699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000117 Project Title: Bellingham Technical College: Fisheries Program Description Starting Fiscal Year: Project Class: Agency Priority: 2010 Program 0 Project Summary Reappropriation request. Project Description Reappropriation request. Location City: Bellingham County: Whatcom Legislative District: 042 Project Type New Facilities/Additions (Major Projects) Growth Management impacts No impacts anticipated. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Account Title State Bldg Constr-State Total Estimated Total Prior Biennium 2,000,000 2,000,000 0 Current Biennium Reapprops 187,000 1,813,000 187,000 1,813,000 New Approps 0 Future Fiscal Periods 057-1 State Bldg Constr-State Total 2015-17 2017-19 2019-21 2021-23 0 0 0 0 FY 1 FY 2 FY 3 FY 4 0.9 0.9 0.9 0.9 Operating Impacts No Operating Impact Acct Code FTE Account Title Full Time Employee FY 0.9 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20062699 Project Title: Clover Park Technical College: Allied Health Care Facility Description Starting Fiscal Year: Project Class: Agency Priority: 2006 Program 0 Project Summary Reappropriation request. Project Description Reappropriation request. Location City: Lakewood County: Pierce Legislative District: 028 Project Type New Facilities/Additions (Major Projects) Growth Management impacts No impacts anticipated. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Account Title State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 22,454,000 1,552,000 4,187,000 16,715,000 22,454,000 1,552,000 4,187,000 16,715,000 Future Fiscal Periods 057-1 State Bldg Constr-State Total Operating Impacts No Operating Impact 2015-17 2017-19 2019-21 2021-23 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000973 Project Title: Green River: Student Life Replacement Project Description Starting Fiscal Year: Project Class: Agency Priority: 2014 Program 0 Project Summary Student life replacement spaces will include the bookstore, food service operations, meeting rooms and staff spaces for student government, intramurals, recreation, conference services, and athletics. New space will be added to include a fitness center. Project Description Reasons for acquisition and how this project relates to the college’s facilities master plan, the strategic plan, and institutional goals: The Facility Master Plan (FMP) is an integrated, college-wide strategic, institutional, instructional, student service, and facilities planning process launched in 2001. The FMP is updated every two years to reflect current conditions and provide the planning tools needed to respond to state-wide, institutional and community needs. The Lindbloom Student Center (LSC) is intended to provide Student Services, Instructional, and Student Life support to Green River Community College students. However, the 36 year-old building is beyond life cycle, overcrowded, and poorly configured to meet growing program needs. The college’s Strategic Plan includes a goal that states: “The citizens of Washington will be ensured of Green River’s consistent practice of responsible fiscal stewardship and public accountability.” This Student Life replacement project is consistent with and supports this goal. This project is also a key element in the college’s Facilities Master Plan Schedule which sequences the major renovation and replacement of campus facilities. The college’s Instructional and Student Services Plan calls for appropriate and maximum utilization of available space. The implementation of this project will allow the college to continue to respond to significant student demand. The inability of the LSC to support Student Life activities resulted in a vote by the student body in May 2007 for a self-imposed fee to replace the Student Life portion of the facility in 2013. The collected fees will fund the design and permit phase as well as a portion of the debt service on a 20 year COP. Economic Analysis: This projects is expected to create 168 construction jobs and 170 indirect jobs for a total of 338 jobs during construction. The taxpayers net short-run investment is $15,200,000 dollars for a long-run return of $21,400,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Auburn Project Type New Facilities/Additions (Major Projects) County: King Legislative District: 047 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000973 Project Title: Green River: Student Life Replacement Project Description Growth Management impacts No impacts anticipated. Yes New Facility: How does this fit in master plan The Facility Master Plan (FMP) is an integrated, college-wide strategic, institutional, instructional, student service, and facilities planning process launched in 2001. The FMP is updated every two years to reflect current conditions and provide the planning tools needed to respond to state-wide, institutional and community needs. The Lindbloom Student Center (LSC) is intended to provide Student Services, Instructional, and Student Life support to Green River Community College students. However, the 36 year-old building is beyond life cycle, overcrowded, and poorly configured to meet growing program needs. The college’s Strategic Plan includes a goal that states: “The citizens of Washington will be ensured of Green River’s consistent practice of responsible fiscal stewardship and public accountability.” This Student Life replacement project is consistent with and supports this goal. This project is also a key element in the college’s Facilities Master Plan Schedule which sequences the major renovation and replacement of campus facilities. The college’s Instructional and Student Services Plan calls for appropriate and maximum utilization of available space. The implementation of this project will allow the college to continue to respond to significant student demand. Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 147-6 HE Plant Accounts-Non-Appropriated COP-6 Certificate of Part-Non-Appropriated Total Prior Biennium Current Biennium Reapprops 13,501,000 15,000,000 13,501,000 15,000,000 28,501,000 0 0 0 Future Fiscal Periods 147-6 HE Plant Accounts-Non-Appropriated COP-6 Certificate of Part-Non-Appropriated Total 2015-17 2017-19 2019-21 2021-23 0 0 0 0 Schedule and Statistics Start Date New Approps End Date 28,501,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000973 Project Title: Green River: Student Life Replacement Project Schedule and Statistics Start Date End Date 11/01/2011 05/01/2012 Design 6/1/2012 6/1/2013 Construction 9/1/2013 2/1/2015 Predesign Total Gross Square Feet: 60,100 Usable Square Feet: 44,100 Efficiency: 73.4% 292 Escalated MACC Cost per Sq. Ft.: Construction Type: College Classroom Facilities Is this a remodel? No A/E Fee Class: B A/E Fee Percentage: 7.20% Cost Summary Acquisition Costs Total Consultant Services Pre-Schematic Design Services Escalated Cost % of Project 400,000 1.4% 60,000 0.2% Construction Documents 898,512 3.2% Extra Services 841,500 3.0% Other Services 752,515 2.6% Design Services Contingency 238,509 0.8% 2,791,036 9.8% 1,664,187 5.8% Consultant Services Total Maximum Allowable Construction Cost(MACC) Site work Related Project Costs Facility Construction GCCM Risk Contingency GCCM or Design Build Costs Construction Contingencies Non Taxable Items Sales Tax Construction Contracts Total Equipment Equipment Non Taxable Items 17,542,242 0 0.0% 15,878,055 55.7% 0 0.0% 0 0.0% 3,157,604 11.1% 0 0.0% 1,966,485 6.9% 22,666,331 79.5% 1,661,421 5.8% 0 0.0% 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000973 Project Title: Green River: Student Life Replacement Project Cost Summary Equipment Sales Tax Escalated Cost % of Project 157,835 0.6% 1,819,256 6.4% 87,711 0.3% Other Costs Total 196,568 0.7% Project Management Total 540,000 1.9% Equipment Total Art Work Total Grand Total Escalated Costs 28,500,902 Rounded Grand Total Escalated Costs 28,501,000 Operating Impacts No Operating Impact 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000118 Project Title: Lower Columbia College: Myklebust Gymnasium Description Starting Fiscal Year: Project Class: Agency Priority: 2010 Program 0 Project Summary Reappropriation request. Project Description Reappropriation request. Location City: Longview County: Cowlitz Legislative District: 019 Project Type New Facilities/Additions (Major Projects) Growth Management impacts No impacts anticipated. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Account Title State Bldg Constr-State Total Estimated Total Prior Biennium 2,000,000 2,000,000 0 Current Biennium Reapprops 173,000 1,827,000 173,000 1,827,000 Future Fiscal Periods 057-1 State Bldg Constr-State Total Operating Impacts No Operating Impact 2015-17 2017-19 2019-21 2021-23 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program Description Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 0 Project Summary Minor Works - Program Project Description Every community and technical college has serious facility conditions, lacks space and needs to renovate or upgrade program areas. These minor works projects are needed to keep space relevant for student needs, meet changing program requirements and upgrade equipment to provide an adequate educational environment. Location City: Statewide County: Statewide Legislative District: 098 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 060-1 Account Title State Bldg Constr-State Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium 20,000,000 20,000,000 0 Current Biennium Reapprops 4,022,000 15,978,000 4,022,000 15,978,000 Future Fiscal Periods 057-1 060-1 State Bldg Constr-State Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 2015-17 2017-19 2019-21 2021-23 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program Operating Impacts SubProjects SubProject Number: 30000675 SubProject Title: Peninsula College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Remodel bldg. creating a new defined entry, two new offices, updated laundry area, and reconfig. men's restroom. $418,300 Location City: Port Angeles County: Clallam Legislative District: 024 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000675 SubProject Title: Narrative Peninsula College No new square footage. SubProject Number: 30000676 SubProject Title: Grays Harbor College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Telecommunications infrastructure - provide a permanent ductbank link from Building 1500 to the new SMArt Building $471,000 Location City: Aberdeen County: Grays Harbor Legislative District: 019 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000676 SubProject Title: Operating Impacts Grays Harbor College No Operating Impact Narrative No new square footage. SubProject Number: 30000677 SubProject Title: Olympic College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works Program Project Description Renovate old Health Occupations Bldg. and convert the space to general classrooms. $605,200 Location City: Bremerton County: Kitsap Legislative District: 023 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000677 SubProject Title: Olympic College Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total 0 0 0 0 Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000678 SubProject Title: Skagit Valley College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 0 Project Summary Minor Works - Program Project Description Interim minor improvements to wiring, plumbing, HVAC, and interior surfaces pending major renovation or replacement. $593,000 Location City: Mount Vernon County: Skagit Legislative District: 040 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000678 SubProject Title: Skagit Valley College Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total 0 0 0 0 Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000679 SubProject Title: Everett Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 0 Project Summary Minor Works - Program Project Description Rainier - Replace boiler; Shucksan - Replace DDC and HVAC systems; Greenhouse - Renovate; Install compactor $596,000 Location City: Everett Project Type Program (Minor Works) County: Snohomish Legislative District: 021 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000679 SubProject Title: Everett Community College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Total Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State 0 Total 0 0 0 Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000680 SubProject Title: Seattle Central Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 0 Project Summary Minor Works Program Project Description Expand installation of new key system & video surveilliance in BE & other Bldgs ;New signs; Update city req. Mstr. Plan. $893,400 Location City: Seattle County: King Legislative District: 043 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects Project Type SubProject Number: 30000680 SubProject Title: Seattle Central Community College Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Total Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000681 SubProject Title: North Seattle Community College 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000681 SubProject Title: North Seattle Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Remodel space in existing buildings to accommodate six programs being relocated from the old Technology Bldg. $701,700 Location City: Seattle County: King Legislative District: 046 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000682 SubProject Title: South Seattle Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Remodel old Machine Shop Building to accommodate the instructional and production requirements of the Wine program $620,600 Location City: Seattle County: King Legislative District: 034 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 2013-15 Fiscal Period Expenditures Funding Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000683 SubProject Title: Shoreline Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Renovate Building 1500 (upgrade electrical, lighting, interactive classrooms, paint, carpet, etc.) $623,200 Location City: Shoreline County: King Legislative District: 032 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000684 SubProject Title: Bellevue Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Renovate classrooms in B Building vacated by the nursing and radiologic programs $734,500 Location City: Bellevue County: King Legislative District: 041 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000685 SubProject Title: Highline Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Replace exterior windows and doors, make restrooms ADA compliant, replace roof & insulation, replace HVAC system. $675,700 Location City: Des Moines County: King Legislative District: 033 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 2013-15 Fiscal Period Expenditures Funding Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000686 SubProject Title: Green River Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Remodel currently vacant campus space to accommodate displaced classes during the SMT renovation project $660,900 Location City: Auburn County: King Legislative District: 031 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000687 SubProject Title: Pierce College Fort Steilacoom 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Remodel & upgrade classroom and lab space in Cascade. Upgrade server room. Remodel classrooms in Olympic South. $554,800 Location City: Lakewood County: Pierce Legislative District: 028 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 2013-15 Fiscal Period Expenditures Funding Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000688 SubProject Title: Pierce College Puyallup 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works Program Project Description Upgrade student & inst. support space in Admin Bldg. Improv. lab & classrooms in Lib/Sci Bldg. & space in Col. Ctr. Bldg $380,100 Location City: Puyallup County: Pierce Legislative District: 025 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 2013-15 Fiscal Period Expenditures Funding Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000689 SubProject Title: Centralia Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Remodel welding shop. Move air scrubber to a pad outside the shop & add welding booths $469,003 Location City: Centralia County: Lewis Legislative District: 020 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000690 SubProject Title: Lower Columbia College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Renovate building replace HVAC system, upgrade electrical and lighting, reconfigure space, & abate hazardous materials $526,129 Location City: Longview County: Cowlitz Legislative District: 019 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 2013-15 Fiscal Period Expenditures Funding Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000691 SubProject Title: Clark College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Renovation & minor improvement of existing instructional and faculty office space. $710,700 Location City: Vancouver County: Clark Legislative District: 049 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000692 SubProject Title: Wenatchee Valley College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Remodel and equip chemistry lab in Eller Fox Building to also be able to accommodate organic chemistry. $499,400 Location City: Wenatchee County: Chelan Legislative District: 012 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000693 SubProject Title: Yakima Valley Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Const. a roof over atrium area, intall HVAC & lighting. Remodel vacant Childcare bldg. into two general classrooms $619,400 Location City: Grandview County: Yakima Legislative District: 015 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000694 SubProject Title: Spokane Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Bldg.16 - rpl. crpt; Bldg. 1 - rnv Cosmo.; Bldg. 10 - cnstr. add./rpl. Hort. wksta; Bldg. 5 - rpl. Lockers; Bldg. 1 - rmdl. vacnt.ofc. $931,400 Location City: Spokane County: Spokane Legislative District: 003 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000695 SubProject Title: Spokane Falls Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Bldg. 13 rprs - struct., expan. joints, roof, masonry end cap walls, & stairs; Bldg. 18 1st flr rmdl/ Bldg. 617 - rpl. Windows. $762,600 Location City: Spokane County: Spokane Legislative District: 006 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000696 SubProject Title: Big Bend Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Improvement of campus building systems to meet current and future educational needs. (HVAC, electrical, lighting, etc.) $536,693 Location City: Moses Lake County: Grant Legislative District: 013 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 2013-15 Fiscal Period Expenditures Funding Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000697 SubProject Title: Columbia Basin College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works Program Project Description Upgrade instructional space throughout campus with enhanced information technology infrastructure & acoustic improv. $633,500. Location City: Pasco County: Franklin Legislative District: 016 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000698 SubProject Title: Walla Walla Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Remodel existing vacated space to accommodate the Wind Turbine Tech. prog. $626,800 Location City: Walla Walla County: Walla Walla Legislative District: 016 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000699 SubProject Title: Whatcom Community College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Reconfig. campus entrances from Cordata Pkwy and Kellogg Rd. Remodel existing facilities gaining add. Two classrooms. $415,900 Location City: Bellingham County: Whatcom Legislative District: 042 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Funding Account Title 060-1 Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total 0 0 0 2013-15 Fiscal Period Expenditures Acct Code New Approps 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000699 SubProject Title: Whatcom Community College Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State 0 Total 0 0 0 Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000700 SubProject Title: Tacoma Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 0 Project Summary Minor Works - Program Project Description Remodel Bldg. 012 into classroom space. Build an ADA compliant ramp to east entrance of Bldg. 007. $573,700 Location City: Tacoma County: Pierce Legislative District: 028 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000700 SubProject Title: Tacoma Community College Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State 0 Total 0 0 0 Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000701 SubProject Title: Edmonds Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 0 Project Summary Minor Works - Program Project Description Rpr. water damaged locker rooms, shower rooms, and restrooms. Upgrade elec. & light. sys. & Rmdl. Ofcs & equip. rooms. $615,100 Location City: Lynnwood Project Type Program (Minor Works) County: Snohomish Legislative District: 021 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000701 SubProject Title: Edmonds Community College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State 0 Total 0 0 0 Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000702 SubProject Title: South Puget Sound Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 0 Project Summary Minor Works - Program Project Description Reconfigure vacated floor in Bldg. 28 to accommodate to faculty ofcs. & gen. classrooms $483,600 Location City: Olympia County: Thurston Legislative District: 022 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects Project Type SubProject Number: 30000702 SubProject Title: South Puget Sound Community College Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000703 SubProject Title: Bellingham Technical College 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000703 SubProject Title: Bellingham Technical College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Construct and addition to Building C for Dental Clinic waiting room, expand reception area, & install HVAC system. $461,800 Location City: Bellingham County: Whatcom Legislative District: 042 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000704 SubProject Title: Lake Washington Technical College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Paint exterior of both the East & West Bldgs. Remove rust and paint the steel stairs in the Technology Building. $444,600 Location City: Kirkland County: King Legislative District: 045 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000705 SubProject Title: Renton Technical College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Rpl. HVAC controls w/ digital controls & software. Install monitoring and energy metering devices, Rpl. wtr. control valves, $522,000 Location City: Renton County: King Legislative District: 041 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000706 SubProject Title: Bates Technical College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works Program Project Description Remodel Pract. Nurse. Prog. Area E. Annex, Instr. Ofc. S. Campus Bldg. A, & S. Campus Bldg. E. $635,400 Location City: Tacoma County: Pierce Legislative District: 029 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000707 SubProject Title: Clover Park Technical College 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Convert former kitchen and cafeteria space into science lab, classroom, tutoring, and study space. $622,300 Location City: Lakewood County: Pierce Legislative District: 029 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000674 Project Title: Minor Works - Program SubProjects SubProject Number: 30000708 SubProject Title: Cascadia CC 2012 Program 0 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description Cascadia's portion of cost of Library roof replacement & elevator repair. $381,575 Location City: Bothell County: King Legislative District: 001 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000501 Project Title: Peninsula College: Forks Satellite Building Renovation Description Starting Fiscal Year: Project Class: Agency Priority: 2010 Program 0 Project Summary Reauthorization for a locally supported COP to renovate the Forks Satellite Site and change scope to allow acquisition of new property to meet educational needs in Forks within previously authorized financing limit. (Please strike the word "Renovation" from the title.) Project Description The Forks Satellite Campus has numerous structural, mechanical and electrical deficiencies. A 2007 assessment of the building concluded that it is rapidly deteriorating and is structurally unsound. The building envelope is failing and it is not insulated to meet current energy code. It is not structured to resist seismic events and has numerous code and safety issues. The Forks Satellite Site provides valuable educational and cultural opportunities to the isolated western portion of Clallam County. Certificate of Participation authority is granted to provide a site that will meet the educational goals of the College and instructional needs of the 21st century. The college will replace this facility with a new building, to include multi-use classrooms, a learning lab, a meeting room/multi-use space, office and work rooms. The renovation will ensure an up-to-date, modern facility with technology and infrastructure to meet current educational standards and a structure that meets building and safety codes. The site will include multi-use classrooms, a learning lab, a meeting room/multi-use space, office and work space, providing an up-to-date, modern educational facility with technology and infrastructure to meet current standards. Economic Analysis: This projects is expected to create 12 construction jobs and 12 indirect jobs for a total of 24 jobs during construction. The taxpayers net short-run investment is $1,100,000 dollars for a long-run return of $1,500,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Forks Project Type Remodel/Renovate/Modernize (Major Projects) County: Clallam Legislative District: 024 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000501 Project Title: Peninsula College: Forks Satellite Building Renovation Description Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. No New Facility: How does this fit in master plan N/A Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title COP-6 Certificate of Part-Non-Appropriated Total Prior Biennium Current Biennium New Approps Reapprops 2,000,000 2,000,000 2,000,000 0 0 0 2,000,000 Future Fiscal Periods COP-6 Certificate of Part-Non-Appropriated Total 2015-17 2017-19 2019-21 2021-23 0 0 0 0 Schedule and Statistics Start Date End Date 09/01/2009 12/01/2009 Design 7/1/2013 2/1/2014 Construction 4/1/2014 6/1/2015 Predesign Total Gross Square Feet: 7,480 Usable Square Feet: 5,600 74.9% Efficiency: 179 Escalated MACC Cost per Sq. Ft.: Construction Type: College Classroom Facilities Is this a remodel? Yes A/E Fee Class: B A/E Fee Percentage: 11.89% Cost Summary Acquisition Costs Total Consultant Services Escalated Cost % of Project 0 0.0% 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000501 Project Title: Peninsula College: Forks Satellite Building Renovation Cost Summary Consultant Services Pre-Schematic Design Services Escalated Cost % of Project 25,385 1.2% 110,106 5.1% Extra Services 72,587 3.4% Other Services 59,227 2.7% Design Services Contingency 23,538 1.1% 290,844 13.4% Site work 89,144 4.1% Related Project Costs 51,794 2.4% Construction Documents Consultant Services Total Maximum Allowable Construction Cost(MACC) Facility Construction 1,342,080 1,201,142 55.5% GCCM Risk Contingency 0 0.0% GCCM or Design Build Costs 0 0.0% 242,017 11.2% 0 0.0% Construction Contingencies Non Taxable Items Sales Tax Construction Contracts Total Equipment Equipment Non Taxable Items Sales Tax 133,064 6.2% 1,717,161 79.4% 82,663 3.8% 0 0.0% 6,944 0.3% 89,607 4.1% 913 0.0% Other Costs Total 30,467 1.4% Project Management Total 35,000 1.6% Equipment Total Art Work Total Grand Total Escalated Costs 2,163,992 Rounded Grand Total Escalated Costs 2,164,000 Operating Impacts No Operating Impact Narrative Renovation of existing space. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000114 Project Title: Peninsula College: Fort Worden Building 202 Description Starting Fiscal Year: Project Class: Agency Priority: 2010 Program 0 Project Summary Reappropriation request. Project Description Reappropriation request. Location City: Port Angeles County: Clallam Legislative District: 024 Project Type Remodel/Renovate/Modernize (Major Projects) Growth Management impacts No impacts anticipated. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Account Title State Bldg Constr-State Total Estimated Total Prior Biennium 2,000,000 2,000,000 0 Current Biennium Reapprops 105,000 1,895,000 105,000 1,895,000 New Approps 0 Future Fiscal Periods 057-1 State Bldg Constr-State Total 2015-17 2017-19 2019-21 2021-23 0 0 0 0 FY 1 FY 2 FY 3 FY 4 1.0 1.0 1.0 1.0 Operating Impacts No Operating Impact Acct Code FTE Account Title Full Time Employee FY 1.0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20042694 Project Title: Pierce College Fort Steilacoom: Science and Technology Description Starting Fiscal Year: Project Class: Agency Priority: 2004 Program 0 Project Summary Reappropriation request. Project Description Reappropriation request. Location City: Lakewood County: Pierce Legislative District: 028 Project Type New Facilities/Additions (Major Projects) Growth Management impacts No impacts are expected. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Account Title State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 32,393,000 31,852,000 324,000 217,000 32,393,000 31,852,000 324,000 217,000 Future Fiscal Periods 057-1 State Bldg Constr-State Total Operating Impacts No Operating Impact 2015-17 2017-19 2019-21 2021-23 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20062698 Project Title: South Puget Sound Community College: Learning Resource Center Description Starting Fiscal Year: Project Class: Agency Priority: 2006 Program 0 Project Summary Reappropriation request. Project Description Reappropriation request. Location City: Olympia County: Thurston Legislative District: 022 Project Type New Facilities/Additions (Major Projects) Growth Management impacts No impacts anticpated. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Account Title State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 33,660,000 2,184,000 5,935,000 25,541,000 33,660,000 2,184,000 5,935,000 25,541,000 New Approps 0 Future Fiscal Periods 057-1 State Bldg Constr-State Total 2015-17 2017-19 2019-21 2021-23 0 0 0 0 FY 1 FY 2 FY 3 FY 4 4.0 4.0 4.0 4.0 Operating Impacts No Operating Impact Acct Code FTE Account Title Full Time Employee FY 4.0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 92000012 Project Title: Spokane Community College: Extended Learning Center Description Starting Fiscal Year: Project Class: Agency Priority: 2013 Program 0 Project Summary Addition to Student Services Building #15 on the Spokane Community College campus. Project Description Construct a two story, 22,200 sq. ft. addition to the east side of existing Student Services Building #15. The building will house classrooms, computer labs, support space, student intake areas and faculty and staff offices. This addition will accomdate most of the programming that is currently offered in the Hillyard community at leased space as well as allow consolidation of existing student services. The existing 23,571 rsf of leased space in the Hillyard community is scheduled to be demolished for highway construction. SCC student services – consolidate student intake services admissions, registration, financial aid, cashiering in one-stop location. House SCC administrative functions dislocated from Max Snyder building. IEL adult education instructional programs relocated from Hillyard rental facility 1.6 miles from SCC campus. Consolidate IEL adult education transition programs (college prep and ESL transitions) now located on the SCC campus. Adult education and transitions enrollment in this facility: 300+ FTE students Economic Analysis: This projects is expected to create 50 construction jobs and 51 indirect jobs for a total of 101 jobs during construction. The taxpayers net short-run investment is $4,500,000 dollars for a long-run return of $6,400,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Spokane County: Spokane Legislative District: 003 Project Type New Facilities/Additions (Major Projects) Growth Management impacts No impacts anticipated. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 147-6 HE Plant Accounts-Non-Appropriated COP-1 Certificate of Part-State Estimated Total 5,400,000 Prior Biennium Current Biennium Reapprops New Approps 5,400,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 92000012 Project Title: Spokane Community College: Extended Learning Center Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title COP-6 Certificate of Part-Non-Appropriated Total Prior Biennium Current Biennium New Approps Reapprops 3,100,000 3,100,000 8,500,000 0 0 0 8,500,000 Future Fiscal Periods 147-6 HE Plant Accounts-Non-Appropriated COP-1 Certificate of Part-State COP-6 Certificate of Part-Non-Appropriated Total 2015-17 2017-19 2019-21 2021-23 0 0 0 0 Schedule and Statistics Start Date End Date 06/01/2012 04/01/2013 Design 6/1/2013 4/1/2014 Construction 5/1/2014 6/1/2015 Predesign Total Gross Square Feet: 22,200 Usable Square Feet: 14,230 Efficiency: 64.1% 232 Escalated MACC Cost per Sq. Ft.: Construction Type: College Classroom Facilities Is this a remodel? No A/E Fee Class: B A/E Fee Percentage: 8.57% Cost Summary Acquisition Costs Total Consultant Services Pre-Schematic Design Services Escalated Cost % of Project 0 0.0% 80,000 0.9% Construction Documents 305,127 3.6% Extra Services 318,000 3.7% Other Services 353,086 4.2% 52,811 0.6% 1,109,024 13.1% Design Services Contingency Consultant Services Total 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 92000012 Project Title: Spokane Community College: Extended Learning Center Cost Summary Escalated Cost % of Project Site work 0 0.0% Related Project Costs 0 0.0% Maximum Allowable Construction Cost(MACC) 5,160,019 Facility Construction 5,160,019 60.7% GCCM Risk Contingency 0 0.0% GCCM or Design Build Costs 0 0.0% 258,001 3.0% 0 0.0% Construction Contingencies Non Taxable Items Sales Tax Construction Contracts Total Equipment Equipment Non Taxable Items Sales Tax Equipment Total Art Work Total Other Costs Total Project Management Total 471,368 5.6% 5,889,388 69.3% 741,720 8.7% 0 0.0% 64,530 0.8% 806,250 9.5% 25,800 0.3% 669,787 7.9% 0 0.0% Grand Total Escalated Costs 8,500,249 Rounded Grand Total Escalated Costs 8,500,000 Operating Impacts Total one time start up and ongoing operating costs Acct Code 001-1 Account Title FY 2014 FY 2015 FY 2016 FY 2017 General Fund-State 604,953 74,370 74,370 74,370 604,953 74,370 74,370 74,370 Total Narrative M & O will be requested in the system operating budget as detailed in the "Operating Impacts" module. The basis for the M & O request is a maintenance cost assumption of $6.54/gsf in FY14 and $6.70/gsf in FY15 and after. The FTE assumptions are college specific, reflecting the college's staffing requirements for maintenance and custodial services for the new space. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000116 Project Title: Spokane Falls CC: Stadium & Athletic Fields Description Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 0 Project Summary Reappropriation request. Project Description Reappropriation request. Location City: Spokane County: Spokane Legislative District: 006 Project Type Remodel/Renovate/Modernize (Major Projects) Growth Management impacts No impacts anticipated. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Account Title State Bldg Constr-State Total Estimated Total Prior Biennium 758,000 758,000 0 Current Biennium Reapprops 95,000 663,000 95,000 663,000 Future Fiscal Periods 057-1 State Bldg Constr-State Total Operating Impacts No Operating Impact 2015-17 2017-19 2019-21 2021-23 0 0 0 0 New Approps 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20062696 Project Title: Spokane Falls Community College: Campus Classrooms Description Starting Fiscal Year: Project Class: Agency Priority: 2006 Program 0 Project Summary Reappropriation request. Project Description Reappropriation request. Location City: Spokane County: Spokane Legislative District: 006 Project Type New Facilities/Additions (Major Projects) Growth Management impacts No impact anticipated. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Account Title State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 19,616,000 1,317,000 995,000 17,304,000 19,616,000 1,317,000 995,000 17,304,000 New Approps 0 Future Fiscal Periods 057-1 State Bldg Constr-State Total 2015-17 2017-19 2019-21 2021-23 0 0 0 0 FY 1 FY 2 FY 3 FY 4 2.5 2.5 2.5 2.5 Operating Impacts No Operating Impact Acct Code FTE Account Title Full Time Employee FY 2.5 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082701 Project Title: Tacoma Community College: Health Careers Center Description Starting Fiscal Year: Project Class: Agency Priority: 2008 Program 0 Project Summary Tacoma Community College will construction of a new 70,000 square foot Health Careers Center to accommodate growth in the high demand allied health programs, improve program delivery, and provide flexible instructional spaces with the latest technology. In addition to classrooms, labs, meeting and office space, the facility will include an interdisciplinary clinical simulation lab. Project Description Local and national data projections of a long-term crisis in availability of qualified health care providers are compelling. Tacoma Community College is well positioned as a Pierce County leader in the education of allied health professionals to address this critical need for health care workers, a task consistent with the College's mission. Lack of capacity at the College and area clinical learning sites forced TCC to turn away 700+ qualified students from its allied health programs annually. Existing TCC classrooms do not allow for interactive, modern, technically supported teaching and learning. Often programs cannot offer class and laboratory learning concurrently, as capacity for these functions are combined in one room. FTEs in TCC's allied health programs are projected to nearly double within the next twenty years. Existing facilities are technologically obsolete and cannot support innovations in program delivery or current and evolving student demand levels. Construct a new 69,715 GSF Health Careers Center to accommodate the demand and growth in high demand allied health professional fields, improve program delivery and provide flexible instructional spaces with the latest technology. TCC envisions a truly innovative facility that teaches the transdisciplinary nature of multiple allied health professions, in an environment that simulates the modern hospital. Transdisciplinary teamwork, technique and real world preparation using high fidelity simulation equipment will allow for less demand on community sites for obtaining competencies. In direct response to student and community demands, TCC's proposed Health Careers Center will accommodate expansion of the existing programs - Nursing, Diagnostic Medical Sonography, Health Information Management, Radiological Sciences, Respiratory Therapy and Emergency Medical Services and allow TCC to offer new programs for Vascular and Echocardiography, Nanotechnology Technicians and Nuclear Medicine Technicians. A new Health Careers Center is the College's highest priority. Location City: Tacoma County: Pierce Legislative District: 028 Project Type New Facilities/Additions (Major Projects) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. No New Facility: How does this fit in master plan The project is a necessary part of the college's Master Plan The project went through a demanding selection process both on campus and at the system level where it had to compete with other projects in meeting both the State Board's Strategic Plan priorities and the State's larger educational objectives as reflected in the State's "Priorities of Government" to be included in the system capital budget request. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082701 Project Title: Tacoma Community College: Health Careers Center Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Estimated Total Account Title State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 41,173,000 1,963,000 315,000 38,895,000 41,173,000 1,963,000 315,000 38,895,000 New Approps 0 Future Fiscal Periods 057-1 State Bldg Constr-State Total 2015-17 2017-19 2019-21 2021-23 0 0 0 0 Schedule and Statistics Start Date Predesign End Date 02/01/2008 06/01/2008 10/1/2009 4/1/2012 6/1/2012 5/1/2014 Design Construction Total Gross Square Feet: 69,715 Usable Square Feet: 45,315 Efficiency: 65.0% 404 Escalated MACC Cost per Sq. Ft.: Construction Type: College Classroom Facilities Is this a remodel? No A/E Fee Class: B A/E Fee Percentage: 6.71% Cost Summary Acquisition Costs Total Consultant Services Pre-Schematic Design Services Escalated Cost % of Project 0 0.0% 255,000 0.6% 1,293,069 3.1% Extra Services 728,643 1.8% Other Services 919,883 2.2% Design Services Contingency 166,023 0.4% 3,362,618 8.2% 2,596,041 6.3% Construction Documents Consultant Services Total Maximum Allowable Construction Cost(MACC) Site work 28,183,025 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082701 Project Title: Tacoma Community College: Health Careers Center Cost Summary Escalated Cost % of Project Construction Contracts Related Project Costs 1,214,047 3.0% Facility Construction 24,372,937 59.2% GCCM Risk Contingency 0 0.0% GCCM or Design Build Costs 0 0.0% 2,829,231 6.9% 0 0.0% Construction Contingencies Non Taxable Items Sales Tax 2,884,139 7.0% 33,896,395 82.3% 3,033,480 7.4% 0 0.0% 282,114 0.7% 3,315,594 8.1% Art Work Total 140,915 0.3% Other Costs Total 257,835 0.6% Project Management Total 200,000 0.5% Construction Contracts Total Equipment Equipment Non Taxable Items Sales Tax Equipment Total Grand Total Escalated Costs 41,173,357 Rounded Grand Total Escalated Costs 41,173,000 Operating Impacts Total one time start up and ongoing operating costs Acct Code FTE 001-1 FY 2014 FY 2015 FY 2016 FY 2017 Full Time Employee 7.0 7.0 7.0 7.0 General Fund-State 68,329 508,000 508,000 508,000 68,329 508,000 508,000 508,000 Account Title Total Narrative M & O will be requested in the system operating budget as detailed in the "Operating Impacts" module. The basis for the M & O request is a maintenance cost assumption of $7.28/sf. The FTE assumptions are college specific, reflecting the college's staffing requirements for maintenance and custodial services for the new space. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000975 Project Title: Whatcom Student Recreation Center Description Starting Fiscal Year: Project Class: Agency Priority: 2014 Program 0 Project Summary This project will provide on-campus space for health and physical education as well as athletics and recreational activities by renovating 6,800 square feet and constructing 20,700 square feet of new space. Project Description The need for renovation and addition to the existing Pavilion gym results from its severe overcrowding, lack of required facilities, and absence of storage area. The Pavilion should be reconceived as a sports and recreational social gathering place, one in which appropriate multi-purpose and studio spaces allow a range of activities and one in which athletic programs can train for competition on campus. The new facility should be open and transparent, displaying the activities within to passersby instead of the current blank, opaque façade. Greater accessibility will promote more active use by a broader spectrum of campus students, faculty and staff, and the larger community, and will contribute to campus vitality. Increased facility use is anticipated because the renovated facility will offer many new opportunities for student recreation and classes and because campus enrollment continues to grow. Economic Analysis: This projects is expected to create 71 construction jobs and 72 indirect jobs for a total of 142 jobs during construction. The taxpayers net short-run investment is $6,400,000 dollars for a long-run return of $9,000,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Blaine County: Whatcom Legislative District: 042 Project Type New Facilities/Additions (Major Projects) Growth Management impacts No impacts anticipated. Yes New Facility: How does this fit in master plan The project is consistent with the master plan. Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 147-6 HE Plant Accounts-Non-Appropriated COP-6 Certificate of Part-Non-Appropriated Total Estimated Total Prior Biennium Current Biennium Reapprops 1,000,000 11,000,000 12,000,000 New Approps 1,000,000 11,000,000 0 0 0 12,000,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000975 Project Title: Whatcom Student Recreation Center Funding Future Fiscal Periods 147-6 HE Plant Accounts-Non-Appropriated COP-6 Certificate of Part-Non-Appropriated Total 2015-17 2017-19 2019-21 2021-23 0 0 0 0 Schedule and Statistics Start Date End Date 09/01/2012 12/01/2012 Design 1/1/2013 1/1/2014 Construction 4/1/2014 6/1/2015 Predesign Total Gross Square Feet: 27,300 Usable Square Feet: 23,205 Efficiency: 85.0% 277 Escalated MACC Cost per Sq. Ft.: Construction Type: College Classroom Facilities Is this a remodel? Varies A/E Fee Class: B A/E Fee Percentage: Varies Cost Summary Acquisition Costs Total Consultant Services Pre-Schematic Design Services Escalated Cost % of Project 0 0.0% 148,253 1.2% Construction Documents 462,994 3.9% Extra Services 410,000 3.4% Other Services 394,580 3.3% Design Services Contingency Consultant Services Total Maximum Allowable Construction Cost(MACC) Site work Related Project Costs 73,046 0.6% 1,488,874 12.4% 306,445 2.6% 7,556,675 0 0.0% 7,250,230 60.5% GCCM Risk Contingency 0 0.0% GCCM or Design Build Costs 0 0.0% Facility Construction 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000975 Project Title: Whatcom Student Recreation Center Cost Summary Construction Contracts Construction Contingencies Non Taxable Items Sales Tax Construction Contracts Total Equipment Equipment Non Taxable Items Sales Tax Equipment Total Art Work Total Other Costs Total Project Management Total Escalated Cost % of Project 1,103,123 9.2% 0 0.0% 753,403 6.3% 9,413,201 78.6% 633,728 5.3% 0 0.0% 55,135 0.5% 688,863 5.8% 37,784 0.3% 0 0.0% 353,991 3.0% Grand Total Escalated Costs 11,982,713 Rounded Grand Total Escalated Costs 11,983,000 Operating Impacts No Operating Impact 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000974 Project Title: Whatcom: Health Professions Building Description Starting Fiscal Year: Project Class: Agency Priority: 2014 Program 0 Project Summary The Health Professions Building (HPB) will be a 24,000 sq. ft. structure to accommodate the Nursing, Physical Therapy, Massage Therapy and Medical Assisting Programs. It will create efficiencies by co-locating programs having similar facility needs and allowing the college to increase general classroom space on campus. Project Description As the Allied Health Programs have grown, there has been a trend of remodeling general classroom spaces to accommodate the need for specialized spaces such as low fidelity and simulation labs. Over time, this has caused a shortage of general or multi-purpose classroom space. In addition to creating scheduling challenges, the health programs are currently scattered between three different buildings limiting the ability to effectively share commonly used equipment and instructional spaces. The new Health Professions Building will combine the allied health programs under one roof, provide improved teaching/learning spaces, and free-up existing space to be converted back to general instructional use. The building will also provide the college with opportunities to partner with community health organizations presenting better clinical opportunities for students. Economic Analysis: This projects is expected to create 43 construction jobs and 44 indirect jobs for a total of 87 jobs during construction. The taxpayers net short-run investment is $3,900,000 dollars for a long-run return of $5,500,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Bellingham County: Whatcom Legislative District: 042 Project Type New Facilities/Additions (Major Projects) Growth Management impacts No impacts anticipated. Yes New Facility: How does this fit in master plan The project is consistent with the master plan. Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 147-6 HE Plant Accounts-Non-Appropriated COP-6 Certificate of Part-Non-Appropriated Total Estimated Total Prior Biennium Current Biennium Reapprops 871,000 6,451,000 7,322,000 New Approps 871,000 6,451,000 0 0 0 7,322,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000974 Project Title: Whatcom: Health Professions Building Funding Future Fiscal Periods 2015-17 2017-19 2019-21 2021-23 0 0 0 0 147-6 HE Plant Accounts-Non-Appropriated COP-6 Certificate of Part-Non-Appropriated Total Schedule and Statistics Start Date End Date 03/01/2012 05/01/2012 Design 5/1/2012 6/1/2013 Construction 7/1/2013 8/1/2014 Predesign Total Gross Square Feet: 24,000 Usable Square Feet: 20,000 Efficiency: 83.3% 227 Escalated MACC Cost per Sq. Ft.: Construction Type: Science Labs (teaching) Is this a remodel? No A/E Fee Class: B A/E Fee Percentage: 8.51% Cost Summary Acquisition Costs Total Consultant Services Pre-Schematic Design Services Construction Documents Escalated Cost % of Project 0 0.0% 11,200 0.2% 320,599 4.4% Extra Services 62,378 0.9% Other Services 159,658 2.2% Design Services Contingency (11,570) -0.2% 542,265 7.4% 594,384 8.1% Consultant Services Total Maximum Allowable Construction Cost(MACC) Site work Related Project Costs Facility Construction GCCM Risk Contingency 5,459,886 122,976 1.7% 4,742,526 64.8% 0 0.0% 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000974 Project Title: Whatcom: Health Professions Building Cost Summary Construction Contracts GCCM or Design Build Costs Construction Contingencies Non Taxable Items Sales Tax Construction Contracts Total Equipment Equipment Non Taxable Items Sales Tax Equipment Total Art Work Total Other Costs Total Project Management Total Escalated Cost % of Project 0 0.0% 273,576 3.7% 0 0.0% 498,811 6.8% 6,232,273 85.1% 252,070 3.4% 0 0.0% 21,930 0.3% 274,000 3.7% 27,299 0.4% 0 0.0% 246,163 3.4% Grand Total Escalated Costs 7,322,000 Rounded Grand Total Escalated Costs 7,322,000 Operating Impacts No Operating Impact 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program Description Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description Every community and technical college has serious facility conditions, lacks space and needs to renovate or upgrade program areas. These minor works projects are needed to keep space relevant for student needs, meet changing program requirements and upgrade equipment to provide an adequate educational environment. Economic Analysis: This projects is expected to create 148 construction jobs and 150 indirect jobs for a total of 299 jobs during construction. The taxpayers net short-run investment is $13,500,000 dollars for a long-run return of $18,900,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Statewide County: Statewide Legislative District: 098 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 060-1 147-6 Account Title State Bldg Constr-State Comm/Tech Cap Proj A-State HE Plant Accounts-Non-Appropriated Total Estimated Total Prior Biennium Current Biennium Reapprops 19,893,000 2,107,000 3,208,000 25,208,000 19,893,000 2,107,000 3,208,000 0 0 0 2019-21 2021-23 Future Fiscal Periods 2015-17 057-1 060-1 147-6 State Bldg Constr-State Comm/Tech Cap Proj A-State HE Plant Accounts-Non-Appropriated New Approps 2017-19 25,208,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program Funding Total Operating Impacts No Operating Impact Narrative No new square footage. SubProjects SubProject Number: 30000724 SubProject Title: Peninsula College 0 0 0 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000724 SubProject Title: Peninsula College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The gymnasium is inadequate and in need of replacement. Minor Improvement funds are being used for much needed work over three biennia. This project is phase two of three. The gymnasium lacks basic amenities for physical education. Educational spaces are lacking needed resources. Restroom facilities are significantly undersized and outdated. The current spaces limit programming and usage. What happens if this project is not funded by the State? Without improvements to the gymnasium, programming, usage and access will continue to be limited. Some classes are currently being held off site due to inadequate facilities. The quality of education will suffer. There is a great and growing need for physical wellness and the college is considering a wellness component as a requirement to graduation. Adequate facilities will be required to implement this. These improvements will enhance the gymnasium and address support space needs. What is the desired solution? The desired solution is to make improvements to the gymnasium to fully utilize and enhance existing space and replace systems to provide for improved programming and access. Will this project increase access or improve utilization? (Yes/No) Yes If yes, please specify the Net Change in FTE capacity. 44 FTEs What benefit will this project provide the college? Improvements will benefit both the college and the community. The facility will provide spaces for physical activity, wellness, nutrition and continuing education classes and exercise opportunities for students and staff. It will provide support space and amenities that reflect the college’s values and the tradition of champions at the college. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The project will enhance and expand educational opportunities by providing opportunities for health and fitness education; educating both mind and body. It will enhance the college environment and services to students. It will continue to foster college and community connections and expand opportunities for cultural events and programming. This project is included in the college Facilities Master Plan. Gymnasium Improvements for $458,000. Location City: Port Angeles Project Type County: Clallam Legislative District: 024 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects Project Type 30000724 SubProject Number: Peninsula College SubProject Title: Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 060-1 Comm/Tech Cap Proj A-State 458,000 Total 458,000 Prior Biennium Current Biennium Reapprops 458,000 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000725 SubProject Title: Grays Harbor College 0 New Approps 0 0 0 458,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000725 SubProject Title: Grays Harbor College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The existing entries are open, covered vestibules that allow access of birds, insects and unwanted visitors. This condition has resulted in health and safety hazards consisting of bird and bat droppings, insects and spider debris and hiding spaces for unauthorized persons possibly intent on inflicting harm. For whatever reasons, the 800 Building was designed with its “back” oriented to the center of the upper level campus. The entries to the 800 Building are located on the north and south ends of the building, largely hidden from view. As a result, the 800 Building is very uninviting and appears isolated from the rest of the upper campus. This project is necessary to eliminate the health and safety concerns described above. This project is also necessary to provide a more positive entry image and experience for the 800 Building and to more positively connect the 800 Building to the upper campus. As noted in the Facilities Master Plan, the 800 Building will remain an integral part of the campus, functioning as a surge space during the construction of replacement buildings and demolition of replaced buildings. What happens if this project is not funded by the State? The health and safety risks remain a concern for students and staff using the 800 Building at the College. The 800 Building will continue to be visually isolated from the upper campus. What is the desired solution? Enclose the existing entry structures on the north and south ends of the building and convert these spaces to interior vestibules with durable and appropriate interior finish materials. Provide new entry roof structures to provide a stronger visual entry clue and also provide weather protection to building users as they approach the entries. Create a new entry in the middle of the west elevation, facing the upper campus. This new building feature will open up the blank, west elevation of the 800 Building to the upper campus and provide an additional accessible entry point to the upper floor of the 800 Building. Will this project increase access or improve utilization? (Yes/No) No. What benefit will this project provide the college? Entry improvements to the 800 Building will eliminate previously discussed health and safety concerns. Entry improvements will create more inviting entry approaches to the 800 Building and provide more direct visual connections with the adjacent 2000 Building and the upper campus. When the existing 200 Building, which occupies the center of the upper campus, is demolished, the entry enhancements to the 800 Building will be even more appreciated. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The Facility Master Plan recognizes the 800 Building will function as surge space after the SMArt Building is constructed and during the subsequent construction of the Student Services/Instructional Building and related, existing, replaced building demolitions. Elimination of health and safety concerns on campus is an ongoing and continuous institutional goal. Integrating buildings within the campus environment and improving visual and physical connections between campus buildings is an important institutional goal. 800 Building Entry Improvements $500,000 State $ 2,200 Local $502,200 Total 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000725 SubProject Title: Grays Harbor College Location City: Aberdeen County: Grays Harbor Legislative District: 019 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 060-1 Comm/Tech Cap Proj A-State 500,000 Total 500,000 Prior Biennium Current Biennium Acct Code Account Title 147-6 HE Plant Accounts-Non-Appropriated Total Estimated Total 0 0 0 Prior Biennium Current Biennium Reapprops 0 0 0 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total 0 0 0 0 Future Fiscal Periods 2015-17 147-6 2017-19 2019-21 2021-23 HE Plant Accounts-Non-Appropriated Total Operating Impacts No Operating Impact 0 New Approps 2,000 Future Fiscal Periods 2015-17 500,000 2013-15 Fiscal Period 2,000 2,000 New Approps 500,000 Expenditures Funding Reapprops 0 0 0 2,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000725 SubProject Title: Narrative Grays Harbor College No new square footage. SubProject Number: 30000726 SubProject Title: Olympic College 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000726 SubProject Title: Olympic College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works Program Project Description What is the problem? The Rotunda Lecture Hall is a round building that was built in 1963 and has had no improvements since that time. The building is also not up to current code including fire, lighting as well as modern electrical and data standards. Why is this project necessary? There is no computer access except for a wireless hub that has been installed. The chairs and desks are mounted in place which makes the room inflexible for being used for any type of class other than lectures. On Olympic College’s Bremerton campus we have very few large classrooms and since this room can seat 100 people it is very important to have this room renovated. What happens if this project is not funded by the State? Olympic College will not be able to serve the students that need the large size classrooms for the program in which they are enrolled. The faculty will not be able instruct at the level that is needed without the available technology. Local funds will necessarily be impressed to bring the building up to current fire codes. What is the desired solution? The goal for the renovation is to make sure the building is asbestos free, provided with modern study tables that have available power and data and are equipped to meet ADA standards. Infrastructure would be installed to allow for a college standard teaching work station. The sound system would be updated and sound absorbing wall fixtures would be installed to improve the acoustics. HVAC systems would be updated. A new fire sprinkler system would be installed. Will this project increase access or improve utilization? (Yes/No) YES The FTE capacity of 100 students would not change, but the space will be able to be used for a wider range of activities leading to greater utilization and so more FTE’s receiving instruction. What benefit will this project provide the college? Olympic College will have 2017 square feet of more usable space for student programs. The new space will also double for a larger computer center if needed. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The Facilities Master Plan identifies this area as not being replaced in the near future, the Condition Facilities Survey scores the room with a 380 score which is in the renovation category. This project also supports the campus core themes for providing instructional spaces to better enable students to succeed during their stay at Olympic College. Rotunda Lecture Hall Renovation $667,000 Location City: Bremerton Project Type Program (Minor Works) County: Kitsap Legislative District: 023 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000726 SubProject Title: Olympic College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 060-1 Comm/Tech Cap Proj A-State 667,000 Total 667,000 Prior Biennium Current Biennium Reapprops 667,000 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000727 SubProject Title: Skagit Valley College 0 New Approps 0 0 0 667,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000727 SubProject Title: Skagit Valley College 2012 Program 5 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? When construction of the college’s new Academic & Student Support Services Building has been completed (estimated as summer of 2014), several student services departments will move from the Cardinal Center to the new building. This project will remodel the vacated spaces for new purposes. What happens if this project is not funded by the State? The existing spaces will not accommodate the new uses. What is the desired solution? Remodel existing space. Schematic design already completed on this project. Will this project increase access or improve utilization? (Yes/No) Yes If yes, please specify the Net Change in FTE capacity. 0 What benefit will this project provide the college? Improved spaces for student, staff and visitors’ use. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? It is consistent with the college’s long term plans. Repurposing of the Gary Knutzen Cardinal Center $436,600 Location City: Mount Vernon County: Skagit Legislative District: 040 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 060-1 Comm/Tech Cap Proj A-State 437,000 Total 437,000 Prior Biennium Current Biennium Reapprops 0 0 0 New Approps 437,000 437,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000727 SubProject Title: Skagit Valley College Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000728 SubProject Title: Everett Community College 0 0 0 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000728 SubProject Title: Everett Community College 2012 Program 5 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Existing roof on the EVCC Olympus Hall building is beyond its useful life and subject to multiple frequent repairs. HVAC system on this site is also past its useful life and subject to multiple breakdowns annually, and does not provide adequate HVAC to building. What happens if this project is not funded by the State? Building occupants would be subjected to repeated leaks and poor comfort levels. Building temporary repairs would quickly cost the college more than the total of re-roofing and HVAC replacement.This will extend the useful life of the building. What is the desired solution? Replace roof and HVAC system Will this project increase access or improve utilization? (Yes/No) No What benefit will this project provide the college? Improved building use forecast, improved occupant comfort, decreased individual repair costs that do not provide a permanent solution How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? This building is planned for use for years to come, as no further replacement projects are being accepted into the pipeline. Olympus Roof and HVAC Replace $665,000 Location City: Everett County: Snohomish Legislative District: 038 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 665,000 665,000 New Approps 665,000 0 0 0 665,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000728 SubProject Title: Everett Community College Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000729 SubProject Title: Seattle Central Community College 0 0 0 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000729 SubProject Title: Seattle Central Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works Program Project Description Expand installation of new key system & video surveilliance in BE & other Bldgs ;New signs; Update city req. Mstr. Plan. $893,400What is the problem? Why is this project necessary? Classroom Renovations - SCCC recently closed their childcare center leaving approximately 2,950 square feet of non-utilized space. A recently completed Space Needs Analysis has documented a shortage of general classroom space throughout campus. Additionally, much of the classroom inventory at SCCC is outdated and lacks current instructional media and technology. Most were constructed at a time with tablet armchair classroom were the predominant seating preference and do not support today’s need for active classroom learning either in terms of seating flexibility and configuration or with access to current instructional technology Restroom Renovations - A second component to this request, is funding to renovate adjacent restroom facilities. The existing restrooms on the first floor of the main campus building are now approaching 40 years old. The heavy use they receive, both by students and the general public (due to their proximity to the Broadway District) has taken a toll on their condition and are need of substantive renovation. While partial ADA upgrades were done in the past, they do not meet current standards are limited at best.. Student safety and sanitation are persistence issues and the required efforts to correct the deficiencies cause the restrooms to be closed frequently. What happens if this project is not funded by the State? Classroom Renovations - The existing spaces will remain vacant. Since the current space was designed as a childcare, it contains a collection of child scaled restroom facilities, counters and play areas, a preparation kitchen, etc. Without renovation the space is very limited in is potential use for any other purpose. Restroom Renovations – Full accessibility to students with disabilities will remain limited. Student and public concerns about sanitation and safety will remain and the restroom will be increasing closed as both labor and the efforts to repair will increase. What is the desired solution? Classroom Renovations - To renovate the existing childcare area into two new general use classrooms that will support active learning with flexible classroom configuration and current instructional technology. The proposed project will fully renovate the existing area including the replacement of all finishes, redistribution of existing mechanical systems, and all new electrical, fire alarm, and communications. Restroom Renovations – To fully renovate the main first floor restrooms. Renovation will include removal of non-ADA compliant access doors, provide all new low-flow plumbing fixtures, toilet partitions, and toilet accessories (include changing stations) and new finishes that are abuse and graffiti resistant as well as easy to maintain. The restroom will be brought up to full ADA compliance. Will this project increase access or improve utilization? (Yes/No) Yes. If yes, please specify the Net Change in FTE capacity. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects 30000729 SubProject Number: Seattle Central Community College SubProject Title: Will add 40 FTE through Improved Utilization and Access: The project will improve the utilization of current space by renovating vacant space and replacing it will high-technology, multiple-use classroom spaces capable of flexible adaptation to accommodate a wide range of program needs, What benefit will this project provide the college? The Classroom Renovation will: 1) Provide two new instructional classrooms to serve Basic Skills and General Education relate curricula 2) Create classroom spaces that are highly flexible, technology-enriched, instructional space to serve a wide range of program needs. The Restroom Renovation will: 3) Remove non-compliant doors to restroom facilities, easing access and increasing passive security. 4) Provide full ADA compliant restroom facilities 5) Remove a substantive maintenance and operational effort from the Facilities work load. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? SCCC’s limited availability of general use and basic skills classroom is a hindrance to effective utilization of spaces as it relate to existing functions, and even more of a hindrance to any new program initiatives. This project will provide non-dedicated space that will give the college flexibility to adapt to the needs of new programs. The flexibility in scheduling achieved by the newly created instruction spaces include in the proposal will allow SCCC to offer greater variations in programs to meet the ever-changing needs of the education it offers. Broadway Edison Building Classroom and Restroom Renovations $963,000 Location City: Seattle County: King Legislative District: 043 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 963,000 963,000 New Approps 963,000 963,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000729 SubProject Title: Seattle Central Community College Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000730 SubProject Title: North Seattle Community College 0 0 0 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000730 SubProject Title: North Seattle Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? There are two areas involved. The first is a minor space reconfiguration and correction of power distribution panels and inadequate circuits in customer service areas scheduled for renovation in the Library, LB. The electrical limitations have created inadequate support for computers and functional equipment in the LB that have impeded appropriate functional layouts in service areas. The LB is a good major capital renovation project candidate, but the time frame is too long to wait to correct these electrical/functional issues in order to provide adequate service to our students and staff. The second is to provide additional support to the reconfiguration of existing space in various locations throughout campus. What happens if this project is not funded by the State? If the project is not funded, the Library would continue to have inadequate electrical power distribution and will not be providing functional service in key customer service areas. Other areas will have less adequate functional space in which to work and provide service to students and staff. What is the desired solution? The desired solution is to fund the Library power distribution correction and renovation project and to improve space funactionaity across campus. Will this project increase access or improve utilization? (Yes/No) Yes If yes, please specify the Net Change in FTE capacity. The minor projects will provide: functional electrical support in reconfigured customer service areas in the Library; and provide the increased functionally adequate space. Both projects will improve space utilization on campus and create opportunities for improved program adjacencies. There are no anticipated FTE capacity changes at this time with the proposed minor projects. What benefit will this project provide the college? The Library will benefit from providing functional customer service to its clients in areas that have a reliable electrical system and a functional space configuration. Besides the overall benefits of the Technology Renewal project, the displaced units will be benefitted by moving into locations that will be satisfactory and functional for their needs. Benefitting displaced units, as well as units going into new facilities, will foster further support rejuvenation efforts on the campus. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? • Create a sense of academic community that is currently perceived as lacking at the College by creating spaces that promote interaction between faculty, staff and students. • Invest in existing facilities to modify space so that the College remains relevant to technology, pedagogy and student needs. The current campus design is outdated and diminishes opportunities for interaction, gathering or informal meetings. There is a lack of public core areas and the exteriors of existing facilities are designed to only provide efficient travel-ways. A major portion of the college educational experience is architecturally diminished. A college educational experience is as much meeting new people, interacting with faculty, staff, and other students as it is just going to class and studying. These projects are a result of the Facility Utilization Study, the Long Range Campus Plan and the Strategic Plan in identifying the need for a college community focal point or “village green” that would create a new inviting core, create more opportunities for physical and social interaction, coordination and collaboration among students, faculty and staff. Basically, the College planning efforts prepared for a rejuvenation of the institution for the next 40 years. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects 30000730 SubProject Number: North Seattle Community College SubProject Title: The requested funds will positively facilitate the continuation of this rejuvenation adventure that the College has undertaken. Campus Wide Renovations $742,000 Location City: Seattle County: King Legislative District: 046 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 0 0 0 742,000 742,000 742,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000731 SubProject Title: South Seattle Community College 0 New Approps 0 0 0 742,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000731 SubProject Title: South Seattle Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The current faculty offices are very inefficient and do not provide an adequate work environment. The lighting and ergonomics are poor, and there are privacy issues with faculty and student meetings. This project is necessary to provide adequate offices for Culinary Arts Faculty. What happens if this project is not funded by the State? The faculty will continue to work in a sub-standard office environment which does not support delivering the quality of instruction services they need to, to support the Culinary Arts Program. What is the desired solution? Provide a more efficient office layout with upgraded lighting and adequate meeting spaces with students. New office partition systems that are ergonomically designed will be provided with new interior finishes. New office systems will allow for improved daylighting. Will this project increase access or improve utilization? (Yes/No) No What benefit will this project provide the college? It will provide updated faculty offices that creates a good work environment for their instructional planning and research. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? This project is consistent with the colleges strategic plan to improve organizational effectiveness. An objective of this goal is to provide an outstanding place to work. The improvement of substandard offices provides an environment to support this objective. Teachers have a better opportunity to be successful in an improved work environment. Culinary Arts Faculty Offices $135,200 Location City: Seattle Project Type Program (Minor Works) County: King Legislative District: 034 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000731 SubProject Title: South Seattle Community College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 135,000 135,000 135,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000732 SubProject Title: Shoreline Community College 0 New Approps 0 0 0 135,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000732 SubProject Title: Shoreline Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The 3000 building was built in 1972 and has had few improvements made to it. It not only has the main gymnasium, but has classrooms and other spaces that are no longer very useful to students. What happens if this project is not funded by the State? Students will continue to learn in spaces that do not meet modern standards and large spaces in this building will not be fully utilized. What is the desired solution? Develop an updated design for the existing building that will have better utilization of spaces, which will make them more useful to students, while also addressing any safety and accessibility issues. Improvements may include and are not limited to one or two new “smart” classrooms, improved existing classroom space, new lighting, re-painting, new flooring, and electrical/data upgrades. Will this project increase access or improve utilization? (Yes/No) Yes If yes, please specify the Net Change in FTE capacity. 36 – 72 FTEs What benefit will this project provide the college? Add one or two new “smart” classrooms and provide long-term improvements that will make the building more useful to students. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? It relates to the college master plan by addressing the long-term future of a 40 year old building that is not being planned for replacement. As a result, this project will make improvements so it can be a more useful asset for the college in the coming years. In the college’s strategic plan, within the “Infrastructure and Technology” theme, one specific direction is to “Implement a unified plan for the maintenance and improvement of classrooms, buildings, and campus grounds”, which this project would support. Building 3000 Improvements $655,000 State $ 85,000 Local $740,000 Total Location City: Shoreline Project Type County: King Legislative District: 032 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects Project Type 30000732 SubProject Number: Shoreline Community College SubProject Title: Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium 655,000 655,000 Funding Account Title 147-6 HE Plant Accounts-Non-Appropriated Total Estimated Total 0 0 0 Prior Biennium Current Biennium Reapprops 0 0 0 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total 0 0 0 0 Future Fiscal Periods 2015-17 147-6 2017-19 2019-21 2021-23 HE Plant Accounts-Non-Appropriated Total Operating Impacts No Operating Impact Narrative No new square footage. 0 New Approps 85,000 Future Fiscal Periods 2015-17 655,000 2013-15 Fiscal Period 85,000 85,000 New Approps 655,000 Expenditures Acct Code Reapprops 0 0 0 85,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000733 SubProject Title: Bellevue Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Due to the age and design of the existing buildings and infrastructure, as well as evolving building codes and safety regulations, several significant compliance issues and safety concerns exist. These measures include modifications to rooftops for fall protection, pedestrian and vehicular circulation, railings, lighting, and evacuation systems across campus. What happens if this project is not funded by the State? Unsafe conditions will persist (and in some cases worsen), the college will remain out of compliance and exposed to potential liabilities. What is the desired solution? Improve safety conditions by retrofitting existing facilities and installing safety equipment where appropriate. New systems would be safe, code compliant, and compatible with existing infrastructure. Will this project increase access or improve utilization? (Yes/No) No What benefit will this project provide the college? The project will solve serious life/safety issues and replace failing infrastructure. Solutions have an average expected useful life of 40 years. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? This work is critical to the usefulness of campus exterior and interior spaces. Maintaining a healthy and safe environment is a key element of the Bellevue College Master Plan These spaces are also used daily in support of several strategic goals and initiatives including; student success, college life and culture, and community engagement and enrichment. Safety Enhancements and Upgrades $490,000 Location City: Bellevue County: King Legislative District: 041 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000733 SubProject Title: Bellevue Community College Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 0 0 0 490,000 490,000 490,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000734 SubProject Title: Highline Community College 0 New Approps 0 0 0 490,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000734 SubProject Title: Highline Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Building 1: Classroom & support offices with an estimated Port contribution of $1.25 million This building is a one story 6410 sq. ft. office type building that houses the classrooms and some faculty and support offices. Specifically the space is laid out in a classroom setting with a mixture of open spaces, small break out rooms, faculty offices, workrooms and one conference meeting space. Building 1’s 25 year old systems are deteriorating and require frequent maintenance. The heat pumps provide inconsistent heat and are unreliable. Operating dollars are needlessly spent maintaining these systems, rather than on preventative maintenance. Deferral of repairs leads to increasing health/safety concerns and liability due to asbestos exposure. Building 16: Technical Lab with an estimated Port contribution of $1.33 million This building is a one story 22,879 sq. ft. facility that houses classrooms and graphics/ceramic art activities along with some faculty offices. These classes support the Liberal Arts requirements of the AA and AA Transfer degrees and are vital to the Instructional programs at the college. In 2002 a portion of this building (the west classroom portion) was remodeled with the assistance of POS sound abatement grant dollars. We are asking to complete this building’s second phase sound remediation project. The building has several different aged HVAC systems. The older equipment is now close to 30 plus years old and is need of complete replacement as it is not cost effective to continue to repair. Like Bldg. 1 above, the hot water piping Victaulic joints leak due to age and deterioration. The system controls are unreliable. Roof leaks have compromised the interior of the building. The entrance doors are not ADA compliant. The building systems are beyond their life expectancy and fail routinely The estimated square footage remaining to be remediated is estimated at 12,000-16,000 sq. feet. What happens if this project is not funded by the State? For both buildings - Wheelchair users will struggle with the entrance doors. Working conditions will continue to be unacceptable due to inadequate HVAC and excessive noise. Additionally a larger amount of money will need to be spent in order to repair the roof leaks and failing HVAC systems in both buildings. In both buildings the ability to fulfill our mission of serving students in an appropriate safe/clean learning environment is at risk if improvements are not conducted soon. Wheelchair users will struggle with the entrance doors. Working conditions will continue to be unacceptable due to inadequate HVAC and excessive noise. What is the desired solution? For both buildings - Insulate the building exterior from noise with new windows, doors and insulation. Replace the HVAC system, repair/replace heating water piping, hot and cold domestic piping as necessary and replace the roofing and insulation. The entrance doors will be wired to allow automatic door openers for ADA compliance and proxy cards installed for security and safety. Install a new DDC control system and make minor interior improvements for accessibility and code compliance. Insulate the building exterior from noise with new windows, doors and insulation. Replace the HVAC system, repair/replace heating water piping, hot and cold domestic piping as necessary and replace the roofing and insulation. The entrance doors will be wired to allow automatic door openers for ADA compliance and proxy cards installed for security and safety. Install a new DDC control system. Will this project increase access or improve utilization? (Yes/No) For both buildings - Yes, the improved access and physical 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000734 Highline Community College SubProject Title: environment will improve the building utilization. What benefit will this project provide the college? By improving the infrastructure and systems in buildings Highline Comm. College will be able to add (Bldg. 1- 1584 square foot of instructional space and improve ad-hoc support learning spaces by another 600 sq. ft.) and (Bldg. 16 - ~14k sq. ft. of improved classroom and building systems). Both buildings will benefit from ADA-compliance/accessibility improvements which are necessary and healthy/safe working/learning environments for employees and students. Additionally, better utilization of space and recognizable reductions to maintenance dollars and labor requirements will be the reality. Finally, newer systems will result in less energy usage and modernized digital control capabilities that have an ongoing ROI. The Port of Seattle Noise Remedy program funds envelope and ventilation upgrades but not all costs associated with those improvements, so Minor funds are used to cover those unfunded, associated costs. In effect, the College receives double the value of the Minor funding, as the Minor funds allow us to accept and spend the Port’s funds. One side of the building is occupied by the College President, Vice President of Administrative Services and Hospitality Services. The other side is occupied by the Financial Services department. Both sides are utilized by on and off campus visitors. ADA-compliant access to these areas is necessary. A healthy working environment for staff as well as for the daily student-visitors. The Port of Seattle Noise Remedy program funds envelope and ventilation upgrades but not all costs associated with those improvements, so Minor funds are used to cover those unfunded, associated costs. In effect, the College receives double the value of the Minor funding, as the Minor funds allow us to accept and spend the Port’s funds. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? Master Plan: For a decade and a half, modernizing campus buildings has been a top College priority. Combining Port of Seattle (over $8.9MM during that span), state, and local funds, Highline has renovated campus buildings at a rate of almost one per year. Strategic Plan: With “improving access to education” and “creating a healthy, nurturing environment for teaching, learning, and working” as priorities, this project will improve wheelchair access and correct an unhealthy work environment. In short the college has identified a 12 year plan for these types of improvements which has been incorporated into the College’s Master Plan and coordinated with the Port of Seattle for future funding requests (submitted in the Port’s planning/grant cycle on an annual basis). Master Plan: For a decade and a half, modernizing campus buildings has been a top College priority. Combining Port of Seattle (over $9M during that span), state, and local funds, Highline has renovated campus buildings at a rate of almost one per year. Strategic Plan: With “improving access to education” and “creating a healthy, nurturing environment for teaching, learning, and working” as priorities, this project will improve wheelchair access and correct an unhealthy work environment. Building 1 & 16 Renovation $ 714,000 State $2,586,000 Local $3,300,000 Total Location City: Des Moines Project Type Program (Minor Works) County: King Legislative District: 033 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000734 SubProject Title: Highline Community College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Prior Biennium Current Biennium 714,000 714,000 Total Funding Acct Code Account Title Estimated Total 147-6 HE Plant Accounts-Non-Appropriated 2,586,000 2,586,000 0 0 0 057-1 Prior Biennium Current Biennium Reapprops 0 0 0 0 2017-19 2019-21 2021-23 0 0 0 Future Fiscal Periods 2015-17 147-6 2017-19 2019-21 2021-23 HE Plant Accounts-Non-Appropriated Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000735 SubProject Title: Green River Community College 0 New Approps 2,586,000 State Bldg Constr-State Total 714,000 2013-15 Fiscal Period Future Fiscal Periods 2015-17 New Approps 714,000 Expenditures Total Reapprops 0 0 0 2,586,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000735 SubProject Title: Green River Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? In 2007, students voted to assess a fee to fund the design and construction of a new Student Life facility that will replace under-sized and inadequate spaces in the Lindbloom Student Center (LC). Student Life programs will move out of LC providing an opportunity to relocate several programs into almost 28,000nsf of vacated LC space. The Speaking Center which provides tutoring for speech and communication students and the Journalism program are both housed in sub-standard spaces. Workforce Education Advisors will temporarily occupy faculty offices in the newly renovated SMT building in 2013. The advisors would better serve students if they are co-located with Educational Planners and other enrollment functions currently housed in LC. Continuing Education is temporarily housed in the WETRC building located on the back side of campus. It is difficult for new visitors to find and is better suited in vacated LC space. Human Resource and Campus Safety staff are housed in two very sub-standard 1968 portables. Shipping and Receiving is housed in the concrete basement of the SS building which is slated to be demolished to accommodate the new Student Life facility, The SS building will be demolished with the exception of the concrete basement which will be made water tight and retained for Shipping and Receiving until they can move into the TID building following the completion of the Trades replacement project. . The ARA building is a 1968 1,700sf portable that is currently used as furniture storage. When the SMT renovation project is complete, the need for storage in ARA will disappear. What happens if this project is not funded by the State? Programs housed in sub-standard spaces will be unable to take advantage of vacated LC spaces reconfigured to meet program needs. The college will continue spending M & O funds on three portables. Workforce Advisors in SMT and CE in WETRC will continue to hamper student services. What is the desired solution? Re-configure vacated spaces in LC to accommodate the Speaking Center, Journalism, Workforce Education, Continuing Education, Human Resources, Campus Safety, and Shipping/Receiving. Workforce Education Advisor offices in SMT will become much-needed faculty offices. Demolish and remove three portables. Update campus maps, signs, and the Facilities Master Plan to support and reflect relocations. Will this project increase access or improve utilization? (Yes/No) Yes The Speaking Center shares space with another program so is limited to the number of days, hours and students it can serve. A dedicated space in LC will allow them to triple their capacity. Moving Workforce Advising next to Educational Planning will greatly enhance the student advising experience. Moving Continuing Education out of WETRC and into vacated LC space will improve access for first-time students. What benefit will this project provide the college? Providing the Speaking Center and Journalism right-sized spaces allows those programs to better serve students. Removing three portables reduces M & O costs. Keeping Shipping/Receiving in their current SS basement location until they can move into LC removes the cost to provide 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects 30000735 SubProject Number: Green River Community College SubProject Title: temporary facilities. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The college’s Strategic Plan includes a goal that states: “The citizens of Washington will be ensured of Green River’s consistent practice of responsible fiscal stewardship and public accountability.” These relocation projects are consistent with and support this goal. These projects are also components in the college’s Facilities Master Plan Schedule which sequences the major renovation and replacement of key campus facilities; specifically the Student Life project and Lindbloom Student Center. Space alterations are driven by the college’s Instructional and Student Services Plan which calls for appropriate and maximum utilization of available space. The implementation of this project will allow the college to continue to respond to significant student demand. Program Relocation $712,000 Location City: Auburn County: King Legislative District: 047 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 712,000 712,000 712,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 New Approps 0 0 0 712,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000736 SubProject Title: Pierce College Fort Steilacoom 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000736 SubProject Title: Pierce College Fort Steilacoom Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Although the Cascade Building (UFI# A08348) is undergoing the second of two funded major renovation projects, minor program space improvements will still be necessary in areas not scheduled for renovation in order to update the College’s instructional environment. Student support services spaces need to be slightly reconfigured to improve service delivery. The lecture hall and math lab are extremely dated and require upgrades. Music instruction and practice rooms in the Olympic South Building (UFI# A03250) have not been updated in over 25 years and are in need of improvements. Computer labs in the Olympic North Building (UFI# A01116) require minor modifications. Instructional spaces in the Health Education Center (UFI# A03199) are in need of minor updates to support current programming. Improvement efforts are necessary to provide updated, technologically capable and efficiently configured instructional spaces to support college programs and provide an appropriate learning environment for students. Continued improvement of the College’s older buildings will alleviate significant programming and service deficiencies. Enhanced flexibility of space and technology improvements will provide benefits throughout the curriculum. Funding may not be sufficient to allow completion of the entire project but portions not completed will be prioritized for future funding cycles. What happens if this project is not funded by the State? Without these minor renovations, the continued upgrade of instructional spaces cannot keep pace with the needs of current instructional methodology and technology or for the need to ensure sufficient student service support. This will continue to strain the College’s ability to provide an appropriate educational environment for students. What is the desired solution? Conduct space modifications, primarily in the Cascade Building, to improve seating, accessibility of use, study arrangements, classroom environment and student service delivery. Will this project increase access or improve utilization? (Yes/No) No What benefit will this project provide the college? Reconfiguration of spaces, primarily in the Cascade and Olympic South Buildings, will make better use of instructional space and provide increased support to students. Existing classroom space will be reconfigured to better accommodate several programs. Overall, improved flexibility of use of instructional spaces will provide a direct benefit to instructors in extending their ability to introduce innovative teaching techniques and delivery of educational material. This will provide a more positive, effective and appropriate learning environment for both students and faculty. Improvements to student service support spaces will enable better services to both instructional and administrative functions of the college. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? These minor improvements will directly support the College’s goal to provide an effective academic environment for students seeking transfer opportunities, readiness for the workforce and in basic literacy. From the standpoint of facility support and maintenance, the project will provide better, more flexible and more efficiently operated spaces that will reduce long-term operating costs. The project is in keeping with the College’s Facilities Master Plan for addressing both immediate and long-term capital needs. This also complies with the Pierce College District Expected Outcomes Policies by providing improved access to comprehensive offerings and to provide quality, relevant learning. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects 30000736 SubProject Number: Pierce College Fort Steilacoom SubProject Title: Improvements in Cascade, Olympic and Health Education Center $629,000 Location City: Lakewood County: Pierce Legislative District: 028 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 629,000 629,000 629,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000737 SubProject Title: Pierce College Puyallup 0 New Approps 0 0 0 629,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000737 SubProject Title: Pierce College Puyallup Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works Program Project Description What is the problem? Why is this project necessary? Older facilities are in need of space improvements in order to better position the college to enable current instructional methodologies and provide adequate student service support. The Gaspard Administration Building (UFI# A03274) and Brouillet Library/Science Building (UFI# A03189) are in particular need of improvements. The priority of effort in the 2013-15 biennium will be to improve direct student service support in the Administration Building. Secondarily, improvements are planned in the Library/Science Building to support instructional space and to improve library space utilization by students. Improvement efforts are necessary to provide enhancements to student support services and to provide updated, technologically capable and efficiently configured instructional spaces in order to maintain an appropriate learning environment for students. Continued improvement of the College’s older buildings will alleviate significant programming and service deficiencies. Enhanced flexibility of spaces and services will provide benefits throughout the curriculum. Funding may not be sufficient to allow completion of the entire project but portions not completed will be prioritized for future funding cycles. What happens if this project is not funded by the State? Without these minor renovations, the continued upgrade of instructional spaces cannot keep pace with the needs of current instructional methodology and technology or for the need to ensure sufficient student service support. This will continue to strain the College’s ability to provide an appropriate educational environment for students. What is the desired solution? Conduct space modifications, primarily in the Administration Building, to improve instructional support and student service delivery. Will this project increase access or improve utilization? (Yes/No) No What benefit will this project provide the college? Reconfiguration of spaces in the Administration and Library/Science Buildings will provide increased support to students and make better use of instructional space. Improvements to student service support spaces in the Administration Building will enable better services to both instructional and administrative functions of the college. Existing classroom space in the Library/Science Building will be reconfigured to better accommodate instructional programs. Minor modifications in the Library will greatly improve student access and support. These projects will provide a more positive, effective and appropriate learning and student support environment for both students and faculty. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? These minor improvements will directly support the College’s goal to provide an effective academic environment for students seeking transfer opportunities, readiness for the workforce and in basic literacy. From the standpoint of facility support and maintenance, the project will provide better, more flexible and more efficiently operated spaces that will reduce long-term operating costs. The project is in keeping with the College’s Facilities Master Plan for addressing both immediate and long-term capital needs. This also complies with the Pierce College District Expected Outcomes Policies by providing improved access to comprehensive offerings and to provide quality, relevant learning. Improvements in Gaspard and Brouillet Buildings $428,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000737 SubProject Title: Pierce College Puyallup Location City: Puyallup County: Pierce Legislative District: 025 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 428,000 428,000 428,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000738 SubProject Title: Centralia Community College 0 New Approps 0 0 0 428,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000738 SubProject Title: Centralia Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? A.) Voc Tech yard has a large oil changing ramp with pit that is no longer used and not part of the instructional program goals and objectives. B.) The installation of the science department’s outdoor learning lab and acquisition of city streets bisecting the campus has raised the campus needs for appropriate lighting and signage for circulation and safety issues. C.) Student Center and Kemp Hall need lighting improvement. Most lighting fixtures are T- 12 florescent type. T-12 lamps are no longer manufactured and soon will be unobtainable. D.) Health and Wellness Center has two exterior upper east and west walls that leak severely with wind driven rain. What happens if this project is not funded by the State? Instructional and student support value of facilities will further erode. Maintenance costs will increase and security concerns during non-daylight hours will escalate. What is the desired solution? A.) Remove ramp, gravel and grade yard. B.) Install signage and add outdoor lighting. C.) Replace old lighting fixtures in Kemp and Student Center D.) Replace old painted surface with a waterproof Dryvit material Will this project increase access or improve utilization? (Yes/No) NO What benefit will this project provide the college? These projects will help preserve our facilities, make the most use of space and increase security with better lighting and signage. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? As the college has expanded over the past decade, circulation issues in particular lighting, have expanded as well. The college master plan established the vehicular and pedestrian circulation patterns and the signage and lighting components of the project will support this concept. In addition, the master planning for the campus and instructional planning calls for the eventual expansion of the welding program into industrial fabrication. This will require modifications and improvements to the current yard set-up. This project will contribute to that goal by addressing the yard component. Site Improvements $501,000 Location City: Centralia Project Type Program (Minor Works) County: Lewis Legislative District: 020 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000738 SubProject Title: Centralia Community College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 501,000 501,000 501,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000739 SubProject Title: Lower Columbia College 0 New Approps 0 0 0 501,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000739 SubProject Title: Lower Columbia College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The Main building was originally constructed in 1950 and has undergone several major renovations within the majority of its original academic space. A large addition was added to the south side of the facility in 2003, with a complete renovation of the northeast section at the same time. In 2007, the lower west wing was renovated and in 2009 the existing art gallery was relocated to the Rose Center for the Arts. This vacated space was renovated and reconfigured in 2009 to meet current academic needs, leaving only the science labs, restrooms and general classrooms on the second floor west wing untouched. As we anticipate relocating these science (biology) labs, classrooms, chemical storage, cadaver, lab offices to our new Health & Science facility, this space must be reconfigured to meet current operational needs. Completion of this project will allow opportunities for program enhancements and expansions while improving functionality, access and space utilization. Critical infrastructure will be updated and brought up to today’s current codes and standards. What happens if this project is not funded by the State? The building will be less than adequate to meet the academic and operational needs of the college. Without a minor renovation, the space will be unavailable for academic use. What is the desired solution? A complete renovation with current technology, life safety devices, ADA accessibility, and an adequate ventilation system which support a modern configuration. Will this project increase access or improve utilization? (Yes/No) Yes The College is currently conducting a facilities master plan, which will determine the future needs of this critical academic space. What benefit will this project provide the college? This minor project will allow us to update the second story west wing of the College’s original building, completing a ten year cycle for complete renovation of this building. Upgrades to the plumbing, restrooms, HVAC, ADA access, and ventilation will improve the overall academic learning within this instructional space. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The project is part of the College’s current master plan under minor projects to renovate existing space in conjunction with the Health and Science facility. This project will also support our enrollment initiatives (#3 & #5) and annual priorities (Core Theme IV: Institutional Excellence) The project area is old, lacks technology, has outdated life safety devices, and is currently configured as an anatomy/physiology & biology lab space. The space does not add to the aesthetic value of the LCC community nor the surrounding community. Renovate Main Building Second Floor West End $582,000 Location City: Longview Project Type Program (Minor Works) County: Cowlitz Legislative District: 019 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000739 SubProject Title: Lower Columbia College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 582,000 582,000 582,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000740 SubProject Title: Clark College 0 New Approps 0 0 0 582,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000740 SubProject Title: Clark College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Clark College’s student population has boomed in the last four years. With total student head count at about 16,000 per quarter and annualized FTES over 9,800, Clark is the most over-enrolled community college in the state. As a result, the College’s instructional spaces are being used more frequently and for more purposes than ever before. Minor improvement funding will enable the College to utilize instructional space more efficiently, support and enhance instructional programming, and accommodate what is sure to be ongoing growth. Faculty and staff offices also need improvement to support College growth. Funds requested will modify existing office areas for more efficiency. What happens if this project is not funded by the State? If this project is not funded opportunities to provide enhanced instructional space and office areas will be lost and existing inefficiencies will continue. The College’s ability to respond to unprecedented growth will also be significantly hampered. Finally, failure to fund minor improvements today will likely result in more costly and complicated improvements tomorrow. What is the desired solution? Modifications to instructional program space will support active learning processes and be consistent with current trends in instructional methodology. Instructional methodology at Clark College has been shaped by education trends and implications related to learner-centered instruction. As Clark College continues to grow the need for faculty and support office space grows. Renovation of existing space to be more efficient is an essential method if addressing the growth by focusing on better utilization of existing spaces. Will this project increase access or improve utilization? (Yes/No) Yes A net change of about 100 FTE is estimated based on the impact of similar past projects, however there is not a direct relationship between either increased access or improved utilization. What benefit will this project provide the college? This project will provide enhanced instructional program space, more efficient office areas, and accommodations for growth in our student population. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The current College Facilities Master Plan update was developed to support the strategic plan and address key educational trends and implications. This project supports the intent of the Facilities Master Plan. Renovations to instructional program and support spaces $840,000 Location City: Vancouver Project Type Program (Minor Works) County: Clark Legislative District: 049 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000740 SubProject Title: Clark College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 840,000 840,000 840,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000741 SubProject Title: Wenatchee Valley College 0 New Approps 0 0 0 840,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000741 SubProject Title: Wenatchee Valley College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? WVC is expanding its service to students in Omak. This service means increased access to classes and to a greater breadth and depth of curricular choices. The primary means by which we can expand our schedule it via distance modalities. We serve a population in Okanogan county that is not adequately prepared with home computers connected by fiber optic networks. We also serve a population that has a great need for developmental (pre-college) courses. We cannot use the online instruction model that expects this population to access their coursework at home. Therefore, we propose to schedule real-time instruction in a technology-enhanced classroom with adequate tutoring resources nearby. The current facility is inadequate to provide additional access in this manner. We are proposing to remodel the Student Resource Center to include a functional technology-enhanced flexible classroom, next door to a modern learning support center (tutoring and “write-lab” services). Student support specialists and counselors are also stationed in this building and would be available for student mentoring, goal-setting, follow-up, etc. We cannot duplicate the breadth and depth of our faculty resource in a face-to-face capacity in Omak. For example, offering physics or higher-level calculus with a masters-prepared instructor in Omak is not realistic. Enrollment would be too low, adjunct faculty are not available in the community, and the current funding climate does not support such low-enrollment efforts with travelling faculty. As stated above, the Okanogan County portion of our district cannot be served well by assuming that the citizens there would thrive in an online learning environment or even have adequate access to such an opportunity. The remodel would facilitate real-time didactic instruction to students in Omak that is generated, at times, from a distant site (e.g., WVC at Wenatchee). A para-educator can be assigned to the room to assist students as they progress through their lessons. Perhaps the most obvious model would be for the lecture in a science course that is not currently offered in Omak to be delivered in real-time (and online for those few who have access) to students in our new facility. The lab would be instructed by a face-to-face instructor in Omak. We can hire qualified persons for lab instruction with the appropriate mentoring from the didactic instructor. This project will serve more students, create a modern classroom, transform the way in which we teach, and open up more curricular choices for our most disadvantaged and underserved students. What happens if this project is not funded by the State? We will continue to under-serve the citizens in Okanogan County, restrict their access to the curriculum, and continue to restrict their choices of courses. What is the desired solution? Remodel the Student Resource Center (SRC) on the WVC-Omak campus by creating a modern, at least 24-seat, technology enhanced, classroom. We would also create a learning support (tutor) center in the same building that would be technology-enhanced. The project will require relocation of some other functions that currently take place in the SRC. Will this project increase access or improve utilization? (Yes/No) Yes If yes, please specify the Net Change in FTE capacity. 24 What benefit will this project provide the college? Please see above. In brief, we will increase WVC’s capacity to offer a broader range of courses to students in Omak because it would utilize a real-time model of technology enhanced instruction. The instructor resource is largely located in the 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects 30000741 SubProject Number: Wenatchee Valley College SubProject Title: Wenatchee area which limits the curriculum in Omak as does the lack of technology infrastructure for the citizens of Okanogan County. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The facilities master plan for the Omak Campus is under review this year. One of our intentions is to increase access to our full curriculum by the Omak students. This program is perfectly aligned with that program enhancement. Program Enhancement at Wenatchee Valley College in Omak $566,000 State $317,612 Local $873,612 Total Location City: Omak County: Okanogan Legislative District: 007 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 556,000 556,000 556,000 Acct Code Account Title 147-6 HE Plant Accounts-Non-Appropriated Total Estimated Total Prior Biennium Current Biennium Reapprops 318,000 318,000 057-1 0 0 0 2017-19 2019-21 2021-23 State Bldg Constr-State Total 0 New Approps 318,000 Future Fiscal Periods 2015-17 556,000 2013-15 Fiscal Period Expenditures Funding New Approps 0 0 0 318,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000741 SubProject Title: Wenatchee Valley College Future Fiscal Periods 2015-17 147-6 2017-19 2019-21 2021-23 HE Plant Accounts-Non-Appropriated Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000742 SubProject Title: Yakima Valley Community College 0 0 0 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000742 SubProject Title: Yakima Valley Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Prior Hall is an Instructional building that was built in 1949. It contains classrooms, science labs, speech labs, a dark room, offices and the technology services department. The current space utilization has the following problems: 1) Science Labs: These labs are outdated and are not being utilized as labs but as basic skills classrooms. The current lab configuration is not conducive to learning. 2) Technology Services: While the location of technology services is ideal, the current HVAC system is not adequate to cool the work area where computer equipment is being worked on. 3) Classroom: Current classroom configuration does not support the colleges need for larger instructional spaces. This project will allow the classrooms and labs to be remodeled to support an updated learning environment that will contribute to the success of our students. This project will also provide adequate HVAC to the technology services area that is critical to the working environment of staff and will help keep the computer equipment at an optimal operating temperature thus adding to the equipments useful life. This project will allow YVCC to convert several smaller classrooms in to one large classroom that will support larger lecture classes. What happens if this project is not funded by the State? The current space will remain inadequate to serve the needs of our students and staff. There will be insufficient classroom space to accommodate needed classroom instruction. What is the desired solution? To remodel the second floor of Prior Hall, transforming the lab spaces into an ideal instructional area for students and providing adequate heating and cooling to the technology services area. Will this project increase access or improve utilization? (Yes/No) Yes, improve utilization. What benefit will this project provide the college? Greater capacity for serving students in classrooms that are built to promote teaching and learning. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? YVCC is committed to providing a state of art learning and working environment for its faculty, staff and students. Prior Hall is an adequate structure in need of interior remodeling and is an important structure in our campus master plan. Prior Hall Interior Improvements $702,000 Location City: Yakima Project Type Program (Minor Works) County: Yakima Legislative District: 014 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000742 SubProject Title: Yakima Valley Community College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 702,000 702,000 702,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000743 SubProject Title: Spokane Community College 0 New Approps 0 0 0 702,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000743 SubProject Title: Spokane Community College 2012 Program 5 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The current complex has classrooms within classrooms and offices within classrooms. There are too many doors to go through to provide safe exit. The current configuration was customized specifically as classrooms/labs/offices for the electronics program (which has moved to the Tech Ed Building 28). The classrooms are not fully accessible for multi-use and it is not the best use of space. What happens if this project is not funded by the State? To use the spaces students will have to go through one classroom to get to another classroom. What is the desired solution? Reconfigure the whole complex to multiuse general classrooms and offices that are safe and assessable. Will this project increase access or improve utilization? (Yes/No) Yes, improve utilization. What benefit will this project provide the college? Provide additional teaching and general classroom space available for the use of any division/department/program. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? This project is consistent with the capital master plan and strategic plan by utilizing space that has been vacated due to a major construction project. Building 1 Room 120 Reconfiguration $440,000 Location City: Spokane County: Spokane Legislative District: 003 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 440,000 440,000 New Approps 440,000 0 0 0 440,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000743 SubProject Title: Spokane Community College Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000744 SubProject Title: Spokane Falls Community College 0 0 0 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000744 SubProject Title: Spokane Falls Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Significant space in Building 17 was originally allocated for recreation activities (bowling facility, table and arcade games), yet this is SFCC’s sole building where critical student services are delivered. Currently there is inadequate and poorly located space allocated to student testing and assessment; there is no space for a Veterans Services center; Career and Workforce Support services operate from separate (too small) spaces; and the building does not have adequate space to accommodate the demand for use by campus-based and external users. What happens if this project is not funded by the State? Since current rules/priorities prevent the use of major capital funding for student unions and athletics facilities, SFCC would be unable to make even simple changes in the building. The proposed changes in this request are more significant than local funding could support and are contingent upon a sequenced set of moves to maximize the connections to student learning and the intensified needs of veteran students, increased demand for testing/assessment, new student orientation and academic advisement. What is the desired solution? By relocating the area for student recreation activities nearer to the food service area and removing the bowling facility, SFCC can dramatically increase the Testing & Assessment Center capacity; it can create a Veterans Services Center; and it can unify Workforce Support and Career Center functions. Additional benefits include the ability to expand a Diversity Center and the Campus Safety & Security suite, as well as the addition of three critically needed break-out rooms for use by campus community groups and external users. Will this project increase access or improve utilization? (Yes/No) Yes, this project improves access for veterans and new students, better utilizes the entire building and can double our current testing and advising capacity. More specifically, it increases the college’s capacity to admit, test, orient and advise new students. It provides a critically needed, one-stop location for an increasing array of veterans (and dependent) services, ranging from counseling to funding. It unifies complementary functions of worker retraining, career/technical education and career planning services. In addition, this project increases the array of spaces available for student clubs and external meeting users, and it unifies a broader range of student sub-populations (primarily GBLT, ethnic clubs and international students) into a larger Diversity Center. It also unifies two sub-standard office spaces where International Programs staff are currently housed, and it concentrates social/recreational spaces in/near the SFCC Falls Café, which is currently under-utilized. These changes shift “noisier” functions away from services requiring quiet space, such as testing, and spaces designed for unstructured/social use (food, recreation, entertainment, etc.). What benefit will this project provide the college? In short it better utilizes the limited square footage of Building 17 and prioritizes a greater range of important student services over recreational activities. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The need to reapportion space and remodel Building 17 to maximize services to students is addressed in the Campus Master Plan, acknowledging that funding to do so is limited. The primary changes proposed directly relate to the first initiative (Student Success) in the 2011-21 CCS strategic plan which includes as key performance indicators: strengthening engagement by (1) improving student success transitioning among educational levels and careers, and (2) strengthening 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects 30000744 SubProject Number: Spokane Falls Community College SubProject Title: student completion. By increasing testing and assessment capacity and providing more comprehensive services to veterans, transfer students and displaced workers, we are sharpening our focus on student success (degree/certificate attainment, career exploration and connections to academic programs). Building 17 SUB Remodel $782,000 Location City: Spokane County: Spokane Legislative District: 006 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 782,000 782,000 782,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000745 SubProject Title: Big Bend Community College 0 New Approps 0 0 0 782,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000745 SubProject Title: Big Bend Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Building 1600 has very small classrooms, limiting the capacity to 20 students in all classrooms except one larger room. This project is necessary to increase classroom size to accommodate 10-15 more students. We would like to increase the Criminal Justice class offerings, but we do not have large enough classrooms. In addition, other social science classes could use larger classrooms. This would allow for more openings in these popular classes and shorter waiting lists. What happens if this project is not funded by the State? It will become increasingly difficult to meet the needs of instruction and to support the academic mission of the College. What is the desired solution? To increase the size of classrooms and improve technology in Building 1600. Will this project increase access or improve utilization? (Yes/No) Yes, project will add capacity for 10 to 15 more students to 6 classrooms. What benefit will this project provide the college? This improvement will create the facility needed to support the delivery of quality education students need and allow us to serve more students. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? This will help the College meet its mission and strategic plan goals to improve access to quality education for our service district. Big Bend Community College has a comprehensive facility master plan and this renovation/addition will keep us in line with the goals outlined in this plan. Renovation of Building 1600 for Business & Liberal Arts $606,000 Location City: Moses Lake County: Grant Legislative District: 013 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000745 SubProject Title: Big Bend Community College Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 0 0 0 606,000 606,000 606,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000746 SubProject Title: Columbia Basin College 0 New Approps 0 0 0 606,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000746 SubProject Title: Columbia Basin College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works Program Project Description What is the problem? Why is this project necessary? Many of the college’s buildings were designed and built in the late 1950’s and 1960s to construction and educational standards that no longer support our educational processes. The spaces were cheaply constructed and totally inadequate for today’s modern instructional processes. These classrooms and labs do not have the infrastructure that will support the technology necessary for instruction. These spaces need upgrades in lighting and lighting controls to better meet multimedia needs and emerging sustainability issues. The acoustics are poor in many areas because there is no control over external noise and surfaces, which are not conducive to quality instruction. Door locks and alarm systems need upgrading. HVAC systems need minor improvements and new control systems in order to be more reliable and cost effective to maintain. Quality education cannot be achieved in facilities that cannot provide full support for instruction at the required levels. Improved facilities greatly enhance student preparation for advancement, articulation and entry into the workforce. What happens if this project is not funded by the State? The facilities will continue to poorly support needed student outcomes and success. Students will be denied access to today’s technology in these areas in need of improvement. Acoustic issues create the potential for students not hearing the entire course content as it is delivered. This puts them at risk for not succeeding. Without upgrades to technology services in the selected classrooms and labs, the faculty’s ability to use advanced tools in teaching will be severely impacted since the classroom will not support the use. Integration of technology and some reconfiguration of library learning spaces are critical to meet students’ need for educational resources outside the classroom. If we cannot make needed improvements, students will continue to have access restricted to resources due to the current facilities inability to physically provide appropriate access. What is the desired solution? Properly designed and equipped facilities are essential in providing quality support students need to succeed in a complex world. Properly constructed space permits flexibility to select and implement future technology improvements as necessary for cutting edge technology, universal access and flexible space for both core and high technology programs. We intend to continue our plan to improve the functionality of office and support areas; ventilation/indoor air quality; electrical, audio, visual, video elements of the educational delivery process; and essentially create a positive environment for students. Severely outdated spaces will be improved with enhanced information technology, enhanced infrastructure, multiple-use labs and classroom spaces will be revamped to accommodate a wide range of course offerings in an overall improved learning environment. Will this project increase access or improve utilization? (Yes/No) Yes, by 100 FTE What benefit will this project provide the college? The real benefit will be increases in student success and retention. Good learning space is the key to student success and eventual transfer to a university or entry into the workforce. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The project will first ensure that CBC will be able to continue to meet a prime element of its Mission to improve access to quality education for our community of learners. Our Strategic Plan brings focus to this by stating if we are to ensure that students successfully complete requirements that would enable them to transfer to upper division colleges and universities, 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects 30000746 SubProject Number: Columbia Basin College SubProject Title: specific steps are to be taken. Accordingly, CBC will provide students with: • Innovative instructional systems • Up to date technology • An educational environment that promotes and develops an appreciation of lifelong learning • An educational environment that promotes and develops an understanding of diversity in people, opinions, cultures and values. • An educational environment that emphasizes communication skills The five main points of the relevant Strategic Direction above drive the Capital Ten Year Plan to provide systematic and continual facility improvement that are necessary for cutting-edge technology, universal access and flexible space for both core and high-technology programs, and will position the College to better assist and support the growing population of the Tri-Cities Region in their educational and life choices. The Tri-Cities is a diverse and growing region whose citizens need access to current and state of the art educational resources in order to become not only a knowledge base work force, but also one trained and educated to meet the demands of an ever increasing knowledge-required world. Bringing CBC’s facilities up to date and capable of supporting the technology needed for student success is one step being taken as part of the College’s Master Strategic Facility Plan. The plan is a balanced mix of replacement, renovation and minor improvement intended to keep this 50+ year old college moving forward as a community resource. Improvements to Pasco Main Campus Classrooms $672,000 Location City: Pasco County: Franklin Legislative District: 016 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 672,000 672,000 672,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts 0 New Approps 0 0 0 672,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000746 SubProject Title: Columbia Basin College No Operating Impact Narrative No new square footage. SubProject Number: 30000747 SubProject Title: Walla Walla Community College 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000747 SubProject Title: Walla Walla Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? WWCC lacks adequate office space for essential functions of business services, payroll, and information technology. As the College has grown, capital construction projects have been directed toward meeting the specific needs of instruction and student services. From 2005 to 2010 state supported enrollment increased from 3,050 to 3,527 FTE students. Use of information technology to support instruction has increased significantly as online, hybrid, and computer assisted learning has grown at a faster rate than overall enrollment. Business services to support this increased enrollment have become more demanding and more complex. While enrollment has increased and complexity of operations has become more demanding, space to house staff who perform critical functions in business services, payroll and information services has not grown or changed. This has resulted in inadequate space for the employees who work in these areas. Crowding in the existing space has resulted in work spaces that are poorly organized, lack security and privacy, and are difficult to heat and cool. Offices must work together are physically separated. There is inadequate space for student interns or cooperative training students to work in either business services or information technology. This limits work/learning opportunities for students on campus. Large, single pane windows in some of the space contribute to heating and cooling difficulties. The result is an inferior work environment that negatively impacts productivity, effectiveness and efficiency of an otherwise dedicated staff. What happens if this project is not funded by the State? If this project is not funded by the State, the inadequate work space for business services, payroll, and information technology will continue to negatively impact work that is essential and critical to the success of students at WWCC. What is the desired solution? The desired solution is to reconfigure at least 3,200 square feet of existing office space, remodel 1,080 square feet of poorly utilized and unnecessary circulation space, and add about 590 square feet to create improved organization and better utilization of the entire space. The proposed project will provide about 350 additional square feet for library use and improved office space for Culinary Arts instruction. The Culinary Arts office is currently located in a space that was a small art gallery. Lighting is inefficient and ineffective. The desired solution is to complete a comprehensive renovation of office space. Will this project increase access or improve utilization? (Yes/No) Yes – Improved Utilization If yes, please specify the Net Change in FTE capacity. Capacity will increase by 5-7 coop. training students. The project will provide improved work space for at least 28 full time employees. What benefit will this project provide the college? The project will create a more professional, productive, organized and efficient work space for at least 28 current employees. As a result it is expected that better communication and coordination of important work in business services, payroll, and information technology will occur. Space for student interns and cooperative training students will allow for expanded learning opportunities for students. Security for staff, important records, and expensive equipment will be improved. Heating, ventilation, and air conditioning will be improved resulting in better indoor air quality. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? When funded, this project will correct deficiencies related to business services spaces and information technology services spaces that were pointed out in the 2005 Facility Master Plan. This project directly relates to several of the College’s goals. These goals are identified by bullets below. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects 30000747 SubProject Number: Walla Walla Community College SubProject Title: OUTCOME GOAL • Prepare students for the 21st-century work force. The improved work space resulting from this project will provide quality, on-campus work/learning opportunities in business services and information technology. PROCESS GOALS • Embrace relevant technologies. The project will improve office space for staff who support both instructional and administrative computer technologies. • Provide services that support student learning. The project will create more suitable space for all of the business functions that support teaching and learning at WWCC. • Hire, develop, and retain highly qualified staff. Completion of this project will result in professional work spaces that will help attract and retain highly qualified employees. The project will result in work spaces that encourage sharing of responsibilities and cross training to maximize effectiveness of employees. • Acquire and maintain high quality facilities. Through this project outdated and inadequate space will be brought up to current, high quality standards. • Pursue additional sources of funding. The minor project request is the most logical way to solve the facility inadequacies described above. Completion of this minor capital project will address one of WWCC’s strategic priorities for 2012-2013 and beyond, “Nurture an organization that focuses on employee engagement and high morale.” Provision of a high quality physical work environment is an important part of nurturing employee engagement and high morale. Walla Walla Campus Building D Office Renovation and Upgrade $659,000 Location City: Walla Walla County: Walla Walla Legislative District: 016 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 659,000 659,000 659,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts 0 New Approps 0 0 0 659,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000747 SubProject Title: Walla Walla Community College No Operating Impact Narrative No new square footage. SubProject Number: 30000748 SubProject Title: Whatcom Community College 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000748 SubProject Title: Whatcom Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? 1) Whatcom has seen a substantial increase in demand for anatomy and physiology courses which are prerequisites for our Nursing Program and other Health Professions Programs. In addition, continued focus on STEM enrollments compound the need for lab space. At current enrollments we are unable to serve the number of students requesting these courses due to a shortage of lab space. More general science lab space is needed to allow the College to add sections in these areas of study. 2) Over the past several years, high demand and growth in specialized programs has forced the College to convert general classrooms into specialized labs or classrooms dedicated to specific programs. This has caused a shortage of multi-use instructional spaces on campus. General classroom space is in high demand and required to serve the increasing number of students. What happens if this project is not funded by the State? 1) Waiting-lists for the prerequisite science courses will continue to grow and student will not be able to take the classes they need to complete their programs on schedule. This will create a bottleneck for many of our health programs in particular. 2) The College will not be able to take full advantage of the spaces vacated by the move of our Allied Health Programs to the Health Professions Building. These program specific spaces would remain vacant until local funds could be allocated for the conversion to general classroom space. Local funds would likely not be available for several years. What is the desired solution? 1) Convert Kulshan, room 109 into a general science lab that will serve general biology, anatomy, and physiology courses. 2) Remodel and provide technology upgrades to approximately 5,360 sq. ft. of classroom space in two buildings (Cascade, Laidlaw). These upgrades will increase multi-use classroom capacity on campus to help relieve current challenges with scheduling and limited course offerings. Will this project increase access or improve utilization? (Yes/No) Yes, 150 FTE What benefit will this project provide the college? 1) It would allow us to follow through with the plan to convert one classroom in Kulshan Hall into a lab designed for general biology, anatomy and physiology course instruction. This would relieve overcrowding in the labs and provide the opportunity to increase offerings of these high-demand science courses. 2) This project will renovate spaces vacated by the Allied Health Programs move to the Health Professions Building allowing the College to accommodate enrollment growth and provide more effective scheduling for the next several years. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? 1) Kulshan Hall was designed and constructed with the infrastructure in place to allow for low-cost conversion of two classrooms into general science lab spaces. The project will provide enhanced instructional space and better serve students by converting one of these classrooms into a general science lab. Building Systems (plumbing, electrical, HVAC) were designed into the original construction to facilitate this conversion. 2) This project follows the College’s strategic plan by increasing student success in transfer and career preparation by increasing course offerings and improving student access through more effective scheduling. Sciene Lab Conversion and Program Area Remodel $457,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000748 SubProject Title: Whatcom Community College Location City: Bellingham County: Whatcom Legislative District: 042 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 457,000 457,000 457,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000749 SubProject Title: Tacoma Community College 0 New Approps 0 0 0 457,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000749 SubProject Title: Tacoma Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The existing Building 9 contains 4,969 square feet of desirable academic square footage at a prime central location on campus, but it is currently not usable. It previously contained TCC office space which has been vacated. Building 9 has not been renovated since it was originally built in 1965. TCC has abated the hazardous materials and demolished the interior partitions, ceilings, mechanical & electrical systems to help prepare the building to be renovated to provide highly-needed classroom space. TCC is currently in the process of performing some limited structural upgrades to the building and infrastructure work on electrical, storm, and sewer systems. Enrollment has risen significantly and TCC has a shortage of classroom space. The college is currently leasing classroom space from Bates Technical College. The renovation is necessary to provide academic classrooms, as well as required restrooms and support space. What happens if this project is not funded by the State? If this project is not funded, it would affect TCC’s ability to provide access to educational classroom space for students, and impact the effectiveness of meeting its mission and Strategic Goals. Building 9 would continue to be vacant and unable to be occupied. Funds that the college has put into abatement & demolition work to date, as well as the building shell & utility work (Phase 1) to be performed during the current biennium, would go to waste. What is the desired solution? The desired solution is to renovate Building 9 to provide 3 classrooms, plus restrooms and support space. A study was recently performed by the Campus Architect which estimated the total project cost of an exterior (shell) and interior (core) renovation to be $1,457,000. The project is planned to be constructed in multiple phases, as funds become available. TCC plans to perform the design and construction of Phase 1 – Building Shell & Outside Utilities – during the current biennium. The 2013-15 Minor Program Request is for Phase 2 – Interior Renovation. The total project cost of Phase 2 was estimated to be $875,000. The scope of the difference between the Phase 2 Interior Renovation estimate and the 2013-15 Minor Program Request budget is planned to be constructed as funds become available. Will this project increase access or improve utilization? (Yes/No) Yes, this project will increase access to classroom space and improve utilization. The new classrooms will have state of the art multi-media capability. The project may not cause an immediate net change in FTEs since the new classrooms will likely allow the college to bring students back to campus from Bates, rather than adding new students. What benefit will this project provide the college? The Renovation of Building 9 will provide many benefits: - Improve the ability of TCC to serve the academic needs of its students. - Provide comprehensive learning space to optimize student success. - Re-use an existing un-occupiable building at a central accessible location on campus. - Enhance the appearance of the campus facilities with a renovated original campus building. - Provide energy savings with current energy code-compliant efficient lighting, plumbing and HVAC systems. - Many TCC students will not need to travel to a different college location to continue with their instruction. - The college will not need to lease as much additional space from another college. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The renovation of Building 9 will provide highly-needed classroom space that supports the facilities master plan, the strategic 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects 30000749 SubProject Number: Tacoma Community College SubProject Title: plan, and institutional goals. The shortage of academic classroom space has been identified in the facilities Master Plan as a priority need. TCC has among the lowest ratios of square feet/FTE of all state community colleges. Providing classroom space relates directly to several 2010-2014 Strategic Planning priorities, including to “create multiple and equitable learning environments to support the needs of our diverse student population.” The project also supports many of TCC’s “Commitment to Innovation” Strategic Initiatives. The primary “Learning” initiative strategy is “Provide adequate classroom space.” Building 9 Renovation $657,000 Location City: Tacoma County: Pierce Legislative District: 028 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 0 0 0 657,000 657,000 657,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000750 SubProject Title: Edmonds Community College 0 New Approps 0 0 0 657,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000750 SubProject Title: Edmonds Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Existing phone switch is at end of life and system cannot be reconfigured or expanded to meet current needs. Campus is experiencing need for additional communication capacity to support programs, services, and emergency preparedness efforts, including installation of a mass notification system. What happens if this project is not funded by the State? We are not able to increase capacity of existing system or reconfigure to accommodate needs for phone service at our remote sites. Current system is not able to support emergency preparedness efforts because it is an outdated system that is no longer supported. An upgrade would provide opportunity to expand mass notification capacity across campus facilities. What is the desired solution? Replace current outdated phone system with new technology (Voice over internet protocol -VoIP), increasing capacity for expansion and services for our campus, including emergency notification. Will this project increase access or improve utilization? (Yes/No) No What benefit will this project provide the college? This project will provide an updated, technologically advanced, multifunctional voice over internet protocol (VoIP) system that is expandable to meet current and future needs as well as the potential to tie into our mass notification capabilities. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? This supports our Facilities Master Plan by making efficient use of resources through a multifunctional communications system that also improves accessibility to the mass notification system on campus. This project also supports the Facilities Master Plan by achieving multiple objectives with one project and improving flexibility to accommodate future growth. This project supports our strategic plan and institutional goals by providing new technologies for the workplace and the classrooms Telecommunications replacement $717,000 State $ 2,200 Local $719,200 Total Location City: Lynnwood Project Type Program (Minor Works) County: Snohomish Legislative District: 032 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000750 SubProject Title: Edmonds Community College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium 717,000 717,000 Funding Account Title Estimated Total 147-6 HE Plant Accounts-Non-Appropriated 0 0 Total 0 Prior Biennium Current Biennium Reapprops 0 0 0 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State 0 Total 0 0 0 Future Fiscal Periods 2015-17 147-6 2017-19 2019-21 2021-23 HE Plant Accounts-Non-Appropriated Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000751 SubProject Title: South Puget Sound Community College 0 New Approps 2,000 Future Fiscal Periods 2015-17 717,000 2013-15 Fiscal Period 2,000 2,000 New Approps 717,000 Expenditures Acct Code Reapprops 0 0 0 2,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000751 SubProject Title: South Puget Sound Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? This project will reconfigure the interior of the building to accommodate and improve the ability of various administrative functions to collaborate around the operational functions necessary to have an efficient and well run institution. The executive and administrative functions of the College are located in this building. Student Services, currently housed in Building 25, will relocate with the completion of the renovation of Building 22. The administrative functions of Campus Security, Human Resources, and the Business Office have been underserved for many years and their space needs require moderate expansion. Our campus officers’ dressing and locker room is shared with the key making and break room activities. Security equipment is being stored in cubbyholes around campus wherever space can be found. Human Resources has no place for confidential counseling with staff and the folks in the business office are working elbow to elbow. Additionally, the Information Services functions have been displaced from Building 22 and need to be housed with the rest of Administration. The College Data Center was previously relocated to the Administration Building under a separate project in the 2011-2013 biennium in preparation for this move. A meeting room that seats 60-80 people needs to be established near the administrative hub of the College to serve the College and local community. This replaces a meeting room previously housed in Building 22. What happens if this project is not funded by the State? Student Services, which is currently housed in Building 25, will relocate with the completion of the renovation of Building 22. Without this project, the portion of the building most used by the public will remain vacant. We will be forced to relocate Information Services staff into a space that will not allow them to work efficiently, which will hamper their ability to serve students, faculty and staff effectively. Security will continue to struggle with space issues, decreasing productivity, morale and safety of staff, faculty, students and visitors. The Business Office will continue to tolerate unnecessary distractions which cause inefficiencies and loss of productive work time. What is the desired solution? This is an opportunity to create space that will permit a wide variety of administrative departments to work collaboratively and improve College operations. This building provides space to engage with the local community through the Board of Trustees and the College Foundation. Will this project increase access or improve utilization? (Yes/No) No. What benefit will this project provide the college? The major renovation of Building 22 creates a center for serving students in a comprehensive and customer focused manner. Building 25 will become the center for the college’s core business functions, housing the Business Office, Human Resource Services, Information Services, College Relations, College Foundation, Board of Trustees, and President’s Office. This project will correct long standing space deficiencies noted above in Human Resources, Safety and Security, and the Business Office. Co-locating Information Services with the other business functions of the college will improve collaborative planning and implementation of strategic initiatives that support students, faculty, and staff and that engage and inform the community. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The 2007 Master Plan had scheduled the Building 25 renovation to be completed in the 2011-2013 biennium as a part of the Campus Center Redevelopment Project. Due to economic pressures and budget revisions, the final phase was dropped 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects 30000751 SubProject Number: South Puget Sound Community College SubProject Title: from the project. This project is a substantially scaled back version to repurpose space vacated by Student Services as they relocate into the renovated College Center Building. This change is reflected in an updated implementation schedule for the Campus Master Plan. Reconfigure Administration Building 25 $547,000 Location City: Olympia County: Thurston Legislative District: 022 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 547,000 547,000 547,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000752 SubProject Title: Bellingham Technical College 0 New Approps 0 0 0 547,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000752 SubProject Title: Bellingham Technical College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Student Services including financial aid, registration, admissions, advising, career development, student and disability support and counseling are all housed on the first floor (6,300nsf) of the College Services Building (CSB). The demands on student services continue to grow. The present configuration of the space is not efficient for staff and is confusing for students trying to navigate their way through the enrollment process. Bellingham Technical College (BTC) is presently reviewing how to re-organize how it can better deliver these important services to provide a “one stop shopping” experience for our students. What happens if this project is not funded by the State? Staff efficiencies gained by reconfiguring the space will be lost and the students will continue to have a less than an optimal experience with enrollment and other important student support areas. What is the desired solution? Reconfigure the first floor of CSB to provide a more efficient layout and flow of student services. Will this project increase access or improve utilization? (Yes/No) Yes, improved utilization. What benefit will this project provide the college? This project will relieve some of the congestion and help to streamline the process of delivering these services that are critical to our students continuing success. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? BTC’s Master Plan supports the strategic plan and institutional goals by including a proper facility to house Student Services. Remodel College Services Building $493,000 Location City: Bellingham County: Whatcom Legislative District: 042 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000752 SubProject Title: Bellingham Technical College Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 0 0 0 493,000 493,000 493,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000753 SubProject Title: Lake Washington Technical College 0 New Approps 0 0 0 493,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000753 SubProject Title: Lake Washington Technical College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The flooring at a number of locations within both the East and West buildings is failing due the age and heavy use. The materials originally installed in these class rooms, labs and hall ways has reached the end of its useful life. This has resulted in higher to maintain the flooring in areas and also creates a safety issue associated with trip hazards on area carpets. As noted by our local health inspector, the situation is also creating potentially unsanitary conditions, particularly in our Bakery Lab. For planning purposes, the College has been provided with estimates from Great Floors, a state contract flooring company. What happens if this project is not funded by the State? In the East and West Buildings at the Kirkland Campus, the ability to maintain a clean and sanitary learning environment will be made increasingly more difficult. The potential for slip and trip hazards and associated injury are also increased. The College will not be able to maintain a quality and aesthetically pleasing learning and work environment if the flooring situation is not addressed. What is the desired solution? The desired solution is to replace carpeting in the West Building corridors and in first floor classrooms. Carpet will also be replaced in classrooms on the second floor of the East Building. In the Bakery Lab, the vinyl flooring will be replaced. Will this project increase access or improve utilization? (Yes/No) No What benefit will this project provide the college? This project will enhance and improve the learning environment in the labs, classrooms and hallways of these portions of our East and West Buildings and restore these areas back to their original condition. This will also allow for effective maintenance of these areas for future years. This project will also improve safety by eliminating trip and slip hazards in these areas. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? One of the goals of the College’s Facilities Master Plan is to “create an aesthetic quality appropriate to the College as a whole and to specific areas, conserving and improving existing buildings”. The Master Plan goals also address the need to create safe and healthy environments. The Strategic Plan goals include maintaining a safe, secure, and supportive work climate. This project addresses these goals as outlined in the College’s master plan and strategic plan by enhancing our ability to provide a safe, sanitary and well maintained learning and working environment for our students, staff and faculty. West Building & East Building Flooring Improvements & Repairs $184,000 Location City: Kirkland Project Type Program (Minor Works) County: King Legislative District: 045 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000753 SubProject Title: Lake Washington Technical College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 184,000 184,000 184,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000754 SubProject Title: Renton Technical College 0 New Approps 0 0 0 184,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000754 SubProject Title: Renton Technical College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Building ‘I’ has several student services departments which have outgrown the facilities in which they have been located. Financial Aid cannot accommodate their daily student traffic, and the privacy of their clientele is therefore compromised. Counseling and Advising departments are not situated so as to facilitate efficient access, and they are difficult to find at all. A renovation project is necessary to address issues of poor access and circulation, way-finding, and inadequate privacy for issues regarding student confidentiality. What happens if this project is not funded by the State? Renton Technical College will continue to lose prospective students due to an inability to greet perspective students with a clear, easily understood, support services building organization. What is the desired solution? Renovate the 2nd floor so as to put the Advising and Counseling program as the first thing a prospective student will see, increase the access and space allocated for Financial Aid, consolidate restrooms and decrease some Bookstore shelving areas in order to increase available square footage. Will this project increase access or improve utilization? (Yes/No) No What benefit will this project provide the college? A newly renovated Campus Center will serve prospective and current students with better functioning support services spaces and will present an up to date appearance which will encourage enrollment and selection of RTC as a viable and modern institution. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The current Facilities Master Plan calls for a Campus Center Renovation and the renovation serves the institutional goals by making their programs and student support services functions more accessible and usable. Renovate 2nd Floor of Campus Center (Building I) $544,000 Location City: Renton Project Type Program (Minor Works) County: King Legislative District: 011 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000754 SubProject Title: Renton Technical College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 544,000 544,000 544,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000755 SubProject Title: Bates Technical College 0 New Approps 0 0 0 544,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000755 SubProject Title: Bates Technical College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works Program Project Description What is the problem? Why is this project necessary? Enrollment has risen significantly, and Bates Technical College has a shortage of academic classrooms for the amount of courses needed to serve its students. The Facilities Master Plan identifies academic classrooms as a “Major Growth” need, which is the category of highest priority. The project is necessary because it provides additional academic classrooms to help serve this highest-priority need. What happens if this project is not funded by the State? If this project is not funded, it would affect the college’s ability to provide access to academic classroom space for students, and impact the effectiveness of meeting its Master Plan, Strategic, and Institutional Goals. The shortage of classroom space at Bates would continue - the college would have to limit enrollment and limit courses provided to meet the needs of its students. What is the desired solution? The desired solution is to renovate approximately 1,800 square feet of existing space existing Building B at the South Campus. The space is currently vacant – until recently it served as an office suite for the Carpentry Apprenticeship program, who has vacated the site to locate their operations north of Tacoma. The renovation is planned to add two academic classrooms. The space is adjacent to a large vocational shop area with multiple programs that need additional classroom support, including electrical construction, carpentry, and welding. These “dual use” classrooms will be used by both the trade programs and general education programs that support career-training degrees. The project also includes providing an exterior door and walkway to an existing classroom, in order to provide access for general education purposes without the current need to circulate through an adjacent vocational shop. Will this project increase access or improve utilization? (Yes/No) Yes, improved building utilization through the facility improvements. What benefit will this project provide the college? The Renovation will provide many benefits: - Improve the ability of Bates to serve the academic needs of its students. - Re-purpose an existing under-utilized space currently not used for instructional purposes for instructional programs. - Provide academic classroom space in a desirable location - directly-accessible, on the first floor, adjacent to restrooms and parking. - Enhance the appearance of the campus facilities with a renovated area in an original South Campus building. - Provide energy savings with current energy code-compliant efficient systems. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The renovation will provide highly-needed classroom space that supports the facilities master plan, the strategic plan, and institutional goals. The Facilities Master Plan identifies academic classrooms a “Major Growth” projected need. The renovation is consistent with Master Plan Goal to “encourage efficiency and economy in College operations, with advantageous locations for facilities and advantageous adjacencies of uses.” Providing classroom space relates directly to several of the 2009-2014 Strategic Plan Goals, including to “provide physical resources that facilitate the success of the college community,” and to “implement improvements to provide an attractive 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects 30000755 SubProject Number: Bates Technical College SubProject Title: environment that is accessible, safe, secure, healthful, and environmentally and culturally sensitive.” This project also supports the Institutional Goal to “provide opportunities for students to satisfy diverse educational goals by offering competency-based education in career, academic, developmental and continuing education programs.” Renovate Building B for Classrooms $268,510 Location City: Tacoma County: Pierce Legislative District: 027 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 269,000 269,000 269,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000756 SubProject Title: Clover Park Technical College 0 New Approps 0 0 0 269,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000756 SubProject Title: Clover Park Technical College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The Student Services area in Building 17 is currently undersized, spaces are inefficiently organized, and interior finishes are worn and outdated. Furthermore, noise is an issue, with sound transmittance between lobby and Financial Aid space, causing privacy concerns. A remodel of this space is necessary to improve the overall appearance/environment of Student Services, improve the acoustics to address privacy concerns, and to improve the organization of spaces to better serve students. What happens if this project is not funded by the State? If this project is not funded, it would affect CPTC’s ability to provide the best access to Student Services, and impact the effectiveness of meeting its Strategic Goals (see below). What is the desired solution? Remodel the Student Services area to provide a more welcoming environment and improve the organization of services provided to students. This remodel will include re-locating the “Ask Me” center adjacent to the Information desk in a more visible and accessible location. Financial Aid will re-locate upstairs to provide expansion of spaces, a more secure location, and privacy for students seeking Financial Aide. Will this project increase access or improve utilization? (Yes/No) Yes. This project will increase access to Student Services, and potentially attract new students by providing a more welcoming environment. What benefit will this project provide the college? The remodel of Student Services will improve the accessibility of students seeking information, and improve the organizational flow of services. Further, this remodel will enhance the appearance, first impression and image of the College to new students and visitors to campus. Finishes will promote a warm, welcoming, timeless environment to attract new students. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? Student Services has been identified in the facilities Master Plan as an area requiring improvements/renovation. It relates directly to the Strategic Plan and institutional goals to “Create opportunities for student achievement and personal success” by improving the organization, efficacy and spaces for Student Services. It also meets CPTC’s Strategic goal to “Reframe Technical Education for the 21st Century” Objective 1 “Create a welcoming environment for students”. Student Services is often the first space that new students and visitors come to on campus. Remodeling this area with new interior finishes and warm colors will provide a welcoming environment to students and enhance the image of CPTC. Remodel Student Services area in Building 17 $688,000 Location City: Lakewood Project Type Program (Minor Works) County: Pierce Legislative District: 029 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000756 SubProject Title: Clover Park Technical College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 668,000 668,000 668,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000757 SubProject Title: Cascadia CC 0 New Approps 0 0 0 668,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000757 SubProject Title: Cascadia CC Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Now that CCC has been open for 11 years, there is a need for some changes in office configurations and the creation of additional classrooms. And, as technology continues to change, large, dedicated server rooms or media space can be re-purposed to other uses. These changes will result in a more efficient use of existing building space. What happens if this project is not funded by the State? Existing inefficiencies in space utilization will continue. What is the desired solution? We expect to utilize our existing buildings more efficiently and effectively by providing smaller classrooms and a variety of offices sizes. Will this project increase access or improve utilization? (Yes/No) Yes, 60 FTE increase in capacity What benefit will this project provide the college? The proposed remodeling will provide additional options and greater flexibility in the size of classrooms and the use of multi-person offices. It will make the scheduling of smaller classes more efficient. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The current master plan of this co-located campus calls for CCC to max at 4,000 FTE and UWB to max at 6,000 FTE. With our three dedicated buildings and some additional office and classroom space in shared buildings, we need to maximize the use of the space we have. This project will assist in that goal. Cascadia’s two core themes are: Learning-Centered Education and Collaboration. This project aligns with both core themes. Classroom and Office Conversions in CC1, CC2 and CC3 $200,000 Location City: Bothell County: King Legislative District: 001 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000757 SubProject Title: Cascadia CC Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 0 0 0 200,000 200,000 200,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000759 SubProject Title: Copy of Skagit Valley College 0 New Approps 0 0 0 200,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000759 SubProject Title: Copy of Skagit Valley College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The college’s Mount Vernon campus is spread out over 100 acres and does not have any wayfinding signage. Currently, wooden placards are placed around the campus in an effort to provide direction, but this system is inadequate and new students or visitors have difficulty in navigating the campus. The college funded development of a wayfinding/signage program and standards two years ago, but needs funds to implement the program. What happens if this project is not funded by the State? The project will have to be deferred. The college will continue to use the inadequate placards that are currently in use. What is the desired solution? Implement as much of the wayfinding program as is affordable. Signage will be manufactured and installed, including parking area identification, informational signs, en route direction and building identification. Will this project increase access or improve utilization? (Yes/No) N/A If yes, please specify the Net Change in FTE capacity. What benefit will this project provide the college? The plan is to get a person onto the campus and then through the campus to a destination building How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? This project is in line with all college plans and goals Campus Wayfinding $187,400 Location City: Mount Vernon County: Skagit Legislative District: 040 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000759 SubProject Title: Copy of Skagit Valley College Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 0 0 0 142,000 142,000 Funding 142,000 Estimated Total Account Title 060-1 Comm/Tech Cap Proj A-State 45,000 Total 45,000 Prior Biennium Current Biennium Reapprops 0 0 0 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total 0 0 0 0 Future Fiscal Periods 2015-17 060-1 2017-19 2019-21 2021-23 Comm/Tech Cap Proj A-State Total 0 Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000761 SubProject Title: Copy of South Seattle Community College New Approps 45,000 Future Fiscal Periods 2015-17 142,000 2013-15 Fiscal Period Expenditures Acct Code New Approps 0 0 0 45,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000761 SubProject Title: Copy of South Seattle Community College 2012 Program 5 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The Wine Academy is moving out of their location in the WWB building and this has created vacant space. This project is necessary to utilize this vacant space. What happens if this project is not funded by the State? The space vacated by the Wine Academy will remain vacant and unused. What is the desired solution? Renovate the space for classrooms and faculty offices. Will this project increase access or improve utilization? (Yes/No) No What benefit will this project provide the college? This will provide needed additional classroom space for the welding program as well as general classroom space for the college. It will also provide new faculty offices. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? There is a need for additional space for the welding program in order to meet the demand for welding workers. Part of the strategic plan is to respond to these types of training needs to supply qualified graduates to fill those positions. Wine Welding Building Renovations $535,800 Location City: Seattle County: King Legislative District: 034 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 2013-15 Fiscal Period Expenditures Funding Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 536,000 536,000 New Approps 536,000 536,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000761 SubProject Title: Copy of South Seattle Community College Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000763 SubProject Title: Copy of Bellevue Community College 0 0 0 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000763 SubProject Title: Copy of Bellevue Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? As the spaces have been repurposed over the past 40 years, existing HVAC infrastructure has become inadequate for this section of the B Building. The condition prohibits us from introducing new student services and using the space to its full potential. It has also contributed to recent indoor air quality issues. What happens if this project is not funded by the State? The space will continue to be underutilized and the college will continue to address air quality issues as they occur. There can be no further program growth in this area. And ultimately, some staff and student services may need to be relocated. What is the desired solution? Resize and upgrade existing RTUs and ducting in the north wing. Minor modifications to both roofing and structural supports will also be required to accommodate the new units and ducting. Will this project increase access or improve utilization? (Yes/No) Yes. If yes, please specify the Net Change in FTE capacity. 20 fte (student services staff) What benefit will this project provide the college? The measure will greatly improve student access to support services (advising, counseling, multicultural support, veterans affairs, and others) and will allow for expansion of these critical wrap-around services. The modifications will also create a healthier environment for roughly 70 staff. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? Bellevue College’s commitment to student services is prominent in the existing master plan, as is maintaining a healthy and safe environment. The facility is used daily in support of several strategic goals and initiatives including; teaching and learning excellence, college life and culture, and student success. Building B - North Wing HVAC / Roofing Modifications $410,000 Location City: Bellevue County: King Legislative District: 041 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000763 SubProject Title: Copy of Bellevue Community College Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 0 0 0 410,000 410,000 410,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000765 SubProject Title: Copy of Spokane Community College 0 New Approps 0 0 0 410,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000765 SubProject Title: Copy of Spokane Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The current bleachers are 42 years old and in disrepair. They have become a safety concern for the athletic department. The bleachers are designed to be pulled out in separate sections. When the five separate sections are pulled out, there are large gaps between the sections and between the individual rows. These gaps are wide enough to allow someone to step into the gap and injure themselves. Also, when set up, the bleachers are not secure or tight and they wobble as spectators are walking up and down to find seating. The railings on the ends of the bleachers are not adequate to prevent a small person or child from falling from a dangerous height. There are no wheelchair accessible seating areas in the bleachers. The wheels need to be replaced and replacement wheels are no longer available. The cost to retrofit the current bleachers would be more than the cost to replace. What happens if this project is not funded by the State? The college will continue to operate with unsafe bleachers in the largest auditorium on campus. What is the desired solution? Replace the current bleachers with a modern bleacher system. Will this project increase access or improve utilization? (Yes/No) Yes, improved utilization. What benefit will this project provide the college? The key benefits are safety and ADA seating. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The new bleachers will enable us to continue on the preventative/corrective maintenance path to ensure good stewardship of state resources as well as staying abreast of current ADA requirements. Replace Bleachers at Johnson Sports Center $147,000 Location City: Spokane County: Spokane Legislative District: 003 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000765 SubProject Title: Copy of Spokane Community College Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 0 0 0 147,000 147,000 147,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000767 SubProject Title: Copy of Spokane Community College 0 New Approps 0 0 0 147,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000767 SubProject Title: Copy of Spokane Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? Nothing has been done with the skylight since the building was built in the early 1970’s. The walls/ceiling are discolored from the skylight leaking. The ceiling finish contains asbestos and must be abated. What happens if this project is not funded by the State? Much funding has been put into improving all areas of the Lai building. The skylight area will continue to leak. Further water damage is a health and safety issue for students, staff, and public. What is the desired solution? The skylight needs to be replaced, and the walls surrounding the opening below must be remediated and repaired. Will this project increase access or improve utilization? (Yes/No) Yes, improved utilization. What benefit will this project provide the college? Improved environment for the student union building which is heavily used on a daily basis by the students, campus, and community events. We additionally generate revenue from renting space to community venues. Health and safety issue if the popcorn texture ceiling is not abated. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? This project will correct recurring deficiencies as well as remediate existing hazardous materials. This is a safety and health issue as well as major maintenance. Replace Lair Skylight $140,000 Location City: Spokane County: Spokane Legislative District: 003 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000767 SubProject Title: Copy of Spokane Community College Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 0 0 0 140,000 140,000 140,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000769 SubProject Title: Copy of Spokane Community College 0 New Approps 0 0 0 140,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000769 SubProject Title: Copy of Spokane Community College 2012 Program 5 Starting Fiscal Year: Project Class: Agency Priority: Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The cast iron boilers are original to the building and have reached the end of their service life. What happens if this project is not funded by the State? The boilers will continue to fail intermittently causing and un-stable learning environment as well as increasing operating costs. We will supplement the project with RMI funds if the minor capital amount is not sufficient. What is the desired solution? Replace the cast iron boilers with new high-efficiency boilers. Will this project increase access or improve utilization? (Yes/No) No. What benefit will this project provide the college? This will provide more consistent heating capacity for the building and reliability. The high-efficiency boilers are also more energy efficient to operate. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? This is in keeping with the policies of the District, College, and State regarding the maintenance and replacement of failed equipment. Replace Two Cast Iron Boilers in Learning Resource Center $81,000 Location City: Spokane County: Spokane Legislative District: 003 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 81,000 81,000 New Approps 81,000 81,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000769 SubProject Title: Copy of Spokane Community College Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State 0 Total 0 0 0 Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000771 SubProject Title: Copy of Spokane Community College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? There were no vestibules designed in the original project due to budget restraints, but there is still a great need for them. What happens if this project is not funded by the State? There will be a continual decline of comfort for students and faculty as well as increase in energy loss due to inefficient entries. What is the desired solution? Construct a new entry vestibule at the north and south entrance. Will this project increase access or improve utilization? (Yes/No) No. What benefit will this project provide the college? Greater energy savings, less heat/cooling loss, greater environmental comfort for students and faculty. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? By being more energy efficient, we continue our effort of being good stewards of the state’s resources. Construct Entry Vestibules for the Livingston Science Building $280,000 Location City: Spokane Project Type County: Spokane Legislative District: 003 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects Project Type 30000771 SubProject Number: Copy of Spokane Community College SubProject Title: Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title Estimated Total 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 280,000 280,000 280,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000773 SubProject Title: Copy of Cascadia CC 0 New Approps 0 0 0 280,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000773 SubProject Title: Copy of Cascadia CC Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? As part of the CC3 construction (building opened in January 2010), we designed a PV array for the roof of that building. The intent was to provide a direct resource for our Environmental Technologies and Sustainable Practices (ETSP) program, which offers classes in solar technology and a certificate program in renewable energy. The installation will provide on-site access to enable student assessment of solar panels and systems. What happens if this project is not funded by the State? Without the PV array program offerings in alternative energy production will be limited, and field trips to off-site resources can be costly and time-consuming. This would negatively impact the growing ETSP program and its feeder program from the Northshore school district. What is the desired solution? The purchase and installation of the already-designed PV array will provide an on-site resource for our ETSP and other science students as well as for the Northshore school district, which has a feeder program leading to the ETSP program. It will also fulfill the renewable energy credit for a LEED building and will connect to the Lucid Technology energy dashboard, providing solar information for students, employees and visitors to that building. Will this project increase access or improve utilization? (Yes/No) No direct FTE change; however project will improve program utilization and will help draw students. What benefit will this project provide the college? The PV array will provide an incredible resource for students in the solar progam at CCC, Northshore, and other neighboring institutions. It will also off-set traditional energy consumption in that building and contribute to our stated goals in carbon footprint reduction. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? The project helps to reduce energy consumption and utility costs as well as provide real-world experience to our students in preparing for “green-collar jobs.” The two core themes for Cascadia are Learning-Centered Education and Collaboration. This project supports both core themes. Energy Enhancements CC3 $210,000 State $215,000 Local $425,000 Total Location City: Bothell Project Type Program (Minor Works) County: King Legislative District: 001 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000773 SubProject Title: Copy of Cascadia CC Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium 210,000 210,000 Funding Account Title Estimated Total 147-6 HE Plant Accounts-Non-Appropriated 0 0 Total 0 Prior Biennium Current Biennium Reapprops 0 0 0 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total 0 0 0 0 Future Fiscal Periods 2015-17 147-6 2017-19 2019-21 2021-23 HE Plant Accounts-Non-Appropriated Total 0 Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000775 SubProject Title: Copy of Lake Washington Technical College New Approps 215,000 Future Fiscal Periods 2015-17 210,000 2013-15 Fiscal Period 215,000 215,000 New Approps 210,000 Expenditures Acct Code Reapprops 0 0 0 215,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000775 SubProject Title: Copy of Lake Washington Technical College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works - Program Project Description What is the problem? Why is this project necessary? The LWIT Safety and Security systems are not adequate to provide for the safety and security of our campuses, students, faculty and staff. The original security system installed in the East and West buildings is obsolete and no longer functioning properly. The Technology Center and Redmond Campus have no access control or video security systems installed. As part of the Allied Health Building project of 2011, the College purchased and installed both video surveillance and card access systems in the new building. Lake Washington is looking provide a greater level of security to the campuses through the implementation of building access control and video surveillance systems. What happens if this project is not funded by the State? Since Virginia Tech, there is an increased concern for additional security measures to be deployed to reduce the number of people at risk during violent acts on college campuses. This coupled with the general on-going need for public safety and the reduction of risk of theft and vandalism of college and private property. If this project is not funded, the College’s ability to provide adequate safety and security of students and employees, and the protection of College assets will be severely limited. This project is critical to providing a safe and quality learning environment. What is the desired solution? The College is planning to implement a phase in response to this problem. Phase I will be to extend access control systems o the majority of the buildings at both our Kirkland and Redmond Campuses. This will include card access readers and lock down functionality. Phase I will also include limited video security camera installations at our College “child care facility”. Future plans are to enhance lock down capabilities by segmenting facilities which will reduce the number of people at risk and to expand the video surveillance system. Will this project increase access or improve utilization? (Yes/No) No What benefit will this project provide the college? This project will significantly enhance the safety and security for students and employees. The project also improves property security and investigatory tools. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? One of the goals of the College’s Master Plan is to “Promote Safety” which is defined as creating a safe and healthy environment. The current Strategic Plan includes a goal to maintain a safe, secure and supportive work climate. This project addresses these goals by providing an adequate and proper level of safety and security on the Lake Washington campuses. Kirkland & Redmond Campus Safety & Security Improvements $312,000 Location City: Kirkland Project Type Program (Minor Works) County: King Legislative District: 045 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000775 SubProject Title: Copy of Lake Washington Technical College Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Estimated Total Account Title 057-1 State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 312,000 312,000 312,000 0 0 0 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. SubProject Number: 30000777 SubProject Title: Copy of Bates Technical College 0 New Approps 0 0 0 312,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000777 SubProject Title: Copy of Bates Technical College Starting Fiscal Year: Project Class: Agency Priority: 2012 Program 5 Project Summary Minor Works Program Project Description What is the problem? Why is this project necessary? The Fujitsu telephone system is outdated and has not been eligible for manufacturer maintenance support since 2001. The software version that resides on the system version has been upgraded by third party but still has interoperability problems. We have documented delayed voice messages in the system causing people to get messages that were important but were often too late. Limited service is available through very few select vendors. Our 911 calls are not being routed correctly due to software glitches. The System is very sluggish and interoperability with modern unified messaging is almost impossible. The system is not equipped to integrate with current Emergency Notification Systems. This project is absolutely necessary for the reliability and credibility of the telecommunication system at Bates Technical College. The current system due to age, inability to be supported and with limited scalability it is no longer a relevant system for today’s communication needs for the college. What happens if this project is not funded by the State? The Telephone system is aging and could fail beyond repair which will cause the Telecommunication System to be unavailable to the staff, faculty and students. This would cripple the college from functioning and be a cause for serious liability. We have been very fortunate that the Vendor is maintaining the system at an unavoidable high cost. What is the desired solution? We need to replace the Switch with a modern system that will support our education and business needs. I am recommending that we install a Server Based Telecommunication system which will integrate Voice, Data (email etc.) and Video Communication for a Unified Communication System. We also need to replicate services between campuses to facilitate redundancy and failover. Will this project increase access or improve utilization? (Yes/No) Yes it will improve utilization and efficiency. The system will be faster and also provide scalability to higher FTE capacity through the Data Network. What benefit will this project provide the college? With the new system the users can keep track of their contacts’ availability; send an IM; start or join an audio, video, or web conference; or make a phone call—all through a consistent, familiar interface. This can lead to improved productivity, increased mobility, and faster responses for customers, partners, and employees. Other benefits may include smoother deployment, easier management, and lower cost of ownership. The system will fully integrate with Microsoft Office which is used for all business and education applications on Campus. This will make it easy for users to create, moderate, and join pre-planned and on-the-fly audio, video, and web meetings with people inside and outside the organization. It will combine the telephony features of a traditional IP PBX with Instant Messaging and Conferencing to improve communication and lower costs. It will make communicating easier and more engaging by delivering a consistent experience across computers, browsers, telephones, and mobile phones.The college will not depend on a telephone system that has reached end of life and does not have adequate support. How does the project relate to the college facilities master plan, the strategic plan, and institutional goals? 5.3.3 Improve communication systems at the college to ensure students, staff and community members can get useful information quickly. December 2010. 5.3.4 Provide support for the College’s Emergency Management Plan. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000723 Project Title: Minor Works - Program SubProjects SubProject Number: 30000777 SubProject Title: Copy of Bates Technical College Replacement of PBX with VoIP Messaging System $426,490 Location City: Tacoma County: Pierce Legislative District: 027 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code Account Title 057-1 State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops 0 0 0 426,000 426,000 426,000 Future Fiscal Periods 2015-17 057-1 2017-19 2019-21 2021-23 State Bldg Constr-State Total Operating Impacts No Operating Impact Narrative No new square footage. 0 New Approps 0 0 0 426,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000734 Project Title: Minor Works - Program SubProjects Start Date End Date SubProject Number: 30000734 SubProject Title: Highline Community College Predesign Design 7/1/2013 12/1/2013 Construction 1/1/2014 6/1/2015 Total 1 Gross Square Feet: 1 Usable Square Feet: 100.0% Efficiency: 0 Escalated MACC Cost per Sq. Ft.: Construction Type: College Classroom Facilities Is this a remodel? Yes A/E Fee Class: B A/E Fee Percentage: 2.00% Acquisition Costs Total 3,300,000 100.0% Pre-Schematic Design Services 0 0.0% Construction Documents 0 0.0% Extra Services 0 0.0% Other Services 0 0.0% Design Services Contingency 0 0.0% 0 0.0% Site work 0 0.0% Related Project Costs 0 0.0% Facility Construction 0 0.0% GCCM Risk Contingency 0 0.0% GCCM or Design Build Costs 0 0.0% Construction Contingencies 0 0.0% Non Taxable Items 0 0.0% Sales Tax 0 0.0% 0 0.0% Equipment 0 0.0% Non Taxable Items 0 0.0% Sales Tax 0 0.0% Consultant Services Total Maximum Allowable Construction Cost(MACC) Construction Contracts Total 0 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000734 Project Title: Minor Works - Program SubProjects Escalated Cost % of Project 0 0.0% Art Work Total 0 0.0% Other Costs Total 0 0.0% Project Management Total 0 0.0% SubProject Number: 30000734 SubProject Title: Equipment Total Highline Community College Grand Total Escalated Costs 3,300,000 Rounded Grand Total Escalated Costs 3,300,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082702 Project Title: Bellevue Community College: Health Science Building Description Starting Fiscal Year: Project Class: Agency Priority: 2008 Program 6 Project Summary Bellevue Community College will construct a new 70,000 square foot facility that will house nursing, radiologic technology, radiation therapy, diagnostic ultrasound, alcohol and drug counseling, fire service, parent education, fitness/wellness, nuclear medicine, and medical informatics. Project Description The current demands in the Health Sciences are not being met because colleges cannot graduate enough students. Radiologic Technologists and Technicians in King County need 36 graduates per year with this expected to increase to 39 by 2010. BCC currently produces 25 graduates per year in this program and offers the only Radiologic Tech and Technician program in the state, with the remainder coming from out of state. There is also a much greater demand for nursing than all of the colleges in the state can graduate per year. All of the Health care programs are growing and have wait lists, and the demand for people in all of these fields is increasing almost monthly in the state. In order to be able to produce more graduates it is necessary to expand space so that offerings and capacity can be increased. To construct a 70,464 square-foot facility on the main campus that will house Nursing, Radiologic Technology, Radiation Therapy, Diagnostic Ultrasound, Nuclear Medicine and the advanced certificate in Medical Informatics. The college will then have the ability to expand these programs and graduate more students, particular in Nursing, Radiologic Technology, Radiation Therapy and Diagnostic Ultrasound. This will give these programs modern up to date facilities. BC will provide $2 million in Local Funds. Economic Analysis: This projects is expected to create 202 construction jobs and 205 indirect jobs for a total of 407 jobs during construction. The taxpayers net short-run investment is $18,300,000 dollars for a long-run return of $25,700,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Bellevue County: King Legislative District: 041 Project Type New Facilities/Additions (Major Projects) Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. No New Facility: How does this fit in master plan The project is a necessary part of the college's Master Plan The project went through a demanding selection process both on campus and at the system level where it had to compete with other projects in meeting both the State Board's Strategic Plan priorities and the State's larger educational objectives as reflected in the State's "Priorities of Government" to be included in the system capital budget request. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082702 Project Title: Bellevue Community College: Health Science Building Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 147-6 Estimated Total Account Title State Bldg Constr-State HE Plant Accounts-Non-Appropriated Total Prior Biennium Current Biennium New Approps Reapprops 35,404,000 2,000,000 2,840,000 44,000 170,000 32,350,000 2,000,000 37,404,000 2,840,000 44,000 170,000 34,350,000 Future Fiscal Periods 057-1 147-6 State Bldg Constr-State HE Plant Accounts-Non-Appropriated Total 2015-17 2017-19 2019-21 2021-23 0 0 0 0 Schedule and Statistics Start Date Predesign End Date 10/01/2007 07/01/2008 11/1/2009 4/1/2013 6/1/2013 1/1/2015 Design Construction Total Gross Square Feet: 70,464 Usable Square Feet: 43,258 Efficiency: 61.4% 357 Escalated MACC Cost per Sq. Ft.: Construction Type: Other Schedule A Projects Is this a remodel? No A/E Fee Class: A A/E Fee Percentage: 7.91% Cost Summary Acquisition Costs Total Consultant Services Pre-Schematic Design Services Escalated Cost % of Project 0 0.0% 187,000 0.5% 1,616,827 4.3% Extra Services 999,600 2.7% Other Services 1,466,683 3.9% Construction Documents Design Services Contingency Consultant Services Total 164,584 0.4% 4,434,694 11.9% 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082702 Project Title: Bellevue Community College: Health Science Building Cost Summary Maximum Allowable Construction Cost(MACC) Site work Related Project Costs Facility Construction Escalated Cost % of Project 2,629,018 7.0% 729,250 2.0% 25,125,534 21,767,266 58.2% GCCM Risk Contingency 0 0.0% GCCM or Design Build Costs 0 0.0% 2,520,515 6.7% 0 0.0% Construction Contingencies Non Taxable Items Sales Tax 2,626,374 7.0% 30,272,423 80.9% 1,954,632 5.2% 0 0.0% 185,690 0.5% 2,140,322 5.7% Art Work Total 125,628 0.3% Other Costs Total 300,933 0.8% Project Management Total 130,000 0.4% Construction Contracts Total Equipment Equipment Non Taxable Items Sales Tax Equipment Total Grand Total Escalated Costs 37,404,000 Rounded Grand Total Escalated Costs 37,404,000 Operating Impacts Total one time start up and ongoing operating costs Acct Code FTE 001-1 FY 2015 FY 2016 FY 2017 Full Time Employee 1.5 2.5 2.5 General Fund-State 236,664 473,328 473,328 236,664 473,328 473,328 Account Title Total Narrative M & O is requested in the system operating budget as detailed in the "Operating Impacts" module. The basis for the M & O request is a maintenance cost assumption of $6.54/gsf in FY14 and $6.70/gsf in FY15 and after. The FTE assumptions are college specific, reflecting the college's staffing requirements for maintenance and custodial services for the new space. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082703 Project Title: Bates Technical College: Mohler Communications Technology Center Description Starting Fiscal Year: Project Class: Agency Priority: 2008 Program 12 Project Summary Bates Technical College has completed design for construction of a 51,959 square foot building on the Mohler Campus to house all of its communications technology programs. Project Description Bates is one of only two technical colleges in the nation offering a full-time communication technology program where students learn their skills during actual on-air operation of a broadcast station. Bates and the College's PBS television station, KBTC-TV, have been designated to deliver community and technical colleges Tele-course programming to the 34 colleges in the State’s community and technical college system. Communications Technology programs are currently located in temporary locations. Area is needed on the Downtown campus for growing programs. Currently the Communications Technology Campus lacks academic and student support services. A new 47,099 gross square foot facility at the 19th Street Communications Technology Campus was included in the 2009-11 capital budget request for design funding. This expansion will provide space for the Audio/Sound Technology, Broadcast Production Technologies, Broadcast Technologist and the Electronic Equipment Service Technology, components of the Communications Technology Program Cluster. The 47,099 gross square foot Communications Technology Facility that was scoped in the 2008 PreDesign Report had included the Electronic & Bio-Medical Equipment Service Technology program. During the Design phase, this program was replaced in the new facility design with the Advanced Technologies Program Cluster, which includes Electrical Power / Process & Automation, Electronics Technician, Wireless Voice & Data Communications, Computer Networking Systems Technician, and Information Technology. This revision added 4,860 gross square feet to the facility to a current total of 51,959. Value-improvement measures were implemented during the Design phase to offset this increase. This project will vacate space needed to accommodate expansion of other growing programs (including Office Occupations, Computer Programming, and Nursing). This project also provides needed academic and student support services such as a new Library, counselor and faculty offices, Distance Learning facilities, open computer lab and student study areas. Economic Analysis: This projects is expected to create 159 construction jobs and 161 indirect jobs for a total of 321 jobs during construction. The taxpayers net short-run investment is $14,400,000 dollars for a long-run return of $20,300,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Tacoma Project Type New Facilities/Additions (Major Projects) County: Pierce Legislative District: 027 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082703 Project Title: Bates Technical College: Mohler Communications Technology Center Description Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. No New Facility: How does this fit in master plan The project is a necessary part of the college's Master Plan The project went through a demanding selection process both on campus and at the system level where it had to compete with other projects in meeting both the State Board's Strategic Plan priorities and the State's larger educational objectives as reflected in the State's "Priorities of Government" to be included in the system capital budget request. Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Estimated Total Account Title State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops New Approps 28,968,000 1,601,000 108,000 219,000 27,040,000 28,968,000 1,601,000 108,000 219,000 27,040,000 Future Fiscal Periods 057-1 State Bldg Constr-State Total 2015-17 2017-19 2019-21 2021-23 0 0 0 0 Schedule and Statistics Start Date End Date 07/01/2007 07/01/2008 Design 7/1/2009 3/1/2013 Construction 6/1/2013 8/1/2014 Predesign Total Gross Square Feet: 51,959 Usable Square Feet: 35,332 Efficiency: 68.0% 394 Escalated MACC Cost per Sq. Ft.: Construction Type: College Classroom Facilities Is this a remodel? No A/E Fee Class: B A/E Fee Percentage: 7.02% Cost Summary Escalated Cost % of Project 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082703 Project Title: Bates Technical College: Mohler Communications Technology Center Cost Summary Escalated Cost % of Project 0 0.0% 165,000 0.6% 991,206 3.4% Extra Services 1,007,000 3.5% Other Services 610,029 2.1% Design Services Contingency 166,311 0.6% 2,939,546 10.2% 2,607,085 9.0% 0 0.0% Acquisition Costs Total Consultant Services Pre-Schematic Design Services Construction Documents Consultant Services Total Maximum Allowable Construction Cost(MACC) Site work Related Project Costs Facility Construction 20,463,399 17,856,314 61.6% GCCM Risk Contingency 0 0.0% GCCM or Design Build Costs 0 0.0% 1,992,327 6.9% 0 0.0% Construction Contingencies Non Taxable Items Sales Tax Construction Contracts Total Equipment Equipment Non Taxable Items Sales Tax 2,133,294 7.4% 24,589,020 84.9% 1,071,637 3.7% 0 0.0% 101,806 0.4% 1,173,443 4.1% 102,317 0.4% Other Costs Total 89,035 0.3% Project Management Total 75,000 0.3% Equipment Total Art Work Total Grand Total Escalated Costs 28,968,361 Rounded Grand Total Escalated Costs 28,968,000 Operating Impacts Total one time start up and ongoing operating costs 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082703 Project Title: Bates Technical College: Mohler Communications Technology Center Operating Impacts Acct Code Account Title FY 2015 FY 2016 FY 2017 FTE Full Time Employee 3.0 3.0 3.0 001-1 General Fund-State 88,790 355,160 355,160 88,790 355,160 355,160 Total Narrative M & O will be requested in the system operating budget as detailed in the "Operating Impacts" module. The basis for the M & O request is a maintenance cost assumption of $6.54/gsf in FY14 and $6.70/gsf in FY15 and after. The FTE assumptions are college specific, reflecting the college's staffing requirements for maintenance and custodial services for the new space. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082704 Project Title: Columbia Basin College: Social Science Center Description Starting Fiscal Year: Project Class: Agency Priority: 2008 Program 13 Project Summary Columbia Basin College will prepare a predesign for construction of a new 51,335 square foot building for the Culture, Language, and Social Sciences program. This facility also will house the basic skills program and allow for the co-located and collaboration of other programs. Classrooms and class/lab space will be specifically designed to meet program needs. Project Description Columbia Basin College provides an outstanding curriculum of Culture, Language, and Social Studies. The program is becoming more critical to the mission of the College in light of a recent agreement with WSU Tri-Cities to offer a coordinated Bachelor Degree program. Unfortunately, the existing facilities cannot support continued excellence. The dispersed location of the program elements, and facilities not designed to meet the programs’ specific requirements contribute to potential disruption of essential needs. CBC has also seen a major shift in demographics, a dramatic population growth, and a revision of teaching theory and practice. CBC must provide sufficient classroom and faculty space, designed specifically for the appropriate programs, to meet even basic needs to provide for quality education in the next ten years, and beyond. CBC proposes a new 51,335-sq ft building to provide a single location for the Culture, Language, and Social Sciences program, providing for current needs and projected growth. Faculty currently scattered across the campus will be located in a collaborative setting. Classrooms and class/lab space will be specifically designed to meet program need and fill critical shortages. After Social Science moves out of the Library building, critically needed library expansion can back fill into the space created. Program needs for formal and informal space for student and faculty interaction will intermix with office and class space. As a campus committed to diversity, our classrooms must reflect that element. New classroom space will provide the opportunity for many of the disciplines to have rooms that have displays or other interpretive materials that will immerse the student into the different ideas and thought processes that characterize the particular discipline. This project is a cost-effective investment to serve an increasingly diverse, yet underserved student population. Economic Analysis: This projects is expected to create 7 construction jobs and 7 indirect jobs for a total of 15 jobs during construction. The taxpayers net short-run investment is $700,000 dollars for a long-run return of $900,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Pasco Project Type New Facilities/Additions (Major Projects) County: Franklin Legislative District: 016 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082704 Project Title: Columbia Basin College: Social Science Center Description Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. No New Facility: How does this fit in master plan The project is a necessary part of the college's Master Plan The project went through a demanding selection process both on campus and at the system level where it had to compete with other projects in meeting both the State Board's Strategic Plan priorities and the State's larger educational objectives as reflected in the State's "Priorities of Government" to be included in the system capital budget request. Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Estimated Total Account Title State Bldg Constr-State Total Prior Biennium 16,117,000 109,000 16,117,000 109,000 Current Biennium Reapprops 1,250,000 0 0 2017-19 2019-21 2021-23 0 0 0 Future Fiscal Periods 2015-17 057-1 14,758,000 State Bldg Constr-State Total 14,758,000 Schedule and Statistics Start Date End Date 07/01/2007 06/01/2011 Design 6/1/2013 5/1/2014 Construction 6/1/2014 8/1/2015 Predesign Total Gross Square Feet: 51,335 Usable Square Feet: 34,845 Efficiency: 67.9% 210 Escalated MACC Cost per Sq. Ft.: Construction Type: Varies Is this a remodel? Varies A/E Fee Class: B A/E Fee Percentage: Varies New Approps Cost Summary Escalated Cost % of Project 1,250,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082704 Project Title: Columbia Basin College: Social Science Center Cost Summary Acquisition Costs Total Consultant Services Pre-Schematic Design Services Escalated Cost % of Project 0 0.0% 114,333 0.7% Construction Documents 625,045 3.9% Extra Services 404,411 2.5% Other Services 420,975 2.6% Design Services Contingency 160,053 1.0% 1,724,817 10.7% 416,021 2.6% 0 0.0% Consultant Services Total Maximum Allowable Construction Cost(MACC) Site work Related Project Costs Facility Construction 10,767,726 10,351,705 64.2% GCCM Risk Contingency 0 0.0% GCCM or Design Build Costs 0 0.0% 1,468,928 9.1% 0 0.0% Construction Contingencies Non Taxable Items Sales Tax Construction Contracts Total Equipment Equipment Non Taxable Items Sales Tax Equipment Total Art Work Total Other Costs Total Project Management Total 1,052,353 6.5% 13,289,007 82.5% 827,700 5.1% 0 0.0% 71,182 0.4% 898,882 5.6% 53,839 0.3% 0 0.0% 150,000 0.9% Grand Total Escalated Costs 16,116,545 Rounded Grand Total Escalated Costs 16,117,000 Operating Impacts Total one time start up and ongoing operating costs 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082704 Project Title: Columbia Basin College: Social Science Center Operating Impacts Acct Code Account Title FY 2016 FY 2017 FY 2018 FY 2019 FTE Full Time Employee 1.5 1.5 1.5 1.5 001-1 General Fund-State 314,813 343,945 343,945 343,945 314,813 343,945 343,945 343,945 Total Narrative M & O will be requested in the system operating budget as detailed in the "Operating Impacts" module. The basis for the M & O request is a maintenance cost assumption of $6.54/gsf in FY14 and $6.70/gsf in FY15 and after. The FTE assumptions are college specific, reflecting the college's staffing requirements for maintenance and custodial services for the new space. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082705 Project Title: Clark College: Health and Advanced Technologies Building Description Starting Fiscal Year: Project Class: Agency Priority: 2008 Program 16 Project Summary Clark College will prepare a design for construction of a 69,925 square foot Health and Advanced Technologies Building (currently called the STEM (Science Technology Engineering and Math) Building) on the west campus expansion property. The building will contain classrooms, science labs, computer labs, professional and technical training labs, faculty offices, and support space. This facility will provide space to house high demand programs in the health, science, and advanced technology fields. Project Description Clark's service district has experienced a steady growth of 2.5-5% over the past 20 years. The population in Clark County has increased 62% over the past 15 years. OFM projections indicate that Clark County could reach a population of 534,000 by 2020. Student enrollment has grown steadily over the past 10 years with a current student headcount exceeding 20,000. The 30% enrollment growth rate over the past five years has been so significant that the College’s facilities are fully utilized and there is a shortage of space to both serve current students and expand enrollment, especially in high demand programs. Furthermore, Clark's fiscal support has not kept pace with the increase in population and as a result Clark's service funding level is below the state average for community colleges. Clark College's goal is to increase its level of service to match the state average level by 2020. The College proposes to construct a 69,925 square foot Health and Advanced Technologies Building (currently called the STEM (Science Technology Engineering and Math) Building) on the west campus expansion property. The proposed new building would contain classrooms, science labs, computer lab, professional and technical training labs, faculty offices and support space. The completion of this project would expand enrollment capacity by 882 FTES and provide suitable facilities to house high demand programs especially in the health, science, and advanced technology field. Economic Analysis: This projects is expected to create 227 construction jobs and 230 indirect jobs for a total of 456 jobs during construction. The taxpayers net short-run investment is $20,500,000 dollars for a long-run return of $28,800,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Vancouver Project Type New Facilities/Additions (Major Projects) County: Clark Legislative District: 049 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082705 Project Title: Clark College: Health and Advanced Technologies Building Description Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. No New Facility: How does this fit in master plan The project is a necessary part of the college's Master Plan The project went through a demanding selection process both on campus and at the system level where it had to compete with other projects in meeting both the State Board's Strategic Plan priorities and the State's larger educational objectives as reflected in the State's "Priorities of Government" to be included in the system capital budget request. Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Estimated Total Account Title State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops New Approps 41,061,000 633,000 441,000 1,500,000 38,487,000 41,061,000 633,000 441,000 1,500,000 38,487,000 Future Fiscal Periods 057-1 2015-17 2017-19 2019-21 2021-23 0 0 0 0 State Bldg Constr-State Total Schedule and Statistics Start Date End Date 09/01/2007 06/01/2008 Design 7/1/2009 3/1/2013 Construction 6/1/2013 6/1/2015 Predesign Total Gross Square Feet: 69,925 Usable Square Feet: 41,798 Efficiency: 59.8% 389 Escalated MACC Cost per Sq. Ft.: Construction Type: Science Labs (teaching) Is this a remodel? No A/E Fee Class: B A/E Fee Percentage: 6.69% Cost Summary Escalated Cost % of Project 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082705 Project Title: Clark College: Health and Advanced Technologies Building Cost Summary Acquisition Costs Total Consultant Services Pre-Schematic Design Services Escalated Cost % of Project 0 0.0% 350,000 0.9% Construction Documents 1,256,699 3.1% Extra Services 1,217,550 3.0% Other Services 913,449 2.2% Design Services Contingency 249,059 0.6% 3,986,757 9.7% 2,779,131 6.8% 494,957 1.2% Consultant Services Total Maximum Allowable Construction Cost(MACC) Site work Related Project Costs Facility Construction 27,224,264 23,950,176 58.3% GCCM Risk Contingency 0 0.0% GCCM or Design Build Costs 0 0.0% 2,732,251 6.7% 0 0.0% Construction Contingencies Non Taxable Items Sales Tax Construction Contracts Total Equipment Equipment Non Taxable Items Sales Tax Equipment Total Art Work Total Other Costs Total Project Management Total 2,516,348 6.1% 32,472,863 79.1% 2,820,220 6.9% 0 0.0% 236,898 0.6% 3,057,118 7.5% 136,121 0.3% 1,088,111 2.7% 320,200 0.8% Grand Total Escalated Costs 41,061,170 Rounded Grand Total Escalated Costs 41,061,000 Operating Impacts Total one time start up and ongoing operating costs 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 20082705 Project Title: Clark College: Health and Advanced Technologies Building Operating Impacts Acct Code Account Title FY 2015 FY 2016 FY 2017 FY 2018 FTE Full Time Employee 1.5 1.5 1.5 1.5 001-1 General Fund-State 39,083 469,000 469,000 469,000 39,083 469,000 469,000 469,000 Total Narrative M & O will be requested in the system operating budget as detailed in the "Operating Impacts" module. The basis for the M & O request is a maintenance cost assumption of $6.54/gsf in FY14 and $6.70/gsf in FY15 and after. The FTE assumptions are college specific, reflecting the college's staffing requirements for maintenance and custodial services for the new space. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000137 Project Title: Edmonds Community College: Science Engineering Technology Bldg Description Starting Fiscal Year: Project Class: Agency Priority: 2010 Program 18 Project Summary Construct a new Science, Engineering and Technology building. Project Description Edmonds Community College's mission is to be "a leader in providing quality opportunities for learning and service, responding to the dynamic needs of our diverse community." Snohomish County 2010: A Blueprint for Education, Workforce and Economic Development in Snohomish County (2003) indicates that the county's future health depends on an educational system that, among other things, "...stays current in new technologies and research". Working closely with university and industry partners, EdCC plays a key role in growing Snohomish County's educated workforce in cutting edge areas such as engineering, biotechnology, computer science, and chemistry, as well as helping to meet the ever growing demand for allied health, nursing, and occupational safety and health professionals. In addition, critical need already exists and is expected to increase for highly qualified teachers in mathematics and the sciences. We will construct a Science, Engineering and Technology (SET) building that will be suitable in design and capacity to meet the current and future growth needs of our allied health, engineering, materials science, mathematics and natural sciences, construction management, occupational safety and health technician and construction trades programs, as well as providing suitable space for our Information Technology department, multi-use classroom space, and much needed faculty office space. To maximize its usefulness, the building will be designed to accomodate all of these programs with their expected growth while remaining flexible to adapt to the changing needs of other campus programs as well. This building will greatly enhance our ability to achieve our strategic mission and goals, by providing our students with the following: up-to-date, specialized lab and flexible facilities; student study and faculty office space; a building design that promotes interdisciplinary cooperation, shared resources, and information sharing. Economic Analysis: This projects is expected to create 49 construction jobs and 49 indirect jobs for a total of 98 jobs during construction. The taxpayers net short-run investment is $4,400,000 dollars for a long-run return of $6,200,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Lynnwood Project Type New Facilities/Additions (Major Projects) County: Snohomish Legislative District: 032 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000137 Project Title: Edmonds Community College: Science Engineering Technology Bldg Description Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. Yes New Facility: How does this fit in master plan Projects are scored and selected based on criteria that include conformance with the College’s Strategic and Facility Master Plan. This project represents the most critical needs of the individual college and is detailed in the PRR and Predesign documents transmitted to OFM capital staff and Legislative Fiscal Committee staff. The project further supports the statewide System Direction adopted by the State Board and represents the highest priority across the state’s 34 Community and Technical Colleges. The individual master plans and system direction are available for review in the State Board Office along with additional copies of PRRs and Predesign documents. Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Estimated Total Account Title State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 42,273,000 8,291,000 42,273,000 0 0 0 2017-19 2019-21 2021-23 0 0 0 Future Fiscal Periods 2015-17 057-1 33,982,000 State Bldg Constr-State Total 33,982,000 Schedule and Statistics Start Date End Date 05/01/2013 12/01/2013 Design 7/1/2014 12/1/2015 Construction 7/1/2015 5/1/2017 Predesign Total Gross Square Feet: 69,910 Usable Square Feet: 45,490 Efficiency: 65.1% 330 Escalated MACC Cost per Sq. Ft.: Construction Type: Science Labs (teaching) Is this a remodel? No A/E Fee Class: B A/E Fee Percentage: 6.88% New Approps 8,291,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000137 Project Title: Edmonds Community College: Science Engineering Technology Bldg Cost Summary Acquisition Costs Total Consultant Services Pre-Schematic Design Services Escalated Cost % of Project 5,200,000 12.3% 365,592 0.9% Construction Documents 1,096,413 2.6% Extra Services 1,381,150 3.3% Other Services 1,145,491 2.7% 376,505 0.9% 4,365,151 10.3% Site work 1,794,445 4.2% Related Project Costs 1,128,338 2.7% Design Services Contingency Consultant Services Total Maximum Allowable Construction Cost(MACC) Facility Construction 23,095,993 20,173,210 47.7% GCCM Risk Contingency 0 0.0% GCCM or Design Build Costs 0 0.0% 3,476,435 8.2% 0 0.0% Construction Contingencies Non Taxable Items Sales Tax Construction Contracts Total Equipment Equipment Non Taxable Items Sales Tax 2,524,380 6.0% 29,096,808 68.8% 2,588,665 6.1% 0 0.0% 245,923 0.6% 2,834,588 6.7% Art Work Total 115,480 0.3% Other Costs Total 511,408 1.2% Project Management Total 150,000 0.4% Equipment Total Grand Total Escalated Costs 42,273,435 Rounded Grand Total Escalated Costs 42,273,000 Operating Impacts Total one time start up and ongoing operating costs 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000137 Project Title: Edmonds Community College: Science Engineering Technology Bldg Operating Impacts Acct Code Account Title FY 2017 FY 2018 FY 2019 FTE Full Time Employee 3.0 3.0 3.0 001-1 General Fund-State 78,280 468,397 468,397 78,280 468,397 468,397 Total Narrative M & O will be requested in the system operating budget as detailed in the "Operating Impacts" module. The basis for the M & O request is a maintenance cost assumption of $6.54/gsf in FY14 and $6.70/gsf in FY15 and after. The FTE assumptions are college specific, reflecting the college's staffing requirements for maintenance and custodial services for the new space. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000138 Project Title: Whatcom Community College: Learning Commons Description Starting Fiscal Year: Project Class: Agency Priority: 2010 Program 19 Project Summary Construct a new 70,000 gsf Learning Commons Project Description Whatcom Community College faces three major challenges: a) Basic academic support services are in critical need of additional instructional and study spaces, properly integrated with technology and information services, to accommodate growing demand. b) By 2016, enrollment demand will reach over 4,750 FTE (all sources). Whatcom will be short 1,037 student seats - facing critical shortages for basic skills, library, faculty offices and general classroom space. c) Whatcom is currently not able to meet the needs of tomorrow’s learners with a flexible, collaborative, diverse, digital, interactive, and on-demand learning environment. Strategic planning has identified the Learning Commons as an effective response to the College’s challenges in meeting increased student enrollment and access to services while maximizing existing campus infrastructure and supporting new learning. The Learning Commons will be a two story, 69,210 SF facility designed to: a) Provide dynamic space for academic support services. Basic academic support services, such as tutoring, and math and writing centers, will be integrated with library resources in a flexible learning environment. b) Provide the space needed to accommodate projected FTE. The Learning Commons will serve 816 new FTE by supporting Whatcom’s strategic commitment to eLearning. In addition, the spaces vacated by existing programs will be remodeled (in a project not included in this proposal) into classroom and lab spaces serving an additional 408 FTE. c) Embrace modern learning and teaching methods by integrating technology throughout the learning environment and providing flexible support and study spaces in an on-demand environment (face-to-face and 24/7 eLearning support). Economic Analysis: This projects is expected to create 13 construction jobs and 13 indirect jobs for a total of 25 jobs during construction. The taxpayers net short-run investment is $1,100,000 dollars for a long-run return of $1,600,000. These results demonstrate that Washington's community and technical colleges are a sound investment from multiple perspectives. The colleges enrich the lives of students and increase their lifetime incomes. They benefit taxpayers by generating increased tax revenues from an enlarged economy and reducing the demand for taxpayer-supported social services. Finally, they contribute to the vitality of the state and local economies. Location City: Bellingham Project Type New Facilities/Additions (Major Projects) County: Whatcom Legislative District: 042 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000138 Project Title: Whatcom Community College: Learning Commons Description Growth Management impacts No significant issues are anticipated as the development of the proposed project is in compliance with all major requirements. Yes New Facility: How does this fit in master plan Projects are scored and selected based on criteria that include conformance with the College’s Strategic and Facility Master Plan. This project represents the most critical needs of the individual college and is detailed in the PRR and Predesign documents transmitted to OFM capital staff and Legislative Fiscal Committee staff. The project further supports the statewide System Direction adopted by the State Board and represents the highest priority across the state’s 34 Community and Technical Colleges. The individual master plans and system direction are available for review in the State Board Office along with additional copies of PRRs and Predesign documents. Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Estimated Total Account Title State Bldg Constr-State Total Prior Biennium Current Biennium Reapprops 31,929,000 2,127,000 31,929,000 0 0 0 2017-19 2019-21 2021-23 0 0 0 Future Fiscal Periods 2015-17 057-1 29,802,000 State Bldg Constr-State Total 29,802,000 Schedule and Statistics Start Date 05/01/2013 Predesign End Date 12/01/2013 Design 1/1/2014 5/1/2015 Construction 6/1/2015 10/1/2016 Total Gross Square Feet: 69,210 Usable Square Feet: 57,675 Efficiency: 83.3% 309 Escalated MACC Cost per Sq. Ft.: Construction Type: Libraries Is this a remodel? No A/E Fee Class: B A/E Fee Percentage: 6.97% New Approps 2,127,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000138 Project Title: Whatcom Community College: Learning Commons Cost Summary Acquisition Costs Total Consultant Services Pre-Schematic Design Services Escalated Cost % of Project 125,000 0.4% 110,973 0.4% 1,029,637 3.2% Extra Services 684,306 2.1% Other Services 582,366 1.8% Design Services Contingency 267,414 0.8% 2,674,697 8.4% 1,098,834 3.4% 0 0.0% Construction Documents Consultant Services Total Maximum Allowable Construction Cost(MACC) Site work Related Project Costs Facility Construction 21,409,283 20,310,449 63.6% GCCM Risk Contingency 0 0.0% GCCM or Design Build Costs 0 0.0% 3,214,686 10.1% 0 0.0% Construction Contingencies Non Taxable Items Sales Tax Construction Contracts Total Equipment Equipment Non Taxable Items Sales Tax 2,142,286 6.7% 26,766,255 83.8% 1,684,350 5.3% 0 0.0% 146,538 0.5% 1,830,888 5.7% Art Work Total 107,046 0.3% Other Costs Total 275,225 0.9% Project Management Total 150,000 0.5% Equipment Total Grand Total Escalated Costs 31,929,111 Rounded Grand Total Escalated Costs 31,929,000 Operating Impacts Total one time start up and ongoing operating costs 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000138 Project Title: Whatcom Community College: Learning Commons Operating Impacts Acct Code Account Title FY 2017 FY 2018 FY 2019 FTE Full Time Employee 1.5 1.5 1.5 001-1 General Fund-State 346,827 463,707 463,707 346,827 463,707 463,707 Total Narrative M & O will be requested in the system operating budget as detailed in the "Operating Impacts" module. The basis for the M & O request is a maintenance cost assumption of $6.54/gsf in FY14 and $6.70/gsf in FY15 and after. The FTE assumptions are college specific, reflecting the college's staffing requirements for maintenance and custodial services for the new space. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000673 Project Title: Future Major Program Projects Description Starting Fiscal Year: Project Class: Agency Priority: 2014 Program 999 Project Summary Future Major Program Projects Project Description Future Major Program Projects Location City: Statewide County: Statewide Legislative District: 098 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project will be in compliance with all major requirements. New Facility: No Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 Account Title State Bldg Constr-State Total Estimated Total Prior Biennium Current Biennium Reapprops New Approps 0 0 0 627,863,000 627,863,000 0 Future Fiscal Periods 057-1 State Bldg Constr-State Total 2015-17 2017-19 2019-21 2021-23 71,113,000 174,900,000 185,350,000 196,500,000 71,113,000 174,900,000 185,350,000 196,500,000 Operating Impacts No Operating Impact Narrative Operating impacts will be identified when the specific projects are requested. 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000506 Project Title: Future Minor Works - Program Description Starting Fiscal Year: Project Class: Agency Priority: 2014 Program 999 Project Summary Future Minor Works - Program Project Description Every community and technical college has serious facility conditions, lacks space and needs to renovate or upgrade program areas. These minor works projects are needed to keep space relevant for student needs, meet changing program requirements and upgrade equipment to provide an adequate educational environment. Location City: Statewide County: Statewide Legislative District: 098 Project Type Program (Minor Works) Growth Management impacts No significant issues are anticipated as the development of the proposed project will be in compliance with all major requirements. No New Facility: How does this fit in master plan N/A Funding 2013-15 Fiscal Period Expenditures Acct Code 057-1 060-1 Account Title State Bldg Constr-State Comm/Tech Cap Proj A-State Total Estimated Total Prior Biennium Current Biennium Reapprops New Approps 0 0 91,200,000 15,200,000 106,400,000 0 0 Future Fiscal Periods 057-1 060-1 State Bldg Constr-State Comm/Tech Cap Proj A-State Total Operating Impacts No Operating Impact 2015-17 2017-19 2019-21 2021-23 22,800,000 1,500,000 22,800,000 3,000,000 22,800,000 4,500,000 22,800,000 6,200,000 24,300,000 25,800,000 27,300,000 29,000,000 699 - Community and Technical College System OFM Capital Project Request 2013-15 Biennium Version: S1 SBCTC 2013-15 Request Report Number: CBS002 Date Run: 9/6/2012 3:32PM Project Number: 30000506 Project Title: Future Minor Works - Program Operating Impacts Narrative No new square footage. Parameter Entered As Interpreted As Biennium 2013-15 2013-15 Agency 699 699 Version S1-A S1-A Project Classification 2 2 Capital Project Number * All Project Numbers Sort Order Priority Priority Include Page Numbers Y Yes For Word or Excel User Group Y Agency Budget Y Agency Budget User Id * All User Ids