Office of Financial Management Washington State Major Project Status Report June 30, 2007 Agency Number: 699 Agency: St. Bd. for Comm. & Tech. Colleges Project Number: 04-1-310 School/Campus: Seattle Central Community College Project Title: Broadway Edison Student Services Renovation Bill References: 26-03X-800 (5) (f), 488-05-778 Contact: George Gary 206.587.4193 gegary@sccd.ctc.edu Project Description: The Student Services program renovation project located on the first floor of the Broadway Edison Building is complete and now provides the student centered delivery of services envisioned for the project. The project has addressed the following elements: Created a primary entrance for the College that will improve access to Student Services, particularly for those students who are new to the College. Relocated and redesigned Student Services offices to reflect our current intake processes and more efficiently and effectively serve students Removed non-student services offices from Registration in order to decrease congestion while allocating additional space for Student Services where appropriate. Installed walls and/or doors where appropriate, including Admissions and Advising, to secure confidential documents governed by the Family Education Rights and Privacy Act and to protect costly state equipment from possible vandalism or theft when these offices are closed but other offices within the suite remain open Provided wheelchair access between all offices in the Student Services suite Turned an unused college stair space into usable office space Removed the wall between Registration and Financial Aid and reallocated some Registration space to Financial Aid, building a new fireproof vault for permanent Registration records and files Replaced the aging and malfunctioning HVAC system to provide healthy air quality, increase staff productivity, decrease absenteeism and illness, and, in general, improve the student services area environment. Improved the security and safety by area reconfiguration and the installation of electronic surveillance equipment. Improved way finding through the use of graphics and services’ placement and reconfiguration of public access corridor. Integration of cashiering and student services functions. Square Feet: 32,000 GSF Seattle Central Stu Svs Ren JUN 2007 MPSR.doc 1 Scope Changes: None Project Total Cost: Phase Predesign Design Biennium 2003-05 2003-05 Appropriation G42 – Fund 057 G42 – Fund 057 Construction* 2003-05 2005-07 2003-05 2003-05 2003-05 G42 – Fund 057 College Local Fund 147 G42 – Fund 057 G42 – Fund 057 G42 – Fund 057 Equipment Art Commission Other Amount 44,550 500,250 3,834,121 400,000 492,500 18,500 105,879 5,395,800 Total * MACC = $4,367,101 Schedule: Predesign Complete Start Design Bid Date Notice to Proceed 50% Complete Substantial Completion Final Acceptance Budget Schedule 01/2004 09/2004 10/2004 03/2005 09/2005 10/2005 Actual/Forecast 06/2004 09/2004 06/2005 07/2005 11/2005 06/2006 07/2006 Variance (wks) 33 37 36 33 36 37 Project Status and Discussion of Critical Path for Construction: The project and close out process is complete. The phased return of the various Student Services departments from their temporary location to their newly renovated space was accomplished over the summer with full occupancy and service delivery in place for the start of fall quarter 2006. Seattle Central Stu Svs Ren JUN 2007 MPSR.doc 2 Contract Award History: A/E Agreement Original Agreement Amendments* Pending Changes Total Current Design Contingency Construction Contract (excl. sales tax) Bid Award Amount $ 4,367,101.00 Change Orders $ 370,589.26 Pending Changes $ Total $ 4,737,690.26 Current Construction Contingency $ - $ 305,100.00 $ 332,709.55 $ $ 637,809.55 $ - * Amendments include construction & completion phases of basic design services. Potential for Project Cost Overruns/Claims: As anticipated, construction cost escalation resulted in a higher MACC than originally estimated. Local funds were utilized to address the escalation. Asbestos and other hazardous material testing was conducted and any incidences addressed. Discussion of Project Quality: Sustainable design elements and energy conservation measures (as required in compliance with Section 918 of the 2001-03 capital appropriation) were incorporated into this project. The renovated areas will provide more efficient and sustainable space, incorporating equipment and lighting upgrades, to enhance the learning environment and better serve the needs of the students and of the college. Security and safety issues were also addressed via the incorporation of new key and access systems, electronic surveillance installations, and way finding signage. Project Diagrams/Photographs: Please see following page photos showing interior space of the completed project Please go to next page Seattle Central Stu Svs Ren JUN 2007 MPSR.doc 3 Above & below, the Registration/Admissions/Financial Aid/Cashiering Center (RAFACC). Seattle Central Stu Svs Ren JUN 2007 MPSR.doc 4 Counseling & Transfer Center. Testing Center. Career Center. Seattle Central Stu Svs Ren JUN 2007 MPSR.doc 5 The following 8 photos are various views of the Main (south Broadway) entrance. Above & below: Views of Information & Community Education Center. Seattle Central Stu Svs Ren JUN 2007 MPSR.doc 6 Project art work at left. Entrance to Library. Seattle Central Stu Svs Ren JUN 2007 MPSR.doc 7 View south from mezzanine towards the Buzz located at main entrance. The BUZZ: Espresso service and the Culinary Arts Academy’s bakery retail outlet. Seattle Central Stu Svs Ren JUN 2007 MPSR.doc 8 Above & below: Views north towards student study area and Tutoring Center. Seattle Central Stu Svs Ren JUN 2007 MPSR.doc 9 Mezzanine student study area with Tutoring Center at right. Please go to next page Seattle Central Stu Svs Ren JUN 2007 MPSR.doc 10 Above & below: Looking south & north down “Main Street” in front of Student Services. Seattle Central Stu Svs Ren JUN 2007 MPSR.doc 11