTEST, INC. TOLTEST, INC. Rosenbauer America LLC Tri Service Professional Support Services Smiths Detection Kipper Tool Alpha Card Systems Iraqi Contractor - 2297 Iraqi Contractor - 1246 Iraqi Contractor - 1246 Iraqi Contractor - 1588 Komatsu America Intl. Co. Rosenbauer America LLC Rosenbauer America LLC Rosenbauer America LLC Iraqi Contractor - 1919 Contractor W914NS-05-M-2002/0/0 W914NS-05-M-2000/0/0 W914NS-04-D-9015/T0001/P00001 W914NS-04-D-9015/0/P00001 W914NS-05-M-9061/0/P00002 W914NS-05-M-9145/0/0 W914NS-05-M-9147/0/0 W914NS-05-M-9139/0/0 W914NS-05-C-9011/0/P00001 W914NS-05-M-9142/0/0 W914NS-05-M-9143/0/0 W914NS-05-C-9011/0/P00002 W914NS-05-C-9011/0/0 FA8903-04-D-8672/0016/0 FA8903-04-D-8672 /T0016/0 FA8903-04-D-8669/T0027/0 W914NS-05-M-9134/0/0 W914NS-05-M-9135/0/0 W914NS-05-M-0135/0/0 W914NS-05-M-9132/0/0 W56HZV-05-D-B109/T0001/0 W914NS-05-M-9108/0/0 W56HZV-05-D-B109/0/0 W914NS-05-M-9136/0/0 W914NS-04-D-9006/0/0 FA8903-04-D-8678/T0073/0 FA8903-04-D-8678/0073/0 W56HZV-04-D-B106/0002/0 W914NS-04-D-9006/0/02 W914NS-05-F-9004/0/0 W914NS-05-F-9003/0/0 W914NS-05-M-9110/0/0 W914NS-05-M-9104/0/0 W914NS-05-M-9103/0/0 W914NS-05-M-9102/0/0 W914NS-05-M-9100/0/0 W56HZV-04-D-B085/T0001/M0003 W56HZV-04-D-B051/T0001/0 W56HZV-04-P-B051/0/0 W56HZV-04-D-B051/0/0 W914NS-05-M-9094/0/0 Contract Number Supply, Install And Test 1 New 11kv Ugf Cable Al Jehad 1st Cav Residential Power Distribution System For Doura Q & Salam 410 39 Unit Scratch Cards Mechanics Tool Kit PCo Perimeter Mobile And Portable Radios Portable Radios Office Supplies Fixtures, Furnishings And Equipment Portable Radios And Radio Supplies 2nd Brigade Kirkuk Civil Site Work Construct An Operating Special Police Station Linen Sets Fixtures, Furnishings And Equipment Fixtures, Furnishings And Equipment Fixtures, Furnishings And Equipment Trucks Fixtures, Furnishings And Equipment Trucks Battalion Sets Flights Renovation Of Baghdad Airport BIAP Military Airport Fire Truck, Medium Rescue Flights Ceia Hi-pe Multi Zone Magnetometer Carpenter Tool Kits Supplies: Card Id, Film, Cleaning Kit Construct Fence W/razor Wire, Renovate Office Supplies Mobile Phone, Laptops Computers, And Computer Supplies Fire Truck Manuals For Fire Trucks Fire Truck Gas Cans, Heavy Duty Scope Limited Competition Limited Competition n/a Open Open Open Open Open Open Open Open Open Open Competitive Open Open Open Open Open Open Open Open Open Open Open Open Competitive Competitive Open Open Open Open Open Open Open Open Open Open n/a Open Open Competition Type PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO AFCEE DCMA DCMA PCO PCO PCO PCO DCMA PCO DCMA PCO PCO DCMA AFCEE TACOM Warren PCO PCO PCO PCO PCO PCO PCO PCO DCMA DCMA DCMA DCMA PCO Contracting Office FFP FFP n/a n/a n/a n/a n/a CPATT n/a n/a n/a n/a CPATT CPFF CPFF CPFF n/a n/a n/a n/a IDIQ n/a IDIQ n/a FFP CPFF CPFF IDIQ FFP n/a n/a n/a FFP n/a n/a n/a FFP n/a n/a n/a CPATT Contract Type Appendix I - 16 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 11/09/04 11/10/04 11/10/04 11/10/04 11/10/04 582 583 584 585 586 11/07/04 569 11/09/04 11/07/04 568 581 11/07/04 567 11/09/04 11/06/04 566 11/09/04 11/05/04 565 580 11/05/04 564 579 11/05/04 563 11/09/04 11/04/04 562 11/08/04 11/03/04 561 578 11/03/04 560 577 11/03/04 559 11/08/04 11/03/04 558 11/08/04 11/03/04 557 576 11/03/04 556 575 11/03/04 555 11/08/04 11/03/04 554 574 11/03/04 553 11/08/04 11/02/04 552 11/07/04 11/02/04 551 573 11/02/04 550 572 11/02/04 549 11/07/04 11/02/04 548 11/07/04 11/02/04 547 571 11/02/04 570 11/01/04 546 Award Date 545 # $246,881 $3,176,481 $3,770,588 $38,172,710 $190,300 $382,900 $1,785,000 $13,214,865 $13,241,865 $10,000 $42,712 $66,953 $85,000 $285,630 $5,008 $14,650 $68,900 $337,697 $1,291,740 $9,474,119 $295,000 $299,736 $15,063,352 $35,746,440 $48,615,094 -$384,265 $188,382 $287,920 $440,000 $2,143,071 $7,515,177 $7,515,177 $29,188,920 $2,480 $13,239 $13,868 $14,400 $14,500 $23,517 $185,000 $199,500 Total Value $246,881 $3,176,481 $3,770,588 $38,172,710 $190,300 $382,900 $1,785,000 $13,214,865 $13,241,865 $10,000 $42,712 $66,953 $85,000 $285,630 $5,008 $14,650 $68,900 $337,697 $1,291,740 $9,474,119 $295,000 $299,736 $15,063,352 $35,746,440 $48,615,094 -$384,265 $188,382 $287,920 $440,000 $2,143,071 $7,515,177 $7,515,177 $29,188,920 $2,480 $13,239 $13,868 $14,400 $14,500 $23,517 $185,000 $199,500 Obligated Value Iraqi Contractor - 2643 Iraqi Contractor - 2722 Rosenbauer America LLC Rosenbauer America LLC S.C. Roman S.A. S.C. Roman S.A. Data Entry Error Toltest, Inc. Toltest, Inc. Iraqi Contractor - 620 Iraqi Contractor - 580 Iraqi Contractor - 3237 Iraqi Contractor - 2665 Iraqi Contractor - 1748 Iraqi Contractor - 1919 Motorola Iraqi Contractor - 1102 Data Entry Error Data Entry Error Nour USA Data Entry Error Iraqi Contractor - 2710 Rosenbauer America LLC AMEC Earth & Environmental, Inc. ECC InternationalL LLC S.C. Roman S.A. Parsons O-two Medical Technologies Inc. S.C. Roman S.A. S.C. Roman S.A. Fisher Scientific Company L.L.C. ECC InternationalL LLC ECC InternationalL LLC ECC InternationalL LLC Iraqi Contractor - 1027 Iraqi Contractor - 620 Iraqi Contractor - 620 Iraqi Contractor - 620 Iraqi Contractor - 620 Iraqi Contractor - 3237 Iraqi Contractor - 2663 Data Entry Error Contractor W914NS-05-M-9187/0/0 W914NS-05-M-9178/0/0 W56HZV-04-D-B104/T0001/03 W56HZV-04-D-B104/T0001/02 W56HZV-04-D-B042/T0001/03 W56HZV-04-D-B042/T0005/0 W914NS-05-C-2000/0/0 FA8903-04-D-8678/0077/0 FA8903-04-D-8678/T0077/0 W914NS-05-M-9196/0/0 W914NS-05-M-9185/0/0 W914NS-05-M-9195/0/0 W914NS-05-M-9183/0/0 W914NS-05-M-9186/0/0 W914NS-05-M-9190/0/0 W914NS-05-M-9189/0/0 W914NS-05-M-9192/0/0 W914NS-05-C-0006/0/0 W914NS-05-C-0005/0/0 W914NS-05-9011/0/P00002 W914NS-05-M-2004/0/0 W914NS-05-M-9175/0/0 W56HZV-04-D-B104/0002/0 FA8903-04-D-8669/T0028/0 FA8903-04-D-8672/0018/0 W56HZV-04-D-B123/T0001/01 W914NS-04-D-0006/5/5 W914NS-05-M-9171/0/0 W56HZV-04-D-B123/T0001/0 W56HZV-04-D-B114/T0001/01 W914NS-04-D-0125/0004/0 FA8903-04-D-8672/0017/0 FA8903-04-D-8672 /T0017/0 FA8903-04-D-8672 /T0011/0 W914NS-05-M-9154/0/0 W914NS-05-M-9148/0/0 W914NS-05-M-9149/0/0 W914NS-05-M-9150/0/0 W914NS-05-M-9151/0/0 W914NS-05-M-9152/0/0 W914NS-05-M-9153/0/0 W914NS-05-M-2001/0/0 Contract Number Augment Equipment Fire Truck Mini Pumper Fire Truck Fire Truck Caterpillar Diesel Engine Generator Mandali Pipe Line Increase The Water Flow And Replace Water Pipeline Delivery And Setup Connexes Construction On Al-muhadam Police Station Paint 2 Front Doors For 351 Land Cruisers. River Patrol Station Construction At Al Shulla Police Station Gas And Water Cans Thuuraya Sat Phone W/chip Mobile Kitchen Pave 7 Kms Road-najaf Pave 15.35 Kms Road-najaf UHF Radios for Iraq security forces Supply, Install And Test A 33kv Ugf Cable Al Washash To New Washash 1st Cav Base Station Conversion Kits Fire truck mini-pumper Construct, Renovate And Repair Tadji Army Depot Camp India Reconstruction Worker’s Comp Reduce Funding Carevent Mri 123/121 Trk, Mobile Equipment Trk 6x4/trl Fire Protection Equipment Al Kut Police Academy Al Kut Regional Safety Academy Facilities Repair Schools Remote Speaker Office Supplies Office Supplies Furniture Furniture Office Supplies Beds And Tables Install And Test New 33kv Yarmouk To Ma’amoon 1st Cav Scope Open Open Open Open Open Open Full & Open Competitive Open Open Open Open Open Open Open Open Open Limited competition Limited competition Competitive Limited Competition Open Competitive Open Competitive Open n/a Open Open Open n/a Competitive Open Open Open Open Open Open Open Open Open Limited Competition Competition Type PCO PCO DCMA DCMA DCMA DCMA PCO AFCEE DCMA PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO TACOM Warren DCMA AFCEE DCMA PCO PCO DCMA DCMA CPA AFCEE DCMA DCMA PCO PCO PCO PCO PCO PCO PCO PCO Contracting Office FFP n/a FFP FFP FFP FFP FFP CPFF n/a n/a FFP FFP n/a FFP FFP n/a FFP FFP FFP FFP FFP n/a IDIQ CPFF IDIQ FFP n/a FFP FFP FFP FFP CPFF CPFF CPFF n/a n/a n/a n/a n/a n/a n/a FFP Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 17 11/13/04 11/13/04 11/13/04 11/14/04 11/14/04 11/14/04 11/15/04 11/15/04 11/15/04 11/15/04 11/15/04 11/16/04 11/16/04 11/16/04 11/17/04 11/17/04 11/17/04 11/17/04 11/17/04 11/17/04 11/17/04 11/17/04 11/17/04 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 11/18/04 11/13/04 598 11/17/04 11/13/04 597 627 11/13/04 596 626 11/13/04 595 11/17/04 11/13/04 594 625 11/13/04 593 11/17/04 11/13/04 592 11/17/04 11/12/04 591 624 11/12/04 590 623 11/12/04 589 11/17/04 11/12/04 622 11/12/04 588 Award Date 587 # $2,535,250 $9,450 $30,000 $30,000 $30,000 $30,000 $163,365 $203,934 $212,500 $229,020 $398,000 $866,400 $1,398,315 $1,802,360 $2,888,268 $95,050 $190,050 $270,235 $2,890 $46,800 $192,366 $14,460 $235,000 $995,371 $1,750 $4,500 $8,140 $30,000 $548,280 $874,520 $910,300 $1,119,476 $1,458,580 $2,258,275 $1,560 $810,000 $1,147,548 Total Value $2,535,250 $9,450 $30,000 $30,000 $30,000 $30,000 $163,365 $203,934 $212,500 $229,020 $398,000 $866,400 $1,398,315 $1,802,360 $2,888,268 $95,050 $190,050 $270,235 $2,890 $46,800 $192,366 $14,460 $235,000 $995,371 $1,750 $4,500 $8,140 $30,000 $548,280 $874,520 $910,300 $1,119,476 $2,258,275 $1,560 $810,000 $1,147,548 Obligated Value Data Entry Error Data Entry Error Iraqi Contractor - 187 Iraqi Contractor - 2722 Iraqi Contractor - 2722 Iraqi Contractor - 2722 Iraqi Contractor - 2722 Iraqi Contractor - 2157 Iraqi Contractor - 2157 Data Entry Error Iraqi Contractor - 1665 Metro Star General Trading SallyPort Global Holdings Data Entry Error Data Entry Error Data Entry Error Econ Energy & Construction Inc. ECON ENERGY & CONSTRUCTION INC. Volvo Construction Equipment North America Inc Certified Stainless Service Inc Certified Stainless Service Inc Iraqi Contractor - 2166 Iraqi Contractor - 1758 Certified Stainless Service Inc Iraqi Contractor - 2629 Global Link Distribution LLC Iraqi Contractor - 2631 Iraqi Contractor - 2568 Iraqi Contractor - 2025 Iraqi Contractor - 2568 Iraqi Contractor - 2025 Data Entry Error Iraqi Contractor - 2643 Data Entry Error Data Entry Error Data Entry Error Data Entry Error Komatsu America Intl. Co. Komatsu America Intl. Co. Iraqi Contractor - 1919 Data Entry Error Contractor W914NS-05-C-0044/0/0 W914NS-05-M-9233/0/0 W914NS-04-D-0104/T0028/P00002 W914NS-04-D-0104/T0028/P00001 W914NS-04-D-0104/0028/PO0002 W914NS04-D-0104/0028/P00002 W914NS-05-M-9236/0/0 W914NS-05-M-9228/0/0 W914NS-05-M-2003/0/0 W914NS-05-M-9215/0/0 W914NS-05-M-9235/0/0 W914NS-04-D-9007/0/01 W914NS-05-C-0030/0/0 W914NS-05-C-0034/0/0 W914NS-05-C-0041/0/0 W56HZV-04-D-B124/T0001/0 W56HZV-04-D-B124/0/0 W56HZV-04-D-B125/T0001/0 W56HZV-04-D-B063/TO0001/02 W56HZV-04-D-B062/T0002/02 W914NS-05-M-9229/0/0 W914NS-05-M-9230/0/0 W56HZV-04-D-B062/T0001/01 W914NS-05-M-9225/0/0 W914NS-05-M-9226/0/0 W914NS-05-M-9220/0/0 W914NS-05-M-9213/0/0 W914NS-05-M-9210/0/0 W914NS-05-M-9214/0/0 W914NS-05-M-9212/0/0 W914NS-05-C-0043/0/0 W914NS-05-M-9188/0/0 W914NS-05-C-0042/0/0 W914NS-05-C-0009/0/0 W914NS-05-C-0026/0/0 W914NS-05-C-0010/0/0 W56HZV-04-D-B085/TO0004/04 W56HZV-04-D-B085/TO0004/0 W914NS-05-M-9032/0/P00001 W914NS-05-C-0008/0/0 W914NS-05-C-0007/0/0 Contract Number Pave 21.4 kms road-Al Qadissiya Water Supply To Pontoons Computers, And Computer Supplies Printer, Laptop, Computer Supplies None. Increase Monetary Value Renovation Of Baghdad Traffic Police Renovation Of Alsadr Patrol Hq 33kv Underground Feeder Cable From The Yosifiya 132/33/11kv Substation To The Al Awaireej 33/11kv Substation Renovation For Living Barracks And Construct Sanitary Building Renovation Of Al Hurrya Police Station Flights Pave 22.1 Kms Road-tameem Pave 20.5 Kms Road-missan Pave 34 kms road-Muthanna Tanker Tanker Construction Equipment Truck With Hydrochloric Acid Tank Trk 6x4/trl Computer Desks And Chairs Concrete Fence Trk 6x4/trl Design And Replace Fencing At Ice House Gate Perimeter And Interior Construction For Jisr Diyala Ip Station Construction Of Al Madean Police Station Install Barriers At Road Entrance For Police College Electrical Work At Umm Qasr Install Chainlink Fence For Police College Entrance Install Perimeter Security Fence At Umm Qasr Pave 6.5 Kms Road-baghdad Construction Of Al Mahmoudya Police Station Pave 8.9 Kms Road-baghdad Pave 21 Kms Road-ninawa Pave 33.1kms Road-ninawa Utility Vehicles, Manuals Utility Vehicles, Manuals Pave 6.6. Kms Road-babil Pave 22.25 Kms Road-babil Scope Limited Competition Open Open Open n/a n/a Open Open Limited Competition Open Open Open Limited Competition Limited Competition Full & Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Limited Competition Open Limited Competition Limited competition Full & Open Limited competition Open Open n/a Limited competition Limited competition Competition Type PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO DCMA DCMA DCMA DCMA DCMA PCO PCO DCMA PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO DCMA DCMA PCO PCO PCO Contracting Office FFP n/a n/a CPATT n/a n/a FFP FFP FFP FFP FFP FFP FFP FFP FFP IDIQ IDIQ FFP FFP FFP n/a n/a FFP FFP FFP FFP IDIQ CPATT IDIQ CPATT IDIQ CPATT IDIQ CPATT FFP FFP FFP FFP n/a FFP FFP FFP n/a FFP FFP Contract Type Appendix I - 18 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 11/18/04 11/18/04 11/18/04 11/18/04 11/18/04 11/18/04 11/18/04 11/18/04 11/19/04 11/19/04 11/22/04 11/22/04 11/22/04 11/22/04 11/22/04 11/22/04 11/23/04 11/24/04 11/24/04 11/25/04 11/27/04 11/27/04 11/27/04 11/28/04 11/28/04 11/28/04 11/28/04 11/28/04 11/28/04 11/28/04 11/29/04 11/29/04 11/29/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 Award Date 628 # $482,155 $913,371 $925,190 $1,175,040 $1,200,000 $1,705,279 $2,210,823 $5,000,000 $1,270,222 $2,451,000 $3,888,725 $4,000 $8,000 $110,360 $160,000 $190,000 $203,000 $908,370 $9,585 $182,000 $840,000 $14,450 $4,460 $144,045 $58,022,308 $3,232 $173,130 $485,335 $1,099,117 $1,161,938 $1,619,825 $5,782,382 $1,610 $150,000 $620,000 $707,705 $707,705 $897,000 Total Value $482,155 $913,371 $925,190 $1,175,040 $1,200,000 $1,705,279 $2,210,823 $5,000,000 $1,270,222 $2,451,000 $3,888,725 $4,000 $8,000 $110,360 $160,000 $190,000 $203,000 $908,370 $9,585 $182,000 $840,000 $14,450 $4,460 $144,045 $55,022,308 $3,232 $173,130 $485,335 $1,099,117 $1,161,938 $1,619,825 $5,782,382 $1,610 $150,000 $620,000 $707,705 $707,705 Obligated Value Data Entry Error Data Entry Error Data Entry Error Data Entry Error Data Entry Error Data Entry Error Data Entry Error Data Entry Error James Worldwide Sales, Inc. Data Entry Error Data Entry Error Iraqi Contractor - 2606 Iraqi Contractor - 2630 Iraqi Contractor - 2712 Iraqi Contractor - 2161 Iraqi Contractor - 2649 Iraqi Contractor - 2521 Data Entry Error Iraqi Contractor - 2569 Data Entry Error Data Entry Error Iraqi Contractor - 3229 Iraqi Contractor - 2129 James Worldwide Sales, Inc. Navistar Rosenbauer America LLC Advanced Technology Iraqi Contractor - 1737 Iraqi Contractor - 76 Rosenbauer America LLC Data Entry Error Data Entry Error Navistar Rosenbauer America LLC S.C. Roman S.A. JTSI Inc. Data Entry Error Global Link Distribution LLC Volvo Construction Equipment North America Inc Volvo Construction Equipment North America Inc Data Entry Error Contractor W914NS-05-C-0020/0005/0 W914NS-05-C-0013/0008/0 W914NS-05-C-0027/0/0 W914NS-05-C-0017/0022/0 W914NS-05-C-0015/0010/0 W914NS-05-C-0011/0006/0 W914NS-05-C-0014/0009/0 W914NS-05-C-0016/0011/0 W56HZV-04-D-B126/0001/0 W914NS-05-C-0038/0/0 W914NS-05-C-0040/0/0 W914NS-05-M-9288/0/0 W914NS-05-M-9287/0/0 W914NS-05-M-9289/0/0 W914NS-05-M-9285/0/0 W914NS-05-M-9284/0/0 W914NS-05-M-9286/0/0 W914NS-05-C-0037/0/0 W914NS-05-M-9280/0/0 W914NS-05-M-2005/0/0 W914NS-05-C-0036/0/0 W914NS-05-M-9277/0/0 W914NS-05-M-9209/0/0 W56HZV-04-D-B126/0/0 W56HZV-04-D-B002/T0001/0 W56HZV-04-D-B044/T0002/0 W914NS-05-M-9245/0/0 W914NS-05-M-9264/0/0 W914NS-05-M-9265/0/0 W56HZV-04-D-B044/T0001/03 W914NS-05-C-0035/0/0 W914NS-05-C-0031/0/0 W56HZV-04-D-B002/T0001/01 W56HZV-04-D-B106/T0001/0 W56HZV-04-D-B056/TO0001/01 W914NS-05-M-9179/T0001/0 W914NS-05-C-0032/0/0 W914NS-05-M-9237/0/0 W56HZV-04-D-B125/T0001/02 W56HZV-04-D-B125/T0001/01 W914NS-05-C-0033/0/0 Contract Number Design--sheikh Sa’ad Bridge Construction--babil & Baghdad Stations Roofing/asbestos Removal Construction--umm Qasr Operations Center Construction--ninewa Stations Construction--basrah & Tri Qar Stations Construction--salad Al Din & Taamim Stations Construction--Baghdad Central Station Mini Bus Pave 19 kms road-Basrah Pave 50 kms road-Wassit Eod Bunker Weekly Camp Steven Refurbishment Eod Bunker Weekly Camp Steven Refurbishment Al Qurnah Tactical Support Unit Refurbishment Refurbishment And Construction For Fob2, Al Kumah Refurbishment For Fob 2, Al Faw Refurbishment For 603 Bn, As Samawah Pave 11.3 Kms Road-salah Al Din Construct Two Room Facility Baghdad Police College Gate Replace Two 11kv Ugf Cables From The Abu-disher Substation, Baghdad Pave 15 Kms Road-salah Al Din Construction Of Shoot House In An Numaniyay Iaf Base Tv And Digital Cameras Standard Commercial Practice For Safe Delivery To Umm Qsar BUSES Fire Truck Microsoft Office Professional 2003 Renovation Of Ing Hq Renovation For Ing Trading Center @ Fob Normandy Fire Truck Pave 15.1 Kms Road-karbala Pave 21.35 Kms Road-tameem Buses Vehicles Mobile Cold Storage Truck, Manuals Design--schalschiya Renovation Of Al Khadamiyah Taji Patrol Station Construction Equipment Construction Equipment Scope Full & Open Full & Open Full & Open Full & Open Full & Open Full & Open Full & Open Full & Open Competitive Limited Competition Limited Competition Open Open Open Open Open Open Limited Competition Open n/a Limited Competition Open Open Open Open Open Open Open Open Open Limited Competition Limited Competition Open Open Open n/a Full & Open Open Open Open n/a Competition Type PCO PCO PCO PCO PCO PCO PCO PCO TACOM Warren PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO DCMA DCMA DCMA PCO PCO PCO DCMA PCO PCO DCMA DCMA DCMA PCO PCO PCO DCMA DCMA PCO Contracting Office FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP n/a IDIQ FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP n/a FFP FFP FFP FFP FFP Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 19 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 11/30/04 12/01/04 12/01/04 12/01/04 12/01/04 12/01/04 12/01/04 12/01/04 12/01/04 12/01/04 12/01/04 12/02/04 12/02/04 12/02/04 12/02/04 12/02/04 12/02/04 12/03/04 12/04/04 12/04/04 12/04/04 12/04/04 12/04/04 12/04/04 12/04/04 12/04/04 12/04/04 12/04/04 12/05/04 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 Award Date 669 # $895,500 $10,000 $24,552 $44,476 $45,954 $55,200 $66,983 $66,983 $123,000 $210,000 $474,490 $118,000 $140,522 $140,522 $143,000 $573,194 $1,312,258 $13,897 $14,320 $38,287 $99,805 $403,400 $413,500 $467,800 $1,736,225 $25,000 $44,000 $44,000 $58,000 $59,200 $66,000 $80,000 $86,000 $87,930 $101,888 $110,000 $110,000 $355,000 Total Value $895,500 $10,000 $24,522 $44,476 $45,954 $55,200 $66,983 $66,983 $123,000 $210,000 $474,490 $118,000 $140,522 $140,522 $143,000 $573,194 $1,312,258 $13,897 $14,320 $38,287 $99,805 $403,400 $413,500 $467,800 $25,000 $44,000 $44,000 $58,000 $59,200 $66,000 $80,000 $86,000 $87,930 $101,888 $110,000 $110,000 $355,000 Obligated Value Data Entry Error Data Entry Error Soheil General Trading Iraqi Contractor - 2618 Iraqi Contractor - 2708 Bea Maurer Inc Iraqi Contractor - 2711 Iraqi Contractor - 2708 Iraqi Contractor - 2708 Global Link Distribution LLC Iraqi Contractor - 288 Data Entry Error Rosenbauer America LLC Iraqi Contractor - 2601 Parts Express International Inc. Parts Express International Inc. Iraqi Contractor - 2601 Iraqi Contractor - 142 Data Entry Error Iraqi Contractor - 2389 Iraqi Contractor - 2389 Global Link Distribution LLC Global Link Distribution LLC Iraqi Contractor - 1887 Iraqi Contractor - 1898 S.C. Roman S.A. S.C. Roman S.A. S.C. Roman S.A. Iraqi Contractor - 2389 Iraqi Contractor - 2586 Data Entry Error Data Entry Error Data Entry Error Data Entry Error Data Entry Error Data Entry Error Data Entry Error Data Entry Error Iraqi Contractor - 3237 Iraqi Contractor - 2657 Data Entry Error Contractor W914NS-05-M-2010/0/0 W914NS-05-M-9360/0/0 W914NS-05-M-9335/0/0 W914NS-05-F-9026/0/0 W914NS-05-F-9024/0/0 W914NS-05-M-9333/0/0 W914NS-05-M-9022/0/0 W914NS-05-F-9022/0/0 W914NS-05-M-9338/0/0 W914NS-05-M-9283/0/0 W914NS-05-M-2007/0/0 W56HZV-04-D-B044/T0004/0 W914NS-05-M-9326/0/0 W56HZV-05-D-B127/TO0002/0 W56HZV-05-D-B127/TO0002/0 W914NS-05-M-9325/0/0 W914NS-05-M-9327/0/0 W914NS-05-C-0039/0/0 W914NS-05-M-9300/0/P00002 W914NS-05-M-9300/0/P00001 W914NS-05-M-9315/0/0 W914NS-05-M-9313/0/0 W914NS-05-M-9303/0/0 W914NS-05-M-9305/0/0 W56HZV-04-D-B049/T0001/04 W56HZV-04-D-B049/T0004/0 W56HZV-04-D-B041/T0003/0 W914NS-05-M-9300/0/0 W914NS-05-M-9304/0/0 W914NS-05-C-0026/0011/0 W914NS-05-C-0023/0008/0 W914NS-05-C-0025/0010/0 W914NS-05-C-0018/Several/0 W914NS-05-C-0022/0007/0 W914NS-05-C-0024/0009/0 W914NS-05-C-0021/0006/0 W914NS-05-C-0029/0/0 W914NS-05-M-9241/0/0 W914NS-05-M-9298/0/0 W914NS-05-C-0019/0004/0 W914NS-05-C-0028/0015/0 Contract Number Design--kufa Bridge Supply, Install And Test A 11kv /400volt Residential Network In Aldura 820 Blankets Tactical Load Bearing Vest Tents Light Kit Window And Doors Tents Tents Zafaraniya Ip Station Refurbishment And Construction For Fob1, Safwan 33kv Underground Cable Between Talaea Substation And Khalood Substation Upgrade Police Logistics Warehouse Tank Truck Tank Truck Upgrade Police Fuel Pit Construct Zuhor Patrol Station Pave 7.1 Kms Road-thi-qar Mobile Radios W/encryption Installed Radios W/encryption Kits Fixtures, Furnishings And Equipment Fixtures, Furnishings And Equipment Construct Facilities/foundation Roads For Ibp Atqadish Construct Roads/foundation/facilities For Ibp At Batufa Fire Truck 6x4 Fire Truck 6x4 Fire Truck Water 16k L Portable Radios And Radio Supplies Renovation Of Latifiyah Highway Patrol Design--baghdad Central Station Design--babil & Baghdad Stations Design--ninewa Stations Design--additional Irr Stations Design--muthanna & Qadissiya Stations Design--salad Al Din & Taamim Stations Design--basrah & Thi Qar Stations Design-nasiriyah Bridge Apartment Furniture Kit Sand Bags, Burlap Design--zuba Bridge Scope Limited Competition Open Open Open n/a Open Open Open Open Open Limited Competition Open Open Open n/a Open Open Limited Competition Open Open Open Open Open Open Open Open Open Open Open Full & Open Full & Open Full & Open Full & Open Full & Open Full & Open Full & Open Full & Open Open Open Full & Open Full & Open Competition Type PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO DCMA PCO DCMA TACOM Warren PCO PCO PCO PCO PCO PCO PCO PCO PCO DCMA DCMA DCMA PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO Contracting Office FFP IDIQ CPATT FFP FFP n/a FFP n/a FFP FFP FFP FFP FFP FFP FFP n/a FFP FFP FFP n/a n/a IMI FFP FFP FFP FFP FFP FFP n/a FFP FFP FFP FFP FFP FFP FFP FFP FFP CPATT FFP FFP FFP Contract Type Appendix I - 20 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 12/12/04 12/12/04 12/12/04 12/12/04 12/12/04 12/12/04 744 745 746 747 748 12/10/04 732 12/12/04 12/09/04 731 743 12/09/04 730 742 12/08/04 729 12/12/04 12/08/04 728 741 12/08/04 727 12/11/04 12/08/04 726 12/11/04 12/08/04 725 740 12/08/04 724 739 12/08/04 723 12/11/04 12/08/04 722 738 12/08/04 721 12/11/04 12/08/04 720 12/10/04 12/06/04 719 737 12/06/04 718 736 12/06/04 717 12/10/04 12/05/04 716 12/10/04 12/05/04 715 735 12/05/04 714 734 12/05/04 713 12/10/04 12/05/04 712 733 12/05/04 12/05/04 711 Award Date 710 # $1,400 $5,000 $6,551 $22,555 $180,469 $710,000 $949,200 $16,000 $108,750 $196,140 $3,481,161 $3,000 $9,174 $320,000 $11,914,731 $11,914,731 $25,000 $28,300 $95,050 $112,125 $169,056 $169,056 $235,000 $896,000 $2,270,911 $24,000 $616,340 $7,295,880 $54,273 $185,700 $220,000 $431,700 $490,000 $522,340 $535,785 Total Value $1,400 $5,000 $6,551 $22,555 $180,469 $710,000 $949,200 $16,000 $108,750 $196,140 $3,481,161 $3,000 $9,174 $320,000 $11,914,731 $11,914,731 $25,000 $28,300 $95,050 $112,125 $169,056 $168,056 $235,000 $896,000 $2,270,911 $24,000 $616,340 $7,295,880 $54,273 $185,700 $220,000 $431,700 $490,000 $522,340 $535,785 Obligated Value Iraqi Contractor - 165 Iraqi Contractor - 2747 Iraqi Contractor - 2623 Iraqi Contractor - 1416 Iraqi Contractor - 165 Fisher Scientific Company L.L.C. Iraqi Contractor - 1953 Iraqi Contractor - 1722 Charles Kendall and Partners Limited Iraqi Contractor - 2228 Data Entry Error Iraqi Contractor - 2644 Iraqi Contractor - 165 ESS Iraqi Contractor - 1953 Sepura Limited Sepura Limited Iraqi Contractor - 2389 Iraqi Contractor - 2389 Soheil General Trading Soheil General Trading Iraqi Contractor - 2609 Econ Energy & Construction Inc. Soheil General Trading Eagle General Services Eagle General Services Data Entry Error Data Entry Error Volvo Construction Equipment North America Inc Iraqi Contractor - 1545 Data Entry Error Praecomm Inc. Iraqi Contractor - 2614 Iraqi Contractor - 142 Metro Star General Trading Global Link Distribution LLC Iraqi Contractor - 2601 Data Entry Error Metro Star General Trading Contractor W914NS-05-M-9366/0/1 W914NS-05-M-9378/0/0 W914NS-05-M-9362/0/0 W914NS-05-M-9380/0/0 W914NS-05-M-9366/0/0 W914NS-04-D-0125/T0003/0 W914NS-05-M-9373/0/0 W914NS-05-M-9379/0/0 W914NS-05-M-9376/0/0 W914NS-05-M-9364/0/0 W914NS-05-M-2008/0/0 W914NS-05-M-9382/0/0 W914NS-05-M-9363/0/0 W914NS-05-M-9365/0/0 W914NS-05-M-9358/0/0 W914NS-05-M-9008/T0001/0 W914NS-05-D-9008/0001/0 W914NS-05-M-9300/TO0003/ PO0003 W914NS-05-M-9300/0/P00003 W914NS-05-M-9360/TO0001/1 W914NS-05-M-9361/0/0 W914NS-05-M-9367/0/0 W56HZV-04-D-B124/T0001/01 W914NS-05-M-9359/0/0 W914NS-05-M-9357/1500 M28/0 W914NS-05-M-9357/0/0 W914NS-05-M-2011/0/0 W914NS-05-M-2012/0/0 W56HZV-04-D-B125/0002/02 W914NS-05-M-9329/0/0 W914NS-05-M-2006/0/0 W914NS-05-F-9027/0/0 W914NS-05-M-9334/0/0 W914NS-05-M-9336/0/0 W914NS-05-M-9340/0/0 W914NS-05-M-9339/0/0 W914NS-05-N-9348/0/0 W914NS-05-M-2009/0/0 W914NS-05-M-9337/0/0 Contract Number None. Face Masks Construct An Obstacle Course Furniture Office Supplies Bunker Gear Heavy Duty Suspenders Blankets, Bed Sets T-wall, Bunkers, Barriers Storage Containers Furniture 33kv Underground Cable Between Kaleeg Substation To Riyadh Substation Cameras & monitors Radiator Heaters Lg Heating And Cooling Units 1000 Watt Portable Light Tower With Generator Office Supplies Radios, training and related equipment None. Changes Payment Terms From Net 15 To Net 30 None. Blankets Purchase And Install Fuel Tank Tanker Winter Outfits Supplies Dental Supplies Supply, Install, Commission And Test Two Residential Networks In Malhalla 835 In Karakh Gbagn-002/supply & Install Ten New 11kv Underground Feeder Cable In Ninewa Grader 50. Cal Machine Gun Mounts 33kv Underground Cable Between Talaea Substation And Khalood Substation Radios A/c, Tv, Washer Dryer, Etc. Renovate Al Habibia Police Station New Baghdad Traffic Sector Renovate New Baghdad Police Station Renovation Of Vehicle Registration Site 33kv Underground Cable From Opera Power Station To Sadoon Power Station Renovate Al Muthana And New Baghdad Hg Fp Scope n/a Open Open Open Open Open Open Open Open Open Limited Competition Open Open Open Open Open Competitive n/a n/a n/a Open Open Open Open Open Open Limited Competition Full & Open Competitive Open Limited Competition Open Open Open Open Open Open Limited Competition Open Competition Type PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO DCMA PCO PCO PCO PCO PCO TACOM Warren PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO Contracting Office n/a IDIQ CPATT FFP FFP IMAR n/a FFP FFP IDIQ CPATT FFP FFP FFP FFP FFP FFP n/a FFP n/a n/a n/a IDIQ CPATT IDIQ CPATT FFP IDIQ CPATT n/a n/a FFP FFP FFP ICDF FFP FFP FFP FFP FFP FFP FFP FFP FFP Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 21 12/13/04 12/13/04 12/13/04 12/13/04 12/13/04 12/13/04 12/13/04 12/13/04 12/14/04 12/14/04 12/14/04 12/14/04 12/14/04 12/14/04 12/15/04 12/15/04 12/15/04 12/15/04 12/15/04 12/15/04 12/15/04 12/16/04 12/16/04 12/17/04 12/17/04 12/17/04 12/18/04 12/18/04 12/18/04 12/18/04 12/18/04 12/19/04 12/19/04 12/19/04 12/19/04 12/19/04 12/19/04 12/20/04 12/20/04 12/20/04 12/20/04 12/20/04 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 Award Date 749 # $59,378 $187,500 $247,319 $247,319 $247,319 $1,100 $7,080 $52,000 $119,000 $120,000 $3,686,663 $13,203 $46,250 $291,067 $291,067 $291,067 $24,990 $1,496,887 $2,143,071 $241,500 $35,470,192 $15,381 $24,976 $264,000 $4,887,379 $6,000,000 $20,505 $137,789 $264,100 $990,000 $1,364,157 $8,510,480 $1,350 $11,500 $98,159 $141,880 $366,974 $366,974 $536,000 $990,000 Total Value $59,378 $187,500 $247,319 $247,319 $247,319 $1,100 $7,080 $52,000 $119,000 $120,000 $3,686,663 $13,203 $46,250 $291,067 $291,067 $291,067 $24,990 $1,496,887 $2,143,071 $241,500 $35,470,192 $15,381 $24,976 $264,000 $4,887,379 $6,000,000 $20,505 $137,789 $264,100 $990,000 $1,364,157 $8,510,480 $1,350 $11,500 $98,159 $141,880 $366,974 $366,974 $536,000 $990,000 Obligated Value Iraqi Contractor - 142 Iraqi Contractor - 1953 MA-TEX Wire and Rope Co, Inc. MA-TEX Wire and Rope Co, Inc. MA-TEX Wire and Rope Co, Inc. Iraqi Contractor - 6 Data Entry Error Soheil General Trading Iraqi Contractor - 141 Iraqi Contractor - 920 Data Entry Error Iraqi Contractor - 1246 Iraqi Contractor - 2538 Hagemeyer North American Inc. Hagemeyer North American Inc. Hagemeyer North American Inc. Iraqi Contractor - 2547 Navistar Fisher Scientific Company L.L.C. Iraqi Contractor - 142 Tetra lnternational LLC Soheil General Trading Soheil General Trading Iraqi Contractor - 140 Iraqi Contractor - 1791 Iraqi Contractor - 329 Iraqi Contractor - 3237 Iraqi Contractor - 3237 Iraqi Contractor - 927 JTSI Inc. Iraqi Contractor - 1765 Iraqi Contractor - 1722 James Worldwide Sales, Inc. James Worldwide Sales, Inc. Soheil General Trading Iraqi Contractor - 2228 Tactical & Rescue Gear, Ltd. Tactical & Rescue Gear, Ltd. Tactical & Rescue Gear, Ltd. Tactical & Rescue Gear, Ltd. Data Entry Error Iraqi Contractor - 861 Contractor W914NS-05-M-9426/0/0 W914NS-05-M-9419/0/0 W914NS-04-D-0139/T0004/0 W914NS-04-D-0139/0004/0 W914NS-04-D-0139/0004/0 W914NS-05-M-9420/0/0 W914NS-05-M-9414/0/0 W914NS-05-M-9417/0/0 W914NS-05-M-9418/0/0 W914NS-05-M-9416/0/0 W914NS-05-C-2001/0/0 W914NS-05-M-9409/0/0 W914NS-05-M-9410/0/0 W914NS-04-D-0136/T0002/0 W914NS-04-D-0136/DO0002/0 W914NS-04-D-0136/0002/0 W914NS-05-M-9397/0/0 W56HZV-05-D-B071/0001/0 W914NS-04-D-0125/0/0 W914NS-05-M-9407/0/0 FA8903-04-D-8677/0026/0 W914NS-05-M-9360/0/M0001 W914NS-05-M-9360/0/1 W914NS-05-M-9399/0/0 W914NS-05-M-9396/0/0 W914NS-05-M-9392/0/0 DABV01-03-C-0002/0/P00005 DABV01-03-C-0002/0/P00004 W914NS-05-M-9376/0/0 W914NS-05-M-9395/0/0 W914NS-05-M-9404/0/0 W914NS-05-M-9402/0/0 W56HZV-04-D-B010/T0001/0 W56HZV-04-D-B010/T0001/01 W914NS-05-M-9393/0/0 W914NS-05-M-9381/0/0 W914NS-04-D-0140/T0002/0 W914NS-04-D-0137/T0002/0 W914NS-04-D-0135/T0003/0 W914NS-04-D-0135/DO0003/0 W914NS-05-M-2013/0/0 W914NS-05-M-9372/0/0 Contract Number Field Jackets Renovation Of Al Jazaer Station Long Underwear Thermal Imager And Bolt Cutter Thermal Imager, Bolt Cutter Thermal Imager & Bolt Cutter Sim Card Tools Sleeping Bag Ips Stickers Used Vehicles For Training Replaced residential electric distribution network-Al Dawasa Office Supplies Three 7-ton Nissan Flat-bed Trucks. Supplies Rescue Supplies Rescue Gear Sleeping Bags Truck, Tractor Fire Fighting Equipment Repair Al Salhiya Ips Station And Karkh Juvenile Station Brigade Facilities Al Rasheed Purpose Of This Mod Is To Change The Accounting Info Change Accounting And Appropriation Data Weapons Mobile Base Kerosene Heaters Laundry Machines Setup, Operate And Maintain The Kirkush Military Base Setup, Operate And Maintain The Kirkush Military Base Coats And Pants Radio Equipment Bunk Beds, Mattresses Sleeping Bags Buses Buses Space Heaters Radiator Heaters Tactical & Rescue Gear Tactical & Rescue Gear Tactical & Rescue Gear Rescue Equipment Supply, Install And Test A 11kv /400volt Residential Network In Aldura 829 Scope Open Open Open n/a Open Open Open Open Open Open Full & Open Open Open Open Open n/a Open Competitive Open Open Competitive n/a n/a Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open n/a Limited Competition Open Competition Type PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO TACOM Warren CPA PCO AFCEE PCO PCO PCO PCO PCO CPA CPA PCO PCO PCO PCO DCMA DCMA PCO PCO PCO PCO PCO PCO PCO PCO Contracting Office FFP FFP n/a FFP n/a CPATT IDIQ CPATT CPATT CPATT CMATT FFP FFP FFP n/a n/a FFP CPATT IDIQ n/a FFP IDIQ n/a n/a FFP CPATT FFP n/a n/a IDIQ CPATT n/a TMTB FFP FFP FFP IDIQ CPATT FFP n/a n/a n/a n/a FFP FFP Contract Type Appendix I - 22 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 12/20/04 12/20/04 12/20/04 12/20/04 12/21/04 12/21/04 12/21/04 12/21/04 12/21/04 12/21/04 12/21/04 12/21/04 12/22/04 12/22/04 12/22/04 12/23/04 12/23/04 12/23/04 12/23/04 12/23/04 12/23/04 12/23/04 12/26/04 12/26/04 12/26/04 12/26/04 12/27/04 12/27/04 12/27/04 12/27/04 12/27/04 12/27/04 12/28/04 12/28/04 12/28/04 12/29/04 12/29/04 12/29/04 12/29/04 12/29/04 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 Award Date 791 # $6,090 $7,000 $8,088 $500,000 $6,230,506 $24,701 $24,701 $50,000 $12,000 $25,000 $120,100 $186,040 $241,060 $499,000 $59,500 $118,625 $473,000 $496,781 $988 $7,200 $7,200 $24,975 $24,975 $59,948 $3,423,413 $1,491 $1,900 $118,625 $578 $9,000 $11,895 $24,975 $29,000 $29,000 $508,215 $508,215 $14,689 $14,690 $16,250 $24,000 Total Value $6,090 $7,000 $8,088 $500,000 $6,230,506 $24,701 $24,701 $50,000 $12,000 $25,000 $120,100 $186,040 $241,060 $499,000 $59,500 $118,625 $473,000 $496,781 $988 $7,200 $7,200 $24,975 $24,975 $59,948 $3,423,413 $1,491 $1,900 $118,625 $578 $9,000 $11,895 $24,975 $29,000 $29,000 $508,215 $508,214 $14,689 $14,690 $16,250 $24,000 Obligated Value Iraqi Contractor - 148 Iraqi Contractor - 2713 Soheil General Trading Iraqi Contractor - 2770 TOLTEST, INC. The Institution Of Internal Auditors The Institution Of Internal Auditors Total Communication Services Iraqi Contractor - 2568 Iraqi Contractor - 2570 Iraqi Contractor - 2617 Iraqi Contractor - 2720 Iraqi Contractor - 142 Iraqi Contractor - 2612 Iraqi Contractor - 328 Soheil General Trading Iraqi Contractor - 142 Data Entry Error Iraqi Contractor - 2693 Iraqi Contractor - 3212 Iraqi Contractor - 899 Iraqi Contractor - 2228 Iraqi Contractor - 2228 Iraqi Contractor - 2695 Data Entry Error Streichers Inc Iraqi Contractor - 2655 Soheil General Trading Iraqi Contractor - 899 Iraqi Contractor - 2220 Soheil General Trading Iraqi Contractor - 2228 Soheil General Trading Soheil General Trading Iraqi Contractor - 2708 Iraqi Contractor - 2708 Global Link Distribution LLC Global Link Distribution LLC Iraqi Contractor - 892 Soheil General Trading Contractor W914NS-05-M-9472/0/0 W914NS-05-M-9479/0/0 W914NS-05-M-9480/0/0 W914NS-05-M-9481/0/0 FA8903-04-D-8678/0085/0 W914NS-05-M-9476/PC31000/0 W914NS-05-M-9476/PC 31000/0 W914NS-05-M-9473/0/0 W914NS-05-M-9460/0/0 W914NS-05-M-9455/0/0 W914NS-05-M-9454/0/0 W914NS-05-M-9462/0/0 W914NS-05-M-9463/0/0 W914NS-05-M-9461/0/0 W914NS-05-M-9450/0/0 W914NS-05-M-9429/QF0453/0 W914NS-05-M-9406/0/0 W914NS-05-M-2014/0/0 W914NS-05-M-9444/0/0 W914NS-05-M-9447/0/0 W914NS-05-9447/0/0 W914NS-05-M-9430/0/QF0445 W914NS-05-M-9430/0/0 W914NS-05-M-9446/0/0 W914NS-05-C-2002/0/0 W914NS-05-F-9036/0/0 W914NS-05-M-9442/0/0 W914NS-05-M-9429/0/0 W914NS-05-M-9415/QF0337/0 W914NS-05-M-9428/0/0 W914NS-05-M-9423/0/0 W914NS-05-M-9430/QF0445/0 W914NS-05-M-9421/PI: QF0432/0 W914NS-05-M-9421/0/0 W914NS-05-M-9025/0/0 W914NS-05-F-9025/0/0 W914NS-05-M-9422/0/0 W914NS-05-M-9424/0/0 W914NS-05-M-9408/0/0 W914NS-05-M-9425/0/0 Contract Number Cots Supplies: Nokia 2100 Mobile Phones, Sim Cards, Minutes Card, Laptop Computers 1991 Bmw; 5 Series Supplies: Yellow Police Tape, Flashlights, Aa Batteries, Welder, Metal Construction Of Iraqi Police Medical Dispensary Military Academy Kirkush Military Training Base Audit Trading Equipment Work Books Handheld Radios Construct And Install Vehicle Spike Bars Supplies: Tents Renovation Of Police Logistics Warehouse Backup Generator Design And Construct Bulk Storage Facility Renovation Of Al Khadamiyah Police Station Bunk Beds, Mattresses Storage Tanks Winter Clothes Renovation Of Al Karkh Police Computer Repair Supply And Install Three New 11kv/400volt Residential Distribution Networks In Babalon Supplies: Mop, Pine Oil, Brooms, Bleach, Record Books, Carbon Paper Truck Batteries Truck Batteries Pillows Pillow Furniture Replaced residential electric distribution network-Al Asri Peerless Handcuffs Steel Bars Shirts, Boots, Gloves, Socks Batteries Load And Unload Trailers At Tadji Military Base Jackets Pillow Toiletries Kit Toiletries Kit Tents Tents Fixtures, Furnishings And Equipment Fixtures, Furnishings And Equipment Short Sleeve Shirt Scope Open Open Open Open Competitive Open Open Open Open Open Open Open Open Open Open Open Open Limited Competition Open Open Open Open Open Open Full & Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Competition Type PCO PCO PCO PCO AFCEE PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO Contracting Office IDIQ CPATT IDIQ CMATT IDIQ CPATT FFP IDIQ n/a FFP CPI FFP FFP FFP FFP FFP n/a CMATT FFP FFP FFP IDIQ CPATT CMATT IDIQ CMATT FFP FFP FFP FFP FFP CPATT CPATT FFP IDIQ CMATT CPATT FFP CPATT CPATT n/a n/a CPATT CPATT IDIQ CPATT IDIQ CPATT Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 23 12/30/04 12/30/04 12/30/04 12/30/04 12/30/04 12/31/04 12/31/04 12/31/04 12/31/04 12/31/04 01/01/05 01/02/05 01/02/05 01/03/05 01/04/05 01/04/05 01/05/05 01/05/05 01/05/05 01/05/05 01/06/05 01/06/05 01/07/05 01/07/05 01/08/05 01/08/05 01/09/05 01/09/05 01/09/05 01/09/05 01/10/05 01/10/05 01/10/05 01/10/05 01/10/05 01/10/05 01/10/05 01/10/05 01/11/05 01/11/05 01/11/05 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 Award Date 831 # $99,910 $223,795 $498,555 $24,600 $88,296 $118,600 $180,000 $188,000 $215,500 $217,500 $255,245 $10,320 $62,000 $200,000 $1,291,175 $24,750 $378,825 $16,000 $24,000 $4,000 $24,250 $839 $6,000 $749,100 $24,000 $24,250 $22,500 $24,000 $1,600 $15,460 $93,500 $333,843 $595,000 $1,495,000 $2,875 $6,025 $9,820 $10,266 $57,684 Total Value $99,910 $223,795 $498,555 $24,600 $88,296 $118,600 $180,000 $188,000 $215,500 $217,500 $255,245 $10,320 $62,000 $200,000 $1,291,175 $24,750 $378,825 $16,000 $24,000 $4,000 $24,250 $839 $6,000 $749,100 $24,000 $24,250 $22,500 $24,000 $1,600 $15,460 $93,500 $333,843 $595,000 $1,495,000 $2,875 $6,025 $9,820 $10,266 $57,684 Obligated Value Iraqi Contractor - 382 Iraqi Contractor - 2620 Iraqi Contractor - 161 Iraqi Contractor - 139 Iraqi Contractor - 2817 Iraqi Contractor - 2854 Iraqi Contractor - 142 Iraqi Contractor - 142 Iraqi Contractor - 142 Iraqi Contractor - 142 Supplycore, Inc Iraqi Contractor - 1923 Iraqi Contractor - 1997 Data Entry Error Data Entry Error Iraqi Contractor - 6 Iraqi Contractor - 2721 Iraqi Contractor - 2372 Iraqi Contractor - 139 Shark Tek For Computer & Technology Iraqi Contractor - 745 Iraqi Contractor - 812 Sunshine Products Corp Iraqi Contractor - 164 Soheil General Trading Iraqi Contractor - 139 Iraqi Contractor - 745 Iraqi Contractor - 812 Iraqi Contractor - 165 Soheil General Trading Iraqi Contractor - 421 Iraqi Contractor - 152 Data Entry Error Data Entry Error Data Entry Error Data Entry Error Iraqi Contractor - 2741 Iraqi Contractor - 1953 Iraqi Contractor - 162 Iraqi Contractor - 162 Iraqi Contractor - 2627 Contractor W914NS-05-M-9564/0/0 W914NS-05-M-9567/0/0 W914NS-05-M-9565/0/0 W914NS-05-M-9548/0/0 W914NS-05-M-9457/0/0 W914NS-05-M-9456/0/0 W914NS-05-M-9550/0/0 W914NS-05-M-9553/0/0 W914NS-05-M-9551/0/0 W914NS-05-M-9552/0/0 W914NS-05-M-9458/0/0 W914NS-05-M-9708/0/0 W914NS-05-M-9707/0/0 W914NS-05-M-9547/0/0 W914NS-05-C-2003/0/0 W914NS-05-M-9540/0/0 W914NS-05-M-9541/0/0 W914NS-05-M-9538/0/0 W914NS-05-M-9537/0/0 W914NS-05-M-9532/0/0 W914NS-05-M-9526/0/0 W914NS-05-M-9518/0/P00001 W914NS-05-M-9530/0/0 W914NS-05-M-9497/0/0 W914NS-05-M-9519/0/0 W914NS-05-M-9522/0/0 W914NS-05-M-9525/0/0 W914NS-05-M-9518/0/0 W914NS-05-M-9366/0/M0001 W914NS-05-M-9511/0/0 W914NS-05-M-9484/0/0 W914NS-05-M-9502/0/0 W914NS-05-M-2015/0/0 W914NS-05-M-2016/0/0 W914NS-05-M-2017/0/0 W914NS-05-C-2004/0/0 W914NS-05-M-9499/0/0 W914NS-05-M-9498/0/0 W914NS-05-M-9119/0/01 W914NS-05-M-9033/0/01 W914NS-05-M-9485/0/0 Contract Number Renovate 401 St. Checkpoint Refurbish Battalion Headquarters Construct 405th Ing Bn Thermal Underwear Hangzou Truck Forklift Renovate Al Rafadan Police Station Renovate Bab Ai Sheikh Police Station Renovate Tahtheeb Police Station Renovate Al Tharwa Police Station Loadali Phones And Setup Wall Lockers Dark Socks Supply & Install Electric Network Feeders Thurraya Phones And Sim Chips Renovate Hy Al Aamel Ip Station Office Furniture 20’ Containers W/2 Locks Internet Service Subscription Office Furniture The Purpose Of This Mod Is To Change The Fund Site Binoculars 1994 Daewoo Car Uniform Items Winter Gloves Office Furniture Fuel, And Fuel Truck Purpose Of This Mod Is To Change The Accounting Info Watch Cap Computer Supplies: Cdr/w, V Converter Supplies: Cell Phones Residential Electrical Service Network To The Al-asuhada Residential Area In The Kerbala Residential Electrical Service Network To The Al-askary Residential Area In The Kerbala Gbagc-368 / Rashdiya Substation To Hamed Shihab 33/11kv Substation Rusafa Gov. Of Baghdad Supply & Install Electric Network Supplies: Screen Pieces, Bridge Steel Fence Maintenance. Supplies: Benzene, Diesel, Water Office Supplies Office Supplies Removal And Refurbishment Of Basra Ips Scope Open Open Open Open Open Open Open Open Open Open Open Open Open Open Full & Open Open Open Open Open Open Open n/a Open Open Open Open Open Open n/a Open Open Open Full & Open Full & Open Limited Competition Full & Open Open Open n/a n/a Open Competition Type PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO Contracting Office FFP FFP FFP CPATT CMATT CMATT FFP FFP FFP FFP CMATT CPATT FFP CMATT FFP CPATT FFP CPATT FFP CPATT CPATT n/a n/a FFP CPATT CPATT CPATT IDIQ CPATT n/a IDIQ CPATT CPATT IDIQ CPATT FFP FFP FFP FFP FFP FFP FFP FFP FFP Contract Type Appendix I - 24 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 01/11/05 01/11/05 01/11/05 01/11/05 01/11/05 01/11/05 01/12/05 01/12/05 01/12/05 01/12/05 01/12/05 01/12/05 01/13/05 01/13/05 01/13/05 01/13/05 01/13/05 01/14/05 01/14/05 01/14/05 01/14/05 01/15/05 01/15/05 01/15/05 01/15/05 01/15/05 01/17/05 01/17/05 01/17/05 01/17/05 01/17/05 01/17/05 01/18/05 01/18/05 01/19/05 01/20/05 01/20/05 01/20/05 01/20/05 01/20/05 01/20/05 01/20/05 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 Award Date 872 # $47,500 $85,500 $193,575 $203,390 $421,485 $896,931 $8,000,000 $391,925 $1,200 $44,117 -$2,927,270 $19,110 $19,110 $24,300 $279,998 $420,000 $3,900 $8,350 $71,850 $110,000 $100 $112,370 $125,000 $171,000 $9,135 $10,552 $46,500 $147,600 $41,155 $419,995 $1,998,805 $1,300 $5,200 $6,030 $7,450 $68,000 $71,800 Total Value $47,500 $85,500 $193,575 $203,390 $421,485 $896,931 $8,000,000 $391,925 $1,200 $44,117 $2,927,270 $19,110 $19,110 $24,300 $279,998 $420,000 $3,900 $8,350 $71,850 $110,000 $100 $112,370 $125,000 $171,000 $9,135 $10,552 $46,500 $147,600 $41,155 $419,995 $1,998,805 $1,300 $5,200 $6,030 $7,450 $68,000 $71,800 Obligated Value Iraqi Contractor - 1246 Overseas Support Services Iraqi Contractor - 798 Iraqi Contractor - 2636 Dell Inc. Stanley Baker Hill Parsons Iraqi Contractor - 2682 SallyPort Global Holdings Gerber Legendary Blades Parsons Iraqi Contractor - 3237 Iraqi Contractor - 3237 Iraqi Contractor - 1747 Iraqi Contractor - 761 SallyPort Global Holdings Parsons Iraqi Contractor - 293 Iraqi Contractor - 2629 Iraqi Contractor - 1351 Iraqi Contractor - 2670 TransAtlantic Traders, Inc Iraqi Contractor - 2543 Iraqi Contractor - 625 Iraqi Contractor - 1997 CSI Aviation Services, Inc. Iraqi Contractor - 165 Iraqi Contractor - 2424 Iraqi Contractor - 2462 Solutions 123 Iraqi Contractor - 2620 Iraqi Contractor - 161 Symbolarts Iraqi Contractor - 2742 CSI Aviation Services, Inc. Barrett Communications Party LTD Iraqi Contractor - 862 Iraqi Contractor - 2703 Iraqi Contractor - 862 Iraqi Contractor - 862 Iraqi Contractor - 2101 Iraqi Contractor - 2742 Contractor W914NS-05-M-9602/0/0 W914NS-05-C-9003/0/P00002 W914NS-05-M-9600/0/0 W914NS-05-M-9603/0/0 W914NS-05-F-9055/0/0 W914NS-04-D-0021/T0005/0 W914NS-04-D-0006/T0007/M0004 W914NS-05-M-9570/0/0 W914NS-04-D-9007/0/1 W914NS-05-F-9052/0/0 W914NS-04-D-0006/T0009/M0003 W914NS-05-M-9590/0/0 W914NS-05-M-9588/0/0 W914NS-05-M-9589/0/0 W914NS-05-M-9594/0/0 W914NS-04-D-9007/0/T0009 W914NS-04-D-0006/T0010/M0002 W914NS-05-M-9568/0/0 W914NS-05-M-9583/0/0 W914NS-05-M-9587/0/0 W914NS-05-M-9580/0/0 W914NS-04-D-0138/T0003/M0001 W914NS-05-M-9571/0/0 W914NS-05-M-9573/0/0 W914NS-05-M-9577/0/0 W914NS-04-D-9008/T0008/M0001 W914NS-05-M-9575/0/0 W914NS-05-M-9576/0/0 W914NS-05-M-0574/0/0 W914NS-05-M-9405/0/0 W914NS-05-M-9567/0/P00001 W914NS-05-M-9565/0/P00001 W914NS-05-M-9031/0/P00002 W914NS-05-M-9566/0/0 W914NS-04-D-9008/T0008/0 W914NS-05-M-9496/0/0 W914NS-05-M-9562/0/0 W914NS-05-M-9558/0/0 W914NS-05-M-9559/0/0 W914NS-05-M-9560/0/0 W914NS-05-M-9563/0/0 W914NS-05-M-9561/0/0 Contract Number Aksa Generators Add Two Line Items Swat And Anti-terrorist Uniforms Camouflage Uniforms Pentium 4’s Budget Analysts, Travel Construct Barracks Change Price And Accounting Info Entrenching Tool The Purpose Of This Mod Is To Deobligate Money From The Original $8,000,000.00 Golf Carts Golf Carts T-shirts Construct Traffic Police Station In Baqubah Movement Of 500 Pax The Purpose Of This Mod Is To Definitize This Task Order Internet Service Subscription Hesko Barriers East Gate Porta Johns And Cleaning Service Construct Government Dispatch Center Increase Contract Value By $100 Iraq Flags Vehicle Purchase Sleeping Bags Air Transportation Shredders Office Supplies 20,000l Tanks Renovate Psd Joint Communications Center Correct Accounting And Appropriation Data Change Accounting Data Change The Vendors Address On The Contract Office Equipment Air Transportation Hf Radio Equipment Taji Ihp Station Removal, Setup Generators Latrine Trailers 20000 L Steel Tank, Tank Prep, And Pump Renovate Checkpoints Refurbish Barracks At Ain Al Tumar Scope Open n/a Open Open Open Open n/a Open n/a Open n/a Open Open Open Open Open n/a Open Open Open Open n/a Open Open Open Open Open Open Open Open n/a n/a n/a Open Open Open Open Open Open Open Open Open Competition Type PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO USACE PCO PCO PCO PCO PCO USACE PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO Contracting Office CPATT n/a n/a n/a FFP n/a n/a FFP n/a FFP n/a FFP FFP CPATT FFP n/a n/a CPATT FFP FFP FFP n/a CMATT n/a CPATT n/a CMATT CPATT n/a FFP n/a n/a n/a FFP n/a FFP FFP CPATT CPATT CPATT FFP CPATT Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 25 01/20/05 01/20/05 01/21/05 01/21/05 01/21/05 01/21/05 01/21/05 01/22/05 01/22/05 01/22/05 01/22/05 01/22/05 01/22/05 01/23/05 01/23/05 01/23/05 01/23/05 01/23/05 01/23/05 01/24/05 01/24/05 01/24/05 01/24/05 01/25/05 01/25/05 01/25/05 01/25/05 01/26/05 01/26/05 01/27/05 01/27/05 01/28/05 01/28/05 01/28/05 01/28/05 01/29/05 01/29/05 01/29/05 01/29/05 01/29/05 01/29/05 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 Award Date 914 # $24,000 $140,000 $247,000 $253,500 $348,475 $493,950 $141,800 $179,625 $206,100 $760 -$1,952,767 $24,750 $24,855 $360,000 $1,212,617 $21,000 $25,000 $102,575 $500,000 $1,080 $1,370 $13,450 $220,215 $365,500 $380,000 $1,670 $18,330 $54,262 $150,000 $150,000 $222,000 $211,063 $1,026,000 $2,100 $25,000 Total Value $24,000 $140,000 $247,000 $253,500 $348,475 $493,950 $141,800 $179,625 $206,100 $760 -$1,952,767 $24,750 $24,855 $360,000 $1,212,617 $21,000 $25,000 $102,575 $500,000 $1,080 $1,370 $13,450 $220,215 $365,500 $380,000 $1,670 $18,330 $54,262 $150,000 $150,000 $222,000 $211,063 $1,026,000 $2,100 $25,000 Obligated Value Iraqi Contractor - 2594 Iraqi Contractor - 2666 Iraqi Contractor - 138 Iraqi Contractor - 142 Dell Inc. Iraqi Contractor - 3226 Parsons Iraqi Contractor - 2260 Iraqi Contractor - 138 Iraqi Contractor - 2730 Parsons Caddo Office Supplies Gerber Legendary Blades Parsons Iraqi Contractor - 71 Iraqi Contractor - 1348 ESS Parsons Iraqi Contractor - 139 Iraqi Contractor - 1953 Iraqi Contractor - 145 Iraqi Contractor - 1257 Iraqi Contractor - 139 Iraqi Contractor - 862 Iraqi Contractor - 2679 Iraqi Contractor - 162 Iraqi Contractor - 745 Iraqi Contractor - 745 Data Entry Error Iraqi Contractor - 140 GTSI, Inc. Iraqi Contractor - 147 Iraqi Contractor - 147 Iraqi Contractor - 2601 Parsons Parsons Parsons Sunshine Products Corp Tamara Vehicles and Equipment Co Iraqi Contractor - 673 Iraqi Contractor - 139 Contractor W914NS-05-M-9661/0/0 W914NS-05-M-9664/0/0 W914NS-05-M-9654/0/0 W914NS-05-M-9655/0/0 W914NS-05-F-9062/0/0 W914NS-05-M-9656/0/0 W914NS-04-D-0006/T0010/M0007 W914NS-05-M-9652/0/0 W914NS-05-M-9653/0/0 W914NS-05-M-9651/0/0 W914NS-04-D-0006/T0010/P00006 W914NS-05-F-9046/0/0 W914NS-05-F-9052/0/P00001 W914NS-04-D-0006/T0016/M0001 W914NS-05-M-9638/0/0 W914NS-05-M-9642/0/0 W914NS-05-M-9640/0/0 W914NS-04-D-0009/2/3 W914NS-05-M-9601/0/0 W914NS-05-M-9631/0/0 W914NS-05-M-9626/0/0 W914NS-05-M-9267/0/0 W914NS-05-M-9621/0/0 W914NS-05-M-9620/0/0 W914NS-05-M-9622/0/0 W914NS-05-M-9618/0/0 W914NS-05-M-9617/0/0 W914NS-05-M-9619/0/0 W914NS-05-M-9612/0/0 W914NS-05-M-9608/0/0 W914NS-05-F-9058/0/0 W914NS-05-M-9614/0/0 W914NS-05-M-9613/0/0 W914NS-05-M-9610/0/0 W914NS-04-D-0006/T0010/M0005 W914NS-04-D-0006/T0010/M0004 W914NS-04-D-0006/T0010/M0003 W914NS-05-F-9057/0/0 W56HZV-04-D-B107/T0001/0 W914NS-05-M-9604/0/0 W914NS-05-M-9599/0/0 Contract Number Shipping Containers 36,000ltr Tank, 10,000ltr Diesel Tank, With Electric Pumps T-walls Camp Justice Construct Al Qanat Police Station Construct New Baghdad Patrol Station Dell Optiplex’s And Office Pro’s Renovation Of Predator Palace The Purpose Of This Mod Is To Definitize This Task Order Construct Al Kharkh Ip Traffic Construct Khadamiya Ip Traffic Al Yarmouk Ip Traffic Station The Purpose Of This Mod Is To Definitize This Task Order Sony Transcriber The Purpose Of This Mod Is To Change The Req # To W915we42822094 The Purpose Of This Mod Is To Deobligate Money From The Original Construction Materials Repair Living Areas, Police Special Ops Unit Water Truck Increase Obligated Funds Foot Containers Tires Construct Adnan Telephone Center Socks And Towels Map Display Units Installation Of Security Doors And Weapons Rack For Taji Ihp Station Printer Fargo And Color Ribbon Police Station Renovation Renovate Baghdad Patrol Station Police Headquarters In Baghdad Adaptec Snap Server Military Web Vest Printer Used Water Trucks Toilets Flatbed Recovery Vehicle The Purpose Of This Mod Is To Definitize This Task Order The Purpose Of This Mod Is To Definitize This Task Order The Purpose Of This Mod Is To Definitize This Task Order Binoculars Forklifts Keys For Toyota Land Cruisers Scope Open Open Open Open Open Open n/a Open Open Open n/a Open n/a n/a Open Open Open n/a Open Open n/a Open Open Open Open Open Open n/a Open Open Open Open Open Open n/a n/a n/a Open Open Open Open Competition Type PCO PCO PCO PCO PCO PCO USACE PCO PCO PCO USACE PCO PCO USACE PCO PCO PCO CPA PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO USACE USACE USACE PCO DCMA PCO PCO Contracting Office n/a FFP FFP FFP CMATT FFP n/a FFP FFP FFP n/a n/a n/a n/a FFP FFP FFP n/a FFP FFP FFP FFP CPATT FFP CPATT n/a FFP FFP FFP FFP FFP FFP FFP FFP n/a n/a n/a n/a n/a CPATT FFP Contract Type Appendix I - 26 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 01/29/05 01/29/05 01/29/05 01/29/05 01/31/05 01/31/05 01/31/05 01/31/05 01/31/05 01/31/05 01/31/05 01/31/05 01/31/05 01/31/05 01/31/05 01/31/05 01/31/05 01/31/05 02/01/05 02/01/05 02/03/05 02/03/05 02/03/05 02/03/05 02/03/05 02/04/05 02/04/05 02/04/05 02/05/05 02/05/05 02/05/05 02/05/05 02/07/05 02/08/05 02/08/05 02/08/05 02/08/05 02/08/05 02/08/05 02/09/05 02/09/05 02/09/05 02/10/05 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 Award Date 955 # $134,900 $24,750 $55,075 $61,160 $5,000 $20,700 $103,740 $126,000 $251,500 $312,724 $15,783 $6,000 $6,900 $22,248 $24,000 -$10,408,993 -$5,776,982 $129,169 -$15,000,000 $18,000 $24,750 $27,142 $4,846,870 $7,735 $50,589 -$24,948,730 $5,800 $11,750 $12,000 $12,250 $18,845 $22,000 $40,000 $40,000 $147,815 $180,000 $3,774 $16,800 $20,000 $22,000 Total Value $134,900 $24,750 $55,075 $61,160 $5,000 $20,700 $103,740 $126,000 $251,500 $312,724 $15,783 $6,000 $6,900 $22,248 $24,000 $10,408,993 -$5,776,982 $129,169 -$15,000,000 $18,000 $24,750 $27,142 $4,846,870 $7,735 $50,589 -$24,948,730 $5,800 $11,750 $12,000 $12,250 $18,845 $22,000 $40,000 $40,000 $147,815 $180,000 $3,774 $16,800 $20,000 $22,000 Obligated Value Iraqi Contractor - 2770 Iraqi Contractor - 2667 Iraqi Contractor - 2608 Iraqi Contractor - 2307 Iraqi Contractor - 2390 Iraqi Contractor - 500 Iraqi Contractor - 1110 Iraqi Contractor - 98 Iraqi Contractor - 139 Iraqi Contractor - 729 Dell Inc. Iraqi Contractor - 1997 Iraqi Contractor - 500 Dell Inc. Iraqi Contractor - 2594 Parsons Parsons Ricoh Business Systems Parsons Iraqi Contractor - 840 Iraqi Contractor - 2598 Carmanah Technologies Lifeline Shelter Systems, Inc Middle East Trading Company Iraqi Contractor - 2103 Parsons Parsons Parsons Parsons Iraqi Contractor - 2173 Iraqi Contractor - 2103 Iraqi Contractor - 3237 Iraqi Contractor - 1351 Iraqi Contractor - 165 Iraqi Contractor - 863 Iraqi Contractor - 1765 Iraqi Contractor - 1765 Iraqi Contractor - 2696 Iraqi Contractor - 2706 Iraqi Contractor - 899 Iraqi Contractor - 1572 Iraqi Contractor - 1997 Iraqi Contractor - 495 Contractor W914NS-05-M-9716/0/0 W914NS-05-M-9713/0/0 W914NS-05-M-9709/0/0 W914NS-05-M-9677/0/0 W914NS-05-M-9705/0/0 W914NS-05-M-9687/0/0 W914NS-05-M-9702/0/0 W914NS-05-M-9704/0/0 W914NS-05-M-9703/0/0 W914NS-05-M-9701/0/0 W914NS-05-F-9064/0/0 W914NS-05-M-9688/0/0 W914NS-05-M-9686/0/0 W914NS-05-M-9689/0/0 W914NS-05-M-9685/0/0 W914NS-04-D-0006/T0008/M0005 W914NS-04-D-0006/T0010/M0009 W914NS-05-M-9597/0/0 W914NS-04-D-0006/T0003/P00012 W914NS-05-M-9535/0/0 W914NS-05-M-9679/0/0 W914NS-05-F-9063/0/0 W56HZV-04-D-B103/T0002/0 W914NS-05-M-9668/0/0 W914NS-05-M-9596/0/0 W914NS-04-D-0006/8/4 W914NS-04-D-0006/8/3 W914NS-04-D-0006/10/8 W914NS-04-D-0006/6/9 W914NS-05-M-9671/0/0 W914NS-05-M-9569/0/0 W914NS-05-M-9666/0/0 W914NS-05-M-9667/0/0 W914NS-05-M-9669/0/0 W914NS-05-M-9670/0/0 W914NS-05-M-9673/0/P00001 W914NS-05-M-9673/0/0 W914NS-05-M-9674/0/0 W914NS-05-M-9675/0/0 W914NS-05-M-9662/0/0 W914NS-05-M-9663/0/0 W914NS-05-M-9658/0/0 W914NS-05-M-9660/0/0 Contract Number Porta Johns And Cleaning Service Site Clean Up At Commando Bsae Site One Latrine And Shower Facilities At Tuz, Iraq Porta Johns And Cleaning Service Construct Six Sliding Map Panels And Two Map Boards Containers Renovation Of Ba’qubah, Iraq Bunk Beds And Mattresses Automobiles 60th Al Umranniyah Bde Barracks Building And Armory Dell Computers Containers Containers Tablet PC’s Fuel Tanks And Pumps The Purpose Of This Mod Is To Decrease The Contract Value The Purpose Of This Mod Is To Deobligate Money From The Original Printer Supplies Reduce Clins 0002 To $0.00 Al Heel Children’s Magazine Forklift Taxiway Lights Ear Muffs Computer Enclosures Includes Statement Of Work And Summarizes Funding Definitize Task Order 0008 For Maternity & Children’s Hospital Definitize Task Order 0010, Statement Of Work, Summarize Funding Deobligate Excess Funds And Definitize Final Hospital On Task Order Supplies Computer Parts Window Bars For Arms Rooms Nail Spikes And Tetrahedrons Swing Arm Chairs Soldier Manuals Western European Latrine And Shower Trailers Western European Latrine And Shower Trailers Wall Lockers Automobiles Repair And Paint Trucks Dodge Cars Towels Paint Dodge Pickup Trucks Scope Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO USACE USACE n/a n/a PCO USACE PCO PCO PCO DCMA PCO PCO USACE USACE USACE USACE PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO Contracting Office Open n/a Open Open Open Open Open Open n/a n/a n/a n/a Open Open Open Open Open Open Open Open Open Open Open Open Open Open Competition Type n/a FFP FFP FFP FFP CPATT CPATT FFP FFP CPATT FFP FFP CPATT CPATT FFP CPATT n/a n/a FFP n/a n/a FFP FFP n/a CMATT n/a n/a n/a n/a n/a CMATT n/a FFP CMATT CMATT CMATT FFP FFP FFP FFP FFP FFP CPATT Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 27 02/13/05 02/14/05 02/14/05 02/14/05 02/14/05 02/14/05 02/14/05 02/14/05 02/14/05 02/14/05 02/15/05 02/15/05 02/15/05 02/15/05 02/16/05 02/16/05 02/16/05 02/16/05 02/16/05 02/16/05 02/16/05 02/17/05 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 02/18/05 02/11/05 1011 1040 02/11/05 1010 02/18/05 02/11/05 1009 02/18/05 02/11/05 1008 1039 02/11/05 1007 1038 02/11/05 1006 02/18/05 02/11/05 1005 1037 02/10/05 1004 02/18/05 02/10/05 1003 1036 02/10/05 1002 02/18/05 02/10/05 1001 02/18/05 02/10/05 1000 1035 02/10/05 1034 02/10/05 999 Award Date 998 # $17,930 $22,824 $55,511 $147,600 $288,000 $313,475 $442,800 $8,600 $6,000 $8,600 $22,475 $23,975 $60,000 $145,600 $467,955 $2,155 $24,000 $87,022 $384,720 $10,900 $10,900 $15,265 $18,675 $24,000 $32,822 $120,000 $304,500 $323,000 $594,500 $4,050 $8,675 $12,000 $52,200 $81,565 $140,000 $241,547 $4,620 $7,423 $18,500 $59,900 $75,848 $92,984 $134,900 Total Value $17,930 $22,824 $55,511 $147,600 $288,000 $313,475 $442,800 $8,600 $6,000 $8,600 $22,475 $23,975 $60,000 $145,600 $467,955 $2,155 $24,000 $87,022 $384,720 $10,900 $10,900 $15,265 $18,675 $24,000 $32,822 $120,000 $304,500 $323,000 $594,500 $4,050 $8,675 $12,000 $52,200 $81,565 $140,000 $241,547 $4,620 $7,423 $18,500 $59,900 $75,848 $92,984 $134,900 Obligated Value Iraqi Contractor - 2683 Iraqi Contractor - 2599 Iraqi Contractor - 2646 Iraqi Contractor - 2689 Iraqi Contractor - 2635 Iraqi Contractor - 2634 Iraqi Contractor - 539 Iraqi Contractor - 471 Saudi Naval Support Company Ltd. Iraqi Contractor - 165 Soheil General Trading Iraqi Contractor - 1590 Spring General Trading Co. Iraqi Contractor - 2741 Iraqi Contractor - 76 Iraqi Contractor - 812 Iraqi Contractor - 1508 Iraqi Contractor - 1201 Iraqi Contractor - 1381 Iraqi Contractor - 1123 Iraqi Contractor - 2653 Iraqi Contractor - 1590 Iraqi Contractor - 2593 Iraqi Contractor - 2568 Iraqi Contractor - 1788 Iraqi Contractor - 2706 Iraqi Contractor - 2570 Iraqi Contractor - 2768 Iraqi Contractor - 2631 Iraqi Contractor - 1252 Iraqi Contractor - 2257 Soheil General Trading Iraqi Contractor - 139 Iraqi Contractor - 355 Iraqi Contractor - 2427 Iraqi Contractor - 2464 Iraqi Contractor - 152 HP Federal Sales Iraqi Contractor - 1747 Iraqi Contractor - 1868 Iraqi Contractor - 2770 Iraqi Contractor - 2770 Iraqi Contractor - 2770 Contractor W914NS-05-M-9751/0/0 W914NS-05-M-9779/0/0 W914NS-05-M-9775/0/0 W914NS-05-M-9771/0/0 W914NS-05-M-9781/0/0 W914NS-05-M-9770/0/0 W914NS-05-M-9777/0/0 W914NS-05-M-9767/0/0 W914NS-05-M-9748/0/0 W914NS-05-M-9768/0/0 W914NS-05-M-9763/0/0 W914NS-05-M-9766/0/0 W914NS-05-M-9740/0/0 W914NS-05-M-9735/0/0 W914NS-05-M-9700/0/0 W914NS-05-M-9757/0/0 W914NS-05-M-9756/0/0 W914NS-05-M-9753/0/0 W914NS-05-M-9712/0/0 W914NS-05-M-9746/0/0 W914NS-05-M-9745/0/0 W914NS-05-M-9755/0/0 W914NS-05-M-9754/0/0 W914NS-05-M-9749/0/0 W914NS-05-M-9729/0/0 W914NS-05-M-9750/0/0 W914NS-05-M-9744/0/0 W914NS-05-M-9743/0/0 W914NS-05-M-9738/0/0 W914NS-05-M-9731/0/0 W914NS-05-M-9711/0/0 W914NS-05-M-9733/0/0 W914NS-05-M-9724/0/0 W914NS-05-M-9732/0/0 W914NS-05-M-9730/0/0 W914NS-05-M-9726/0/0 W914NS-05-M-9727/0/0 W914NS-05-M-9680/0/0 W914NS-05-M-9723/0/0 W914NS-05-M-9719/0/0 W914NS-05-M-9714/0/0 W914NS-05-M-9715/0/0 W914NS-05-M-9717/0/0 Contract Number Supplies Building For 208th Ing Bn, Kirkik, Iraq Office Space Construction Beds And Bed Supplies Generators And Room For Generators Security Fence At Hillah, Iraq Beds And Appliances Carpet Installation Shipping Container Bed Sheets And Pillows Toiletries Kits Classroom Furniture Al Rustamiyah Electrical Generation Plants For Police Facilities T-wall Installation Maintenance Kit For 205th Ing Batteries Anti-terrorist Trainers South Castle Renovation Renovation At Ba’qubah Mc Generator Generator, Oil Tank Furniture Curtains Baghdad Police Academy Renovation Tactical Checkpoint Upgrades Sedans And Vans Beds And Bed Supplies Barriers And Bunkers Renovation Of Al-sikek (railway) Police Station Phones And Fax Machines Guard Command Post For Tcp 30 Flashlights Containers Construction For Barracks In Tikrit T-walls Material And Services Office Supplies Laserjet Printers Flashlights Construct Maintenance Bay At Ghalibiya Porta Johns And Cleaning Service Porta Johns And Cleaning Service Porta Johns And Cleaning Service Scope Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Competition Type JCCI PCO PCO PCO PCO PCO JCCI PCO JCCI PCO JCCI JCCI JCCI JCCI PCO PCO PCO JCCI PCO PCO PCO PCO PCO PCO PCO JCCI PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO PCO Contracting Office n/a FFP FFP FFP FFP FFP FFP FFP CPATT CMATT FFP CMATT FFP CMATT FFP n/a n/a FFP FFP FFP n/a CPATT n/a FFP FFP CMATT n/a FFP FFP FFP FFP FFP FFP FFP n/a FFP FFP CMATT FFP FFP FFP FFP FFP Contract Type Appendix I - 28 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 02/24/05 1065 03/03/05 02/24/05 1064 03/01/05 02/24/05 1063 1077 02/24/05 1062 1076 02/23/05 1061 03/01/05 02/23/05 1060 1075 02/23/05 1059 02/28/05 02/23/05 1058 1074 02/22/05 1057 02/27/05 02/22/05 1056 02/26/05 02/22/05 1055 1073 02/22/05 1054 1072 02/22/05 1053 02/26/05 02/22/05 1052 02/26/05 02/22/05 1051 1071 02/22/05 1050 1070 02/21/05 1049 02/25/05 02/21/05 1048 02/25/05 02/21/05 1047 1069 02/21/05 1046 1068 02/20/05 1045 02/25/05 02/20/05 1044 1067 02/19/05 1043 02/24/05 02/18/05 1066 02/18/05 1042 Award Date 1041 # $211,200 $5,880 $56,000 $1,250 $9,595 $8,000 $9,135 $13,600 $400 $5,010 $22,975 $2,413 $11,500 $31,190 $78,800 $2,004,800 $5,000 $47,500 $97,279 $488,294 $3,180 $6,000 $14,850 $24,000 $90,420 $208,460 $468,125 $505,400 -$163,365 $24,750 $37,200 $455,500 $42,000 $240,000 $238,000 $4,000 $7,512 Total Value $211,200 $5,880 $56,000 $1,250 $9,595 $8,000 $9,135 $13,600 $400 $5,010 $22,975 $2,413 $11,500 $31,190 $78,800 $2,004,800 $5,000 $47,500 $97,279 $488,294 $3,180 $6,000 $14,850 $24,000 $90,420 $208,460 $468,125 $505,400 -$163,365 $24,750 $37,200 $455,500 $42,000 $240,000 $238,000 $4,000 $7,512 Obligated Value Iraqi Contractor - 1592 Iraqi Contractor - 1570 Iraqi Contractor - 1351 Iraqi Contractor - 2570 Iraqi Contractor - 165 Iraqi Contractor - 2383 Iraqi Contractor - 165 Iraqi Contractor - 500 Iraqi Contractor - 471 Iraqi Contractor - 165 Iraqi Contractor - 165 Iraqi Contractor - 1997 Iraqi Contractor - 957 Iraqi Contractor - 2570 Rock Solid Solution Inc Astro Systems Iraqi Contractor - 500 Iraqi Contractor - 2681 Agon Group International Iraqi Contractor - 2635 Iraqi Contractor - 144 Iraqi Contractor - 2590 Iraqi Contractor - 2587 Iraqi Contractor - 2594 Iraqi Contractor - 2660 Iraqi Contractor - 798 Iraqi Contractor - 798 Iraqi Contractor - 798 Iraqi Contractor - 2157 Iraqi Contractor - 2570 Iraqi Contractor - 1750 Iraqi Contractor - 798 n/a Iraqi Contractor - 955 Iraqi Contractor - 3236 Iraqi Contractor - 1382 Iraqi Contractor - 892 Contractor W914NS-05-M-9811/0/0 W914NS-05-M-9833/0/0 W914NS-05-M-9830/0/0 W914NS-05-M-9826/0/0 W914NS-05-M-9822/0/0 W914NS-05-M-9823/0/0 W914NS-05-M-9819/0/0 W914NS-05-M-9809/0/0 W914NS-05-M-9767/0/P00001 W914NS-05-M-9821/0/0 W914NS-05-M-9820/0/0 W914NS-05-M-9805/0/0 W914NS-05-M-9818/0/0 W914NS-05-M-9814/0/0 W914NS-05-M-9810/0/0 W914NS-04-D-9006/T0002/0 W914NS-05-M-9804/0/0 W914NS-05-M-9728/0/0 W914NS-05-A-0001/DO0006/0 W914NS-05-M-9778/0/0 W914NS-05-M-9799/0/0 W914NS-05-M-9802/0/0 W914NS-05-M-9790/0/0 W914NS-05-M-9803/0/0 W914NS-05-M-9681/0/0 W914NS-05-M-9797/0/0 W914NS-05-M-9795/0/0 W914NS-05-M-9796/0/0 W914NS-05-M-9236/0/P00001 W914NS-05-M-9791/0/0 W914NS-05-M-9792/0/0 W914NS-05-M-9794/0/0 W914NS-05-M-9788/0/0 W914NS-05-M-9752/0/0 W914NS-05-M-9772/0/0 W914NS-05-M-9776/0/0 W914NS-05-M-9780/0/0 Contract Number Fence At 1st Mech Bde Iaf, Tadji Internet Service Vehicle Repair Wheeled Travel Bags Recreational Furnishings Shipping Container Cabinets Increase Contract Value Padlocks, Projector Stands And Hand Trucks Chairs And Lan Adaptors Cleaning Supplies Repair Buildings Electronic Accessories Shower/latrine Hook Up At Tadji Base Voice And Data Networking Fuel For Diesel Generators Communications Building Construction Soldier Equipment To Tadji Construction In Najaf APC Back-ups Fuel Tank Memory Sticks Diesel/ Benzene Tanks, Pumps And Walls Build/ Refurbish Diyala Provincial Detention Facilities Miscellaneous Supplies, And Cars On Person Military Supplies Construction On Jebella Police Station The Purpose Of This Mod Is To Cancel Contract W914ns05-m-9236 Toiletries Generators For Abu Ghraib Tactical Supplies For Hilla Swat Team Road Repair At Tmtb Barracks Construction Chevy Suburbans Move Gravel To Kasik Military Training Base Furniture Scope Open Open Open Open Open Open Open Open n/a Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open n/a Open Open Open Open Open Open Open Open Competition Type PCO PCO PCO JCCI JCCI PCO PCO JCCI PCO PCO PCO PCO PCO PCO PCO PCO JCCI PCO PCO PCO PCO PCO JCCI PCO PCO JCCI JCCI PCO PCO PCO JCCI JCCI JCCI PCO PCO JCCI PCO Contracting Office FFP FFP n/a n/a CMATT CPATT n/a CPATT n/a n/a n/a n/a n/a CMATT FFP CPATT CPATT FFP FFP FFP CMATT n/a FFP n/a FFP FFP FFP FFP n/a n/a FFP FFP FFP FFP FFP FFP n/a Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 29 03/05/05 03/05/05 03/05/05 03/06/05 03/07/05 03/08/05 03/08/05 03/08/05 03/08/05 03/09/05 03/09/05 03/09/05 03/10/05 03/12/05 03/12/05 03/13/05 03/13/05 03/14/05 03/14/05 03/14/05 03/14/05 03/14/05 03/14/05 03/15/05 03/15/05 03/15/05 03/17/05 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 03/20/05 03/20/05 03/20/05 03/20/05 03/21/05 03/22/05 03/22/05 03/22/05 03/22/05 1111 1112 1113 1114 1115 1116 1117 1118 1119 03/19/05 03/05/05 1081 03/19/05 03/05/05 1080 1110 03/04/05 1109 03/03/05 1079 Award Date 1078 # $19,232 $56,880 $377,603 $1,252,500 $180,000 $20,000 $24,850 $723,792 $5,640,778 $1,101 $8,000 $110,544 $205,500 $233,151 $7,360,680 $4,600 $9,525 $25,000 $187,083 $1,160 $236,250 $34,280 $619,625 $119,338 -$52,000 $22,000 $23,708 -$14,000 $117,701 $825,000 $2,051,748 $78,092 $26,000 $20,400 $28,890 $52,000 $61,858 $98,100 $35,347 $93,000 Total Value $19,232 $56,880 $377,603 $1,252,500 $180,000 $20,000 $24,850 $723,792 $5,640,778 $1,101 $8,000 $110,544 $205,500 $233,151 $7,360,680 $4,600 $9,525 $25,000 $187,083 $1,160 $236,250 $34,280 $619,625 $119,338 -$52,000 $22,000 $23,708 -$14,000 $117,701 $825,000 $2,051,748 $78,092 $26,000 $20,400 $28,890 $52,000 $61,858 $98,100 $35,347 $93,000 Obligated Value The Fire Safety Engineering College Boston Rack & Wire Iraqi Contractor - 2692 Motorola Iraqi Contractor - 2756 Iraqi Contractor - 863 Iraqi Contractor - 139 ESS Mine Safety Appliances Company Iraqi Contractor - 788 Iraqi Contractor - 3218 Agon Group International Iraqi Contractor - 3233 Astro Systems Lifeline Shelter Systems, Inc GKL Iraqi Contractor - 147 Iraqi Contractor - 2757 Iraqi Contractor - 975 Iraqi Contractor - 3225 Soheil General Trading GSS Gerber Legendary Blades Iraqi Contractor - 1590 Soheil General Trading Iraqi Contractor - 539 USAJFKSWCS Iraqi Contractor - 2173 Fuad Al-Essa & Partner Company Iraqi Contractor - 3236 Iraqi Contractor - 2694 Iraqi Contractor - 1580 Lifeline Shelter Systems, Inc Agon Group International Iraqi Contractor - 3233 Data Entry Error Iraqi Contractor - 1888 Usajfkswcs Agon Group International Iraqi Contractor - 3233 Agon Group International Iraqi Contractor - 3233 Contractor W914NS-05-M-9902/0/0 W914NS-05-M-9901/0/0 W914NS-05-D-9009/0/0 W914NS-05-M-9906/0/0 W914NS-05-M-9883/0/0 W914NS-05-M-9894/0/0 W914NS-05-M-9892/0/0 W914NS-05-C-9036/2/0 W914NS-05-M-9877/0/0 W914NS-05-M-9889/0/0 W914NS-05-M-9886/0/0 W914NS-05-A-0001/D0004/0 W914NS-05-A-0003/D0003/0 W914NS-04-D-9006/T0003/0 W56HZV-04-D-B132/T0002/0 W914NS-05-M-9807/0/P00001 W914NS-05-M-9614/0/P00001 W914NS-05-M-9872/0/0 W914NS-05-M-9873/0/0 W914NS-05-M-1213/0/0 W914NS-05-M-9870/0/0 W914NS-05-M-9866/0/0 W914NS-05-M-9807/0/0 W914NS-05-M-9853/0/0 W914NS-05-M-9861/0/0 W914NS-05-M-9859/0/0 W914NS-05-M-9847/0/P00001 W914NS-05-M-9984/0/0 W914NS-05-M-9854/0/0 W914NS-05-M-9672/0/P00002 W914NS-05-M-9585/0/P00001 W914NS-05-M-9851/0/0 W56HZV-04-D-B132/T0001/0 W914NS-05-A-0001/D0003/0 W914NS-05-A-0003/D0002/0 W914NS-05-M-9844/0/0 W914NS-05-M-9846/0/0 W914NS-05-M-9847/0/0 W914NS-05-A-0001/D0002/0 W914NS-05-A-0003/D0001/0 W914NS-05-A-0001/D0001/0 W914NS-05-A-0003/DO0014/0 Contract Number Fire Instructor Training Lockers And Shipping Maintenance, Utilities And Protection Handheld Radio And Encryption Board Training Training Manuals Construction Materials Exercise Option Period For Contract Breathing Apparatuses Internet Service Weapon Mount Mixed Cargo Security And Transportation Telephones And Supplies Truck/mobile X-ray Unit Change Payment Address The Purpose Of This Mod Is To Cancel Contract W914ns05-m-9614 Generator Installation Table Chairs Refrigerator Electronics Usb To Serial Port Cable T-walls Office/medical Furnishings Clothing Phone Services Cancel Order Conex Containers Hygiene Kit Change Payment Office, Appropriation Data And Price Extend Period Performance And Increase Contract Value T-walls Truck/mobile X-ray Unit Armored Hmmwvs And Kuwait Rate Security And Transportation Barracks Renovation Recreational Training Equipment Handbooks Nissan Cabstar Security And Transportation Vehicles Cargo To Kirkush Mtb Scope Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open n/a n/a Open Open Open Open Open n/a Open Open Open n/a Open Open n/a n/a n/a Open Open Open n/a Open Open Open Open Open Open Competition Type PCO JCCI JCCI JCCI PCO JCCI PCO PCO JCCI JCCI PCO PCO JCCI PCO DCMA JCCI JCCI JCCI JCCI JCCI JCCI JCCI PCO JCCI JCCI JCCI JCCI PCO JCCI PCO PCO JCCI DCMA PCO JCCI JCCI JCCI JCCI PCO JCCI PCO JCCI Contracting Office n/a MOI n/a n/a n/a CMATT n/a n/a MOI CPATT n/a n/a n/a CPATT CPAIQ n/a n/a CPATT IHP n/a CMATT n/a n/a CMATT CMATT n/a n/a n/a n/a CMATT n/a n/a n/a CPAIQ n/a n/a n/a CPATT ISOF AND CMATT n/a n/a n/a FFP Contract Type Appendix I - 30 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 03/23/05 03/24/05 03/24/05 03/24/05 03/24/05 03/24/05 03/25/05 03/25/05 03/26/05 03/26/05 03/26/05 03/26/05 03/26/05 03/27/05 03/28/05 03/28/05 03/28/05 03/29/05 03/29/05 03/29/05 03/30/05 03/30/05 03/30/05 03/30/05 03/30/05 03/31/05 03/31/05 04/01/05 04/01/05 04/01/05 04/04/05 04/05/05 04/05/05 04/05/05 04/05/05 04/06/05 04/06/05 04/06/05 04/06/05 04/06/05 04/06/05 04/06/05 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 Award Date 1120 # $7,000 $19,000 $25,000 $41,000 $41,000 $5,300 $5,300 $11,300 $589,911 $19,000 $1,701,371 $1,701,371 $1,701,371 $3,045 $24,475 $9,466 $12,000 $107,400 $125,138 $965,000 $30,100 $49,041 $134,550 $450 $16,000 $29,250 $2,245 $12,000 $12,550 $15,700 $264,000 $1,150 $5,004 $600 $600 $215,085 $280,625 $356,200 $221,088 Total Value $7,000 $19,000 $25,000 $41,000 $41,000 $5,300 $5,300 $11,300 $589,911 $19,000 $1,701,371 $1,701,371 $1,701,371 $3,045 $24,475 $9,466 $12,000 $107,400 $125,138 $965,000 $30,100 $49,041 $134,550 $450 $16,000 $29,250 $2,245 $12,000 $12,550 $15,700 $264,000 $1,150 $5,004 $600 $600 $215,085 $280,625 $356,200 $221,088 Obligated Value Iraqi Contractor - 2770 Iraqi Contractor - 2770 Iraqi Contractor - 840 Iraqi Contractor - 840 Iraqi Contractor - 840 Iraqi Contractor - 3233 Iraqi Contractor - 3233 Iraqi Contractor - 2753 Iraqi Contractor - 3401 Iraqi Contractor - 2568 Iraqi Contractor - 3237 Iraqi Contractor - 2632 Iraqi Contractor - 2692 Iraqi Contractor - 2692 Iraqi Contractor - 2692 Iraqi Contractor - 1997 Iraqi Contractor - 2765 Iraqi Contractor - 2765 Iraqi Contractor - 2745 Iraqi Contractor - 3233 Iraqi Contractor - 2754 Integrated Convoy Protection Ltd. Soheil General Trading P & G Chevrolet, Inc. Iraqi Contractor - 2233 Motorola Iraqi Contractor - 2390 Iraqi Contractor - 2568 Iraqi Contractor - 2568 Iraqi Contractor - 2770 Iraqi Contractor - 1935 Iraqi Contractor - 1203 Iraqi Contractor - 2599 Triple Canopy Inc. Iraqi Contractor - 2424 Iraqi Contractor - 2619 Altec Industries Inc. Altec Industries Inc. Iraqi Contractor - 2767 Iraqi Contractor - 2611 Iraqi Contractor - 262 Agon Group International Contractor W914NS-05-M-9931/0/1 W914NS-05-M-931/0/P00001 W914NS-05-M-9535/0/P00001 W914NS-05-M-9991/0/0 W914NS-05-M-9990/0/0 W914NS-05-A-0003/D0005/0 W914NS-05-A-0003/5/0 W914NS-05-M-9989/0/0 W914NS-05-M-9958/0/0 W914NS-05-M-9983/0/0 W914NS-05-M-9982/0/0 W914NS-05-M-9957/0/0 W914NS-05-M-9016/T0001/0 W914NS-05-D-9016/1/0 W914NS-05-D-9016/0001/0 W914NS-05-M-9969/0/0 W914NS-05-M-9973/0/0 W914NS-05-M-9961/0/0 W914NS-05-M-9960/0/0 W914NS-05-A-0003/D0004/0 W914NS-05-M-9965/0/0 W914NS-05-M-9952/0/0 W914NS-05-M-9956/0/0 W56HZV-04-D-B108/T0001/0 W914NS-05-M-9955/0/0 W914NS-05-M-9041/0/P00001 W914NS-05-M-9945/0/0 W914NS-05-M-9944/0/0 W914NS-05-M-9943/0/0 W914NS-05-M-9931/0/0 W914NS-05-M-9940/0/0 W914NS-05-M-9937/0/0 W914NS-05-M-9929/0/0 W914NS-05-M-9942/0/0 W914NS-05-M-9895/0/0 W914NS-05-M-9882/0/0 W56HZV-04-D-B059/T0002/M0003 W56HZV-04-D-B014/T0001/M0004 W914NS-05-M-9928/0/0 W914NS-05-M-9930/0/0 W914NS-05-M-9927/0/0 W914NS-05-A-0001/D0005/0 Contract Number Mixed Cargo Change Accounting And Appropriation Data Change Accounting And Appropriation Data Increase Total Dollar Amount Pens, Mugs, Calendars…. Al Heel Children’s Magazine Additional Funding For BPA Additional Funds For Existing BPA’s Arabic Instructions Arabic Instruction Build A Gate At Baghdad Police Academy Refurbishment Of BPC Living Quarters Logistical Support Life Support Operations Utility And Sanitary Services Services And Equipment For Al Walid Cleaning Supplies School Supplies Flashlights Blankets Additional Funding For BPA Construct Subhani Border Post Reva APC Vehicle W/upgrades Generators, And Trailers 11-16 Passenger Van R-bgan Open Sin Chip Change Accounting And Appropriation Data Construct Plasma Screen Demolish “ticket Building” Staff Office Renovation Chairs Heavy Duty Shredders Internet Service And Supporting Hardware Trailer SUV Cleaning Supplies Meals/drinks Increase Contract Value By $600 Increase Contract Value By $600 Ezza Ip District Station Falihiyah Ip District Station Wassit Military Itel. Equipment Scope n/a n/a n/a Open Open Open Open Open Open Open Open Open Open Open n/a Open Open Open Open Open Open Open Open Open Open n/a Open Open Open Open Open Open Open Open Open Open n/a n/a Open Open Open Open Competition Type JCCI JCCI PCO PCO PCO JCCI JCCI PCO PCO PCO JCCI PCO PCO PCO PCO JCCI JCCI JCCI JCCI JCCI PCO JCCI JCCI DCMA PCO JCCI JCCI JCCI PCO JCCI JCCI JCCI PCO JCCI JCCI JCCI DCMA DCMA PCO PCO JCCI PCO Contracting Office n/a n/a n/a n/a n/a n/a FFP FFP n/a FFP FFP n/a n/a n/a n/a n/a FFP CMATT CMATT n/a FFP CPATT FFP CPAIQ FFP n/a CPATT CPATT CPATT n/a CPATT CPATT n/a CPATT CPATT n/a FFP FFP n/a n/a n/a n/a Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 31 04/13/05 04/13/05 04/13/05 04/13/05 04/13/05 04/14/05 04/14/05 04/14/05 04/14/05 04/14/05 04/15/05 04/15/05 04/15/05 04/15/05 04/15/05 04/15/05 04/16/05 04/16/05 04/16/05 04/19/05 04/19/05 04/20/05 04/20/05 04/20/05 1174 1175 1176 1177 1178 1179 1180 1181 1182 1183 1184 1185 1186 1187 1188 1189 1190 1191 1192 1193 1194 1195 1196 1197 04/22/05 04/13/05 1173 1203 04/12/05 1172 04/22/05 04/12/05 1171 04/21/05 04/11/05 1170 1202 04/09/05 1169 1201 04/09/05 1168 04/21/05 04/09/05 1167 04/20/05 04/09/05 1166 1200 04/08/05 1165 1199 04/08/05 1164 04/20/05 04/08/05 1198 04/07/05 1163 Award Date 1162 # $70,610 $127,308 $82,250 $82,250 $6,515 $11,010 $42,300 $61,200 $173,500 $78,700 $78,700 $210 $4,850 $62,165 $24,968 $24,968 $24,976 $24,976 $377,603 $377,603 $6,327 $14,813 $29,795 $38,460 $54,300 $24,900 $48,200 $88,700 $88,700 $123,375 $123,375 $90,475 $90,475 $19,755 $4,000 $23,010 $89,976 $175,000 $94,000 $94,000 $992,215 $24,000 Total Value $70,610 $127,308 $82,250 $82,250 $6,515 $11,010 $42,300 $61,200 $173,500 $78,700 $78,700 $210 $4,850 $62,125 $24,968 $24,968 $24,976 $24,976 $377,603 $377,603 $6,327 $14,813 $29,795 $38,460 $54,300 $24,900 $48,200 $88,700 $88,700 $123,375 $123,375 $90,475 $90,475 $19,755 $4,000 $23,010 $89,976 $175,000 $94,000 $94,000 $992,215 $24,000 Obligated Value Iraqi Contractor - 2723 Iraqi Contractor - 2607 Agon Group International Agon Group International Soheil General Trading Iraqi Contractor - 1737 Soheil General Trading Galls Inc. Iraqi Contractor - 3082 Iraqi Contractor - 3233 Iraqi Contractor - 3233 Iraqi Contractor - 500 Iraqi Contractor - 3204 Iraqi Contractor - 1737 Iraqi Contractor - 1888 Iraqi Contractor - 1888 Soheil General Trading Soheil General Trading Iraqi Contractor - 2692 Iraqi Contractor - 2692 Iraqi Contractor - 892 Iraqi Contractor - 3215 Ultimak Iraqi Contractor - 2427 Iraqi Contractor - 2427 Iraqi Contractor - 2756 Iraqi Contractor - 3235 Iraqi Contractor - 3233 Iraqi Contractor - 3233 Agon Group International Agon Group International Agon Group International Agon Group International Iraqi Contractor - 142 Iraqi Contractor - 500 Rock Solid Solutions, Inc. Soheil General Trading Iraqi Contractor - 2705 Iraqi Contractor - 3233 Iraqi Contractor - 3233 Harris Corporation Iraqi Contractor - 2462 Contractor W914NS-05-M-9915/0/0 W914NS-05-M-1080/0/0 W914NS-05-A-0001/D0010/0 W914NS-05-A-0001/10/0 W914NS-05-M-1077/0/0 W914NS-05-M-9912/0/0 W914NS-05-M-1076/0/0 W914NS-05-M-1073/0/0 W914NS-05-M-1299/0/0 W914NS-05-A-0003/D0011/0 W914NS-05-A-0003/11/0 W914NS-05-M-1055/0/0 W914NS-05-M-1061/0/0 W914NS-05-M-9997/0/0 W914NS-05-A-0005/D0001/0 W914NS-05-A-0005/1/0 W914NS-05-A-0004/D0001/0 W914NS-05-A-0004/1/0 W914NS-05-D-9009/T0003/0 W914NS-05-D-9009/3/0 W914NS-05-M-9913/0/0 W914NS-05-M-1043/0/0 W914NS-05-M-1026/0/0 W914NS-05-M-1048/0/0 W914NS-05-M-1041/0/0 W914NS-05-M-1027/0/0 W914NS-05-M-1040/0/0 W914NS-05-A-0003/D0008/0 W914NS-05-A-0003/8/0 W914NS-05-A-0001/D0008/0 W914NS-05-A-0001/8/0 W914NS-05-A-0001/D0007/0 W914NS-05-A-0001/7/0 W914NS-05-M-1017/0/0 W914NS-05-M-1002/0/0 W914NS-05-M-1001/0/0 W914NS-05-M-1010/0/0 W914NS-05-M-1007/0/0 W914NS-05-A-0003/D0006/0 W914NS-05-A-0003/6/0 W914NS-05-M-9999/0/0 W914NS-05-M-9993/0/0 Contract Number 10 Ton Forklift Office Furniture Mixed Cargo And Trucks Mixed Cargo Miscellaneous Supplies Fire Fighting Equipment Cage Pallets, And Utility Cabinets Body Armor & Shipping Construct T-walls Ambulances And Trucks Ambulances And Leyland Trucks Transportation Office Supplies Furniture 3” Plus Gravel Dump Truck Loads Toiletries Kit Toiletries Toiletries Kit Toiletries Supplies Maintenance And Management For Utilities And Vehicles Furnishings And Cleaners Iraqna Subscription Optic Mount Motorpool Overhead Cover Bridge Fencing, Steel Plate And Concertina Wire Vehicle Armor For Pick-up Truck Planning Facility And Shoot House Improvements Vehicles And Transportation Nissan Cabstar Vehicle Transportation Pick-up Truck Pickup Truck Mixed Cargo Mixed Cargo Office Annex For Al Nasir Police Station Cranes And Trucks Install Fence At Mx Base, Taji, Iraq Computers, Phones And Supplies Renovate Medical Warehouse Bedding, Spare Parts, Misc. Military Equipment Miscellaneous Supplies And Bedding Shipping 400 Watt Hf Base Station Construct A Concrete Barrier Scope Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Competition Type PCO PCO PCO PCO JCCI PCO JCCI JCCI PCO JCCI JCCI JCCI PCO PCO JCCI JCCI JCCI JCCI JCCI JCCI PCO PCO PCO JCCI PCO JCCI PCO JCCI JCCI PCO PCO PCO PCO JCCI PCO PCO PCO PCO JCCI JCCI PCO JCCI Contracting Office n/a n/a n/a FFP FFP n/a FFP n/a FFP n/a FFP FFP CMATT FFP n/a FFP n/a FFP n/a n/a n/a FFP FFP FFP FFP CPATT FFP n/a FFP n/a FFP n/a FFP FFP FFP FFP CMATT FFP n/a n/a FFP CPATT Contract Type Appendix I - 32 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 04/22/05 04/22/05 04/22/05 04/23/05 04/23/05 04/23/05 04/23/05 04/23/05 04/23/05 04/23/05 04/23/05 04/24/05 04/24/05 04/24/05 04/24/05 04/24/05 04/24/05 04/25/05 04/25/05 04/25/05 04/25/05 04/25/05 04/25/05 04/25/05 04/26/05 04/26/05 04/26/05 04/26/05 04/26/05 04/26/05 04/26/05 04/26/05 04/26/05 04/26/05 04/27/05 04/27/05 04/28/05 04/28/05 04/28/05 04/28/05 04/28/05 04/28/05 04/29/05 04/30/05 1205 1206 1207 1208 1209 1210 1211 1212 1213 1214 1215 1216 1217 1218 1219 1220 1221 1222 1223 1224 1225 1226 1227 1228 1229 1230 1231 1232 1233 1234 1235 1236 1237 1238 1239 1240 1241 1242 1243 1244 1245 1246 1247 Award Date 1204 # $171,940 $16,552 $200 $4,296 $6,898 $14,396 $113,017 $995,450 $5,040 $156,600 $1,600 $14,000 $17,400 $21,440 $22,000 $22,500 $24,850 $60,000 $70,520 $134,750 $7,250 $11,700 $24,800 $40,000 $43,810 $90,000 $499,933 $805 $4,000 $8,525 $23,275 $82,250 $82,250 $350 $414 $5,000 $5,000 $12,600 $32,000 $91,520 $491,948 $3,270 $4,950 $13,450 Total Value $171,940 $16,552 $200 $4,296 $6,898 $14,396 $113,017 $995,450 $5,040 $156,600 $1,600 $14,000 $17,400 $21,440 $22,000 $22,500 $24,850 $60,000 $70,520 $134,750 $7,250 $11,700 $24,800 $40,000 $43,810 $90,000 $499,933 $805 $4,000 $8,525 $23,275 $82,250 $82,250 $350 $414 $5,000 $5,000 $12,600 $32,000 $91,520 $491,948 $3,270 $4,950 $13,450 Obligated Value Galls Inc. Iraqi Contractor - 3232 Danaher Tool Group, Easco T. Iraqi Contractor - 3206 Iraqi Contractor - 2770 Iraqi Contractor - 3232 Iraqi Contractor - 500 Iraqi Contractor - 2704 Iraqi Contractor - 3082 Iraqi Contractor - 152 Iraqi Contractor - 3233 Iraqi Contractor - 2715 TDI-Arms Inc. Iraqi Contractor - 3082 Laurus Systems Inc. Iraqi Contractor - 3207 Iraqi Contractor - 3221 Iraqi Contractor - 3210 Iraqi Contractor - 2568 Iraqi Contractor - 3232 Iraqi Contractor - 3082 Iraqi Contractor - 2173 Iraqi Contractor - 675 Iraqi Contractor - 3200 Iraqi Contractor - 1737 Tactical & Rescue Gear, Ltd. Iraqi Contractor - 3230 Iraqi Contractor - 609 Soheil General Trading Iraqi Contractor - 3221 Iraqi Contractor - 1590 Iraqi Contractor - 2637 Agon Group International Agon Group International Iraqi Contractor - 2746 Iraqi Contractor - 2723 Iraqi Contractor - 2427 Iraqi Contractor - 2427 Iraqi Contractor - 863 Iraqi Contractor - 2720 Iraqi Contractor - 675 Iraqi Contractor - 2605 Distagage.com/ Greg Detray Iraqi Contractor - 2688 Contractor W914NS-05-A-0006/0/0 W914NS-05-F-9072/0/0 W914NS-05-M-1130/0/0 W914NS-05-M-1131/0/0 W914NS-05-A-0006/D0002/0 W914NS-05-M-1126/0/0 W914NS-05-M-1132/0/0 W914NS-05-M-1129/0/0 W914NS-05-M-1125/0/0 W914NS-05-A-0003/12/0 W914NS-05-M-1099/0/0 W914NS-05-M-1121/0/0 W914NS-05-M-1111/0/0 W914NS-05-M-1124/0/0 W914NS-05-M-1052/0/0 W914NS-05-M-1119/0/0 W914NS-05-M-1120/0/0 W914NS-05-M-1118/0/0 W914NS-05-A-0006/1/0 W914NS-05-M-1112/0/0 W914NS-05-M-1115/0/0 W914NS-05-M-1109/0/0 W914NS-05-M-1106/0/0 W914NS-05-M-1108/0/0 W914NS-05-M-1105/0/0 W914NS-05-M-1110/0/0 W914NS-05-M-1081/0/0 W914NS-05-M-1098/0/0 W914NS-05-M-1095/0/0 W914NS-05-M-1101/0/0 W914NS-05-M-1097/0/0 W914NS-05-A-0001/DO011/0 W914NS-05-A-0001/11/0 W914NS-05-M-1094/0/0 W914NS-05-M-9985/0/0 W914NS-05-M-1048/0/P00001 W914NS-05-M-1048/0/1 W914NS-05-M-1090/0/0 W914NS-05-M-1092/0/0 W914NS-05-M-1091/0/0 W914NS-05-M-1089/0/0 W914NS-05-M-1088/0/0 W914NS-05-M-1086/0/0 W914NS-05-M-1082/0/0 Contract Number Move Trailers Tool Sets Sign Porta Johns Mobile Generator Furniture Office Supplies Helicopter Pad Construction Hygiene Kits Additional Funds For Existing BPA’s Printer Ribbons Rail Hand Guard For Ak-47 Project Qf1076 Battery Pack And Air Sampler For Batteries Modify Mercedes Truck Tent Move Nissan Bus T-wall Barriers Additional Funds For Existing BPA’s Install A 500kva Generator Internet Connection And Service Projector Auto Body And Paint Work For Three Vehicles Generator And Change Over Switch Flashlights, Weapon Flashlight Mounts Shower Trailers Renovation Of The Emergency Ip Team Building Paints Move And Install Guard Towers Furniture Installation Of A Fence And A Gate Trucks And Trailers To Al Kasik Training Base Ambulances Alterations Of Vests W/pockets & Pouch Field Supplies Increase Amount And Replace Sand Bags Include Sand Bags Into Contract Printing Services - Mi Student Courseware Install Laundry Facility Exercise Equipment Build Headquarters For For Military Intelligence Division Disto Plus Iron And Ironing Boards Ap300 Rino Gps Radio Scope Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open n/a Open Open Open Open Open Open Open Open n/a n/a Open Open Open Open Open Open Open Competition Type PCO PCO JCCI JCCI PCO PCO PCO PCO JCCI JCCI CMATT,KMTB JCCI JCCI PCO PCO JCCI JCCI PCO PCO JCCI PCO JCCI PCO JCCI PCO PCO JCCI JCCI PCO JCCI JCCI PCO PCO JCCI PCO JCCI JCCI JCCI JCCI PCO PCO JCCI PCO PCO Contracting Office FFP FFP CPATT FFP n/a CPATT CPATT FFP FFP FFP CMATT CPATT, CMATT FFP FFP CPATT CMATT CPATT FFP FFP FFP CMATT CMATT FFP CMATT CPATT FFP n/a CMATT FFP FFP FFP FFP FFP CMATT FFP n/a n/a CMATT FFP FFP FFP FFP CMATT FFP Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 33 05/03/05 05/04/05 05/04/05 05/04/05 05/04/05 05/04/05 05/04/05 05/04/05 05/04/05 1270 1271 1272 1273 1274 1275 1276 1277 1278 05/06/05 05/02/05 1269 1289 05/02/05 1268 05/06/05 05/02/05 1267 05/06/05 05/02/05 1266 1288 05/02/05 1265 1287 05/02/05 1264 05/05/05 05/01/05 1263 1286 05/01/05 1262 05/05/05 05/01/05 1261 05/05/05 05/01/05 1260 1285 04/30/05 1259 1284 04/30/05 1258 05/05/05 04/30/05 1257 05/05/05 04/30/05 1256 1283 04/30/05 1255 1282 04/30/05 1254 05/05/05 04/30/05 1253 1281 04/30/05 1252 05/05/05 04/30/05 1251 05/04/05 04/30/05 1250 1279 04/30/05 1280 04/30/05 1249 Award Date 1248 # $3,500 $51,460 $945,000 $8,343 $10,491 $15,120 $21,000 $107,700 $123,879 $142,800 $1,560 $6,000 $6,954 $12,816 $17,000 $19,375 $62,220 $556,906 $29,400 $22,000 $22,100 $23,200 $24,196 $30,381 $43,305 $36,000 $149,700 $277,500 $347,500 $275 $359 $750 $850 $1,200 $4,100 $4,771 $8,050 $9,740 $12,100 $15,415 $24,750 Total Value $3,500 $51,460 $945,000 $8,343 $10,491 $15,120 $21,000 $107,700 $123,879 $142,800 $1,560 $6,000 $6,954 $12,816 $17,000 $19,375 $62,220 $556,906 $29,400 $22,000 $22,100 $23,200 $24,196 $30,381 $43,305 $36,000 $149,700 $277,500 $347,500 $275 $359 $750 $850 $1,200 $4,100 $4,771 $8,050 $9,740 $12,100 $15,415 $24,750 Obligated Value Iraqi Contractor - 2597 Soheil General Trading Iraqi Contractor - 790 Iraqi Contractor - 3217 The Peavey Corporation Iraqi Contractor - 1765 Iraqi Contractor - 2570 Iraqi Contractor - 3233 EMW Golden Spectrum Engineering Co. (G.S.T.) Reep Dba Operational Support Services Soheil General Trading Iraqi Contractor - 2568 Iraqi Contractor - 500 Sprint Communication Company Iraqi Contractor - 2679 Iraqi Contractor - 2568 Soheil General Trading Agilent Technologies, Inc. Iraqi Contractor - 784 Iraqi Contractor - 863 Iraqi Contractor - 2570 Motorola Iraqi Contractor - 2715 Ultimak Iraqi Contractor - 3228 Iraqi Contractor - 2656 Iraqi Contractor - 3233 Iraqi Contractor - 2752 Iraqi Contractor - 2752 Iraqi Contractor - 2424 Iraqi Contractor - 3237 Iraqi Contractor - 429 Soheil General Trading Iraqi Contractor - 2424 Danish-jordan Company For Contracting, General Supply & Concrete Works Iraqi Contractor - 2727 Iraqi Contractor - 892 Iraqi Contractor - 3237 Iraqi Contractor - 675 Iraqi Contractor - 2720 Iraqi Contractor - 2462 Contractor W914NS-05-M-1188/0/0 W914NS-05-M-1185/0/0 W914NS-05-M-1189/0/0 W914NS-05-M-1182/0/0 W914NS-05-M-1184/0/0 W914NS-05-M-1180/0/0 W914NS-05-M-1181/0/0 W914NS-05-A-0003/D0015/0 W914NS-05-M-1174/0/0 W914NS-05-M-1179/0/0 W914NS-05-A-0007/0/P00001 W914NS-05-M-1168/0/0 W914NS-05-M-1165/0/0 W914NS-05-M-9909/0/0 W914NS-05-M-1166/0/0 W914NS-05-M-1167/0/0 W914NS-05-M-1169/0/0 W914NS-05-M-1171/QF-1161/0 W914NS-05-F-9073/0/0 W914NS-05-M-1164/0/0 W914NS-05-M-1157/0/0 W914NS-05-M-1155/0/0 W914NS-05-M-1150/0/0 W914NS-05-M-1151/0/0 W914NS-05-M-1123/0/0 W914NS-05-M-1156/0/0 W914NS-05-M-1192/0/0 W914NS-05-A-0003/D0013/0 W914NS-05-M-1146/0/0 W914NS-05-M-1147/0/0 W914NS-05-M-1139/0/0 W914NS-05-M-1140/0/0 W914NS-05-M-1141/0/0 W914NS-05-M-9959/0/0 W914NS-05-M-1136/0/0 W914NS-05-M-1143/0/0 W914NS-05-M-1148/0/0 W914NS-05-M-1135/0/0 W914NS-05-M-1137/0/0 W914NS-05-M-1144/0/0 W914NS-05-M-1142/0/0 W914NS-05-M-1233/0/0 Contract Number Jersey Barriers Furniture, Outlets And Power Strips Armored Mercedes Digital Scales Office Supplies Porta Johns Bottled Water Additional Funding For BPA It Services X-ray And Inspection System The Purpose Of This Mod Is To Change The Accounting Data Office Supplies Install Gate Vehicle Search Computer Supplies Phone Service Ymckk Color Ribbon Wood Test Booths Body Armor, Computers, Supplies Expensive Electronic Equipment Generator Service Printing Services: Moi Soldier Handbook Flash Lights Cables Tools Ultimak Optic Mount For The Ak-47 Office Supplies/ Appliances Engineering Support Services Additional Funding For BPA Transportation Transportation Air Compressor Battery And Paint Supplies Arm Bands Filing Cabinets Print Cartridges Counter Tent Repairs Printers And Cartridges Metal Detectors Office Supplies Printer Cartridges And Other Computer Supplies Diesel & Benzene Fuel Scope Open Open Open Open Open Open Open Open Open Open n/a Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Competition Type PCO JCCI PCO PCO PCO PCO PCO JCCI JCCI PCO PCO JCCI JCCI PCO JCCI JCCI JCCI PCO PCO PCO PCO JCCI JCCI PCO PCO JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI PCO JCCI JCCI PCO PCO JCCI JCCI Contracting Office CPATT CPATT CPATT FFP FFP FFP CPATT n/a FFP FFP n/a CMATT n/a PC2100 FFP CMATT FFP FFP FFP FFP CPATT CMATT n/a n/a CPATT & CMATT FFP FFP n/a CPATT CPATT CPATT CPATT FFP CPATT CPATT CPATT CMATT CMATT FFP CMATT FFP FFP Contract Type Appendix I - 34 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 05/14/05 05/14/05 05/15/05 05/15/05 1327 1328 1329 1330 05/12/05 1314 05/14/05 05/12/05 1313 1326 05/12/05 1312 05/14/05 05/12/05 1311 05/14/05 05/12/05 1310 1325 05/12/05 1309 1324 05/11/05 1308 05/14/05 05/11/05 1307 05/14/05 05/11/05 1306 1323 05/11/05 1305 1322 05/11/05 1304 05/14/05 05/11/05 1303 1321 05/10/05 1302 05/13/05 05/09/05 1301 05/13/05 05/09/05 1300 1320 05/08/05 1299 1319 05/08/05 1298 05/13/05 05/08/05 1297 1318 05/08/05 1296 05/13/05 05/07/05 1295 05/13/05 05/07/05 1294 1317 05/07/05 1293 1316 05/07/05 1292 05/13/05 05/07/05 1315 05/06/05 1291 Award Date 1290 # $495,000 $495,000 $13,500 $42,500 $66,643 $353,651 $498,000 $1,287,360 $2,750 $5,318 $15,000 $22,200 $25,000 $25,000 $5,500 $24,500 $24,928 $24,928 $39,068 $86,400 $1,500 $11,736 $16,000 $18,934 $20,400 $70,400 $8,851 $24,600 $24,928 $11,676 $39,000 $100,616 $142,546 $880 $6,402 $246,500 $246,500 $885,500 $1,460 Total Value $495,000 $495,000 $13,500 $42,500 $66,643 $353,651 $498,000 $1,287,360 $2,750 $5,318 $15,000 $22,200 $25,000 $25,000 $5,500 $24,500 $24,928 $24,928 $39,068 $86,400 $1,500 $11,736 $16,000 $18,934 $20,400 $70,400 $8,851 $24,600 $24,928 $11,676 $39,000 $100,616 $142,546 $880 $6,402 $246,500 $246,500 $885,500 $1,460 Obligated Value Iraqi Contractor - 1862 Iraqi Contractor - 1862 GTSI, INC. GTSI, INC. Iraqi Contractor - 3225 Iraqi Contractor - 3224 Iraqi Contractor - 2767 BDL Systems, Ltd. Iraqi Contractor - 798 PAE Government Systems, Inc. Iraqi Contractor - 497 Iraqi Contractor - 3237 Iraqi Contractor - 2715 Motorola Iraqi Contractor - 3237 Iraqi Contractor - 3237 Iraqi Contractor - 2705 Iraqi Contractor - 3221 OSS/Brian O. Remmey Operational Support Services Digital Connect Communications Iraqi Contractor - 2597 Iraqi Contractor - 2705 Soheil General Trading Iraqi Contractor - 3234 Soheil General Trading Motorola Motorola Soheil General Trading Soheil General Trading OSS/Brian O. Remmey JTSI Inc. Soheil General Trading Soheil General Trading Horiba Jobin Yvon, Inc. Iraqi Contractor - 3208 Reep Dba Operational Support Services Iraqi Contractor - 3233 Iraqi Contractor - 3233 Iraqi Contractor - 2372 Soheil General Trading Contractor W914NS-05-M-1266/0/0 W914NS-05-M-1226/0/0 W914NS-05-F-9076/0/P00001 W914NS-05-F-9076/0/1 W914NS-05-M-1212/0/0 W914NS-05-M-1225/0/0 W914NS-05-M-9928/0/1 W914NS-05-M-1204/0/0 W914NS-05-M-1228/0/0 W914NS-04-D-0133/8/0 W914NS-05-M-1221/0/0 W914NS-05-M-1223/0/0 W914NS-05-M-1246/0/0 W914NS-05-M-1224/0/0 W914NS-05-M-91239/0/0 W914NS-05-M-1220/0/0 W914NS-05-M-1217/0/0 W914NS-05-M-1216/0/0 W914NS-05-A-0007/D0004/0 W914NS-05-A-0007/4/0 W914NS-05-F-9079/0/0 W914NS-05-M-1218/0/0 W914NS-05-M-1210/0/0 W914NS-05-M-1208/0/0 W914NS-05-M-1214/0/0 W914NS-05-M-1207/0/0 W914NS-05-M-1211/0/0 W914NS-05-M-1211/0/0 W914NS-05-M-1205/0/0 W914NS-05-A-0004/2/0 W914NS-05-A-0007/D0003/0 W914NS-05-M-1193/0/0 W914NS-05-M-1197/0/0 W914NS-05-M-1199/0/0 W914NS-05-F-9075/0/0 W914NS-05-M-1183/0/0 W914NS-05-M-9482/0/1 W914NS-05-A-0003/DO0016/0 W914NS-05-A-0003/16/0 W914NS-05-M-1128/0/0 W914NS-05-M-1185/0/0 Contract Number Gmc Pick Up Trucks Pick-up Truck Incorporate The Correct Paying Information Correct Payment Information Cooler Boxes Junk Cars Used For Rescue Training Increase Performance Period And Force Protection Measures Bomb Disposal Nissan Pick-ups Firefighter Training Engineering Electrical Assessment Printer Supplies Provide All Equipment And Personnel To Clean 6 Miles Of Sewage Coax Cables Tactical Goggles Tactical Goggles Termite Treatment Tents City Repair Translated Panel Translated Panels Photographic Supplies Pumps, Cleaning Supplies, Safety Gear, Tools Window Shades Furniture Mattress Cover Furniture And Appliances Scratch Cards And Sat Phones Scratch Cards And Sat Phones Transport And Bid For Furniture And Support Equipment For Baghdad Police Station Toiletry Kits Translated Panel Internet Connectivity In NATO Annex B Fax Machines Furniture Forensic Light Source Satellite Package Add Clin 0013 Trucks Move Leyland Trucks Beds And Bed Supplies Office Supplies Scope Open Open n/a n/a Open Open n/a Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open n/a Open Open Open Open Competition Type PCO PCO JCCI JCCI JCCI PCO JCCI PCO JCCI JCCI PCO PCO PCO PCO PCO PCO PCO JCCI JCCI JCCI PCO JCCI JCCI PCO PCO JCCI JCCI JCCI PCO JCCI JCCI PCO JCCI PCO PCO JCCI PCO JCCI JCCI PCO JCCI Contracting Office n/a n/a n/a n/a CMATT IRMO/MOI n/a CMATT FFP n/a CPATT CPATT CMATT CPATT CMATT CMATT FFP CMATT n/a n/a FFP FFP FFP CPATT FFP CPATT FFP FFP CPATT CPATT n/a FFP FFP CMATT FFP CPATT n/a FFP FFP FFP CPATT Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 35 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/16/05 05/17/05 05/17/05 05/17/05 05/17/05 05/18/05 05/18/05 1343 1344 1345 1346 1347 1348 1349 1350 1351 1352 1353 1354 1355 1356 1357 1358 1359 1360 1361 1362 1363 1364 1365 1366 05/19/05 05/16/05 1342 1372 05/16/05 1341 05/19/05 05/16/05 1340 1371 05/16/05 1339 05/18/05 05/16/05 1338 05/18/05 05/16/05 1337 1370 05/16/05 1336 1369 05/16/05 1335 05/18/05 05/16/05 1334 1368 05/15/05 1333 05/18/05 05/15/05 1367 05/15/05 1332 Award Date 1331 # $1,447,850 $2,990,998 $5,100 $15,465 $70,817 $120,600 $189,500 $189,500 $10,895 $11,700 $200,000 $3,048,000 $3,280 $5,408 $7,000 $7,020 $8,200 $13,430 $20,000 $20,290 $24,000 $24,895 $24,928 $24,928 $27,000 $49,500 $415,000 $490,048 $900,168 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,550 $5,500 $9,000 Total Value $1,447,850 $2,990,998 $5,100 $15,465 $70,817 $120,600 $189,500 $189,500 $10,895 $11,700 $200,000 $3,048,000 $3,280 $5,408 $7,000 $7,020 $8,200 $13,430 $20,000 $20,290 $24,000 $24,895 $24,928 $24,928 $27,000 $49,500 $415,000 $490,048 $900,168 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,287,360 $1,550 $5,500 $9,000 Obligated Value Wamar lnternational, lnc Textron Iraqi Contractor - 2705 Iraqi Contractor - 2720 Iraqi Contractor - 2622 Reep Dba Operational Support Services Iraqi Contractor - 3082 Iraqi Contractor - 3082 Iraqi Contractor - 500 Iraqi Contractor - 1173 Iraqi Contractor - 3223 Soheil General Trading Soheil General Trading Iraqi Contractor - 500 Iraqi Contractor - 3214 Iraqi Contractor - 2715 Iraqi Contractor - 3220 Iraqi Contractor - 2173 Iraqi Contractor - 3203 Iraqi Contractor - 2738 Iraqi Contractor - 3216 Soheil General Trading OSS/Brian O. Remmey Operational Support Services Iraqi Contractor - 2678 Iraqi Contractor - 2462 Iraqi Contractor - 1862 Charles Kendall & Partners Ltd. Protective Communications Inc. PAE Government Systems, Inc. PAE Government Systems, Inc. PAE Government Systems, Inc. PAE Government Systems, Inc. PAE Government Systems, Inc. PAE Government Systems, Inc. PAE Government Systems, Inc. PAE Government Systems, Inc. PAE Government Systems, Inc. PAE Government Systems, Inc. Starcraft Iraqi Contractor - 2705 Iraqi Contractor - 3231 Contractor W914NS-05-M1254/0/0 W914NS-05-M-1285/0/0 W914NS-05-M-1281/0/0 W914NS-05-M-1283/0/0 W914NS-05-M-1289/0/0 W914NS-05-M-1288/0/0 W914NS-05-M-1255/0/0 W914NS-05-M1255/0/0 W914NS-05-M-9988/0/0 W914NS-05-M-1219/0/0 W914NS-05-M-1273/0/0 W914NS-05-M-1248/0/0 W914NS-05-M-1250/0/0 W914NS-05-M-1242/0/0 W914NS-05-M-1240/0/0 W914NS-05-M-1243/0/0 W914NS-05-M-1241/0/0 W914NS-05-M-1238/0/0 W914NS-05-M-1237/0/0 W914NS-05-M-1239/0/0 W914NS-05-M-1247/0/0 W914NS-05-M-1245/0/0 W914NS-05-A-0007/D0005/0 W914NS-05-A-0007/5/0 W914NS-05-M-1244/0/0 W914NS-05-M-1232/0/0 W914NS-05-M-1251/0/0 W914NS-05-M-1127/0/0 W914NS-05-M-1236/0/0 W914NS-05-D-0133/T0013/0 W914NS-05-D-0133/T0012/0 W914NS-05-D-0133/T0011/0 W914NS-05-D-0133/T0010/0 W914NS-05-D-0133/T0009/0 W914NS-04-D-0133/9/0 W914NS-04-D-0133/13/0 W914NS-04-D-0133/12/0 W914NS-04-D-0133/11/0 W914NS-04-D-0133/10/0 W914NS-05-M-1231/0/0 W914NS-05-M-1227/0/0 W914NS-05-M-1234/0/0 Contract Number Armored Vehicles Weapon Supplies Cement, Sand, Gravel, Water Tank Supplies Cameras Cultural Awareness Sessions Construct T-wall At Suleihk Baghdad Construct T-wall At Suleihk Baghdad Painting And Welding Supplies Furniture Barriers Computers Tools Supplies Patches Speakers And Speaker Supplies Construction Furniture Guard Tower Improvement Warehouse Shades Trailer Carpets, Ceiling, Conference Table And Office Chairs Translated Panel Translated Panels Supplies: Bunk Beds, Pillows, Wall Lockers, Mattresses Diesel Fuel And Benzene Trucks Supplies Satellite Solution For Communication Basic Recruit/firefighting Training Class #12 Basic Recruit/firefighting Training Class #12 Basic Recruit/firefighting Training Class #11 Basic Recruit/firefighting Training Class #10 Basic Recruit/firefighting Training Class #9 Firefighter Training Firefighter Training Firefighter Training Firefighter Training Firefighter Training Tactical Templates Janitorial Services Deliver And Setup 40’ Shipping Containers Scope Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Competition Type JCCI JCCI JCCI PCO PCO PCO JCCI JCCI PCO PCO JCCI JCCI JCCI JCCI JCCI PCO PCO PCO SVCO JCCI JCCI PCO JCCI JCCI PCO JCCI PCO PCO PCO JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI PCO JCCI PCO Contracting Office n/a n/a n/a CMATT CMATT CMATT FFP FFP FFP CPATT n/a n/a n/a FFP CMATT CMATT CMATT CMATT FFP CMATT FFP CPATT n/a n/a CMATT FFP n/a MOI CMATT n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a FFP CPATT Contract Type Appendix I - 36 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 05/19/05 05/19/05 05/19/05 05/19/05 05/19/05 05/19/05 05/19/05 05/19/05 05/19/05 05/19/05 05/20/05 05/20/05 05/20/05 05/20/05 05/20/05 05/20/05 05/20/05 05/21/05 05/21/05 05/21/05 05/21/05 05/21/05 05/21/05 05/22/05 05/22/05 05/22/05 05/23/05 05/23/05 05/23/05 05/23/05 05/23/05 05/24/05 05/24/05 05/24/05 05/24/05 05/24/05 05/24/05 05/24/05 05/24/05 05/24/05 05/25/05 05/25/05 1374 1375 1376 1377 1378 1379 1380 1381 1382 1383 1384 1385 1386 1387 1388 1389 1390 1391 1392 1393 1394 1395 1396 1397 1398 1399 1400 1401 1402 1403 1404 1405 1406 1407 1408 1409 1410 1411 1412 1413 1414 Award Date 1373 # $20,000 $1,040,000 $9,600 $13,585 $22,281 $179,548 $528,813 $710,800 $748,130 $994,950 $997,221 $1,200 $40,000 $123,250 $314,075 $534,282 -$7,650 -$7,650 $112,700 -$490,048 $1,424 $51,618 $118,500 $128,000 $152,000 $2,450 $5,840 $25,770 $153,580 $204,000 $396,380 $484,300 $5,500 $14,000 $24,600 $63,700 $97,875 $113,500 $139,987 $497,400 $996,170 $1,447,850 Total Value $20,000 $1,040,000 $9,600 $13,585 $22,281 $179,548 $528,813 $710,800 $748,130 $994,950 $997,221 $1,200 $40,000 $123,250 $314,075 $534,282 -$7,650 $112,700 -$490,048 $1,424 $51,618 $118,500 $128,000 $152,000 $2,450 $5,840 $25,770 $153,580 $204,000 $396,380 $484,300 $5,500 $14,000 $24,600 $63,700 $97,875 $113,500 $139,987 $497,400 $996,170 $1,447,850 Obligated Value Iraqi Contractor - 760 Iraqi Contractor - 3236 Iraqi Contractor - 899 Iraqi Contractor - 2723 Iraqi Contractor - 163 Aco Electronics Ltd Iraqi Contractor - 2727 Iraqi Contractor - 3082 Iraqi Contractor - 3082 Iraqi Contractor - 3082 Iraqi Contractor - 3082 Identification Data And Imaging Iraqi Contractor - 2771 Iraqi Contractor - 2597 Iraqi Contractor - 2709 B & H Foto and Electronics Iraqi Contractor - 784 Iraqi Contractor - 784 Iraqi Contractor - 1508 Charles Kendall and Partners Limited Blackhawk Products Group Iraqi Contractor - 2602 Iraqi Contractor - 3082 Iraqi Contractor - 3082 Iraqi Contractor - 1592 Iraqi Contractor - 2583 Iraqi Contractor - 3231 Smith Security Safes, Inc. Iraqi Contractor - 2740 Iraqi Contractor - 1888 Iraqi Contractor - 2770 Iraqi Contractor - 2621 Agon Group International Iraqi Contractor - 3213 Soheil General Trading Iraqi Contractor - 1765 Iraqi Contractor - 3231 Iraqi Contractor - 3082 Segovia Iraqi Contractor - 3082 Iraqi Contractor - 3082 Wamar lnternational, lnc Contractor W914NS-05-M-1257/0/0 W914NS-04-D-0122/12/0 W914NS-05-M-1325/0/0 W914NS-05-M-1282/0/0 W914NS-05-M-1321/0/0 W914NS-05-M-1312/0/0 W914NS-05-M-1316/0/0 W914NS-05-M-1324/0/0 W914NS-05-M-1323/0/0 W914NS-05-M-1252/0/0 W914NS-05-M-1320/0/0 W914NS-05-F-9080/0/0 W914NS-05-M-1318/0/0 W914NS-05-M-1256/0/0 W914NS-05-M-1319/0/0 W914NS-05-M-1134/0/0 W914NS-05-M-1164/0/P00001 W914NS-05-M-1164/0/1 W914NS-05-M-1293/0/0 W914NS-05-M-1127/0/1 W914NS-05-M-1287/0/0 W914NS-05-M-1313/0/0 W914NS-05-M-1315/0/0 W914NS-05-M-1314/0/0 W914NS-05-M-1311/0/0 W914NS-05-M-1307/0/0 W914NS-05-M-1305/0/0 W914NS-05-M-1054/0/0 W914NS-05-M-1303/0/0 W914NS-05-M-1304/0/0 W914NS-05-M-1302/0/0 W914NS-05-M-1308/0/0 W914NS-05-M-1286/0/0 W914NS-05-M-1292/0/0 W914NS-05-A-0004/D0002/0 W914NS-05-M-1301/0/0 W914NS-05-M-1300/0/0 W914NS-05-M-1297/0/0 W914NS-05-M-1253/0/0 W914NS-05-M-1295/0/0 W914NS-05-M-1298/0/0 W914NS-05-M-1254/0/0 Contract Number Cars Furniture And Office Supplies Armored Vehicles Vehicle Engineering Support Supplies Janitor Supplies Software And Software Training Cold Bottled Water Delivery Supply T-walls And Construct Towers Al-dora Pob Renovation Civil Works Commando Site 3 Force Protection Law Enforcement Close Up Kits Construct Training Range Furniture Bunk Beds And Bed Supplies Photographic Materials And Cameras Reduce Scope And Make Changes To Work Reduce Scope And Change SOW Tents, Covering, Flooring, Electricity, And Fixtures Cancel Purchase Order Emergency Medical Supply Roll Computers, Printers And Supplies T-wall And Jersey Barriers Construct T-walls Install Force Protection Fence Furniture Furniture Magnum Gun Safe Office Furniture Cots And Blankets Tents, Generators, And Furnishings Generators Supplies And Furniture Renovation Of 300 M Bern Toiletries Kit Materials And Services At Camp Solidarity Provide Meals And Water T-walls For Al-ameen Public Order Battalion Site Deliver And Install Fiber Optics Soil Barrier And Sewage System Rehabilitation Of Al-saidia Public Order Battalion Scope Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open n/a n/a Open n/a Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Competition Type PCO JCCI JCCI PCO JCCI JCCI JCCI PCO JCCI JCCI PCO PCO PCO PCO JCCI PCO JCCI JCCI JCCI PCO PCO PCO JCCI JCCI PCO JCCI JCCI PCO JCCI JCCI JCCI PCO JCCI JCCI JCCI JCCI JCCI PCO JCCI PCO PCO JCCI Contracting Office n/a CMATT FFP n/a CMATT FFP FFP CPATT FFP FFP FFP FFP FFP FFP CMATT FFP FFP n/a n/a CMATT n/a CMATT n/a FFP FFP FFP n/a CPATT n/a CMATT n/a CPATT FFP MOD FFP n/a n/a n/a FFP FFP FFP FFP Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 37 05/25/05 05/25/05 05/26/05 05/28/05 05/28/05 05/28/05 05/29/05 05/29/05 05/29/05 05/29/05 05/30/05 05/30/05 05/30/05 05/30/05 05/30/05 05/30/05 05/30/05 05/30/05 05/30/05 05/30/05 05/31/05 05/31/05 05/31/05 05/31/05 05/31/05 05/31/05 06/01/05 06/01/05 06/01/05 06/01/05 06/02/05 06/02/05 06/02/05 06/02/05 06/03/05 06/03/05 06/03/05 06/04/05 06/04/05 06/04/05 06/05/05 1416 1417 1418 1419 1420 1421 1422 1423 1424 1425 1426 1427 1428 1429 1430 1431 1432 1433 1434 1435 1436 1437 1438 1439 1440 1441 1442 1443 1444 1445 1446 1447 1448 1449 1450 1451 1452 1453 1454 1455 Award Date 1415 # $579,635 $5,953 $14,100 $97,292 $27,682 $200,571 $748,327 $8,748 $24,850 $54,780 $370,983 $56,250 $112,000 $145,500 $598,600 -$748,086 $4,200 $4,900 $33,500 $842,567 $842,567 $15,700 $20,000 $24,928 $24,928 $24,928 $24,928 $62,848 $78,170 $84,000 $400,000 $1,000 $15,415 $49,041 $130,000 $41,060 $59,700 $1,044,000 $189,000 $1,040 $2,700 Total Value $579,635 $5,953 $14,100 $97,292 $27,682 $200,571 $748,327 $8,748 $24,850 $54,780 $370,983 $56,250 $112,000 $145,500 $598,600 -$748,086 $4,200 $4,900 $33,500 $842,567 $842,567 $15,700 $20,000 $24,928 $24,928 $24,928 $24,928 $62,848 $78,170 $84,000 $400,000 $1,000 $15,415 $49,041 $130,000 $41,060 $59,700 $1,044,000 $189,000 $1,040 $2,700 Obligated Value AEY Inc. Iraqi Contractor - 2762 Iraqi Contractor - 2738 Iraqi Contractor - 1380 Trans Atlantic Gen Trdg & Contg Co.WLL Iraqi Contractor - 2723 American International Radio Ameco Iraqi Contractor - 116 Iraqi Contractor - 2773 Communication Specialists, Ltd Iraqi Contractor - 162 Iraqi Contractor - 2724 MAC International FZE Iraqi Contractor - 3211 MAC International FZE Iraqi Contractor - 2705 Iraqi Contractor - 784 Iraqi Contractor - 2677 Remotec Inc. Remotec Inc. C.D.S. Consultants Motorola OSS/Brian O. Remmey OSS/Brian O. Remmey Operational Support Services Operational Support Services Iraqi Contractor - 2748 Iraqi Contractor - 2724 Iraqi Contractor - 163 Anham Joint Venture Iraqi Contractor - 2705 Iraqi Contractor - 2720 P & G Chevrolet, Inc. Iraqi Contractor - 2610 Iraqi Contractor - 2652 Iraqi Contractor - 2597 Wamar lnternational, lnc Advanced Technology Iraqi Contractor - 3236 Iraqi Contractor - 2704 Contractor W914NS-05-M-1357/0/0 W914NS-05-P-0017/0/0 W914NS-05-P-0018/0/0 W914NS-04-M-9080/0/P00001 W914NS-05-P-0016/0/0 W914NS-05-P-0014/0/0 W914NS-05-P-0012/0/0 W914NS-05-M-1351/0/0 W914NS-05-M-1353/0/0 W914NS-05-M-1341/0/0 W914NS-05-P-0013/0/0 W914NS-05-P-0010/0/0 W914NS-05-M-1345/0/0 W914NS-05-M-1346/0/0 W914NS-05-M-1235/0/0 W914NS-04-D-0117/17/3 W914NS-05-P-0003/0/0 W914NS-05-P-0009/0/0 W914NS-05-M-1338/0/0 W914NS-05-F-9081/0/0 W914NS-05-F-9080/0/0 W914NS-05-M-1342/0/0 W914NS-05-M-1340/0/0 W914NS-05-A-0007/D0007/0 W914NS-05-A-0007/D0006/0 W914NS-05-A-0007/7/0 W914NS-05-A-0007/6/0 W914NS-05-P-0004/0/0 W914NS-05-M-1334/0/0 W914NS-05-P-0005/0/0 W914NS-05-P-0008/0/0 W914NS-05-M-1336/0/0 W914NS-05-M-1337/0/0 W56HZV-05-D-B108/1/0 W914NS-05-M-1339/0/0 W914NS-05-M-1332/0/0 W914NS-05-P-0002/0/0 W914NS-04-D-0121/7/0 W914NS-04-M-9226/0/P00001 W914NS-04-D-0122/DO0012/0 W914NS-05-M-1327/0/0 Contract Number Supplies: Bunk Beds, Pillows, Wall Lockers, Mattresses Communication Equipment Shelves, Security Doors Include Server Installation And Lan Maintenance To Existing Contract Wood Flooring And Tents Plumbing Supplies Radios And Equipment Lease 3 Diesel Generator Light Towers With Lamps International Housing Project Construct Latrine And Shower Facilities Radio Equipment Generators Sleep Tents Chevy Express 2005 Cargo Van Pick Up Trucks Change Schedule Of Supplies Air Conditioners Generator Iraqi Human Rights Handbook Assembly Of Various Machinery Optic Cables And Assembly Generators Install Uhf Repeater Translated Panel Translated Panel Translated Panels Translated Panels Furniture Repair & Renovate The 5th Ia Brigade Headquarters Shower Trailers Vehicle Maintenance Agreement Install Battery Chargers For Forklifts Printing Supplies Van Construct Vehicle Loading And Unloading Ramps Beds, Sheets, Safes T-walls, Weapon Clearing Barrels Armored Vehicles The Purpose Of This Mod Is To Incorporate Training In The Contract Supplies Or Services Brassards Scope Open Open Open n/a Open Open Open Open Open Open Open Open Open Open Open n/a Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open n/a Open Open Competition Type PCO JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI DCMA JCCI PCO JCCI JCCI JCCI JCCI JCCI Contracting Office MOI FFP FFP FFP FFP FFP FFP CPATT CPATT FFP n/a FFP CMATT FFP n/a n/a CMATT n/a CMATT FFP FFP FFP FFP n/a n/a n/a n/a FFP FFP FFP FFP CMATT CMATT FFP FFP CPATT FFP FFP n/a n/a CMATT Contract Type Appendix I - 38 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 07/10/05 07/12/05 07/13/05 07/13/05 1494 1495 06/21/05 1480 1493 06/20/05 1479 1492 06/20/05 1478 07/06/05 06/19/05 1477 07/06/05 06/18/05 1476 1491 06/18/05 1475 1490 06/16/05 1474 07/03/05 06/16/05 1473 07/02/05 06/15/05 1472 1489 06/14/05 1471 1488 06/14/05 1470 07/01/05 06/13/05 1469 1487 06/13/05 1468 07/01/05 06/12/05 1467 1486 06/11/05 1466 07/01/05 06/10/05 1465 06/30/05 06/09/05 1464 1485 06/08/05 1463 1484 06/08/05 1462 06/29/05 06/08/05 1461 1483 06/07/05 1460 06/24/05 06/07/05 1459 06/23/05 06/06/05 1458 1482 06/05/05 1481 06/05/05 1457 Award Date 1456 # $24,990 $576,550 $1,840 $14,500 $2,080 $3,750 $998,380 $636 $194,580 $1,022,760 $64,986 $473 $1,800 $8,917 $73,000 $20,500 $169,326 $2,500 $20,020 $25,000 $2,877 $3,294,649 $288,200 $21,000 $120,000 $460 $1,500 $84,000 $500,000 $27,000 $18,250 $13,700 $19,040 $129,000 $7,971 $22,000 $587,147 $8,900 $110,650 Total Value $24,990 $576,550 $1,840 $14,500 $2,080 $3,750 $998,380 $636 $194,580 $1,022,760 $64,986 $473 $1,800 $8,917 $73,000 $20,500 $169,326 $2,500 $20,020 $25,000 $2,877 $3,294,649 $288,200 $21,000 $120,000 $460 $1,500 $84,000 $500,000 $27,000 $18,250 $13,700 $19,040 $129,000 $7,971 $22,000 $587,147 $8,900 $110,650 Obligated Value Iraqi Contractor - 3414 Iraqi Contractor - 3082 Green Shield Limited Agon Group International Soheil General Trading Iraqi Contractor - 2621 Iraqi Contractor - 3082 Iraqi Contractor - 2756 Meek Manufacturing Company PAE Government Systems, Inc. Iraqi Contractor - 1747 Iraqi Contractor - 892 Galls Inc. Iraqi Contractor - 2621 Iraqi Contractor - 892 Iraqi Contractor - 2568 Qatar International Trading Company, Wll Lee Dynamics International Iraqi Contractor - 2568 Iraqi Contractor - 2738 Airosmith Aviation Services, Inc. West Coast Business Products, Inc. Iraqi Contractor - 2704 Parsons Iraqi Contractor - 2738 Iraqi Contractor - 892 BLP Iraqi Contractor - 3408 Haval Company Anham Joint Venture Data Entry Error Iraqi Contractor - 2705 Iraqi Contractor - 2724 Iraqi Contractor - 2765 Iraqi Contractor - 3434 London Bridge Trading Co., Ltd Iraqi Contractor - 2705 Iraqi Contractor - 2723 Iraqi Contractor - 2736 Baliistics Research, Inc. Contractor W914NS-05-M-1530/0/0 W914NS-05-M-1536/0/0 W914NS-05-M-1520/0/0 W914NS-05-A-0001/D0020/0 W914NS-05-M-1672/0/0 W914NS-05-M-1366/0/0 W914NS-05-F-1463/0/0 W914NS-05-M-9883/0/P00003 GS-27F-0009J/W914NS-05-F9089/0 W914NS-05-F-0133/T0014/0 W914NS-05-F-1458/0/0 W914NS-05-M-1454/0/0 GS-07F-0157M/W914NS-05-F9090/0 W914NS-05-M-1448/0/0 W914NS-05-M-1443/0/0 W914NS-05-M-1438/0/0 W914NS-05-M-1437/0/0 W914NS-05-M-1431/0/0 W914NS-05-M-1429/0/0 W914NS-05-P-1424/0/0 W914NS-05-M-1398/0/0 W914NS-05-M-1416/0/0 W914NS-05-M-1393/0/0 W914NS-04-D-0015/30/0 W914NS-05-M-1399/0/0 W914NS-05-M-1400/0/0 W914NS-05-M-1376/0/0 W914NS-05-M-1395/0/0 W914NS-05-M-1391/0/0 W914NS-05-M-1387/0/0 W914NS-05-M-1382/0/0 W914NS-05-M-1361/0/0 W914NS-05-M-1358/0/0 W914NS-05-M-1359/0/0 W914NS-05-M-1374/0/0 W914NS-05-M-1367/0/0 W914NS-05-M-1373/0/0 W914NS-05-M-1364/0/0 W914NS-05-M-1355/0/0 W914NS-05-M-1177/0/0 Contract Number Children’s Magazine Commando Site 11 Gun Safe Flatbed Trailers School Supplies Portable Generators Commando Site 8 Change The Accounting Data To 2004 1096.0103 Inspection Mirror Pre Screening Program Provide Cold Bottled Water Forklifts Training Gun Fuel Tank Tools T-walls And Clearing Barrels T-walls And Jersey Barriers Carpentry And Woodwork Shop Repairs Sewing Materials Parts, Tools, Etc. Life Vests Furniture And Office Items For Department Of Border Enforcement Steel Doors And Windows Containers Repair Door Renovation Of The Maintenance Building Repair Of Ministry Of Interior Vehicles Heating And Cooling Units Engineer Payment Showers Office And Recreational Supplies Generators And Preventetive Maintenance Vests Concrete Pads Miscellaneous Electrical & Hvac Material Range Signs, And Inspections Dprs Dp-05 Systems Scope Open Open Open Open n/a Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open SMALL BUSINESS Open Open Open Open Open Open Open Open Open Competition Type DCMA JCCI DCMA PCO n/a DCMA JCCI PCO JCCI JCCI JCCI JCCI JCCI JCCI DCMA JCCI JCCI JCCI JCCI DCMA DCMA JCCI JCCI CPA JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI JCCI PCO Contracting Office FFP FFP n/a n/a n/a FFP FFP n/a FFP n/a CPATT FFP FFP FFP FFP FFP FFP FFP FFP FFP FFP CPATT CPATT n/a FFP FFP n/a FFP FFP FFP FFP FFP FFP FFP CPATT FFP FFP CMATT FFP FFP Contract Type Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress Appendix I - 39 08/08/05 08/17/05 08/19/05 08/20/05 08/22/05 08/25/05 08/25/05 08/29/05 09/02/05 09/05/05 09/05/05 09/06/05 09/06/05 09/08/05 09/08/05 09/11/05 09/11/05 09/13/05 09/13/05 09/14/05 09/15/05 1508 1509 1510 1511 1512 1513 1514 1515 1516 1517 1518 1519 1520 1521 1522 1523 1524 1525 1526 1527 1528 09/29/05 08/06/05 1507 09/26/05 08/03/05 1506 1534 07/23/05 1505 1533 07/23/05 1504 09/26/05 07/22/05 1503 1532 07/21/05 1502 09/24/05 07/19/05 1501 1531 07/19/05 1500 09/23/05 07/16/05 1499 1530 07/16/05 1498 09/19/05 07/15/05 1497 1529 07/14/05 Award Date 1496 # $46,620 $22,900 $34,800 $16,821 $980,400 $7,903 $129,000 $7,605 $330,915 $38,216 $53,000 $202,200 $360,000 $389,368 $1,460 $1,925 $320,000 $752,277 $62,400 $117,000 $69,825 $5,691 $2,100 $293,831 $127,182 $707 $4,175 $945,930 $65,807 $37,182 $100,826 $350 $456,050 $60,000 $22,750 Total Value $46,620 $22,900 $34,800 $16,821 $980,400 $7,903 $129,000 $14,000 $7,605 $330,915 $38,216 $53,000 $202,200 $360,000 $389,368 $1,460 $1,925 $320,000 $752,277 $62,400 $117,000 $69,825 $5,691 $2,100 $293,831 $127,182 $707 $4,175 $945,930 $65,807 $37,182 $100,826 $350 $456,050 $60,000 $22,750 Obligated Value Iraqi Contractor - 3452 Global Link Distribution LLC Soheil General Trading Iraqi Contractor - 1173 Global Link Distribution LLC Iraqi Contractor - 3493 C.d.s. Consultants Iraqi Contractor - 2723 Iraqi Contractor - 2770 SAIC Iraqi Contractor - 2723 Iraqi Contractor - 152 Iraqi Contractor - 2770 Iraqi Contractor - 3450 Whitley, Bradlee And Brown, Inc. Whitley, Bradlee And Brown, Inc. Iraqi Contractor - 2723 Soheil General Trading Iraqi Contractor - 3502 Leica Microsystems Iraqi Contractor - 1737 Iraqi Contractor - 3483 Bob Barker Company I Comport Inc. Iraqi Contractor - 3493 Soheil General Trading Acuity Solutions Iraqi Contractor - 2679 Iraqi Contractor - 3493 Iboats Incom Galls Inc. Iraqi Contractor - 3082 Iraqi Contractor - 268 Iraqi Contractor - 268 American Science and Engineering Inc. Iraqi Contractor - 3430 Iraqi Contractor - 3431 Iraqi Contractor - 3424 Iraqi Contractor - 116 Contractor W914NS-05-M-1896/0/0 W914NS-05-M-1883/0/0 W914NS-05-M-1882/0/0 W914NS-05-M-1872/0/0 W914NS-05-M-1857/0/0 W914NS-05-M-1836/0/0 W914NS-05-M-1834/0/0 W914NS-05-M-1364/0/P00003 W914NS-05-A-0008/0001/00001 W914NS-05-F-9106/0/0 W914NS-05-P-0014/0/00001 W914NS-05-M-1838/0/0 W914NS-05-A-0008/0/00003 W914NS-05-M-1771/0/0 W914NS-05-M-1751/0/00001 W914NS-05-M-1751/0/0 W914NS-05-M-1814/0/0 W914NS-05-M-1812/0/0 W914NS-05-M-1800/0/0 W914NS-05-F-9105/0/0 W914NS-05-M-1764/0/0 W914NS-05-M-1765/0/0 W914NS-05-M-1776/0/0 W914NS-05-M-1737/0/0 W914NS-05-F-9098/0/00001 W914NS-05-M-1714/0/0 W914NS-05-M-1620/0/0 W914NS-05-1167/0/001 W914NS-05-F-9098/0/0 W914NS-05-M-1471/0/0 W914NS-05-M-1596/0/0 W914NS-05-M-1589/0/0 W914NS-05-M-1576/0/0 W914NS-05-M-1549/0/0 W914NS-05-M-1575/0/0 W914NS-05-M-1564/0/0 W914NS-05-M-1552/0/0 W914NS-05-M-1551/0/0 W914NS-05-M-1353/0/2 Contract Number Construct Iraqi Scout Platoon Compound 40’ Connex Boxes. Delivery And Crane Operator To Offload. Adult Size Military Sleeping Bag. Military Sleeping Cots. Military Sleeping Mats. Commercial Dining Table And Chairs. Repair Parts Recovery At Tami Iaw Radar Systems Septic Vacuum Truck Increase Total Contract Award Amount From $587,147.72 To $601,147.42 Contract Mod Portable Surveillance System W/ Maintenance Renovate Plumbing In Ing Dorms Furniture Contract Mod Khaki Uniforms Change Req Number Ethics Training For Iraqi Soldiers Paints And Brushes NATO College Supplies Worldwide Linguist Support Services Microscopes Potable Water Benzene And Diesel 50 Gun Lockers NATO Supplies Finance Contract Mod Supplies For The Setup Of A Department Of Border Enforcement Academy Located At Al Kut. Copiers The Purpose Of This Is To Correct The Requisition Number And The Line Of Accounting: Req No: A0029-5121-f002 21 4 1096.0103 71-2089p12230.00 83 9acc A0029-5121-f002 9acc 83 S09076 River Patrol Boats Misc. Boating Equipment Lockers River Police Hq Renovation River Boat Parts Testing Supplies Backscatter Repairs Barber Services Force Protection Tents Rescind Mod 1, Change Fund Code, Incorporate Funding And Change Statement Of Work Scope n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Open RFQ n/a unrestricted n/a Open RFQ n/a Open RFQ n/a Open Open RFQ RFQ UNRESTRICTED n/a n/a n/a Open n/a Open Open Open Open Open Open Open Open Open Open n/a Competition Type JCCI JCCI JCCI JCCI JCCI JCCI n/a JCCI n/a n/a PCO JCCI n/a n/a n/a n/a JCCI JCCI n/a JCCI n/a JCCI n/a JCCI n/a n/a JCCI n/a JCCI JCCI JCCI JCCI DCMA DCMA DCMA DCMA JCCI DCMA JCCI Contracting Office n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a FFP n/a n/a n/a FFP w/NTE clin n/a FFP n/a FFP w/NTE clin FFP w/NTE clin FFP n/a n/a n/a n/a FFP n/a FFP n/a CPI FFP FFP n/a CPATT FFP FFP CPATT CPATT Contract Type Appendix I - 40 Special Inspector General for Iraq Reconstruction October 30, 2005 Report to Congress 09/29/05 09/30/05 09/30/05 10/05/05 10/06/05 n/a n/a n/a n/a n/a n/a n/a n/a 1536 1537 1538 1539 1540 1541 1542 1543 1544 1545 1546 1547 Award Date 1535 # -$6,000,000 $23,750 $655,978 $747,000 $3,439,668 $7,549,666 $64,368,328 $4,475,150 $135,545 $12,200 $15,975 Total Value -$6,000,000 $23,750 $655,978 $747,000 $3,439,668 $7,549,666 $64,368,328 $4,475,150 $135,545 $12,200 $15,975 Obligated Value Symbolarts International Resources Group Agon Group International SATCO Iraqi Contractor - 201 Iraqi Contractor - 2720 FluorAMEC LLC Earth Tech, Inc. Point Blank Body Armor Advanced Technology Iraqi Contractor - 1280 Iraqi Contractor - 1380 Laser Data Command Contractor W91150-05-M-9031/0/P00002 EMT-C-00-03-00007/0/10 W914NS-05-M-1194/0/0 W914NS-05-C-9010/0/P00001 W914NS-05-C-9005/0/0 W914NS-04-D-0102/0001/0 W914NS-04-D-0008/3/0 FA8903-04-D-8671/TBD/M0002 GS-07F-8942D/W91GY0-06-F0001/0 W91GY0-06-M-0006/0/0 W914NS-05-M-1900/0/0 W914NS-04-M-9080/0/00002 W914NS-05-M-1865/0/0 Contract Number Change Contractor Details Support Usaid In The Overall Planning, Monitoring, Management, And Reporting On Reconstruction Activities Ford Explorer Increase Monthly Man Days And Total Price Adnon Palace Basement Base Camp Life Support New Water Supply System Renovate An Numaniyah Military Base Body Armor 1 Year Internet Service Delivery And Installation Of One Caravan, 3 Bathrooms, 3 Showers, And 2 Sinks Contract Mod Id Cards Scope n/a Competitive Open n/a Open Competitive Open n/a n/a Open RFQ n/a n/a Open RFQ Competition Type PCO USAID PCO PCO PCO CPA CPA DCMA n/a JCCI JCCI JCCI JCCI Contracting Office n/a CPFF CPATT n/a n/a FFP FFP CPFF n/a FFP n/a n/a FFP Contract Type